This document is a Justification and Approval (J&A) for Other Than Full and Open Competition to award a sole source contract to Pierce Manufacturing, Inc. for the supply of repair parts for Pierce fire pumper and ladder trucks assigned to the Marine Corps Installations Pacific (MCIPAC) Camp Butler and CATC Camp Fuji Fire Departments.
The contract will be for a 5-year period from July 1, 2024 to June 30, 2029, with a total estimated value of $700,000. Pierce Manufacturing, Inc. is the sole source provider of these proprietary parts, as they are the original manufacturer of the vehicles. There are no other compatible parts available, and the company does not offer this direct purchase option to non-government customers. The Contracting Officer will determine the price to be fair and reasonable during the evaluation for award.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
U N I T E D S T A T E S M A R I N E C O R P S
REGIONAL CONTRACTING OFFICE
MARINE CORPS INSTALLATIONS PACIFIC-MCB CAMP BUTLER
PSC 557, BOX 2000
FPO AP 96373-2000
JUSTIFICATION AND APPROVAL FOR
USE OF OTHER THAN FULL AND OPEN COMPETITION
J&A No. M67400-24-SSBN-03
1. Agency and Contracting Activity:
Garrison Mobile Equipment (GME) Regional Contracting Office (RCO) Unit 35001 MCIPAC-MCB Camp Butler
FPO AP 96373-5001 FPO AP 96373-2000
2. Description of Action Being Approved.
Request approval to use other than full and open competition to award a Firm-Fixed Price contract for name brand vehicle repair parts for Pierce Fire pumper and Ladder trucks assigned to the Marine Corps Installation Pacific (MCIPAC) Camp Butler and CATC Camp Fuji Fire Departments. The contract includes provisions for the fire pumper and ladder truck parts to be shipped from the original manufacturer's facility, door to door to the Camp Butler and Camp Fuji Garrison Mobile Equipment (GME) Branches.
3. Description of Supplies/Services.
Pierce Manufacturing, Inc. is required to provide new, rebuilt, or refurbished parts for Pierce manufactured vehicle parts to be delivered to the GME Branches on Camp Butler, Okinawa and CATC Camp Fuji, Shizuoka, Japan to support normal operations of Pierce manufactured vehicles maintained by the GME Branches. The contractor shall be required to provide equipment, supplies, materials, transportation, and shipping of repair parts. This sole-source contract will be required for reasons stated in Paragraph 5. The total estimated value of the requirement for both Camps is $700,000 for the period from 1 July 2024 through 30 June 2029.
4. Statutory Authority Permitting Other Than Full and Open Competition.
This request is submitted pursuant to the authority of Title 10 U.S.C. 2304(c) (1) or 41 U.S.C.
253 (c) (1), which provides that full and open competition need not be obtained where there is "only one responsible source and no other supplies or services will satisfy agency requirements". (FAR 6.302-1)
5. Rationale Justifying Use of Cited Statutory Authority.
These Pierce fire trucks are procured by G4-Logistics and Services - Marine Corps Installations Command Headquarters Marine Corps (HQMC) and contracted directly from Pierce Manufacturing Inc. and supplied to the Garrison Mobile Equipment Branches. The associated repair parts are specific to Pierce fire pumper and ladder trucks, which have proprietary systems, and can only be obtained from Pierce Manufacturing Inc. There are no other parts that are compatible for these vehicles. Only Pierce Manufacturing Inc. sells the parts directly to the U.S. Government. This direct purchase option is not offered to non-government customers.
The Pierce company is affiliated with authorized dealerships that sell its originally manufactured equipment; military locations within the U.S. may contract with the local dealers or the factory directly. However, these dealers are unable to accept parts orders from OCONUS for export.
Therefore, Pierce Manufacturing Inc. is the only available source from which these replacement parts can be purchased.
6. Description of Efforts Made to Solicit Offers from as Many Offerors as Possible
This proposed action will be publicized in accordance with FAR 5.102(a)(6) which states "When an acquisition contains brand name specifications, the contracting officer shall include with the solicitation, the justification or documentation required by 6.302-1(c), 13.106-1(b), or 13.501, redacted as necessary (see 6.305)."
The market survey has found that there are no other commercial sources available that can meet the needs of the government. Pierce Manufacturing, Inc. is the only authorized company who can provide the repair parts for the proprietary components of the Pierce fire pumper and ladder trucks, as well as fabricate those necessary parts that are no longer in stock.
7. Determination of Fair and Reasonable Cost.
The Contracting Officer will determine that the price for this acquisition to be fair and reasonable during the evaluation for award. This will be done using a combination of items listed FAR Part 13.106-3, to include comparison with proposed price with prices found on previous service contracts, current prices list, and comparison with similar items in the commercial market. This is a "Fixed Priced" contract.
8. Actions to Remove Barriers to Future Competition.
Due to only one company being able to manufacture proprietary replacement parts for the existing fleet of fire trucks, there is no feasible alternative to remove barriers to competition.
The only possible way to remove these barriers is for the Government to purchase a different make and model of the fire pumper and ladder trucks.
CERTIFICATIONS AND APPROVAL
Technical/Requirements Certification
I certify that the facts and representations under my cognizance, which are included in this Justification and its supporting acquisition planning documents, except as noted herein, are complete and accurate to the best of my knowledge and belief.
(Signature) Date
Printed Name and Phone No.
Legal Sufficiency Review
I have determined that this Justification is legally sufficient.
(Signature) Date
Printed Name and Phone No. DSN
Contracting Officer Certification
I certify that this Justification is accurate and complete to the best of my knowledge and belief.
(Signature) Date
Printed Name and Phone No.
| 2. Description of Action Being Approved. |
| 3. Description of Supplies/Services. |
| 4. Statutory Authority Permitting Other Than Full and Open Competition. |
| 5. Rationale Justifying Use of Cited Statutory Authority. |
| 6. Description of Efforts Made to Solicit Offers from as Many Offerors as Possible |
| 7. Determination of Fair and Reasonable Cost. |
| 8. Actions to Remove Barriers to Future Competition. |
| CERTIFICATIONS AND APPROVAL |
| Legal Sufficiency Review |
| Contracting Officer Certification |
| 2024-07-16T14:01:06+0900 | |
| STOWELL.ZACKERY.ALLEN.1255164127 |
| Date: 07/16/2024 | |
| Printed Name and Phone No: Zackery A. Stowell | |
| 2024-07-16T17:30:44+0900 | |
| FORJOHN.STEVEN.KENNETH.1028268960 |
| Date_2: 07/16/2024 | |
| Printed Name and Phone No_2: Steve Forjohn | |
| DSN: 315-645-3823 | |
| 2024-07-17T07:37:33+0900 | |
| CHRESAIDOS.NICHOLAS.ANDREW.1366054266 |
| Date_3: 07/17/2024 |
| Printed Name and Phone No_3: Capt Nicholas Chresaidos 645-8145 |
File details come from the government source that posted it. Updated .