SOL-CI-15-00011_Attch_2_QASP.pdf
PDF 38 KB Posted
- Attached to
- This is a $0. 00 PR to start the new procurement pr Federal contract opportunity
- Solicitation number
- SOL-CI-15-00011
About this file
SOL-CI-15-00011 Attch 2 Quality Assurance Surveillance Plan STREAMS 3
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_SOL-CI-15-00011_Amd_000003.pdf | ||
| Sol_SOL-CI-15-00011_Amd_000002.pdf | ||
| Sol_SOL-CI-15-00011_Amd_000001.pdf | ||
| Cover_Memo_SOL-CI-15-00011.pdf | ||
| SOL-CI-15-00011_Attch_5_Labor_Class_Standards.pdf | ||
| SOL-CI-15-00011_Attch_4_TPI_.pdf | ||
| Sol_SOL-CI-15-00011.pdf | ||
| SOL-CI-15-00011_Attch_3_Reports_of_Work.pdf | ||
| SOL-CI-15-00011_Attch_1_PWS.pdf | ||
| SOL-CI-15-00011_Attch_6_CPI.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOL-CI-15-00011 Attachment 2
Attachment 2
Quality Assurance Surveillance Plan
Quality Assurance Surveillance Plan
The requirements contained in this contract are considered performance-based, focusing on the
Agency's desired results and outcomes. The contractor shall be responsible for determining the most effective means by which these requirements will be fulfilled. In order to fulfill the requirements, the contractor shall design innovative processes and systems that can deliver the required services in a manner that will best meet the Agency's performance objectives. This performance-based requirement presents a challenge to the Contractor to develop and apply innovative and efficient approaches for achieving results and meeting or exceeding the performance objectives, measures, and standards described below. The Contractor's performance will be reflected in the positive or negative evaluation offered by the Agency in the Past
Performance Evaluation (PPE) which is developed annually (per the "Past Performance
Evaluation" clause in the contract). In issued task orders, the Performance Objectives shall be designated as "Tasks" specified within the scope of work. In cases where Tasks (Performance
Objectives) and minimum Acceptable Quality Levels (AQLs) are not being met, the Contractor will make every effort to immediately correct the problem. If the problem is systemic, the
Contractor will submit a plan of corrective action to the Task Order Contracting Officer
Representative (TOCOR) and Contract Level Contracting Officer Representative (CLCOR).
Each TOCOR shall submit a complete annual review of the areas outlined in the Quality
Assurance Surveillance Plan (QASP), included as an attachment to this contract, which will then be utilized by the CLCOR in preparing the overall evaluations submitted annually in response to the Past Performance Evaluation requirements in the contract. The past performance evaluation scoring will take into consideration the successes, shortcomings, and corrective actions associated with meeting the performance standards delineated in the QASP.
These are the Minimum Mandatory PBSC Requirements as listed in the PBSC checklist:
1. Performance requirements that define the work in measurable, mission-related terms. (The description of each task is considered the designated performance requirement.)
2. Measurable Performance standards (i.e., management and communications, technical analyses, timeliness) are tied to the performance requirements. (These standards are included in the performance requirement.)
3. A Government Quality Assurance (QA) Surveillance Plan that describes how the
Contractor's performance will be measured against the performance standards. (The QA
Methods and Surveillance Plan are described with each task as appropriate as outlined in
Attachment 2 of the contract.)
QUALITY ASSURANCE SURVEILLANCE PLAN for SCIENTIFIC, TECHNICAL, RESEARCH, ENGINEERING, AND MODELING SUPPORT III (STREAMS III)
General Management and Administration
Performance Requirement
Measurable Performance
Standards
Surveillance Methods
Incentives/Disincentives
Management and Communications:
The Contractor shall maintain contact with the EPA TOCOR and CLCOR throughout the performance of the contract and shall immediately bring potential problems to the attention of the appropriate EPA TOCOR. In cases where issues have a direct impact on project schedules and/or cost the Contractor shall provide options for EPA's consideration on resolving the issues or mitigating their impacts.
Any issues that impact project schedules and/or cost shall be brought to the attention of the appropriate EPA TOCOR within 3days of occurrence.
All active task orders under the contract will be reviewed by the EPA TOCOR monthly (via monthly progress report) to identify unreported issues.
Unsatisfactory rating under the category of Business Relations in the Contractor Performance Assessment Reporting System (CPARS) if two or more incidents occur during a period of performance where the contractor does not meet the measurable performance standards.
Timeliness:
Services and deliverables shall be in accordance with schedules stated in each task order, unless amended or modified by an approved EPA action.
All submitted deliverables shall be submitted no later than 6 days past the due date.
Active task orders will be reviewed by the EPA TOCOR monthly (via monthly progress report & milestones established for each deliverable) to compare actual delivery dates against those approved.
category of Schedule in CPARS when the Contractor does not meet the measurable performance standards during an applicable period of performance.
Cost Management and Control.
The Contractor shall monitor, track, and accurately report cost and fee expenditures to EPA through progress reports and approved special reporting requirements.
The Contractor shall assign appropriately leveled and skilled personnel to all tasks, practice and encourage time management, and ensure accurate and appropriate cost control.
The Contractor shall manage costs to the level of approved ceiling on the task order. The Contractor shall notify the TOCOR, CLCOR and CO when 85% of the approved funding ceiling for the task order is reached.
Active task orders will be reviewed by the TOCOR monthly (via meetings, monthly progress reports & milestones established for each deliverable) to compare actual versus projected expenditures.
category of Cost Control in CPARS when the contractor does not meet the measurable performance standards during an applicable period of performance.
Technical Analyses:
The analysis conducted by the Contractor shall be factual, defensible, and based on sound science and engineering. All data shall be collected from reputable sources and quality assurance measures shall be conducted in accordance with agency requirements outlined in individual task orders. Any work requiring the Contractor to provide options or recommendations shall include the rationale used in selecting the option/recommendation and all other options considered.
All analyses conducted for EPA by the Contractor must be factual and based on sound science and engineering.
EPA will review all analyses conducted by the Contractor and will independently consider their merit.
EPA may opt to peer review analyses to further validate merit.
category of Quality of Product or Service in CPARS when the Contractor does not meet the measurable performance standards during an applicable period of performance even after review input and follow-up discussion by Agency personnel.
File details come from the government source that posted it. Updated .