Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)

7. ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICITATION

NO.

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.

12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO.

IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PAGE OF PAGES

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

NSN 7540-01-152-8070

Previous edition unusable

Michael Ashkouri, Esq.

Supervisory Regional Contracting Officer

Amendment No. 02 revises the solicitation, Attachment J.2, Attachment J.3, Attachment J.4, and Attachment J.20 as shown in the track changes recorded in the below PDF.

Amendment No. 02 replaces Attachment J.12 and Attachment J.17.

USAID/Southern Africa Regional Office of Acquisition and Assistance 100 Totius Street Groenkloof 0027 Pretoria, Republic of South Africa

TO ALL PROSPECTIVE OFFERORS

See Item 6

REQ-AFR-16-000059

SOL-674-16-000023

1 201

08/01/2016

06/30/2016

08/01/2016

/S/

Solicitation Issuance Date: June 30, 2016 Closing Date and Time for Receipt of Past Performance Information: August 12, 2016 (17:00 EDT) Closing Date and Time for Receipt of Proposals: August 29, 2016 (11:00 EDT) Closing Date and Time for Offeror Questions: July 8, 2016 (17:00 Pretoria)

Re: Request for Proposal SOL-674-16-000023, Power Africa Expansion

Dear Prospective Offerors:

The U.S. Agency for International Development (“USAID”) intends to award a Multiple Award Indefinite Delivery, Indefinite Quantity (“IDIQ”) Contract to implement President’s Power Africa Initiative as described in Section C of this Request for Proposal.

USAID invites all interested and responsible organizations to submit offers in accordance with the requirements of this solicitation. USAID will conduct this procurement as a full and open competition under which any type of organization may submit a proposal. The procedures set forth in Federal Acquisition Regulation (“FAR”) Part 15 will govern the procurement. FAR Part 36 does not apply to this procurement as it does not contemplate Architect- Engineer or construction services. The North American Industry Classification System (“NAICS”) Code is 541611.

The Authorized Geographic Code for procurement of goods and services under any task order issued under this IDIQ Contract is 935.

USAID anticipates that the maximum ordering limitation of the contract(s) resulting from this RFP will not exceed $900,000,000 over the ordering period. USAID anticipates the award of seven (7) IDIQ contracts, including three

(3) IDIQ awards set-aside for small business concerns. USAID reserves the right to award more or less awards than this anticipated number. USAID anticipates issuing one initial task order upon award of the IDIQ contract.

Attachment J.1 contains the initial task order. Attachment J.2 contains the Statement of Objectives. USAID estimates the following price range for the initial task order: $90,000,000 to $110,000,000.

Prospective offerors must submit questions about this solicitation to powerafricaidiq@usaid.gov by the time and date indicated above. Offerors must submit electronic and hard copies of offers in accordance with the instructions contained in Section L, “Instructions to Offerors.” Please note that USAID will find offers nonresponsive if they fail to comply with the material terms of this solicitation. As a result of the complexity of this requirement, USAID requires that offerors submit Past Performance Information to powerafricaidiq@usaid.gov and as outlined in Section L.5(2)(i) by the date indicated above, two weeks prior to the closing date for the submission of full offers. USAID will evaluate technically acceptable proposals in accordance with the evaluation factors in Section M, “Evaluation Factors for Award.” USAID will not evaluate technically unacceptable offers.

Issuance of this solicitation neither obligates USAID to award a contract nor commits USAID to pay for any costs incurred by the Offeror in preparing and submitting an offer. Offerors incur such costs at their own risk. Contract award under this solicitation remains subject to the availability of funds and other internal approvals. Furthermore, USAID reserves the right to reject any and all offers when considered by the Contracting Officer to serve the best interests of the U.S. Government.

USAID encourages prospective offerors to regularly check Federal Business Opportunities for any amendments to the solicitation. Thank you in advance for your interest in this procurement.

//s//

Michael Ashkouri, Esq.

Supervisory Regional Contracting Officer USAID/Southern Africa

Deleted: Pretoria

Deleted: 12

Deleted: 7

Deleted: Pretoria

Deleted: will

Deleted: responsive

Deleted: nonresponsive mailto:powerafricaidiq@usaid.gov mailto:powerafricaidiq@usaid.gov http://www.fbo.gov/

SOLICITATION, OFFER AND AWARD 1. THIS CONTRACT IS A RATED ORDER

UNDER DPAS (15 CFR 700)

RATING PAGE OF PAGES

2. CONTRACT NUMBER 3. SOLICITATION NUMBER 4. TYPE OF SOLICITATION 5. DATE ISSUED 6. REQUISITION/PURCHASE NUMBER

CODE7. ISSUED BY 8. ADDRESS OFFER TO (If other than item 7)

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

SOLICITATION

9. Sealed offers in original and copies for furnishings the supplies or services in the Schedule will be received at the place specified in item 8, or if hand carried, in the depository located in until local time

CAUTION - LATE Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and conditions contained in this solicitation.

10. FOR

INFORMATION

CALL:

A. NAME B. TELEPHONE (NO COLLECT CALLS)

AREA CODE NUMBER EXTENSION

C. E-MAIL ADDRESS

11. TABLE OF CONTENTS

(X) SEC. DESCRIPTION PAGE(S) (X) SEC. PAGE(S)DESCRIPTION

A B C D E F G H

I

J

K

L

M EVALUATION FACTORS FOR AWARD

INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS

REPRESENTATIONS, CERTIFICATIONS AND OTHER

STATEMENTS OF OFFERORS

PART IV - REPRESENTATIONS AND INSTRUCTIONS

LIST OF ATTACHMENTS

PART III - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACH.

CONTRACT CLAUSESSOLICITATION/CONTRACT FORM

SUPPLIES OR SERVICES AND PRICES/COSTS

DESCRIPTION/SPECS./WORK STATEMENT

PACKAGING AND MARKING

INSPECTION AND ACCEPTANCE

DELIVERIES OR PERFORMANCE

CONTRACT ADMINISTRATION DATA

SPECIAL CONTRACT REQUIREMENTS

NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.

OFFER (Must be fully completed by offeror)

12. In compliance with the above, the undersigned agrees, if this offer is accepted within calendar days (60 calendar days unless a different period is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the set opposite each item, delivered at the designated point(s), within the time specified in the schedule.

13. DISCOUNT FOR PROMPT PAYMENT

(See Section I, Clause No. 52.232-8)

14. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments to the SOLICITATION for offerors and related documents numbered and dated):

10 CALENDAR DAYS (%) 20 CALENDAR DAYS (%) 30 CALENDAR DAYS (%) CALENDAR DAYS(%)

DATEAMENDMENT NO.AMENDMENT NO. DATE

15A. NAME AND

ADDRESS

OF OFFER-

OR

CODE FACILITY 16. NAME AND THE TITLE OF PERSON AUTHORIZED TO SIGN OFFER

(Type or print)

15B. TELEPHONE NUMBER

AREA CODE NUMBER EXTENSION

15C. CHECK IF REMITTANCE ADDRESS IS

DIFFERENT FROM ABOVE - ENTER SUCH

ADDRESS IN SCHEDULE.

17. SIGNATURE 18. OFFER DATE

AWARD (To be completed by Government)

19. ACCEPTED AS TO ITEMS NUMBERED 20. AMOUNT 21. ACCOUNTING AND APPROPRIATION

22. AUTHORITY FOR USING OTHER THAN FULL OPEN COMPETITION:

10 U.S.C. 2304 (c) ( )41 U.S.C. 3304(a)

24. ADMINISTERED BY (If other than Item 7)

26. NAME OF CONTRACTING OFFICER (Type or print)

IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.

AUTHORIZED FOR LOCAL REPRODUCTION

Previous edition is unusable

23. SUBMIT INVOICES TO ADDRESS SHOWN IN

(4 copies unless otherwise specified)

25. PAYMENT WILL BE MADE BY

27. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

28. AWARD DATE

CODE

ITEM

STANDARD FORM 33 (REV. 6/2014)

Prescribed by GSA - FAR (48 CFR) 53.214 (c)

SEALED BID (IFB)

NEGOTIATED (RFP)

(Hour) (Date)

PART I - THE SCHEDULE PART II - CONTRACT CLAUSES

N/A 01 166

REQ-AFR-16-000059

See Item 7 USAID/Southern Africa, Regional Office of Acquisition and Assistance 100 Totius Street, Groenkloof 0027, P.O. Box 43, Pretoria, South Africa

TBD SOL-674-16-000023

See Section L See Section L

See Solicitation powerafricaidiq@usaid.gov

56 158

27 124522000

06/29/2016

Michael Ashkouri, Esq.

SOL-674-16-000023

Power Africa Expansion

Deleted: 5

PART I—THE SCHEDULE

SECTION B—SUPPLIES OR SERVICES AND PRICES/COSTS

B.1 Purpose

The United States Agency for International Development (“USAID” or the “Agency”) requires the Contractor to provide technical services described in the Statement of Work (“SOW”) in Section C of this Indefinite Delivery, Indefinite Quantity (“IDIQ”) Contract to implement the President’s Power Africa initiative (“Power Africa”). USAID Task Order Contracting Officers (“TOCOs”) will request Contractor services through the issuance of Request for Task Order Proposals (“RFTOP”) during the ordering period as specified in Section F.2.

B.2 Contract Type and Services

This is a Multiple Award IDIQ Contract. TOCOs may issue task orders in the following contract type:

Cost-Plus-Fixed-Fee (“CPFF”) contracts (term or completion); Cost-Plus-Award-Fee (“CPAF”); Cost- Plus-Incentive-Fee (“CPIF”); any Firm Fixed-Price (“FFP”) type; or, any combination thereof. The Contractor must perform the services set forth in the task orders at prices consistent with Section B of this IDIQ Contract. The Contractor may use any of the above contract types when awarding subcontracts.

B.3 Maximum Contract Ceiling

This Multiple Award IDIQ has an overall ceiling price of $900,000,000. The maximum aggregate dollar value of task orders awarded to all contractors must not exceed this IDIQ Contract ceiling. USAID will neither subdivide the ceiling among the IDIQ awardees nor multiply it among awardees.

B.4 Minimum Obligated Amount

This basic IDIQ Contract includes an initial obligation of funds in the amount of $25,000 to cover the minimum order guarantee USAID must order. The Contractor must furnish the minimum order amount of services. Following this initial obligation, individual task orders will obligate funds to cover the work required under that task order.

B.5 Fixed Fee Ceiling

(a) The fixed fee ceiling does not apply to FFP or cost-reimbursement incentive task orders.

(b) For each CPFF task order issued under this IDIQ, the TOCO and the Contractor must negotiate a fixed dollar amount for fee. In negotiating the fixed fee, the TOCO must consider the policies and factors for establishing fixed fee set forth in FAR § 15.404-4. In addition, the TOCO must consider applicable USAID policy on establishing a fixed fee.

(c) The fixed fee for any individual task order must not exceed [Offeror proposes ceiling percentage] of a task order’s estimated cost, excluding fixed fee. The fixed fee ceiling applies to the prime contractor and any subcontractor.

(d) The TOCO may tie the fixed fee dollar amount to the level of effort for a term task order or to specific deliverables or milestones for a completion task order.

(e) The Contractor must negotiate fees for CPIF and CPAF task orders with the TOCO in accordance with the terms of this IDIQ Contract and applicable regulations.

(f) Grants Under Contract.

(i) The fee ceiling provided in paragraph (c) above does not apply to “Grants Under

Contract” (“GUC”), if any, or other costs that have a separate fee ceiling established in the contract.

(ii) Separate Fixed Fee Ceiling Applicable to GUCs.

(1) The amount of fixed fee, if any, applicable to GUCs in any individual task order must not exceed [Offeror proposes ceiling percentage] of the task order GUC cost.

(2) If the TOCO issued a Letter of Credit to the Contractor for GUC-related expenditures, the amount of the fixed fee, if any, applicable to GUCs in any individual task order must not exceed [Offeror proposes ceiling percentage] of the task order GUC cost.

B.6 Labor

B.6.1 Unburdened Ceiling Daily Rates

(a) This Section B.6 does not apply to FFP task orders, FFP subcontracts, or FFP contract line items.

(b) Unburdened Ceiling Daily Rates (“CDR”) apply to all labor (i.e., the prime contractor, subcontractor, Third Country Nationals (“TCNs”), Cooperating Country Nationals (“CCNs”), and consultant salaries) on cost-type task orders. CDRs assume a productive, eight hour work day.

(c) Additional requirements and approvals under the IDIQ Contract may apply to labor costs, including, but not limited to the following:

(i) Agency for International Development Acquisition Regulation (“AIDAR”) § 752.7007, Personnel Compensation (July 2007), as provided in Section I.26;

(ii) Approval of subcontractors as required under FAR Part 42;

(iii) Approval of any final salary rates that exceed the Contractor Salary Threshold

(“CST”);

(iv) AIDAR § 722.170, Employment of third country nationals and cooperating country nationals, Rules requiring that CCN and TCN labor comply with a USAID Mission’s Local Compensation Plan (“LCP”), as provided in Section I.13.

(d) The Contractor will negotiate approved labor rates at equal to or lower than the CDRs. The

TOCO will provide the final approval of any labor rate. USAID will not pay any daily rate that exceeds the CDR set forth in Table 1 without prior TOCO approval.

(e) The CDR for personnel listed in Table 1 is “unburdened” and must only include salary costs or consulting rates of the individual providing the services. The CDR must not include the following:

(i) Payroll costs (e.g., fringe benefits, Federal Insurance Contributions Act (“FICA”), allowances, differentials);

(ii) Indirect costs applicable to labor; and,

(iii) Profit or fee, if any.

(f) The CDRs set forth in Table 1 apply to Year 1 of the IDIQ’s period of performance. An escalation rate of [Offeror proposes escalation rate]% per contract year applies to those CDRs.

(g) The CDRs apply to all consented subcontractors under this IDIQ Contract and new subcontractors proposed for specific cost-type task orders.

The unburdened CDR for each labor category set forth in Table 1 represents the mid-level and senior-level rate for each labor category. If a task order requires junior-level personnel, then the Contractor must propose rates reasonably below the mid-level unburdened CDR.

Table 1. Labor Categories

No Labor Category Unburdened CDR (Senior- Level)

Unburdened CDR (Mid- Level)

1 Director $ N/A 2 Financial Advisor $ $ 3 Legal Advisor $ $ 4 Engineering Advisor $ $ 5 Scientist $ $ 6 Procurement Expert $ $ 7 Economist $ $ 8 Regulatory Advisor $ $ 9 Gas Specialist $ $ 10 Renewable Energy/Sustainability Expert $ $ 11 Cross-Cutting Specialists $ $ 12 Home Office Specialist Positions $ $ 13 Administrative Support Specialists N/A $

Table 2. Definition of Labor Categories

Labor Category Illustrative Examples Director Director, Project Manager, Chief of Party Financial Advisor General Financial Advisor, Financial Modeler, Finance Arranger, Transaction

Advisor Legal Advisor General Legal Advisor, Institutional Legal Advisor, Project Legal Advisor, Local Legal Advisor Engineering Advisor Civil, Electrical, Mechanical, Environmental, Engineer, Project, Planning

Engineer Scientist Geologist, Hydrologist, Environmental Scientist Procurement Expert Procurement, Contracting Specialist, Tender Expert for Engineering Services, EPC Contracts, BOT and PPP Concessions Economist General Rates Specialist, Electric Utility Expert, Utility Accountant, Utility

Financial Expert Regulatory Advisor Regulatory and Legal Framework Advisor, Power Sector Restructuring

Advisor, Regulatory Agency Advisor, Electricity Market Expert, Rural Electrification Agency Advisor

Gas Specialist Gas Policy Expert, Gas Planning Expert, Gas Pipeline Expert, Gas Health and Safety Expert, Gas Pricing Expert

Renewable Energy/Sustainability Expert

Energy Efficiency Expert, Sustainability Advisor, Climate Change Expert, Hydro, Wind, Solar, Biomass, Geothermal, Fuel Cell, or Mini-Grid Expert

Cross-Cutting Specialists Gender Specialist, Monitoring & Evaluation Expert, Social/Community Impact Advisor, Communications Advisor, Web Designer

Home Office Specialist Positions

Home Office Project Managers, Compliance, Grants, Accounting, Security or Procurement Specialist

Administrative Support Specialists

Secretary, Receptionist, Clerk

(h) Locally-Hired National Personnel or Other Non-U.S. Expatriate Rates. The Contractor must pay all locally hired national personnel and other non-U.S. expatriates in accordance with AIDAR

722.170. Further, the Contractor must pay salaries for locally-hired personnel and non-U.S.

expatriates under this IDIQ Contract and any resulting subcontract in accordance with AIDAR 752.7007, “Personnel,” after factoring the prevailing compensation paid to personnel performing comparable work in the cooperating country as determined by USAID and consideration of the individual’s education, work experience, and recent and relevant salary history. Unless otherwise authorized by USAID, CCN, and TCN compensation must not exceed the prevailing compensation paid to personnel performing comparable work in the cooperating country as determined by USAID. Also, the Contractor must pay locally-hired national personnel in the currency of the cooperating country unless otherwise authorized by USAID.

B.6.2 Minimum Qualifications

The Contractor must provide personnel that meet the minimum education and experience requirements set forth in Table 3. These minimum qualifications for mid-level and senior-level personnel correspond to the Unburdened CDRs set forth in Table 1.

Table 3

Level Education Requirement (highest degree obtained should relate to the services provided)

Experience Requirement (experience should relate to the services provided)

Mid-Level Ph.D 4 JD/All But Dissertation (“ABD”) 5

MS/MA/MBA 6

BS/BA 7

Less than BS/BA 8

Senior-Level Ph.D 8

JD/ABD 10

MS/MA/MBA 12

BS/BA 15

Less than BS/BA 20

B.6.3 Subcontractor Labor Rates

The following provides guidance for various subcontracting arrangements:

(a) The Prime subcontracts with an approved subcontractor from the original IDIQ competition. The unburdened CDR’s for the prime contract apply to the subcontractor.

Formatted: Underline

Formatted: Underline

Formatted: Underline

Deleted: This IDIQ Contract does not sets forth minimum qualifications for the mid-level and senior-level personnel that would correspond to the Unburdened CDRs set forth in Table 1. Each RFTOP will set the minimum education and experience requirements, if any. ¶

Formatted: Font: Times New Roman

Formatted: Font: Times New Roman, Not Italic, Underline

Formatted: List Paragraph,References, Numbered + Level: 1 + Numbering Style: a, b, c, … + Start at: 1 + Alignment: Left + Aligned at: 0.25" + Indent at: 0.5"

Formatted: Font: Times New Roman, Not Italic

Formatted: List Paragraph,References, No bullets or numbering

(b) The Prime contracts with a new subcontractor not yet approved. The unburdened CDR’s for the prime contract apply to the new subcontractor.

(c) Prime subcontracts with a new subcontractor not yet approved and may or may not have a different cost accounting system that only processes fully burdened rates. Further, subcontractor proposes rates that are “above” the prime IDIQ rates. The Prime may then include in its TO proposal, (i) the fully burdened rate proposed to the Prime by the Subcontractor,(ii) allocation of the Prime’s indirect costs in accordance with established accounting practices, and (iii) a reasonable profit. If the rates proposed to USAID, inclusive of the Prime’s allocable indirect costs and a reasonable profit are above the Prime’s unburdened CDRs , the Prime must disclose the amount of the indirect costs, and the amount of the proposed profit that were added to the Subcontractor’s proposed rates. A reasonable profit will be negotiated by the TOCO for the specific TO. The CDRs of the subcontractor must not exceed the prime’s CDRs in the IDIQ contract.

B.6.4 Unburdened CDR Rate Changes

(a) Parties to this IDIQ Contract may propose additional labor categories, rates, and descriptions. The Contractor must submit a proposal requesting the modification of Section B.6.1, providing a rationale for the proposed labor rates. The IDIQ Contracting Officer will review these proposals and determine if the revised rates are reasonable, realistic, and serve the best interests of the U.S.

Government (“USG”). If the IDIQ Contracting Officer accepts the rates, then USAID will incorporate the new rates into the IDIQ Contract through a modification.

B.6.5 Billing Central Management Costs

(a) The Contracting Officer has determined that a key (full time) technical manager is not necessary or required to administer this basic IDIQ Contract. Contractors will not be authorized to bill USAID directly for IDIQ management costs under this IDIQ Contractor or under task orders.

Contractors must propose a centralized management structure that allows for recovery of IDIQ management costs as part of its indirect costs.

B.7 Indirect Costs and Advanced Understanding on Ceilings

(a) This Section B.7 only applies to prime contractors performing cost-type task orders.

(b) Pending establishment of revised provisional or final indirect cost rates, USAID will reimburse allowable indirect costs on the basis of the following negotiated provisional or predetermined rates and the appropriate bases pursuant to the contractor’s current executed Negotiated Indirect Cost Rate Agreement (“NICRA”):

Formatted: Font: Times New Roman, Not Italic, Underline

Formatted: List Paragraph,References, Numbered + Level: 1 + Numbering Style: a, b, c, … + Start at: 1 + Alignment: Left + Aligned at: 0.25" + Indent at: 0.5"

Formatted: Font: Times New Roman

Formatted: Underline

Formatted: No bullets or numbering

Formatted: Font: Times New Roman, Not Italic, Underline

Formatted: List Paragraph,References, Numbered + Level: 1 + Numbering Style: a, b, c, … + Start at: 1 + Alignment: Left + Aligned at: 0.25" + Indent at: 0.5", Don't adjust space between Latin and Asian text, Don't adjust space between Asian text and numbers

Formatted: Font: Times New Roman

Formatted: Underline

Deleted: ¶ <#>Unburdened CDRs apply to all subcontractor labor on any cost-type task order.¶ <#>For subcontractors with a cost accounting system that only processes fully burdened rates, the Contractor must include in its task order proposal:¶

(i) The fully burdened rate proposed to the Contractor by the subcontractors;¶

(ii) Allocation of the Contractor’s indirect cost in accordance with established accounting practices; and,¶

(iii) Reasonable profit.¶

<#>If proposed rates, inclusive of the prime Contractor’s allocable indirect costs and a reasonable profit, exceed the IDIQ contract’s unburdened CDRs, then the Contractor must disclose the amount of the indirect costs and the amount of the proposed profit added to the subcontractor’s proposed rates. The TOCO will negotiate reasonable labor rates using that information.¶

Table 4

[To Be Determined at Award]

Description Fringe Rate

Overhead Rate %

Overhead Ceiling Rate

G&A Rate G&A Ceiling Rate

Prime Contractor: [•] Base of Application: [•] Source: [•]) Period: [•]

Note: The unshaded columns in Table 3 are the current approved indirect cost rates for the prime contractor.

(c) The Contractor must not change its established method of classifying or allocating indirect costs without the prior written approval of the IDIQ Contracting Officer.

(d) USAID will reimburse the Contractor for indirect costs at the final negotiated rates, but not in excess of the ceiling rates specified in Table 3.

(e) For FFP task orders, the indirect cost ceiling rates serve only as the basis of negotiation.

(f) The Contractor can recoup indirect costs (e.g., overhead, G&A, etc.) as other direct costs if it is part of the Contractor’s usual accounting procedures, consistent with FAR Part 31 and the Contractor’s NICRA.

B.8 Reimbursable Costs

For cost-reimbursement task orders, USAID will only reimburse the Contractor for allowable costs in accordance with FAR § 52.216-7, “Allowable Cost and Payment,” FAR § 52.216-8, “Fixed Fee,” FAR § 52.232-20, “Incentive fee,” FAR § 52.216-10, “Limitation of Cost,” and FAR § 52-232-22, “Limitation of Funds,” if applicable, and AIDAR 752.7003, “Documentation for Payment.”

END OF SECTION B

Deleted: 3

Deleted: overhead

SECTION C—STATEMENT OF WORK

C.1 Introduction

This IDIQ Contract allows for the provision of all technical assistance and engineering consulting services that fall within the scope of work specified in this Section C to implement USAID’s activities that support Power Africa. The services provided under this IDIQ Contract require expertise in project development, finance, legal, engineering, regulatory affairs, and utility operations, among others.

The Contractor must provide services in the following functional areas:

1. Generation, Transmission, and Distribution Transactions

2. Finance

3. Legal

4. Engineering

5. Planning

6. Electric Utility Reform and Restructuring

7. Electricity Access

8. International Power Exchange and Power Trading

9. Demand-Side Management and Energy Efficiency

10. Cleaner Energy Technologies

11. Gas

12. Governance

13. Legal and Regulatory Framework

14. Coordination and Cooperation

In addition to the functional areas identified above, the Contractor should note that Institutional Strengthening, as well as Sustainability, Climate Change, and Gender (addressed separately below), are crosscutting themes, reflected in each of the areas of services listed above.

C.2 Background

On June 30, 2013, President Obama launched Power Africa, a partnership between the USG, African governments, the private sector, international organizations, non-governmental organizations (“NGOs”), and bilateral and multilateral partners to double access to electricity in Sub-Saharan Africa (“SSA”).

Initially, Power Africa focused on the countries of Liberia, Ghana, and Nigeria in West Africa and Ethiopia, Kenya, and Tanzania in East Africa. In addition, Power Africa worked with select regional institutions, including the Economic Community of West African States (“ECOWAS”), East African Commission (“EAC”), African Union Commission (“AUC”), and the East and West Africa Power Pools.

However, on August 5, 2014, at the U.S.-Africa Leaders’ Summit, President Obama announced an expanded commitment to Power Africa, increasing the goals to 30,000 megawatts (“MW”) of power generation capacity and at least 60 million household and business connections, and pledging $300 million in annual assistance to expand the reach of Power Africa across SSA.

Power Africa focuses on completing individual power sector transactions quickly and cost-effectively by attracting private investment and helping countries make critical power sector reforms. Partnership is the heart of Power Africa’s strategy, which aims to achieve its goals by leveraging the collective resources of three different types of organizations: (i) Development and strategic partners, including multilateral finance institutions, bilateral aid agencies, and government agencies1 that provide direct support for power sector transactions; (ii) more than 100 private sector partners including developers, project developers/sponsors, financiers, equipment suppliers, and industry associations (the “Private Sector Partners”); and, (iii) African governments that help create the enabling environment necessary for power sector transactions to move forward.

Power Africa’s private sector partners have committed more than $31 billion to power generation and distribution projects across SSA. Power Africa’s development partners, including the African Development Bank (“AfDB”), World Bank Group (“WB”), and the Government of Sweden, have collectively committed an additional $9 billion as part of Power Africa. The European Union is aligning with Power Africa to fund more than $2.8 billion in sustainable energy activities across the region. Power Africa also has strong partnerships with the African Union, the United Nations’ Sustainable Energy for All (“SE4ALL”) initiative and the International Renewable Energy Agency. This approach leverages partners’ collective technical expertise, financial contributions, and relationships in the power sector. The capabilities and resources provided by the other USG agencies and Power Africa Partners can be found at www.usaid.gov/powerafrica.

USAID coordinates the interagency implementation of Power Africa and serves as the primary deliverer of USG technical assistance and transaction support to advance its goals. USAID provides policy support, technical assistance and analysis, grants, capacity-building, and loan guarantees to advance Power Africa projects and critical reforms, with USAID teams across SSA helping administer from the field.

The Coordinator for Power Africa (the “Coordinator”) manages the USG initiative from offices located at USAID’s Mission to Southern Africa (“USAID/Southern Africa”) in Pretoria, South Africa. The Coordinator works with USAID bilateral and regional missions in SSA to develop and oversee annual work plans and ensure budget allocations align with Power Africa priorities. Power Africa has two Deputy Coordinators, one based in South Africa and a second based in Washington, D.C.

The Coordinator works closely with White House staff, the USG interagency Power Africa Working Group (“PAWG”) in Washington, D.C., and other Power Africa partners, including bilateral and multilateral donors, NGOs, financial institutions, and the private sector to coordinate Power Africa activities, ensure collaboration, and leverage resources to achieve Power Africa goals. Representatives from the DOC, USTDA, DOE, and OPIC also have representatives located with Power Africa in South Africa to ensure the greatest synergies possible.

In addition to its main office in South Africa, Power Africa also has an office located at USAID headquarters in Washington, D.C., managed by the second Deputy Coordinator.

1 Power Africa brings together a total of 12 USG agencies and departments in a “whole of government” approach. These include:

USAID, Overseas Private Investment Corporation (“OPIC”), U.S. Export‐Import Bank (“Ex‐Im”), Millennium Challenge Corporation (“MCC”), U.S. Trade and Development Agency (“USTDA”), U.S. African Development Foundation (“USADF”), the Department of Commerce (“DOC”), the Department of Energy (“DOE”), the Department of Treasury (“Treasury”), the Department of State (“DOS”), the Department of Agriculture (“DOA”), and the U.S. Army Corp of Engineers (“USACE”).

http://www.usaid.gov/powerafrica

C.3 IDIQ Objectives and Expected Results

As the Power Africa initiative enters its third year, it has set two ambitious targets to expand access to power across SSA by 2030:

1. Increase installed power capacity by 30,000 MW; and

2. Create 60 million new connections to double electricity access in SSA.

This IDIQ Contract will serve as Power Africa’s principal tool to achieve these targets, which comprise the core objectives of this IDIQ Contract. Results towards these targets are ultimately the measure of successful Contractor performance. To guide their implementation, Power Africa’s strategy, or Roadmap (Attachment J.7) is built on three strategic pillars and it is underpinned by a strong, global partnership approach. The three strategic pillars are:

1. Getting to 30,000 MW. Power Africa’s approach to increase generation starts and ends with energy deals. The Contractor will prioritize support for the following:

a. Transactions rooted in a country’s national power strategy, particularly those using renewable technologies, such as solar, wind, biomass, and geothermal;

b. Economically feasible hydropower projects when they are developed in an environmentally and socially sustainable manner.

c. Renewable energy opportunities as they are crucial for the diversification of African energy markets, increasing energy security, the expansion of off-grid access, and the mitigation of environmental damage.

d. Non-renewable projects with lower carbon emissions, including natural gas;

e. In limited circumstances, other non-renewables like fuel oil where there are no viable affordable alternatives and, whenever possible, help countries transition from fossil fuels to cleaner generation sources; and

f. Transmission projects that unlock generation capacity, as well as operational improvements that increase the available capacity at existing and planned generation plants.

2. Getting to 60 million connections. Creating new generation capacity is not an end unto itself. New MW are only important if they can be delivered to homes and businesses. Therefore, the Contractor will perform the following:

a. Coordinate the expansion of electricity grids to connect to approximately 35 to 40 million homes and businesses by scaling up our support for large-scale urban and rural grid roll-out programs.

African partner governments are responsible for managing and coordinating their grid development, while our work will focus on ensuring that every step of the transmission and distribution value chain receives adequate technical and financial support.

b. Intensify Beyond the Grid efforts in order to provide access to rural areas. Even by 2030, many households in SSA will still be too far from urban areas and major transmission lines to connect directly into the grid. To reach these households, Beyond the Grid, a Power Africa sub-initiative supporting off-grid and small-scale solutions, particularly rooftop solar and micro-grids, will expand access to electricity to those who will not be grid-connected by 2030 for an additional 25 to 30 million connections.

3. Unlocking energy sector potential. To reach 30,000 MW and 60 million connections, the Contractor will support the development of effective institutions within partner governments and regional organizations that can support and maintain sustainable power projects. Three critical enablers are necessary to ensure that transactions are effectively identified and completed:

a. Governments need laws, regulations, and institutions in place that are capable of developing and managing the country’s power sector. This includes developing appropriate legal and regulatory frameworks to attract sustainable investment, and ensure that regulators and oversight bodies have sufficient expertise, experience, and authority to manage the sector. Power Africa is supporting and will continue to support governments with targeted policy interventions that move transactions forward (such as developing competitive procurements and frameworks for public-private partnerships (PPPs)). This also includes support to governments, regulators, and utilities to achieve cost-reflective tariffs and improve utility balance sheets in order to increase service reliability. These interventions will help attract responsible investors, facilitate effective government oversight, and ultimately enable governments to sustainably expand access.

b. We will facilitate national and regional power sector integration through support of regional power pools and electricity trade. Regional efforts unlock new generation and connections opportunities, improve generation efficiencies, and help stabilize national grids.

c. We will ensure long-term sustainability of reforms and new power generation by investing in African institutions; supporting capacity building in local governments and civil society organizations; promoting the establishment of private sector trade associations; and facilitating dialogue between the private sector, governments, civil society, and development partners.

Although specific targets will be developed in each Task Order, it is expected that the Contractor will support the objectives outlined above in all aspects. Expected results include, but are not limited to the following:

1. Development of a healthy pipeline and portfolio of new power generation projects from the concept phase right up through late stage development and ultimately financial close, which will help Power Africa achieve its generation targets;

2. Power generation and transmission projects brought to financial close and ultimately commissioned;

3. Substantive increase of electricity access to households and businesses through new connections

(both on and off grid);

4. A notable increase in private and public investment in the power sector in SSA, including the number and quality of actors participating in power projects, and a reduction in transaction costs as a means of stimulating and expediting power sector investments; and

5. Measurable and observable improvements in the legal and enabling environment and institutional capacity to grow and manage the power sector in SSA, including: the capacity of the power sector workforce; system operations and planning; the financial viability of utilities; the quality of regulatory and legal frameworks; and policies that lead to a more efficient electricity sector and cross-border trade.

C.4 Power Africa Achievements

Since its launch in 2013, Power Africa has brought more than 4,300 MW of generation projects to financial close. Under Beyond the Grid, a sub-initiative that drives investment in off-grid and small-scale energy solutions, Power Africa has funded companies and projects expected to achieve more than 1 million new connections.

The below list provides examples of the achievements over the last two years:

● Ethiopia: Reykjavik Geothermal. Supported in the execution of the Power Purchase Agreement (“PPA”) for the country’s first Independent Power Producer (“IPP”) and geothermal project representing 500 MW of power potential at the Corbetti geothermal energy field. Supported through Power Africa technical and transaction assistance.

● Rwanda: Gigawatt Global. First ever utility-scale solar energy facility (8.5 MW enough for 15,000 homes) at the Agahozo Shalom Youth Village. Supported through a U.S.-Africa Clean Energy Finance Initiative (“ACEF”) early stage grant.

● Kenya: Lake Turkana Wind project. Power Africa, through OPIC, approved $250 million in financing for this 310 MW wind power generation project. Through the Grid Management Support Program, funded by Power Africa, the Kenyan government has determined the national electric grid’s absorption capacity for wind power, enabling the signing of the PPA with Lake Turkana Wind Power. In addition, Power Africa, through the US Treasury Department, supported the AfDB’s “Partial Risk Guarantee” to the lenders for the associated transmission line.

● Nigeria: Afam 150 MW natural gas power plant. Supported through Power Africa assistance to the National Bulk Trader in the negotiation of the PPA.

● Nigeria: Azura-Edo 450 MW natural gas power plant. Supported through Power Africa assistance to the National Bulk Trader in negotiating the PPA; first IPP in Nigeria in 10 years following recent power sector reforms; OPIC approved up to $50 million in financing. The project is now in the construction phase.

● Ghana: Cenpower Kpone 350 MW IPP natural gas power plant. Supported through Power Africa assistance on the negotiation of the PPA and tariff.

C.5 Power Africa Transactions and Reforms Program and Other Implementing Mechanisms

In May 2014, USAID awarded the Power Africa Transactions and Reforms Program (“PATRP”) contract for the provision of technical assistance, capacity building, and project transaction support services to advance Power Africa’s goals in the initial six priority countries.

PATRP focuses on four programmatic areas:

1. Institutional Support to the Power Africa Coordinator’s Office

2. Late Stage Transaction Support

3. Small Scale Projects and Rural Electrification/Mini‐Grids Support

4. Regulatory and Institutional Strengthening and Policy Reform

It is expected that a number of functional areas and activities within this IDIQ may overlap with those of PATRP. The Contractor will coordinate closely with and take direction from the Power Africa team in order to avoid redundancies and to maximize possible synergies. In addition, USAID deploys a number of other implementing mechanisms described in Attachment J with which the Contractor must coordinate.

In addition, PATRP currently maintains the Power Africa Tracking Tool (PATT), a web portal that provides easily accessible information on power transactions across SSA. These transactions as well as additional information can be accessed via a mobile application. The Contractor must provide information for the PATT, depending on the country and type of work required in the Task Order.

https://www.usaid.gov/power-africa/newsletter/jan2016/powerafrica-tracking-tool

C.6 Required Contractor Services

This IDIQ Contract allows for the provision of technical assistance services, including engineering consulting services, within the scope of work specified in this section, to implement USAID’s activities in support of Power Africa’s achievement of the President’s goals.

This IDIQ Contract covers a total of 49 countries in SSA with the exception of those countries USAID has identified as Critical Priority Countries (“CPCs”) in the region (e.g., South Sudan). Currently, USAID has 33 bilateral missions and 4 regional missions covering the remainder of the 54 countries (also referred to as “non-presence” countries). These missions cover countries speaking a variety of languages with differing socio-economic barriers; thus, the Contractor must consider social and cultural realities when developing task order proposals.

Pursuant to Section F.10, “Ordering Procedures,” the TOCO will request Contractors to provide services through the issuance of task orders. The TOCO may issue task orders specific to geographic regions or countries, function areas, and possibly for specific tasks or deliverables. USAID may prioritize specific countries and regions based on USG foreign policy objectives and transaction opportunities.

As required for each task order, the Contractor will provide services in the following areas:

1. Generation, Transmission, and Distribution Transactions

2. Finance

3. Legal

4. Engineering

5. Planning

6. Electric Utility Reform and Restructuring

7. Electricity Access

8. International Power Exchange and Power Trading

9. Demand-Side Management and Energy Efficiency

10. Cleaner Energy Technologies

11. Gas

12. Governance

13. Legal and Regulatory Framework

14. Coordination and Cooperation

Contractors should note that Sustainability, Climate Change, Institutional Strengthening, and Gender (see Section C.7) are crosscutting themes of this IDIQ Contract that must be reflected in each of the areas of services listed above.

C.6.1 Generation, Transmission, and Distribution Transactions

Power Africa employs a transaction-centered approach to directly address the constraints to project development and investment in SSA’s power sector. Shifting the typical development paradigm to a transaction-centered approach provides partner governments, the private sector, and donors with a focal point to galvanize collaboration, emphasizes near-term results, and drives systemic change that will facilitate greater private sector involvement.

The approach seeks to accelerate the pace of project development by identifying key milestones, risks, and challenges, while also identifying USG and Power Africa Partner interventions that can effectively help project stakeholders address such challenges. By helping projects reach financial close2 as quickly as possible, Power Africa seeks to not only increase availability of power in the near-term, but to create models that facilitate future private sector investment.

The Contractor must tailor technical assistance and financial resource interventions to each transaction, taking into account the country’s specific political, economic, social, and energy circumstances, as well as actions undertaken by private sector stakeholders, other donors, and Power Africa Partners. Interventions also vary significantly when comparing projects at different stages of the project cycle or projects of different magnitude.

Before selecting projects to support, the Contractor will evaluate the critical path for each project and confirm that projects are technically and financially feasible while being affordable for electric utilities and their customers. The Contractor will also critically assess the financial feasibility of each selected project, including the financial capacity of the buyer to pay for the power generated. Power Africa will support open, transparent and, to the extent feasible, competitive transaction processes. Competitive procurements in the power sector generally result in better value for the power purchaser in the form of timely project execution, lower costs and prices, and greater efficiency in plant operation.

Depending on the sub-national, national, and regional conditions, the Contractor may provide transaction support and technical assistance to national and sub-national governments, state-owned and investor-owned electric and gas utilities, rural energy agencies, and private sector entities, including project developers, energy service companies, investors, and lenders. Technical assistance activities must take into account the political, economic, social, and power sector circumstances in the country or countries where each planned project is located as well as actions undertaken by private sector stakeholders and other donors.

Specific tasks will be further defined in the task orders, as appropriate. They may include, but not be limited, to the following activities:

Transaction Advisory Services to Accelerate Projects to Financial Close

● Provide advisory services to assist in the negotiations to bring transactions to financial close including pre-feasibility studies, data collection for feasibility studies, and business planning.

● Provide support for PPPs, including management contracts, concessions, and divestiture.

● Support power and gas purchasers in relationship to the negotiation of key agreements on specific transactions.

● Assist in the privatization of generation, transmission, and distribution assets when requested by host governments.

2 The term “financial close” refers to an event in a project at which each of the conditions precedent to the initial drawdown of funds under the credit agreement are either satisfied by the project company, as borrower, or waived by the project lender(s). See The Law and Business of International Project Finance, Scott L. Hoffman (1998) at 702. Further, the financial close event implies that the project company has concluded with project lenders a complete package of permanent financing on a nonrecourse or limited recourse basis. The availability of permanent financing (i.e., debt with a grace period equal to the construction period plus a repayment period of at least 10 years) on reasonable terms and conditions is a key pre-requisite to attract long-term investment from the private sector into the power sector in SSA.

Technical Assistance to Host-Country Institutions

● Provide technical assistance for development of IPP and PPP laws and regulations, including design and standardization

● Provide technical support to address specialized issues related to renewable generation projects, such as geothermal exploration costs and risks, and variable renewable and micro-grid integration with the grid.

●…