SOL-663-15-000001-Water_Installation_for_Five_Health_Centers.pdf

PDF 5 MB Posted

Attached to
Water Installation for Five Health Centers
Solicitation number
SOL-663-15-000001
Issued by

About this file

Solicitation Package

View the file

Other files

File Type Posted
RFP_Amendment_1.pdf PDF
Answers_to_questions.pdf PDF
Cover.pdf PDF
Limiting_competition_to_Local_entities.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOLICITATION, OFFER,

AND AWARD

2. TYPE OF SOLICITATION

6. PROJECT NO. 4. CONTRACT NO. 5. REQUISITION/PURCHASE REQUEST NO.

PAGE OF PAGES

7. ISSUED BY CODE 8. ADDRESS OFFER TO

SOLICITATION

(Construction, Alteration, or Repair)

1. SOLICITATION NO. 3. DATE ISSUED

IMPORTANT -- The "offer" section on the reverse must be fully completed by offeror.

9.

INFORMATION

a. NAME b. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder."

CALL:

FOR

SEALED BID (IFB)

NEGOTIATED (RFP)

USAID Ethiopia

ETHIOPIA

USAID Ethiopia

Entoto Road US Embassy P. O.Box 1014, AA

Hiwot SEYOUM

1x 04/30/2015

SOL-663-15-000001

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date)

Part I - THE SCHEDULE

Section A - Solicitaiton contract form, Page 3

Section B - Supplies or Services/Price, Page 6

Section C - Description/Specifications, Page 9

Section D - Packaging and Marking, Page 22

Section E - Inspection and Acceptance, Page 24

Section F - Deliverables or Performance, Page 26

Section G - Contract Administration Data, Page 28

Section H - Special Contract Requierments, Page 32

PART II - CONTRACT CLAUSES

Section I - Contract Clauses, Page 44

PART III - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS

Section J - List of Documents, Exhibits and other Attachments, Page 60

PART IV - REPRESENTATIONS AND INSTRUCTIONS

Section K - Representations, Certifications and Otehr Statements of Bidders, Page 61

Section L - Instructions, Conditions and Notices to Bidders, Page 70

Section M - Evaluation Factors for Award, Page 79

11. The Contractor shall begin performance

12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

award, notice to proceed. The performance period is mandatory negotiable. (See ________________________________________________.)

13. ADDITIONAL SOLICITATION REQUIREMENTS:

a. Sealed offers in original and is not required.is, b. An offer guarantee

c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

(date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

d. Offers providing less than

12b. CALENDAR DAYSYES NO

(If "YES", indicate within how many calendar days after award in Item 12b.)

1 180 calendar days and complete it within ________________ ________________ calendar days after receiving

06/15/2015

NSN 7540-01-155-3212

x x x x copies to perform the work required are due at the place specified in Item 8 by _____________ ___________________ (hour) local time calendar days for Government acceptance after the date offers are due will not be considered and will be rejected. _________________

STANDARD FORM 1442 (Rev. 4-85)

Prescribed by GSA

FAR(48 CFR) 53.236-1(d)

17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within ____________________ calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in item 13d. Failure to insert any number means the offeror accepts the minimum in item 13d.)

14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code) 15. TELEPHONE NO. (Include area code)

16. REMITTANCE ADDRESS (Include only if different than item 14.)

CODE FACILITY CODE

AMOUNTS

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGEMENT OF AMENDMENTS

OFFER (Must be fully completed by offeror)

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT NO.

DATE.

20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print) 20b. SIGNATURE 20c. OFFER DATE

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN

(4 copies unless otherwise specified)

ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

26. ADMINISTERED BY CODE 27. PAYMENT WILL BE MADE BY

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

(Contractor is required to sign this document and return (Contractor is not required to sign this document.)

Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.

30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print) 31a. NAME OF CONTRACTING OFFICER (Type or print)

30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA 31c. DATE

BY

2PAGE OF

Anthony E. Amerson

28. NEGOTIATED AGREEMENT 29. AWARD

Contractor agrees to furnish and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, copies to issuing office.)

10 U.S.C. 2304(c) 41 U.S.C. 253(c)

STANDARD FORM 1442 (REV. 4-85) BACK

Continued...

ITEM NO.

(A)

SUPPLIES/SERVICES

(B)

QUANTITY

(C)

UNIT

(D)

UNIT PRICE

(E)

AMOUNT

(F)

NAME OF OFFEROR OR CONTRACTOR

3 105

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

SOL-663-15-000001

The purpose of this contract is to complete the water supply system at each of five new Health Care Centers, located in SNNPR.

Hiwot Seyoum, A&A Specialist

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

Sponsored by GSA

FAR (48 CFR) 53.110

Water Installation for Five Health Centers Request for Proposal SOL-663-15-000001

Contents

PART I – THE SCHEDULE

SECTION A - SOLICITATION/CONTRACT FORM

SECTION B - SUPPLIES OR SERVICES/PRICES

B.1 Purpose B.2 Contract Type B.3 Ceiling Task Order Price B.4 Line Item Pricing B.5 Payment

SECTION C - DESCRIPTION/SPECIFICATIONS

C.1 Background C.2 Objective C.3 Scope C.4 Specifications - Borehole Drilling C.5 Blind and Screen Casing Material C.6 Report Compilation

SECTION D - PACKAGING AND MARKING

D.1 AIDAR 752.7009 Marking (JAN 1993) D.2 Branding Strategy and Marking Plan D.3 Branding Strategy

SECTION E - INSPECTION AND ACCEPTANCE

E.1. Notice Listing Contract Clauses Incorporated by Reference E.2 52.246-12 Inspection of Construction (Aug. 1996)

SECTION F - DELIVERIES OR PERFORMANCE

F.1 Notice Listing Contract Clauses Incorporated by Reference F.2 Deliverables and Performance Requirements F.3 Period of Performance F.4 Place of Performance F.5 Reporting Requirements Invoices will be submitted as per the delivery/payment schedule reflected under F.2 above F.6 Authorized Work Day / Week F.7 Personnel Requirements

SECTION G - CONTRACT ADMINISTRATION DATA

G.1 AIDAR 752.7003 Documentation for Payment (Nov. 1998) G.2 Administrative Contracting Office G.3 Contracting Officer’s Technical Representative (COR) G.4 Technical Directions/Relationship with USAID G.5 Contractor’s Primary Point of Contact G.6 Paying Office G.7 Invoicing Instructions:

G.8 Contractors Payment Address G.9 Accounting and Appropriation Data

SECTION H - SPECIAL CONTRACT REQUIREMENTS

H.1 Notice Listing Contract Clauses Incorporated by Reference H.2 302.3.5.5 Reporting of Foreign Taxes (July 2007) H.3 302.3.5.9 Nondiscrimination (June 2012) H.4 302.3.5.16(A)(1) Conscience Clause Implementation (Acquisition) – Solicitation Provision (February 2012) H.5 302.3.5.16(A)(2) Conscience Clause Implementation (February 2012)

H.6 302.3.5.16(A)(3) CONDOMS (ACQUISITION) (September 2014) H.7 302.3.5.16(A)(4) Prohibition On The Promotion Or Advocacy Of The Legalization Or Practice Of Prostitution Or Sex Trafficking (September 2014) H.8 302.3.5.17 Limitation on Subcontracting to Non-Local Entities (May 2012) H.9 302.3.5.21 USAID Implementing Partner Notices (IPN) Portal for Acquisition (July 2014) H.10 302.3.5.22 Submission of Datasets to The Development Data Library (DDL) (October 2014) . 37 H.11 752.204-70 Partner Vetting Pre-Award Requirements (Feb 2012) H.12 752.222-70 USAID Disability Policy (Dec 2004) H.13 752.225-70 Source and Nationality Requirements (Feb 2012) H.14 752.236-70 Standards for Accessibility For The Disabled In USAID Construction Contracts (July 2007) H.15 752.242-70 Periodic Progress Reports (Oct 2007) H.16 752.245-71 Title To And Care Of Property (Apr 1984)

PART II - CONTRACT CLAUSES

SECTION I - CONTRACT CLAUSES

I.1 Notice Listing Contract Clauses Incorporated By Reference I.2 Responsibility Matters (Jan 2011) I.3 52.243-7 Notification of Changes (Apr 1984) I.4 52.244-2 Subcontracts (Oct 2010) I.5 52.232-27 Prompt Payment for Construction Contracts (Oct 2008) I.6 52.236-21 Specifications and Drawings for Construction (Feb 1997) I.7 52.246-21 Warranty of Construction (Mar 1994) I.8 752.7013 Contractor-Mission Relationships (Oct 1989)

PART III - LIST OF DOCUMENTS EXHIBITS AND OTHER ATTACHMENTS

SECTION J - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS

J.1 ATTACHMENT I – Bill of Quantity Form J.2 ATTACHMENT II – Diagrams and Specifications

PART IV – REPRESENTATIONS AND INSTRUCTIONS

SECTION K - REPRESENTATIONS, CERTIFICATIONS, AND OTHER STATEMENTS OF BIDDERS

K.1 Notice Listing Solicitation Provisions Incorporated by Reference K.2 52.204-3 Taxpayer Identification (Oct 1998) K.3 52.204-8 Annual Representations and Certifications (Dec 2014) K.4 52.209-5 Certification Regarding Responsibility Matters (Apr 2010) K.5 52.209-7 Information Regarding Responsibility Matters (Jul 2013) K.6 52.225-2 Buy American Act - Certificate (May 2014) K.7 52.227-15 Representation of Limited Rights Data and Restricted Computer Software (Dec 2007) 68 K.8 Signature

SECTION L – INSTRUCTIONS, CONDITIONS AND NOTICES TO BIDDERS

L.1 Notice Listing Solicitation Provisions Incorporated by Reference L.2 52.215-1 Instructions to Offerors – Competitive Acquisition (JAN 2004) L.3 52.233-2 Service of Protest (Sep 2006) L.4 General Instructions to Offerors L.5 Delivery Instructions L.6 Instructions for the Preparation of the Technical Proposal

SECTION M - EVALUATION FACTORS FOR AWARD

M.1 General Information M.2 Technical Evaluation Criteria M.3 Cost Evaluation M.4 Source Selection

SECTION B - SUPPLIES OR SERVICES/PRICES

B.1 Purpose

The purpose of this contract is to install and connect water supply at five Health Centers (Udassa, Wacho, Sibiya, Jaradado, and Mehal Jarso) in the SNNP Region.

B.2 Contract Type

The U.S. Government contemplates award of a Firm-fixed-price contract as set forth in Section B.4. For the consideration set forth in this Section, the contractor shall, during the period specified in Section C.3 and F.2 of this contract, perform the work per the standard specified under Sections C and J.

B.3 Ceiling Task Order Price

(a) The Firm-fixed-price for the performance of the work required hereunder is $__________.

(b) Within the total Firm-fixed-price specified in paragraph (a) above, the amount currently obligated and available for reimbursement of allowable costs incurred by the Contractor for performance hereunder is $____________. The Contractor shall not exceed the aforesaid obligated amount.

(c) Funds obligated hereunder are anticipated to be sufficient through TBD.

B.4 Line Item Pricing

B.5 Payment

Payment will be made in Ethiopian Birr (ETB) and will be processed for each Deliverable within each Task, as follows:

Task 1. Udassa Water Utility Connection

Deliverable 1.1) Lightning protection system installed and tested, with verification and approval from USAID. Payment will be processed for 50% of the total Task price. Deadline to be proposed by contractor.

Tasks Budget

Task 1: Udassa Water Utility Connection

Task 2: Wacho Water Utility Connection

Task 3: Sibiya Water Utility Connection

Task 4: Jaradado Well Connection

Task 5: Mehal Jarso Well Construction and Connection

TOTAL (FIRM-FIXED-PRICE)

Deliverable 1.2) Pipe materials delivered and secured, with verification and approval from USAID.

Payment will be processed for up to 15% of the total Task price, based on receipts for material and delivery costs. Deadline to be proposed by contractor.

Deliverable 1.3) Task fully completed, with verification and approval from USAID. Payment will be processed for the remaining Task amount due. Deadline to be proposed by contractor; deadline must be within twelve weeks of Notice To Proceed.

Task 2. Wacho Water Utility Connection

Deliverable 2.1) Lightning protection system installed and tested, with verification and approval from USAID. Payment will be processed for 50% of the total Task price. Deadline to be proposed by contractor.

Deliverable 2.2) Pipe materials delivered and secured, with verification and approval from USAID.

Payment will be processed for up to 15% of the total Task price, based on receipts for material and delivery costs. Deadline to be proposed by contractor.

Deliverable 2.3) Task fully completed, with verification and approval from USAID. Payment will be processed for the remaining Task amount due. Deadline to be proposed by contractor; deadline must be within twelve weeks of Notice To Proceed.

Task 3. Sibiya Water Utility Connection

Deliverable 3.1) Lightning protection system installed and tested, with verification and approval from USAID. Payment will be processed for 50% of the total Task price. Deadline to be proposed by contractor.

Deliverable 3.2) Pipe materials delivered and secured, with verification and approval from USAID.

Payment will be processed for up to 15% of the total Task price, based on receipts for material and delivery costs. Deadline to be proposed by contractor.

Deliverable 3.3) Task fully completed, with verification and approval from USAID. Payment will be processed for the remaining Task amount due. Deadline to be proposed by contractor; deadline must be within twelve weeks of Notice To Proceed.

Task 4. Jaradado Well Connection

Deliverable 4.1) Lightning protection system installed and tested, with verification and approval from USAID. Payment will be processed for 25% of the total Task price. Deadline to be proposed by contractor.

Deliverable 4.2) Well materials (including riser pipe, pump control, and pump electrical materials) delivered and secured, with verification and approval from USAID. Payment will be processed for up to 25% of the total Task price, based on receipts for material and delivery costs. Deadline to be proposed by contractor.

Deliverable 4.3) Task fully completed, with verification and approval from USAID. Payment will be processed for the remaining Task amount due. Deadline to be proposed by contractor; deadline must be within 16 weeks of Notice To Proceed.

Task 5. Mehal Jarso Well Construction and Connection

Deliverable 5.1) Lightning protection system installed and tested, with verification and approval from USAID. Payment will be processed for 5% of the total Task price. Deadline to be proposed by contractor.

Deliverable 5.2) Well materials (including riser pipe, pump control, and pump electrical materials) delivered and secured, with verification and approval from USAID. Payment will be processed for up to 25% of the total Task price, based on receipts for material and delivery costs. Deadline to be proposed by contractor.

Deliverable 5.3) Well constructed (including riser pipe, submersible pump, pump control, and pump electrical) and tested, with verification and approval from USAID. Payment will be processed for 25% of the total Task price. Deadline to be proposed by contractor.

Deliverable 5.4) Task completed, with verification and approval from USAID. Payment will be processed for the remaining Task amount due. Deadline to be proposed by contractor; deadline must be within 24 weeks of Notice To Proceed.

– END OF SECTION B –

SECTION C - DESCRIPTION/SPECIFICATIONS

C.1 Background

The purpose of this contract is to provide water supply for five new Health Centers (HCs) that were constructed by USAID/Ethiopia in SNNP Region. USAID’s contractor has previously installed the water supply network for the HCs. However, water supply (i.e., connection to a source) was not included in the construction.

The first phase of the procurement process was to assess and design the most practical water supply connection or source for each of the five new Health Centers. The first phase has been completed.

The second phase is to install the water supply connection or source. This Statement of Work describes the requirements of the second phase.

The five Health Centers involved are located at Udassa, Wacho, Sibiya, Jaradado, and Mehal Jarso.

Location and contact information for the sites is shown in the table below:

Latitude Longitude Region Zone Woreda Name Phone Number

Jaradado 6.99278 38.37083 SNNPR Sidama Awasa Zuriya 13km from Finote Selam 300 km Limaso Shega +251-913-959189

Sibiyia 7.18056 37.88807 SNNPR Hadiya Mirab Badewacho 13 km from Shone 270 km Desta Wadidi +251-936-526844

Wacho 8.32628 38.61783 SNNPR Gurage Sodo 13 km from Buee 100 km Solomon Kumbi +251-913-128349

Mehal Jarso 7.12639 37.89917 SNNPR Hadiya Misrak Badewacho 7 km from Shone 270 km Assefa Mancho +251-916-747680

Udassa 7.91769 38.46769 SNNPR Silte Silte 13 km from Koshe 180 km Aschalew Abera +251-912-245545

Contact Person Site Name

Location Approximate Distance between Site and Nearest Town

Approximate Distance between Site and

Addis Ababa

C.2 Objective

The purpose of this contract is to complete the water supply system at each of five new Health Centers, located in Udassa, Wacho, Sibiya, Jaradado, and Mehal Jarso. They are all located in SNNP Region.

C.3 Scope

The project will be divided into five tasks, corresponding to the five Health Center (HC) sites where the project will take place. The five sites are Udassa (Task 1), Wacho (Task 2), Sibiya (Task 3), Jaradado (Task 4), and Mehal Jarso (Task 5).

The contractor should initiate the water service provider (kebele) requests (described below) for Task 1, Task 2, and Task 3 as early as possible after the Notice To Proceed; Tasks 1, 2, and 3 will all be completed within a total of twelve weeks from the Notice To Proceed. The contractor should initiate the order for the pump for Task 4 (Jaradado) as early as possible after the Notice To Proceed; Task 4 will be completed within 16 weeks after the Notice To Proceed. Task 5 will be completed within 24 weeks after the Notice To Proceed.

All sites and work areas must be returned to their pre-construction condition (e.g., grading, grass, vegetation, gardens, fencing, etc.) following any impacts from construction activities.

USAID or others on behalf of USAID may review the contractor’s site work periodically and when the contractor believes all site work has been completed. If USAID identifies work that is unacceptable or incomplete, USAID will provide Quality Assurance or Quality Control (QA/QC) technical direction to the contractor. The contractor will modify or redo work to address USAID’s QA/QC technical direction.

The USAID CO or COR will inform the contractor in writing when a Task is accepted as complete.

After the project is accepted as complete, the contractor will provide a 12-month warranty period during which the contractor will rectify any defects in the construction at no additional cost.

The contractor’s performance (including quality and adherence to the schedule) will be rated and used to inform USAID’s decisions to select the contractor for future work.

Unless specified otherwise, the contractor will provide all necessary materials, equipment, machinery, site security, labor, government/utility payments, etc. necessary to complete the work according to the project milestones. The contractor will provide or obtain all utilities or services required during the work, such as power and water. The contractor will be responsible for all costs associated with replacing any materials that become unusable (e.g., lost, damaged, stolen) after they have been purchased, delivered, or installed on site and prior to final completion of the Task.

Any template Bill of Quantities (BOQ) included with this RFP package is not a part of the Statement of Work and is only an estimate of potential labor, materials, etc. and the associated quantities. The contractor must determine what labor, materials, etc. are required for completing the project and the contractor must determine the associated quantities.

C.3.1 Task 1: Udassa HC Water Supply Connection

The contractor will provide all necessary payments and requests to the local water service provider (kebele) for installation of water service with a water meter for the HC. Diagram 1 shows the schematic site layout, not to scale.

The contractor will provide and install 50mm galvanized steel pipe (Class B) connecting the elevated water storage tanks to the water meter and connecting the water meter to the existing water service line

– see Diagram 4. Piping will be installed in a similar fashion to the existing water piping of the HC.

The contractor will install blue warning tape above all new yard piping. The contractor will install the water meter if required.

The contractor will verify that the existing float valve in the storage tanks is working properly. If the float valve is not working properly, the contractor will provide and install a new float valve or fix the existing float valve.

The contractor will provide and install lightning protection on the existing water towers; the lightning protection should be early stream emission lightning protection system or equivalent with a 60 meter radius of protection. The contract will provide a submittal to USAID for their approval of the proposed lightning protection system prior to purchase and installation. An example of an early stream emission lightning protection system with a 60 meter radius of protection is included as Diagram 5.

C.3.2 Task 2: Wacho HC Water Supply Connection

The contractor will provide all necessary payments and requests to the local water service provider (kebele) for installation of water service with a water meter for the HC. Diagram 1 shows the schematic site layout, not to scale.

The contractor will provide and install 50mm galvanized steel pipe (Class B) connecting the elevated water storage tanks to the water meter and connecting the water meter to the existing water service line

– see Diagram 4. Piping will be installed in a similar fashion to the existing water piping of the HC.

The contractor will install blue warning tape above all new yard piping. The contractor will install the water meter if required.

The contractor will verify that the existing float valve in the storage tanks is working properly. If the float valve is not working properly, the contractor will provide and install a new float valve or fix the existing float valve.

The contractor will provide and install lightning protection on the existing water towers; the lightning protection should be early stream emission lightning protection system or equivalent with a 60 meter radius of protection. The contract will provide a submittal to USAID for their approval of the proposed lightning protection system prior to purchase and installation. An example of an early stream emission lightning protection system with a 60 meter radius of protection is included as Diagram 5.

C.3.3 Task 3: Sibiya HC Water Supply Connection

The contractor will provide all necessary payments and requests to the local water service provider (kebele) for installation of water service with a water meter for the HC. Diagram 1 shows the schematic site layout, not to scale.

The contractor will provide and install 50mm galvanized steel pipe (Class B) connecting the elevated water storage tanks to the water meter and connecting the water meter to the existing water service line

– see Diagram 4. Piping will be installed in a similar fashion to the existing water piping of the HC.

The contractor will install blue warning tape above all new yard piping. The contractor will install the water meter if required.

The contractor will verify that the existing float valve in the storage tanks is working properly. If the float valve is not working properly, the contractor will provide and install a new float valve or fix the existing float valve.

The contractor will provide and install lightning protection on the existing water towers; the lightning protection should be early stream emission lightning protection system or equivalent with a 60 meter radius of protection. The contract will provide a submittal to USAID for their approval of the proposed lightning protection system prior to purchase and installation. An example of an early stream emission lightning protection system with a 60 meter radius of protection is included as Diagram 5.

C.3.4 Task 4: Jaradado HC Well Connection

The contractor will field verify and confirm that the Total Dynamic Head (TDH) for selecting a submersible pump for the existing well should be 60 meters at 1.5 liters per second. The contractor will provide the TDH calculations to USAID for review and approval. The contractor will provide and install a submersible pump in the existing well. For a TDH of 60 meters at 1.5 liters per second, the pump will be Grundfos Type SP-5A/17 with 1.5kW MS 402 motor, or equivalent. The pump should be supplied with all spare parts required for a three (3) year period per the manufacturer recommendation.

The pump should be 100% stainless steel inside and outside; sand resistant; resistant to aggressive water; and have dry-running protection. The contractor will provide submittals to USAID for the approval of the pump and all accessories related to this project. The pump will be tested and commissioned; this includes connecting the pump to the existing electrical supply, connecting the pump to the existing water conveyance and storage network, cleaning of the existing water conveyance and storage network with chlorine flush, and installing and/or activating an automatic pump control based on water storage levels.

The contractor will provide and install a 40mm stainless steel riser pipe connected to the pump, as shown in Diagram 2. The contractor will provide and install galvanized steel pipe (Class B) connecting the riser pipe and the elevated storage tanks, including a well head as shown in Diagram 3. Diagram 1 shows the schematic plan, not to scale. Piping will be installed in a similar fashion to the existing water piping of the HC.

USAID may approve alternative materials for the riser pipe and yard piping at its discretion.

The contractor will provide and install water tank level controls and housing, pump controls and housing, and all necessary electrical components. The contractor will connect the new electrical into the existing electrical network at the HC. The contractor will adhere to Diagram 6, Diagram 7, and Diagram 8 for the pump power and control installations. The contractor will provide submittals describing all electrical system components prior to purchase. Electrical components should include the following or similar:

• Pump control panel, steel enclosure with control voltage transformer, 3x16Amp main switch circuit breaker, Overload relay, 3x16Amp contactor, power on-running and fault indicator lamps, Auto manual selector, Voltmeter 0-500V with selector switch and 3x6A fuses, Ammeters 3 pcs direct or CT type 0-50Amp, Lovato brand or equivalent logical level control relay with 3 electrodes, isolated neutral and ground buses, float switch with 3x2.5mm2 control cable, high and low level alarm sensors/electrodes and audio-visual alarm display complete with all necessary accessories

• Steel enclosure housing with 40x40x2mm angle iron legs height 250mm (100mm above foundation) for pump control panel, weather proof, dimension 550x500x200mm, two layer antirust coat and one layer enamel paint , with RC foundation

• (4x2.5)mm sq. electric power cable from pump control panel to bore hole, multi-core copper conductor, PVC/PVC, color coded, in PVC Pipe of diameter 50mm for UG and UPVC pipe of diameter 50mm for above grade work, with warning tape

• (3x1.5)mm sq. i/signal cable from pump control panel to bore hole ii/ signal cable from pump control panel to float switch iii/ signal cable from pump control panel to level electrodes on elevated water tank and iv/signal cable from pump control panel to audio-visual display, multi-core copper conductor, PVC/PVC, color coded, in PVC Pipe of diameter 50mm for UG and UPVC pipe of diameter 50mm for above grade work, with warning tape

• Electrical Manholes, 600x600x700mm

The contractor will provide and install lightning protection on the existing water towers; the lightning protection should be early stream emission lightning protection system or equivalent with a 60 meter radius of protection. The contract will provide a submittal to USAID for their approval of the proposed lightning protection system prior to purchase and installation. An example of an early stream emission lightning protection system with a 60 meter radius of protection is included as Diagram 5.

C.3.5 Task 5: Mehal Jarso HC Well Construction and Connection

The contractor will provide all necessary materials and construct a well with a 150 mm galvanized steel casing (Class B) at the location indicated on Diagram 1. The contractor will confirm that the necessary depth of the borehole is 130 meters. The contractor will adhere to the attached Specifications - Borehole Drilling. All plans, including drilling, casing, screens, etc., must be reviewed and approved by USAID prior to construction. The contractor will complete well drilling logs for all drilling.

The contractor will provide and install a submersible pump in the well. The pump will be Grundfos or equivalent to achieve a discharge of approximately 1.5 liters per second. The exact pump model will be proposed by the contractor after constructing the well. The pump should be supplied with all spare parts required for a three (3) year period per the manufacturer recommendation. The pump should be 100% stainless steel inside and outside; sand resistant; resistant to aggressive water; and have dry-running protection. The contractor will provide submittals to USAID for the approval of the pump and all accessories related to this project. The pump will be tested and commissioned; this includes connecting the pump to the existing electrical supply, connecting the pump to the existing water conveyance and storage network, cleaning of the existing water conveyance and storage network with chlorine flush, and installing and/or activating an automatic pump control based on water storage levels.

The contractor will provide and install a 40mm stainless steel riser pipe connected to the pump, as shown in Diagram 2. The contractor will provide and install galvanized steel pipe (Class B) connecting the riser pipe and the elevated storage tanks, including a well head as shown in Diagram 3. Diagram 1 shows the schematic plan, not to scale. Piping will be installed in a similar fashion to the existing water piping of the HC.

USAID may approve alternative materials for the well casing, riser pipe, and yard piping at its discretion.

The contractor will provide and install water tank level controls and housing, pump controls and housing, and all necessary electrical components. The contractor will connect the new electrical into the existing electrical network at the HC. The contractor will adhere to Diagram 6, Diagram 7, and Diagram 8 for the pump power and control installations. The contractor will provide submittals describing all electrical system components prior to purchase. Electrical components should include the following or similar:

• Pump control panel, steel enclosure with control voltage transformer, 3x16Amp main switch circuit breaker, Overload relay, 3x16Amp contactor, power on-running and fault indicator lamps, Auto manual selector, Voltmeter 0-500V with selector switch and 3x6A fuses, Ammeters 3 pcs direct or CT type 0-50Amp, Lovato brand or equivalent logical level control relay with 3 electrodes, isolated neutral and ground buses, float switch with 3x2.5mm2 control cable, high and low level alarm sensors/electrodes and audio-visual alarm display complete with all necessary accessories

• Steel enclosure housing with 40x40x2mm angle iron legs height 250mm (100mm above foundation) for pump control panel, weather proof, dimension 550x500x200mm, two layer antirust coat and one layer enamel paint , with RC foundation

• (4x2.5)mm sq. electric power cable from pump control panel to bore hole, multi-core copper conductor, PVC/PVC, color coded, in PVC Pipe of diameter 50mm for UG and UPVC pipe of diameter 50mm for above grade work, with warning tape

• (3x1.5)mm sq. i/signal cable from pump control panel to bore hole ii/ signal cable from pump control panel to float switch iii/ signal cable from pump control panel to level electrodes on elevated water tank and iv/signal cable from pump control panel to audio-visual display, multi-core copper conductor, PVC/PVC, color coded, in PVC Pipe of diameter 50mm for UG and UPVC pipe of diameter 50mm for above grade work, with warning tape

• Electrical Manholes, 600x600x700mm

The contractor will provide and install lightning protection on the existing water towers; the lightning protection should be early stream emission lightning protection system or equivalent with a 60 meter radius of protection. The contract will provide a submittal to USAID for their approval of the proposed lightning protection system prior to purchase and installation. An example of an early stream emission lightning protection system with a 60 meter radius of protection is included as Diagram 5.

The completed system should be tested for WHO and GOE standards. The following tests will be conducted: Total Coliform, Fecal Coliform, pH, Turbidity, TDS, Arsenic, and Fluoride. Appropriate advice and warnings should be given to the local authorities when handing over the water supply based upon the drinking water test.

• If the water supply does not meet the standards for bacteriological contamination then appropriate advice for mitigating the risk of drinking this water such as boiling for a certain time period should be given in writing.

• If the water supply does not meet the standards for chemical contamination such as flouride then local authorities should be warned in writing about it and advised to use the water for non-drinking purposes only unless they can treat it appropriately.

C.4 Specifications - Borehole Drilling

C.4.1 Borehole design and construction

Though the final design of each borehole will be determined based on site specific design information on the formation, for the purpose of this contract a typical multiple casing boreholes in unstable formation above aquifer zone are considered. Drilling will be carried out at the location agreed with USAID’s representative within the area where studies have been conducted and have established a high probability of yielding a productive borehole. Drilling will commence at larger diameter and surface casing is set through the overburden and sealed by pressure grouting, drilling will continue at a reduced diameter through the unstable zone. An inner casing will be installed through the unstable zone and drilling will continue at reduced diameter. Further reduction in drilled hole and casing will continue as required to case off several unstable zones above the aquifer. Finally, a uniform diameter steel casing and screen assemblies will be lowered into the borehole and all larger diameter casings are recovered, apart from the grouted surface casing. The annular space between the completion casing and the borehole wall is then back filled and grouted at the surface.

Sampling

During the process of drilling, rock/soil samples shall be collected every 2 meters and as the lithology changes, for further analysis, identification of the water-bearing zone and to make decisions regarding the setup of the blind and screen casings. The samples shall be stored in a graduated sample box designed for such purpose. The drilling report shall include detailed records of lithology, drilling rate and borehole construction.

Drilling method

DTH is the preferred method of drilling, however, the Contractor may use any rotary or mud drilling technique that he feels applicable to achieve the depth and diameter required, provided that the techniques used are those specified in his proposal or are approved by USAID. The use of lost circulation agents or any form of plugging materials that may ultimately affect the production capacity of the water bearing strata will not be permitted. Any drilling fluids additives must be approved by USAID.

Drilling diameter and depth

Drilling diameter shall be proposed by the Contractor and approved by USAID based on field conditions. Drilling depth shall be determined in the field by bail testing and other criteria as directed by USAID. Borehole drilling shall be classified as soft, medium and hard formation as defined below.

Soft Formation: shall mean unconsolidated sediments, like surface soils, alluvium and laurite sediments, unconsolidated volcanic material like volcanic ash, tuff, etc., and decomposed igneous indicted sedimentary rocks & metamorphic rocks.

Medium Formation: shall mean unconsolidated materials of grain size greater than cobble, moderately weathered rocks and moderately soft rocks

Hard Formation: shall mean fresh not weathered igneous indicated sedimentary rocks & metamorphic rocks

Water supply and auxiliary services for drilling The Contractor shall make his own arrangements for obtaining, storing, transporting and pumping of water required for the drilling purposes and for use by the drilling crew at their campsite. The Contractor shall provide light and all necessary equipment and auxiliaries for drilling or any other of the operation to avoid unnecessary delays and work stoppages.

Environmental protection of site Care must be taken in handling and storage of all drilling fuels, oils, greases and fluids on site, to avoid any environmental degradation. The Contractor shall dispose of any toxic materials, drilling fluids, and other additives, cuttings and discharged water in a manner approved by USIAD so as not to create damage to public and private property, and shall adhere to the set of “ Environmental Guidelines for Drilling and Test Pumping Operation” described below. The Contractor’s adherence to these guidelines will be closely monitored by USAID, and any infringement by the Contractor may render unacceptable the particular portion of the works to which it applies. The Contractor shall ensure that all his personnel are aware of these Environmental Guidelines and the consequences of not adhering to them.

C.4.2 Environmental Guidelines and Code of Conduct

Groundwater exploration and development work should be conducted in an environmentally and socially sensitive and responsible manner. These guidelines are intended to ensure that all parties are aware of the potential impacts of their activities, and carry out the work in an appropriate way.

These guidelines are intended as a written statement of intent for the Contractor to adhere to, and to which recourse can be made in the event of a perceived undesirable impact.

Contractors are required to familiarize all employees with the content and spirit of these guidelines.

i. Camps If and where field camps are needed, their construction and removal should be carried out along the following lines:

• Permission for camp areas must be obtained in writing from the relevant local authorities.

• Suitable latrines and other sanitary arrangements at the camps and sites where work is in progress should be availed to the crew.

• Access roads and the camp area should be sited to cause minimum disturbance. No trees should be cut down; use of firewood must be restricted to dead wood only and should not conflict with the needs of the residents of the area.

• No permanent structures should be built at the camp.

• The camp should be removed, the site cleared and cleaned of all debris, and waste and hydrocarbons at the end of the Contract and local authorities should be shown the cleared site.

• All rubbish (except for oils and other mechanical or chemical waste) should be buried or removed

• Waste oils, chemicals and mechanical wastes should be stored and removed to Government/Municipal designated sites or recycling plants.

ii. Human Relations

• People, water, land and livestock must be respected and protected;

• Access routes should not transgress gardens. But if found necessary permission to enter the gardens must be sought from the owner. Work should be done with minimal damage to fences, trees and crops.

• All conflicts/disagreements and any agreements, no matter how trivial, must be logged and dated, with details of persons involved and subject matter, in a book for this purpose at the base camp.

iii. Drilling Site

• Each drilling site should be cleared of all waste after use. Drilling waste (chippings and muds) should be buried. Waste oils, chemicals and mechanical wastes should be stored and removed to Government/Municipal designated sites or recycling plants.

• No spillage of oils or fuels should occur and if it occurs appropriate methods should be used to clean the site to environmentally acceptable standards.

• During drilling and pump tests, the site must be protected from erosion by the erection of check dams, if needed.

• On completion of each borehole the site must be left clean and free from all debris, hydrocarbons and waste, and all pits filled to the satisfaction of USAID.

C.5 Blind and Screen Casing Material

Unless specified in the bills of quantities, uPVC blind and screen casings are specified they shall confirm to ISO 12818:1992 Standard with threaded male and female ends.

Internal Diameter (ID) Wall thickness

150mm (6”) 7.5 – 8.5mm 200mm (8”) 10.0 – 11.2mm 250mm (10”) 12.5 – 14.0mm

Screens shall conform to the same standards specified above. Screen slots arrangement, openings and type shall be submitted to USAID for approval before installation. The total opening area should not be less than 10 percent and the openings shall be 1 to 2.5mm

Casing Installation

The Contractor shall provide to USAID data obtained during drilling regarding the depth and thickness of the water-bearing zone, the water struck depth/level, and the static water level. Based on this data, the Contractor shall propose the number and position of screen casings, which USAID will approve or decline. The screen casings and blind casings shall be of the same specification as specified above.

The Contractor shall ensure that the borehole is cased throughout its depth, with a small (1-2% of the total depth of the borehole) allowance for settling.

All casing shall be joined by screwing them together, screwing should move easily without force thus ensuring verticality is maintained. To strengthen the joints, the outer side of joint of all steel casings shall be welded with 4mm metal strip to connect adjoining casing. A proper casing shoe, approved by USAID’s supervisor shall be fitted to the bottom of the first casing before lowering.

Casing installation shall not be done in the absence of USAID’s supervisor.

Observation Pipe Installation

One water level observation pipe should be installed in each well to be drilled. The observation pipes should preferably but not necessarily be 3/4” diameter GI pipe. The observation line should reach approximately as deep as the bottom of the housing line or as determined by USAID. The bottom most observation pipe shall be slotted at a distance 2m above the bottom and thereafter slots shall be at an interval of 10m. Each slotted section (screen) shall be 2m length. The uppermost slotted section should be 10m below the static water level.

If observation pipe screens are made by hand, slots may be cut with hack saw. Slots may be arranged on two opposite sides in an alternating manner. The slot spacing on each side being about 2cm apart, and care should be taken to ensure the slots are clean and without residues. Drilling holes or torch-cuts are not permitted

It must under all circumstance be installed in the borehole in a rectilinear way to allow the free passing of probes. Noncompliance with these requirements entitles USAID to not accept the well.

Well Plumbness/Verticality and Alignment Testing

Drilled boreholes will be tested for verticality and alignment by means of running a dummy down the casing. The dummy shall consist of a cylinder 10m length with a diameter 20mm less than the well casing. The dummy must pass freely through the entire length of the cased borehole. In the absence of a dummy, testing will be done by running two iron discs at least 3mm thick and of equal diameter or no more than 13mm less than the internal diameter of the borehole casing. The iron discs shall be connected from their centers by at least 3m of steel pipe of at least 25mm diameter. The dummy or the discs and pipe will be supplied by the Contractor and will be lowered to the bottom of the borehole by means of a steel wire passing over a pulley suspended from the machine winch or tripod and connected to the exact center of the dummy or the center of the top disc. The discs should easily pass down the whole depth of the borehole. The deviation of the steel wire connected to the center of the dummy or top disc from the center of the borehole shall not exceed one quarter of the internal diameter of the borehole casing. If these requirements are not met and if the borehole is determined more than 3% out of alignment, the Contractor will, if possible, correct the defects. If not, USAID has the right to reject the borehole and no payments will be made for its drilling and completion.

The contractor may also conduct these and other tests he may deem necessary to keep the borehole being drilled vertical and straight. These shall be made entirely at the contractor’s own expense

The contractor will report result of measurement and calculated deviation within 24-48 hours after each measurement. Six (6) days after the last measurement in each hole, the contractor shall prepare a report with summary table of instrument readings and calculated deviations. The results will be attached to the report

Well Development and Gravel Packing

In addition to the cleaning and development of the well before casing installation, the well will be developed continually during filter gravel packing. Washed and well-rounded river gravel, of diameter range 6-9mm and uniformity coefficient in the range 2.5 – 5 will be packed between the annular space of the casing and the well from the bottom until 6m below the ground surface. To avoid bridging of the gravel, which may lead to severe damage of the permeability of the aquifer or damage the borehole wall, it is forbidden to fill–in gravel by mechanized equipment. The gravel shall be inserted into the borehole by hand using a shovel.

After packing is complete, the well will be developed by air-lifting, alternating continuous and surging, for a minimum of 24 hours. During well development, the position of the air outlet (bottom of the drill pipe if drilling apparatus is used for air-lifting) shall be in the blind casing below the lowest screen casing and the Contractor shall ensure that the casing string is adequately supported at the top if necessary and is not damaged. Any casing and/or screen damage during installation and well development shall be the responsibility of the Contractor, who shall make the necessary corrections/repairs without additional cost to USAID. The airlift well development shall proceed systematically from top to bottom until the water is clear to the satisfaction of USAID’s supervisor. When well development is completed, the gravel packing will be topped up if it is found settling below the required depth.

Well development and gravel packing shall not be undertaken in the absence of USAID’s supervisor.

Pumping Tests

Test Pump Unit

The test pump unit shall consist of an appropriate submersible pump with a capacity determined by USAID’s supervisor based on the estimates of borehole yield determined from airlift or a bailer. The pump shall have appropriate number of stages to make it adequate to tackle the dynamic head. The test pump shall have an appropriate power source (generator) to run it, pipe on which to set the pump and all necessary tools and equipment to carry out pumping tests with an accurate measurement of water discharge and water level in the well. A turbine pump unit, run by an easily throttled diesel engine with the capability of discharging the estimated discharge range is considered advantageous over other types. For measurement of water levels in wells, electric water level indicators shall be used. The equipment and crew shall be as stated in the bid document, capable of performing the test pumping to the satisfaction of USAID’s supervisor.

Water Level Gauges: The contractor should have on the site at least 2 electric gauges suitable for maximum depth of borehole. The device should fit into the observation pipe and should permit direct, convenient and accurate reading of depth of static and dynamic water level.

Test pumping methods

Two types of pumping test shall be undertaken once the borehole is completed and developed. After measuring the static water level, a constant rate pumping test and recovery measurement shall be undertaken using an appropriate electrical submersible pump and generator for a minimum of 24 hours, although the duration can vary according to the rate of the drawdown. The recovery test shall continue until a minimum of 90% recovery is achieved. The discharge shall be measured using a suitable-sized water containers and a stopwatch, with suitable time intervals agreed beforehand with USAID. The Contractor will follow the instructions of USAID’s supervisor regarding the duration of the constant rate pumping and recovery tests.