SEE ADDENDUM

(No Collect Calls)

W911N221R0016 04-Aug-2021

b. TELEPHONE NUMBER

717-267-5375

8. OFFER DUE DATE/LOCAL TIME

02:30 PM 27 Aug 2021

5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

STANDARD FORM 1449 (REV. 2/2012)

Prescribed by GSA – FAR (48 CFR) 53.212

(TYPE OR PRINT)

(SIGNATURE OF CONTRACTING OFFICER)

ADDENDA ARE

26. TOTAL AWARD AMOUNT (For Gov t. Use Only )

23.

CODE 10. THIS ACQUISITION IS

SUCH ADDRESS IN OFFER

17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT

BELOW IS CHECKED

TELEPHONE NO.

W911N29. ISSUED BY

18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK

7. FOR SOLICITATION

INFORMATION CALL:

a. NAME

MARY BRITSCH

2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER

(TYPE OR PRINT)

30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER

30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA

0 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.

25. ACCOUNTING AND APPROPRIATION DATA

1. REQUISITION NUMBER

20.

ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.

OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

W25G1Q033600IE

ARE NOT ATTACHED

27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED

(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE

SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:

. YOUR OFFER ON SOLICITATION

28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN

% FOR:SET ASIDE:UNRESTRICTED ORX

SMALL BUSINESS

17a.CONTRACTOR/ CODE FACILITY

OFFEROR CODE

LETTERKENNY ARMY DEPOT

LETTERKENNY CONTRACTING OFFICE - ACC-RSA-LEAD

1 OVERCASH AVENUE, ATTN: CCAM-MLK, BLDG 2S

CHAMBERSBURG PA 17201-4150

18a. PAYMENT WILL BE MADE BY CODE

RATED ORDER UNDER

DPAS (15 CFR 700)

13a. THIS CONTRACT IS A

13b. RATING

CODE15. DELIVER TO CODE W91FVA 16. ADMINISTERED BY

12. DISCOUNT TERMS11. DELIVERY FOR FOB DESTINA-

TION UNLESS BLOCK IS

MARKED

SEE SCHEDULE

14. METHOD OF SOLICITATION

RFQ IFB RFPX

DIRECTORATE OF INDUSTRIAL OPERATIONS

KIRK DOMER

LETTERKENNY ARMY DEPOT, BLDG 370

CHAMBERSBURG PA 17201

TEL: (717) 267-4100 FAX:

717-2679834FAX:

TEL: SERVICE-DISABLED

VETERAN-OWNED

SMALL BUSINESS

8(A)

HUBZONE SMALL

BUSINESS

SIZE STANDARD:

1,250

NAICS:

333415

X

OFFER DATED

29. AWARD OF CONTRACT: REF.

DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY

COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND

EMAIL:

TEL:

31c. DATE SIGNED

SEE SCHEDULE

SCHEDULE OF SUPPLIES/ SERVICESITEM NO. QUANTITY UNIT UNIT PRICE AMOUNT

24.22.21.19.

WOMEN-OWNED SMALL BUSINESS (WOSB)

ELIGIBLE UNDER THE WOMEN-OWNED

SMALL BUSINESS PROGRAM

EDWOSB

32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

(CONTINUED)

PAGE 2 OF70

ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________

32a. QUANTITY IN COLUMN 21 HAS BEEN

RECEIVED INSPECTED

32b. SIGNATURE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE

37. CHECK NUMBER

FINALPARTIALCOMPLETE

36. PAYMENT35. AMOUNT VERIFIED

CORRECT FOR

34. VOUCHER NUMBER

FINAL

33. SHIP NUMBER

PARTIAL

38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY

41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT

41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE

42a. RECEIVED BY (Print)

42b. RECEIVED AT (Location)

42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS

STANDARD FORM 1449 (REV. 2/2012) BACK

Prescribed by GSA – FAR (48 CFR) 53.212

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

SEE SCHEDULE

20.

SCHEDULE OF SUPPLIES/ SERVICES

21.

QUANTITY UNIT

22. 23.

UNIT PRICE

24.

AMOUNT

19.

ITEM NO.

W911N221R0016

Section SF 1449 - CONTINUATION SHEET

SOLICITATION NOTES

1. System for Award Management (SAM): In accordance with FAR 4.1102, Offerors shall be registered in the SAM database in order to be eligible for contract award. No award will be made to an Offeror not registered.

Registration can be accomplished at https://sam.gov/content/entity-registration. Registration in this database shall remain active. There has been a recent SAM requirement for submission of notarized letters for all new vendor registrants, and for renewals of existing registrations. Please check your SAM registration and if the registration is due for renewal in the next few months, it is important to start that process immediately. For additional information on notarized letters, visit:

https://www.fsd.gov/gsafsd_sp?id=kb_article_view&sysparm_article=KB0016652&sys_kb_id=8cfe46491b1cb8909 ac5ddb6bc4bcbbb&spa=1.

2. Annual Representations and Certifications: In accordance with FAR 4.1201, Offerors shall complete electronic annual representations and certifications within SAM as part of required registration. Registration in this database shall remain active and can be accessed at https://sam.gov/content/entity-registration.

3. Questions: Questions regarding this solicitation shall be submitted to the Contracting Officer, in writing, at least 10 calendar days prior to the closing date. Questions submitted after this time will be answered at the discretion of the Contracting Officer. The Contracting Officer for this action is Shaun Leatherman (shaun.r.leatherman.civ@mail.mil). The Contract Specialsit for this action is Mary Shifflett (mary.e.shifflett2.civ@mail.mil) and Alternate Contract Specialist Velma White (velma.e.white2.civ@mail.mil)

4. Award without Discussions: The Government intends to award without discussions, offerors should submit their best prices in their initial offer. If FAR Provision 52.212-2, Evaluation-Commercial Items, is included, Offerors must submit all information requested therein in order for the Government to determine technical acceptability.

5. Amendments: The Offeror shall submit to the Contracting Officer signed copies of all amendments issued to this solicitation. Failure to comply may cause your proposal to be rejected.

6. Payment: Payment for this action will be made by Electronic Funds Transfer (EFT) through the Defense Finance and Accounting Services (DFAS) utilizing Wide Area Work Flow (WAWF). See 252.232-7006 for more information.

7. Period for Acceptance of Offers: The Offeror agrees to hold the prices in its offer firm for 60 calendar days from the date specified for receipt of offers.

8. Type of Contract: The type of contract resulting from this solicitation is specified in FAR Provision 52.216-1, Type of Contract. For Indefinite Delivery/Indefinite Quantity (IDIQ) or Requirements contracts all quantities are estimated and individual orders shall be issued citing specific quantities and delivery dates. Payment will be made on actual quantities delivered and/or serviced.

9. Proposals: Proposals shall be signed by an authorized individual in accordance with FAR 4.102, Contractor’s Signature. Failure to comply may cause your proposal to be rejected. Offerors should mark each page of their proposal as "Proprietary Information" if they want it treated as Proprietary Information under the Procurement Integrity Act.

10. First Article Approval: A successful First Article Approval shall be required for CLIN 0001 in accordance with FAR 52.209-3, First Article Approval – Contractor Testing.

11. FOB Destination: Unless otherwise stated in the solicitation, Offerors shall provide FOB Destination prices.

12. Contact Information: A Contracting Officer’s Representative (COR) will be appointed at the time of award.

The successful Offeror will be furnished the COR name and contact information at the time of contract award.

13. Wage Determination: Service Contract Act Wage Determination #2015-4253, Revision #15, dated 14 June 2021 is hereby incorporated. Wage Determination can be viewed at http://www.wdol.gov.

14. Insurance (Fixed Price): Pursuant to the requirements of FAR clause 52.228-5 Insurance-Work on a Government Installation, the contractor shall obtain and maintain at least the following kinds of insurance and minimum liability coverage during any period of contract performance:

a. Workmen's Compensation and occupational disease coverage as required by law except that, if this contract is to be performed in a state which does not require or permit private insurance, then compliance with the statutory or administrative requirements in any such state will be satisfactory. The required Workmen's Compensation Insurance shall extend to cover employers' liability for accidental bodily injury or death and for occupational disease with a minimum liability limit of $100,000.

b. Comprehensive General Liability Insurance in the minimum limit of $500,000 per occurrence for bodily injury liability.

c. Comprehensive Automotive Liability Insurance with minimum limits of $200,000 per person and $500,000 per occurrence for bodily injury, and a minimum limit of $200,000 per occurrence for property damage.

15. AMC-Level Protest Program: Prior to submitting an agency protest, it is preferable that you first attempt to resolve your concerns with the responsible contracting officer. However, you may also file a protest to the Headquarters (HQ), Army Materiel Command (AMC). The HQ AMC-Level Protest Program is intended to encourage interested parties to seek resolution of their concerns within AMC as an Alternative Dispute Resolution forum, rather than filing a protest with the General Accountability Office (GAO), or other external forum. Contract award or performance is suspended during the protest to the same extent, and within the same time periods, as if filed at the GAO. The AMC protest decision goal is to resolve protests within 35 calendar days from filing. To be timely, protests must be filed within the periods specified in Federal Acquisition Regulation 33.103. If you want to file a protest under the HQ AMC-Level Protest Program, the protest must request resolution under that program and be sent to the address below.

Headquarters U.S. Army Materiel Command Office of Command Counsel-Deputy Command Counsel 4400 Martin Road Rm: A6SE040.001 Redstone Arsenal, AL 35898-5000 Fax: (256) 450-8840 or email usarmy.redstone.usamc.mbx.protests@mail.mil

The AMC-level protest procedures are found at:

www.amc.army.mil/amc/commandcounsel.html

If internet access is not available, contact the contracting officer or HQ, AMC to obtain the AMC-Level Protest Procedures.

PURCHASE DESCRIPTION

PURCHASE DESCRIPTION

FOR

ENVIRONMENTAL CONTROL SYSTEM

1.0 General

1.1 Scope: This specification shall apply to an estimated quantity of four (4) Environmental Control Systems (ECS) used on mobile shelters containing electronics equipment deployed in a tactical military environment in support of the TPY-2 Electronic Equipment Unit (EEU) program.

1.2 Period of Performance (PoP): The Period of Performance shall be one Base Year of 12 months and one 12-month option year. Period of Performance reads as follows:

1.2.1 Base Year: 15 September 2021 to 14 September 2022

1.2.2 Option Year One: 15 September 2022 to 14 September 2023

2.0 S Specifications

2.1 The ECS shall provide heating, cooling, and humidity control to create an environment suitable for commercial-grade and military-grade electronics.

2.2 The ECS is the primary source of cooling, heating, dehumidification, humidification, filtration, and fresh outside air supply for equipment and personnel operating in an insulated, EMI/RFI shielded 41 foot shelter. It may be used either in the shelter known as the Electronics Equipment Unit (EEU) or the Concurrent Training and Test operations Support Unit (CSU). The purpose of the ECS is to maintain the EEU/CSU main compartment temperature and humidity within acceptable limits for the enclosed electronics and personnel. The ECS may use redundant or partially-redundant systems in order to meet performance requirements.

2.3 Available Equipment Spaces:

2.3.1 Condenser Compartment: The condenser will be a partially enclosed assembly on a space frame structure.

The compartment will have a roof panel which can be removed to gain access for routine maintenance.

2.3.2 Evaporator Compartment: The evaporator compartment will be an insulated enclosure assembly on a space frame structure. Accessibility to interior components of the evaporator section for replacement or service shall be made through doors/panels that, when closed, do not compromise the NBS integrity of the EEU/CSU main compartment.

2.4 Physical design and construction

2.4.1 Weight: Evaporator Section shall not exceed 1,865 lbs. (excluding refrigerant). Components in Condenser

Section, including frame shall not exceed 3,500 lbs. (excluding refrigerant).

2.4.2 Refrigerant shall be in accordance with A-A-58060A.

2.5 Performance Requirements

2.5.1 Operating Modes: The ECS shall have two states: “ON” and “OFF.” The “ON” state indicates that the ECS is powered and is controlling temperature and humidity. This is also referred to as the “operating” state, and includes the Start Up, Transient, and Steady-State sub states. The “OFF” state indicates that the ECS is not powered. This is also referred to as the “non-operating” condition. Storage requirements assume the ECS is in the “OFF” state.

2.5.1.1 Sub-States of the ON state

- Start Up sub-state: The ECS is on, but the temperature and humidity conditions in the ECS/CSU main compartment are outside the bounds. The EEU payload electronics cannot safety be energized when the ECS is in Start Up sub-state.

- Transient sub-state: The ECS is ON, and the temperature and humidity in the EEU/CSU main compartment are within the bounds, but not within the steady-state bounds. The EEU/CSU electronics can safely be energized while the ECS is in the TRANSIENT sub-state. The ECS may go from STEADY-STATE to TRANSIENT under the following circumstances:

a) a temperature change is commanded by the user.

b) an auto-restart occurs.

c) the heat load inside the EEU/CSU changes by more than 10%.

The ECS shall recover and return to STEADY-STATE within120 minutes.

- Steady State sub-state: The ECS is ON and is maintaining temperature and humidity in the EEU/CSU main compartment within the bounds.

2.6 Operating Requirements: The ECS shall meet performance requirements continuously, without interruptions for maintenance, for not less than (nlt) 96 hours over a period of 45 days, under the worst-case combination of environmental conditions allowed. The ECS shall support 17 hours-per day operations, meeting all performance requirements, for nlt 75 days, under the worst-case combination of environmental conditions allowed. Each time the ECS is cycled ON, the redundant component set energized shall be alternated from that of the previous ON cycle.

Additionally, the ECS shall automatically cycle to the redundant system if a fault is detected which would prevent the running system from maintaining EEU/CSU internal environmental control. A manual override which forces the use of a single system (disabling auto-switchover) shall be provided. The ECS shall meet performance requirements for 24 hours, during which continuous humidification is required, without refilling the humidifier reservoir.

2.7 Internal Environmental Control: The ECS shall maintain the internal environment of the EEU main compartment within the requirements with a heat load of between 0 and 153,683 BTU/hr. (45 kW) deliverable capacity, including 30 kW from payload electronics, environmentals and a maximum of three operators, in any combination of the environments. The ECS shall be sixed to account for heat generated within the ECS, including but not limited to the fans, heaters, wiring and motors.

2.7.1 Steady-State Requirements: When in a steady-state condition, the ECS shall maintain the air temperature in the EEU main compartment at the primary control location at a selected steady-state temperature between 70o F (21oC) and 75of (24oC) Dry Bulb. The temperature shall be stable and accurate to the selected temperature with +/- 2oF (+/- 1oC) at the primary control location. The temperature variation across the shelter shall not exceed +/- 10oF.

The ECS shall control relative humidity inside the EEU main compartment between 30% and 60%. Within that range, the humidity shall be stable within +/-5%. The desired steady-state temperature and steady-state humidity shall be adjustable through a lockable human machine interface.

2.7.2 Transient Requirements: While the ECS electronics are operating, if a temperature change of more than +/- 2oF (+/-1oC) is commanded, the maximum rate of temperature change inside the EEU main compartment shall not exceed 8oF/hr. (4oC)/hr.). The ECS shall prevent the EEU main compartment air temperature from exceeding 90oF (32.2oC) or dropping below 68oF (20oC) at any time during operation. The ECS shall prevent the EEU main compartment humidity from condensing in any internal equipment and on any interior surface of an exterior wall who’s temperature is above 40oF, and from exceeding 80% of dropping below 20% at any time.

2.7.2.1 Startup Requirements: The rate of temperature change shall not exceed 36°F/hr. (20°C/hr.) at any time.

2.7.2.2 Start Up Timeline, Normal Operation. When the ECS is energized, it is in the START UP sub-state. The ECS shall meet the steady-state temperature and humidity requirements within 60 minutes of being turned ON, given the following conditions:

a) 0 BTU/hr. electronics heat load.

b) Ambient temperature between +41°F (+5°C) and +100.4°F (+38°C).

c) Daylight and dry, clear weather.

d) No Nuclear, Biological, and Chemical (NBC) threat (Mission Oriented Protective Posture -0 (MOPP-0)).

2.7.2.3 Start Up Timeline, Adverse Conditions: The ECS shall meet the steady state temperature and humidity requirements of Paragraph 3.3.3.1 herein within 8 hours of ECS Power application when the external ambient temperature is between -26°F(-32°C) and +41°F (+5°C) or between +100.4°F (+38°C) and +121°F(+49°C).

2.7.2.4 Low Ambient -26oF (-32o C) Operation: EEU/CSU main compartment heating and cooling will be required at low ambient temperatures. The ECS logic shall determine when the compressors are safe to energize after the ECS has been turned “ON”. Low temperature operations shall maintain the compressors within safe starting and operating limits as determined by the compressor manufacturer.

2.7.3 Refrigeration System Operation

2.7.3.1 Low-Temperature System Protection: The ECS components must be protected from freezing during operation. The ECS shall provide protection to the compressors against liquid slugging, oil dilution, and other low temperature-related faults.

2.7.3.2 Structural Isolation: Components of the refrigeration system shall not carry structural loads.

2.7.3.3 Refrigerant Moisture Content: The moisture content of the system shall not exceed 60 parts per million by weight in the liquid state.

2.7.3.4 Condensate Drainage: Provisions shall be made for complete draining of condensate from the coils to the condensate drain pan under all conditions. In the event of a chemical threat, chemical agents shall not enter into the circulating air stream through the condensate drains. A “duckbill” check valve may be used to accomplish this. The ECS design shall prevent insects from entering the condensate drains. The drainage system shall prevent the formation of standing water. Condensate from the evaporator coils shall be prevented from re-entering the supply air stream.

2.7.3.5 Refrigerant Lines: When parts of the system are located in both the front and rear compartments of the shelter, connecting refrigerant lines shall be run such that they do not protrude beyond the outer boundaries of the shelter and do not interfere with access to the main compartment. ECS design and/or insulation shall prevent dripping due to condensation on cold lines. Design analysis, fabrication, and inspection of the refrigeration piping system shall be in accordance with American Society of Mechanical Engineers (ASME) B31.5, Refrigeration Piping.

2.7.4 Minimum Controls/Safeties.

2.7.4.1 Safe Operating Pressure: The system shall shut down the operating system in the event maximum or minimum safe operating pressures are exceeded. The safety device(s) shall have an automatic reset feature to allow ECS operation either immediately, using a redundant system, or after the pressure returns to a safe level.

2.7.4.2 Circuit Protection Devices: The ECS shall have a main circuit protection device accessible from the ECS control panel. The main circuit protection device shall provide overload and short circuit protection for the entire system. Additional circuit protection devices shall be incorporated as recommended by the National Electrical Code (NEC).The circuit breakers within the ECS shall provide selective protection such that only the circuit protection device closest to the fault is tripped. Redundant systems shall have circuit protection devices which shut down all components of one system without affecting components of the other (redundant) system.

2.7.5 System Status Data Logging: The system shall automatically record system health and status data for remote troubleshooting and failure trend prediction. Data shall be retained automatically for a minimum of 14 days. Where applicable, the redundant equipment shall have independent readings. The data should be accessible for download and analysis within one hour of being recorded. The following items are examples of the types of data which should be recorded:

a) Internal air temperature(s).

b) Internal humidity measurement(s).

c) On / Off status of compressor(s), fans, motors, humidifiers and heaters.

d) Energized / de-energized status of valves.

e) Refrigerant system pressures (suction, discharge, liquid line, evaporator discharge, etc.).

f) Refrigerant system temperatures (suction, discharge, liquid line, evaporator discharge, etc.).

g) Status of control power.

h) Phase / Voltage / Current Fault status.

i) Ambient temperature.

j) Status of replaceable items (filters).

k) System runtime.

Data logging equipment is Built-In Test Equipment (BITE) and is therefore not mission-critical equipment.

2.7.6 Control Panel(s): The ECS shall be supplied with control panels which contain a full complement of controls for all the sub-systems in the ECS. Components of the EEU/CSU control/display panels, patch panels, and other panels shall utilize functional grouping. The ECS shall prohibit activation of controls in improper sequence for functions that may result in a hazard. A test button or switch shall be provided to prove the functionality of all indicators. Visual indicators shall be provided for (at a minimum) all Hardware Effective Function Faults, ECS ON/OFF status, ECS START UP/TRANSIENT/STEADY-STATE status, MOV status, Voltage Monitor status, the status of redundant systems, and the current temperature and relative humidity levels in the EEU/CSU main compartment. Temperature and humidity levels should be displayed numerically inside the EEU/CSU.

If a remote/secondary panel is provided, the following controls shall exist in the remote panel. Other controls may exist if space is available.

a) System Power Switch and system power indicator light.

b) ECS START UP/TRANSIENT/STEADY-STATE status.

c) Redundant System Selector Switch and active system indicator light.

d) Indicator Light Test Switch.

e) Fault Status.

f) EEU/CSU main compartment air temperature and relative humidity.

2.7.7 Control Circuitry: All control circuitry shall be contained in one or more waterproof, EMI-shielded enclosures. All control and power wiring between the evaporator and condenser compartments shall be EMI shielded.

2.7.8 Fault Monitoring: The ECS shall have a Voltage Monitor and Phase Rotation Failure Relay which detects when a power phase is lost or mis-rotated, or when the voltage deviates more than ±10% and automatically shuts down the ECS. The Voltage Monitor and Phase Failure Relay shall automatically restart the ECS after corrective action has been made.

A Fresh Air Flow Sensor shall be provided on the fresh air make up line to verify operation of the fresh air make up damper and/or the Gas Particulate Filter Unit (GPFU). This sensor shall provide a switch closure to activate an audible alarm in the main compartment if fresh air is not being supplied at a rate of 60 SCFM or greater.

2.8 Physical Requirements

2.8.1 Accessibility: When the ECS is installed in the EEU/CSU, access to every major unit, subassembly, and diagnostic aid shall be through removable access panels or doors. The ECS shall be constructed to permit access (in accordance with MIL-STD-1472) to interior parts, terminals and wiring for inspection, repair, removal or replacement of line replaceable units (LRUs). It should not be necessary to displace or remove wires, cables, subassemblies or assemblies to access LRUs. Line Replaceable Units (LRUs) include all those items which are field-replaceable. Depot repairable/replaceable items do not need to be removable without displacing other components, but shall be accessible for inspection and any required maintenance. All panels or covers on the equipment which must be removed or opened for servicing or making adjustments shall be retained with captive hardware. Components which are subject to replacement or servicing shall not be permanently secured by rivets, welding, inaccessible fasteners or other means which would preclude their removal. All filters shall be located such that replacement and routine service can be accomplished. Access to all lubrication fittings on machinery bearings is required. Cables shall be permanently installed and require no removal for transportation.

2.8.2 Nuclear/Biological/Chemical (NBC) Integrity: The ECS shall withstand, without damage, the effects of NBC contaminant exposure and subsequent decontamination wash-downs with Supertropical Bleach (STB), High-Test Hyperchlorite (HTH), and Hot Soapy Water (HSW) not less than five times in a 30 day period. The presence of features which would prevent decontamination of the ECS should be avoided.

2.9 Power Requirements

2.9.1 Electrical Interfaces: The ECS shall operate from an Input Voltage of 480V +/- 10%. The ECS will be fed from a wye configured transformer secondary. This will be a four wire feed (no neutral) and the wye secondary neutral will be connected to ground using a high resistance ground configuration. See Figure 2 herein. The input frequency will be 60 Hz +/-5%. Input short circuit current will not exceed 10,000 A RMS with a bolted short at the ECS input terminals. The ECS shall not require more than 110 Amps RMS max long term, 500A max for less than

0.2 Seconds. Time delays may be used to manage inrush current. Input power shall be no greater than 73.0 kW/91.25 kVA at worst case operating conditions. The power factor shall be no less than .80 lagging. Three properly rated MOVs shall be connected in a star configuration and the common point tied to chassis ground using a fourth MOV as shown in Figure 2 herein. The GPFU shall be supplied with 60Hz, single phase, 120VAC at 20A power from the ECS via a step down transformer. All electrical components and wiring shall be properly de-rated to meet environmental requirements specified herein. The electrical design and implementation shall meet NFPA-70 National Electrical Code 2008.

2.9.2 Auto-Restart: The ECS shall recover and autonomously return to normal startup operation after a prime power interruption of up to 5 minutes in not greater than 1 minute thereafter. The ECS shall recover and return to normal startup operation after a prime power interruption of up to 2 seconds in not greater than 15 seconds thereafter. In both cases, the ECS is only required to return to TRANSIENT mode operation within the specified time.

2.10 Testability Requirements

2.10.1 Fault Detection: 99% of all ECS hardware essential function failures (HEFFs) and 95% of all ECS non- HEFF faults shall be detected. All critical ECS fault indications shall latch on during the existence of the fault condition.

2.10.2 Fault Reporting Latency: During ECS operation, HEFFs shall be detected and reported within 2 seconds.

Non-HEFF faults shall be detected and reported within 2 minutes. The following faults shall be reported to the Signal Data Processing Equipment (SDPE) as normally-open contact closures (open on fault condition, close on non-fault condition) indicators:

a) ECS status (no fault/fault) (duplicated for redundant sides, if applicable).

b) EEU shelter under temperature

c) EEU shelter over temperature

d) ECS humidifier water level low.

e) Fresh Air Damper Fault.

2.10.3 Fault Isolation: 99% of all reported failures of the ECS shall be isolated to one LRU using a combination of BIT/Built-in Test Equipment (BITE), visual operations/inspections, and/or automated maintainer controlled fault isolation subroutines used in conjunction with test equipment.

2.10.4 False Failure Indication: The ECS false failure indication rate shall be not greater than 1 percent of the failures reported over the lifetime of the system.

2.10.5 BIT/BITE Failure: ECS Built-In Test Equipment (including the data-logging equipment) is not considered mission-critical equipment. BITE shall not degrade the performance of mission-critical operations.

2.11 Environmental Requirements

2.11.1 Operating Temperature Range: The ECS shall meet performance requirements in ambient temperatures of – 26oF to +121oF (-32oC to +49C) with solar radiation of 0 to 1120 W/m2 (at +42oC) or 0 to 701 W/m2 (at +49oC) with no degradation in performance.

2.11.2 Storage Temperature Range, Non-operating: The ECS shall not sustain damage when stored in ambient temperatures of –50.8oF to +160F (-46oC to +71oC).

2.11.3 Operating Altitude: The ECS shall meet performance requirements at altitudes from sea level to 8,000 feet (2.45 km) above sea level.

2.11.4 Operating Humidity: The ECS shall meet performance requirements in environments with relative humidity tending towards saturation at all temperatures not greater than +87.8oF (+31oC), or at relative humidity decreasing to 75% at +95oF (+35C), 20% at +109oF (+43oC), and 3% at +120oF (+49oC).

2.12 Design and Construction.

2.12.1 Materials, Parts and Processes: The ECS Parts, Materials, and processes (PMP) used shall be as specified in the Radar EMD Parts, Materials and Process Plan, MSRI Program, Parts Obsolescence Management System Analysis, and the applicable specifications specified herein. Materials or processes which are not covered by applicable specifications or are not specifically described herein, shall be selected from Army document 13553906 unless otherwise approved. Materials or components subject to rapid deterioration due to the environmental requirements imposed herein shall not be used. The use of Military Off The Shelf (MOTS) or Commercial Off The Shelf (COTS) shall not affect the ability of the ECS to meet its performance specifications.

2.12.2 Materials

2.12.2.1 Dissimilar Metals: Unless suitably protected against corrosion, dissimilar metals couples as defined in MIL- STD-889 shall not be used in intimate contact with each other. When parts of dissimilar metals are in contact with each other, the contact faces shall meet the criteria for metallic couples defined in MIL-STD-889 for the appropriate environment.

2.12.2.2 Corrosion Resistance: Corrosion prevention and control shall be in accordance with Army document 13553905.

2.12.2.3 Electrical Connections: Electrical Connections shall be made with liquid-tight conduit and waterproof enclosures.

2.12.2.4 Mechanical Fasteners: Anti-seize compound shall be used on mechanical fasteners, excepting 1/4 turn fasteners, exposed to corrosive environments that are not otherwise sealed.

2.12.2.5 Non-Metals: All non-metal parts used, such as plastic, fabric, and insulation, shall be moisture, fungus and flame retardant. Products derived from wood or wood fibers shall not be used. All non-metal parts shall be resistant to chemical agents and their decontaminates.

2.12.2.6 Flammable Materials: Materials shall be noncombustible or fire retardant in any combination of atmospheric, pressure, and temperature (ambient or induced) conditions within the limits defined herein. All materials used shall have a minimum flame spread rating of less than 25 when tested in accordance with ASTM- E162-1998E1.

2.12.2.7 Hazardous Materials: The ECS shall not use or contain any of the Class I ozone depleting chemicals (ODC) as listed in "Section 602" of the Clean Air Act. The ECS shall not contain or use any of the Environmental Protection Agency (EPA) listed set of highly toxic substances without specific approval of the procuring activity.

The ECS shall not contain or use any of the DoD "Top 10 Toxic Release Inventory (TRI) List of Hazardous Chemicals" without specific approval of the procuring activity.

2.12.3 Parts: Standard parts (MS, AN or JAN) shall be used and shall be identified on drawings by their military part numbers. In the event there is no suitable corresponding standard military part, commercial parts may be used provided they conform to the overall requirements of this specification. When commercial parts are utilized, the equipment manufacturer shall cross reference their assigned part numbers with those of their suppliers on all drawings and spare parts lists such that the original source and part numbers of those components are readily identifiable.

2.13 The contractor shall supply all equipment, parts, and materials outlined in the drawing.

3.0 E quipment Nameplate: If and where applicable, a corrosion resistant metal nameplate shall be securely attached to the equipment. The ECS system nameplate shall include the contract number, official nomenclature of the component, the vendor CAGE code and part number and the serial number. Nameplates shall be securely and permanently mounted and not be obstructed from view by units or parts. Nomenclature characters on the nameplate shall be no less than 0.187 inch, and other characters shall not be less than 0.093 inch in height.

4.0 Testing:

4.1 The following acceptance tests shall be performed on each ECS:

a) Visual Inspection;

b) Dimensional check;

c) Evaporator fan airflow and static pressure;

5.0 First Article: The ECS shall be subjected to the first article verification as outline in the drawing. Verification shall be performed before installation into the EEU/CSU unless otherwise specified.

6.0 D rawings and Manuals: All specifications and requirements in the drawing shall be followed.

7.0 Warranty: If the warranty period is less than one year, it must be approved to by the LEAD Contracting Officer prior to contract award. Otherwise, a minimum of a one year warranty shall be furnished with the provided equipment. The warranty shall cover all components. The warranty period begins when the LEAD Contracting Officer provides official confirmation that the equipment has satisfied all operational provisions of the contract.

8.0 S tandard Products: The equipment shall be new and regularly advertised product in order to provide a constant source of replacement parts and technical assistance.

9.0 P reservation, Packaging and Delivery: The requirements for packaging shall be sufficient to afford adequate protection against corrosion, deterioration, and physical damage during shipment from the manufacturer to the point of delivery, and may conform to the manufacturer's best commercial practice when such meets these requirements.

The ECS, in its transport configuration, shall be transportable worldwide over air, ground, rail, and water as one or more individual units (requiring no major disassembly), using existing transport aircraft and/or equipment. Major disassembly is defined as disassembly requiring more than 30 minutes.

10.0 Inspection and Acceptance: The provided equipment shall be examined for design, construction, materials, components, and workmanship to determine compliance with the contract and this specification. Any deviation from these requirements shall be cause for rejection.

11.0 O fferor’s Proposal and Compliance: The offeror’s proposal shall clearly demonstrate that the proposed equipment meets the detailed performance and equipment specifications described in this document and drawing.

All information required to verify compliance with this specification shall be provided, (i.e. manufacturers specifications, drawings, brochures, etc.).

12.0 Safety: Safety engineering principles and design guidance shall be in accordance with the Occupational Safety and Health Act (OSHA) as identified in Code of Federal Regulations (CFR) Title 29, Part 1910. MIL-HDBK-454, Guideline 1 should be followed.

PERFORMANCE WORK STATEMENT

PERFORMANCE WORK STATEMENT (PWS)

FOR

INSTALLATION, MODIFICATION AND TESTING OF THE ENVIRONMENTAL CONTROL SYSTEM (ECS)

ON THE ELECTRONICS EQUIPMENT UNIT (EEU).

1.0 General:

1.1 Scope: The contractor shall provide all personnel, equipment, tools, materials, supervision, quality control and other items and non-personal services necessary to install, modify and test the Environmental Control Systems (ECSs) as defined in this PWS, except as specified in Paragraph 3.0 as Government Furnished. The contractor shall perform to the standards in this contract.

1.2 Background: Letterkenny Army Depot (LEAD) has been tasked to refurbish Electronic Equipment Units (EEUs) for the AN/TPY-2 radar. The EEU includes an ECS which is manufactured by Tactical Environmental Systems (TES). The Model number of the ECS is ECS 1541151. LEAD intends to procure services to install, modify and test the ECS assemblies using performance specifications developed in this PWS.

1.3 Period of Performance (PoP): The Period of Performance shall be one Base Year of 12 months and foud (4) 12-month option years. The Period of Performance reads as follows:

1.3.1 Base Year: 15 SEPT 2021 to 14 SEPT 2022

1.3.2 Option Year 1: 15 SEPT 2022 to 14 SEPT 2023

1.3.3 Option Year 2: 15 SEPT 2023 to 14 SEPT 2024

1.3.4 Option Year 3: 15 SEPT 2024 to 14 SEPT 2025

1.3.5 Option Year 4: 15 SEPT 2025 to 14 SEPT 2026

1.4 General Information:

1.4.1 Quality Control (QC): The contractor shall develop and maintain an effective QC program to ensure services are performed in accordance with this PWS. The contractor shall develop and implement procedures to identify, prevent, and ensure non-recurrence of defective services. The contractor’s QC program is the means by which it assures itself that its work complies with the requirements of the contract. As a minimum, the contractor shall develop QC procedures that address the areas identified in Technical Exhibit 1, Performance Requirements Summary.

1.4.2 Quality Assurance (QA): LEAD shall evaluate the contractor’s performance under this contract in accordance with the Quality Assurance Surveillance Plan (QASP). This plan is primarily focused on what the LEAD must do to ensure that the contractor has performed in accordance with the performance standards. It defines how the performance standards will be applied, the frequency of surveillance, and acceptable quality level(s) (defect rate(s)).

1.4.3 Recognized Holidays: The following are recognized US holidays and the date for each can be found at the following website: http://www.opm.gov/Operating_Status_Schedules/fedhol/Index.asp . The contractor shall not perform services on these days:

1.4.3.1 New Year’s Day

1.4.3.2 Martin Luther King, Jr.’s Birthday

1.4.3.3 President’s Day

1.4.3.4 Memorial Day

1.4.3.5 Juneteenth

1.4.3.6 Independence Day

1.4.3.7 Labor Day

1.4.3.8 Columbus Day

1.4.3.9 Veteran’s Day

1.4.3.10 Thanksgiving Day

1.4.3.11 Christmas Day

1.4.3.12 When an observed holiday falls on a Tuesday or Thursday, the Depot regularly schedules a closure on the corresponding Monday or Friday.

1.4.4 Place and Performance of Services: The contractor shall provide services between the hours of 6:00 am and 3:30 pm on Monday through Friday during one week and between the hours of 6:00 am and 3:30 pm Monday through Thursday during alternate weeks. These hours apply except on recognized US holidays or when the LEAD facility/installation is closed due to local or national emergencies, administrative closings, or similar Government-directed facility/installation closings. Performance shall be at LEAD, Building 408. The contractor shall at all times maintain an adequate work force for the uninterrupted performance of all tasks defined within this PWS when the Government facility/installation is not closed for the above reasons. When hiring personnel, the contractor shall keep in mind that the stability and continuity of the work force are essential.

1.4.5 Security Requirements: Contractor and all associated sub-contractor’s employees shall comply with applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative). The contractor shall also provide all information required for background checks to meet installation access requirements to be accomplished by installation Provost Marshal Office, Director of Emergency Services or Security Office. contractor workforce shall comply with all personal identity verification requirements as directed by DOD, HQDA and/or local policy. Should the Force Protection Condition (FPCON) change, the Government may require changes in subcontractor security matters or processes.

1.4.5.1 Physical Security: The contractor shall safeguard all Government property provided for Subcontractor use.

At the close of each work period, Government facilities, equipment and materials shall be secured.

1.4.5.2 AT Level 1 Training: All contractor employees, to include subcontractor employees, requiring access to Army installations, facilities and controlled access areas shall complete AT Level I awareness training within 30 calendar days after contract start date or effective date of incorporation of this requirement into the contract, whichever is applicable. The contractor shall submit certificates of completion for each affected contractor employee and subcontractor employee to the COR or to the contracting officer, if a COR is not assigned, within 30 calendar days after completion of training by all employees and contractor personnel. AT level I awareness training is available at the following website: http://jko.jten.mil.

1.4.5.3 IWATCH Training: The contractor and all associated subcontractors shall brief all employees on the local iWATCH program (training standards provided by the requiring activity ATO). This local developed training will be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the CO. This training shall be completed within 30 calendar days of contract award and within 30 calendar days of new employees commencing performance with the results reported to the COR NLT 30 calendar days after contract award.Training website:

http://www.myarmyonesource.com/FamilyProgramsandServices/iWatchProgram/Default.aspx

1.4.5.4 OPSEC Training: Per AR 530-1, the contractor employees must complete Level I OPSEC Awareness training. New employees must be trained with 30 calendar days of their reporting for duty and annually thereafter.

1.4.6 Safety: The contractor is reminded that LEAD maintains a Safety Management System (SMS) and is either OHSAS 18001 or ISO 45001 certified. LEAD’s safety policy and safety program (LEAD-R 385-1) can be found at https://www.letterkenny.army.mil/PDF/385-1.pdf. Any and all on site work at LEAD shall be completed in accordance with applicable OSHA, DoD, DOT, Army, and LEAD Safety requirements. As a federal installation, additional requirements other than OSHA apply to contractors performing work at LEAD. Examples include full conformance to all applicable NFPA standards, ANSI standards, and other consensus standards for the industry covered by the subject contract. It is the responsibility of the contractor to be familiar with all applicable standards prior to starting work. Additionally, the contractor shall make themselves familiar with and comply with LEAD's local safety regulation LEAD-R 385-1 prior to the start of any work at LEAD. If contractor personnel determine a procedure is unsafe, they shall discontinue work immediately and contact their Program Manager who shall notify safety personnel and the COR. As soon as LEAD Safety Office personnel determine that the unsafe conditions have been corrected, the COR will notify the contractor Program Manager that personnel may resume work. Additionally, all contractor supervisors and employees shall read and be knowledgeable of the governing SOP(s) prior to signing the SOP(s) and starting the operation.

All contractor personnel shall wear the appropriate PPE when in the following work areas: industrial buildings, at construction sites, test sites and test facilities. Failure to wear/use PPE may cause removal from the job site and/or seizure of non-compliant equipment/items. The contractor shall comply with reporting requirements of 29 CFR Part 1904, AR 385-40 and APGR 385-4, and shall report accidents resulting in injury or death and accidents resulting in damage to Government property, supplies, and equipment to the COR promptly of the occurrence. In case of an injury/accident, the contractor shall complete a safety Investigation of injury/accident report and submit it to the COR Office with a copy to the LEAD Safety Office. All shipped material shall include a current product Safety Data Sheet (SDS) for any chemical products being shipped other than residue. This includes items like engine oil.

All safety messages or recalls related to the safe use of products produced by the contractor will be provided to the COR for the Contract within 5 days of contractor’s awareness of the message or notice. It is the contractor’s responsibility to be familiar with these documents and to comply with their contents.

1.4.7 Conservation of Utilities: The contractor shall instruct employees in utilities conservation practices. The contractor shall operate under conditions that preclude the waste of utilities, which include turning off the water faucets or valves after using the required amount.

1.4.8 Post Award Conference/Periodic Progress Meetings: The contractor agrees to attend any post award conference convened by the KO in accordance with Federal Acquisition Regulations Subpart 42.5. The KO, Contracting Officer’s Representative (COR), and other Government personnel, as appropriate, may meet periodically with the contractor to review the contactor’s performance. At these meetings, the Contacting Officer will apprise the contractor of how the Government views the contractor’s performance and the contractor shall apprise the Government of problems, if any, being experienced The contractor shall resolve outstanding issues raised by the Government. contractor attendance at these meetings shall be at no additional cost to the Government.

1.4.9 Contract Manager (CM): The contractor shall provide a CM who shall ensure performance under this contract.

The name of this person, and an alternate who shall act for the contractor when the CM is absent, shall be designated in writing to the KO. The CM or alternate shall have full authority to act for the contractor on all contract matters relating to daily operation of this contract.

1.4.10 Identification of Subcontractor Employees: All contact personnel attending meetings, answering Government telephones and working in other situations where their contractor status is not obvious to third parties are required to identify themselves as such to avoid creating an impression in the minds of members of the public that they are Government officials. The contractor shall also ensure that all documents or reports produced by contractor personnel are suitably marked as contractor products or that contractor participation is appropriately disclosed.

1.4.11 Organizational Conflicts of Interest (OCI): The contractor and subcontractor personnel performing work under this contract may receive, have access to or participate in the development of proprietary or source selection information (e.g., cost or pricing information, budget information or analyses, specifications or work statements, etc.) or perform evaluation services which may create a current or subsequent OCIs, as defined in FAR Subpart 9.5.

The Subcontractor shall notify the KO immediately whenever it becomes aware that such access or participation may result in any actual or potential OCI and shall promptly submit a plan to the KO to avoid or mitigate any such OCI. The contractor’s mitigation plan will be determined to be acceptable solely at the discretion of the KO and in the event the KO unilaterally determines that any such OCI cannot be satisfactorily avoided or mitigated, the KO may affect other remedies as he or she deems necessary, including prohibiting the Subcontractor from participation in subsequent contracted requirements which may be affected by the OCI.

2.0 Definitions and Acronyms:

2.1.1 CONTRACTOR. A supplier or vendor awarded a contract to provide specific supplies or service to the government. The term used in this contract refers to the prime.

2.1.2 CONTRACTING OFFICER (KO). A person with authority to enter into, administer, and or terminate contracts, and make related determinations and findings on behalf of the government. Note: The only individual who can legally bind the government.

2.1.3 CONTRACTING OFFICER'S REPRESENTATIVE (COR). An employee of the U.S. Government designated by the KO to monitor contractor performance. Such appointment shall be in writing and shall state the scope of authority and limitations. This individual has authority to provide technical direction to the Contractor as long as that direction is within the scope of the contract, does not constitute a change, and has no funding implications. This individual does NOT have authority to change the terms and conditions of the contract.

2.1.4 DEFECTIVE SERVICE.