SEE ADDENDUM
(No Collect Calls)
W911N221Q0024 02-Jul-2021
b. TELEPHONE NUMBER
717-267-9481
8. OFFER DUE DATE/LOCAL TIME
02:00 PM 23 Jul 2021
5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
STANDARD FORM 1449 (REV. 2/2012)
Prescribed by GSA – FAR (48 CFR) 53.212
(TYPE OR PRINT)
(SIGNATURE OF CONTRACTING OFFICER)
ADDENDA X ARE
26. TOTAL AWARD AMOUNT (For Gov t. Use Only )
23.
CODE 10. THIS ACQUISITION IS
SUCH ADDRESS IN OFFER
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT
BELOW IS CHECKED
TELEPHONE NO.
W911N29. ISSUED BY
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK
7. FOR SOLICITATION
INFORMATION CALL:
a. NAME
RYAN T. POE
2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER
(TYPE OR PRINT)
30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER
30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA
1 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.X
25. ACCOUNTING AND APPROPRIATION DATA
1. REQUISITION NUMBER
20.
ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.
OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
W25G1Q1081R001
ARE NOT ATTACHED
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED
(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE
SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:
. YOUR OFFER ON SOLICITATION
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN
% FOR:SET ASIDE:UNRESTRICTED OR X
SMALL BUSINESSX
17a.CONTRACTOR/ CODE FACILITY
OFFEROR CODE
LETTERKENNY ARMY DEPOT
LETTERKENNY CONTRACTING OFFICE - ACC-RSA-LEAD
1 OVERCASH AVENUE, ATTN: CCAM-MLK, BLDG 2S
CHAMBERSBURG PA 17201-4150
18a. PAYMENT WILL BE MADE BY CODE
RATED ORDER UNDER
DPAS (15 CFR 700)
13a. THIS CONTRACT IS A
13b. RATING
CODE15. DELIVER TO CODE W91FVA 16. ADMINISTERED BY
12. DISCOUNT TERMS11. DELIVERY FOR FOB DESTINA-
TION UNLESS BLOCK IS
MARKED
SEE SCHEDULE
14. METHOD OF SOLICITATION
RFQ IFB RFPX
DIRECTORATE OF INDUSTRIAL OPERATIONS
DAN GRAVNING
LETTERKENNY ARMY DEPOT
BLDG 350, DOOR 1
CHAMBERSBURG PA 17201
TEL: 717-267-9475 FAX:
717-2679834FAX:
TEL: SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
8(A)
HUBZONE SMALL
BUSINESS
SIZE STANDARD:
$8,000,000
NAICS:
811310
X
OFFER DATED
29. AWARD OF CONTRACT: REF.
DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND
EMAIL:
TEL:
31c. DATE SIGNED
SEE SCHEDULE
SCHEDULE OF SUPPLIES/ SERVICESITEM NO. QUANTITY UNIT UNIT PRICE AMOUNT
24.22.21.19.
WOMEN-OWNED SMALL BUSINESS (WOSB)
ELIGIBLE UNDER THE WOMEN-OWNED
SMALL BUSINESS PROGRAM
EDWOSB
32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
(CONTINUED)
PAGE 2 OF50
ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________
32a. QUANTITY IN COLUMN 21 HAS BEEN
RECEIVED INSPECTED
32b. SIGNATURE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE
37. CHECK NUMBER
FINALPARTIALCOMPLETE
36. PAYMENT35. AMOUNT VERIFIED
CORRECT FOR
34. VOUCHER NUMBER
FINAL
33. SHIP NUMBER
PARTIAL
38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY
41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT
41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE
42a. RECEIVED BY (Print)
42b. RECEIVED AT (Location)
42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS
STANDARD FORM 1449 (REV. 2/2012) BACK
Prescribed by GSA – FAR (48 CFR) 53.212
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
SEE SCHEDULE
20.
SCHEDULE OF SUPPLIES/ SERVICES
21.
QUANTITY UNIT
22. 23.
UNIT PRICE
24.
AMOUNT
19.
ITEM NO.
W911N221Q0024
Section SF 1449 - CONTINUATION SHEET
SOLICITATION NOTES
1. System for Award Management (SAM): In accordance with FAR 4.1102, Offerors shall be registered in the SAM database in order to be eligible for contract award. No award will be made to an Offeror not registered. Registration can be accomplished at https://sam.gov/content/entity-registration. Registration in this database shall remain active.
There has been a recent SAM requirement for submission of notarized letters for all new vendor registrants, and for renewals of existing registrations. Please check your SAM registration and if the registration is due for renewal in the next few months, it is important to start that process immediately. For additional information on notarized letters, visit:
https://www.fsd.gov/gsafsd_sp?id=kb_article_view&sysparm_article=KB0016652&sys_kb_id=8cfe46491b1cb8909 ac5ddb6bc4bcbbb&spa=1.
2. Annual Representations and Certifications: In accordance with FAR 4.1201, Offerors shall complete electronic annual representations and certifications within SAM as part of required registration. Registration in this database shall remain active and can be accessed at https://sam.gov/content/entity-registration.
3. Questions: Questions regarding this solicitation shall be submitted to the Contracting Officer, in writing, at least 7 calendar days prior to the closing date. Questions submitted after this time will be answered at the discretion of the Contracting Officer. The Contracting Officer for this action is Thomas Hall at email:
thomas.c.hall111.civ@mail.mil cc Contract Specialist Ryan Poe at email: ryan.t.poe.civ@mail.mil.
4. Award without Discussions: The Government intends to award without discussions, offerors should submit their best prices in their initial offer. If FAR Provision 52.212-2, Evaluation-Commercial Items, is included, Offerors must submit all information requested therein in order for the Government to determine technical acceptability.
5. Amendments: The Offeror shall submit to the Contracting Officer signed copies of all amendments issued to this solicitation. Failure to comply may cause your proposal to be rejected.
6. Payment: Payment for this action will be made by Electronic Funds Transfer (EFT) through the Defense Finance and Accounting Services (DFAS) utilizing Wide Area Work Flow (WAWF). See 252.232-7006 for more information.
7. Period for Acceptance of Offers: The Offeror agrees to hold the prices in its offer firm for 90 calendar days from the date specified for receipt of offers.
8. Set- Aside: The proposed contract is 100% set-aside for small business concerns.
9. FOB Destination: Unless otherwise stated in the solicitation, Offerors shall provide FOB Destination prices.
10. Contact Information: A Contracting Officer's Representative (COR) will be appointed at the time of award. The successful Offeror will be furnished the COR name and contact information at the time of contract award.
11. Wage Determination: WD 2015-4253 Revision 15 date 14 June 2021 and is hereby incorporated. Wage Determination can be viewed at beta.sam.gov.
PWS
PERFORMANCE WORK STATEMENT
FOR
Service to Perform Rotor and Stator Resistance and Winding Insulation for the Electric Power Plant (EPP) Generators as Supplied
1.0 General:
1.1 Scope: The Contractor shall provide all services, labor, facilities, equipment, tools, parts, materials, and shipping costs to accomplish National Maintenance Work Requirement (NMWR) 9-6115-669-3, dated 1 Dec 2002, rotor and stator resistance and winding insulation testing of the Electric Power Plant (EPP) III Generator and re-insulate the rotor and stator components. The Lechmotoren (Original Equipment Manufacturer (OEM)) Generators are used on the EPP III Generator Sets, shall be cleaned, tested, and re-insulated per the listed NMWR. A thorough knowledge and understanding of the technical data and testing criteria concerning the end item and components will be required. The generator components will be used at Letterkenny Army Depot (LEAD) in Chambersburg, Pennsylvania.
1.2 Background: Letterkenny Army Depot continues to be the Center of Industrial and Technical Excellence for refurbishing and recertifying the PATRIOT Missile System. The EPP III Generator Sets are the power source for the PATRIOT Missile System. The EPP consists of two 150 kilowatt diesel engines with 400 hertz, 3-phase generators which are interconnected through the power distribution unit.
1.3 Period of Performance (PoP): The Period of Performance shall be one Base Year of 12 months and four 12-month option years. The Period of Performance reads as follows:
1.3.1 Base Year: 1 March 2022 to 28 February 2023
1.3.2 Option Year One: 1 March 2023 to 29 February 2024
1.3.3 Option Year Two: 1 March 2024 to 28 February 2025
1.3.4 Option Year Three: 1 March 2025 to 28 February 2026
1.3.5 Option Year Four: 1 March 2026 to 28 February 2027
1.4 General Information:
1.4.1 Recognized Holidays: The contractor shall not have to perform this service on recognized US holidays. The recognized US holidays can be found at https://www.opm.gov/policy-data-oversight/pay-leave/federal-holidays/#url=Overview
1.4.2 Place and Performance of Services: Asset(s) will be delivered and picked up by the Government within 25 miles of, 1 Overcash Avenue Chambersburg, PA 17201. If the Contractor is located outside of a 25 mile radius, pick-up and delivery shall be at Bldg 350, Letterkenny Army Depot between the hours of 7 AM and 2 PM on Monday through Friday, except on recognized US holidays or when the Government facility/installation is closed due to local or national emergencies, administrative closings, or similar Government-directed facility/installation closings.
1.4.3 Quality Control (QC): The contractor shall develop and maintain an effective QC program to ensure services are performed in accordance with this PWS. The contractor shall develop and implement procedures to identify, prevent, and ensure non-recurrence of defective services. The contractor’s QC program is the means by which it assures itself that its work complies with the requirements of the contract. As a minimum, the contractor shall develop QC procedures that address the areas identified in Technical Exhibit 1, Performance Requirements Summary. After acceptance of the QC Plan, the contractor shall obtain the KO’s (KO) acceptance in writing of any proposed changes to its QC system.
1.4.4 Quality Assurance (QA): The Government shall evaluate the contractor’s performance under this contract in accordance with the Quality Assurance Surveillance Plan (QASP). This plan is primarily focused on what the Government must do to ensure that the contractor has performed in accordance with the performance standards. It defines how the performance standards will be applied, the frequency of surveillance, and acceptable quality level(s) (defect rate(s)).
1.4.4.1 Finished assets returned from the contractor will be inspected by LEAD’s QC Personnel for compliance with the QASP. The tested generator components shall seamlessly integrate with the next higher assembly, the EPP III
Generator Set. Upon QC Inspection at LEAD, there shall be no loose components, and the insulation shall be evenly applied and complete. A failed QC Inspection shall be cause for rejection, return and rework by the Contractor at no additional cost to the Government.
1.4.4.2 Finished assets will be accepted only if they are found to be in compliance with the requirements given in this PWS and with the Applicable Publications in Section 6.0.
1.4.5 Security Requirements: Contractor and all associated sub-contractor’s employees shall comply with applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative). The contractor shall also provide all information required for background checks to meet installation access requirements to be accomplished by installation Provost Marshal Office, Director of Risk Management or Security Office. Contractor workforce shall comply with all personal identity verification requirements as directed by DOD, HQDA and/or local policy. Should the Force Protection Condition (FPCON) change, the Government may require changes in contractor security matters or processes.
1.4.5.1 Physical Security: The contractor shall safeguard all Government property provided for contractor use. At the close of each work period, Government facilities, equipment and materials shall be secured.
1.4.5.2 OPSEC Training: Per AR 530-1, Operations Security, new contractor employees and associated sub-contractor employees shall complete Level I OPSEC training within 30 calendar days of their reporting for duty and annually thereafter. The contractor shall submit certificates of completion for each affected contractor employee and subcontractor employee, to the COR or to the contracting officer, if a COR is not assigned, within 15 calendar days after completion of training. Level 1 OPSEC training is available on the Letterkenny Army Depot homepage – www.lead.army.mil.
1.4.5.3 iWATCH Training: The contractor and all associated sub-contractors with an area of performance within an Army-controlled installation, facilities or area shall brief all employees on the local iWATCH program. This local developed training will be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the TPOC or contracting officer. This training shall be completed within 30 calendar days of contract award and within 30 calendar days of new employees commencing performance. The contractor shall report completion for each affected contractor employee and subcontractor employee, to the TPOC and contracting officer within 15 calendar days after completion of training. iWATCH training is available on the Letterkenny Army Depot homepage – www.lead.army.mil
1.4.5.4 AT Level I Training: All contractor employees, to include subcontractor employees, requiring access to Army installations, facilities, and controlled access areas shall complete AT Level I awareness training within 30 calendar days after contract start date or effective date of incorporation of this requirement into the contract, whichever is applicable. The contractor shall submit certificates of completion for each affected contractor employee and subcontractor employee to the COR or to the contracting officer, if a COR is not assigned, within 15 calendar days after completion of training by all employees and subcontractor personnel. AT Level I awareness training is available at the following website: http://jko.jten.mil/courses/atl1/launch.html
1.4.6 Safety and Environmental: The contractor shall conduct operations in accordance with applicable safety and environmental laws, regulations, and standards. There is a possibility of the presence of chromium in the coating that may require special personal protective equipment and/or disposal methods. The Government will not be responsible for contractor operations not carried out in accordance with applicable safety and environmental laws, regulations, and standards. Any surcharges related to safety or environmental compliance requirements must be included in the contractor’s per-item price.
1.4.7 Post Award Conference/Periodic Progress Meetings: The contractor agrees to attend any post award conference convened by the KO in accordance with Federal Acquisition Regulations Subpart 42.5. The KO, Contracting Officer’s Representative (COR), and other Government personnel, as appropriate, may meet periodically with the contractor to review the contactor’s performance. At these meetings, the Contacting Officer will apprise the contractor of how the Government views the contractor’s performance and the contractor shall apprise the Government of problems, if any, being experienced The contractor shall resolve outstanding issues raised by the Government. Contractor attendance at these meetings shall be at no additional cost to the Government.
1.4.8 Contractor Points of Contact: The Contractor shall submit a minimum of one (1) point of contact (POC). The contractual POC(s) shall provide telephone number, fax number, and email address for each of the POCs. These names shall be designated in writing to the COR. The PM shall have full authority to act for the contractor on all contract matters relating to daily operation of this contract.
1.4.9 Identification of Contractor Employees: All contact personnel attending meetings, answering Government telephones and working in other situations where their contractor status is not obvious to third parties are required to identify themselves as such to avoid creating an impression in the minds of members of the public that they are Government officials. The contractor shall also ensure that all documents or reports produced by contractor personnel are suitably marked as contractor products or that contractor participation is appropriately disclosed.
1.4.10 Safety: The contractor is reminded that LEAD maintains a Safety Management System (SMS) and is either OHSAS 18001 or ISO 45001 certified.
1.4.10.1 LEAD’s safety policy and safety program (LEAD-R 385-1) can be found at https://www.letterkenny.army.mil/PDF/385-1.pdf
1.4.10.2 Any and all on site work at LEAD shall be completed in accordance with applicable OSHA, DoD, DOT, Army, and LEAD Safety requirements. As a federal installation, additional requirements other than OSHA apply to contractors performing work at LEAD. Examples include full conformance to all applicable NFPA standards, ANSI standards, and other consensus standards for the industry covered by the subject contract. It is the responsibility of the contractor to be familiar with all applicable.
1.4.10.3 In order to document electrical panel ARC Flash rating deficiencies at Letterkenny Army Depot IAW (NFPA 70E Article 130.5), the contractor shall be so advised that all electrical panels require ARC Flash labels IAW NFPA 70E and are considered to be non-representative of the actual ARC Flash hazard contained within the panel or system circuits at Letterkenny Army Depot.
1.4.10.4 If contractor personnel determine a procedure is unsafe, they shall discontinue work immediately and contact their Program Manager who shall notify safety personnel and the COR. As soon as LEAD Safety Office personnel determine that the unsafe conditions have been corrected, the COR will notify the contractor Program Manager that personnel may resume work.
1.4.10.5 Additionally, all contractor supervisors and employees shall read and be knowledgeable of the governing SOP(s) prior to signing the SOP(s) and starting the operation.
1.4.10.6 All contractor personnel shall wear the appropriate PPE when in the following work areas: industrial buildings, at construction sites, test sites and test facilities. Failure to wear/use PPE may cause removal from the job site and/or seizure of non-compliant equipment/items.
1.4.10.7 The contractor shall comply with reporting requirements of 29 CFR Part 1904, AR 385-40 and APGR 385- 4, and shall report accidents resulting in injury or death and accidents resulting in damage to Government property, supplies, and equipment to the COR promptly of the occurrence.
1.4.10.8 In case of injury/accident, the contractor shall complete a safety Investigation report and submit it to the COR Office with a copy to the LEAD Safety Office.
1.4.10.9 All shipped material shall include a current product Safety Data Sheet (SDS) for any chemical products being shipped other than residue. This includes items like engine oil.
1.4.10.10 All safety messages or recalls related to the safe use of products produced by the contractor will be provided to the COR for the Contract within 5 days of contractor’s awareness of the message or notice.
1.4.10.11 It is the contractor’s responsibility to be familiar with these documents and to comply with their contents.
2.0 Definitions and Acronyms:
2.1.1 CONTRACTOR. A supplier or vendor awarded a contract to provide specific supplies or service to the government. The term used in this contract refers to the prime.
2.1.2 CONTRACTING OFFICER (KO). A person with authority to enter into, administer, and or terminate contracts, and make related determinations and findings on behalf of the government. Note: The only individual who can legally bind the government.
2.1.3 CONTRACTING OFFICER'S REPRESENTATIVE (COR). An employee of the U.S. Government designated by the KO to monitor contractor performance. Such appointment shall be in writing and shall state the scope of authority and limitations. This individual has authority to provide technical direction to the Contractor as long as that direction is within the scope of the contract, does not constitute a change, and has no funding implications. This individual does NOT have authority to change the terms and conditions of the contract.
2.1.4 DEFECTIVE SERVICE. A service output that does not meet the standard of performance associated with the Performance Work Statement.
2.1.5 DELIVERABLE. Anything that can be physically delivered and includes non-manufactured things such as meeting minutes or reports.
2.1.6 KEY PERSONNEL. Contractor personnel that are evaluated in a source selection process and that may be required to be used in the performance of a contract by the Key Personnel listed in the PWS. When key personnel are used as an evaluation factor in best value procurement, an offer can be rejected if it does not have a firm commitment from the persons that are listed in the proposal.
2.1.7 PHYSICAL SECURITY. Actions that prevent the loss or damage of Government property.
2.1.8 QUALITY ASSURANCE. The government procedures to verify that services being performed by the Contractor are performed according to acceptable standards.
2.1.9 QUALITY ASSURANCE SURVEILLANCE PLAN (QASP). An organized written document specifying the surveillance methodology to be used for surveillance of contractor performance.
2.1.10 QUALITY CONTROL. All necessary measures taken by the Contractor to assure that the quality of an end product or service shall meet contract requirements.
2.1.11 SUBCONTRACTOR. One that enters into a contract with a prime contractor. The Government does not have privity of contract with the subcontractor.
2.1.12 WORK DAY. The number of hours per day the Contractor provides services in accordance with the contract.
2.1.13 WORK WEEK. Monday through Friday, unless specified otherwise.
2.2 ACRONYMS:
AFARS Army Federal Acquisition Regulation Supplement AR Army Regulation CARC Chemical Agent Resistant Coating CFR Code of Federal Regulations CONUS Continental United States (excludes Alaska and Hawaii) COR Contracting Officer Representative
COTS Commercial-Off-the-Shelf DA Department of the Army DD250 Department of Defense Form 250 (Receiving Report) DD254 Department of Defense Contract Security Requirement List DFARS Defense Federal Acquisition Regulation Supplement DOD Department of Defense FAR Federal Acquisition Regulation KO Contracting Officer OCI Organizational Conflict of Interest ODC Other Direct Costs PIPO Phase In/Phase Out POC Point of Contact PRS Performance Requirements Summary PWS Performance Work Statement QA Quality Assurance QAP Quality Assurance Program QASP Quality Assurance Surveillance Plan QC Quality Control QCP Quality Control Program TE Technical Exhibit
3.0 Government Furnished Property, Material, Equipment and Services (GFP/M/E/S): The Government will provide the facilities, equipment, materials, and/or services listed below:
3.1 Materials: The Government will provide EPPIII A/C Generator to be serviced. The Government will provide the required insulation paint to be placed on the A/C generator components after they are tested.
3.2 Services: The Government will pack the components using standard commercial methods as agreed upon with the Contractor. The Government will stage the package for pick-up by the Contractor.
3.3. The COR will monitor the contractor’s performance by physical inspection and validated customer complaints.
Any defects or work not accomplished will be brought to the attention of the contractor Point of Contact (POC).
4.0 Contractor Furnished Property, Materials, Equipment (CFP/M/E):
4.1 General: The contractor shall furnish everything required to perform the services described in Paragraph 1.1 and Section 5.0.
4.2 Services: The Contractor shall be responsible for pick-up and delivery of all parts and components involved with this service.
5.0 Requirements: The Contractor shall National Maintenance Work Requirement (NMWR) 9-6115-669-3, dated 1 Dec 2002, rotor and stator resistance and winding insulation testing of the Electric Power Plant (EPP) III Generator and re-insulate the rotor and stator components as specified below:
Table 1:
Generator
Vendor P/N NSN Expected Yearly QTY
Lechmotoren Generator 130.03.0063 6115-12-341-6789 40 EA.
5.1 The contractor shall perform cleaning and drying of the generator components to the NMWR requirements.
5.2 The contractor shall perform testing of the generator components to the NMWR specifications.
5.3 The contractor shall complete the required Tables of the NMWR to document all testing results.
5.4 The contractor shall re-insulate the rotor and stator with the government supplied insulation paint and shall provide an even coverage of the rotor and stator windings.
5.5 The contractor shall pack each tested generator components in single unit with protection from transportation damage and weather and include the testing results with the generator components.
5.6 The Contractor shall use calibrated (per the meter OEM recommendations) meters capable of measuring the milliohms and insulation test and insulation tests with high voltage. The calibration certification shall be kept current during the length of this contract.
5.7 Delivery and Packaging:
5.7.1 The EPPIII components shall be picked-up, serviced, and delivered back to the customer within ten (10) working days after the contractor is notified by a receipt of a LEAD Task Order that the items are available for pickup.
5.7.2 If a preferred day of the week for pickup and delivery is requested by the contractor, it will be considered.
Notification shall be by email.
5.7.3 Earlier delivery is acceptable and preferred at no additional cost to the Government. The Contractor shall provide best delivery schedule.
5.7.4 The Contractor shall arrange for pickup and delivery of all components to Directorate of Maintenance, Letterkenny Army Depot, AMSAM-LE-MO, Building 350 ASRS, Door 1, Chambersburg, PA 17201 using best commercial packaging. The packaging shall provide adequate measures to ensure that the fuel system components are protected from the elements to prevent deterioration/corrosion of the items. The Contractor shall provide a packing list by serial number on each delivered pallet/container.
5.7.5 The Contractors offer shall include all shipping costs TO and FROM LEAD. Quantities listed in the Solicitation are Estimated Quantities.
6.0 APPLICABLE DOCUMENTS: The contractor is responsible for obtaining all OEM technical manuals, testing criteria, drawings, parts listing, etc. as required. Other applicable publications are as follows:
National Maintenance Work Requirement (NMWR) 9-6115-669-3, dated 1 Dec 2002, Table 4-3, Test Winding Resistance; Table 4-6, Winding Insulation Test; and Table 4-7, Winding Test with High Voltage, and the associated descriptions. NMWR 9-6115-669-3 applies to the above generator.
Letterkenny Army Depot (LEAD) Publications LEAD Regulation 385-1 – LEAD Safety and Occupational Health Program (copies may be obtained from LEAD Directorate of Contracting, Bldg. 2)
TECHNICAL EXHIBIT 1: Performance Requirements Summary
This Performance Requirements Summary includes performance standards. The Government will use these standards to determine contractor performance and shall compare contractor performance to the Acceptable Quality Level (AQL).
PWS Paragraph
Task
Performance Standard
Acceptable Quality Levels (AQL)
Surveillance Method / By Whom
5.1, 5.2, 5.4, 5.5, 5.6
Rotor and stator resistance and winding insulation testing of
Generator components as required
100% reliability of equipment in the next higher assembly
100% QC inspection of all components
COR and QC personnel will inspect each component
5.3 NMWR Tables Correctly Filed
Out.
All NMWR Tables shall be completed for every generator.
98.5% completion COR will inspect and maintain records of
Tables
5.7 Delivery and Packaging
Upon receipt of Delivery
Order, the contractor has 10 days to pick-up, complete services and return (deliver) the finished assets back to
LEAD.
98.5% completion
COR will inspect and maintain records of invoices and delivery orders
TECHNICAL EXHIBIT 2: Deliverables Schedule
Deliverable Frequency Number of
Copies Medium/ Format Submit To
Finished assets:
Generator components
Per delivery order
Determined by
LEAD
production quantity
N/A COR – Delivery
Location
Invoice for services performed
Per each delivery order
LEAD
production quantity
Paper, shipped with finished assets and/or Electronic Submission
COR
Tables of the NMWR Per each asset
Submission
Warranty Per each asset
Submission
ITEM NO SUPPLIES/SERVICES ESTIMATED
QUANTITY
UNIT UNIT PRICE ESTIMATED AMOUNT
0001 40 Lot
CLEAN, INSPECT, & TEST A/C GENERATOR
FFP
IAW the Performance Work Statement FOB: Destination
PURCHASE REQUEST NUMBER: W25G1Q1081R001
PSC CD: J061
ESTIMATED
NET AMT
UNIT UNIT PRICE ESTIMATED AMOUNT
1001 40 Lot
OPTION CLEAN, INSPECT, & TEST A/C GENERATOR
FFP
IAW the Performance Work Statement FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
2001 40 Lot
OPTION CLEAN, INSPECT, & TEST A/C GENERATOR
FFP
IAW the Performance Work Statement FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
3001 40 Lot
OPTION CLEAN, INSPECT, & TEST A/C GENERATOR
FFP
IAW the Performance Work Statement FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
4001 40 Lot
OPTION CLEAN, INSPECT, & TEST A/C GENERATOR
FFP
IAW the Performance Work Statement FOB: Destination
INSPECTION AND ACCEPTANCE TERMS
Supplies/services will be inspected/accepted at:
CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY
0001 Destination Government Destination Government 1001 Destination Government Destination Government 2001 Destination Government Destination Government 3001 Destination Government Destination Government
4001 Destination Government Destination Government
DELIVERY INFORMATION
CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /
CAGE
0001 POP 01-MAR-2022 TO
28-FEB-2023
N/A DIRECTORATE OF INDUSTRIAL
OPERATIONS
DAN GRAVNING
LETTERKENNY ARMY DEPOT
BLDG 350, DOOR 1
CHAMBERSBURG PA 17201
717-267-9475 FOB: Destination
W91FVA
1001 POP 01-MAR-2023 TO
29-FEB-2024
N/A (SAME AS PREVIOUS LOCATION)
2001 POP 01-MAR-2024 TO
28-FEB-2025
N/A (SAME AS PREVIOUS LOCATION)
3001 POP 01-MAR-2025 TO
28-FEB-2026
N/A (SAME AS PREVIOUS LOCATION)
4001 POP 01-MAR-2026 TO
28-FEB-2027
N/A (SAME AS PREVIOUS LOCATION)
CLAUSES INCORPORATED BY REFERENCE
52.202-1 Definitions JUN 2020 52.204-7 System for Award Management OCT 2018 52.204-9 Personal Identity Verification of Contractor Personnel JAN 2011 52.204-10 Reporting Executive Compensation and First-Tier
Subcontract Awards
JUN 2020
52.204-13 System for Award Management Maintenance OCT 2018 52.204-16 Commercial and Government Entity Code Reporting AUG 2020 52.204-17 Ownership or Control of Offeror AUG 2020 52.204-18 Commercial and Government Entity Code Maintenance AUG 2020 52.204-19 Incorporation by Reference of Representations and
Certifications.
DEC 2014
52.204-25 Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment.
AUG 2020
52.209-6 Protecting the Government's Interest When Subcontracting With Contractors Debarred, Suspended, or Proposed for Debarment
JUN 2020
52.209-9 Updates of Publicly Available Information Regarding Responsibility Matters
OCT 2018
52.209-10 Prohibition on Contracting With Inverted Domestic Corporations
NOV 2015
52.212-1 Instructions to Offerors--Commercial Items JUN 2020 52.212-4 Contract Terms and Conditions--Commercial Items OCT 2018 52.217-5 Evaluation Of Options JUL 1990 52.219-8 Utilization of Small Business Concerns OCT 2018 52.222-3 Convict Labor JUN 2003 52.222-21 Prohibition Of Segregated Facilities APR 2015 52.222-26 Equal Opportunity SEP 2016 52.222-36 Equal Opportunity for Workers with Disabilities JUN 2020 52.222-37 Employment Reports on Veterans JUN 2020 52.222-41 Service Contract Labor Standards AUG 2018 52.222-43 Fair Labor Standards Act And Service Contract Labor
Standards - Price Adjustment (Multiple Year And Option Contracts)
AUG 2018
52.222-50 Combating Trafficking in Persons OCT 2020 52.222-55 Minimum Wages Under Executive Order 13658 NOV 2020 52.222-62 Paid Sick Leave Under Executive Order 13706 JAN 2017 52.223-18 Encouraging Contractor Policies To Ban Text Messaging
While Driving
JUN 2020
52.225-13 Restrictions on Certain Foreign Purchases FEB 2021 52.232-23 Assignment Of Claims MAY 2014 52.232-33 Payment by Electronic Funds Transfer--System for Award
Management
OCT 2018
52.232-39 Unenforceability of Unauthorized Obligations JUN 2013 52.232-40 Providing Accelerated Payments to Small Business
Subcontractors
DEC 2013
52.233-1 Disputes MAY 2014 52.233-3 Protest After Award AUG 1996 52.233-4 Applicable Law for Breach of Contract Claim OCT 2004 52.237-2 Protection Of Government Buildings, Equipment, And
Vegetation
APR 1984
52.237-3 Continuity Of Services JAN 1991 52.242-13 Bankruptcy JUL 1995 52.242-15 Stop-Work Order AUG 1989 52.242-17 Government Delay Of Work APR 1984 52.245-1 Government Property JAN 2017 52.245-9 Use And Charges APR 2012 52.246-4 Inspection Of Services--Fixed Price AUG 1996 52.247-34 F.O.B. Destination NOV 1991 252.201-7000 Contracting Officer's Representative DEC 1991 252.203-7000 Requirements Relating to Compensation of Former DoD
Officials
SEP 2011
252.203-7002 Requirement to Inform Employees of Whistleblower Rights SEP 2013 252.203-7005 Representation Relating to Compensation of Former DoD
Officials
NOV 2011
252.204-7003 Control Of Government Personnel Work Product APR 1992 252.204-7008 Compliance With Safeguarding Covered Defense Information
Controls
OCT 2016
252.204-7012 Safeguarding Covered Defense Information and Cyber Incident Reporting
DEC 2019
252.204-7015 Notice of Authorized Disclosure of Information for Litigation Support
MAY 2016
252.209-7004 Subcontracting With Firms That Are Owned or Controlled By The Government of a Country that is a State Sponsor of Terrorism
MAY 2019
252.211-7003 Item Unique Identification and Valuation MAR 2016 252.211-7007 Reporting of Government-Furnished Property AUG 2012 252.232-7003 Electronic Submission of Payment Requests and Receiving
Reports
DEC 2018
252.232-7010 Levies on Contract Payments DEC 2006 252.242-7005 Contractor Business Systems FEB 2012 252.243-7001 Pricing Of Contract Modifications DEC 1991 252.244-7000 Subcontracts for Commercial Items JAN 2021 252.245-7001 Tagging, Labeling, and Marking of Government-Furnished
Property
APR 2012
252.245-7002 Reporting Loss of Government Property JAN 2021 252.245-7003 Contractor Property Management System Administration APR 2012 252.245-7004 Reporting, Reutilization, and Disposal DEC 2017 252.247-7023 Transportation of Supplies by Sea FEB 2019
CLAUSES INCORPORATED BY FULL TEXT
52.204-24 REPRESENTATION REGARDING CERTAIN TELECOMMUNICATIONS AND VIDEO
SURVEILLANCE SERVICES OR EQUIPMENT (OCT 2020)
The Offeror shall not complete the representation at paragraph (d)(1) of this provision if the Offeror has represented that it "does not provide covered telecommunications equipment or services as a part of its offered products or services to the Government in the performance of any contract, subcontract, or other contractual instrument" in paragraph (c)(1) in the provision at 52.204-26, Covered Telecommunications Equipment or Services-- Representation, or in paragraph (v)(2)(i) of the provision at 52.212-3, Offeror Representations and Certifications- Commercial Items. The Offeror shall not complete the representation in paragraph (d)(2) of this provision if the Offeror has represented that it "does not use covered telecommunications equipment or services, or any equipment, system, or service that uses covered telecommunications equipment or services" in paragraph (c)(2) of the provision at 52.204-26, or in paragraph (v)(2)(ii) of the provision at 52.212-3.
(a) Definitions. As used in this provision-
Backhaul, covered telecommunications equipment or services, critical technology, interconnection arrangements, reasonable inquiry, roaming, and substantial or essential component have the meanings provided in the clause 52.204-25, Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment.
(b) Prohibition.
(1) Section 889(a)(1)(A) of the John S. McCain National Defense Authorization Act for Fiscal Year 2019 (Pub. L.
115-232) prohibits the head of an executive agency on or after August 13, 2019, from procuring or obtaining, or extending or renewing a contract to procure or obtain, any equipment, system, or service that uses covered telecommunications equipment or services as a substantial or essential component of any system, or as critical technology as part of any system. Nothing in the prohibition shall be construed to--
(i) Prohibit the head of an executive agency from procuring with an entity to provide a service that connects to the facilities of a third-party, such as backhaul, roaming, or interconnection arrangements; or
(ii) Cover telecommunications equipment that cannot route or redirect user data traffic or cannot permit visibility into any user data or packets that such equipment transmits or otherwise handles.
(2) Section 889(a)(1)(B) of the John S. McCain National Defense Authorization Act for Fiscal Year 2019 (Pub. L.
115-232) prohibits the head of an executive agency on or after August 13, 2020, from entering into a contract or extending or renewing a contract with an entity that uses any equipment, system, or service that uses covered telecommunications equipment or services as a substantial or essential component of any system, or as critical technology as part of any system. This prohibition applies to the use of covered telecommunications equipment or services, regardless of whether that use is in performance of work under a Federal contract. Nothing in the prohibition shall be construed to--
(i) Prohibit the head of an executive agency from procuring with an entity to provide a service that connects to the facilities of a third-party, such as backhaul, roaming, or interconnection arrangements; or
(ii) Cover telecommunications equipment that cannot route or redirect user data traffic or cannot permit visibility into any user data or packets that such equipment transmits or otherwise handles.
(c) Procedures. The Offeror shall review the list of excluded parties in the System for Award Management (SAM) (https://www.sam.gov) for entities excluded from receiving federal awards for "covered telecommunications equipment or services."
(d) Representations. The Offeror represents that--
(1) It [] will, [] will not provide covered telecommunications equipment or services to the Government in the performance of any contract, subcontract or other contractual instrument resulting from this solicitation. The Offeror shall provide the additional disclosure information required at paragraph (e)(1) of this section if the Offeror responds "will" in paragraph (d)(1) of this section; and
(2) After conducting a reasonable inquiry, for purposes of this representation, the Offeror represents that--
It [] does, [] does not use covered telecommunications equipment or services, or use any equipment, system, or service that uses covered telecommunications equipment or services. The Offeror shall provide the additional disclosure information required at paragraph (e)(2) of this section if the Offeror responds "does" in paragraph (d)(2) of this section.
(e) Disclosures.
(1) Disclosure for the representation in paragraph (d)(1) of this provision. If the Offeror has responded "will" in the representation in paragraph (d)(1) of this provision, the Offeror shall provide the following information as part of the offer:
(i) For covered equipment--
(A) The entity that produced the covered telecommunications equipment (include entity name, unique entity identifier, CAGE code, and whether the entity was the original equipment manufacturer (OEM) or a distributor, if known);
(B) A description of all covered telecommunications equipment offered (include brand; model number, such as OEM number, manufacturer part number, or wholesaler number; and item description, as applicable); and
(C) Explanation of the proposed use of covered telecommunications equipment and any factors relevant to determining if such use would be permissible under the prohibition in paragraph (b)(1) of this provision.
(ii) For covered services--
(A) If the service is related to item maintenance: A description of all covered telecommunications services offered (include on the item being maintained: Brand; model number, such as OEM number, manufacturer part number, or wholesaler number; and item description, as applicable); or
(B) If not associated with maintenance, the Product Service Code (PSC) of the service being provided; and explanation of the proposed use of covered telecommunications services and any factors relevant to determining if such use would be permissible under the prohibition in paragraph (b)(1) of this provision.
(2) Disclosure for the representation in paragraph (d)(2) of this provision. If the Offeror has responded "does" in the representation in paragraph (d)(2) of this provision, the Offeror shall provide the following information as part of the offer:
(i) For covered equipment--
(A) The entity that produced the covered telecommunications equipment (include entity name, unique entity identifier, CAGE code, and whether the entity was the OEM or a distributor, if known);
(B) A description of all covered telecommunications equipment offered (include brand; model number, such as OEM number, manufacturer part number, or wholesaler number; and item description, as applicable); and
(C) Explanation of the proposed use of covered telecommunications equipment and any factors relevant to determining if such use would be permissible under the prohibition in paragraph (b)(2) of this provision.
(ii) For covered services--
(A) If the service is related to item maintenance: A description of all covered telecommunications services offered (include on the item being maintained: Brand; model number, such as OEM number, manufacturer part number, or wholesaler number; and item description, as applicable); or
(B) If not associated with maintenance, the PSC of the service being provided; and explanation of the proposed use of covered telecommunications services and any factors relevant to determining if such use would be permissible under the prohibition in paragraph (b)(2) of this provision.
(End of provision)
52.204-26 COVERED TELECOMMUNICATIONS EQUIPMENT OR SERVICES--REPRESENTATION (OCT
2020)
(a) Definitions. As used in this provision, “covered telecommunications equipment or services” and "reasonable inquiry" have the meaning provided in the clause 52.204-25, Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment.
(b) Procedures. The Offeror shall review the list of excluded parties in the System for Award Management (SAM) (https://www.sam.gov) for entities excluded from receiving federal awards for “covered telecommunications equipment or services”.
(c) Representations.
(1) The Offeror represents that it [ ___ ] does, [ ___ ] does not provide covered telecommunications equipment or services as a part of its offered products or services to the Government in the performance of any contract, subcontract, or other contractual instrument.
(2) After conducting a reasonable inquiry for purposes of this representation, the offeror represents that it [ ___ ] does, [ ___ ] does not use covered telecommunications equipment or services, or any equipment, system, or service that uses covered telecommunications equipment or services.
52.212-1 INSTRUCTIONS TO OFFERORS--COMMERCIAL ITEMS (JUN 2020)
ADDENDUM TO FAR 52.212-1, INSTRUCTIONS TO OFFERORS--COMMERCIAL ITEMS:
Paragraph (c) is changed to read: Period for acceptance of offers. The Offeror agree to hold the prices in its offer firm for 90 calendar days from the date specified for receipt of offers, unless another time period is specified in an addendum to the solicitation.
(End of Addendum)
52.212-2 EVALUATION--COMMERCIAL ITEMS (OCT 2014)
(a) The Government will award a contract resulting from this solicitation to the responsible offeror whose offer conforming to the solicitation will be most advantageous to the Government, price and other factors considered. The following factors shall be used to evaluate offers:
Lowest Price, Technically Acceptable. The Government intends to evaluate and award a contract without discussions with offerors.
(b) Options. The Government will evaluate offers for award purposes by adding the total price for all options to the total price for the basic requirement. The Government may determine that an offer is unacceptable if the option prices are significantly unbalanced. Evaluation of options shall not obligate the Government to exercise the option(s).
(c) A written notice of award or acceptance of an offer, mailed or otherwise furnished to the successful offeror within the time for acceptance specified in the offer, shall result in a binding contract without further action by either party. Before the offer's specified expiration time, the Government may accept an offer (or part of an offer), whether or not there are negotiations after its receipt, unless a written notice of withdrawal is received before award.
(End of provision)
ADDENDUM TO FAR 52.212-2, BASIS OF AWARD:
A. General Information:
1. The basis of award will be the Lowest Priced, Technically Acceptable offer. Proposals that are unrealistic in terms of Technical Requirements or Price may be rejected at any time during the evaluation process. Offerors must receive a rating of Technically Acceptable in all factors/subfactors in order for their overall proposal to be determined Technically Acceptable.
2. By submission of its offer, the offeror accedes to all solicitation requirements, including terms and conditions, and technical requirements.
3. The Government intends to make award without discussions, unless the Contracting Officer determines that discussions are necessary. Offerors should provide their most favorable prices in their initial offers.
B. Non-Price Evaluation Factors and Subfactors:
1. Factor 1- Technical:
(a) Subfactor 1 Compliance: The offeror shall comply with all the Paragraphs in the Performance Work Statement. The offeror shall provide all information possible for the Government POC to evaluate their proposals against the requirement in the Performance Work Statement. This includes but is not limited to brochures, videos, and testimonials.
(b) Subfactor 2 Experience: The Contractor shall submit evidence of performing identical or “like” services of A/C generator components as described in the PWS. The records shall be copies of the original invoices/records and a sampling of test reports for that invoice/record.
(c) Subfactor 3 Property Control Plan: The contractor shall provide a description of the offeror’s property management system/plan in accordance with FAR 45.201(c)(4).
2. Factor 2 - Past Performance: The Offerors shall provide three recent and relevant Government or private sector projects completed within the past three years that demonstrates the ability to perform the requirements in this solicitation. The Offeror shall identify the contract title, contract number, dollar value, client name and address, location of work, point of contact with telephone number, and an explanation of how each project related to the work requirements of this solicitation.
C. Price Evaluation Factor: Offerors shall complete the Schedule B with pricing for each Contract Line Item Number (CLIN).
D. Proposals will be evaluated initially independently of the price to determine the Offerors’ ability to meet the Government’s requirement set forth in the solicitation. The Government may make a final rating determination based on the proposal as submitted without requesting any further information. For all proposals determined to be Technically Acceptable, the offer providing the lowest price will receive the contract award.
1. Offerors’ technical proposals will receive an overall rating based on the following:
(a) Technically Acceptable: Offeror meets all requirements or technical specifications or has submitted all documentation requested in any technical evaluation criteria and all documentation meets the standard set forth in the solicitation.
(b) Technically Unacceptable: Offerer fails to meet all requirements or technical specifications or has failed to comply in submitting requested documentation in any technical evaluation criteria or the submitted documentation fails to meet the standard set forth in the solicitation.
2. Evaluation of past performance will be performed only on proposals that receive a technically acceptable rating on technical evaluation factors. Offerors’ past performance information will receive an overall rating based on the following:
(a) Acceptable: Based on the Offeror’s performance record, the Government has a reasonable expectation that the Offeror will successfully perform the required effort, or the Offeror’s performance record is unknown. An Offeror without a record of relevant past performance or for whom information on past performance is not available or so sparse that no meaningful past performance rating can be reasonably assigned, shall be determined to have unknown past performance. In the context of acceptability or unacceptability, “unknown” shall be considered “acceptable.”
(b) Unacceptable: Based on the Offeror’s performance record, the Government has no reasonable expectation that the Offeror will be able to successfully perform the required effort.