Sol_140R6021Q0040.pdf

PDF 537 KB Posted

Attached to
EC- ECAO/FIPP PEST CONTROL SERVICES Federal contract opportunity
Solicitation number
140R6021Q0040
Issued by
Department of the Interior Bureau of Reclamation

View the file

Other files for this federal contract opportunity

Other files attached to EC- ECAO/FIPP PEST CONTROL SERVICES, newest first.
File Type Posted
Sol_140R6021Q0040_Amd_0002.pdf PDF
Sol_140R6021Q0040_Amd_0001.pdf PDF
C05_05_Maps_ECAO_Pest_Control.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Solicitation #: 140R6021Q0040 Bureau of Reclamation ECAO/FIPP Pest Control Service Missouri Basin Regional Office

Cover Page ECAO/FIPP Pest Control Service

This combined Synopsis / Solicitation is a Total Small Business Set-Aside using NAICS code 561710 Exterminating and Pest Control Services; This is a total small business set-aside with size standard of $12.0 million. This combined synopsis/solicitation for commercial items is prepared in accordance with the format in subpart 12.6, as supplemented with additional information included in this notice. The solicitation document and incorporated provisions and clauses are those in effect through Federal Acquisition Circular 2021-06 effective 7/12/2021.

This announcement constitutes the only solicitation to be issued; quotes are being requested and a written solicitation using the Standard Form 1449 will not be issued.

Combined Synopsis / Solicitation Closing Date: August 19, 2021 Combined Synopsis / Solicitation Closing Time: 14:00 (2:00 PM) Mountain Time

ONLY ELECTRONIC QUOTES will be accepted for this requirement. Quotes must be electronically delivered to:

Mr. Michael Hirsch E-mail: mhirsch@usbr.gov

E-mailed proposals must be in the following format: One (1) PDF document for full quote.

E-mailed proposals must be received by the Contract Specialist via e-mail no later than 14:00 hours (2:00 PM) MT August 19, 2021 to be considered for award.

E-mail subject line must contain the following naming scheme:

Request for Quotes – Company Name RFQ # 140R6021Q0040 – ECAO/FIPP Pest Control Service

Inquiries regarding this Solicitation should be made to:

Mr. Michael Hirsch, Contract Specialist E-mail: mhirsch@usbr.gov Phone: 970-541-4432

All correspondence regarding this Solicitation should reference RFQ No. 140R6021Q0040 – ECAO/FIPP Pest Control Service in the subject line.

DEADLINE FOR QUESTIONS: Questions must be submitted to the Contract Specialist at least 48 business hours prior to the closing. Any questions submitted after the deadline will not be answered.

Please read Clause 52.212-2 Evaluation – Commercial Items thoroughly for evaluation of quotes and award information.

NOTE: All proposals MUST be submitted in one part, the technical package (Company experience, past performance, warranty information) and the pricing must be submitted in one package.

mailto:E-mail:%20mhirsch@usbr.gov mailto:mhirsch@usbr.gov

SOLICITATION # 140R6021Q0040 BUREAU OF RECLAMATION

ECAO/FIPP PEST CONTROL SERVICE MISSOURI BASIN REGION

Combined Synopsis / Solicitation

ECAO/FIPP Pest Control Service for Missouri Basin Region

(a) Offers will be considered for award on the following Price Schedule, but no offer will be considered for award on only a part of the Price Schedule.

(1) Offerors shall complete Price Schedule.

(b) Offers are subject to the terms and conditions of this combined synopsis / solicitation.

(c) CLIN – Contract Line Item Number

(d) This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in subpart 12.6, as supplemented with additional information included in this notice. This announcement constitutes the only solicitation to be issued; quotes are being requested and a written solicitation using the OF347 will be issued. The solicitation document and incorporated provisions and clauses are those in effect through Federal Acquisition Circular 2021-06 effective 7/12/2021.

Price Schedule

CLIN Item Description Unit of Measure

Unit Price Quantity Total Amount

1) ECAO/FIPP PEST

CONTROL SERVICE

BASE YEAR

MO $ 12 $

2) ECAO/FIPP PEST

CONTROL SERVICE

OPTION YEAR 1

MO $ 12 $

3) ECAO/FIPP PEST

CONTROL SERVICE

OPTION YEAR 2

MO $ 12 $

4) ECAO/FIPP PEST

CONTROL SERVICE

OPTION YEAR 3

MO $ 12 $

5) ECAO/FIPP PEST

CONTROL SERVICE

OPTION YEAR 4

MO $ 12 $

6) Option to Extend Services in accordance with FAR 52.217-8. The rate will be a continuation of the same rate as the service being extended. For the purpose of evaluation, this CLIN

MO $ 6 $

SOLICITATION # 140R6021Q0040 BUREAU OF RECLAMATION

ECAO/FIPP PEST CONTROL SERVICE MISSOURI BASIN REGION

TOTAL FOR PRICE SCHEDULE $_________________

Vendor Name DUNS Point of

Contact Name Contact Information

Physical address, phone, email shall be set at 6 months of service at the OY 4 rate.

SOLICITATION # 140R6021Q0040 BUREAU OF RECLAMATION

ECAO/FIPP PEST CONTROL SERVICE MISSOURI BASIN REGION

CLAUSES

ADDENDUM TO 52.212-4

DOI-AAAP-0028 ELECTRONIC INVOICING AND PAYMENT REQUIREMENTS-INVOICE

PROCESSING PLATFORM (IPP) (APR 2013)

Payment requests must be submitted electronically through the U. S. Department of the Treasury's Invoice Processing Platform System (IPP).

'Payment request' means any request for contract financing payment or invoicing payment by the Contractor. To constitute a proper invoice, the payment request must comply with the requirements identified in the applicable Prompt Payment clause included in the contract, or the clause 52.212-4 Contract Terms and Conditions-Commercial Items included in commercial item contracts. The IPP website address is: https://www.ipp.gov.

Under this contract, the following documents are required to be submitted as an attachment to the IPP invoice:

Valid COR approved invoices for all work completed and delivered

The Contractor shall also submit an electronic copy of the IPP invoice to the Contract Specialist Michael Hirsch at mhirsch@usbr.gov and Contracting Officer Sarah Weippert at sweippert@usbr.gov once the invoice has been signed as approved by the COR and submitted to IPP. Failure to email the invoice may cause significant delay or possible rejection of your payment request.

The Contractor must use the IPP website to register access and use IPP for submitting requests for payment. The Contractor Government Business Point of Contact (as listed in SAM) will receive enrollment instructions via email from the Federal Reserve Bank of Boston (FRBB) within 3-5 business days of the contract award date. Contractor assistance with enrollment can be obtained by contacting the IPP Production Helpdesk via email ippgroup@bos.frb.org or phone (866) 973-3131.

If the Contractor is unable to comply with the requirement to use IPP for submitting invoices for payment, the Contractor must submit a waiver request in writing to the Contracting Officer with its proposal or quotation.

(End of Local Clause)

52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)

This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es): FAR Clauses – https://www.acquisition.gov/far/

52.204-13 SYSTEM FOR AWARD MANAGEMENT MAINTENANCE (OCT 2018)

52.204-18 COMMERCIAL AND GOVERNMENT ENTITY CODE MAINTENANCE (AUG

2020) mailto:sweippert@usbr.gov

SOLICITATION # 140R6021Q0040 BUREAU OF RECLAMATION

ECAO/FIPP PEST CONTROL SERVICE MISSOURI BASIN REGION

52.212-4 CONTRACT TERMS AND CONDITIONS--COMMERCIAL ITEMS (OCT 2018)

52.223-2 AFFIRMATIVE PROCUREMENT OF BIOBASED PRODUCTS UNDER SERVICE

AND CONSTRUCTION CONTRACTS (SEP 2013)

52.233-4 APPLICABLE LAW FOR BREACH OF CONTRACT CLAIM (OCT 2004)

52.242-15 STOP-WORK ORDER (AUG 1989)

52.252-6 AUTHORIZED DEVIATIONS IN CLAUSES (NOV 2020)

1452.201-70 AUTHORITIES AND DELEGATIONS (SEP 2011)

52.212-5 CONTRACT TERMS AND CONDITIONS REQUIRED TO IMPLEMENT STATUTES

OR EXECUTIVE ORDERS-COMMERCIAL ITEMS (JAN 2021)

52.209-6, PROTECTING THE GOVERNMENT’S INTEREST WHEN SUBCONTRACTING

WITH CONTRACTORS DEBARRED, SUSPENDED, OR PROPOSED FOR DEBARMENT.

(OCT 2015) (31 U.S.C. 6101 NOTE).

52.219-6, NOTICE OF TOTAL SMALL BUSINESS SET-ASIDE (NOV 2020) (15 U.S.C.644).

52.219-13, NOTICE OF SET-ASIDE OF ORDERS (MAR 2020) (15 U.S.C. 644(R)).

52.222-3, CONVICT LABOR (JUNE 2003) (E.O.11755).

52.222-19, CHILD LABOR-COOPERATION WITH AUTHORITIES AND REMEDIES (JAN

2020) (E.O.13126).

52.222-21, PROHIBITION OF SEGREGATED FACILITIES (APR 2015).

52.222-26, EQUAL OPPORTUNITY (SEPT 2016) (E.O. 11246).

52.222-36, EQUAL OPPORTUNITY FOR WORKERS WITH DISABILITIES (JULY 2014) (29

U.S.C. 793).

52.222-37, EMPLOYMENT REPORTS ON VETERANS (FEB 2016) (38 U.S.C. 4212).

52.222-40, NOTIFICATION OF EMPLOYEE RIGHTS UNDER THE NATIONAL LABOR

RELATIONS ACT (DEC 2010) (E.O. 13496).

52.222-50, COMBATING TRAFFICKING IN PERSONS (OCT 2020) (22 U.S.C. CHAPTER 78

AND E.O. 13627).

52.223-12, MAINTENANCE, SERVICE, REPAIR, OR DISPOSAL OF REFRIGERATION

EQUIPMENT AND AIR CONDITIONERS (JUN 2016)(E.O. 13693)

52.223-18, ENCOURAGING CONTRACTOR POLICIES TO BAN TEXT MESSAGING WHILE

DRIVING (AUG 2011) (E.O. 13513).

52.225-13, RESTRICTIONS ON CERTAIN FOREIGN PURCHASES (JUNE 2008) (E.O.’S,

PROCLAMATIONS, AND STATUTES ADMINISTERED BY THE OFFICE OF FOREIGN

ASSETS CONTROL OF THE DEPARTMENT OF THE TREASURY).

52.232-33, PAYMENT BY ELECTRONIC FUNDS TRANSFER—SYSTEM FOR AWARD

MANAGEMENT (OCT 2018) (31 U.S.C. 3332).

SOLICITATION # 140R6021Q0040 BUREAU OF RECLAMATION

ECAO/FIPP PEST CONTROL SERVICE MISSOURI BASIN REGION

52.222-41, SERVICE CONTRACT LABOR STANDARDS (AUG 2018) (41 U.S.C. CHAPTER 67).

52.222-42, STATEMENT OF EQUIVALENT RATES FOR FEDERAL HIRES (MAY 2014) (29

U.S.C. 206 AND 41 U.S.C. CHAPTER 67).

52.222-44, FAIR LABOR STANDARDS ACT AND SERVICE CONTRACT LABOR

STANDARDS—PRICE ADJUSTMENT (MAY 2014) (29 U.S.C. 206 AND 41 U.S.C. CHAPTER

67).

52.222-55, MINIMUM WAGES UNDER EXECUTIVE ORDER 13658 (NOV 2020)

52.219-6 NOTICE OF TOTAL SMALL BUSINESS SET-ASIDE (DEVIATION 2019-01) (JUL

(a) Definition. Small business concern, as used in this clause, means a concern, including its affiliates, that is independently owned and operated, not dominant in the field of operation in which it is bidding on Government contracts, and qualified as a small business under the size standards in this solicitation.

(b) Applicability. This clause applies only to—

(1) Contracts that have been totally set aside or reserved for small business concerns; and

(2) Orders set aside for small business concerns under multiple-award contracts as described in 8.405-5 and 16.505(b)(2)(i)(F).

(c) General.

(1) Offers are solicited only from small business concerns. Offers received from concerns that are not small business concerns shall be considered nonresponsive and will be rejected.

(2) Any award resulting from this solicitation will be made to a small business concern.

(d) Agreement.

(1) For a contract at or below the simplified acquisition threshold, a small business concern may provide the end item of any firm. For a contract exceeding the simplified acquisition threshold and the requirements of paragraphs (d)(1)(i) through (iii) of this clause have not been waived by SBA in accordance with 13 CFR 121.1204, a small business concern that provides an end item it did not manufacture, process, or produce, shall—

(i) Provide an end item that a small business has manufactured, processed, or produced in the United States or its outlying areas;

(ii) Be primarily engaged in the retail or wholesale trade and normally sell the type of item being supplied; and

(iii) Take ownership or possession of the item(s) with its personnel, equipment, or facilities in a manner consistent with industry practice; for example, providing storage, transportation, or delivery.

SOLICITATION # 140R6021Q0040 BUREAU OF RECLAMATION

ECAO/FIPP PEST CONTROL SERVICE MISSOURI BASIN REGION

(2) Paragraph (d)(1) of this clause does not apply to construction or service contracts.

(End of clause)

WBR 1452.201-80 CONTRACTING OFFICER’S REPRESENTATIVE’S AUTHORITIES AND

LIMITATIONS -- BUREAU OF RECLAMATION (MAY 2018)

(a) Performance of the work under this contract shall be subject to the technical direction of the Reclamation Contracting Officer's Representative (COR). The term “technical direction” is defined to include, without limitation:

(1) Inspecting and accepting or rejecting work performed under the contract.

(2) Representing the Government in technical phases of the work. The COR is responsible for the technical administration of the contract and will provide instructions and interpretations to the Contractor on all technical matters relating to the contract. The COR will supervise or oversee all Government technical and administrative personnel assigned to assist the COR.

(3) Reviewing and, where required by the contract, approving submittals of technical data, shop drawings, samples, literature, plans, or other data required to be delivered by the Contractor to the Government.

(b) The Contractor will receive a copy of the written COR designation from the Contracting Officer. It will specify the extent of the COR’s authority to act on behalf of the Contracting Officer.

(c) Technical direction must be within the scope of work stated in the contract. Only the Contracting Officer is authorized to determine if a change is within the scope of the contract; therefore, the COR does not have the authority to, and may not, issue any technical direction that -

(1) Constitutes a direction of additional work outside the Contract requirements;

(2) Constitutes a change as defined in the contract clause entitled “Changes;”

(3) In any manner causes an increase or decrease in the total contract cost, or the time required for contract performance;

(4) Changes any of the expressed terms, conditions or specifications of the contract; or

(5) Interferes with the Contractor's right to perform the terms and conditions of the contract.

(d) All technical direction shall be issued in writing by the COR.

(e) The Contractor must proceed promptly with the performance of technical direction duly issued by the COR in the manner prescribed by this clause and within its authority under the provisions of this clause.

If, in the opinion of the Contractor, any instruction or direction by the COR falls within one of the categories defined in (c)(1) through (c)(5) of this clause, the Contractor must not proceed and must notify the Contracting Officer in writing within five (5) working days after receipt of any such instruction or direction and must request the Contracting Officer to modify the contract accordingly. Upon receiving the notification from the Contractor, the Contracting Officer must -

SOLICITATION # 140R6021Q0040 BUREAU OF RECLAMATION

ECAO/FIPP PEST CONTROL SERVICE MISSOURI BASIN REGION

(1) Advise the Contractor in writing after receipt of the Contractor's letter that the technical direction is within the scope of the contract effort and does not constitute a change under the Changes clause of the contract; or

(2) Advise the Contractor that the Government will issue a written change order.

(f) A failure of the Contractor and Contracting Officer either to agree that the technical direction is within the scope of the contract or to agree upon the contract action to be taken with respect to the technical direction will be subject to the provisions of the clause entitled “Disputes.”

(End of Clause)

52.217-8 OPTION TO EXTEND SERVICES (NOV 1999)

The Government may require continued performance of any services within the limits and at the rates specified in the contract. These rates may be adjusted only as a result of revisions to prevailing labor rates provided by the Secretary of Labor. The option provision may be exercised more than once, but the total extension of performance hereunder shall not exceed 6 months. The Contracting Officer may exercise the option by written notice to the Contractor within 30 days.

52.217-9 OPTION TO EXTEND THE TERM OF THE CONTRACT (MAR 2000)

(a) The Government may extend the term of this contract by written notice to the Contractor within 30 days; provided that the Government gives the Contractor a preliminary written notice of its intent to extend at least 60 days before the contract expires. The preliminary notice does not commit the Government to an extension.

(b) If the Government exercises this option, the extended contract shall be considered to include this option clause.

(c) The total duration of this contract, including the exercise of any options under this clause, shall not exceed five (5) years.

1452.228-70 LIABILITY INSURANCE -- DEPARTMENT OF THE INTERIOR JULY 1996

(a) The Contractor shall procure and maintain during the term of this contract and any extension thereof liability insurance in form satisfactory to the Contracting Officer by an insurance company which is acceptable to the Contracting Officer. The named insured parties under the policy shall be the Contractor and the United States of America. The amounts of the insurance shall be not less than as follows:

WORKERS’ COMPENSATION AND EMPLOYER’S LIABILITY

$100,000 minimum coverage

GENERAL LIABILITY

$500,000 per occurrence

AUTOMOBILE LIABILITY

$200,000 each person $500,000 each occurrence

$20,000 property damage

SOLICITATION # 140R6021Q0040 BUREAU OF RECLAMATION

ECAO/FIPP PEST CONTROL SERVICE MISSOURI BASIN REGION

(b) Each policy shall have a certificate evidencing the insurance coverage. The insurance company shall provide an endorsement to notify the Contracting Officer 30 days prior to the effective date of cancellation or termination of the policy or certificate; or modification of the policy or certificate which may adversely affect the interest of the Government in such insurance. The certificate shall identify the contract number, the name and address of the Contracting Officer, as well as the insured, the policy number and a brief description of contract services to be performed. The Contractor shall furnish the Contracting Officer with a copy of an acceptable insurance certificate prior to beginning the work

GP-7 SITE SECURITY (FEB 2004)

(a) At least 10 days prior to arriving at the worksite, the contractor shall submit a list to the Contracting Officer's Representative (COR) of the names of all contractor employees that will be on-site initially.

Additional employee names must be provided to COR prior to additional employees arriving on-site. The list(s) must include a legible photocopy of each employee's driver's license. In the absence of a driver's license, provide an alternate source of official identification that includes: First, Middle, Last Name; date and place of birth; and place of residence. All contractor employees must be U.S. citizens or have a valid Immigrant Visa Number, Permanent Resident Card, or Resident Alien Card authorizing them to work in the U.S.

(b) The contractor is hereby notified of the following: The Government may perform background checks on any or all workers. If the Government performs background checks, workers shall be required to submit additional personal and work history information. The Government may deny access to any worker at any time, based on information discovered during the background check. Information related to criminal matters (e.g., outstanding arrest warrants) that is discovered during a background check will be reported to the appropriate authorities.

(c) At least 10 days prior to arriving at the worksite, the contractor shall submit an initial list to COR of all contractor vehicles to be brought to the worksite. A supplemental list shall be provided to COR before additional vehicles are brought on-site. For each vehicle the list shall include the year, make, model, and color; and license plate numbers and state of issuance when applicable.

(d) Reclamation will provide keys and/or locks to gates and doors, etc. as necessary for contractor personnel to access points within the scope of this project. Any duplication of keys or substitution of locks is strictly prohibited. Contractor shall be accountable to secure and return all keys and/or locks provided by the Government, and shall immediately notify the COR of the loss or misplacement of any provided key and/or lock.

(e) All drawings, plans, and other sensitive documents issued to the contractor shall remain under their direct control at all times. These sensitive documents shall not be reproduced or copied or further distributed without approval from COR.

(f) All firearms and dangerous weapons are prohibited in Federal facilities for all persons not specifically authorized by Title 18, United States Code, Section 930. A license to carry a concealed firearm issued under state law is not an exception to this prohibition. This prohibition shall apply to all areas within the construction worksite and contractor use area.

SOLICITATION # 140R6021Q0040 BUREAU OF RECLAMATION

ECAO/FIPP PEST CONTROL SERVICE MISSOURI BASIN REGION

(g) In case of an emergency situation, the contractor shall follow emergency instructions provided by

COR.

(h) Unless exempted by COR, the contractor shall comply with all security requirements already in place at the site, i.e., those security requirements that have been adopted as standard operating procedures at the site.

(i) The contractor shall report to COR all incidents of criminal and/or suspicious activity observed by their employees on or adjacent to the construction site.

(j) Reclamation reserves the right to change or modify security requirements as mandated by the Office of Homeland Security and/or as deemed necessary by Reclamation security staff.

(k) Any violations of Reclamation security requirements and/or restrictions may result in Reclamation denying the contractor personnel access to the worksite.

(l) Cost. Include cost incurred for General Security Requirements in prices offered in the schedule for other items of work. In the event Reclamation changes of modifies these requirements after the contract is in place, increased Contractor costs will be paid for under the Contract Change Clause.

(m) Contractor shall notify Contracting Officer's Representative at least 24 hours in advance of any material delivery to worksite. Material may only be delivered to areas approved by COR.

WBR 1452.223-82 PROTECTING FEDERAL EMPLOYEES AND THE PUBLIC FROM

EXPOSURE TO TOBACCO SMOKE IN THE FEDERAL WORKPLACE -- BUREAU OF

RECLAMATION (DEC 2009)

(a) In performing work under this contract, the contractor shall comply with the requirements of Executive Order 13058, dated August 9, 1997, which prohibits the smoking of tobacco products in all interior space owned, rented, or leased by the executive branch of the Federal Government, and in any outdoor areas under executive branch control in front of air intake ducts.

(b) This restriction does not apply in designated smoking areas that are enclosed and exhausted directly to the outside and away from air intake ducts, and are maintained under negative pressure (with respect to surrounding spaces) sufficient to contain tobacco smoke within the designated area.

(c) Smoking may also be restricted at doorways and in courtyards under executive branch control in order to protect workers and visitors from environmental tobacco smoke.

WBR 1452.222-80 NOTICE OF APPLICABILITY – COOPERATION WITH AUTHORITIES

AND REMEDIES – CHILD LABOR -- BUREAU OF RECLAMATION (JAN 2004)

(a) The clause at FAR 52.222-19, Child Labor, Cooperation with Authorities and Remedies, does not apply to Bureau of Reclamation acquisitions to the extent that the contractor is supplying end products mined, produced, or manufactured in –

(1) Canada, and the anticipated value of the acquisition is $175,000 or more; and

(2) Israel, and the anticipated value of the acquisition is $175,000 or more.

SOLICITATION # 140R6021Q0040 BUREAU OF RECLAMATION

ECAO/FIPP PEST CONTROL SERVICE MISSOURI BASIN REGION

(b) Nonapplicability thresholds for other countries are the same as listed in the FAR clause.

WBR 1452.237-80 SECURITY REQUIREMENTS--BUREAU OF RECLAMATION (FEB 2017)

(a) General Security Requirements:

(1) This clause addresses security requirements, including general procedural requirements, information security requirements, contractor employee suitability requirements, identification card requirements, site security requirements, and information technology security requirements. Within this clause, COR means Contracting Officer's Representative. If there is no COR appointed and identified to the Contractor, the term instead will mean the Program Manager or any other authorized individual responsible for technical oversight under the contract. “Work site” means the Government facility, office, construction site, and any other area within the Government office or facility that the Contractor must access to accomplish work under this contract.

(2) The work performed under this contract shall only be accomplished by individuals (in the employment of the Contractor or any subcontractors) whose conduct and behavior is consistent with the efficiency of the Federal Service and the requirements of this contract, and who are acceptable to the CO.

If Reclamation finds a Contractor employee to be unsuitable or unfit for his or her assigned duties, the CO will direct the Contractor to remove the individual from the contract and access to the Federal facility at which the contract activities are occurring.

(3) The Contractor’s employees governed by this contract may need access to sensitive information and/or may need access to designated Controlled Access Areas (CAAs). The Federal Government (Government) reserves the right, in its sole discretion, to determine suitability of Contractor personnel and deny access to any sensitive information or project specific area to any personnel for any cause.

(4) The Contractor is responsible for informing and ensuring compliance by its employees with any applicable security procedures of the Government facility where work may be performed under this contract.

(5) Any Contractor employee that will have access to a Federally-controlled facility or information system will be required to have a Government-issued identification card, consisting of either a Personal Identity Verification (PIV) Card, a temporary identification card, or a visitor badge. During performance of the contract, the Contractor shall keep the COR apprised of any changes in personnel, or changes in personnel access or duration, to ensure that performance is not delayed by compliance with credentialing processes.

(6) A Contractor employee will not be provided access to a Government facility or information system until a Government PIV Card, temporary identification card, or visitor identification badge has been issued to the Contractor employee. For those individuals that will be receiving a PIV Card, the Government may, at its discretion, issue a temporary identification card or visitor identification badge after the background investigation forms have been received and the investigation is initiated.

(7) All Contractor employees shall access the facility via the facility’s entry screening system and visibly display the Government-issued PIV Card, temporary identification card, or visitor identification badge at all times. Contractor employees must visibly wear the Government-issued identification card at all times they are on Government facilities. Contractor employees are responsible for the safekeeping of all Government-issued identification cards, whether on-site or off-site. Cards that have been lost, damaged, or stolen must be reported to the COR within 24 hours. The Contractor shall return all identification cards and card keys and any other Government property and information upon completion of performance or when personnel depart permanently or for a period of 7 days or more. The Contractor may be required to turn in access control cards or identification cards on a daily basis.

SOLICITATION # 140R6021Q0040 BUREAU OF RECLAMATION

ECAO/FIPP PEST CONTROL SERVICE MISSOURI BASIN REGION

(8) Misuse or loss of access control or identification cards, or failure to comply with required surrender of such cards may, at Government discretion, result in Contractor personnel being denied access to the work site, at no cost to Government. The Contractor may be charged up to $500 for each occurrence for any required replacement of Government-issued access control or identification cards due to loss or misuse. At the end of contract performance, or when a Contractor employee is no longer working under this contract, the Contractor shall ensure that all access control and identification cards are returned to the COR.

(9) All Contractor personnel, including subcontractor personnel, with access to the work site shall be U.S. citizens or foreign individuals legally residing in, or legally admitted to, the U.S. At the direction of the COR, the Contractor shall provide to the COR, in writing, the name and nationality of all non-U.S.

citizens working under this contract. For those individuals with access to the work site, the Contractor shall also provide documentation that the foreign individual is legally residing in, or has been legally admitted to, the U.S.

(10) The Contractor shall report all contacts with entities, individuals, and counsel/representatives (including foreign entities and foreign nationals) who seek in any way to obtain unauthorized access to sensitive information or areas. The Contractor shall report any violations of contract provisions, laws, executive orders, regulations, and guidance to the CO. The Contractor shall report any information raising a doubt as to whether an individual’s eligibility for continued employment or access to sensitive information is consistent with the interests of National Security and the Public Trust.

(11) Unsanctioned, negligent, or willful inappropriate action on the part of the Contractor (or its employees) may result in termination of the contract or removal of some Contractor employees from Reclamation facilities at no cost to the Government. These actions include, but are not limited to, exploration of a sensitive system and/or information, introduction of unauthorized and/or malicious software, or failure to follow prescribed access control policies and/or security procedures. Failure to comply with Reclamation policies, procedures, or other published security requirements may result in termination of the contract or removal of some contracted employees from Reclamation buildings and/or facilities at no cost to the Government.

(12) All provisions of this clause shall equally apply to all subcontractors. The Contractor shall incorporate the substance of this clause in all subcontracts.

(13) These security requirements apply to all sections of this Contract including Contract Drawings and other Contract Specifications as applicable. Related documents include other general provisions of Construction or Operations and Maintenance type Contracts, including FAR clauses by reference or as amended by related documents.

(b) Information Security Requirements.

(1) The term “sensitive information” means any information which warrants a degree of protection and administrative control as defined by Reclamation or that meets the criteria for exemption from public disclosure set forth under Sections 552 and 552a of Title 5, United States Code: the Freedom of Information Act and the Privacy Act. Sensitive information is generally categorized as FOR OFFICIAL USE ONLY (FOUO) information, but in some cases may include other unclassified information. (The protection of National Classified information is beyond the scope of this clause. If any work on Classified information is required under this contract, it is addressed under other contract clauses.) The Contractor shall protect this type of information from unauthorized release into public domain, or to unauthorized persons, organizations, or subcontractors. Information which, either alone or in aggregate, is deemed sensitive by Reclamation shall be handled and protected in accordance with Reclamation Directives and Standards for Identifying and Safeguarding FOR OFFICIAL USE ONLY (FOUO) Information, which is available at http://www.usbr.gov/recman/DandS.html#sle.

SOLICITATION # 140R6021Q0040 BUREAU OF RECLAMATION

ECAO/FIPP PEST CONTROL SERVICE MISSOURI BASIN REGION

(2) Any Government-furnished information/material does not become the property of the Contractor and may be withdrawn at any time. Upon expiration of the contract, all documents released to the Contractor and any material created using data from such documents shall be returned to the COR for final disposition. Only with prior authorization from the CO may the Contractor retain the material. The Contractor or subcontractor shall not disclose or release the materials provided to the Contractor to any individuals of the Contractor's organization not directly engaged in providing services under the contract or that do not have a valid need-to-know. All technical data provided to the Contractor by the Government shall be protected from public or private disclosure in accordance with the markings printed on them. All other information relating to the items to be delivered or the services to be performed under this contract shall not be disclosed by any means without prior approval of the CO. Prohibited dissemination or disclosure includes, but is not limited to: permitting access to such information by foreign nationals or by immigrant aliens who may be employed by the Contractor, publication of technical or scientific papers, advertising, and disclosure to Contractor staff not investigated and deemed acceptable at the appropriate contract/information sensitivity level, or any other proposed public release.

The Contractor shall maintain, and furnish upon demand of the CO, records of the names of individuals who have access to sensitive material in its custody. All questions regarding information security, access, and control shall be referred to the COR.

(3) The Contractor shall not release to anyone outside the Contractor’s organization any sensitive, or otherwise protected information, regardless of medium in which it is contained (for example, film, tape, document, electronic), pertaining to any part of this contract or any Reclamation program or activity, unless the CO has given prior written approval. This includes, but is not limited to, news releases, marketing promotions, articles, interviews, reports, and any other media releases. Requests for approval shall identify the specific information to be released, the medium to be used, the purpose for the release, and a description of the need-to-know. The Contractor shall submit its request to the CO before the proposed date for release. Subcontractors shall submit requests for authorization to release through the prime Contractor to the CO.

(4) The Contractor shall notify the COR immediately when known or suspected loss/compromise of sensitive information or other documents, notes, drawings, sketches, reports, photographs, exposed film or similar information which may affect the security interests of Government has occurred. This requirement extends to employees and other personnel working on behalf of the Contractor, and expands responsibility to include prompt reporting of security issues, including observed or subsequently discovered efforts by unauthorized persons to gain unauthorized access to sensitive information.

(c) Contractor Employee Suitability and Issuance of Government Identification Cards:

(1) Performance of this contract requires Contractor personnel to have a Federal Government-issued Personal Identification Verification (PIV) Card before being allowed unsupervised access to a Federally-controlled facility or information system.

(2) At the Government’s sole discretion, the Government may issue a temporary identification card or visitor identification badge, in lieu of a PIV Card, under one of the following conditions:

(i) The individual will only be associated with Reclamation for a period of 180 days or less, will not have access to sensitive information, and any access to a Controlled Access Area or Federal-controlled information system will be fully supervised. The 180 calendar day period begins on the first day of the individual’s affiliation with Reclamation (in this case, the date that the individual’s contract performance begins) and ends exactly 180 days later, regardless of the number of times the individual actually accesses a Government facility or information system.

(ii) The individual will only have sporadic access to Federal facilities and information systems, will not have access to sensitive information, and any access to a Reclamation Controlled Access Area or Federal-controlled information system will be fully supervised.

SOLICITATION # 140R6021Q0040 BUREAU OF RECLAMATION

ECAO/FIPP PEST CONTROL SERVICE MISSOURI BASIN REGION

(iii) The individual will work exclusively outdoors, will not have access to sensitive information, and any access to a Reclamation Controlled Access Area or Federal-controlled information system will be fully supervised.

(iv) In paragraphs (i) through (iii), supervised access means the individual’s access to, and movement within, a facility is monitored and controlled sufficiently to prevent access to any unauthorized areas, equipment, or information; and the individual’s access to an information system is monitored and controlled sufficiently to ensure appropriate use of the system and information, and to prevent access to any unauthorized systems or information. Supervision must be performed by an individual with an active Government-issued PIV Card.

(3) The Contractor shall furnish to the COR an alphabetical list of contract personnel, to include subcontractors, who will require access to a Government facility or information system. The list shall provide the full name, social security number, date of birth, place of birth, purpose or job title, and the estimated duration of access. If the Contractor believes an individual should be issued a temporary identification card or visitor identification badge in lieu of a PIV Card based on the conditions in paragraph (4), then the Contractor must also submit a sufficient written justification as to why the specific individual or individuals will not need a PIV Card. The Contractor shall provide this information before the start of contract performance, or before the start of an individual’s performance when there is a change or addition of personnel, with sufficient time to ensure that performance is not delayed by compliance with credentialing processes.

(4) Any contract employees that will be issued a temporary identification card or visitor identification badge, in lieu of a PIV Card, at the Government’s sole discretion, will be subject to the following credentialing procedures:

[Insert any local identification card or visitor badge issuance procedures that will be used, such as those used at the Denver Federal Center or in Federal Buildings.]

(5) Any contract employees that will be issued a PIV Card will be subject to the following credentialing procedures:

(i) For Contractor employees needing a PIV Card, as determined by the Government, the CO or COR will provide the appropriate background investigation forms to the Contractor, or initiate the electronic background investigation process, and give the Contractor instructions for completing the background investigation, fingerprinting, and PIV Card process. After the background investigation forms are completed, each Contractor employee shall be required to appear in person before a Government PIV Registrar to submit the background investigation forms, have personal identity verification documents verified, have a photograph taken, and sign the PIV Card Request Form. The Contractor must make its personnel available at the place and time specified by the COR in order to initiate this process. The following forms shall be used to initiate the background investigation and PIV process: OPM Standard Form 85, 85P, or 86; OF 306; Fingerprint Card FD-258; Fair Credit Reporting Act Authorization Form;

and PIV Card Request Form (paper or web-based).

(ii) The cost of completing and submitting the above forms, including any charges for obtaining fingerprints, shall be borne by the Contractor. The cost of the background investigation shall be borne by Reclamation.

(iii) Contractor employees are required to give, and to authorize others to give, full, frank, and truthful answers to relevant and material questions needed to reach a suitability determination.

Refusal or failure to furnish or authorize provision of information may constitute grounds for denial or revocation of credentials. Government personnel may contact the Contractor personnel being investigated in person, by telephone, or in writing, and the Contractor agrees to make them available for such contact.

(iv) For each Contractor employee that will be issued a PIV Card, the Government will conduct a background investigation. The level of background investigation for each Contractor employee will be determined by the Government based on the risk and sensitivity levels as described in

SOLICITATION # 140R6021Q0040 BUREAU OF RECLAMATION

ECAO/FIPP PEST CONTROL SERVICE MISSOURI BASIN REGION

Reclamation’s Personnel Security and Suitability Directives and Standards,” SLE 01-01, which is available at http://www.usbr.gov/recman/DandS.html#sle. At a minimum, each Contractor employee that will be issued a PIV Card will receive a National Agency Check with Written Inquiries (NACI) Background Investigation. The minimum standards which will be used in suitability determinations are contained in the DOI Departmental Manual Part 441, Chapter 5, which is available at http://elips.doi.gov/app_dm/act_getfiles.cfm?relnum=3290.

(v) Each Contractor employee in a position designated as higher than Low Risk Non- Sensitive shall be reinvestigated on a periodic basis as described in Reclamation’s Personnel Security and Suitability Directives and Standards. A reinvestigation may also be initiated when the Contractor or the Government believes that a particular individual’s continued ability to meet the contract’s minimum standards is in question.

(vi) If a Contractor employee has worked under a Federal agency contract within the past two years, and that contract required a successfully-adjudicated background investigation at the same risk level as (or higher than) this contract, further investigation may not be necessary. The Contractor shall provide the COR with documentation that supports the individual’s previous contract work and any information, including name and social security number, date of birth, and place of birth, needed for Government verification of previous background investigation.

(vii) If the final adjudication is unfavorable on a Contractor employee, or if Reclamation finds a Contractor employee to be unsuitable or unfit for his or her assigned duties, the CO will direct the Contractor to remove the individual from the contract and access to the Federal facility at which the contract activities are occurring. In the event of a disagreement between the Contractor and the Government concerning the suitability of a particular employee to perform work under this contract, the Government shall have the right of final determination. Determinations under this requirement are subject to the Disputes Clause. Failure of the Contractor to comply with the requirements of this clause could constitute grounds for termination for default.

(viii) Reclamation will not allow a Contractor employee access to their investigation files. An individual may request, under the provisions of the Privacy Act and/or Freedom of Information Act, copies of their files from the investigative agency (Office of Personnel Management). Reclamation will not release a copy of any investigative file, in whole or part, to the Contractor or any Contractor representative.

(ix) Upon completion of a favorably-adjudicated background investigation, Contractor employees will be issued a Government PIV Card. When the PIV Card is printed, each Contractor employee shall be required to appear in person before the Reclamation PIV Card Issuer for identity verification, to sign the PIV Request Form, and receipt of the PIV Card.

(d) Site Security Requirements

(1) General Description. This section provides provisions to ensure the full security integrity of the facility and personnel working at the facility. The work of this section may involve interfaces with a number of Government security personnel, normally coordinated through the designated COR. The Contractor is responsible for ensuring that activities are accomplished in a manner that complies fully with applicable security statutes, regulations, policies, directives, and standards.

(2) Government Security Personnel. When and where applicable, security personnel may be assigned to control access, secure materials or activities at the work site, or escort Contractor personnel in CAAs or other sensitive areas. Personnel may include security managers, security guards, security contractors acting as agents of the Government, law enforcement personnel, or others. These individuals may be used to ensure the overall security and integrity of the site or building and may provide controlled access to designated CAAs. These individuals may conduct inspection of all workers, vehicles, SOLICITATION # 140R6021Q0040 BUREAU OF RECLAMATION

ECAO/FIPP PEST CONTROL SERVICE MISSOURI BASIN REGION

equipment, or materials entering, or re-entering the work site. The inspection may be done with walk-through and/or hand-held metal detectors or by other means as may be deemed necessary by Reclamation.

(3) Contractor Guard Force. At the Contractor’s sole discretion, and at the Contractor’s own expense, with prior written Government approval, a Contractor may be authorized to hire its own guards to secure Contractor-owned equipment and/or to protect Contractor employees or subcontractors. If such a relationship is permitted, the Contractor shall be exclusively liable for all guard activities to include action or inaction of Contractor’s guard personnel. The Government will not offer nor provide any indemnification. Contractor shall be solely responsible for guards at all times to include any supervision, oversight, and for the development of local guard orders and or procedures. The Contractor shall be responsible for coordinating all guard activities with the COR and shall develop and submit to the COR, for advance approval, any guard orders and/or guard procedures.

(4) Additional Security-Related Submittals

(i) Visitor List. The Contractor shall furnish to the COR, in advance, notification of visit of any Contractor-sponsored visitor to a Government-controlled facility. This notification should be in writing and must include the purpose or nature of the visit, the full name of the visitor, and the full name and phone number of the designated sponsor who will be physically responsible for escorting the visitor for the duration of the scheduled visit.

(ii) Delivery Schedule. The Contractor shall furnish to the COR, in advance, a schedule for all deliveries. This list shall include estimated delivery date, time, nature of the materials being delivered, and – where available – the name of delivery company and type of vehicle.

(iii) Explosive Security Plan. The Contractor shall furnish to the COR for approval, in advance, an explosive security plan at any work site where explosives will be stored or used.

(5) General Provisions.

(i) General. The Contractor shall comply with the Government’s site security procedures as specified, and as requested subsequent to award of Contract. Failure of the Contractor to comply with required access controls, information handling procedures, or any other security controls or procedures, may result in revocation of Contractor personnel access to the work site. The Government reserves the right to modify or clarify security provisions of this contract based on changing political and civil circumstances, and perceived threats to personnel or the facility.

(ii) Security Facilities and Equipment. The Contractor shall use security facilities and equipment only for the purposes intended and as directed by the COR. The Contractor shall comply with the Government’s instructions for use of secure storage areas, site enclosure and gates, temporary security lighting, building space enclosure, and lockup devices and systems established for detection, monitoring, signaling, and alarming field office facilities. Measures necessary to secure the integrity of materials, equipment, and tools installed or used in furtherance of this contract shall be at no cost to the Government.

(iii) Security Personnel Availability/Work Schedules. The Contractor shall notify the COR at least 24 hours in advance of any projected work which might impact on security or require the scheduling of extended security personnel support. The Contractor shall provide a weekly work schedule which may have security implications, such as anticipated delivery of materials, use of explosives or heavy machinery, and extra time needed for continuous or inherently lengthy construction or project specific operations (such as concrete placement).

(iv) Deliveries. The Contractor shall provide at least one day’s advance notice of major deliveries, including time of arrival and trucks/carriers/documentation to be expected for arrival at work site. The Contractor shall provide reasonable advanced notice of deliveries which must be accommodated/accepted at times other than the Government’s established working hours. Failure to provide adequate advanced notice may result in delivery delays at the Contractor’s expense.

SOLICITATION # 140R6021Q0040 BUREAU OF RECLAMATION

ECAO/FIPP PEST CONTROL SERVICE MISSOURI BASIN REGION

(v) Site Access. All Contractor personnel will be issued appropriate identification and must comply with all local access control procedures. The Government reserves the exclusive right to refuse or disallow any vehicular or pedestrian access to any Government-controlled facility or for any deliveries to the work site, regardless if access was scheduled or unscheduled.

(vi) Inspections and Searches. The Government reserves unqualified and unlimited right at any time to conduct security-related inspections or searches of work, material, equipment, personnel, and temporary facilities at the work site.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .