This is a Performance Work Statement (PWS) for archaeological monitoring during post-construction modification of the Pasco Pump Lateral 5.8 Wasteway (PPL 5.8 WW) project in Franklin County, Washington. The Bureau of Reclamation requires archaeological monitoring services to address potential cultural materials discoveries during construction work near the Columbia River. Historical Research Associates, Inc. will provide a Lead Archaeological Monitor to observe construction activities across three 10-day sessions, with an option for a fourth session, anticipated to begin in November 2025.

The primary tasks include: (1) monitoring construction activities and potential cultural material discoveries, (2) preparing session monitoring reports and a comprehensive monitoring summary report, (3) attending project meetings, and (4) optional cultural material excavation and analysis if significant archaeological finds are encountered. The monitoring will cover activities such as survey marker placement, vegetation clearing, structure installation, and post-construction cleanup. Specific reporting requirements include session monitoring reports, draft and final monitoring summary reports, and potential excavation documentation if cultural materials are discovered. The project involves coordination with multiple stakeholders, including the U.S. Army Corps of Engineers, Washington State Historic Preservation Office, and local Native American tribes.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

WOMEN-OWNED SMALL

BUSINESS (WOSB)

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES

1. REQUISITION NUMBER PAGE 1 OF

2. CONTRACT NUMBER 3.AWARD/EFFECTIVE

DATE

4. ORDER NUMBER 5. SOLICITATION NUMBER 6. SOLICITATION ISSUE

DATE

7. FOR SOLICITATION

INFORMATION CALL:

a. NAME b. TELEPHONE NUMBER (No collect calls)

8. OFFER DUE DATE/

LOCAL TIME

9. ISSUED BY

13b. RATING

14. METHOD OF SOLICITATION

CODE

15. DELIVER TO 16. ADMINISTERED BY CODE

18a. PAYMENT WILL BE MADE BY CODE17a. CONTRACTOR/

OFFEROR

CODE

FACILITY

CODE

CODE

TELEPHONE NUMBER

17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN

OFFER

18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK

BELOW IS CHECKED

REQUEST

FOR QUOTE

(RFQ)

INVITATION

FOR BID

(IFB)

REQUEST

FOR

PROPOSAL

(RFP)

SEE ADDENDUM

19.

ITEM NO.

20.

SCHEDULE OF SUPPLIES/SERVICES

21.

QUANTITY

22.

UNIT

23.

UNIT PRICE

24.

AMOUNT

(Use Reverse and/or Attach Additional Sheets as Necessary)

25. ACCOUNTING AND APPROPRIATION DATA 26. TOTAL AWARD AMOUNT (For Government Use Only)

28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN 29. AWARD OF CONTRACT: REFERENCE

. YOUR OFFER ON SOLICITATION

(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE

SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:

30a. SIGNATURE OF OFFEROR/CONTRACTOR

30b. NAME AND TITLE OF SIGNER (Type or print) 30c. DATE SIGNED

31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER)

31b. NAME OF CONTRACTING OFFICER (Type or print) 31c. DATE SIGNED

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

STANDARD FORM 1449 (REV. 11/2021)

Prescribed by GSA - FAR (48 CFR) 53.212

10. THIS ACQUISITION IS UNRESTRICTED OR

NORTH AMERICAN

INDUSTRY CLASSIFICATION

STANDARD (NAICS):

SIZE STANDARD:

13a. THIS CONTRACT IS A

RATED ORDER UNDER

THE DEFENSE PRIORITIES

AND ALLOCATIONS

SYSTEM - DPAS (15 CFR 700)

SET ASIDE: % FOR:

11. DELIVERY FOR FREE ON

BOARD (FOB) DESTINATION

UNLESS BLOCK IS MARKED

SEE SCHEDULE

12. DISCOUNT TERMS

ARE ARE NOT ATTACHED

ARE ARE NOT ATTACHED

27a. SOLICITATION INCORPORATES BY REFERENCE (FEDERAL ACQUISITION REGULATION) FAR 52.212-1, 52.212-4.

FAR 52.212-3 AND 52.212-5 ARE ATTACHED.

27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED.

8(A)

ECONOMICALLY

DISADVANTAGED

WOMEN-OWNED SMALL

BUSINESS (EDWOSB)

SERVICE-DISABLED

VETERAN-OWNED

SMALL BUSINESS

(SDVOSB)

HUBZONE SMALL

BUSINESS

SMALL BUSINESS

NOTE: OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30.

COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH

AND DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND

ON ANY ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS

SPECIFIED

DATED.

OFFER

ADDENDA

ADDENDA

140R1726Q0001

See Schedule See Schedule

Bureau of Reclamation - CPN, GCPO

PO BOX 620 - MAIL STOP 7810

Grand Coulee WA 99133

12/19/2025 1700 PS

0044031503

Paula Gross 5096336132

R17 100.00

R17

Paula Gross

541620

$19

12/16/2025

0011285576

ADMINISTERED BY:

Bureau of Reclamation - CPN, GCPO

PO Box 620 - Mail Stop 7810

Grand Coulee WA 99133 US

DELIVER TO:

Bureau of Reclamation-PN-RO

Continued...

STOCK RECORD (S/R)

STANDARD FORM 1449 (REV. 11/2021) BACK

19.

ITEM NO.

20.

SCHEDULE OF SUPPLIES/SERVICES

21.

QUANTITY

22.

UNIT

23.

UNIT PRICE

24.

AMOUNT

32a. QUANTITY IN COLUMN 21 HAS BEEN

RECEIVED INSPECTED AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED:

41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT

32b. SIGNATURE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32c. DATE

41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE

42a. RECEIVED BY (Print)

42b. RECEIVED AT (Location)

42c. DATE RECEIVED (MM/DD/YYYY) 42d. TOTAL CONTAINERS

40. PAID BY

32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f. TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE

32g. EMAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE

33. SHIP NUMBER 34. VOUCHER NUMBER 35. AMOUNT VERIFIED

CORRECT FOR

PARTIAL FINAL

37. CHECK NUMBER

38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER

36. PAYMENT

COMPLETE PARTIAL FINAL

ACCEPTED,

Pacific Northwest Regional Office

1150 N. Curtis Road

Boise ID 83706-1234 US

THIS TASK ORDER UTILIZES THE SAME TERMS AND

CONDITIONS OF IDIQ 140R1725D0001. ALL

CORRESPONDENCE WITH THE CONTRACTOR SHALL

INVOLVE THE CONTRACTING OFFICER.

Delivery: 07/17/2026

Period of Performance: 01/01/2026 to

07/17/2026

00010 Construction Monitoring - per the attached

Performance Work Statement.

TASK 1 - MONITORING - Lead Archaeological

Monitor

TASK 2 - REPORTING - Session monitoring, draft summary, final report

TASK 3 - MEETINGS - Pre-construction, Safety, Session check-in, other meetings as needed

00020 Option Line - 4th work session per the

Performance Work Statement.

(Option Line Item)

Anticipated Exercise Date 01/29/2026

00030 Option Line - Funding for Recoveries and resulting reporting per the attached

Continued...

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGES

NAME OF OFFEROR OR CONTRACTOR

SUPPLIES/SERVICES

(B)

UNIT

(D)

UNIT PRICE

(E)

AMOUNT

(F)

OPTIONAL FORM 336 (4-86)

Sponsored by GSA FAR (48 CFR) 53.110

ITEM NO.

(A)

QUANTITY

(C)

NSN 7540-01-152-8067

140R1726Q0001

Performance Work Statement.

TASK 4 - CULTURAL MATERIAL EXCAVATION -

Analysis, reporting and curation.

(Option Line Item)

Anticipated Exercise Date 02/28/2026

BUREAU OF RECLAMATION

EPHRATA FIELD OFFICE

EPHRATA, GRANT COUNTY, WASHINGTON

Pricing Schedule:

Pasco Pump Lateral 5.8 Wasteway Post-Construction Project: Archaeological Site Monitoring

TASK ONE:

Session 1 – estimate eight (8), 10-hour days of monitoring. $________________

**1st and 10th day are travel days**

Session 2 – estimate eight (8), 10-hour days of monitoring. $________________

Session 3 – estimate eight (8), 10-hour days of monitoring. $________________

TOTAL: $_________________

Session 4 – estimate eight (8), 10-hour days of monitoring. (OPTION) $________________

TASK TWO:

Session Monitoring Report $_____________ ea x4 $________________

Draft Monitoring Summary Report $________________

Final Monitoring Summary Report $________________

TOTAL: $________________

TASK THREE:

Pre-Construction Meeting $________________

Project Implementation Meeting (if needed) $________________

Session Check-in calls/meetings (if needed) $_____________ ea x4 $________________

Schedule and Progress meetings – COR initiated (if needed) $________________

TOTAL: $________________

TASK FOUR (OPTION ITEM):

Cultural excavation, Analysis, Reporting and Curation - Please estimate the number of hours that would be needed for this task if any of the following were discovered.

Exposures of riverine mussel extending over 50 cm (1.7 ft.) in length.

______________ hours x _____________hourly rate $_________________

Concentrations of fire-modified rock (as opposed to isolated pieces of fire-modified rock).

Hearths, which may include distinct charcoal-stained bands, areas of bisque soils, or pits.

Evidence of a habitation feature like post molds, housepit floors, and aggregations of “furniture” rocks.

Other concentrations of cultural materials, especially debitage, bones, or other potentially significant features.

TOTAL: $_________________

Task One: $_________________

Task Two: $_________________

Task Three: $_________________

Task Four (Option): $_________________

GRAND TOTAL: $_________________

P a g e 1 | 17

BUREAU OF RECLAMATION

INTERIOR REGION 9

COLUMBIA-PACIFIC NORTHWEST

COLUMBIA-CASCADES AREA OFFICE

EPHRATA FIELD OFFICE

EPHRATA, GRANT COUNTY, WASHINGTON

Performance Work Statement:

Pasco Pump Lateral 5.8 Wasteway Post-Construction Monitoring

1) BACKGROUND

Pasco Pump Lateral 5.8 Wasteway (PPL 5.8 WW) drains excess water from the Pasco Pump

Lateral (PPL). The wasteway is located on a Reclamation owned right-of-way with the wasteway outlet passing through a strip of Federal land owned by the United States and managed by the Walla District of the U.S. Army Corps of Engineers (USACE). Below the ordinary high-water mark of Lake Wallula (340 feet), the lands are under the management of the Washington State Department of Natural Resources.

As a part of the wasteway post-construction modification to halt excessive erosion (PPL 5.8

WW Post-Construction Project), Reclamation acquired additional fee land, a USACE perpetual permit area, and a temporary construction permit area. These areas near the mouth of the outlet along Lake Wallula were acquired for staging and construction of the permanent erosion fix.

During the archaeological testing project conducted in September 2017, Reclamation archaeologists encountered a light scatter of artifacts and other cultural materials on a low terrace adjacent to the Columbia River in the area where the PPL 5.8 WW is to be built.

Cultural materials were not found in other parts of the wasteway route. These materials appear to be on the periphery of 45FR19, a pre-Contact village site first recorded by archaeologists in 1947 (Hess et al. 2018). This site location coincides with the traditional village site known as Tamántawla (Hunn et al. 2015).

The National Historic Preservation Act (NHPA) requires that Federal agencies take action to assess and resolve adverse effects to historic properties caused by Federal actions. Under contract to Reclamation, Historical Research Associates, Inc. (HRA) monitored the new wasteway construction from October 31, 2019, to June 9, 2020. Tribal monitors from

Confederated Tribes of the Colville Reservation (CTCR), the Confederated Tribes of the

Umatilla Indian Reservation (CTUIR), and the Confederated Tribes and Bands of the Yakama

Nation (YN) were present at various times throughout this period.

2) INTRODUCTION

This Performance Work Statement (PWS) is for archaeological monitoring during modification of the PPL 5.8 WW outlet. PPL 5.8 WW is in Franklin County, Washington, P a g e 2 | 17 directly across the Columbia River from Richland, Washington. The legal location of the project is T9N, R28E Section 1, T9N, R29E Section 6, T10N, R28E Section 36, and T10N, R29E, Section 31. Reclamation will designate an individual to be the Lead Archaeological

Monitor (Lead Monitor). This individual will meet or exceed the Secretary of the Interior standards for a professional archaeologist as expressed in 36 CFR 61, Appendix A, as well as the definition of “professional archaeologist” provided in RCW 27.53.030 (11). USACE does not require an ARPA permit for construction monitoring tasks conducted alongside

Reclamation designated Lead Monitor. During construction there will be a Reclamation designated Lead Monitor present to work with the archaeological monitor provided by the

Tribe (Tribal Monitor).

a) Task 1 – Approximately 30, 10-hour days of archaeological monitoring during three (3) sessions of construction (1st and 10th day of the session include drive time to and from the

Area of Potential Effect (APE)).

b) Task 2 – Applicable session summaries, draft report, and a final monitoring report provided to the Contracting Officer Representative (COR). The COR will be a

Reclamation Archaeologist.

c) Task 3 – Meetings with Reclamation.

Reclamation proposes post-construction modification to the existing wasteway outlet to halt excessive erosion at this location. After the wasteway was put into use, excessive erosion occurred due to the consistent volume of water coming out of the wasteway and downstream operations of McNary Dam. Normal operations within the McNary Dam forebay range from

337 to 340 feet. However, river levels have been documented to be higher in late summer while the wasteway is in full operations, leading to erosion that exposed the foundation of the wasteway.

Reclamation’s PPL 5.8 WW Post Construction Project was initiated after completion of the original outlet due to this excessive erosion occurring during the wasteway’s use. Measures to address the erosion were conducted in FY21 and FY22 under the provisions of the 2019

MOA (R19MA13755) and archaeological monitoring reports were submitted (Luxton 2021a

2021b). Ultimately, these efforts were unsuccessful. Excessive erosion continued, and the installed riprap continued to be washed away due to the consistent volume of water coming out of the wasteway and operations of McNary Dam.

All the post-construction modification work will occur within the previously disturbed prism of the original wasteway construction. However, given the possibility that other cultural materials may be found during construction and post-construction modification, Reclamation considers it important to have archaeologists on-site during construction to monitor the activities and to evaluate cultural materials that may be exposed.

P a g e 3 | 17

Reclamation estimates that 30 days of lead archaeological monitoring services (which include drive time to and from the APE) shall be required.

3) LOCATION OF WORK

The PPL 5.8 WW lies within an acquired Bureau of Reclamation (Reclamation) right-of-way, owned in fee. Pasco, Washington, lies about 5 miles to the southeast of the project area. The wasteway outlet is located at approximately Columbia River Mile 339.5 on the left bank of the river.

4) TASKS

a) TASK 1 – MONITORING

Historical Research Associates, Inc. shall provide a Lead Archaeological Monitor (Lead

Monitor) as Reclamation’s representative to observe construction at PPL 5.8 WW, investigate possible cultural materials and features, and be present to assist in addressing human remains or NAGPRA cultural items. After initial identification, any work to address features or recover or treat human remains or burials shall be handled as defined and described in the Post-Review Discovery section (4.a.i.1) under contract option Task

4.

Historical Research Associates, Inc.’s Lead Monitor shall observe activities for post-review discoveries at PPL 5.8 WW. This may include, but is not limited to, the following activities:

• Placement of survey markers and stakes that involves removal of vegetation, especially in the strip of riparian vegetation along the river and to delineate the staging area within the APE.

• Clearing and grubbing, especially of the vegetation along the river’s edge.

• Installation of booms and other structures at the water’s edge designed to control run-off.

• Placement of forms for the concrete outlet structure at the discharge end of the wasteway.

• Construction activities at the wasteway outlet.

• Placement of rip-rap along river’s edge around the outlet structure.

• Other minor ground disturbing activities such as may be necessary for project completion on the low terrace.

• Post-construction cleanup activities.

P a g e 4 | 17

The Lead Monitor shall be present whenever there is construction-related activity occurring at PPL 5.8 WW according to the agreed upon Lead Monitor Work Schedule

(Schedule). It is critical that Historical Research Associates, Inc. work with the COR to schedule days on site during construction. The project will be split into three (3) 10-day construction sessions. Each construction session will have up to 10-hour workdays with travel days on the 1st and 10th days. For budget and planning purposes, Historical

Research Associates, Inc. shall plan to have the Lead Monitor on-site for approximately

8, 10-hour days for each of the three (3) 10-day sessions unless agreed to in writing otherwise and documented in the Schedule. See “Schedule” below for the planned duration of the work.

i) WORK STOPPAGES

The authority to order a work stoppage rests with the Reclamation Contracting

Officer (CO). The CO will be delegating this authority, on a limited basis, to the

Reclamation Contracting Officer’s Representative (COR) or Construction Control

Representative (CCR), who will be the representative of the Contracting Officer in the field during construction. The Lead Monitor will work closely with the COR or

CCR when making decisions regarding work stoppages.

Should the Lead Monitor want construction activities to stop to assess a possible find, the following procedures shall be followed:

• To avert disturbance of archaeological items or possible features within the construction site, the Tribal Monitor(s) shall notify the Lead Monitor and CCR that a temporary halt of up to 30 minutes is needed. The Tribal Monitor and

Lead Monitor shall work together to assess the activity or find.

• After initial assessment, if it appears more than 30 minutes is needed to conduct an assessment, the Lead Monitor will inform the CCR and COR regarding the need for a longer work stoppage.

• The CO and COR are the only persons with authority to stop and restart construction activity.

• The Lead Monitor shall coordinate the flow of information between the Tribal

Monitors and the COR.

• The Lead Monitor shall document the time and duration of each work stoppage, regardless of length.

• Work shall resume after the Lead Monitor’s assessment and appropriate consultations with the CO or COR are complete.

P a g e 5 | 17

It will be the responsibility of Reclamation’s CCR to ensure that no construction activities take place until such time as the Lead Monitor, and the Tribal Monitor are available to observe the work. The CCR, the construction contractor’s supervisor, foreman, and other on-site authorities will be informed of the Lead Monitor’s and

Tribal Monitor’s presence and authority to halt construction work for up to 30 minutes to conduct an initial assessment. If it appears that it will take longer than this to conduct an assessment, the Lead Monitor will inform Reclamation’s CCR and

COR regarding the need for a longer work stoppage. The Lead Monitor will follow construction as closely as conditions allow, making all reasonable efforts to follow on-site safety protocols and not interfere with normal construction activities. See

“Safety” below for the required safety precaution required for the duration of the work.

(1) POST-REVIEW DISCOVERY

While Reclamation does not anticipate recovering artifacts during the PPL 5.8

WW Post-Construction Project. In the unlikely event that suspected cultural materials or features are identified during the post-construction modification project, Reclamation will follow the procedure outlined below.

Should suspected cultural materials or features be found, the Lead Monitor shall determine if the artifacts are part of an intact cultural feature or an isolated archaeological find. The steps that will be taken to evaluate archaeological resources identified during construction will be as follows:

(a) In the case of an isolated archaeological find, construction excavation will halt in the vicinity of the find. The Lead Monitor will photograph the isolated find and the surrounding area, recording details regarding the depth below surface, stratigraphic context, GPS position, etc. Construction excavation may resume as soon as the Lead Monitor has informed the CCR and COR that the assessment is complete. Small aggregations of riverine mussel extending over an area measuring no more than 50 centimeters (1.7 ft.) will be treated as isolated archaeological finds.

(b) In the case of the following discoveries, the Lead Monitor and Tribal Monitor will conduct more extensive work under contract option Task 4 to evaluate the finds:

(i) Exposures of riverine mussel extending over 50 cm (1.7 ft.) in length.

(ii) Concentrations of fire-modified rock (as opposed to isolated pieces of fire-modified rock).

P a g e 6 | 17

(iii)Hearths, which may include distinct charcoal-stained bands, areas of bisque soils, or pits.

(iv) Evidence of a habitation feature like post molds, housepit floors, and aggregations of “furniture” rocks.

(v) Other concentrations of cultural materials, especially debitage, bones, or other potentially significant features.

In the case of these kinds of cultural materials or features, the Lead Monitor will inform the CCR, the COR, and other on-site construction authorities that a longer work stoppage will be necessary to assess the finds. The Lead

Monitor will contact the COR and Reclamation Archaeologist, who will (in turn) contact Reclamation’s Project Manager and the NHPA Section 106

Consulting Parties (i.e., Washington SHPO, Confederated Tribes and Bands of the Yakama Nation, Confederated Tribes of the Colville Reservation, and

Confederated Tribes of the Umatilla Indian Reservation). Notification will also be provided to the appropriate land-owner depending on the location of the find (Debra Kohler, Warm Springs Properties LLC, or the designated representative of the USACE Northwestern Division, Walla Walla District).

Reclamation will then consult with these NHPA Section 106 Consulting

Parties regarding the steps to be taken to evaluate the finds. This may include, but is not limited to, photography, mapping, and other kinds of opportunistic sampling in the side of the excavated construction area. Cultural features, horizons and artifacts detected in buried sediments may require further evaluation using hand-dug test units which would require exercising contract option Task 4. Consultation will take place in an expedited manner through the use of conference calls and other immediate forms of communication. The outcomes of verbal consultation will be documented in e-mails or letters for later reference.

The results of activities undertaken as a result of this monitoring will be included in the Monitoring Summary Report. Exercising of contract option

Task 4 will require a separate excavation report. See “Reporting” task below for the required reporting to complete the task.

The Reclamation CO or COR will not allow work to resume after a longer work stoppage until consultation with the SHPO and affected Tribes under

Section 106 of the National Historic Preservation Act has been completed.

This will also require permission from the appropriate land-owner to resume construction.

(2) DISCOVERY OF HUMAN REMAINS

P a g e 7 | 17

While Reclamation does not anticipate identify human remains or NAGPRA cultural items during the PPL 5.8 WW Post-Construction Project. In the unlikely event that suspected human remains or NAGPRA cultural items are identified during the post-construction modification project, Reclamation will follow the procedure outlined below.

Should the Lead or Tribal Monitor identify human remains or NAGPRA cultural items during construction, the Lead Monitor shall work with Reclamation’s CO or

COR to stop construction-related activity within the area of the discovery. As used here, “discovery” refers only to the discovery of human remains or cultural items during the conduct of other activities as defined in 43 CFR § 10.5 or RCW

27.44.040.

(a) Federal Lands: On Federal lands, the procedures specified in 43 CFR 10.5 will be followed in the event that human remains or NAGPRA cultural items are found:

(i) The Lead Monitor will inform the CCR, other on-site construction authorities, and the COR that the Lead or Tribal Monitor has found something that they think is a human remain or a NAGPRA cultural item.

Work will stop immediately within 100 ft. of the find.

(ii) The Lead Monitor will take reasonable steps to protect the find.

(iii)The Lead Monitor will immediately contact the COR and Reclamation

Archaeologist who will (in turn) immediately contact the following people in the following order by phone, text, or e-mail:

1. The designated representative of the Federal agency managing the lands.

a. In the case of the USACE lands along the river, this will be an individual designated by the USACE Walla Walla District.

b. In the case of Reclamation lands along the wasteway route, this will be the Columbia-Cascades Area Office Manager.

2. The designated representative of each of the three (3) Consulting

Tribes (i.e., Confederated Tribes and Bands of the Yakama Nation, Confederated Tribes of the Colville Reservation, and Confederated

Tribes of the Umatilla Indian Reservation).

(iv) Written notification (in the form of an e-mail) will be sent to the designated individual at the Federal agency within 24 hours of the find.

Because the USACE is responsible for NAGPRA compliance on the Federal lands that it manages, Reclamation’s actions and timelines will be heavily

P a g e 8 | 17 dependent on USACE NAGPRA compliance procedures. The Reclamation

Archaeologist will be available to assist USACE in whatever means necessary to complete the NAGPRA consultation process. The Reclamation CO or COR will not allow work to resume on USACE lands until the USACE provides permission.

As per the request of the SHPO, the Reclamation Archaeologist will notify the

Franklin County Coroner, the Franklin County Sheriff, and the Washington

State Physical Anthropologist regarding discoveries of human remains on

Reclamation lands. At the request of the USACE, the Reclamation

Archaeologist would be willing to notify these same parties about discoveries of human remains on USACE lands, as well.

(b) Private Lands: On private lands, the procedures found in RCW 27.44 will be followed in the event that skeletal human remains are found.

(i) The Lead Monitor will inform the CCR, other on-site construction authorities, COR, and Reclamation Archaeologist that they have found something that they think is a skeletal human remain or an Indian burial.

(ii) Work will stop immediately within 100 ft. of the find.

(iii)The Lead Monitor will take reasonable steps to protect the find.

(iv)

(v) The Lead Monitor will immediately contact the COR and Reclamation

Archaeologist who will (in turn) immediately contact the following people in the following order by phone, text, or e-mail:

1. The private property owner

2. The Franklin County Coroner

3. The Franklin County Sheriff

4. The Washington State Physical Anthropologist

5. The designated representative of each of the three (3) Consulting

Tribes (i.e., Confederated Tribes and Bands of the Yakama Nation, Confederated Tribes of the Colville Reservation, and Confederated

Tribes of the Umatilla Indian Reservation).

(vi) The Reclamation Archaeologist will request that the Coroner determine whether the skeletal human remains are forensic or non-forensic in the most expeditious manner possible, and The Lead Monitor and

Reclamation Archaeologist will provide information as needed by the

Coroner to support this effort.

1. If the remains are determined to be non-forensic, Reclamation will support the respectful transfer the remains to the Washington State

Physical Anthropologist.

P a g e 9 | 17

2. If the remains are determined to be forensic, Reclamation will support the respectful transfer the remains to the Coroner.

(vii) Reclamation will not resume work within 100 ft. of the find until the process of consulting with affected Tribes regarding the treatment of the skeletal human remains has been completed in keeping with RCW

27.44 and 36 CFR § 800.

Because the Washington State Physical Anthropologist at the Department of

Archaeology and Historic Preservation (DAHP) is heavily involved in the process of addressing Native American human remains found on private lands, Reclamation’s actions and timelines will be dependent on DAHP compliance procedures. The Reclamation Archaeologist will be available to assist DAHP in whatever means necessary to complete the process of addressing RCW 27.44.

Reclamation will not resume work within 100 ft. of the find until the process of complying with RCW 27.44 and 36 CFR § 800 are completed and private land-owners (Warm Springs and Kohler) provide permission for the resumption of work.

b) TASK 2 – REPORTING

Historical Research Associates, Inc. shall prepare the following reports and documents and deliver them electronically. No hard copies are necessary. See “Deliverables” below for document descriptions.

i) Session Monitoring Report

At the end of each session, the Lead Monitor will provide the Reclamation

Archaeologist, who will (in turn), provide the Consulting Parties with a report regarding the progress of construction, the number of work stoppages and their duration, and a brief description of cultural materials, if any are found. This report may be provided by phone or in a written form by e-mail.

ii) Draft, Monitoring Summary Report

The Monitoring Summary Report will provide details about the dates and periods of time that the Lead Monitor was on-site during construction and what kinds of construction activities were monitored. Any artifacts, samples, human remains and

NAGPRA cultural items that were identified and/or collected, if any, would be addressed under contract option Task 4 and not within the Monitoring Report. The report will include maps showing the findspots of the collected items based on GPS data collected in the field. If excavations were conducted to assess the significance of identified cultural features, the report will include appropriate photographs and drawings of the stratigraphic position of the feature, as well as a written description of the feature and its contents. The report will also discuss the implications of the finds for our understanding of the ability of the identified archeological resources to provide important information about our understanding of prehistory or history. If

P a g e 10 | 17 there are no significant discoveries during monitoring, the draft report may be provided as an electronic letter report sent via email in an attached Microsoft (MS)

Word document. The Draft Monitoring Summary Report shall be provided to

Reclamation within 45 calendar days of the completion of PPL 5.8 WW post-construction modification.

iii) Final, Monitoring Summary Report

The Monitoring Summary Report will provide details about the dates and periods of time that the Lead Monitor was on-site during construction and what kinds of construction activities were monitored. Any artifacts, samples, human remains and

NAGPRA cultural items that were identified and/or collected, if any, would be addressed under contract option Task 4 and not within the Monitoring Report. The report will include maps showing the findspots of the collected items based on GPS data collected in the field. If excavations were conducted to assess the significance of identified cultural features, the report will include appropriate photographs and drawings of the stratigraphic position of the feature, as well as a written description of the feature and its contents. The report will also discuss the implications of the finds for our understanding of the ability of the identified archeological resources to provide important information about our understanding of prehistory or history. If there are no significant discoveries during monitoring, the final report may be provided as an electronic letter report sent via email in an attached Microsoft (MS)

Word document. The Final Monitoring Summary Report shall be provided to

Reclamation within 45 calendar days of the receipt of Reclamation’s comments on the

Draft Monitoring Summary Report.

iv) Field Records (including digital camera photos)

The Lead Monitor will collect on a form and transmit data electronically whenever possible to reduce hard copy documents. The Lead Monitor will provide an electronic copy of digital camera photographs via email, a file sharing system, or on a CD. The digital camera photographs will be provided as TIF or JPEG files in keeping with

National Archives and Records Administration standards.

v) GPS data and GIS layers

The Lead Monitor will provide electronic copies of all GPS data generated as a part of construction monitoring activities. The data will be provided in the “UTM Zone 11

North NAD83 meters” projection, and the supplied data will include a “PRJ” file. The data will be submitted as shapefiles or a geodatabase and will include attribute data.

(1) Location of collected diagnostic artifacts.

(2) Location of identified cultural features.

(3) Location of identified human remains and other NAGPRA “cultural items.”

(4) Location of excavation units.

P a g e 11 | 17

Reclamation shall review and provide comments no later than 45 calendar days after receipt of the Draft Monitoring Summary Report. If a substantial number of typos and grammatical errors are found, the reports may be returned to Historical Research

Associates, Inc. for rework before Reclamation’s review is continued. Reclamation shall review the Final Monitoring Summary Report and may provide written comments no later than 45 calendar days after receipt.

Historical Research Associates, Inc. shall prepare draft and final reports in a format reflecting professional writing standards for contemporary organizational and illustrative style. Historical Research Associates, Inc. shall address written comments and incorporate changes in the report as suggested by Reclamation.

The documents shall meet the following technical specifications:

1) Historical Research Associates, Inc. shall submit documents in readable typeface and font size, such as Times New Roman 12.

2) Documents shall be submitted electronically via email in letter format.

3) Photographs, maps, tables, text, and bibliography must be free of extraneous marks, clear, and suitable for technical and professional publication.

4) All pages, figures, and tables shall be consecutively numbered throughout the report and, where applicable, shall have titles and appropriate explanatory notes.

5) Draft documents shall include consecutively numbered lines in the left margin to aid in the comment process and will be recorded in an HRA provided comment matrix.

Draft and final reports shall include:

1) Cover page with:

a) Statement that work was performed under an IDIQ task order with the Bureau of Reclamation, Columbia-Pacific Northwest Region, Grand Coulee Power

Office.

b) IDIQ and task order number.

c) All applicable Permit number(s).

d) The following near the top:

CONTAINS CONFIDENTIAL INFORMATION

FOR OFFICIAL USE ONLY

NOT SUBJECT TO DISCLOSURE UNDER F.O.I.A.

2) Introduction:

a) Site map and table that lists the dates monitored.

b) Summary of construction activity during archaeological monitoring.

3) Additional sections shall describe:

P a g e 12 | 17

a) Work methods.

b) Required communications.

c) Post-review discoveries.

d) Summary of key information related to monitoring efforts.

e) Location descriptions of discoveries.

f) Summary data for each discovery, if applicable.

g) Number of features observed.

h) Number, location and type of archaeological objects.

i) General observations of site conditions during work.

4) Summary of work

5) Monitoring improvement suggestions

Reports shall conform to The Chicago Manual of Style for capitalization, punctuation, and general grammatical rules. Reports shall also conform to the Society for American

Archaeology (SAA) "Style Guide" for formatting headings, tables, citation callouts and bibliographic citations. The SAA style guide is available at the following website:

SAA Style Guide

Map copies may be included in the report because the report will not be publicly distributed.

c) TASK 3 – MEETINGS WITH RECLAMATION

Historical Research Associates, Inc.’s Professional Archeologist(s) and Lead Monitor(s) shall attend the following meetings:

i) Pre-construction meeting with the Construction Crew and other involved parties.

ii) Safety meetings arranged by the Construction Crew which may be held daily before the start of work on days the Lead Monitor is present.

iii) Three (3) session check-in calls or meetings to discuss monitoring activities and any concerns.

iv) One (1) technical meeting to discuss project implementation, if necessary.

v) Monitoring schedule and progress meetings as needed or requested by the COR. The

COR will be a Reclamation Archaeologist.

d) TASK 4 – OPTION: CULTURAL MATERIAL EXCAVATION, ANALYSIS, REPORTING, AND CURATION

i) In the case of the following discoveries, the Lead Monitor and Tribal Monitor will conduct more extensive work under contract option Task 4 to evaluate the finds:

(1) Exposures of riverine mussel extending over 50 cm (1.7 ft.) in length.

https://documents.saa.org/container/docs/default-source/doc-publications/style-guide/saa-style-guide_updated-july-2018c5062f7e55154959ab57564384bda7de.pdf?sfvrsn=8247640e_6

P a g e 13 | 17

(2) Concentrations of fire-modified rock (as opposed to isolated pieces of fire-modified rock).

(3) Hearths, which may include distinct charcoal-stained bands, areas of bisque soils, or pits.

(4) Evidence of a habitation feature like post molds, housepit floors, and aggregations of “furniture” rocks.

(5) Other concentrations of cultural materials, especially debitage, bones, or other potentially significant features.

In the case of these kinds of cultural materials or features, the Lead Monitor will inform the CCR, the COR, and other on-site construction authorities that a longer work stoppage will be necessary to assess the finds. The Lead Monitor will contact the COR and Reclamation Archaeologist, who will (in turn) contact Reclamation’s

Project Manager and the NHPA Section 106 Consulting Parties (i.e., Washington

SHPO, Confederated Tribes and Bands of the Yakama Nation, Confederated Tribes of the Colville Reservation, and Confederated Tribes of the Umatilla Indian

Reservation). Notification will also be provided to the appropriate land-owner depending on the location of the find (Debra Kohler, Warm Springs Properties LLC, or the designated representative of the USACE Northwestern Division, Walla Walla

District). Reclamation will then consult with these NHPA Section 106 Consulting

Parties regarding the steps to be taken to evaluate the finds. This may include, but is not limited to, photography, mapping, and other kinds of opportunistic sampling in the side of the excavated construction area. Cultural features, horizons and artifacts detected in buried sediments may require further evaluation using hand-dug test units.

Units may be dug in controlled fashion to expose features, collect samples from undisturbed contexts, or interpret complex stratigraphy. A test excavation unit or small trench may also be used to determine if an intact occupation surface is present.

Test units would be implemented only when necessary to gather information on the nature, extent, and integrity of subsurface cultural deposits to evaluate the site’s significance. Consultation will take place in an expedited manner through the use of conference calls and other immediate forms of communication. The outcomes of verbal consultation will be documented in e-mails or letters for later reference.

Pre-Contact and historic-period artifacts that are not human remains or cultural items collected from the surface, construction excavations, and/or archaeological testing will be analyzed, catalogued, and temporarily curated by the Lead Archaeological

Monitor. Ultimate disposition of cultural materials will be determined by the appropriate property owner provided that these items are not covered by either

NAGPRA or RCW 27.44. Items to be curated will be housed in a Federally approved

P a g e 14 | 17 repository following the standards in 36 CFR § 79 and the Department of Interior

Museum Property Handbook.

The results of excavations and other investigations undertaken as a result of this monitoring will be included in the Excavation Report. See “Reporting” task below for the required reporting to complete the task.

The Reclamation CO or COR will not allow work to resume after a longer work stoppage until consultation with the SHPO and affected Tribes under Section 106 of the National Historic Preservation Act has been completed. This will also require permission from the appropriate land-owner to resume construction.

5) GENERAL CONSIDERATIONS

a) SAFETY

The Lead Monitor shall be near heavy equipment. The Lead Monitor shall participate in pre-work safety meetings as organized by the Construction Crew. The Lead Monitor shall wear personal protective equipment (PPE) referenced in the following sub-section.

b) HISTORICAL RESEARCH ASSOCIATES, INC. -FURNISHED PROPERTY

Historical Research Associates, Inc. shall furnish all items (equipment, materials, supplies, incidentals, etc.) required to perform the work identified in this PWS.

Historical Research Associates, Inc. shall furnish appropriate PPE for the Lead Monitor when on the construction site.

c) WORK SCHEDULE

Historical Research Associates, Inc. shall ensure a Lead Monitor is on-site throughout the workday according to the schedule created by the Construction Crew when construction activities could result in discoveries of cultural materials or features, human remains, or

NAGPRA cultural items.

For planning and cost-estimation purposes, Reclamation anticipates archeological monitoring shall occur over eight (8), 10-hour days for each of the three (3) 10-day sessions unless agreed to in writing otherwise and documented in the Schedule. Each construction session will have travel days on the 1st and 10th days, this includes travel time to and from the APE.

d) QUALIFICATIONS

Historical Research Associates, Inc. shall have a Professional Archeologist available during all sessions of construction to provide archaeological monitoring. The

Professional Archeologist shall meet the Secretary of Interior’s standards contained in 36

CFR 61, Appendix A. Historical Research Associates, Inc. shall ensure that Lead https://www.nps.gov/history/local-law/arch_stnds_9.htm https://www.nps.gov/history/local-law/arch_stnds_9.htm

P a g e 15 | 17

Monitor(s) are familiar with archeological field procedures and data recording techniques.

6) DELIVERABLES

Historical Research Associates, Inc. shall provide three (3) session monitoring reports; one (1) at the end of each construction session at PPL 5.8 WW. After

Reclamation has received the session reports, Historical Research Associates, Inc.

shall combine them into one (1) final PPL 5.8 WW Post-Construction Monitoring

Summary Report.

a) SESSION MONITORING REPORT

At the end of each session, the Lead Monitor shall provide the COR and Reclamation

Archaeologist a report regarding the work performed and, if necessary, discussion of any work stoppages and their duration. This letter report shall be written and transmitted by email at such time as agreed to by the COR and Reclamation

Archaeologist and Historical Research Associates, Inc.

b) DRAFT, MONITORING SUMMARY REPORT

i) Draft, Monitoring Summary Report shall include:

(1) Dates and periods of time Lead Monitor(s) were on-site during construction as well as types of construction activities monitored.

(2) List of artifacts, samples, human remains and NAGPRA cultural items collected, if any.

(3) Maps showing findspots of the collected items based on GPS data collected in the field, if any.

(4) Assessed significance of identified cultural features if excavations were conducted.

(5) Photographs and drawings of the feature’s stratigraphic position, as well as a written description of the feature and its contents.

(6) Implications and important information concerning the finds for

Reclamation’s continued understanding of the archeological resources’ prehistory or history.

c) FINAL, MONITORING SUMMARY REPORT

i) Draft, Monitoring Summary Report shall include:

(1) Dates and periods of time Lead Monitor(s) were on-site during construction as well as types of construction activities monitored.

(2) List of artifacts, samples, human remains and NAGPRA cultural items collected, if any.

(3) Maps showing findspots of the collected items based on GPS data collected in the field, if any.

(4) Assessed significance of identified cultural features if excavations were conducted.

(5) Photographs and drawings of the feature’s stratigraphic position, as well as a written description of the feature and its contents.

P a g e 16 | 17

(6) Implications and important information concerning the finds for Reclamation’s continued understanding of the archeological resources’ prehistory or history.

d) FIELD RECORDS (INCLUDING DIGITAL PHOTOGRAPHS)

i) A single, hard copy of the field records (for example session monitoring forms) shall be provided to the Reclamation COR. Digital photographs and GPS data shall be submitted via email, a file sharing system, or on a CD to Reclamation. Digital photographs shall be TIF or JPEG files in keeping with National Archives and

Records Administration standards.

e) OPTION TASK 4 DELIVERABLES

i) SESSION EXCAVATION SUMMARY

(1) At the end of each session, HRA shall provide the COR and Reclamation

Archaeologist a summary report regarding the work performed and discussion of any discoveries. This letter report shall be written and transmitted by email at such time as agreed to by the COR and Reclamation Archaeologist and

HRA.

ii) DRAFT, EXCAVATION REPORT

(1) Draft, Excavation Report shall include:

(a) Dates and periods of time HRA crew were conducting excavation activities on-site.

(b) List of artifacts, samples, human remains and NAGPRA cultural items collected, if any.

(c) Maps showing findspots of the collected items based on GPS data collected in the field, if any.

(d) Assessed significance of identified cultural features excavated.

(e) Photographs and drawings of the feature’s stratigraphic position, as well as a written description of the feature and its contents.

(f) Any in-field or laboratory analyses conducted.

(g) Implications and important information concerning the finds for

iii) FINAL, EXCAVATION REPORT

(1) Draft, Monitoring Report shall include:

(a) Dates and periods of time HRA crew were conducting excavation activities on-site.

(b) List of artifacts, samples, human remains and NAGPRA cultural items collected, if any.

(c) Maps showing findspots of the collected items based on GPS data collected in the field, if any.

(d) Assessed significance of identified cultural features excavated.

(e) Photographs and drawings of the feature’s stratigraphic position, as well as a written description of the feature and its contents.

P a g e 17 | 17

(f) Any in-field or laboratory analyses conducted.

(g) Implications and important information concerning the finds for

iv) FIELD RECORDS (INCLUDING DIGITAL PHOTOGRAPHS)

(1) A single, hard copy of the field records (for example excavation level forms) shall be provided to the Reclamation COR. Digital photographs and GPS data shall be submitted via email, a file sharing system, or on a CD to Reclamation. Digital photographs shall be TIF or JPEG files in keeping with National Archives and

Records Administration standards.

7) SCHEDULE OF TASKS AND DELIVERABLES

Table 1 provides the schedule of tasks and deliverables based on the criteria above.

Table 1. Estimated Schedule

Task Date Pre-Construction Meeting Construction Estimate 8, 10-hour days of monitoring per session and a total of 3 sessions with an option for a 4th session if needed. Construction is anticipated to begin November 2025.

*** 1st and 10th days are travel to/from the APE. *** Session Monitoring Reports Submitted to Reclamation the Friday after the end of the session (3 sessions x 1 report per session) or TBD Monitoring Summary Report –

DRAFT

Submitted to Reclamation within 45 calendar days following the completion of construction

Reclamation review Within 45 calendar days after receipt of the draft monitoring summary report or form

Monitoring Summary Report –

FINAL

Submitted to Reclamation within 45 calendar days following the receipt of Reclamation’s comments on Draft Monitoring Summary Report

CD containing GIS layers and Final Monitoring Summary Report

Same schedule as the Draft and Final Monitoring Summary Reports

8) COORDINATION AND POINTS OF CONTACT

Technical questions about this task order should be directed to:

Marielle Black, Regional Office Archeologist

Contracting Officer’s Representative (COR1)

(208) 871-2387 [work cell] mblack@usbr.gov mailto:mblack@usbr.gov

Solicitation/Contract/Order for commercial products and commercial services
Requisition number
Contract number
Award/Effective date
Order number
Solicitation number
Solicitation issue date
For solicitation information call:
Name
Telephone number
Offer due date/local time
Issued by
Code
This acquisition is
NAICS
Size standard
Delivery for free on board (FOB) destination unless block is marked
Discount terms
This contract is a rated order under the defense priorities and allocations system - DPAS
Rating
Method of solicitation
Deliver to
Code
Administered by
Code
Contractor/Offeror
Code
Facility code
Telephone number
Check if remittance is different and put such address in offer
Payment will be made by
Code
Submit invoices to address shown in block 18a unless block below is checked
Accounting and appropriation data
Total award amount
Solicitation incorporates by reference
Addenda
Contract/purchase order incorporates by reference
Addenda
Contractor is required to sign this doc. and return:
Award of contract: reference
Signature of offeror/contractor
Name and title of signer
Signer date signed
Signature of contracting officer
Name of contracting officer
Contracting officer date signed
Authorized for local reproduction. Previous edition is not usable
Standard Form 1449 (Rev. 11/2021)
Quantity in column 21 has been
Signature of authorized government representative
Date
Printed name and title of authorized government representative
Mailing address authorized government representative
Telephone number of authorized government representative
Email number of authorized government representative
Ship number
Voucher number
Amount verified correct for
Payment
Check number
Stock record (S/R)
S/R account number
S/R voucher number
Paid by
I certify this account is correct and proper for payment
Signature and title of certifying officer
Date
Received by
Received at
Date received
Total containers
Standard Form 1449 (rev. 11/2021) Back