Sol_140R1723Q0054.pdf

PDF 651 KB Posted

Attached to
G-12'S EXCITER REMANUFACTURE
Solicitation number
140R1723Q0054
Issued by

About this file

This solicitation is for the remanufacture of G-12 exciter sets including labor, equipment, materials, testing and inspection. The Bureau of Reclamation is seeking to bring exciter sets to an as-new condition, including rewinding armatures and fields to original specifications and performing tests such as megger, pole drop, polarization index and resistance readings. Offerors must submit responses by July 24th, 2023 with award anticipated on August 14th. Pricing shall be on a firm fixed price basis for the base period of performance ending October 31st, 2023. This set-aside contract targets small businesses. The work will be performed off-site with government inspection of testing and shipping.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SEE ADDENDUMIS CHECKED

CODE 18a. PAYMENT WILL BE MADE BY

CODE

FACILITYCODE

17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN OFFER

OFFEROR

R17

Hwy 155, PO Box 620 Grand Coulee Acquisition Group Pacific Northwest Region Bureau of Reclamation

0009906770 CODE 16. ADMINISTERED BYCODE

X

X

X

335312

SIZE STANDARD:

100.00 % FOR:SET ASIDE:UNRESTRICTED ORR17

RFPIFB

10. THIS ACQUISITION ISCODE

RFQ

14. METHOD OF SOLICITATION

13b. RATING

NAICS:

SMALL BUSINESS

08/14/2023 1700 PD

07/24/2023

5096336132Paula Gross (No collect calls)

INFORMATION CALL:

FOR SOLICITATION 8. OFFER DUE DATE/LOCAL TIMEb. TELEPHONE NUMBER a. NAME

4. ORDER NUMBER3. AWARD/ 6. SOLICITATION

140R1723Q0054

5. SOLICITATION NUMBER

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS 1. REQUISITION NUMBER PAGE OF

1 41 0040628412OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, & 30

Grand Coulee WA 99133

TELEPHONE NO.

17a. CONTRACTOR/

Grand Coulee WA 99133 Industrial Area Hwy 155 - Warehouse B - Door 6 Grand Coulee - Receiving Bureau of Reclamation-PN-GCPO

15. DELIVER TO

Grand Coulee WA 99133 Hwy 155, PO Box 620 Grand Coulee Acquisition Group Pacific Northwest Region

9. ISSUED BY

7.

2. CONTRACT NO.

EFFECTIVE DATE

1,250

18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK BELOW

ISSUE DATE

DELIVERY FOR FOB DESTINA-

TION UNLESS BLOCK IS

MARKED

11.

SEE SCHEDULE

12. DISCOUNT TERMS

THIS CONTRACT IS A

RATED ORDER UNDER

DPAS (15 CFR 700)

13a.

SERVICE-DISABLED

VETERAN-OWNED

SMALL BUSINESS

HUBZONE SMALL

BUSINESS

8(A)

Bureau of Reclamation

WOMEN-OWNED SMALL BUSINESS

(WOSB) ELIGIBLE UNDER THE WOMEN-OWNED

SMALL BUSINESS PROGRAM

EDWOSB

24.

AMOUNT

23.

UNIT PRICE

22.

UNIT

21.

QUANTITY

20.

SCHEDULE OF SUPPLIES/SERVICES

19.

ITEM NO.

Delivery: 10/31/2023

00010 Remanufacture G-12's exciter set per the attached 1 EA statement of work.

(Use Reverse and/or Attach Additional Sheets as Necessary)

HEREIN, IS ACCEPTED AS TO ITEMS:

XX

DATED

Paula Gross

. YOUR OFFER ON SOLICITATION (BLOCK 5),

INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE SET FORTH

COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND DELIVER

ARE

ARE

31c. DATE SIGNED

27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA

31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER)

30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER (Type or print)

ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY ADDITIONAL

SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.

27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1, 52.212-4. FAR 52.212-3 AND 52.212-5 ARE ATTACHED. ADDENDA

26. TOTAL AWARD AMOUNT (For Govt. Use Only)

OFFER

STANDARD FORM 1449 (REV. 2/2012)

Prescribed by GSA - FAR (48 CFR) 53.212

ARE NOT ATTACHED.

ARE NOT ATTACHED.

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

30b. NAME AND TITLE OF SIGNER (Type or print)

30a. SIGNATURE OF OFFEROR/CONTRACTOR

28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN

25. ACCOUNTING AND APPROPRIATION DATA

29. AWARD OF CONTRACT:

REF.

32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE

32c. DATE 32b. SIGNATURE OF AUTHORIZED GOVERNMENT REPRESENTATIVE

ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED:

32a. QUANTITY IN COLUMN 21 HAS BEEN

RECEIVED INSPECTED

40. PAID BY39. S/R VOUCHER NUMBER38. S/R ACCOUNT NUMBER

37. CHECK NUMBER

FINALPARTIAL

36. PAYMENT

FINALPARTIAL

35. AMOUNT VERIFIED

CORRECT FOR

34. VOUCHER NUMBER33. SHIP NUMBER

COMPLETE

32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE

42d. TOTAL CONTAINERS42c. DATE REC'D (YY/MM/DD)

42b. RECEIVED AT (Location)

42a. RECEIVED BY (Print)

41c. DATE41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER

41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT

STANDARD FORM 1449 (REV. 2/2012) BACK

24.

AMOUNT

23.

UNIT PRICE

22.

UNIT

21.

QUANTITY

20.

SCHEDULE OF SUPPLIES/SERVICES

19.

ITEM NO.

32f. TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE

32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT REPRESENTATIVE

41 2 of

Solicitation No. 140R1723Q0054 Commercial Item Acquisition Specification: G-12’s Exciter Remanufacture and Testing.

1.0 SUMMARY

Furnish labor, equipment, and materials to bring DC-Generator-Exciter set to as-new condition.

Furnish labor, equipment, and materials to test and inspect the exciter pieces in accordance with the attached test forms, upon completion of remanufacture.

For the purpose of Government acceptance of the work, and payment for said work, all tests listed in the test forms shall be completed. In addition, all Contractor standard tests shall be performed and documented on the Contractor’s standard forms; said forms shall be attached to the appropriate Government test form.

2.0 DESCRIPTION OF EXCITER & RECENT OPERATIONAL HISTORY

MAIN EXCITER:

400 kW

250 VDC

1600 Amps

120 RPM

Weights:

Field Frame: 32,040 lbs.

Rotor: 30,000 lbs.

PILOT EXCITER:

23 kW

250 VDC

92 Amps

120 RPM

Weights:

Rotor: 3000 lbs.

PMG:

Weight: 1,000 lbs.

3.0 SCOPE OF WORK

3.1 Pilot Exciter Armature:

Rewind armature to Original Equipment Manufacturers specifications.

Rewind to include:

• Rewind armature,

• VPI armature,

• Clean armature after VPI,

• Turn and undercut commutator,

• Remove and reinstall commutator,

• Fabricate fixtures as needed,

• Commutator refill,

• Armature coil set and insulating materials

3.2 Pilot Exciter Field Windings:

Rewind field windings to Original Equipment Manufacturers specifications.

Rebuild brush rigging insulation to Original Equipment Manufacturers specifications.

Rewind/Rebuild to include:

• Clean and prep parts for assembly,

• Rewind shunt fields,

• Rewind interpoles,

• Re-lead fields,

• VPI fields

• Re-tin bussing,

• Rebuild re-insulate brush rigging,

• Reassemble,

• Water jet blocks,

• Water jet collars

3.3 Main Exciter Armature:

Rebuild armature to Original Equipment Manufacturers specifications.

Rewind/Rebuild to include:

• Burn & strip armature and take data,

• Repairs laminations,

• Prep and install insulation,

• Insert coils,

• Install wedges,

• Test coils,

• Band armature,

• Solder commutator,

• VPI armature,

• Turn commutator,

• Undercut commutator,

• Bevel slots,

• Polish commutator,

• Remove and reinstall commutator,

• Fabricate fixtures as needed,

• Final AWA test,

• Commutator refill,

• Coil set including equalizers

3.4 Main Exciter Field Windings:

Rewind field stator frame to Original Equipment Manufacturers specifications.

Rebuild brush rigging insulation to Original Equipment Manufacturers specifications.

Rewind/Rebuild to include:

• Rewind shunt and differential fields,

• Rewind interpoles,

• VPI fields,

• Post rewind final test,

• Machine brush rigging insulators,

• Re-tin connections for brush rigging,

• Rebuild brush rigging,

• Reassemble

3.5 Permanent Magnet Generator (PMG):

Rewind Stator to Original Equipment Manufacturers specifications.

Rewind to include:

• Remove iron from stator housing,

• Rewind stator,

• Dip and bake stator,

• Clean stator bore after dip and bake,

• Reinstall iron in stator housing,

• Post rewind final test,

• Replace broken coupling pin

3.6 Main Exciter Testing:

Meggar and perform pole drop tests as applicable on armature and fields. Verify correct polarity of the field pole connections on the two shunt fields before and after any repairs or reconnections are made. Record the readings of the as-found (incoming), the after-cleaning, and the as-left (after sealing windings) conditions of the windings on test form 430-131.

Check rotor balance and dynamically balance if necessary; notify the Government of any abnormalities.

Perform AC and DC Voltage Pole Drop tests on the main shunt field, the differential shunt field, and the interpole field. Record readings on test form 430-131. The field poles may or may not be numbered. The Contractor shall assign numbers to un-numbered poles and attach to the test form a diagram of the pole arrangement showing the number and location of each pole.

Perform Polarization Index insulation tests on the armature, the main shunt field, the differential shunt field, and the Interpole field. Attach graphs and report to form 430-131.

This same test shall be performed after the windings have been sealed and cured.

Measure the DC resistance of the two shunt fields. Record the readings on test form 430- 131.

3.7 Pilot Exciter Testing:

Meggar and perform pole drop tests as applicable on armature and fields. Verify correct polarity of the field pole connections on the shunt field before and after any repairs or reconnections are made. Record the readings of the as-found (incoming), the after-cleaning, and the as-left (after sealing windings) conditions of the windings on test form 430-130.

Note: The industry lead designations on the pilot exciter are not standard. The armature leads are A3 and A4 (circuit designation 84/PEP); the shunt field leads are F5 (circuit designation 85/PEF) and F6. DO NOT CHANGE THESE DESIGNATIONS. If the leads do not have stamped metal tags with these designations, they shall be affixed with stamped metal tags per the designations above and drawing 222-117-20977.

Check rotor balance and dynamically balance if necessary; notify the Government of any abnormalities.

Perform AC and DC Voltage Pole Drop tests on the main shunt field, the differential shunt field, and the interpole field. Record readings on test form 430-131. The field poles may or may not be numbered. The Contractor shall assign numbers to un-numbered poles and attach to the test form a diagram of the pole arrangement showing the number and location of each pole.

Perform Polarization Index insulation tests on the armature, the main shunt field, the differential shunt field, and the Interpole field. Attach graphs and report to form 430-131.

This same test shall be performed after the windings have been sealed and cured.

Measure the DC resistance of the shunt field. Record the readings on test form 430-130.

Check rotor balance and dynamically balance if necessary; notify the Government of any abnormalities.

3.8 Permanent Magnet Generator (PMG) testing: Testing and inspection shall be specified as accepted national or industry standards.

4.0 INSPECTIONS

The Government reserves the right to witness testing and to inspect the exciter components after refurbishment has been completed and to witness final testing prior to shipping to Grand Coulee Dam. The Contractor shall provide two business days’ notice of expected testing times and provide the same notice for the expected shipping date.

The Government will assign a technical contact/representative to oversee Contractor performance of this Statement of Work after contract has been awarded. The technical representative will monitor each requirement and performance thereof and report to the Contracting Officer/Specialist and the Powerhouse Superintendent on any issues that are of concern.

5.0 SHIPPING/TRANSPORTATION

5.1 The Contractor shall transport the exciter pieces to and from the Contractor’s shop. The exciter pieces are located at a machine shop in Spokane, WA. The Government will off-load the exciter pieces from the Contractor’s truck upon their return to the Grand Coulee Dam Powerhouse.

5.2 All exciter pieces shall be wrapped and sealed in Mobil Wrap or equivalent before transporting. Upon completion of work and testing, the Contractor shall package components and secure them to the truck bed in such a manner as to prevent damage from weather and transportation hazards. Packaging methods must be adequate to ensure that all pieces, parts, and integral components are well protected from the elements and all road hazards, and to facilitate their safe arrival at Grand Coulee Dam.

6.0 TEST & RUNOUT FORMS

430-131 G7-G18 Main Exciter Winding Test Data 430-130 G7-G18 Pilot Exciter Winding Test Data MMB-132B G7-G18 Main Exciter Rotor Shaft Runout Data MMB-131B G7-G18 Pilot Exciter Rotor Shaft Runout Data

7.0 REFERENCE DRAWINGS

Government will be providing drawing when requested.

G-12 Exciter’s Wiring Diagram: 222-117-20977 Drawing will be made available after written request. The request shall be sent to PGROSS@USBR.GOV. The request shall contain the vendors name, UEI, SAM registration status, contact name and phone number.

8.0 GOVERNMENT FURNISHED PROPERTY (GFP)

Pursuant to Clause 52.2451-1, Alternate 1 titled “Government Furnished Property,” the Government will issue to the Contractor on an as-is basis, the following equipment for use only in the performance of this contract:

Government-Furnished Property

Property Control No.

Description Year New Unit of Issue Cost

No Control Number

Exciter Unit Described in Section 4.0

Unknown 1 each $3,000,000.00 each

Except for those items specifically stated to be Government Furnished Property, the contractor shall furnish all items (equipment, supplies, materials, etc.) required to perform the tasks in this Statement of Work.

mailto:PGROSS@USBR.GOV

Clauses

52.212-4 CONTRACT TERMS AND CONDITIONS –COMMERCIAL PRODUCTS AND COMMERCIAL

SERVICES (DEC 2022)

52.212-4 Sub-clause (o) Warranty, is tailored to read as follows: (o) Warranty: Manufacturer’s Standard

Warranty is required.

---Addendum to 52.212-4---

52.252-6 AUTHORIZED DEVIATIONS IN CLAUSES (NOV 2020)

(a) The use in this solicitation or contract of any Federal Acquisition Regulation (48 CFR Chapter 1) clause with an authorized deviation is indicated by the addition of "(DEVIATION)" after the date of the clause.

(b) The use in this solicitation or contract of any Department of the Interior Acquisition Regulation (48

CFR Chapter 14) clause with an authorized deviation is indicated by the addition of

"(DEVIATION)" after the name of the regulation.

DIAR 1452.237-70 INFORMATION COLLECTION - DEPARTMENT OF THE INTERIOR (JUL 1996)

52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)

This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):

Federal Acquisition Regulation: https://www.acquisition.gov/far

Department of the Interior Acquisition Regulation: https://www.acquisition.gov/diar

(End of clause)

DOI-AAAP-0028 ELECTRONIC INVOICING AND PAYMENT REQUIREMENTS-INVOICE PROCESSING

PLATFORM (IPP) (APR 2013)

Payment requests must be submitted electronically through the U. S. Department of the Treasury's

Invoice Processing Platform System (IPP).

'Payment request' means any request for contract financing payment or invoice payment by the

Contractor. To constitute a proper invoice, the payment request must comply with the requirements identified in the applicable Prompt Payment clause included in the contract, or the clause 52.212-4

Contract Terms and Conditions - Commercial Items included in commercial item contracts. The IPP website address is: https://www.ipp.gov.

The Contractor shall also submit an electronic copy of the IPP invoice to PGROSS@USBR.GOV once the invoice has been submitted to IPP. Failure to email the invoice may cause significant delay or possible rejection of your payment request.

The Contractor must use the IPP website to register access and use IPP for submitting requests for payment. The Contractor Government Business Point of Contact (as listed in SAM) will receive enrollment instructions via email from the Federal Reserve Bank of St. Louis (FRBSTL) within 3 - 5 business days of the contract award date. Contractor assistance with enrollment can be obtained by contacting the IPP Production Helpdesk via email IPPCustomerSupport@fiscal.treasury.gov or phone

(866) 973-3131.

If the Contractor is unable to comply with the requirement to use IPP for submitting invoices for payment, the Contractor must submit a waiver request in writing to the Contracting Officer with its proposal or quotation.

(End of Local Clause)

DOI-AAAP-0050 CONTRACTOR PERFORMANCE ASSESSMENT REPORTING SYSTEM (DEC 2015)

1) FAR 42.1502 directs all Federal agencies to collect past performance information on contracts. The

Department of the Interior (DOI) has implemented the Contractor Performance Assessment http://www.acquisition.gov/far http://www.acquisition.gov/diar http://www.ipp.gov/ mailto:PGROSS@USBR.GOV mailto:IPPCustomerSupport@fiscal.treasury.gov

Reporting System (CPARS) to comply with this regulation. One or more past performance evaluations will be conducted in order to record your contract performance as required by FAR

42.15.

2) The past performance evaluation process is a totally paperless process using CPARS. CPARS is a web-based system that allows for electronic processing of the performance evaluation report.

Once the report is processed, it is available in the Past Performance Information Retrieval System

(PPIRS) for Government use in evaluating past performance as part of a source selection action.

3) We request that you furnish the Contracting Officer (CO) with the name, position title, phone number, and email address for each person designated to have access to your firm's past performance evaluation(s) for the contract no later than 30 days after award. Each person granted access will have the ability to provide comments in the Contractor portion of the report and state whether or not the Contractor agrees with the evaluation, before returning the report to the

Assessing Official (AO). Information in the report must be protected as source selection sensitive information not releasable to the public.

4) When your Contractor Representative(s) are registered in CPARS, they will receive an automatically generated email with detailed login instructions. Further details, systems requirements, and training information for CPARS is available at https://www.cpars.gov/.

5) Within 60 days after the end of a performance period, the AO will complete an interim or final past performance evaluation, and the report will be accessible at https://www.cpars.gov/.

a) Contractor Representatives may then provide comments in response to the evaluation, or return the evaluation without comment.

b) Your comments should focus on objective facts in the AO's narrative and should provide your views on the causes and ramifications of the assessed performance.

c) All information provided should be reviewed for accuracy prior to submission.

d) If you elect not to provide comments, please acknowledge receipt of the evaluation by indicating "No comment" in the space provided, and then selecting “Accept the Ratings and Close the Evaluation”.

e) Your response is due within 60 calendar days after receipt of the CPAR. On day 15, the evaluation will become available in PPIRS-RC marked as “Pending” with or without comments and whether or not it has been closed.

f) If you do not sign and submit the CPAR within 60 days, it will automatically be returned to the

Government and will be annotated: "The report was delivered/received by the contractor on (date). The contractor neither signed nor offered comment in response to this assessment."

6) The following guidelines apply concerning your use of the past performance evaluation:

a) Protect the evaluation as source selection information. After review, transmit the evaluation by completing and submitting the form through CPARS. If for some reason you are unable to view and/or submit the form through CPARS, contact the CO for instructions.

b) Strictly control access to the evaluation within your organization. Ensure the evaluation is never released to persons or entities outside of your control.

c) Prohibit the use of or reference to evaluation data for advertising, promotional material, pre-award surveys, responsibility determinations, production readiness reviews, or other similar purposes.

7) If you wish to discuss a past performance evaluation, you should request a meeting in writing to the CO no later than seven days following your receipt of the evaluation. The meeting will be held in person or via telephone or other means during your 60-day review period.

8) A copy of the completed past performance evaluation will be available in CPARS for your viewing and for Government use supporting source selection actions after it has been finalized.

(End of Local Clause) http://www.cpars.gov/ http://www.cpars.gov/

52.203-17 CONTRACTOR EMPLOYEE WHISTLEBLOWER RIGHTS AND REQUIREMENT TO INFORM

EMPLOYEES OF WHISTLEBLOWER RIGHTS (JUN 2020)

52.204-4 PRINTED OR COPIED DOUBLE-SIDED ON RECYCLED PAPER (MAY 2011)

52.204-13 SYSTEM FOR AWARD MANAGEMENT MAINTENANCE (OCT 2018)

52.204-18 COMMERCIAL AND GOVERNMENT ENTITY CODE MAINTENANCE (AUG 2020)

52.232-40 PROVIDING ACCELERATED PAYMENTS TO SMALL BUSINESS SUBCONTRACTORS (NOV

2021)

--- End of Addendum to 52.212-4---

52.212-5 CONTRACT TERMS AND CONDITIONS REQUIRED TO IMPLEMENT STATUTES OR

EXECUTIVE ORDERS--COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES (JUN 2023)

(a) The Contractor shall comply with the following Federal Acquisition Regulation (FAR) clauses, which are incorporated in this contract by reference, to implement provisions of law or Executive orders applicable to acquisitions of commercial products and commercial services:

(1) 52.203-19, Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements

(Jan 2017) (section 743 of Division E, Title VII, of the Consolidated and Further Continuing

Appropriations Act, 2015 (Pub. L. 113-235) and its successor provisions in subsequent appropriations acts (and as extended in continuing resolutions)).

(2) 52.204-23, Prohibition on Contracting for Hardware, Software, and Services Developed or

Provided by Kaspersky Lab and Other Covered Entities (Nov 2021) (Section 1634 of Pub.

L. 115-91).

(3) 52.204-25, Prohibition on Contracting for Certain Telecommunications and Video Surveillance

Services or Equipment. (Nov 2021) (Section 889(a)(1)(A) of Pub. L. 115-232).

(4) 52.209-10, Prohibition on Contracting with Inverted Domestic Corporations (Nov 2015).

(5) 52.232-40, Providing Accelerated Payments to Small Business Subcontractors (Mar 2023) ( 31

U.S.C. 3903 and 10 U.S.C. 3801).

(6) 52.233-3, Protest After Award (Aug 1996) (31 U.S.C. 3553).

(7) 52.233-4, Applicable Law for Breach of Contract Claim (Oct 2004) (Public Laws 108-77 and

108-78 ( 19 U.S.C. 3805 note)).

(b) The Contractor shall comply with the FAR clauses in this paragraph (b) that the Contracting Officer has indicated as being incorporated in this contract by reference to implement provisions of law or Executive orders applicable to acquisitions of commercial products and commercial services:

[X] (1) 52.203-6, Restrictions on Subcontractor Sales to the Government (Jun 2020), with Alternate

I (Nov 2021) (41 U.S.C. 4704 and 10 U.S.C. 4655).

[ ] (2) 52.203-13, Contractor Code of Business Ethics and Conduct (Nov 2021) (41 U.S.C. 3509)).

[ ] (3) 52.203-15, Whistleblower Protections under the American Recovery and Reinvestment Act of 2009 (Jun 2010) (Section 1553 of Pub. L. 111-5). (Applies to contracts funded by the

American Recovery and Reinvestment Act of 2009.)

[X] (4) 52.204-10, Reporting Executive Compensation and First-Tier Subcontract Awards (Jun 2020)

(Pub. L. 109-282) ( 31 U.S.C. 6101 note).

[ ] (5) [Reserved].

[ ] (6) 52.204-14, Service Contract Reporting Requirements (Oct 2016) (Pub. L. 111-117, section

743 of Div. C).

[ ] (7) 52.204-15, Service Contract Reporting Requirements for Indefinite-Delivery Contracts (Oct

2016) (Pub. L. 111-117, section 743 of Div. C).

[X] (8) 52.204-27, Prohibition on a ByteDance Covered Application (Jun 2023) (Section 102 of

Division R of Pub. L. 117-328).

[X] (9) 52.209-6, Protecting the Government’s Interest When Subcontracting with Contractors

Debarred, Suspended, or Proposed for Debarment. (Nov 2021) (31 U.S.C. 6101 note).

[ ] (10) 52.209-9, Updates of Publicly Available Information Regarding Responsibility Matters (Oct

2018) (41 U.S.C. 2313).

[ ] (11) [Reserved].

[ ] (12) 52.219-3, Notice of HUBZone Set-Aside or Sole-Source Award (Oct 2022) (15 U.S.C. 657a).

[ ] (13) 52.219-4, Notice of Price Evaluation Preference for HUBZone Small Business Concerns (Oct

2022) (if the offeror elects to waive the preference, it shall so indicate in its offer) (15

U.S.C. 657a).

[ ] (14) [Reserved]

[X] (15) (i) 52.219-6, Notice of Total Small Business Set-Aside (Nov 2020) (15 U.S.C. 644).

[ ] (ii) Alternate I (Mar 2020) of 52.219-6.

[ ] (16) (i) 52.219-7, Notice of Partial Small Business Set-Aside (Nov 2020) (15 U.S.C. 644).

[ ] (ii) Alternate I (Mar 2020) of 52.219-7.

[X] (17) 52.219-8, Utilization of Small Business Concerns (Oct 2022) (15 U.S.C. 637(d)(2) and (3)).

[ ] (18) (i) 52.219-9, Small Business Subcontracting Plan (Oct 2022) (15 U.S.C. 637(d)(4)).

[ ] (ii) Alternate I (Nov 2016) of 52.219-9.

[ ] (iii) Alternate II (Nov 2016) of 52.219-9.

[ ] (iv) Alternate III (Jun 2020) of 52.219-9.

[ ] (v) Alternate IV (Sep 2021) of 52.219-9

[ ] (19) (i) 52.219-13, Notice of Set-Aside of Orders (Mar 2020) (15 U.S.C. 644(r)).

[ ] (ii) Alternate I (Mar 2020) of 52.219-13.

[ ] (20) 52.219-14, Limitations on Subcontracting (Oct 2022) (15 U.S.C. 637(a)(14)).

[ ] (21) 52.219-16, Liquidated Damages-Subcontracting Plan (Sep 2021) (15 U.S.C. 637(d)(4)(F)(i)).

[ ] (22) 52.219-27, Notice of Service-Disabled Veteran-Owned Small Business Set-Aside (Oct 2022)

(15 U.S.C. 657f).

[X] (23) (i) 52.219-28, Post Award Small Business Program Representation (Mar 2023) (15 U.S.C.

632(a)(2)).

[ ] (ii) Alternate I (MAR 2020) of 52.219-28.

[ ] (24) 52.219-29, Notice of Set-Aside for, or Sole Source Award to, Economically Disadvantaged

Women-Owned Small Business Concerns (Oct 2022) (15 U.S.C. 637(m)).

[ ] (25) 52.219-30, Notice of Set-Aside for, or Sole Source Award to, Women-Owned Small

Business Concerns Eligible Under the Women-Owned Small Business Program (Oct 2022)

(15 U.S.C. 637(m)).

[ ] (26) 52.219-32, Orders Issued Directly Under Small Business Reserves (Mar 2020) (15 U.S.C.

644(r)).

[X] (27) 52.219-33, Nonmanufacturer Rule (Sep 2021) (15U.S.C. 637(a)(17)).

[X] (28) 52.222-3, Convict Labor (Jun 2003) (E.O.11755).

[X] (29) 52.222-19, Child Labor-Cooperation with Authorities and Remedies (Dec 2022)

(E.O.13126).

[X] (30) 52.222-21, Prohibition of Segregated Facilities (Apr 2015).

[X] (31) (i) 52.222-26, Equal Opportunity (Sep 2016) (E.O.11246).

[ ] (ii) Alternate I (Feb 1999) of 52.222-26.

[X] (32) (i) 52.222-35, Equal Opportunity for Veterans (Jun 2020) (38 U.S.C. 4212).

[ ] (ii) Alternate I (Jul 2014) of 52.222-35.

[X] (33) (i) 52.222-36, Equal Opportunity for Workers with Disabilities (Jun 2020) (29 U.S.C. 793).

[ ] (ii) Alternate I (Jul 2014) of 52.222-36.

[X] (34) 52.222-37, Employment Reports on Veterans (Jun 2020) (38 U.S.C. 4212).

[X] (35) 52.222-40, Notification of Employee Rights Under the National Labor Relations Act (Dec

2010) (E.O. 13496).

[X] (36) (i) 52.222-50, Combating Trafficking in Persons (Nov 2021) (22 U.S.C. chapter 78 and E.O.

13627).

[ ] (ii) Alternate I (Mar 2015) of 52.222-50 (22 U.S.C. chapter 78 and E.O. 13627).

[X] (37) 52.222-54, Employment Eligibility Verification (May 2022). (Executive Order 12989). (Not applicable to the acquisition of commercially available off-the-shelf items or certain other types of commercial products or commercial services as prescribed in 22.1803.)

[ ] (38) (i) 52.223-9, Estimate of Percentage of Recovered Material Content for EPA–Designated

Items (May 2008) ( 42 U.S.C. 6962(c)(3)(A)(ii)). (Not applicable to the acquisition of commercially available off-the-shelf items.)

[ ] (ii) Alternate I (May 2008) of 52.223-9 (42 U.S.C. 6962(i)(2)(C)). (Not applicable to the acquisition of commercially available off-the-shelf items.)

[ ] (39) 52.223-11, Ozone-Depleting Substances and High Global Warming Potential

Hydrofluorocarbons (Jun 2016) (E.O. 13693).

[ ] (40) 52.223-12, Maintenance, Service, Repair, or Disposal of Refrigeration Equipment and Air

Conditioners (Jun 2016) (E.O. 13693).

[ ] (41) (i) 52.223-13, Acquisition of EPEAT®-Registered Imaging Equipment (Jun 2014) (E.O.s

13423 and 13514).

[ ] (ii) Alternate I (Oct 2015) of 52.223-13.

[ ] (42) (i) 52.223-14, Acquisition of EPEAT®-Registered Televisions (Jun 2014) (E.O.s 13423 and

13514).

[ ] (ii) Alternate I (Jun 2014) of 52.223-14.

[ ] (43) 52.223-15, Energy Efficiency in Energy-Consuming Products (May 2020) (42 U.S.C. 8259b).

[ ] (44) (i) 52.223-16, Acquisition of EPEAT®-Registered Personal Computer Products (Oct 2015)

(E.O.s 13423 and 13514).

[ ] (ii) Alternate I (Jun 2014) of 52.223-16.

[X] (45) 52.223-18, Encouraging Contractor Policies to Ban Text Messaging While Driving (Jun

2020) (E.O. 13513).

[ ] (46) 52.223-20, Aerosols (Jun 2016) (E.O. 13693).

[ ] (47) 52.223-21, Foams (Jun 2016) (E.O. 13693).

[ ] (48) (i) 52.224-3 Privacy Training (Jan 2017) (5 U.S.C. 552 a).

[ ] (ii) Alternate I (Jan 2017) of 52.224-3.

[X] (49) (i) 52.225-1, Buy American-Supplies (Oct 2022) (41 U.S.C. chapter 83).

[ ] (50) (i) 52.225-3, Buy American-Free Trade Agreements-Israeli Trade Act (Dec 2022) (19 U.S.C.

3301 note, 19 U.S.C. 2112 note, 19 U.S.C. 3805 note, 19 U.S.C. 4001 note, 19 U.S.C. chapter

29 (sections 4501-4732), Pub. L. 103-182, 108-77, 108-78, 108-286, 108-302, 109-53, 109-

169, 109-283, 110-138, 112-41, 112-42, and 112-43.

[ ] (ii) Alternate I [Reserved].

[ ] (iii) Alternate II (Dec 2022) of 52.225-3.

[ ] (iv) Alternate III (Jan 2021) of 52.225-3.

[ ] (51) 52.225-5, Trade Agreements (Dec 2022) (19 U.S.C. 2501, et seq., 19 U.S.C. 3301 note).

[X] (52) 52.225-13, Restrictions on Certain Foreign Purchases (Feb 2021) (E.O.’s, proclamations, and statutes administered by the Office of Foreign Assets Control of the Department of the

Treasury).

[ ] (53) 52.225-26, Contractors Performing Private Security Functions Outside the United States

(Oct 2016) (Section 862, as amended, of the National Defense Authorization Act for Fiscal

Year 2008; 10 U.S.C. Subtitle A, Part V, Subpart G Note).

[ ] (54) 52.226-4, Notice of Disaster or Emergency Area Set-Aside (Nov 2007) (42 U.S.C. 5150).

[ ] (55) 52.226-5, Restrictions on Subcontracting Outside Disaster or Emergency Area (Nov 2007)

(42 U.S.C. 5150).

[X] (56) 52.229-12, Tax on Certain Foreign Procurements (Feb 2021).

[ ] (57) 52.232-29, Terms for Financing of Purchases of Commercial Products and Commercial

Services (Nov 2021) (41 U.S.C. 4505, 10 U.S.C. 3805).

[ ] (58) 52.232-30, Installment Payments for Commercial Products and Commercial Services (Nov

2021) (41 U.S.C. 4505, 10 U.S.C. 3805).

[X] (59) 52.232-33, Payment by Electronic Funds Transfer-System for Award Management (Oct

2018) (31 U.S.C. 3332).

[ ] (60) 52.232-34, Payment by Electronic Funds Transfer-Other than System for Award

Management (Jul 2013) (31 U.S.C. 3332).

[ ] (61) 52.232-36, Payment by Third Party (May 2014) (31 U.S.C. 3332).

[ ] (62) 52.239-1, Privacy or Security Safeguards (Aug 1996) (5 U.S.C. 552a).

[ ] (63) 52.242-5, Payments to Small Business Subcontractors (Jan 2017) (15 U.S.C. 637(d)(13)).

[ ] (64) (i) 52.247-64, Preference for Privately Owned U.S.-Flag Commercial Vessels (Nov 2021) (46

U.S.C. 55305 and 10 U.S.C. 2631).

[ ] (ii) Alternate I (Apr 2003) of 52.247-64.

[ ] (iii) Alternate II (Nov 2021) of 52.247-64.

(c) The Contractor shall comply with the FAR clauses in this paragraph (c), applicable to commercial services, that the Contracting Officer has indicated as being incorporated in this contract by reference to implement provisions of law or Executive orders applicable to acquisitions of commercial products and commercial services:

[ ] (1) 52.222-41, Service Contract Labor Standards (Aug 2018) (41 U.S.C. chapter67).

[ ] (2) 52.222-42, Statement of Equivalent Rates for Federal Hires (May 2014) (29 U.S.C. 206 and 41

U.S.C. chapter 67).

[ ] (3) 52.222-43, Fair Labor Standards Act and Service Contract Labor Standards-Price Adjustment

(Multiple Year and Option Contracts) (Aug 2018) (29 U.S.C. 206 and 41 U.S.C. chapter 67).

[ ] (4) 52.222-44, Fair Labor Standards Act and Service Contract Labor Standards-Price Adjustment

(May 2014) ( 29U.S.C.206 and 41 U.S.C. chapter 67).

[ ] (5) 52.222-51, Exemption from Application of the Service Contract Labor Standards to

Contracts for Maintenance, Calibration, or Repair of Certain Equipment-Requirements

(May 2014) (41 U.S.C. chapter 67).

[ ] (6) 52.222-53, Exemption from Application of the Service Contract Labor Standards to

Contracts for Certain Services-Requirements (May 2014) (41 U.S.C. chapter 67).

[ ] (7) 52.222-55, Minimum Wages for Contractor Workers Under Executive Order 14026 (Jan

2022).

[ ] (8) 52.222-62, Paid Sick Leave Under Executive Order 13706 (Jan 2022) (E.O. 13706).

[ ] (9) 52.226-6, Promoting Excess Food Donation to Nonprofit Organizations (Jun 2020) (42 U.S.C.

1792).

(d) Comptroller General Examination of Record. The Contractor shall comply with the provisions of this paragraph (d) if this contract was awarded using other than sealed bid, is in excess of the simplified acquisition threshold, as defined in FAR 2.101, on the date of award of this contract, and does not contain the clause at 52.215-2, Audit and Records-Negotiation.

(1) The Comptroller General of the United States, or an authorized representative of the

Comptroller General, shall have access to and right to examine any of the Contractor’s directly pertinent records involving transactions related to this contract.

(2) The Contractor shall make available at its offices at all reasonable times the records, materials, and other evidence for examination, audit, or reproduction, until 3 years after final payment under this contract or for any shorter period specified in FAR subpart 4.7, Contractor Records Retention, of the other clauses of this contract. If this contract is completely or partially terminated, the records relating to the work terminated shall be made available for 3 years after any resulting final termination settlement. Records relating to appeals under the disputes clause or to litigation or the settlement of claims arising under or relating to this contract shall be made available until such appeals, litigation, or claims are finally resolved.

(3) As used in this clause, records include books, documents, accounting procedures and practices, and other data, regardless of type and regardless of form. This does not require the Contractor to create or maintain any record that the Contractor does not maintain in the ordinary course of business or pursuant to a provision of law.

(e) (1) Notwithstanding the requirements of the clauses in paragraphs (a), (b), (c), and (d) of this clause, the Contractor is not required to flow down any FAR clause, other than those in this paragraph (e)(1), in a subcontract for commercial products and commercial services. Unless otherwise indicated below, the extent of the flow down shall be as required by the clause-

(i) 52.203-13, Contractor Code of Business Ethics and Conduct (Nov 2021) (41 U.S.C. 3509).

(ii) 52.203-19, Prohibition on Requiring Certain Internal Confidentiality Agreements or

Statements (Jan 2017) (section 743 of Division E, Title VII, of the Consolidated and Further Continuing Appropriations Act, 2015 (Pub. L. 113-235) and its successor provisions in subsequent appropriations acts (and as extended in continuing resolutions)).

(iii) 52.204-23, Prohibition on Contracting for Hardware, Software, and Services Developed or

Provided by Kaspersky Lab and Other Covered Entities (Nov 2021) (Section 1634 of Pub. L. 115-91).

(iv) 52.204-25, Prohibition on Contracting for Certain Telecommunications and Video

Surveillance Services or Equipment. (Nov 2021) (Section 889(a)(1)(A) of Pub. L.

115-232).

(v) 52.204-27, Prohibition on a ByteDance Covered Application (Jun 2023) (Section 102 of

Division R of Pub. L. 117-328).

(vi) 52.219-8, Utilization of Small Business Concerns (Oct 2022) (15 U.S.C. 637(d)(2) and (3)), in all subcontracts that offer further subcontracting opportunities. If the subcontract

(except subcontracts to small business concerns) exceeds the applicable threshold specified in FAR 19.702(a) on the date of subcontract award, the subcontractor must include 52.219-8 in lower tier subcontracts that offer subcontracting opportunities.

(vii) 52.222-21, Prohibition of Segregated Facilities (Apr 2015).

(viii) 52.222-26, Equal Opportunity (Sep 2015) (E.O.11246).

(ix) 52.222-35, Equal Opportunity for Veterans (Jun 2020) (38 U.S.C. 4212).

(x) 52.222-36, Equal Opportunity for Workers with Disabilities (Jun 2020) (29 U.S.C. 793).

(xi) 52.222-37, Employment Reports on Veterans (Jun 2020) (38 U.S.C. 4212).

(xii) 52.222-40, Notification of Employee Rights Under the National Labor Relations Act (Dec

2010) (E.O. 13496). Flow down required in accordance with paragraph (f) of FAR clause 52.222-40.

(xiii) 52.222-41, Service Contract Labor Standards (Aug 2018) (41 U.S.C. chapter 67).

(xiv) (A) 52.222-50, Combating Trafficking in Persons (Nov 2021) (22 U.S.C. chapter 78 and E.O

13627). (B) Alternate I (Mar 2015) of 52.222-50 (22 U.S.C. chapter 78 and E.O.

13627).

(xv) 52.222-51, Exemption from Application of the Service Contract Labor Standards to

Contracts for Maintenance, Calibration, or Repair of Certain Equipment-

Requirements (May2014) (41 U.S.C. chapter 67).

(xvi) 52.222-53, Exemption from Application of the Service Contract Labor Standards to

Contracts for Certain Services-Requirements (May 2014) (41 U.S.C. chapter 67).

(xvii) 52.222-54, Employment Eligibility Verification (May 2022) (E.O. 12989).

(xviii) 52.222-55, Minimum Wages for Contractor Workers Under Executive Order 14026 (Jan

2022).

(xix) 52.222-62, Paid Sick Leave Under Executive Order 13706 (Jan 2022) (E.O. 13706).

(xx) (A) 52.224-3, Privacy Training (Jan 2017) (5 U.S.C. 552a). (B) Alternate I (Jan 2017) of

52.224-3.

(xxi) 52.225-26, Contractors Performing Private Security Functions Outside the United States

(Oct 2016) (Section 862, as amended, of the National Defense Authorization Act for Fiscal Year 2008; 10 U.S.C. Subtitle A, Part V, Subpart G Note).

(xxii) 52.226-6, Promoting Excess Food Donation to Nonprofit Organizations (Nov 2021) (42

U.S.C. 1792). Flow down required in accordance with paragraph (e) of FAR clause

52.226-6.

(xxiii) 52.247-64, Preference for Privately Owned U.S.-Flag Commercial Vessels (Feb 2006) (46

U.S.C. 55305 and 10 U.S.C. 2631). Flow down required in accordance with paragraph (d) of FAR clause 52.247-64.

(2) While not required, the Contractor may include in its subcontracts for commercial products and commercial services a minimal number of additional clauses necessary to satisfy its contractual obligations.

ADDENDUM TO 52.212-5

52.245-1 GOVERNMENT PROPERTY (JAN 2017), WITH ALTERNATE I (APRIL 2012)

52.245-9 USE AND CHARGES (APR 2012)

52.214-19 LIMITATIONS ON SUBCONTRACTING (OCT 2022) (DEVIATION)

(a) This clause does not apply to the unrestricted portion of a partial set-aside.

(b) Definition. Similarly situated entity, as used in this clause, means a first-tier subcontractor, including an independent contractor, that—

(1) Has the same small business program status as that which qualified the prime contractor for the award (e.g., for a small business set-aside contract, any small business concern, without regard to its socioeconomic status); and

(2) Is considered small for the size standard under the North American Industry Classification

System (NAICS) code the prime contractor assigned to the subcontract.

(c) Applicability. This clause applies only to—

(1) Contracts that have been set aside for any of the small business concerns identified in

19.000(a)(3);

(2) Part or parts of a multiple-award contract that have been set aside for any of the small business concerns identified in 19.000(a)(3);

(3) Contracts that have been awarded on a sole-source basis in accordance with subparts 19.8, 19.13, 19.14, and 19.15;

(4) Orders expected to exceed the simplified acquisition threshold and that are—

(i) Set aside for small business concerns under multiple-award contracts, as described in 8.405-5 and 16.505(b)(2)(i)(F); or

(ii) Issued directly to small business concerns under multiple-award contracts as described in

19.504(c)(1)(ii);

(5) Orders, regardless of dollar value, that are—

(i) Set aside in accordance with subparts 19.8, 19.13, 19.14, or 19.15 under multiple-award contracts, as described in 8.405-5 and 16.505(b)(2)(i)(F); or

(ii) Issued directly to concerns that qualify for the programs described in subparts 19.8, 19.13, 19.14, or 19.15 under multiple-award contracts, as described in 19.504(c)(1)(ii); and

(6) Contracts using the HUBZone price evaluation preference to award to a HUBZone small business concern unless the concern waived the evaluation preference.

(d) Independent contractors. An independent contractor shall be considered a subcontractor.

(e) Limitations on subcontracting. By submission of an offer and execution of a contract, the

Contractor agrees to the following requirements in the performance of a contract assigned a North

American Industry Classification System (NAICS) code applicable to this contract:

(1) Services (except construction). It will not pay more than 50 percent of the amount paid by the

Government for contract performance, excluding certain other direct costs and certain work performed outside the United States (see paragraph (e)(1)(i)), to subcontractors that are not similarly situated entities.

Any work that a similarly situated entity further subcontracts will count towards the prime contractor’s 50 percent subcontract amount that cannot be exceeded. When a contract includes both services and supplies, the 50 percent limitation shall apply only to the service portion of the contract.

(i) The following services may be excluded from the 50 percent limitation:

(A) Other direct costs, to the extent they are not the principal purpose of the acquisition and small business concerns do not provide the service. Examples include airline travel, work performed by a transportation or disposal entity under a contract assigned the environmental remediation

NAICS code (562910), cloud computing services, or mass media purchases.

(B) Work performed outside the United States on awards made pursuant to the

Foreign Assistance Act of 1961, or work performed outside the United States required to be performed by a local contractor.

(2) Supplies (other than procurement from a nonmanufacturer of such supplies). It will not pay more than 50 percent of the amount paid by the Government for contract performance, excluding the cost of materials, to subcontractors that are not similarly situated entities. Any work that a similarly situated entity further subcontracts will count towards the prime contractor’s 50 percent subcontract amount that cannot be exceeded. When a contract includes both supplies and services, the 50 percent limitation shall apply only to the supply portion of the contract.

(3) General construction. It will not pay more than 85 percent of the amount paid by the

Government for contract performance, excluding the cost of materials, to subcontractors that are not similarly situated entities. Any work that a similarly situated entity further subcontracts will count towards the prime contractor’s 85 percent subcontract amount that cannot be exceeded.

(4) Construction by special trade contractors. It will not pay more than 75 percent of the amount paid by the Government for contract performance, excluding the cost of materials, to subcontractors that are not similarly situated entities. Any work that a similarly situated entity further subcontracts will count towards the prime contractor’s 75 percent subcontract amount that cannot be exceeded.

(f) The Contractor shall comply with the limitations on subcontracting as follows:

(1) For contracts, in accordance with paragraphs (c)(1), (2), (3) and (6) of this clause –

[Contracting Officer check as appropriate.]

__ By the end of the base term of the contract and then by the end of each subsequent option period; or

__ By the end of the performance period for each order issued under the contract.

(2) For orders, in accordance with paragraphs (c)(4) and (5) of this clause, by the end of the performance period for the order.

(g) A joint venture agrees that, in the performance of the contract, the applicable percentage specified in paragraph (e) of this clause will be performed by the aggregate of the joint venture participants.

(1) In a joint venture comprised of a small business protégé and its mentor approved by the Small

Business Administration, the small business protégé shall perform at least 40 percent of the work performed by the joint venture. Work performed by the small business protégé in the joint venture must be more than administrative functions.

(2) In an 8(a) joint venture, the 8(a) participant(s) shall perform at least 40 percent of the work performed by the joint venture. Work performed by the 8(a) participants in the joint venture must be more than administrative functions.

---End Addendum to 52.212-5---

\\ibr1pnrfp01.bor.doi.net\Common\PN7400\Paula\FY 19\40426102 Exciter IDIQ\Tab 4 Specifications-SOW-PWS\Test forms\430- 130 G7-G18 PILOT EXCITER (Rev 7-2013 rkm).doc

Form 430-130 (Revised 7-2013 rkm) Date:___________

G7-G18 PILOT EXCITER WINDING TEST DATA

W.O.:___________

P.O.:___________

Contractor & Job#:___________

UNIT G7-G18

PILOT EXCITER WINDING TEST DATA

UNIT: _______________

Insulation Resistance (meggared). Test Instrument Voltage: ____________________

BRUSHES REMOVED: As Found After Cleaning As Left

Rotor (armature) Coils and Comm. to shaft .... . . . . . ….……______ Megohms ______ Megohms ______Megohms

Stator (fields) Interpole Coils to frame ………………….....______ Megohms ______ Megohms ______Megohms

Brush Rigging to frame…………………….. ______ Megohms ______ Megohms ______Megohms

Shunt (F5 & F6) to frame..... ....................... ______ Megohms ______ Megohms ______Megohms

Series (S1 & S2) to frame…………..…....... ______ Megohms ______ Megohms ______Megohms

Shunt to Series …….......…………………...._______Megohms _______Megohms _______Megohms

ARMATURE COILS AFTER CLEANING:

Ductor: Attach separate sheet with ductor readings.

Surge Comparison Tests: Attach separate sheet with photographs for each coil and a narrative of test results.

FIELD COILS AFTER CLEANING:

AC & DC VOLTAGE DROP TESTS

Interpoles, ______ Amps @ ______ VAC

Volts/pole = ______ - ______ - ______ - ______ - ______ - ______

Total = ______ VAC

Interpoles, ______ Amps @ ______ VDC

Total = ______ VDC

Shunt (F5– F6) ______ Amps @ ______ VAC

Volts/pole = ______ - ______ - ______ - ______ - ______ - ______with S1 & S2 Open

Volts/pole = ______ - ______ - ______ - ______ - ______ - ______with S1 & S2 Tied Together

\\ibr1pnrfp01.bor.doi.net\Common\PN7400\Paula\FY 19\40426102 Exciter IDIQ\Tab 4 Specifications-SOW-PWS\Test forms\430- 130 G7-G18 PILOT EXCITER (Rev 7-2013 rkm).doc

Total = ______ VAC

Shunt (F5 – F6) ______ Amps @ ______ VDC

Series (S1 – S2) ______ Amps @ ______ VAC

Total = ______ VAC

Series (S1 – S2) ______ Amps @ ______ VDC

DC RESISTANCE READINGS

Shunt (F5 – F6) ______ Ohms

Series (S1 – S2) ______ Ohms

PERFORM OTHER CONTRACTOR STANDARD INSPECTIONS AND TESTS, AND DOCUMENT ON CONTRACTOR

STANDARD FORMS.

REMARKS:

\\ibr1pnrfp01.bor.doi.net\Common\PN7400\Paula\FY 19\40426102 Exciter IDIQ\Tab 4 Specifications-SOW-PWS\Test forms\430- 131 G7-G18 MAIN EXCITER (Rev 7-2013 rkm).doc

Form 430-131 (Revised 7-2013 rkm) Date:_____________

G7-G18 MAIN EXCITER WINDING TEST DATA

W.O.:_____________

P.O.:_____________

Contractor & Job#:_____________

UNIT G7-G18

MAIN EXCITER WINDING TEST DATA

UNIT:_______________

Insulation Resistance (meggared). Test Instrument Voltage: _______________________

BRUSHES REMOVED: As Found After Cleaning As Left

Rotor (armature) Coils and Comm. to shaft . . . . . . …………. _______Megohms _______Megohms _______Megohms

Stator (fields) Interpole Coils to frame . . . . . . . . ……… _______Megohms _______Megohms _______Megohms

Brush Rigging to frame (Inside)…………… _______Megohms _______Megohms _______Megohms

Brush Rigging to frame (Outside)………..…_______Megohms _______Megohms _______Megohms

Main Shunt (F1 & F2) to frame …………… _______Megohms _______Megohms _______Megohms

Diff. Shunt (F3 & F4) to frame. . ………... . _______Megohms _______Megohms _______Megohms

Main Shunt to Diff. Shunt . . ………...…... . _______Megohms _______Megohms _______Megohms

ARMATURE COILS AFTER CLEANING:

Ductor: Attach separate sheet with ductor readings.

Surge Comparison Tests: Attach separate sheet with photographs for each coil and a narrative of test results.

FIELD COILS AFTER CLEANING:

AC & DC VOLTAGE DROP TESTS

Interpoles, _________Amps @ _________VAC

Volts/pole = _____ - _____ - _____ - _____- _____ - _____ - _____- _____ - _____ - _____

Total = ______VAC

Interpoles, _________Amps @ _________VDC

Volts/pole = _____ - _____ - _____ - _____- _____ - _____ - _____- _____ - _____ - _____

Total = ______VDC

Main Shunt (F1 - F2) _______Amps @ ______VAC

\\ibr1pnrfp01.bor.doi.net\Common\PN7400\Paula\FY 19\40426102 Exciter IDIQ\Tab 4 Specifications-SOW-PWS\Test forms\430- 131 G7-G18 MAIN EXCITER (Rev 7-2013 rkm).doc

Total = ______VAC

Main Shunt (F1 - F2) _______Amps @ ______VDC

Diff. Shunt (F3 - F4) _______Amps @ ______VAC

Total = ______VAC

Diff. Shunt (F3 - F4) ______Amps@ _____VDC

DC RESISTANCE READINGS

Main Shunt (F1 - F2) ______ Ohms

Diff. Shunt (F3 – F4) ______ Ohms

PERFORM OTHER CONTRACTOR STANDARD INSPECTIONS AND TESTS, AND DOCUMENT ON CONTRACTOR

STANDARD FORMS.

REMARKS:

MMB-131B GRAND COULEE PROJECT

G-7 THROUGH G-18

Revised 11-22-2011 PILOT EXCITER ROTOR Page 1 of 1

IA HYDROMECHANIC

Unit: ______________________ Work Order No. ________________________

By: ______________________ Date: _________________________________

\\ibr1pnrfp01.bor.doi.net\Common\PN7400\Paula\FY 19\40426102 Exciter IDIQ\Tab 4 Specifications-SOW-PWS\Test forms\MMB-131B G7 thru G18 PILOT EXCITER ROTOR.docx

MMB-132B GRAND COULEE PROJECT LPH Hydromechanic

G-7 THROUGH G-18

Revised 11-22-2011 MAIN EXCITER ROTOR Page 1 of 1

IA MACHINE SHOP

Unit No. ____________________ Work Order No. ___________________

By: ________________________ Date: ____________________________

\\ibr1pnrfp01.bor.doi.net\Common\PN7400\Paula\FY 19\40426102 Exciter IDIQ\Tab 4 Specifications-SOW-PWS\Test forms\MMB-132B G7 thru G18 MAIN EXCITER ROTOR.docx

Provisions

52.212-1 INSTRUCTIONS TO OFFERORS–COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES

(MAR2023)

This addendum replaces the term “offer” with “quote” within the provision at 52.212-1.

This addendum requires the vendor to submit full warranty documentation on the item(s) being quoted.

---Addendum to 52.212-1---

52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998)

This solicitation incorporates one or more solicitation provisions by reference, with the same force and effect as if they were…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .