Sol_140P6026Q0025.pdf

PDF 420 KB Posted

Attached to
FOSM - Replace Backflow Prevention Assemblies Federal contract opportunity
Solicitation number
140P6026Q0025
Issued by
Department of the Interior National Park Service Midwest Region

About this file

This is a Request for Quotation (RFQ) for construction services to replace backflow prevention assemblies at Fort Smith National Historic Site in Fort Smith, Arkansas.

The National Park Service seeks quotations for replacing two commercial backflow preventers and installing heated enclosures to ensure freeze protection. The work is classified under NAICS code 237110 (Water and Sewer Line and Related Structures Construction) with a small business size standard of $45 million. Quotations must be received by June 26, 2026, at 12:00 PM Central Daylight Time. The work shall be completed within 90 days after notice to proceed, with a performance period from August 1, 2026, to November 1, 2026. An organized site visit is scheduled for June 10, 2026, at 10:00 AM CT at the project location. Quotations are requested as a lump sum price in Section B of the RFQ and must be valid for a minimum of 60 days. All quotes must be submitted via email to the Contract Specialist, Bridget Parizek, at bridget_parizek@ios.doi.gov, with a maximum email attachment size of 25MB per submission.

Award will be made to the quoter offering the best value based on evaluation of price, technical capability, and prior experience using simplified acquisition procedures under FAR Part 13. Bonding requirements specify that the contractor must provide either a payment bond or an irrevocable letter of credit (100 percent of contract value) within 10 calendar days after award. Quoters must be registered in the System for Award Management (SAM) as an active small business. Quoters must demonstrate technical capability through a project narrative describing their approach and schedule, and provide prior experience references (3-5 projects) from the past five years of similar size and scope. The RFQ incorporates numerous FAR and Department of Interior clauses including Buy American construction materials requirements, wage rate determinations, labor standards compliance, and various administrative and payment provisions.

View the file

Other files for this federal contract opportunity

Other files attached to FOSM - Replace Backflow Prevention Assemblies, newest first.
File Type Posted
Sol_140P6026Q0025_Amd_0002.pdf PDF
B12_MISC_Image_0002.jpg JPG image
B12_MISC_Updated_2026_Drawings_0002.pdf PDF
B12_Project_Sign_In_Sheet_0001.pdf PDF
Sol_140P6026Q0025_Amd_0001.pdf PDF
B08_Solicitation_-_Att_4_-_IMG_0419.jpeg JPEG file
B08_Solicitation_-_Att_5_-_Wage_Determination.pdf PDF
B08_Solicitation_-_Att_1_-_Specifications.pdf PDF
B08_Solicitation_-_Att_3_-_IMG_0417.jpeg JPEG file
B08_Solicitation_-_Att_2_-_IMG_0415.jpeg JPEG file

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REQUEST FOR QUOTATION

(THIS IS NOT AN ORDER)

THIS RFQ IS IS NOT A SMALL BUSINESS SET-ASIDE

15. DATE OF QUOTATION

16. SIGNER

a. NAME (Type or print)

c. TITLE (Type or print)

b. TELEPHONE

AREA CODE

NUMBER

STANDARD FORM 18 (REV. 6/1995)

Prescribed by GSA-FAR (48 CFR) 53.215-1(a)

AUTHORIZED FOR LOCAL REPRODUCTION

Previous edition not usable

8. TO:

b. COMPANYa. NAME

c. STREET ADDRESS

d. CITY e. STATE f. ZIP CODE

9. DESTINATION

a. NAME OF CONSIGNEE

b. STREET ADDRESS

d. STATE e. ZIP CODE

7. DELIVERY

FOB DESTINATION

OTHER

(See Schedule)

10. PLEASE FURNISH QUOTATIONS TO THE

ISSUING OFFICE IN BLOCK 5a ON OR BEFORE CLOSE OF BUSINESS (Date)

IMPORTANT: This is a request for information and quotations furnished are not offers. If you are unable to quote, please so indicate on this form and return it to the address in Block 5a. This request does not commit the Government to pay any costs incurred in the preparation of the submission of this quotation or to contract for supplies or service. Supplies are of domestic origin unless otherwise indicated by quoter. Any representations and/or certifications attached to this Request for Quotation must be completed by the quoter.

11. SCHEDULE (Include applicable Federal, State and local taxes)

ITEM NUMBER

(a)

SUPPLIES/SERVICES

(b)

QUANTITY

(c)

UNIT

(d)

UNIT PRICE

(e)

AMOUNT

(f)

12. DISCOUNT FOR PROMPT PAYMENT

a. 10 CALENDAR DAYS (%) b. 20 CALENDAR DAYS (%) c. 30 CALENDAR DAYS (%) d. CALENDAR DAYS

NUMBER PERCENTAGE

NOTE: Additional provisions and representations are are not attached.

13. NAME AND ADDRESS OF QUOTER

a. NAME OF QUOTER

b. STREET ADDRESS

c. COUNTY

d. CITY e. STATE f. ZIP CODE

14. SIGNATURE OF PERSON AUTHORIZED TO

SIGN QUOTATION

PAGE OF PAGES

1. REQUEST NUMBER 2. DATE ISSUED 3. REQUISITION/PURCHASE REQUEST NUMBER 4. CERT. FOR NAT. DEF.

UNDER BDSA REG. 2

AND/OR DMS REG. 1

RATING

5a. ISSUED BY 6. DELIVER BY (Date)

NAME TELEPHONE NUMBER

AREA CODE NUMBER

c. CITY

5b. FOR INFORMATION CALL (NO COLLECT CALLS)

301 Parker Avenue

NPS, MWR - MWRO MABO

601 Riverfront Drive Omaha NE 68102

0044043489140P6026Q0025

Bridget Parizek

800-7927 NPS, MWR, Fort Smith NHS

72902

05/27/2026

06/26/2026 1200 CD

90 Days After Notice to Proceed

Fort Smith

AR

FOSM - Replace Backflow Prevention

Assemblies

Request for quote for Replace Backflow

Prevention Assemblies Fort Smith

National Historic Site in Fort Smith, Arkansas.

NAICS: 237110, Water and Sewer Line and

Related Structures Construction, Small

Business Standard of $45M

Bonding: Payment Bond OR Irrevocable

Letter of Credit (100% of the contract value) due within 10 calendar days after award

Continued...

1 27

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGES

NAME OF OFFEROR OR CONTRACTOR

SUPPLIES/SERVICES

(B)

UNIT

(D)

UNIT PRICE

(E)

AMOUNT

(F)

OPTIONAL FORM 336 (4-86)

Sponsored by GSA FAR (48 CFR) 53.110

ITEM NO.

(A)

QUANTITY

(C)

NSN 7540-01-152-8067

140P6026Q0025

Site Visit: see 52.236-27 Site Visit

(Construction)

Contracting POC: Bridget Parizek, bridget_parizek@ios.doi.gov

00010 Replace Backflow Prevention Assemblies

Product/Service Code: Z2ND

Product/Service Description: REPAIR OR

ALTERATION

OF SEWAGE AND WASTE FACILITIES

Delivery: 90 Days After Notice to Proceed

Period of Performance: 08/01/2026 to

11/01/2026

140P6026Q0025 FOSM – Replace Backflow Prevention Assemblies Page 3 of 27

TABLE OF CONTENT

SECTION A – Solicitation/Contract Form Special Notice for Contractors Submitting Quotes SECTION B – Price/Bid Schedule SECTION C – Specifications/Drawings SECTION D - Packaging and Marking SECTION E - Inspection and Acceptance 52.246-12 -- Inspection of Construction. Inspection of Construction (Aug 1996) SECTION F - Deliveries or Performance 52.242-14 -- Suspension of Work (Apr 1984) SECTION G - Contract Administration Data 1452.201-70 Authorities and Delegations (Sep 2011) Electronic Invoicing and Payment Requirements - Invoice Processing Platform (IPP) (Feb 2021) Construction Contract Administration

COMPLIANCE WITH RECENT EXECUTIVE ORDERS 14148/14208

SECTION H - Special Contract Requirements Part II – Contract Clauses SECTION I - Contract Clauses 52.252-2 Clauses Incorporated by Reference (Feb 1998) 52.252-6 Authorized Deviations in Clauses (Nov 2020) 52.203-17 Contractor Employee Whistleblower Rights (Nov 2023) 52.203-19 Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements (Jan 2017) .10 52.204-10 Reporting Executive Compensation and First-Tier Subcontract Awards (Jun 2020) (DEVIATION Mar 2026) 52.204-13 System for Award Management Maintenance (Oct 2018) (DEVIATION Mar 2026) 52.204-19 Incorporation by Reference of Representations and Certifications (Dec 2014) 52.209-6 Protecting the Government's Interest When Subcontracting With Contractors Debarred, Suspended, Proposed for Debarment, or Voluntarily Excluded (Jan 2025) (DEVIATION May 2026) 52.209-10 Prohibition on Contracting with Inverted Domestic Corporations (Nov 2015) (DEVIATION May 2026) 52.215-8 Order of Precedence -- Uniform Contract Format (Oct 1997) DEVIATION DATE 52.219-6 Notice of Total Small Business Set-Aside (Mar 2020) (DEVIATION Jan 2026) 52.219-28 Post-Award Small Business Program Rerepresentation (Jan 2025) (DEVIATION Jan 2026) 52.222-1 Notice to the Government of Labor Disputes (Feb 1997) (DEVIATION May 2026) 52.222-3 Convict Labor (June 2003) (DEVIATION May 2026) 52.222-6 Construction Wage Rate Requirements (Aug 2018) (DEVIATION May 2026) 52.222-7 Withholding of Funds (May 2014) (DEVIATION May 2026) 52.222-8 Payrolls and Basic Records (Jul 2021) (DEVIATION May 2026) 52.222-9 Apprentices and Trainees (Jul 2005) (DEVIATION May 2026) 52.222-10 Compliance with Copeland Act Requirements (Feb 1988) (DEVIATION May 2026) 52.222-11 Subcontracts (Labor Standards) (May 2014) (DEVIATION May 2026) 52.222-12 Contract Termination-Debarment (May 2014) (DEVIATION May 2026) 52.222-13 Compliance with Construction Wage Rate Requirements and Related Regulations (May 2014) 52.222-14 Disputes Concerning Labor Standards (Feb 1988) (DEVIATION May 2026) 52.222-15 Certification of Eligibility (May 2014) 52.222-50 Combating Trafficking in Persons (Oct 2025) (DEVIATION May 2026) 52.222-55 Minimum Wages Under Executive Order 14026 (Jan 2022) (DEVIATION May 2026) 52.222-62 Paid Sick Leave Under Executive Order 13706 (Jan 2022) (DEVIATION May 2026) 52.222-90 Addressing DEI Discrimination by Federal Contractors (Mar 2026) (DEVIATION May 2026) 52.225-1 Buy American-Supplies (Oct 2022) DEVIATION DATE 52.226-7 Drug-Free Workplace (May 2024) 52.226-8 Encouraging Contractor Policies to Ban Text Messaging While Driving (May 2024) 52.227-1 Authorization and Consent (Jun 2020) 52.227-2 Notice and Assistance Regarding Patent and Copyright Infringement (Jun 2020) 52.227-4 Patent Indemnity- Construction Contracts (Dec 2007) 52.228-2 Additional Bond Security (Oct 1997) 52.228-11 Individual Surety - Pledges of Assets (Feb 2021) (DEVIATION May 2023)

140P6026Q0025 FOSM – Replace Backflow Prevention Assemblies Page 4 of 27

52.228-14 Irrevocable Letter of Credit (Nov 2014) 52.228-15 Performance and Payment Bonds- Construction (Jun 2020) (DEVIATION May 2023) 52.229-12 Tax on Certain Foreign Procurements (Feb 2021) (DEVIATION Oct 2025) 52.232-5 Payments under Fixed-Price Construction Contracts (May 2014) 52.232-23 Assignment of Claims (May 2014) 52.232-27 Prompt Payment for Construction Contracts (Jan 2017) 52.232-33 Payment by Electronic Funds Transfer - System for Award Management (Oct 2018) 52.232-40 Providing Accelerated Payments to Small Business Subcontractors (Mar 2023) 52.233-1 Disputes (May 2014) DEVIATION DATE 52.233-3 Protest after Award (Aug 1996) DEVIATION DATE 52.233-4 Applicable Law for Breach of Contract Claim (Oct 2004) DEVIATION DATE 52.236-5 Material and Workmanship (Apr 1984) (DEVIATION Jan 2026) 52.236-7 Permits and Responsibilities (Nov 1991) (DEVIATION Jan 2026) 52.236-14 Availability and Use of Utility Services (Apr 1984) (DEVIATION Jan 2026) 52.240-91 Security Prohibitions and Exclusions (Dec 2025) (DEVIATION Mar 2026) 52.240-93 Basic Safeguarding of Covered Contractor Information Systems (Dec 2025) (DEVIATION Mar 2026) 52.243-5 Changes and Changed Conditions (Apr 1984) (DEVIATION Oct 2025) 52.246-21 Warranty of Construction (Mar 1994) 52.249-1 Termination for Convenience of the Government (Fixed-Price) (Short Form) (Apr 1984) 52.249-10 Default (Fixed-Price Construction) (Apr 1984) 52.253-1 Computer Generated Forms (Jan 1991)

CLAUSES INCORPORATED BY FULL TEXT

1452.203-70 -- Restrictions on Endorsements (Jul 1996) 1452.204-70 -- Release of Claims – Department of Interior (Jul 1996) 1452.228-70 -- Liability Insurance—Department of the Interior (Jul 1996) 52.213-4 – Terms and Conditions – Simplified Acquisitions (Noncommercial) (Mar 2026) (DEVIATION Mar 2026) 52.225-9 -- Buy American–Construction Materials (Oct 2022) DEVIATION DATE 52.228-13 -- Alternative Payment Protections (Jul 2000) SECTION J – List of Attachments Part IV – Representations and Instructions SECTION K - Representations, Certifications, and Other Statements of Offerors 52.252-1 Solicitation Provisions Incorporated by Reference (Feb 1998) 52.252-5 Authorized Deviations in Provisions (Nov 2020) 52.203-18 Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements - Representation (Jan 2017) 52.229-11 Tax on Certain Foreign Procurements—Notice and Representation (Jun 2020) (DEVIATION Oct 2025)

PROVISIONS INCORPORATED BY FULL TEXT

52.209-11 Representation by Corporations Regarding Delinquent Tax Liability or a Felony Conviction under any Federal Law (Feb 2016) (DEVIATION May 2026) 52.209-13 Violation of Arms Control Treaties or Agreements – Certification (Nov 2021) (DEVIATION May 2026) SECTION L - Instructions, Conditions, and Notices to Offerors 52.252-1 Solicitation Provisions Incorporated by Reference (Feb 1998) 52.214-34 Submission of Offers in the English Language (Apr 1991) 52.214-35 Submission of Offers in U.S. Currency (Apr 1991)

PROVISIONS INCORPORATED BY FULL TEXT

52.216-1 – Type of Contract (Apr 1984) DEVIATION DATE 52.222-5 -- Construction Wage Rate Requirements—Secondary Site of the Work (May 2014) (DEVIATION May 2026) 52.225-10 -- Notice of Buy American Requirement--Construction Materials (May 2014) 52.233-2 Service of Protest Department of the Interior (Sep 2006) (DEVIATION) (Jul 1996) 52.237-1 – Site Visit (Apr 1984)

INSTRUCTIONS, CONDITIONS AND NOTICES TO OFFERORS OR RESPONDENTS

SECTION M – EVALUATION FACTORS FOR AWARD

Part I – The Schedule

140P6026Q0025 FOSM – Replace Backflow Prevention Assemblies Page 5 of 27

SECTION A – Solicitation/Contract Form

This solicitation is a Request for Quote (RFQ), in accordance with the Specifications/Drawings and is issued on Standard Form SF18. Award of this contract will be made according to FAR Part 13 Simplified Acquisition Procedures. All references to “proposal” or “bid” in this solicitation shall be understood to mean “quotation.” The Government will evaluate all Quotations in an impartial manner and consideration will be given to those with the highest perceived value to the government based on responses to the evaluation factors identified in Section M.

Special Notice for Contractors Submitting Quotes Signing of the offer shall be deemed to be a representation by the quoter that contractor owns, operates, or maintains a place of business, regularly engaged in construction projects that include having staff with experience required to perform the work described in this solicitation. Quoted price must include all materials/labor/work/taxes to complete work outlined in the Specifications.

SECTION B – Price/Bid Schedule

Quote pricing shall be provided in accordance with Section L and is incorporated herein.

CLIN CLIN TITLE QUANTITY UNIT OF

MEASURE

PRICE

10 Backflow Preventer & Sewer Relining

1 Lump Sum $

TOTAL: $

SECTION C – Specifications/Drawings

Project work consists of replacing two commercial backflow preventers and installation of heated enclosures to ensure freeze protection. Additional requirements information is provided in the solicitation, specifications, supporting documents and other pertinent attachments.

“Specifications and other supporting documents are attached and incorporated herein. Refer to SECTION J.”

SECTION D - Packaging and Marking

No clauses included

SECTION E - Inspection and Acceptance

52.246-12 -- Inspection of Construction. Inspection of Construction (Aug 1996)

(a) Definition. “Work” includes, but is not limited to, materials, workmanship, and manufacture and fabrication of components.

(b) The Contractor shall maintain an adequate inspection system and perform such inspections as will ensure that the work performed under the contract conforms to contract requirements. The Contractor shall maintain complete inspection records and make them available to the Government. All work shall be conducted under the general direction of the Contracting Officer and is subject to Government inspection and test at all places and at all reasonable times before acceptance to ensure strict compliance with the terms of the contract.

(c) Government inspections and tests are for the sole benefit of the Government and do not --

140P6026Q0025 FOSM – Replace Backflow Prevention Assemblies Page 6 of 27

(1) Relieve the Contractor of responsibility for providing adequate quality control measures;

(2) Relieve the Contractor of responsibility for damage to or loss of the material before acceptance;

(3) Constitute or imply acceptance; or

(4) Affect the continuing rights of the Government after acceptance of the completed work under paragraph

(i) of this section.

(d) The presence or absence of a Government inspector does not relieve the Contractor from any contract requirement, nor is the inspector authorized to change any term or condition of the specification without the Contracting Officer’s written authorization.

(e) The Contractor shall promptly furnish, at no increase in contract price, all facilities, labor, and material reasonably needed for performing such safe and convenient inspections and tests as may be required by the Contracting Officer. The Government may charge to the Contractor any additional cost of inspection or test when work is not ready at the time specified by the Contractor for inspection or test, or when prior rejection makes reinspection or retest necessary. The Government shall perform all inspections and tests in a manner that will not unnecessarily delay the work. Special, full size, and performance tests shall be performed as described in the contract.

(f) The Contractor shall, without charge, replace or correct work found by the Government not to conform to contract requirements, unless in the public interest the Government consents to accept the work with an appropriate adjustment in contract price. The Contractor shall promptly segregate and remove rejected material from the premises.

(g) If the Contractor does not promptly replace or correct rejected work, the Government may --

(1) By contract or otherwise, replace or correct the work and charge the cost to the Contractor; or

(2) Terminate for default the Contractor’s right to proceed.

(h) If, before acceptance of the entire work, the Government decides to examine already completed work by removing it or tearing it out, the Contractor, on request, shall promptly furnish all necessary facilities, labor, and material. If the work is found to be defective or nonconforming in any material respect due to the fault of the Contractor or its subcontractors, the Contractor shall defray the expenses of the examination and of satisfactory reconstruction. However, if the work is found to meet contract requirements, the Contracting Officer shall make an equitable adjustment for the additional services involved in the examination and reconstruction, including, if completion of the work was thereby delayed, an extension of time.

(i) Unless otherwise specified in the contract, the Government shall accept, as promptly as practicable after completion and inspection, all work required by the contract or that portion of the work the Contracting Officer determines can be accepted separately. Acceptance shall be final and conclusive except for latent defects, fraud, gross mistakes amounting to fraud, or the Government’s rights under any warranty or guarantee.

(End of clause)

SECTION F - Deliveries or Performance

Work shall be completed by skilled personnel per industry standards and manufacturer specifications.

52.242-14 -- Suspension of Work (Apr 1984)

140P6026Q0025 FOSM – Replace Backflow Prevention Assemblies Page 7 of 27

(a) The Contracting Officer may order the Contractor, in writing, to suspend, delay, or interrupt all or any part of the work of this contract for the period of time that the Contracting Officer determines appropriate for the convenience of the Government.

(b) If the performance of all or any part of the work is, for an unreasonable period of time, suspended, delayed, or interrupted (1) by an act of the Contracting Officer in the administration of this contract, or (2) by the Contracting Officer's failure to act within the time specified in this contract (or within a reasonable time if not specified), an adjustment shall be made for any increase in the cost of performance of this contract (excluding profit) necessarily caused by the unreasonable suspension, delay, or interruption, and the contract modified in writing accordingly.

However, no adjustment shall be made under this clause for any suspension, delay, or interruption to the extent that performance would have been so suspended, delayed, or interrupted by any other cause, including the fault or negligence of the Contractor, or for which an equitable adjustment is provided for or excluded under any other term or condition of this contract.

(c) A claim under this clause shall not be allowed—

(1) For any costs incurred more than 20 days before the Contractor shall have notified the Contracting Officer in writing of the act or failure to act involved (but this requirement shall not apply as to a claim resulting from a suspension order); and

(2) Unless the claim, in an amount stated, is asserted in writing as soon as practicable after the termination of the suspension, delay, or interruption, but not later than the date of final payment under the contract.

(End of clause)

SECTION G - Contract Administration Data

(a) Contact Information:

The Contracting Specialist administrating the Contract:

Bridget Parizek Contract Specialist National Park Service Telephone No. (402) 800-7927 Email: bridget_parizek@ios.doi.gov

(b) The Contracting Officer (CO) is the only person authorized to approve changes or modify any of the requirements under this contract and notwithstanding any provisions contained elsewhere in this contract, the said authority remains solely with the CO. In the event the contractor effects any such change at the direction of any person other than the CO, the change will be considered made without authority and no adjustment will be made in the contract price to cover increase in costs incurred as a result thereof.

(c) Contractual problems, of any nature, which might occur during the life of the contract, must be handled in conformance with very specific public laws and regulations (e.g., Federal Acquisition Regulation), and must be referred to the CO for resolution. Only the CO is authorized to formally resolve such problems. Therefore, the contractor is hereby directed to bring all such contractual problems to the immediate attention of the CO.

(d) Any request for contract changes/modifications shall be submitted to the CO.

(e) The contractor and the Government may agree to perform a no-cost field change. Field changes are made when the change appears to be mutually beneficial to all parties and would not require changing the negotiated line items.

All field changes must be approved by the CO prior to execution.

(f) All correspondence concerning this contract, such as requests for information (RFI), explanation of terms, and contract interpretation, shall be submitted to the CO.

mailto:bridget_parizek@ios.doi.gov

140P6026Q0025 FOSM – Replace Backflow Prevention Assemblies Page 8 of 27

FINAL PAYMENT

Final payment will be made only after receipt of all payrolls to include subcontractors, SF 1413 Statement of Acknowledgement for each subcontractor, project schedule, updated progress reports, material submittals, test reports, as-built drawings, warranty of construction, release of claims and any other documents requested by the contracting office as applicable. Contractor must provide a signed copy of the 'Release of Claims' to the Contract Administrator upon submittal of final invoice.

AVAILABILITY OF UTILITIES SERVICES

Notwithstanding the provisions of contract clause FAR 52.236-14, Availability and Use of Utility Services, all reasonable required amounts of water, gas, electricity, etc., essential to contract performance shall be made available, at no cost to the contractor, from existing systems, outlets, and supplies. All temporary connections, outlets, and distribution lines as may be required will be installed by the contractor at the contractor's own expense.

UTILITIES CONSERVATION

The contractor will be required to participate in government energy conservation programs. For the purpose of this contract, utilities such as water, electricity, etc., will be furnished by the government at no cost to the contractor.

OCCUPATIONAL SAFETY AND HEALTH ACT (OSHA) INSPECTIONS

The contractor shall be subject to inspections under the OCCUPATIONAL SAFETY AND HEALTH ACT (OSHA) program by inspectors of the Department of Labor.

INTERIM AND FINAL INSPECTIONS

1. Prior to covering, enclosing, or hiding any of type work, the Contractor must contact the Government representative to perform an interim inspection. Failure to contact the Government representative perform an interim inspection prior to concealment may result in the Contractor being required to uncover performed work sufficiently to allow for proper inspection.

2. When ready for final inspection, the Contractor shall notify the CO and COR, requesting a final inspection in writing to the CO. The final inspection shall normally be requested a minimum of three (3) calendar days before the desired date or as otherwise negotiated with the Contracting Officer.

3. The final inspection will be onsite with the Contractor, the Contracting Officer’s Representative, and Contract Specialist/Contracting Officer (when possible).

1452.201-70 Authorities and Delegations (Sep 2011)

(a) The Contracting Officer is the only individual authorized to enter into or terminate this contract, modify any term or condition of this contract, waive any requirement of this contract, or accept nonconforming work.

(b) The Contracting Officer will designate a Contracting Officer's Representative (COR) at time of award. The COR will be responsible for technical monitoring of the contractor's performance and deliveries. The COR will be appointed in writing, and a copy of the appointment will be furnished to the Contractor. Changes to this delegation will be made by written changes to the existing appointment or by issuance of a new appointment.

The COR for this contract will be:

(c) The COR is not authorized to perform, formally or informally, any of the following actions:

(1) Promise, award, agree to award, or execute any contract, contract modification, or notice of intent that changes or may change this contract;

(2) Waive or agree to modification of the delivery schedule;

(3) Make any final decision on any contract matter subject to the Disputes Clause;

(4) Terminate, for any reason, the Contractor's right to proceed;

140P6026Q0025 FOSM – Replace Backflow Prevention Assemblies Page 9 of 27

(5) Obligate in any way, the payment of money by the Government.

(d) The Contractor shall comply with the written or oral direction of the Contracting Officer or authorized representative(s) acting within the scope and authority of the appointment memorandum. The Contractor need not proceed with direction that it considers to have been issued without proper authority. The Contractor shall notify the Contracting Officer in writing, with as much detail as possible, when the COR has taken an action or has issued direction (written or oral) that the Contractor considers to exceed the COR’s appointment, within 3 days of the occurrence. Unless otherwise provided in this contract, the Contractor assumes all costs, risks, liabilities, and consequences of performing any work it is directed to perform that falls within any of the categories defined in paragraph (c) prior to receipt of the Contracting Officer's response issued under paragraph (e) of this clause.

(e) The Contracting Officer shall respond in writing within 30 days to any notice made under paragraph (d) of this clause. A failure of the parties to agree upon the nature of a direction, or upon the contract action to be taken with respect thereto, shall be subject to the provisions of the Disputes clause of this contract.

(f) The Contractor shall provide copies of all correspondence to the Contracting Officer and the COR.

(g) Any action(s) taken by the Contractor, in response to any direction given by any person acting on behalf of the Government or any Government official other than the Contracting Officer or the COR acting within his or her appointment, shall be at the Contractor’s risk.

(End of Local Clause)

Electronic Invoicing and Payment Requirements - Invoice Processing Platform (IPP) (Feb 2021)

Payment requests must be submitted electronically through the U. S. Department of the Treasury's Invoice Processing Platform System (IPP).

"Payment request" means any request for contract financing payment or invoice payment by the Contractor. To constitute a proper invoice, the payment request must comply with the requirements identified in the applicable Prompt Payment clause included in the contract, or the clause 52.212-4 Contract Terms and Conditions - Commercial Items included in commercial item contracts. The IPP website address is: https://www.ipp.gov.

Under this contract, the following documents are required to be submitted as an attachment to the IPP invoice:

1. Copy of vendor invoice document in PDF format, completed on the pay application document provided by contracting, which shows pricing breakdown for all line items. Once all signatures (Contractor’s / COR / CO) and approvals are completed on the pay application, the vendor can then upload this document into IPP as their invoice attachment.

The Contractor must use the IPP website to register access and use IPP for submitting requests for payment. The Contractor Government Business Point of Contact (as listed in SAM) will receive enrollment instructions via email from the Federal Reserve Bank of St. Louis (FRBSTL) within 3 - 5 business days of the contract award date.

Contractor assistance with enrollment can be obtained by contacting the IPP Production Helpdesk via email IPPCustomerSupport@fiscal.treasury.gov or phone (866) 973-3131.

If the Contractor is unable to comply with the requirement to use IPP for submitting invoices for payment, the Contractor must submit a waiver request in writing to the Contracting Officer with its proposal or quotation.

(End of clause)

Construction Contract Administration

Federal Acquisition Regulation (FAR) 36.211(b) and RFO FAR 36.101-4 requires agencies provide description of policies and procedures that apply to definitization of equitable adjustments for change orders under construction contracts and data on the time required to definitize equitable adjustments for change orders under construction contracts. This information can be found at: FAR Overhaul - Part 36 | Acquisition.GOV https://www.ipp.gov/ mailto:IPPCustomerSupport@fiscal.treasury.gov https://www.acquisition.gov/far-overhaul/far-part-deviation-guide/far-overhaul-part-36

140P6026Q0025 FOSM – Replace Backflow Prevention Assemblies Page 10 of 27

COMPLIANCE WITH RECENT EXECUTIVE ORDERS 14148/14208

System updates may lag policy updates. The System for Award Management (SAM) may continue to require entities to complete representations based on provisions that are not included in agency solicitations, including 52.223-22, Public Disclosure of Greenhouse Gas Emissions and Reduction Goals—Representation, and paragraph

(t) of 52.212-3, Offeror Representations and Certifications—Commercial Products and Commercial Services.

Agencies will not consider or use these representations. Entities are not required to, nor are they able to, update their entity registration to remove these representations in SAM.

SECTION H - Special Contract Requirements

GREEN PROCUREMENT

To the extent that the construction services provided by the Contractor require provision of any of the types of products listed at https://sftool.gov/greenprocurement, the Contractor is expected to provide the green type of product unless that type of product is not available competitively within a reasonable time, at a reasonable price, is not life cycle cost efficient in the case of energy consuming products, or does not meet reasonable performance standards.

Part II – Contract Clauses

SECTION I - Contract Clauses

52.252-2 Clauses Incorporated by Reference (Feb 1998)

This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address (es): www.acquisition.gov

(End of clause)

52.252-6 Authorized Deviations in Clauses (Nov 2020)

As prescribed in 52.107(f), insert the following clause in solicitations and contracts that include any FAR or supplemental clause with an authorized deviation. Whenever any FAR or supplemental clause is used with an authorized deviation, the contracting officer shall identify it by the same number, title, and date assigned to the clause when it is used without deviation, include regulation name for any supplemental clause, except that the contracting officer shall insert "(DEVIATION)" after the date of the clause.

Authorized Deviations in Clauses (Nov 2020)

(a) The use in this solicitation or contract of any Federal Acquisition Regulation (48 CFR Chapter 1) clause with an authorized deviation is indicated by the addition of "(DEVIATION)" after the date of the clause.

(b) The use in this solicitation or contract of any Department of Interior Acquisition Regulation (48 CFR Chapter

14) clause with an authorized deviation is indicated by the addition of "(DEVIATION)" after the name of the regulation.

(End of clause)

52.203-17 Contractor Employee Whistleblower Rights (Nov 2023) 52.203-19 Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements (Jan 2017) 52.204-10 Reporting Executive Compensation and First-Tier Subcontract Awards (Jun 2020) (DEVIATION Mar 2026) https://sftool.gov/greenprocurement http://www.acquisition.gov/ https://www.acquisition.gov/far/part-52#FAR_52_107

140P6026Q0025 FOSM – Replace Backflow Prevention Assemblies Page 11 of 27

52.204-13 System for Award Management Maintenance (Oct 2018) (DEVIATION Mar 2026) 52.204-19 Incorporation by Reference of Representations and Certifications (Dec 2014) 52.209-6 Protecting the Government's Interest When Subcontracting With Contractors Debarred, Suspended, Proposed for Debarment, or Voluntarily Excluded (Jan 2025) (DEVIATION May 2026) 52.209-10 Prohibition on Contracting with Inverted Domestic Corporations (Nov 2015) (DEVIATION May 2026) 52.215-8 Order of Precedence -- Uniform Contract Format (Oct 1997) DEVIATION DATE 52.219-6 Notice of Total Small Business Set-Aside (Mar 2020) (DEVIATION Jan 2026) 52.219-28 Post-Award Small Business Program Rerepresentation (Jan 2025) (DEVIATION Jan 2026) 52.222-1 Notice to the Government of Labor Disputes (Feb 1997) (DEVIATION May 2026) 52.222-3 Convict Labor (June 2003) (DEVIATION May 2026) 52.222-6 Construction Wage Rate Requirements (Aug 2018) (DEVIATION May 2026) 52.222-7 Withholding of Funds (May 2014) (DEVIATION May 2026) 52.222-8 Payrolls and Basic Records (Jul 2021) (DEVIATION May 2026) 52.222-9 Apprentices and Trainees (Jul 2005) (DEVIATION May 2026) 52.222-10 Compliance with Copeland Act Requirements (Feb 1988) (DEVIATION May 2026) 52.222-11 Subcontracts (Labor Standards) (May 2014) (DEVIATION May 2026) 52.222-12 Contract Termination-Debarment (May 2014) (DEVIATION May 2026) 52.222-13 Compliance with Construction Wage Rate Requirements and Related Regulations (May 2014) 52.222-14 Disputes Concerning Labor Standards (Feb 1988) (DEVIATION May 2026) 52.222-15 Certification of Eligibility (May 2014) 52.222-50 Combating Trafficking in Persons (Oct 2025) (DEVIATION May 2026) 52.222-55 Minimum Wages Under Executive Order 14026 (Jan 2022) (DEVIATION May 2026) 52.222-62 Paid Sick Leave Under Executive Order 13706 (Jan 2022) (DEVIATION May 2026) 52.222-90 Addressing DEI Discrimination by Federal Contractors (Mar 2026) (DEVIATION May 2026) 52.225-1 Buy American-Supplies (Oct 2022) DEVIATION DATE 52.226-7 Drug-Free Workplace (May 2024) 52.226-8 Encouraging Contractor Policies to Ban Text Messaging While Driving (May 2024) 52.227-1 Authorization and Consent (Jun 2020) 52.227-2 Notice and Assistance Regarding Patent and Copyright Infringement (Jun 2020) 52.227-4 Patent Indemnity- Construction Contracts (Dec 2007) 52.228-2 Additional Bond Security (Oct 1997) 52.228-11 Individual Surety - Pledges of Assets (Feb 2021) (DEVIATION May 2023) 52.228-14 Irrevocable Letter of Credit (Nov 2014) 52.228-15 Performance and Payment Bonds- Construction (Jun 2020) (DEVIATION May 2023) 52.229-12 Tax on Certain Foreign Procurements (Feb 2021) (DEVIATION Oct 2025) 52.232-5 Payments under Fixed-Price Construction Contracts (May 2014) 52.232-23 Assignment of Claims (May 2014) 52.232-27 Prompt Payment for Construction Contracts (Jan 2017) 52.232-33 Payment by Electronic Funds Transfer - System for Award Management (Oct 2018) 52.232-40 Providing Accelerated Payments to Small Business Subcontractors (Mar 2023) 52.233-1 Disputes (May 2014) DEVIATION DATE 52.233-3 Protest after Award (Aug 1996) DEVIATION DATE 52.233-4 Applicable Law for Breach of Contract Claim (Oct 2004) DEVIATION DATE 52.236-5 Material and Workmanship (Apr 1984) (DEVIATION Jan 2026) 52.236-7 Permits and Responsibilities (Nov 1991) (DEVIATION Jan 2026) 52.236-14 Availability and Use of Utility Services (Apr 1984) (DEVIATION Jan 2026) 52.240-91 Security Prohibitions and Exclusions (Dec 2025) (DEVIATION Mar 2026) 52.240-93 Basic Safeguarding of Covered Contractor Information Systems (Dec 2025) (DEVIATION Mar 2026) 52.243-5 Changes and Changed Conditions (Apr 1984) (DEVIATION Oct 2025) 52.246-21 Warranty of Construction (Mar 1994) 52.249-1 Termination for Convenience of the Government (Fixed-Price) (Short Form) (Apr 1984) 52.249-10 Default (Fixed-Price Construction) (Apr 1984) 52.253-1 Computer Generated Forms (Jan 1991)

CLAUSES INCORPORATED BY FULL TEXT

140P6026Q0025 FOSM – Replace Backflow Prevention Assemblies Page 12 of 27

1452.203-70 -- Restrictions on Endorsements (Jul 1996)

Restriction on Endorsements—Department of the Interior

The Contractor shall not refer to contracts awarded by the Department of the Interior in commercial advertising, as defined in FAR 31.205–1, in a manner which states or implies that the product or service provided is approved or endorsed by the Government, or is considered by the Government to be superior to other products or services. This restriction is intended to avoid the appearance of preference by the Government toward any product or service. The Contractor may request the Contracting Officer to make a determination as to the propriety of promotional material.

(End of clause)

1452.204-70 -- Release of Claims – Department of Interior (Jul 1996)

Release of Claims—Department of the Interior

After completion of work and prior to final payment, the Contractor shall furnish the Contracting Officer with a release of claims against the United States relating to this contract. The Release of Claims form (DI–137) shall be used for this purpose. The form provides for exception of specified claims from operation of the release.

(End of clause)

1452.228-70 -- Liability Insurance—Department of the Interior (Jul 1996)

(a) The Contractor shall procure and maintain during the term of this contract and any extension thereof liability insurance in form satisfactory to the Contracting Officer by an insurance company which is acceptable to the Contracting Officer. The named insured parties under the policy shall be the Contractor and the United States of America. The amounts of the insurance shall be not less than as follows:

$100,000.00 each person

$500,000.00 each occurrence

$500,000.00 property damage

(b) Each policy shall have a certificate evidencing the insurance coverage. The insurance company shall provide an endorsement to notify the Contracting Officer 30 days prior to the effective date of cancellation or termination of the policy or certificate; or modification of the policy or certificate which may adversely affect the interest of the Government in such insurance. The certificate shall identify the contract number, the name and address of the Contracting Officer, as well as the insured, the policy number and a brief description of contract services to be performed. The contractor shall furnish the Contracting Officer with a copy of an acceptable insurance certificate prior to beginning the work.

(End of clause)

52.213-4 – Terms and Conditions – Simplified Acquisitions (Noncommercial) (Mar 2026) (DEVIATION Mar 2026)

(a) Inspection/Acceptance. The Contractor shall only tender for acceptance those items that conform to the requirements of this contract. The Government reserves the right to inspect or test any supplies or services that have been tendered for acceptance. The Government may require repair or replacement of nonconforming supplies or reperformance of nonconforming services at no increase in contract price. If repair/replacement or reperformance will not correct the defects or is not possible, the Government may seek an equitable price reduction or adequate consideration for acceptance of nonconforming supplies or services. The Government must exercise its post acceptance rights—

140P6026Q0025 FOSM – Replace Backflow Prevention Assemblies Page 13 of 27

(1) Within a reasonable period of time after the defect was discovered or should have been discovered; and

(2) Before any substantial change occurs in the condition of the item, unless the change is due to the defect in the item.

(b) Excusable delays. The Contractor shall be liable for default unless nonperformance is caused by an occurrence beyond the reasonable control of the Contractor and without its fault or negligence. Examples of occurrences include acts of God or the public enemy, acts of the Government in either its sovereign or contractual capacity, fires, floods, epidemics, quarantine restrictions, strikes, unusually severe weather, and delays of common carriers. When an excusable delay occurs, the Contractor shall—

(1) Notify the Contracting Officer in writing as soon as possible;

(2) Remedy the delay as quickly as possible; and

(3) Notify the Contracting Officer when the occurrence is over.

(c) Termination for the Government’s convenience. The Government reserves the right to terminate this contract, or any part hereof, for its sole convenience. In the event of such termination, the Contractor shall immediately stop all work and shall immediately cause any and all of its suppliers and subcontractors to cease work. Subject to the terms of this contract, the Contractor shall be paid a percentage of the contract price reflecting the percentage of the work performed prior to the notice of termination, plus reasonable charges the Contractor can demonstrate to the satisfaction of the Government using its standard record keeping system, have resulted from the termination. The Contractor shall not be required to comply with the cost accounting standards or contract cost principles for this purpose. This paragraph does not give the Government any right to audit the Contractor’s records. The Contractor shall not be paid for any work performed or costs incurred which reasonably could have been avoided.

(d) Termination for cause. The Government may terminate this contract, or any part hereof, for cause in the event of any default by the Contractor, or if the Contractor fails to comply with any contract terms and conditions, or fails to provide the Government, upon request, with adequate assurances of future performance. The Government will send a cure notice to the Contractor, unless the reason for the termination is late delivery. In the event of termination for cause, the Government shall not be liable to the Contractor for any amount for supplies or services not accepted, and the Contractor shall be liable to the Government for any and all rights and remedies provided by law. If it is determined that the Government improperly terminated this contract for default, such termination shall be deemed a termination for convenience.

(e) Warranty. The Contractor warrants and implies that the items delivered hereunder are merchantable and fit for use for the particular purpose described in this contract.

(End of clause)

52.225-9 -- Buy American–Construction Materials (Oct 2022) DEVIATION DATE

(a) Definitions. As used in this clause—

Commercially available off-the-shelf (COTS) item—

(1) Means any item of supply (including construction material) that is–

(i) A commercial product (as defined in paragraph (1) of the definition of “commercial product” at Federal Acquisition Regulation (FAR) 2.101);

(ii) Sold in substantial quantities in the commercial marketplace; and

140P6026Q0025 FOSM – Replace Backflow Prevention Assemblies Page 14 of 27

(iii) Offered to the Government, under a contract or subcontract at any tier, without modification, in the same form in which it is sold in the commercial marketplace; and

(2) Does not include bulk cargo, as defined in 46 U.S.C. 40102(4), such as agricultural products and petroleum products.

"Construction material" means an article, material, or supply brought to the construction site by the Contractor or a subcontractor for incorporation into the building or work. The term also includes an item brought to the site preassembled from articles, materials, or supplies. However, emergency life safety systems, such as emergency lighting, fire alarm, and audio evacuation systems, that are discrete systems incorporated into a public building or work and that are produced as complete systems, are evaluated as a single and distinct construction material regardless of when or how the individual parts or components of those systems are delivered to the construction site.

Materials purchased directly by the Government are supplies, not construction material.

Cost of components means—

(1) For components purchased by the Contractor, the acquisition cost, including transportation costs to the place of incorporation into the construction material (whether or not such costs are paid to a domestic firm), and any applicable duty (whether or not a duty-free entry certificate is issued); or

(2) For components manufactured by the Contractor, all costs associated with the manufacture of the component, including transportation costs as described in paragraph (1) of this definition, plus allocable overhead costs, but excluding profit. Cost of components does not include any costs associated with the manufacture of the construction material.

Critical component means a component that is mined, produced, or manufactured in the United States and deemed critical to the U.S. supply chain. The list of critical components is at FAR 25.105.

Critical item means a domestic construction material or domestic end product that is deemed critical to U.S. supply chain resiliency. The list of critical items is at FAR 25.105.

Domestic construction material means—

(1) For construction material that does not consist wholly or predominantly of iron or steel or a combination of both-

(i) An unmanufactured construction material mined or produced in the United States; or

(ii) A construction material manufactured in the United States, if–

(A) The cost of its components mined, produced, or manufactured in the United States exceeds 60 percent of the cost of all its components, except that the percentage will be 65 percent for items delivered in calendar years 2024 through 2028 and 75 percent for items delivered starting in calendar year 2029. Components of foreign origin of the same class or kind for which nonavailability determinations have been made are treated as domestic. Components of unknown origin are treated as foreign; or

(B) The construction material is a COTS item; or

(2) For construction material that consists wholly or predominantly of iron or steel or a combination of both, a construction material manufactured in the United States if the cost of foreign iron and steel constitutes less than 5 percent of the cost of all components used in such construction material. The cost of foreign iron and steel includes but is not limited to the cost of foreign iron or steel mill products (such as bar, billet, slab, wire, plate, or sheet), castings, or forgings utilized in the manufacture of the construction material and a good faith estimate of the cost of all foreign iron or steel components excluding COTS fasteners. Iron or steel components of unknown origin are treated as foreign. If the construction material contains multiple components, the cost of all the materials used in such construction material is calculated in accordance with the definition of "cost of components".

http://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title46-section40102(4)&num=0&edition=prelim

140P6026Q0025 FOSM – Replace Backflow Prevention Assemblies Page 15 of 27

Fastener means a hardware device that mechanically joins or affixes two or more objects together. Examples of fasteners are nuts, bolts, pins, rivets, nails, clips, and screws.

Foreign construction material means a construction material other than a domestic construction material.

Foreign iron and steel means iron or steel products not produced in the United States. Produced in the United States means that all manufacturing processes of the iron or steel must take place in the United States, from the initial melting stage through the application of coatings, except metallurgical processes involving refinement of steel additives. The origin of the elements of the iron or steel is not relevant to the determination of whether it is domestic or foreign.

Predominantly of iron or steel or a combination of both means that the cost of the iron and steel content exceeds 50 percent of the total cost of all its components. The cost of iron and steel is the cost of the iron or steel mill products (such as bar, billet, slab, wire, plate, or sheet), castings, or forgings utilized in the manufacture of the product and a good faith estimate of the cost of iron or steel components excluding COTS fasteners.

Steel means an alloy that includes at least 50 percent iron, between 0.02 and 2 percent carbon, and may include other elements.

"United States" means the 50 States, the District of Columbia, and outlying areas.

(b) Domestic preference.

(1) This clause implements 41 U.S.C. chapter 83, Buy American, by providing a preference for domestic construction material. In accordance with 41 U.S.C. 1907, the domestic content test of the Buy American statute is waived for construction material that is a COTS item, except that for construction material that consists wholly or predominantly of iron or steel or a combination of both, the domestic content test is applied only to the iron and steel content of the construction materials, excluding COTS fasteners. The Contractor shall use only domestic construction material in performing this contract, except as provided in paragraphs (b)(2) and (b)(3) of this clause.

(2) This requirement does not apply to information technology that is a commercial product or to the construction materials or components listed by the Government as follows: NONE

________________________________________________[Contracting Officer to list applicable excepted materials or indicate "none"]

(3) The Contracting Officer may add other foreign construction material to the list in paragraph (b)(2) of this clause if the Government determines that-

(i) The cost of domestic construction material would be unreasonable.

(A) For domestic construction material that is not a critical item or does not contain critical components.

(1) The cost of a particular domestic construction material subject to the requirements of the Buy American statute is unreasonable when the cost of such material exceeds the cost of foreign material by more than 20 percent;

(2) For construction material that is not a COTS item and does not consist wholly or predominantly of iron or steel or a combination of both, if the cost of a particular domestic construction material is determined to be unreasonable or there is no domestic offer received, and the low offer is for foreign construction material that is manufactured in the United States and does not exceed 55 percent domestic content, the Contracting Officer will treat the lowest offer of foreign construction material that exceeds 55 percent domestic content as a domestic offer and determine whether the cost of that offer is unreasonable by applying the evaluation factor listed in paragraph (b)(3)(i)(A)(1) of this clause.

http://uscode.house.gov/view.xhtml?req=granuleid%3AUSC-prelim-title41-chapter83&saved=%7CZ3JhbnVsZWlkOlVTQy1wcmVsaW0tdGl0bGU0MC1jaGFwdGVyMzctZnJvbnQ%3D%7C%7C%7C0%7Cfalse%7Cprelim&edition=prelim http://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title41-section1907&num=0&edition=prelim

140P6026Q0025 FOSM – Replace Backflow Prevention Assemblies Page 16 of 27

(3) The procedures in paragraph (b)(3)(i)(A)(2) of this clause will no longer apply as of January 1, 2030.

(B) For domestic construction material that is a critical item…