SOLICITATION, OFFER,
AND AWARD
2. TYPE OF SOLICITATION
6. PROJECT NO. 4. CONTRACT NO. 5. REQUISITION/PURCHASE REQUEST NO.
PAGE OF PAGES
7. ISSUED BY CODE 8. ADDRESS OFFER TO
SOLICITATION
(Construction, Alteration, or Repair)
1. SOLICITATION NO. 3. DATE ISSUED
IMPORTANT -- The "offer" section on the reverse must be fully completed by offeror.
9.
INFORMATION
a. NAME b. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder."
CALL:
FOR
SEALED BID (IFB)
NEGOTIATED (RFP)
0040534195
NPS, MWR - MWRO MABO
601 Riverfront Drive
Omaha NE 68102
PMH
James Bissaillon via email james_bissaillon@nps.gov
James Bissaillon 4026611690
1x 07/28/2021
140P6021R0023
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date)
The National Park Service, Midwest Region Major Acquisition Buying Office (MABO), is issuing a Request for Proposal (RFP) 140P6021R0023, for the Replace Two Wood Shingle
Roofs and Repaint One House requirement at Herbert Hoover National Historic Site in accordance with the attached Specifications and all addenda.
This requirement is a Service-Disabled Veteran Owned Small Business set aside under
NAICS 236118, Residential Remodelers.
Contracting POC: James Bissaillon, james_bissaillon@nps.gov
SITE VISIT: Interested contractors are highly encouraged to attend the formal Site
Visit. Please see FAR 52.236-27 for Site Visit information.
GENERAL INFORMATION: In accordance with FAR 36.204, the magnitude of this project is between $25,000 and $100,000.
CONSTRUCTION DURATION: 90 Calendar Days from Notice to Proceed.
REQUIRED BONDS: The project is subject to the Davis-Bacon Act. Bonds will be
Continued ...
11. The Contractor shall begin performance
12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
award, notice to proceed. The performance period is mandatory negotiable. (See ________________________________________________.)
13. ADDITIONAL SOLICITATION REQUIREMENTS:
a. Sealed offers in original and is not required.is, b. An offer guarantee
c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
(date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
d. Offers providing less than
12b. CALENDAR DAYSYES NO
(If "YES", indicate within how many calendar days after award in Item 12b.)
10 90 calendar days and complete it within ________________ ________________ calendar days after receiving
08/30/2021
NSN 7540-01-155-3212
x x x x copies to perform the work required are due at the place specified in Item 8 by _____________ ___________________ (hour) local time calendar days for Government acceptance after the date offers are due will not be considered and will be rejected . _________________
STANDARD FORM 1442 (Rev. 4-85)
Prescribed by GSA
FAR(48 CFR) 53.236-1(d)
17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within ____________________ calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in item 13d. Failure to insert any number means the offeror accepts the minimum in item 13d.)
14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code) 15. TELEPHONE NO. (Include area code)
16. REMITTANCE ADDRESS (Include only if different than item 14.)
CODE FACILITY CODE
AMOUNTS
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGEMENT OF AMENDMENTS
OFFER (Must be fully completed by offeror)
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT NO.
DATE.
20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print) 20b. SIGNATURE 20c. OFFER DATE
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN
(4 copies unless otherwise specified)
ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
26. ADMINISTERED BY CODE 27. PAYMENT WILL BE MADE BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
(Contractor is required to sign this document and return (Contractor is not required to sign this document.)
Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award.
No further contractual document is necessary.
30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print) 31a. NAME OF CONTRACTING OFFICER (Type or print)
30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA 31c. DATE
BY
2PAGE OF
NPS, MWR - MWRO MABO
601 Riverfront Drive
Omaha NE 68102
PMH
Bridget Parizek
28. NEGOTIATED AGREEMENT 29. AWARD
Contractor agrees to furnish and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, copies to issuing office.)
10 U.S.C. 2304(c) 41 U.S.C. 253(c)
STANDARD FORM 1442 (REV. 4-85) BACK
Continued...
ITEM NO.
(A)
SUPPLIES/SERVICES
(B)
QUANTITY
(C)
UNIT
(D)
UNIT PRICE
(E)
AMOUNT
(F)
NAME OF OFFEROR OR CONTRACTOR
3 41
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
140P6021R0023 required as follows:
The contractor is required to provide one (1) or more of the following payment protection: A payment bond(SF-25a) 100 percent of the original contract price or an irrevocable letter of credit
(ILC).
Insurance will be required for this project.
TYPE OF CONTRACT: Firm Fixed Price
REQUIRED SUBMISSION DOCUMENTS:
1. Completed Section B - Bid Schedule
2. Completed SF1442 (Blocks 14 - 20)
3. Review all required vendor completed sections within the solicitation document and provide all requested documents and information in Section L of the solicitation.
Be advised that this requirement may be delayed, canceled, or revised at any time during the process based on decisions related to the
Department of the Interior (DOI) and National
Park Service (NPS) changes.
ALL QUESTIONS WILL BE PRESENTED TO
JAMES_BISSAILLON@NPS.GOV ON THIS PROJECT; DO NOT
CONTACT THE PARK.
Delivery: 90 Days After Notice to Proceed
Delivery Location Code: 0009060382
NPS, MWR, Herbert Hoover NHS
110 Parkside Drive
P.O. Box 607
West Branch IA 52358 US
00010 Paint and Reroof Staples House
Product/Service Code: Z1FA
Product/Service Description: MAINTENANCE OF
FAMILY HOUSING FACILITIES
00020 Reroof Hayhurst House
Continued ...
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
ITEM NO.
(A)
SUPPLIES/SERVICES
(B)
QUANTITY
(C)
UNIT
(D)
UNIT PRICE
(E)
AMOUNT
(F)
NAME OF OFFEROR OR CONTRACTOR
4 41
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
140P6021R0023
Product/Service Code: Z1FA
Product/Service Description: MAINTENANCE OF
FAMILY HOUSING FACILITIES
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
140P6021R0023 HEHO Replace Two Wood Shingle Roofs and Repaint One House Page 5 of 41
TABLE OF CONTENTS
SECTION A – Solicitation/Contract Form 52.252-2 – Clauses Incorporated by Reference (Feb 1998)
SECTION B – Bid Schedule
SECTION C – Specifications/Drawings
SECTION D - Packaging and Marking
SECTION E - Inspection and Acceptance 52.246-12 -- Inspection of Construction. Inspection of Construction (Aug 1996)
SECTION F - Deliveries or Performance 52.236-15 Schedules for Construction Contracts (Apr 1984) 52.242-14 Suspension Of Work (Apr 1984) 52.211-10 -- Commencement, Prosecution, and Completion or Work (Apr 1984)
SECTION G - Contract Administration Data 1452.201-70 Authorities and Delegations (Sep 2011) Electronic Invoicing and Payment Requirements - Invoice Processing Platform (IPP) (April 2013)
SECTION H - Special Contract Requirements
GREEN PROCUREMENT
SECTION I - Contract Clauses 52.252-2 – Clauses Incorporated by Reference (Feb 1998) 52.202-1 Definitions (Jun 2020) 52.204-10 Reporting Executive Compensation and First-Tier Subcontract Awards (Jun 2020) 52.204-13 System for Award Management Maintenance (Oct 2018) 52.204-14 Service Contract Reporting Requirements (Oct 2016) 52.204-18 Commercial and Government Entity Code Maintenance (Aug 2020) 52.204-19 Incorporation by Reference of Representations and Certifications (Dec 2014) 52.204-23 Prohibition on Contracting for Hardware, Software, and Services Developed or Provided by Kaspersky Lab and Other Covered Entities (Jul 2018) 52.204-25 Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment. (AUG 2020) 52.209-6 Protecting the Government's Interest When Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment (Jun 2020) 52.209-10 Prohibition on Contracting With Inverted Domestic Corporations (Nov 2015) 52.215-2 Audit and Records- Negotiations (Jun 2020) 52.215-8 Order of Precedence -- Uniform Contract Format (Oct 1997) 52.219-8 Utilization of Small Business Concerns (Oct 2018) 52.219-28 Post-Award Small Business Program Representation (Nov 2020) 52.222-3 Convict Labor (June 2003) 52.222-4 Contract Work Hours and Safety Standards- Overtime Compensation (Mar 2018) 52.222-6 Construction Wage Rate Requirements (Aug 2018) 52.222-7 Withholding of Funds (May 2014) 52.222-8 Payrolls and Basic Records (Aug 2018) 52.222-9 Apprentices and Trainees (Jul 2005) 52.222-10 Compliance with Copeland Act Requirements (Feb 1988) 52.222-11 Subcontracts (Labor Standards) (May 2014) 52.222-12 Contract Termination-Debarment (May 2014) 52.222-13 Compliance with Construction Wage Rate Requirements and Related Regulations (May 2014) 52.222-14 Disputes Concerning Labor Standards (Feb 1988) 52.222-15 Certification of Eligibility (May 2014) 52.222-21 Prohibition of Segregated Facilities (Apr 2015)
140P6021R0023 HEHO Replace Two Wood Shingle Roofs and Repaint One House Page 6 of 41
52.222-26 Equal Opportunity (Sep 2016) 52.222-27 Affirmative Action Compliance Requirements for Construction (Apr 2015) 52.222-37 Employment Reports on Veterans (Jun 2020) 52.222-40 Notification of Employee Rights Under the National Labor Relations Act (Dec 2010) 52.222-50 Combating Trafficking in Persons (Oct 2020) 52.222-55 Minimum Wages Under Executive Order 13658 (Nov 2020) 52.222-62 Paid Sick Leave Under Executive Order 13706 (Jan 2017) 52.223-2 Affirmative Procurement of Bio-based Products Under Service and Construction Contracts (Sep 2013) 52.223-3 Hazardous Material Identification and Material Safety Data (Feb 2021) 52.223-5 Pollution Prevention and Right-to-Know Information (May 2011) 52.223-6 Drug Free Workplace (May 2001) 52.223-10 Waste Reduction Program (May 2011) 52.223-15 Energy Efficiency in Energy-Consuming Products (May 2020) 52.223-17 Affirmative Procurement of EPA-Designated Items in Service and Construction Contracts (Aug 2018) 52.223-18 Encouraging Contractor Policies to Ban Text Messaging While Driving (Jun 2020) 52.225-13 Restriction on Certain Foreign Purchases (Feb 2021) 52.227-1 Authorization and Consent (Jun 2020) 52.227-2 Notice and Assistance Regarding Patent and Copyright Infringement (Jun 2020) 52.227-4 Patent Indemnity- Construction Contracts (Dec 2007) 52.228-2 Additional Bond Security (Oct 1997) 52.228-5 Insurance- Work on a Government Installation (Jan 1997) 52.228-11, Pledges of Assets (Aug 2018)(DEVIATION APR 2020), not requiring the Standard Form 28 to be sworn and notarized, in place of 52.228-11, Pledges of Assets (Aug 2018) 52.228-12 Prospective Subcontractor Request for Bonds (May 2014) 52.228-13 Alternative Payment Protections (Jul 2000) 52.228-14 Irrevocable Letter of Credit (Nov 2014) 52.229-3 Federal, State, and Local Taxes (Feb 2013) 52.232-5 Payments under Fixed-Price Construction Contracts (May 2014) 52.232-17 Interest (May 2014) 52.232-23 Assignment of Claims (May 2014) 52.232-27 Prompt Payment for Construction Contracts (Jan 2017) 52.232-33 Payment by Electronic Funds Transfer - System for Award Management (Oct 2018) 52.232-39 Unenforceability of Unauthorized Obligations (Jun 2013) 52.232-40 Providing Accelerated Payments to Small Business Subcontractors (Dec 2013) 52.233-1 Disputes (May 2014) with Alt I (Dec 1991) 52.233-3 Protest after Award (Aug 1996) 52.233-4 Applicable Law For Breach Of Contract Claim (Oct 2004) 52.236-2 Differing Site Conditions (Apr 1984) 52.236-3 Site Investigation and Conditions Affecting the Work (Apr 1984) 52.236-5 Material and Workmanship (Apr 1984) 52.236-6 Superintendence by the Contractor (Apr 1984) 52.236-7 Permits and Responsibilities (Nov 1991) 52.236-8 Other Contracts (Apr 1984) 52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements (Apr 1984) 14 52.236-10 Operations and Storage Areas (Apr 1984) 52.236-11 Use and Possession Prior to Completion (Apr 1984) 52.236-12 Cleaning Up (Apr 1984) 52.236-13 Accident Prevention (Nov 1991) 52.236-14 Availability and Use of Utility Services (Apr 1984) 52.236-17 Layout of Work (Apr 1984) 52.236-21 Specifications and Drawings for Construction (Feb 1997) 52.236-26 Preconstruction Conference (Feb 1995) 52.243-4 Changes (Jun 2007) 52.244-6 Subcontracts for Commercial Items (Nov 2020) 52.246-21 Warranty of Construction (Mar 1994) 52.249-2 Termination for Convenience of the Government (Fixed-Price) (ALT I) (Apr 2012)
140P6021R0023 HEHO Replace Two Wood Shingle Roofs and Repaint One House Page 7 of 41
52.249-10 Default (Fixed-Price Construction) (Apr 1984) 52.253-1 Computer Generated Forms (Jan 1991)
CLAUSES INCORPORATED BY FULL TEXT
1452.203-70 -- Restrictions on Endorsements (Jul 1996) 1452.204-70 -- Release of Claims (Jul 1996) 1452.228-70 -- Liability Insurance—Department of the Interior (Jul 1996) 52.204-21 – Basic Safeguarding of Covered Contractor Information Systems (Jun 2016) 52.219-14 Limitations on Subcontracting (Mar 2020) 52.219-27 - Notice of Service-Disabled Veteran-Owned Small Business Set-Aside (Mar 2020) 52.222-23 -- Notice of Requirement for Affirmative Action to Ensure Equal Employment Opportunity for Construction (Feb 1999) 52.222-35 Equal Opportunity for Veterans (Jun 2020) 52.222-36 Equal Opportunity for Workers With Disabilities (Jun 2020) 52.225-10 -- Notice of Buy American Requirement—Construction Materials. Notice of Buy American Requirement--Construction Materials (May 2014) 52.236-14 Availability and Use of Utility Services (Apr 1984) 52.225-9 -- Buy American–Construction Materials. Buy American–Construction Materials (Feb 2021) 52.252-6 Authorized Deviations in Clauses (Nov 2020)
SECTION J - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS
SECTION K - Representations, Certifications, and Other Statements of Bidders 52.252-1 – Solicitation Provisions Incorporated by Reference (Feb 1998) 52.204-16 Commercial and Government Entity Code Reporting (Aug 2020) 52.203-18 Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements - Representation (Jan 2017) 52.236-28 Preparation of Proposal – Construction (Oct 1997)
PROVISIONS INCORPORATED BY FULL TEXT
52.204-8 Annual Representations and Certifications. (Mar 2020) 52.204-24 – Representation Regarding Certain Telecommunications and Video Surveillance Services or Equipment (Oct 2020) 52.204-26 Covered Telecommunications Equipment or Services-Representation. (Oct 2020) 52.209-7 - Information Regarding Responsibility Matters (Oct 2018) 52.209-11 – Representations by Corporations Regarding Delinquent Tax Liability or a Felony Conviction under any Federal Law (Feb 2016) 52.219-1 Small Business Program Representations (Nov 2020)
SECTION L - Instructions, Conditions, and Notices to Bidders 52.204-22 Alternative Line Item Proposal (Jan 2017) 52.204-7 System for Award Management (Oct 2018)
PROVISIONS INCORPORATED BY FULL TEXT
52.211-3 -- Availability of Specifications Not Listed in the GSA Index of Federal Specifications, Standards and Commercial Item Descriptions (Jun 1988) 52.215-1 -- Instructions to Offerors-Competitive Acquisition (Jan 2017) with Alternate II (Oct 1997) 52.216-1 – Type of Contract (Apr 1984) 52.222-5 -- Construction Wage Rate Requirements—Secondary Site of the Work (May 2014) 52.233-2 Service of Protest Department of Interior (Jul 1996) (Deviation) 52.236-27 – Site Visit (Construction) (Feb 1995) 52.252-5 Authorized Deviations in Provisions (Nov 2020) 1452.215-71 -- Use and Disclosure of Proposal Information - Department of the Interior (Apr 1984)
SUBMISSION REQUIREMENTS
Section M – Evaluation Factors for Award
140P6021R0023 HEHO Replace Two Wood Shingle Roofs and Repaint One House Page 8 of 41
SECTION A – Solicitation/Contract Form
52.252-2 – Clauses Incorporated by Reference (Feb 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):
http://www.acquisition.gov/far/
SECTION B – Bid Schedule
Please submit all proposed costs on the price schedule provided.
Contract Line Item Number
(CLIN)
Contract Line Item (CLIN) Title
Total Material
Total Labor Direct Costs Other TOTAL
00010 Paint and Reroof
Staples House $ $ $ $ $
00020 Reroof Hayhurst
House $ $ $ $ $
Profit % $ $ Overhead % $ $
Bonds % $ $
TOTAL: $
SECTION C – Specifications/Drawings
Provide everything necessary, including supervision, certifications, licensing, labor, tools, materials, transportation, equipment, etc. necessary for the following:
1) Removal and replacement of the existing wood shingle roof on the Hayhurst House (HS-10) and the Staples House (HS-09)
a) Remove, dispose, and replace approximately 1200 square feet (12 squares) wood shingle roofing and 80 linear feet wood ridge cap (Hayhurst House) and remove, dispose of and replace approximately 1600 square feet (16 squares) wood shingle roofing and 100 linear feet wood ridge cap (Staples House)
b) Remove and replace approximately 80 linear feet (lf) of rain gutter on the Staples house. Remove and replace approximately 120 lf of rain gutter on the Hayhurst House.
c) Note – The standing seam metal roof on the Staples House shall remain and be protected from damage due to construction activity.
2) Wet scrape, spot prime and apply two coats of paint on exterior doors, windows, and siding on Staples House.
a) Wet scrape, spot prime and apply two coats of paint to approximately 2800 square feet(sf) of wood siding on the Staples House, including two exterior doors and trim and approximately fifteen exterior window and trim on both levels.
SECTION D - Packaging and Marking
N/A
SECTION E - Inspection and Acceptance
52.246-12 -- Inspection of Construction. Inspection of Construction (Aug 1996) http://www.acquisition.gov/far/
140P6021R0023 HEHO Replace Two Wood Shingle Roofs and Repaint One House Page 9 of 41
(a) Definition. “Work” includes, but is not limited to, materials, workmanship, and manufacture and fabrication of components.
(b) The Contractor shall maintain an adequate inspection system and perform such inspections as will ensure that the work performed under the contract conforms to contract requirements. The Contractor shall maintain complete inspection records and make them available to the Government. All work shall be conducted under the general direction of the Contracting Officer and is subject to Government inspection and test at all places and at all reasonable times before acceptance to ensure strict compliance with the terms of the contract.
(c) Government inspections and tests are for the sole benefit of the Government and do not --
(1) Relieve the Contractor of responsibility for providing adequate quality control measures;
(2) Relieve the Contractor of responsibility for damage to or loss of the material before acceptance;
(3) Constitute or imply acceptance; or
(4) Affect the continuing rights of the Government after acceptance of the completed work under paragraph
(i) of this section.
(d) The presence or absence of a Government inspector does not relieve the Contractor from any contract requirement, nor is the inspector authorized to change any term or condition of the specification without the Contracting Officer’s written authorization.
(e) The Contractor shall promptly furnish, at no increase in contract price, all facilities, labor, and material reasonably needed for performing such safe and convenient inspections and tests as may be required by the Contracting Officer. The Government may charge to the Contractor any additional cost of inspection or test when work is not ready at the time specified by the Contractor for inspection or test, or when prior rejection makes reinspection or retest necessary. The Government shall perform all inspections and tests in a manner that will not unnecessarily delay the work. Special, full size, and performance tests shall be performed as described in the contract.
(f) The Contractor shall, without charge, replace or correct work found by the Government not to conform to contract requirements, unless in the public interest the Government consents to accept the work with an appropriate adjustment in contract price. The Contractor shall promptly segregate and remove rejected material from the premises.
(g) If the Contractor does not promptly replace or correct rejected work, the Government may --
(1) By contract or otherwise, replace or correct the work and charge the cost to the Contractor; or
(2) Terminate for default the Contractor’s right to proceed.
(h) If, before acceptance of the entire work, the Government decides to examine already completed work by removing it or tearing it out, the Contractor, on request, shall promptly furnish all necessary facilities, labor, and material. If the work is found to be defective or nonconforming in any material respect due to the fault of the Contractor or its subcontractors, the Contractor shall defray the expenses of the examination and of satisfactory reconstruction. However, if the work is found to meet contract requirements, the Contracting Officer shall make an equitable adjustment for the additional services involved in the examination and reconstruction, including, if completion of the work was thereby delayed, an extension of time.
(i) Unless otherwise specified in the contract, the Government shall accept, as promptly as practicable after completion and inspection, all work required by the contract or that portion of the work the Contracting Officer determines can be accepted separately. Acceptance shall be final and conclusive except for latent defects, fraud, gross mistakes amounting to fraud, or the Government’s rights under any warranty or guarantee.
140P6021R0023 HEHO Replace Two Wood Shingle Roofs and Repaint One House Page 10 of 41
(End of Clause)
SECTION F - Deliveries or Performance
52.236-15 Schedules for Construction Contracts (Apr 1984)
52.242-14 Suspension Of Work (Apr 1984)
52.211-10 -- Commencement, Prosecution, and Completion or Work (Apr 1984)
The Contractor shall be required to (a) commence work under this contract within 10 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 90 calendar days after receipt of Notice to Proceed. The time stated for completion shall include final cleanup of the premises.
(End of Clause)
SECTION G - Contract Administration Data
(a) The Contracting Officer/Contract Specialist administrating the Contract:
Contract Specialist (CS)/Administrator: Contracting Officer (CO):
James Bissaillon Bridget Parizek National Park Service-MWR MABO National Park Service-MWRMABO 601Riverfront Drive 601 Riverfront Drive Omaha, NE 68102 Omaha, NE 68102 402-661-1690 402-661-1896 james_bissaillon@nps.gov bridget_parizek@nps.gov
(b) The Contracting Officer (CO) is the only person authorized to approve changes or modify any of the requirements under this contract and notwithstanding any provisions contained elsewhere in this contract, the said authority remains solely with the CO. In the event the contractor effects any such change at the direction of any person other than the CO, the change will be considered made without authority and no adjustment will be made in the contract price to cover increase in costs incurred as a result thereof.
(c) Contractual problems, of any nature, which might occur during the life of the contract, must be handled in conformance with very specific public laws and regulations (e.g., Federal Acquisition Regulation), and must be referred to the CO for resolution. Only the CO is authorized to formally resolve such problems.
Therefore, the contractor is hereby directed to bring all such contractual problems to the immediate attention of the CO.
(d) Any request for contract changes/modifications shall be submitted to the CS.
(e) The contractor and the Government may agree to perform a no-cost field change. Field changes are made when the change appears to be mutually beneficial to all parties and would not require changing the negotiated line items. An example of a field change is: rerouting planned location of a sidewalk to avoid a tree (when quantities are not changed). All field changes must be approved by the CO prior to execution.
(f) All correspondence concerning this contract, such as requests for information (RFI), explanation of terms, and contract interpretation, shall be submitted to the CS.
Final Payment.
Final payment will be made only after receipt of all payrolls to include subcontractors, SF 1413 Statement of Acknowledgement for each subcontractor, project schedule, updated progress reports, material submittals, test reports, as-built drawings, and release of claims. Contractor must provide a signed copy of the 'Release of Claims' to the Contract Administrator upon submittal of final invoice.
140P6021R0023 HEHO Replace Two Wood Shingle Roofs and Repaint One House Page 11 of 41
Availability of Utility Services Notwithstanding the provisions of contract clause FAR 52.236-14, Availability and Use of Utility Services, all reasonable required amounts of water, gas, electricity, etc. are available for temporary connection. All temporary connections, outlets, meters and distribution lines as may be required will be installed by the contractor at the contractor's own expense.
Utility Conversation The contractor will be required to participate in government energy conservation programs. For the purpose of this contract, utilities such as water, electricity, etc., will not be furnished by the Government.
The contractor is responsible for all utilities to include providing portable restrooms.
Occupational Safety and Health Act (OSHA) Inspections The contractor shall be subject to inspections under the OSHA program by inspectors of the Department of Labor.
OBSERVED HOLIDAYS
The following legal holidays are observed by the National Park Service in accordance with:
https://www.opm.gov/policy-data-oversight/pay-leave/federal-holidays/#url=2021
New Year’s Day Birthday of Martin Luther King, Jr.
Washington’s Birthday Memorial Day Juneteenth Independence Day Independence Day Labor Day Columbus Day Veterans Day Thanksgiving Day Christmas
1452.201-70 Authorities and Delegations (Sep 2011)
(a) The Contracting Officer is the only individual authorized to enter into or terminate this contract, modify any term or condition of this contract, waive any requirement of this contract, or accept nonconforming work.
(b) The Contracting Officer will designate a Contracting Officer's Representative (COR) at time of award. The COR will be responsible for technical monitoring of the contractor's performance and deliveries. The COR will be appointed in writing, and a copy of the appointment will be furnished to the Contractor. Changes to this delegation will be made by written changes to the existing appointment or by issuance of a new appointment.
The COR for this contract will be:
(c) The COR is not authorized to perform, formally or informally, any of the following actions:
(1) Promise, award, agree to award, or execute any contract, contract modification, or notice of intent that changes or may change this contract;
(2) Waive or agree to modification of the delivery schedule;
(3) Make any final decision on any contract matter subject to the Disputes Clause;
(4) Terminate, for any reason, the Contractor's right to proceed;
(5) Obligate in any way, the payment of money by the Government.
(d) The Contractor shall comply with the written or oral direction of the Contracting Officer or authorized
140P6021R0023 HEHO Replace Two Wood Shingle Roofs and Repaint One House Page 12 of 41 representative(s) acting within the scope and authority of the appointment memorandum. The Contractor need not proceed with direction that it considers to have been issued without proper authority. The Contractor shall notify the Contracting Officer in writing, with as much detail as possible, when the COR has taken an action or has issued direction (written or oral) that the Contractor considers to exceed the COR’s appointment, within 3 days of the occurrence. Unless otherwise provided in this contract, the Contractor assumes all costs, risks, liabilities, and consequences of performing any work it is directed to perform that falls within any of the categories defined in paragraph (c) prior to receipt of the Contracting Officer's response issued under paragraph (e) of this clause.
(e) The Contracting Officer shall respond in writing within 30 days to any notice made under paragraph (d) of this clause. A failure of the parties to agree upon the nature of a direction, or upon the contract action to be taken with respect thereto, shall be subject to the provisions of the Disputes clause of this contract.
(f) The Contractor shall provide copies of all correspondence to the Contracting Officer and the COR.
(g) Any action(s) taken by the Contractor, in response to any direction given by any person acting on behalf of the Government or any Government official other than the Contracting Officer or the COR acting within his or her appointment, shall be at the Contractor’s risk.
(End of Local Clause)
Electronic Invoicing and Payment Requirements - Invoice Processing Platform (IPP) (April 2013)
Payment requests must be submitted electronically through the U. S. Department of the Treasury's Invoice Processing Platform System (IPP).
"Payment request" means any request for contract financing payment or invoice payment by the Contractor. To constitute a proper invoice, the payment request must comply with the requirements identified in the applicable Prompt Payment clause included in the contract, or the clause 52.212-4 Contract Terms and Conditions - Commercial Items included in commercial item contracts. The IPP website address is: https://www.ipp.gov.
Under this contract, the following documents are required to be submitted as an attachment to the IPP invoice:
1. Copy of vendor invoice document in PDF format, which shows pricing breakdown for all line items.
2. The Contractor must use the IPP website to register access and use IPP for submitting requests for payment. The Contractor Government Business Point of Contact (as listed in SAM) will receive enrollment instructions via email from the Federal Reserve Bank of Boston (FRBB) prior to the contract award date, but no more than 3 - 5 business days of the contract award date. Contractor assistance with enrollment can be obtained by contacting the IPP Production Helpdesk via email ippgroup@bos.frb.org or phone (866) 973-3131.
If the Contractor is unable to comply with the requirement to use IPP for submitting invoices for payment, the Contractor must submit a waiver request in writing to the Contracting Officer with its proposal or quotation.
(End of Local Clause)
SECTION H - Special Contract Requirements
GREEN PROCUREMENT
To the extent that the construction services provided by the Contractor require provision of any of the types of products listed at https://sftool.gov/greenprocurement, the Contractor is expected to provide the green type of product unless that type of product is not available competitively within a reasonable time, at a reasonable price, is not life cycle cost efficient in the case of energy consuming products, or does not meet reasonable performance standards.
SECTION I - Contract Clauses https://www.ipp.gov/ https://sftool.gov/greenprocurement
140P6021R0023 HEHO Replace Two Wood Shingle Roofs and Repaint One House Page 13 of 41
52.252-2 – Clauses Incorporated by Reference (Feb 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):
http://www.acquisition.gov/far/
52.202-1 Definitions (Jun 2020) 52.203-19 Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements (Jan 2017) 52.204-10 Reporting Executive Compensation and First-Tier Subcontract Awards (Jun 2020) 52.204-13 System for Award Management Maintenance (Oct 2018) 52.204-14 Service Contract Reporting Requirements (Oct 2016) 52.204-18 Commercial and Government Entity Code Maintenance (Aug 2020) 52.204-19 Incorporation by Reference of Representations and Certifications (Dec 2014) 52.204-23 Prohibition on Contracting for Hardware, Software, and Services Developed or Provided by Kaspersky Lab and Other Covered Entities (Jul 2018) 52.204-25 Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment. (AUG 2020) 52.209-6 Protecting the Government's Interest When Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment (Jun 2020) 52.209-10 Prohibition on Contracting With Inverted Domestic Corporations (Nov 2015) 52.215-2 Audit and Records- Negotiations (Jun 2020) 52.215-8 Order of Precedence -- Uniform Contract Format (Oct 1997) 52.219-8 Utilization of Small Business Concerns (Oct 2018) 52.219-28 Post-Award Small Business Program Representation (Nov 2020) 52.222-3 Convict Labor (June 2003) 52.222-4 Contract Work Hours and Safety Standards- Overtime Compensation (Mar 2018) 52.222-6 Construction Wage Rate Requirements (Aug 2018) 52.222-7 Withholding of Funds (May 2014) 52.222-8 Payrolls and Basic Records (Aug 2018) 52.222-9 Apprentices and Trainees (Jul 2005) 52.222-10 Compliance with Copeland Act Requirements (Feb 1988) 52.222-11 Subcontracts (Labor Standards) (May 2014) 52.222-12 Contract Termination-Debarment (May 2014) 52.222-13 Compliance with Construction Wage Rate Requirements and Related Regulations (May 2014) 52.222-14 Disputes Concerning Labor Standards (Feb 1988) 52.222-15 Certification of Eligibility (May 2014) 52.222-21 Prohibition of Segregated Facilities (Apr 2015) 52.222-26 Equal Opportunity (Sep 2016) 52.222-27 Affirmative Action Compliance Requirements for Construction (Apr 2015) 52.222-37 Employment Reports on Veterans (Jun 2020) 52.222-40 Notification of Employee Rights Under the National Labor Relations Act (Dec 2010) 52.222-50 Combating Trafficking in Persons (Oct 2020) 52.222-55 Minimum Wages Under Executive Order 13658 (Nov 2020) 52.222-62 Paid Sick Leave Under Executive Order 13706 (Jan 2017) 52.223-2 Affirmative Procurement of Bio-based Products Under Service and Construction Contracts (Sep 2013) 52.223-3 Hazardous Material Identification and Material Safety Data (Feb 2021) 52.223-5 Pollution Prevention and Right-to-Know Information (May 2011) 52.223-6 Drug Free Workplace (May 2001) 52.223-10 Waste Reduction Program (May 2011) 52.223-15 Energy Efficiency in Energy-Consuming Products (May 2020) 52.223-17 Affirmative Procurement of EPA-Designated Items in Service and Construction Contracts (Aug 2018) 52.223-18 Encouraging Contractor Policies to Ban Text Messaging While Driving (Jun 2020) 52.225-13 Restriction on Certain Foreign Purchases (Feb 2021) 52.227-1 Authorization and Consent (Jun 2020)
140P6021R0023 HEHO Replace Two Wood Shingle Roofs and Repaint One House Page 14 of 41
52.227-2 Notice and Assistance Regarding Patent and Copyright Infringement (Jun 2020) 52.227-4 Patent Indemnity- Construction Contracts (Dec 2007) 52.228-2 Additional Bond Security (Oct 1997) 52.228-5 Insurance- Work on a Government Installation (Jan 1997) 52.228-11, Pledges of Assets (Aug 2018)(DEVIATION APR 2020), not requiring the Standard Form 28 to be sworn and notarized, in place of 52.228-11, Pledges of Assets (Aug 2018) 52.228-12 Prospective Subcontractor Request for Bonds (May 2014) 52.228-13 Alternative Payment Protections (Jul 2000) 52.228-14 Irrevocable Letter of Credit (Nov 2014) 52.229-3 Federal, State, and Local Taxes (Feb 2013) 52.232-5 Payments under Fixed-Price Construction Contracts (May 2014) 52.232-17 Interest (May 2014) 52.232-23 Assignment of Claims (May 2014) 52.232-27 Prompt Payment for Construction Contracts (Jan 2017) 52.232-33 Payment by Electronic Funds Transfer - System for Award Management (Oct 2018) 52.232-39 Unenforceability of Unauthorized Obligations (Jun 2013) 52.232-40 Providing Accelerated Payments to Small Business Subcontractors (Dec 2013) 52.233-1 Disputes (May 2014) with Alt I (Dec 1991) 52.233-3 Protest after Award (Aug 1996) 52.233-4 Applicable Law For Breach Of Contract Claim (Oct 2004) 52.236-2 Differing Site Conditions (Apr 1984) 52.236-3 Site Investigation and Conditions Affecting the Work (Apr 1984) 52.236-5 Material and Workmanship (Apr 1984) 52.236-6 Superintendence by the Contractor (Apr 1984) 52.236-7 Permits and Responsibilities (Nov 1991) 52.236-8 Other Contracts (Apr 1984) 52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements (Apr 1984) 52.236-10 Operations and Storage Areas (Apr 1984) 52.236-11 Use and Possession Prior to Completion (Apr 1984) 52.236-12 Cleaning Up (Apr 1984) 52.236-13 Accident Prevention (Nov 1991) 52.236-14 Availability and Use of Utility Services (Apr 1984) 52.236-17 Layout of Work (Apr 1984) 52.236-21 Specifications and Drawings for Construction (Feb 1997) 52.236-26 Preconstruction Conference (Feb 1995) 52.243-4 Changes (Jun 2007) 52.244-6 Subcontracts for Commercial Items (Nov 2020) 52.246-21 Warranty of Construction (Mar 1994) 52.249-2 Termination for Convenience of the Government (Fixed-Price) (ALT I) (Apr 2012) 52.249-10 Default (Fixed-Price Construction) (Apr 1984) 52.253-1 Computer Generated Forms (Jan 1991)
CLAUSES INCORPORATED BY FULL TEXT
1452.203-70 -- Restrictions on Endorsements (Jul 1996)
Restriction on Endorsements—Department of the Interior
The Contractor shall not refer to contracts awarded by the Department of the Interior in commercial advertising, as defined in FAR 31.205–1, in a manner which states or implies that the product or service provided is approved or endorsed by the Government, or is considered by the Government to be superior to other products or services. This restriction is intended to avoid the appearance of preference by the Government toward any product or service. The Contractor may request the Contracting Officer to make a determination as to the propriety of promotional material.
(End of clause)
1452.204-70 -- Release of Claims (Jul 1996)
140P6021R0023 HEHO Replace Two Wood Shingle Roofs and Repaint One House Page 15 of 41
Release of Claims—Department of the Interior
After completion of work and prior to final payment, the Contractor shall furnish the Contracting Officer with a release of claims against the United States relating to this contract. The Release of Claims form (DI–137) shall be used for this purpose. The form provides for exception of specified claims from operation of the release.
(End of clause)
1452.215-70 - Examination of Records by the Department of the Interior (Apr 1984)
For purposes of the Examination of Records by the Comptroller General clause of this contract (FAR 52.215-1), the Secretary of the Interior, the Inspector General, and their duly authorized representative(s) from the Department of the Interior shall have the same access and examination rights as the Comptroller General of the United States.
(End of Clause)
1452.228-70 -- Liability Insurance—Department of the Interior (Jul 1996)
(a) The Contractor shall procure and maintain during the term of this contract and any extension thereof liability insurance in form satisfactory to the Contracting Officer by an insurance company which is acceptable to the Contracting Officer. The named insured parties under the policy shall be the Contractor and the United States of America. The amounts of the insurance shall be not less than as follows:
$200,000.00 each person $500,000.00 each occurrence $500,000.00 property damage
(b) Each policy shall have a certificate evidencing the insurance coverage. The insurance company shall provide an endorsement to notify the Contracting Officer 30 days prior to the effective date of cancellation or termination of the policy or certificate; or modification of the policy or certificate which may adversely affect the interest of the Government in such insurance. The certificate shall identify the contract number, the name and address of the Contracting Officer, as well as the insured, the policy number and a brief description of contract services to be performed. The contractor shall furnish the Contracting Officer with a copy of an acceptable insurance certificate prior to beginning the work.
(End of clause)
52.204-21 – Basic Safeguarding of Covered Contractor Information Systems (Jun 2016)
(a) Definitions. As used in this clause– “Covered contractor information system” means an information system that is owned or operated by a contractor that processes, stores, or transmits Federal contract information.
“Federal contract information” means information, not intended for public release, that is provided by or generated for the Government under a contract to develop or deliver a product or service to the Government, but not including information provided by the Government to the public (such as on public websites) or simple transactional information, such as necessary to process payments.
“Information” means any communication or representation of knowledge such as facts, data, or opinions, in any medium or form, including textual, numerical, graphic, cartographic, narrative, or audiovisual (Committee on National Security Systems Instruction (CNSSI) 4009).
“Information system” means a discrete set of information resources organized for the collection, processing, maintenance, use, sharing, dissemination, or disposition of information (44 U.S.C. 3502).
“Safeguarding” means measures or controls that are prescribed to protect information systems.
(b) Safeguarding requirements and procedures.
http://uscode.house.gov/
140P6021R0023 HEHO Replace Two Wood Shingle Roofs and Repaint One House Page 16 of 41
(1) The Contractor shall apply the following basic safeguarding requirements and procedures to protect covered contractor information systems. Requirements and procedures for basic safeguarding of covered contractor information systems shall include, at a minimum, the following security controls:
(i) Limit information system access to authorized users, processes acting on behalf of authorized users, or devices (including other information systems).
(ii) Limit information system access to the types of transactions and functions that authorized users are permitted to execute.
(iii) Verify and control/limit connections to and use of external information systems.
(iv) Control information posted or processed on publicly accessible information systems.
(v) Identify information system users, processes acting on behalf of users, or devices.
(vi) Authenticate (or verify) the identities of those users, processes, or devices, as a prerequisite to allowing access to organizational information systems.
(vii) Sanitize or destroy information system media containing Federal Contract Information before disposal or release for reuse.
(viii) Limit physical access to organizational information systems, equipment, and the respective operating environments to authorized individuals.
(ix) Escort visitors and monitor visitor activity; maintain audit logs of physical access; and control and manage physical access devices.
(x) Monitor, control, and protect organizational communications (i.e., information transmitted or received by organizational information systems) at the external boundaries and key internal boundaries of the information systems.
(xi) Implement subnetworks for publicly accessible system components that are physically or logically separated from internal networks.
(xii) Identify, report, and correct information and information system flaws in a timely manner.
(xiii) Provide protection from malicious code at appropriate locations within organizational information systems.
(xiv) Update malicious code protection mechanisms when new releases are available.
(xv) Perform periodic scans of the information system and real-time scans of files from external sources as files are downloaded, opened, or executed.
(2) Other requirements. This clause does not relieve the Contractor of any other specific safeguarding requirements specified by Federal agencies and departments relating to covered contractor information systems generally or other Federal safeguarding requirements for controlled unclassified information (CUI) as established by Executive Order 13556.
(c) Subcontracts. The Contractor shall include the substance of this clause, including this paragraph (c), in subcontracts under this contract (including subcontracts for the acquisition of commercial items, other than commercially available off-the-shelf items), in which the subcontractor may have Federal contract information residing in or transiting through its information system.
(End of clause)
52.219-14 Limitations on Subcontracting (Mar 2020)
(a) This clause does not apply to the unrestricted portion of a partial set-aside.
(b) Applicability. This clause applies only to—
(1) Contracts that have been set aside for small business concerns or 8(a) participants;
(2) Part or parts of a multiple-award contract that have been set aside for small business concerns or 8(a)
140P6021R0023 HEHO Replace Two Wood Shingle Roofs and Repaint One House Page 17 of 41 participants;
(3) Orders set aside for small business concerns or 8(a) participants under multiple-award contracts as described in 8.405-5 and 16.505(b)(2)(i)(F); and
(4) Orders issued directly to small business concerns or 8(a) participants under multiple-award contracts as described in 19.504(c)(1)(ii).
(c) Limitations on subcontracting. By submission of an offer and execution of a contract, the Contractor agrees that in performance of the contract in the case of a contract for—
(1) Services (except construction). At least 50 percent of the cost of contract performance incurred for personnel shall be expended for employees of the concern.
(2) Supplies (other than procurement from a nonmanufacturer of such supplies). The concern shall perform work for at least 50 percent of the cost of manufacturing the supplies, not including the cost of materials.
(3) General construction. The concern will perform at least 15 percent of the cost of the contract, not including the cost of materials, with its own employees.
(4) Construction by special trade contractors. The concern will perform at least 25 percent of the cost of the contract, not including the cost of materials, with its own employees.
(d) The Contractor shall comply with the limitations on subcontracting as follows:
(1) For contracts, in accordance with paragraph (b)(1) and (2) of this clause— [Contracting Officer check as appropriate.] _ By the end of the base term of the contract and then by the end of each subsequent option period; or _ By the end of the performance period for each order issued under the contract.
(2) For orders, in accordance with paragraphs (b)(3) and (4) of this clause, by the end of the performance period for the order.
(End of clause)
52.219-27 - Notice of Service-Disabled Veteran-Owned Small Business Set-Aside (Mar 2020)
(a) Definition. "Service-disabled veteran-owned small business concern"—
(1) Means a small business concern–
(i) Not less than 51 percent of which is owned by one or more service-disabled veterans or, in the case of any publicly owned business, not less than 51 percent of the stock of which is owned by one or more service-disabled veterans; and
(ii) The management and daily business operations of which are controlled by one or more service-disabled veterans or, in the case of a service-disabled veteran with permanent and severe disability, the spouse or permanent caregiver of such veteran.
(2) "Service-disabled veteran" means a veteran, as defined in 38 U.S.C.101(2), with a disability that is service-connected, as defined in 38 U.S.C.101(16).
(b) Applicability. This clause applies only to—
(1) Contracts that have been set aside for service-disabled veteran-owned small business concerns;
(2) Part or parts of a multiple-award contract that have been set aside for service-disabled veteran-owned small business concerns;
(3) Orders set aside for service-disabled veteran-owned small business concerns under multiple-award contracts as described in 8.405-5 and 16.505(b)(2)(i)(F); and
(4) Orders issued directly to service-disabled veteran-owned small business concerns under multiple-award contracts as described in 19.504(c)(1)(ii).
(c) General.
https://www.acquisition.gov/far/part-8#FAR_8_405_5 https://www.acquisition.gov/far/part-16#FAR_16_505 https://www.acquisition.gov/far/part-19#FAR_19_504…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .