Sol_140P5423Q0012_Attach__0001-SOW.pdf
PDF 338 KB Posted
- Attached to
- Roads, Trails, Grounds and Facilities Vegetation R Federal contract opportunity
- Solicitation number
- 140P5423Q0012
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_140P5423Q0012_Amend_0001_Attach__0003-Questions_and_Answers_0001.pdf | ||
| Sol_140P5423Q0012_Amd_0001.pdf | ||
| Sol_140P5423Q0012_Attach__0002-WD.pdf | ||
| Sol_140P5423Q0012.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Virgin Islands National Service St. John, Virgin Islands
R5365230058
SCOPE OF WORK
ROADS, TRAILS, GROUNDS, AND FACILITIES VEGETATION
REMOVAL
1.0 PROJECT INTRODUCTION
Project Name: Roads, Trails, Grounds and Facilities Vegetation Removal
Project Number: R5365230058
1.1 Scope
Per the terms and conditions of the Contract, the Contractor shall perform the work of this Request for Quote (RFQ) for the National Park Service (NPS) as described below.
All services performed under this RFQ shall be performed per applicable codes and accepted industry standards.
1.2 Location
The project is located at the Virgin Islands National Park Service Roads, Trails, Grounds, and Facilities on the islands of St. John, and St. Thomas:
North Shore Roadway- Maintenance Facility Entrance to Top of Kingshill.
Including Annaberg Ruins and Francis roadway to the beach.
Remote Roads- John Head Road, Salt Pond, and Lameshur- Roadway vegetation
Red Hook Facility-Grounds, Road, and Picnic Areas (St. Thomas)
1.3 Description- Roads, Trails, Ground and Facilities Vegetation, The work includes:
Parks Roads: Approximately 13.97 plus miles on North Shore roadway o Cutting vegetation, trees, and debris removal to a uniform low finish;
cutting vegetation, trees, and debris removal on both sides of the roads with a clearing width of 5 feet from the edge of pavement and gutters.
Clearing width refers to the corridor free from overhanging obstacles-either from the side or from overhead. Cut and remove any overhanging trees, branches, and vegetation 5 feet from the edge of the roadway to 12 feet vertical for delivery and safari taxi trucks. Any tree that poses an immediate danger to normal traffic flow and poses a threat to pedestrians or vehicle traffic shall be removed and cut to the ground level. Any tree larger than 3 inches in diameter shall have Park approval before being cut and remove. Care shall be given to traversing vehicles, parked vehicles, pedestrians, and anything other feature that can be damaged because of work being performed.
Remote Roads-
John Head Road - Approximately 2301 ft (Callahan residence to the main road on Centerline) Salt Pond- Approximately 1,128 ft (Entrance gate to Beach) Lameshur – Approximately 2,443 ft (Asphalt to Utility Pole) o Cutting vegetation, trees, and debris removal on both sides of the roads with a clearing width of 3 feet from the edge of pavement and gutters.
Clearing width refers to the corridor free from overhanging obstacles-either from the side or from overhead. Cut and remove any overhanging trees, branches, and vegetation 3 feet from the edge of the roadway to 12 feet vertical for vehicular and pedestrian traffic. Any tree that poses an immediate danger to normal traffic flow and poses a threat to pedestrians or vehicle traffic shall be removed and cut to the ground level. Any tree larger than 3 inches in diameter shall have Park approval before being cut and remove. Care shall be given to traversing vehicles, parked vehicles, pedestrians, and anything other feature that can be damaged because of work being performed.
Red Hook Facility-
Entrance roadway (both sides) – Approximately 2,547 ft Picnic areas (Handicap and Main) Approximately 27,440 sq Sidewalks -Approximately 392 sq Dock area (Grounds and concrete) - Approximately 2,156 sq Side and rear of the office building – Approximately 6,760 sq Office building lawn – Approximately 23,517 sq o Cutting vegetation, trees, and debris removal to a uniform low finish;
cutting vegetation, trees, and debris removal. The cutting and removal at the Red Hook Facility area include:
The entrance roadway outside and inside of both gates.
the entire length of the roadway, 3 feet from the edge of the pavement and horizontal 12 feet vertically straight up.
The picnic areas, picnic benches, and bench pads.
The dock area and sidewalks.
around the existing office building and generator.
o Any tree that poses an immediate danger to normal traffic flow and poses a threat to pedestrians or vehicle traffic shall be removed and cut to the ground level. Any tree larger than 3 inches in diameter shall have Park approval before being cut and removed. Any debris and grass cutting shall be placed and spread evenly throughout the illegal short. Care shall be given to parked vehicles, vessels, pedestrian exercisers, and anything other feature that can be damaged because of work being performed.
1.4 Vegetation Removal Guidelines from Historic Structures
Clearing Vegetation Along the Edge of Roads-
In clearing along the Park’s road edges by mechanical means we must be mindful to not use this equipment where historic ruins are present. Clearing the road edge at these locations must be done by hand as described below in Clearing Vegetation Around Historic Sites. Most ruins on the road edge can be found on the one-way loop between Maho Bay and Annaberg.
Clearing Vegetation Around Historic Sites
In clearing around historic sites, we must keep in mind that there may still be remnants of historic gardens and crops present that can add so much to the government’s and visitors’ knowledge and understanding of these historic sites and the landscape that surrounded them.
Safety is of utmost importance when working around these old walls. The possibility of injury due to a collapse is there and all precautions must be adhered to insure everyone’s safety.
Before clearing a structure, the contractor must be sure to evaluate the risks and dangerous areas that must be avoided and never remove vines or plants by pulling on them as this can result in a collapse and will assuredly result in damage to the building.
As a rule, vegetation is removed no more than ten feet around a structure.
In a complex setting, this can result in the removal of almost all vegetation if precautions are not taken. Each time a new site is selected it is important to establish the limits as to what should be removed with a park manager.
Mowers, weed whackers, and hand tools are all great tools if used in the right locations. Within one foot of a historic wall that contains any soft masonry materials such as historic brick or plaster only hand tools such as loppers, hand saws, and clippers should be used to cut. If a structure is made of only stone then a weed whacker can be used next to the building without damaging the structure. Clearing away from the walls past the one-foot zone can be accomplished with hand tools and weed whackers where historic fabric is not present. Clearing inside the structure’s walls should be accomplished with only loppers, hand saws, and clippers and no plants should be pulled as this could be damaging a historic floor that may not be obvious. Mowers that can be used and were approved in usually large open areas such as the esplanade at Shipley Battery, the grounds at Careening Cove, and the grounds at Creque Marine.
Clearing Vegetation Growing out of Historic Structures
Clearing vegetation growing out of the walls of historic structures can preserve these buildings and if done wrong can quickly destroy them. If the roots of a plant have firmly embedded themselves to the point where they are blowing the wall apart or in some cases holding the wall together cutting and killing the plant will result in a masonry collapse. However, if the plant can be eliminated before it gets to this stage then we have prolonged the time the structure will remain standing.
In general, plants that are one inch or less in diameter that are growing out of the walls have not reached the point where cutting and killing them with an herbicide would not be harmful to the building. However, there is always the exception so the crew supervisor should emphasize the need for each team member to inspect first to ensure the cutting of the plant is the appropriate action. If the plant is two inches in diameter then the plant’s removal should be evaluated by a supervisor or park employee to determine if its removal would cause damage. Again, do not pull plants out of the historic fabric for your safety and the life of the structure.
In clearing along the Park’s road edges by mechanical means we must be mindful to not use this equipment where historic ruins are present. Clearing the road edge at these locations must be done by hand as described below in Clearing Vegetation Around Historic Sites. Most ruins on the road edge can be found on the one-way loop between Maho Bay and Annaberg.
1.5 Requirement
1. Contractor shall use all safety equipment and procedures; necessary PPE and tools to perform work safely (e.g., signage, cones, safety vest, hard hats, etc.).
2. Contractor shall remove dead trees in a manner that does not damage persons and property.
3. Contractor shall remove all debris from the site unless specified by the Park.
4. Contractor shall provide a schedule for each location before beginning work.
Schedule to include days and times to give prior notification to Park personnel and residents at the location.
5. No additional work is to be performed that is not listed in the scope of work.
Any change request must be made by the contracting officer representative (COR) only and must be brought to the attention of the contracting officer (CO) for approval before proceeding. The CO is the only person with the authority to authorize changes.
6. Contractor shall provide all necessary copies of the invoice for work performed.
1.6 INFORMATION
NPS Points of Contact: TBA
1.7 FEES AND PAYMENT
A. All travel and any other direct or indirect costs shall be included in the work included in the offer.
B. No legal liability on the part of the Government for any payment may arise for performance under this contract beyond the amount that has been authorized through the issuance of the award.
C. Payment will be processed after the inspection and acceptance by the government of the installation.