Sol_140P5121Q0006.pdf
PDF 385 KB Posted
- Attached to
- Provide Tree Thinning Services Federal contract opportunity
- Solicitation number
- 140P5121Q0006
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_140P5121Q0006_Amd_0002.pdf | ||
| B08 Attachment 6 140P5121Q0006 RFQ QA KEMO Haz Tree Removal_0002.pdf | ||
| Sol_140P5121Q0006_Amd_0001.pdf | ||
| B08 Attachment 5 140P5121Q0006 Sit Visit KEMO Haz Tree Removal_0001.pdf | ||
| B03 140P5121Q0006 WDOL WD KEMO Haz Tree Removal.pdf | ||
| A04 0040524389 SOW KEMO Haz Tree Removal.pdf | ||
| B08 Attachment 4 140P5121Q0006 Price Sheet KEMO Haz Tree Removal.pdf | ||
| B08 Attachment 3 140P5121Q0006 PPQ KEMO Haz Tree Removal.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SEE ADDENDUMIS CHECKED
CODE 18a. PAYMENT WILL BE MADE BY
CODE
FACILITYCODE
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN OFFER
OFFEROR
PSE
Atlanta GA 30303-8701 1924 Building 100 Alabama St., SW
NPS SER EAST MABO
0009060271 CODE 16. ADMINISTERED BYCODE
X
X
X
115310
SIZE STANDARD:
100.00 % FOR:SET ASIDE:UNRESTRICTED ORPSE
RFPIFB
10. THIS ACQUISITION ISCODE
RFQ
14. METHOD OF SOLICITATION
13b. RATING
NAICS:
SMALL BUSINESS
03/22/2021 1700 ES
03/01/2021
(404)5075747Edward Dingle (No collect calls)
INFORMATION CALL:
FOR SOLICITATION 8. OFFER DUE DATE/LOCAL TIMEb. TELEPHONE NUMBER a. NAME
4. ORDER NUMBER3. AWARD/ 6. SOLICITATION
140P5121Q0006
5. SOLICITATION NUMBER
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS 1. REQUISITION NUMBER PAGE OF
1 14 0040524389OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, & 30
TELEPHONE NO.
17a. CONTRACTOR/
Kennesaw GA 30152-4855 905 Kennesaw Mountain Dr. NW NPS, Kennesaw Mountain NBP
15. DELIVER TO
Atlanta GA 30303-8701 1924 Building 100 Alabama St., SW
9. ISSUED BY
7.
2. CONTRACT NO.
EFFECTIVE DATE
$8.00
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK BELOW
ISSUE DATE
DELIVERY FOR FOB DESTINA-
TION UNLESS BLOCK IS
MARKED
11.
SEE SCHEDULEX
12. DISCOUNT TERMS
THIS CONTRACT IS A
RATED ORDER UNDER
DPAS (15 CFR 700)
13a.
SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
HUBZONE SMALL
BUSINESS
8(A)
NPS SER EAST MABO
WOMEN-OWNED SMALL BUSINESS
(WOSB) ELIGIBLE UNDER THE WOMEN-OWNED
SMALL BUSINESS PROGRAM
EDWOSB
24.
AMOUNT
23.
UNIT PRICE
22.
UNIT
21.
QUANTITY
20.
SCHEDULE OF SUPPLIES/SERVICES
19.
ITEM NO.
Legacy Doc #: NPS Delivery: 03/31/2022 Period of Performance: 04/01/2021 to 03/31/2022
00010 Removal of hazardous trees and limbs on the Visitor Center grounds, Kennesaw Mountain Trail and Little Kennesaw Mountain trail at Kennesaw Mountain National Battlefield Park in accordance with the attached statement of work (SOW).
Product/Service Code: F014
(Use Reverse and/or Attach Additional Sheets as Necessary)
HEREIN, IS ACCEPTED AS TO ITEMS:
XX
DATED
Edward Dingle
. YOUR OFFER ON SOLICITATION (BLOCK 5),
INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE SET FORTH
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND DELIVER
ARE
ARE
31c. DATE SIGNED
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA
31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER)
30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER (Type or print)
ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY ADDITIONAL
SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.
27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1, 52.212-4. FAR 52.212-3 AND 52.212-5 ARE ATTACHED. ADDENDA
26. TOTAL AWARD AMOUNT (For Govt. Use Only)
OFFER
STANDARD FORM 1449 (REV. 2/2012)
Prescribed by GSA - FAR (48 CFR) 53.212
ARE NOT ATTACHED.
ARE NOT ATTACHED.
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
30b. NAME AND TITLE OF SIGNER (Type or print)
30a. SIGNATURE OF OFFEROR/CONTRACTOR
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN
25. ACCOUNTING AND APPROPRIATION DATA
29. AWARD OF CONTRACT:
REF.
32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE
32c. DATE 32b. SIGNATURE OF AUTHORIZED GOVERNMENT REPRESENTATIVE
ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED:
32a. QUANTITY IN COLUMN 21 HAS BEEN
RECEIVED INSPECTED
40. PAID BY39. S/R VOUCHER NUMBER38. S/R ACCOUNT NUMBER
37. CHECK NUMBER
FINALPARTIAL
36. PAYMENT
FINALPARTIAL
35. AMOUNT VERIFIED
CORRECT FOR
34. VOUCHER NUMBER33. SHIP NUMBER
COMPLETE
32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE
42d. TOTAL CONTAINERS42c. DATE REC'D (YY/MM/DD)
42b. RECEIVED AT (Location)
42a. RECEIVED BY (Print)
41c. DATE41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER
41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT
STANDARD FORM 1449 (REV. 2/2012) BACK
24.
AMOUNT
23.
UNIT PRICE
22.
UNIT
21.
QUANTITY
20.
SCHEDULE OF SUPPLIES/SERVICES
19.
ITEM NO.
Product/Service Description: NATURAL
RESOURCES/CONSERVATION- TREE THINNING
32f. TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE
32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT REPRESENTATIVE
14 2 of
Combined Synopsis/Solicitation for Commercial Services
FAR 12.603
Document Type: Combined Solicitation/Synopsis Solicitation Number: 140P5121Q0006 Posted Date: March 01, 2021 Original Response Date: March 22, 2021 Current Response Date: March 22, 2021 Site Visit Date: March 08, 2021 Product or Service Code: F014 Set Aside: 100% Small Business NAICS Code: 115310
Contracting Office Address:
National Park Service East Buying Office 100 Alabama St. SW, Building 1924, 5th Floor Atlanta, GA 30303
Description:
This is a combined synopsis/solicitation for a commercial items prepared in accordance with the format outlined in FAR Subpart 12.6. Streamlined Procedures for Evaluation and Solicitation for Commercial Items,” as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; quotes are being requested, and a written solicitation document will not be issued.
The National Park Service, East Buying Office has a requirement to procure Hazardous Tree Removal Services for the Little River Canyon National Preserve. This solicitation is a Request for Quotations (RFQ).
The solicitation document and incorporated provisions and clauses are those in effect through Federal Acquisition Circular (FAC) 2021-03.
The associated North American Industrial Classification System (NAICS) code for this procurement is 115310; Support Activities for Forestry, with a small business size standard of $7,500,000.00. The Product Service Code (PSC) is F014; Tree Thinning Services.
In accordance with FAR Subpart 28, a certificate of insurance is required and coverage must be at a minimum of: $200,000 per person; $500,000 per occurrence; and $20,000 per property. The insurance certificate must be submitted within 10 calendar days of receipt of the award.
The contractor must have current Representation and Certifications in SAM.gov, submitted with quote.
The Government contemplates the award of a single Firm-Fixed Price Contract using the best value – Lowest Priced Technically Acceptable (LPTA) source selection procedures. All eligible and responsible sources may submit a proposal, which if timely received, shall be considered by the Agency. Companies must have valid DUNS numbers and be registered with System for Award Management (www.sam.gov).
SAM.gov offers free services. An offeror must ensure that they are self-certified under NAICS Code 115310 in the Representations and Certifications portion of SAM.gov. The basis of award is the responsible offeror whose offer conforming to the solicitation will be most advantageous to the Government, price and other factors considered. Award will be made to the responsible Offeror pursuant to FAR subpart 9.1.
All interested companies shall provide proposals for the following:
Services:
Statement of Work
“Remove Hazardous tree and limbs at KEMO”
The U.S. Department of the Interior, National Park Service, Kennesaw Mountain National Battlefield Park, located in Kennesaw, GA, has a requirement to remove hazardous and potentially hazardous trees throughout the park.
Statement of Services 1.
Project Site:
Kennesaw Mountain National Battlefield Park 905 Kennesaw Mountain Drive, Kennesaw, GA, 30152.
2. Background:
Kennesaw Mountain National Battlefield Park preserves a Civil War battlefield of the Atlanta Campaign. The battle was fought here from June 18, 1864 until July 2, 1864. There are 4 battlefield areas at the park: The Kolb farm area, Visitor Center including the top of Kennesaw Mountain, off Burnt Hickory Road and the main site is located at Cheatham Hill. The Visitor Center provides introductory information about the park and the battle. While walking some of the 18+ miles of interpretive walking trails you will see historic earthworks, cannon emplacements and various interpretive signs. There are 3 monuments representing states that fought here. Kennesaw Mountain is 1808 feet above sea level. It is approximately a 700-foot incline from the Visitor Center to the mountain's summit. The hike up is approximately 1.4 miles on the road and 1.2 mile up the trail. Kennesaw Mountain National Battlefield Park was authorized for protection by the War Department in 1917 and was transferred to the Department of the Interior as a unit of the National Park System in 1933. The 2992+- acre park includes the site of some of the heaviest fighting of the Atlanta Campaign. The park was set aside as an important cultural property dedicated to public inspiration and interpretation of the significant historic events that occurred here.
3.0 General Statement of Work:
The purpose of this Statement of Work is to establish a contract for the removal of hazardous trees and limbs on the Visitor Center grounds, Kennesaw Mountain Trail and Little Kennesaw Mountain trail at Kennesaw Mountain National Battlefield Park. The work will be ordered, as needed by the National Park Service (NPS) approximately once per month. Trees will range from 16 inches to 24 inches in diameter and up to 100+ feet high. Trees will need to be cut down and debris chipped and/or moved from park boundaries, roads, parking lots and trails as order by the NPS. Tree stumps shall be cut at ground level. Of particular concern in these cutting operations is the protection of the historic earthworks. These earthen fortifications date back to the battle here and are a major resource to be protected within the park boundaries. These earthworks are particularly vulnerable to damage by the operation of both the tracked and wheeled vehicles which are often used in timbering operations. It is essential and mandatory that the contractor meet with the COTR and representatives of the park’s interpretive staff before operations begin in any new area, so they can be shown what these earthworks look like and discuss how best to protect them. Park employees has marked 25+- to 40- trees each month to be removed. A total of 237 hazardous trees will need to be removed. This contract will last 10 to 12 months. Contractor will start mid-2021 and finish in mid-2022.
3.1. Work Descriptions:
Tree Removal: Removed trees and debris shall be fallen safely to prevent injury of workers and/or visitors using the adjacent areas. When ordered by the NPS, tree debris and limbs will be chipped and hauled to a NPS approved area for disposal. When chipping is not ordered by the NPS, the contractor will spread tree debris and limbs evenly across the area of disposal. The contractor may harvest large trees and limbs that they actively remove. Salvaged wood, should the contractor choose to re-utilize the material, will be removed immediately after felling, chipping and bucking of individual trees.
Removed/harvested trees are the property of the contractor.
Trail Trimming: Temporary trail closures of one hour or less are permissible for public safety reasons. Closures longer than one hour must be scheduled and approved by the NPS prior to closure and the commencement of the work. Special care must be taken to prevent damage to the surrounding area or adjacent trees, brush and other vegetation. The contractor will post appropriate warning signs indicating the removal process is underway.
Limb Trimming: The contractor may be required to trim the area prism of large limbs and other overhead (or horizontal) obstacles that could prevent the safe use of those roads, parking lots, trails or adjacent public use areas. The area prism also includes horizontal limbs or obstructions that protrude into the vertical plane from the trail tread sides, roads, parking lots or adjacent public use areas.
Climbing of trees may be required to accomplish some trimming work.
Desired Results: With the completion of the tree and limb removal project at Kennesaw Mountain National Battlefield Park, trees and limbs order by the NPS shall be removed and/or chipped and spread in the area of disturbance and the worksites will show little indication of that removal. Stumps ultimately shall be cut at ground level. Park boundaries, roads, parking lots and trails will be free of hazardous trees that may interfere with safe use of those areas.
3.2 Certified Arborist:
Contractor must be a Certified Arborist
ISA (International Society of Arboriculture) or equivalent
Contractor must be trained and knowledgeable in all aspects of arboriculture. Contractor must show three or more years of full-time, eligible, practical work experience in arboriculture.
3.3 Certified Arborist Bidding:
Because of the complexity of the project, it will be necessary for bidders to visit worksite.
Site visit meeting date/time - TBD
Removal of 237 previously marked Hazardous Trees 16’-24’
Services Include: Felling trees, limbing dropped trees, moving all tree debris into the park 60 feet away from all park boundaries, roads, and trails to keep fire breaks open. Cut and spreading debris ensure direct soil contact.
4.0 : HAULING RESTRICTIONS:
When hauling on National Park Service roads, do not exceed the following load restrictions:
Single Units Gross Vehicle Weight –Lbs.
2 axles 40,000
3 axles 48,000
4 or more axles 52,000
Combination Units Gross Vehicle Weight –Lbs.
3 axles 57,000
4 axles 62,000
5 or more axles 66,000 Where the ground is saturated with water or during periods of freezing and thawing, the Contracting Officer may impose further load restrictions or suspend hauling.
4.1 Haul vehicles shall turn around only at intersections and parking areas, not on the Park Road.
4.2 Operate loaded vehicles hauling material at speeds not exceeding the posted speed limit and spaced at 500-foot minimum intervals. On bridges, speeds shall not exceed 25 MPH and not more than one loaded hauling vehicle will be allowed on any bridge at one time. Hauling of materials, supplies, and equipment over the park road, other than within the limits of the project, will not be permitted without prior approval of the Contracting Officer. Load restrictions on park roads are identical to the state load restrictions with such additional regulations as may be imposed by the Contracting Officer.
5.0: EQUIPMENT
Equipment that is leaking any type fluids shall be repaired immediately or removed from the park.
Equipment deemed unsafe by the NPS will be repaired immediately or removed from the park.
6.0: INSPECTION – CONTROL OF WORK
Contractor working hours shall take place Monday through Friday, not before 7:00 AM and no after 6:00 PM. The contractor may work other hours only with submission of a written request and subsequent permission of the Contracting Officer. Work on weekends or on Federal Holidays and at night may be performed only with submission of a written request and subsequent permission of the Contracting Officer.
All work shall be scheduled by the NPS, five (5) workdays or more notice will be given by the NPS.
7.0: PROTECTION AND RESTORATION OF PROPERTY
The contractor shall be responsible for the preservation from injury or damage, resulting directly or indirectly from the execution of the work, of all public and private property along and adjacent to the park.
Contractor shall use every precaution necessary to prevent damage to historic earthworks, pipes, conduits, and other underground structures; also, all overhead structures such as wires, cables, etc.; and poles, trees, shrubbery and crops, within or outside of the project area. Any damage by the contractor or his employee shall be repaired at once at the contractor expense. The contractor will stop work immediately as directed by the COR if there is a suspicion of potentially undocumented cultural and natural resources. In such cased the NPS would require review and documentation of such resources.
8.0: SAFETY
The contractor must keep the entrance roads and parking lots open for public use at all times during removal activities. Contractor shall provide all traffic flaggers and other traffic control measures and must be in place and functional at all times during the tree removal and trimming in public areas, roads, trails and parking lots. Special care must be taken to prevent impacting the surrounding areas and facilities. The contractor will post appropriate warning signs indicating periods of tree removal and trimming work. The successful contractor shall use best management practices for tree removal and trimming, following all NPS, State, County and OSHA regulations pertaining to tree removal and trimming. Employees utilizing chain saw equipment shall wear approved safety equipment to include chaps, hard hat, eyes and hearing protection. All equipment shall be in good and safe working condition. Contractor shall inspect all equipment at the start of the workday. Contractor shall start each day with a safety briefing/meeting with all contractor and NPS staff on the work site.
9.0: PROJECT CLOSE OUT
The project period of performance is for 12 months with the exception of more days allowed for bad weather. When the contractor cannot work because of bad weather, the contractor must contact the COR in writing and provide the explanation and request additional days for inclement weather circumstances.
The FOB point will be Destination. “FOB Destination” means that all costs for transportation or freight from the shipping point shall be paid by the contractor and included as a separate line item. The total price should include all shipping cost.
Simplified Acquisition evaluation procedures pursuant to FAR Part 13, will be applied in the evaluation of quotes received. Failure to submit the information called for in this solicitation may render the quote unacceptable. Only those quotes deemed responsive will be evaluated. The Government will award a single firm-fixed price services contract resulting from this solicitation to the responsible Quoter whose quote conforms to the solicitation requirements and is determined to be the “Best Value”; that is, the lowest priced, technically acceptable quote. Technical acceptability must meet or exceed the standards set for non-price factors. The government will evaluate information based on the following evaluation criteria:
(1) Price
(2) Technical Approach
(3) Past Performance
Technical and Past Performance when combined, are approximately equal to cost or price
Technical Approach: Offeror shall describe a realistic plan, to include the means (labor, equipment, and materials) and methods (plan of work), logical sequencing of activities (including interdependencies of activities), and schedule, necessary to successfully complete the work within the required performance period. The plan shall list the specific equipment availability, crew(s) (size and composition) proposed to work concurrently, any other available resources, and daily production rate required in accordance with the attached Statement of Work (SOW). A rating of either “Acceptable” or “Unacceptable” will be assigned to this non-price factor. The standard for this factor is met and is acceptable when the responses provided by the Quoter can support a complete understanding of the work to be performed, potential obstacles and mitigation, and the specific requirements that are to be met to successfully complete the contract within the time required, and presents low or no risk to the Government. Technical factor shall be evaluated on an acceptable/unacceptable basis (See table below).
TECHNICAL CAPABILITY RATINGS:
Past Performance: Offeror shall have the Past Performance Questionnaire(s) completed by the contracting agency/customer that can confirm your company has successfully completed relevant services in the past five years as outlined in the Statement of Work. Offeror shall submit past performance information on three (3) projects of similar scope and magnitude. Past Performance must reflect work that was completed within three (3) years of the solicitation closing date. Past performance information must consist of final performance evaluations of project(s) or project references who can provide performance assessments. References shall consist of officials from the issuing contracting agency who oversaw the performance of the project. The Government reserves the right to obtain past performance information from other sources such as the references and the Past Performance Information Retrieval System (PPIRS) and other Federal performance assessments systems but is not limited to these sources. Offerors
Technical Acceptable/Unacceptable Ratings
Rating Description
Acceptable Quote clearly meets the minimum requirements of the solicitation.
Unacceptable Quote does not clearly meet the minimum requirements of the solicitation.
with no historical record of past performance will receive a Neutral rating. Information required for each project shall include:
• Contracting agency/customer
• Contract number
• Contract title or meaningful description of services and location
• Award date
• Initial award amount
• Award amount at contract completion
• Contract Completion Date
• Actual Completion Date
• Final performance evaluation with rating or reference information (first and last name, title, office, mailing address, telephone number, and email address)
• Address any adverse past performance information and explain the corrective actions taken to achieve a successful outcome.
Past performance will be evaluated on a pass/fail basis in accordance with FAR 15.305 (a)(2).
Price: A price evaluation will be performed as described in FAR 15-404-1to determine the reasonableness of the proposed price. Reasonableness will be determined considering other competitive prices received and comparison to the independent Government estimate. If multiple contract line items are included in the price schedule, prices will also be evaluated to determine whether any line items are unbalanced. The Offeror shall remit a completed price schedule (Section B). The price shall include a breakdown of all necessary supervision, management, labor, transportation, equipment, materials, any other direct incidental costs, overhead and profit. Offerors are cautioned to distribute costs appropriately.
The price submission will be evaluated but not rated.
The full text of FAR provisions or clauses may be accessed electronically at http://acquisition.gov/comp/far/index.html.
The following solicitation provisions apply to this acquisition:
1. FAR 52.212-1, “Instructions to Offerors–Commercial Items” (Oct 2018)
2. FAR 52.212-2, “Evaluation – Commercial Items” (Oct 2014)
3. FAR 52.212-3, “Offerors Representations and Certifications–Commercial Items” (Oct 2018)
4. FAR 52.217-5, “Evaluation of Options: (Jul 1990)
Offerors must complete annual representations and certifications on-line at http://orca.bpn.gov in accordance with FAR 52.212-3, “Offerors Representations and Certifications–Commercial Items.” If paragraph (j) of the provision is applicable, a written submission is required.
52.252-1 Solicitation Provisions Incorporated by Reference. (FEB 1998)
This solicitation incorporates one or more solicitation provisions by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. The offeror is cautioned that the listed provisions may include blocks that must be completed by the offeror and submitted with its quotation or offer. In lieu of submitting the full text of those provisions, the offeror may identify the provision by paragraph identifier and provide the appropriate information with its quotation or offer. Also, the full text of a solicitation provision may be accessed electronically at this/these address(es): http://farsite.hill.af.mil (End of provision) http://acquisition.gov/comp/far/index.html http://orca.bpn.gov/ http://farsite.hill.af.mil/
52.212-2 -- Evaluation -- Commercial Items.
As prescribed in 12.301(c), the Contracting Officer may insert a provision substantially as follows:
Evaluation -- Commercial Items (Oct 2014)
(a) The Government will award a contract resulting from this solicitation to the responsible offeror whose offer conforming to the solicitation will be most advantageous to the Government, price and other factors considered. The following factors shall be used to evaluate offers:
• Price
• Technical Approach
• Past Performance
(b) Options. The Government will evaluate offers for award purposes by adding the total price for all options to the total price for the basic requirement. The Government may determine that an offer is unacceptable if the option prices are significantly unbalanced. Evaluation of options shall not obligate the Government to exercise the option(s).
(c) A written notice of award or acceptance of an offer, mailed or otherwise furnished to the successful offeror within the time for acceptance specified in the offer, shall result in a binding contract without further action by either party. Before the offer’s specified expiration time, the Government may accept an offer (or part of an offer), whether or not there are negotiations after its receipt, unless a written notice of withdrawal is received before award.
(End of Provision)
The following contract clauses apply to this acquisition:
• FAR 52.212-4, “Contract Terms and Conditions–Commercial Items” (Oct 2018)
• FAR 52.212-5, “Contract Terms and Conditions Required to Implement Statutes or Executive
Orders” (May 2019)
The following subparagraphs of FAR 52.212-5 are applicable:
X__ (6) 52.204-14, Service Contract Reporting Requirements (Oct 2016) (Pub. L. 111-117, section 743 of Div. C).
X__ (14)(i) 52.219-6, Notice of Total Small Business Set-Aside (Nov 2011) (15 U.S.C. 644).
X__ (16) 52.219-8, Utilization of Small Business Concerns (Oct 2018) (15 U.S.C. 637(d)(2) and (3)).
X__ (25) 52.222-3, Convict Labor (June 2003) (E.O. 11755).
X__ (26) 52.222-19, Child Labor—Cooperation with Authorities and Remedies (Jan 2018) (E.O. 13126).
X__ (27) 52.222-21, Prohibition of Segregated Facilities (Apr 2015).
(28)(i) 52.222-26, Equal Opportunity (Sept 2016) (E.O. 11246).
(ii) Alternate I (Feb 1999) of 52.222-26.
(29)(i) 52.222-35, Equal Opportunity for Veterans (Oct 2015)(38 U.S.C. 4212).
(ii) Alternate I (July 2014) of 52.222-35.
(30)(i) 52.222-36, Equal Opportunity for Workers with Disabilities (July 2014) (29 U.S.C. 793).
(ii) Alternate I (July 2014) of 52.222-36.
_X_ (31) 52.222-37, Employment Reports on Veterans (Feb 2016) (38 U.S.C. 4212).
_X_ (33)(i) 52.222-50, Combating Trafficking in Persons (Mar 2015) (22 U.S.C. chapter 78 and E.O.
13627).
_X_ (42) 52.223-18, Encouraging Contractor Policies to Ban Text Messaging While Driving (Aug 2011) (E.O. 13513).
_X_ (43) 52.223-20, Aerosols (Jun 2016) (E.O. 13693).
_X_ (46) 52.225-1, Buy American—Supplies (May 2014) (41 U.S.C. chapter 83).
_X_ (57) 52.232-36, Payment by Third Party (May 2014) (31 U.S.C. 3332).
_X_ (2) 52.222-41, Service Contract Labor Standards (Aug 2018) (41 U.S.C. chapter 67).
_X_ (3) 52.222-42, Statement of Equivalent Rates for Federal Hires (May 2014) (29 U.S.C. 206 and 41 U.S.C. chapter 67).
52.237-2 Protection of Government Buildings, Equipment, and Vegetation. (APR 1984)
The Contractor shall use reasonable care to avoid damaging existing buildings, equipment, and vegetation on the Government installation. If the Contractor's failure to use reasonable care causes damage to any of this property, the Contractor shall replace or repair the damage at no expense to the Government as the Contracting Officer directs. If the Contractor fails or refuses to make such repair or replacement, the Contractor shall be liable for the cost, which may be deducted from the contract price.
(End of clause)
52.252-2 Clauses Incorporated by Reference. (FEB 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es): http://farsite.hill.af.mil (End of clause)
52.252-6 -- Authorized Deviations in Clauses.
As prescribed in 52.107(f), insert the following clause in solicitations and contracts that include any FAR or supplemental clause with an authorized deviation. Whenever any FAR or supplemental clause is used with an authorized deviation, the contracting officer shall identify it by the same number, title, and date http://farsite.hill.af.mil/ http://farsite.hill.af.mil/reghtml/regs/far2afmcfars/fardfars/far/52_000.htm#P98_14103 assigned to the clause when it is used without deviation, include regulation name for any supplemental clause, except that the contracting officer shall insert “(Deviation)” after the date of the clause.
Authorized Deviations in Clauses (Apr 1984)
(a) The use in this solicitation or contract of any Federal Acquisition Regulation (48 CFR Chapter 1) clause with an authorized deviation is indicated by the addition of “(DEVIATION)” after the date of the clause.
(b) The use in this solicitation or contract of any National Park Service. (48 CFR _____) clause with an authorized deviation is indicated by the addition of “(DEVIATION)” after the name of the regulation.
LOC-DOI ELECTRONIC INVOICING - Electronic Invoicing and Payment Requirements - Invoice Processing Platform (IPP) (April 2013)
Payment requests must be submitted electronically through the U. S. Department of the Treasury's Invoice Processing Platform System (IPP).
"Payment request" means any request for contract financing payment or invoice payment by the Contractor. To constitute a proper invoice, the payment request must comply with the requirements identified in the applicable Prompt Payment clause included in the contract, or the clause 52.212-4 Contract Terms and Conditions - Commercial Items included in commercial item contracts. The IPP website address is: https://www.ipp.gov.
Under this contract, the following documents are required to be submitted as an attachment to the IPP invoice [CO to edit and include the documentation required under this contract]: Contractor’s invoice
The Contractor must use the IPP website to register access and use IPP for submitting requests for payment. The Contractor Government Business Point of Contact (as listed in SAM will receive enrollment instructions via email from the Federal Reserve Bank of Boston (FRBB) within 3 - 5 business days of the contract award date. Contractor assistance with enrollment can be obtained by contacting the IPP Production Helpdesk via email ippgroup@bos.frb.org or phone (866) 973-3131.
If the Contractor is unable to comply with the requirement to use IPP for submitting invoices for payment, the Contractor must submit a waiver request in writing to the Contracting Officer with its proposal or quotation.
(End of Local Clause)
LOC-DOI AGENCY PROTESTS - Agency Protests
Insert the provision in all solicitations Agency Protests
(a) Interested parties may request an independent review at a level above the Contracting Officer of protests filed directly with the agency. This review is available as an alternative to consideration of the protest by the Contracting Officer or as an appeal of the Contracting Officer's response to the protest. An interested party may:
(1) Protest to the Contracting Officer;
(2) Protest directly to the Bureau Procurement Chief without first protesting to the Contracting
Officer; or
(3) Appeal a contracting officer’s decision to the Bureau Procurement Chief.
(4) Requests for Bureau Procurement Chief review should be addressed to:
Edward Dingle, Jr.
National Park Service Interior Region 2 South Atlantic Gulf 100 SW Alabama St.
Atlanta, GA 30303 Email: edward_dingle@nps.gov Phone: (404) 507-5747
(c) Requesting independent agency review will not extend the Government Accountability Office’s (GAO’s) timeliness requirements. Any subsequent protest.
All offerors shall submit the following:
1. One (1) copy of company’s capability statement with technical approach (Must include CAGE CODE and DUNS NUMBER)
2. Three (3) completed copies of the past performance questionnaire (Attachment 003)
3. I completed copy of price sheet (Attachment 4) (DO NOT INCLUDE ANY PRICING ON
STANDARD FORM 1449 (SF1449).
All offerors shall be sent electronically via e-mail to:
edward_dingle@nps.gov
This is an open-market combined synopsis/solicitation for services as defined herein. The government intends to award a contract as a result of this combined synopsis/solicitation that will include the terms and conditions set forth herein. To facilitate the award process, all proposals must include a statement regarding the terms and conditions herein as follows:
"The terms and conditions in the solicitation are acceptable to be included in the award document without modification, deletion, or addition."
OR
mailto:edward_dingle@nps.gov mailto:edward_dingle@nps.gov
"The terms and conditions in the solicitation are acceptable to be included in the award document with the exception, deletion, or addition of the following: offeror, shall list exception(s) and rationale for the exception(s).
Site Visit Information:
Point of Contact Mr. Carlos Hurston 404-707-1581 carlos_hurston@nps.gov
Site Visit Address:
Kennesaw Mountain National Battlefield Park 905 Kennesaw Mountain Drive, Kennesaw, GA, 30152
Submission of offerors shall be received not later than 5:00pm Eastern Standard Time (EST) March 22, 2021 at edward_dingle@nps.gov. Faxed or hand delivered submissions will not be accepted as part of this solicitation. Late submissions shall be treated in accordance with the solicitation provision at FAR 52.212-1(f). Electronic (e-mailed) offers will be the only form of quote submission accepted for this solicitation.
Any questions or concerns regarding this solicitation should be forwarded in writing no later than 1:00pm EST March 12, 2021 via e-mail to:
Point of Contact:
Edward Dingle edward_dingle@nps.gov mailto:carlos_hurston@nps.gov mailto:edward_dingle@nps.gov mailto:edward_dingle@nps.gov
| The U.S. Department of the Interior, National Park Service, Kennesaw Mountain National Battlefield Park, located in Kennesaw, GA, has a requirement to remove hazardous and potentially hazardous trees throughout the park. |
| Statement of Services 1. Project Site: |
| 2. Background: |
| 3.1. Work Descriptions: |
| Removal of 237 previously marked Hazardous Trees 16’-24’ |
| 4.0 : HAULING RESTRICTIONS: |
| 5.0: EQUIPMENT |
| 6.0: INSPECTION – CONTROL OF WORK |
| 7.0: PROTECTION AND RESTORATION OF PROPERTY |
| 8.0: SAFETY |
| 9.0: PROJECT CLOSE OUT |