This document is a Request for Proposal (RFP) for construction services to rehabilitate the fire sprinkler system in the Technology Museum at Steamtown National Historic Site. The National Park Service (NPS) is seeking proposals for this work, with a contract type of Firm Fixed Price (FFP) and an estimated magnitude between $100,000 and $250,000. The NAICS code is 238220 with a size standard of $19 million. This is a Small Business set-aside.
The RFP outlines the technical evaluation factors, including Technical Approach, Experience, and Licensure, which will be rated on a pass/fail basis. The price evaluation will determine price reasonableness, considering offered prices and the Independent Government Cost Estimate. The period of performance is estimated to be June 17, 2024 to December 17, 2024. Proposals are due by 5:00 PM EST on May 31, 2024 and must remain valid for 90 days.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Solicitation 140P4524R0014
Request for Proposal 140P4524R0014 STEAMTOWN-Rehab Fire Sprinklers Technology Museum
This is a request for construction proposals prepared in accordance with the format in the Federal Acquisition Regulations (FAR) Part 13 and Part 36, as supplemented with additional information included in this notice. This announcement constitutes the only solicitation issued as a Request for Proposal (RFP) 140P4524R0014. FAR clauses and provisions enclosed within this RFP are those in effect through Federal Acquisition Circular (FAC) 2022-08 and are available in full text through Internet access at http:// www.acquisition.gov/far/.
Type of Contract: Construction, Firm Fixed Priced (FFP), Single Award Contract County: Kings Type of Construction: Civil
Magnitude:
Between $100,000 and $250,000
NAICS:
238220
SIZE STD:
$19 Million
SET-ASIDE:
Small Business
National Park Service Contract Specialist (CS) Contracting Officer (CO)
Name: Mathew Pisko Nathan Jones Mary Hallmon
Email: Matthew_Pisko@nps.gov Nathan_A_Jones@nps.gov Mary_hallmon@nps.gov
Award Selection Process:
Award will be made in accordance with FAR Part 13 to the offeror that provides the best value to the government based on price, technical, and prior experience. This solicitation is not stating nor required to state the relative importance assigned to each evaluation factor and/or sub factor (FAR 13.106-1(a)(2)).
1. Technical Evaluation Factor 1 – TECHNICAL EVALUATIONS (Pass/Fail):
The Technical Evaluation determines if proposals meet the Technical Subfactors as prescribed below. Each Subfactor below will be rated as either “Technically Acceptable” or “Not Technically Acceptable.”
To be considered “Technically Acceptable” overall, each Subfactor must be rated “Technically Acceptable.” If any Subfactor is determined to be “Not Technically Acceptable,” the entire proposal is rated as “Not Technically Acceptable”, and an award cannot be made to that firm.
Offerors shall provide a narrative describing their proposed work plan not to exceed 10 pages as described below.
The NPS may hold clarifications concerning Technical Subfactors.
Subfactor 1 – Technical Approach:
The Contractor shall submit a detailed narrative description of the proposed methods and approaches to performing roof replacement work, as well as the Contractor’s understanding of the scope of work and capability to perform the work within the performance period. The proposed work plan should include sequencing and coordination of work, quality control reporting, scheduling, temporary protection measures, and best management practices that will be employed.
To be considered Technically Acceptable, the proposal must demonstrate a clear understanding of contract requirements and project scope and must reflect that the contractor and any identified personnel meet specific qualifications set out in the solicitation and its attachments.
Subfactor 2 – Experience:
At a minimum, the submission for each project should include a short (less than one page) description of the project, dates of performance, client’s name, and total project cost. A separate form/page shall be submitted for each individual project. The offeror shall limit submissions to no more than a total of five (5) projects. Projects shall include work of similar or greater size, scope, and complexity, completed within the past five (5) years.
Subfactor 3 – Licensure:
The Primary Contractor will provide a qualifying Fire Suppression System Worker License.
2. Price.
A price evaluation will be performed to determine the reasonableness of the proposed price. Reasonableness will be determined by considering other offered competitive prices received and comparison to the Independent Government Cost Estimate (IGCE). If multiple contract line items are included in the price schedule, prices will also be evaluated to determine whether any line items are unbalanced. The government will also evaluate whether a proposed price is unreasonably high and may also consider whether a proposed price is unreasonably low since this might indicate a lack of technical understanding on the Offeror’s part or a performance risk associated with the proposal that the Government may not be willing to accept. Whether a proposed price is unreasonably high or unreasonably low may be considered in the context of comparison to other price proposals received as well as to the IGCE or to any other information deemed useful in the decision.
GENERAL
(a) The National Park Service (NPS) is seeking proposals for construction services as attached in the accompanying statement of work.
The NPS intends to conduct this acquisition by use of simplified acquisition procedures in accordance with FAR Part 13.
(b) To assure timely and equitable evaluation of proposals, respondents are cautioned to strictly comply with all instructions within this solicitation to ensure submission of a complete proposal. Respondents are required to meet all solicitation requirements, including terms and conditions, representations and certifications, and technical requirements. Failure to adhere to proposal requirements, at the time of submission, may result in the proposal being unacceptable to the government and eliminated from consideration for the award.
(c) Respondents are cautioned to submit adequate information to enable the government to fully ascertain each respondent’s capability to perform the requirements in accordance with the requirements of the request for proposal (RFP).
(d) If a respondent believes that requirements in these instructions contain an error, omission, or are otherwise flawed, the respondent shall immediately notify the contracting officer in writing (email is the preferred method) with supporting rationale prior to the closing of this RFP.
(e) This RFP does not commit the Government to any costs incurred in the preparation and submission of a proposal or for any other costs incurred by any firm submitting a proposal in response to this solicitation. Note specifically that the Offeror will not be participating in a sealed bid procurement process under this acquisition method. Issuance of this RFP does not constitute an award commitment on the part of the Government.
(f) Proposal must be valid for a minimum of 90 days.
(g) All interested parties shall be registered in the System for Award Management or SAM at time an offer or proposal is submitted.
(h) Award is subject to and based on the availability of funds. This project is currently funded based upon an independent cost estimate.
(i) Respondents shall not contact any government personnel related to this requirement other than the Contracting Officer and Contracting Specialist.
(j) All questions should be emailed directly to the Contract Specialist no later than 13 May 2024. Only written RFI’s will be considered and responded to by the government. NPS responses to RFIs will be posted as an amendment to the solicitation.
SPECIAL CONTRACT REQUIREMENTS
WORK HOURS
The performance period established for this contract is based upon all work being conducted during regular working hours between 7:30 am and 4:00 pm, Monday through Friday, excluding government holidays. If the Contractor desires to carry on work outside regular hours, including Saturdays, Sundays, and government holidays, a request must be submitted to the Contracting Officer in sufficient time to allow satisfactory arrangements to be made by the Government for access to the work site and inspection.
The following Federal Legal Holidays are observed:
Federal Holidays:
New Year’s Day Martin Luther King, Jr. Day President’s Day Memorial Day Juneteenth National Independence Day Independence Day Labor Day Columbus Day Veterans Day Thanksgiving Day Christmas
PERIOD OF PERFORMANCE (Reference 52.211-10) Notice to Proceed will only be issued upon receipt of acceptable bonding and insurance.
All onsite work is estimated to be performed: 6/17/2024 – 12/17/2024.
INSTRUCTIONS TO OFFERORS:
Proposals must be in accordance with and in the order detailed in this section. Failure to submit proposals according to the instructions provided within the solicitation may result in the respondent’s proposal being deemed unacceptable.
All interested parties shall be registered in the System for Award Management (SAM) at time of proposal submittal.
Offerors shall submit their proposal to the contracting officer by email to Nathan_A_Jones@nps.gov, no later than 1700 EST on May 31st, 2024..
Offerors shall submit the following information in its entirety:
a) Price schedule in accordance with the Scope of work. In addition, provide a price breakdown of major components that matches the total price as reflected in the contract price schedule.
b) Checklist for proposal submittal:
● This page of the solicitation completed as the first page in the package ☐
● Signed acknowledgment of SF1442 ☐
● Signed amendments if applicable ☐
● Draft schedule based on product lead times ☐
● Roofing Trade License ☐
● Complete and return a copy of FAR 52.204-24 and FAR 52.204-26 ☐
● No more than five (5) prior experiences of projects in similar size and scope of each part of the requirement as described in the
SOW. Prior experience must be within the past five (5) years and include:
o Brief description of the project o Point of contact information ☐
c) Contractor Core Data:
Offeror’s Name:__________________________________________________________________
Offeror’s Address:________________________________________________________________
Offeror’s Unique Entity Identifier (UEI):__________________________________________________________________
Offeror’s POC:___________________________________________________________________
Offeror’s Phone/Email:_____________________________________________________________
SOLICITATION, OFFER,
AND AWARD
2. TYPE OF SOLICITATION
6. PROJECT NO. 4. CONTRACT NO. 5. REQUISITION/PURCHASE REQUEST NO.
PAGE OF PAGES
7. ISSUED BY CODE 8. ADDRESS OFFER TO
SOLICITATION
(Construction, Alteration, or Repair)
1. SOLICITATION NO. 3. DATE ISSUED
IMPORTANT -- The "offer" section on the reverse must be fully completed by offeror.
9.
INFORMATION CALL
a. NAME b. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder."
FOR
SEALED BID (IFB)
NEGOTIATED (RFP)
0040660218
NPS, NER - NPNH
210 New York Ave.
Contracting Office Staten Island NY 10305
PNP
Nathan Jones 6179138830
336375 x 05/02/2024
140P4524R0014
INVITATION FOR BID
REQUEST FOR PROPOSAL
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date)
Steamtown NHS has a requirement to rehabilitate the fire sprinkler system in the
Technology Museum. NAICS code 238220
Place of Performance: 150 South Washington Ave, Scranton, PA 18505.
Attachments:
1. Statement of Work
2. Drawings
3. Wage Determination
4. Price Schedule
11. The Contractor shall begin performance within
12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
award, notice to proceed. The performance period is mandatory negotiable. (See ________________________________________________.)
13. ADDITIONAL SOLICITATION REQUIREMENTS:
a. Sealed offers in original and is not required.is, b. An offer guarantee
c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
(date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
d. Offers providing less than
12b. CALENDAR DAYSYES NO
(If "YES", indicate within how many calendar days after award in Item 12b.)
10 180 calendar days and complete it within ________________ ________________ calendar days after receiving
06/03/2024
NSN 7540-01-155-3212
x x x x copies to perform the work required are due at the place specified in Item 8 by _____________ ___________________ (hour) local time calendar days for Government acceptance after the date offers are due will not be considered and will be rejected . _________________
STANDARD FORM 1442 (Rev. 12/2022)
Prescribed by GSA
FAR(48 CFR) 53.236-1(d)
17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within ____________________ calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in item 13d. Failure to insert any number means the offeror accepts the minimum in item 13d.)
14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code) 15. TELEPHONE NO. (Include area code)
16. REMITTANCE ADDRESS (Include only if different than item 14.)
CODE FACILITY CODE
AMOUNTS
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGEMENT OF AMENDMENTS
OFFER (Must be fully completed by offeror)
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT NO.
DATE.
20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print) 20b. SIGNATURE 20c. OFFER DATE
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN
(4 copies unless otherwise specified)
ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO THE UNITED STATES CODE AT
26. ADMINISTERED BY CODE 27. PAYMENT WILL BE MADE BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
(Contractor is required to sign this document solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.
30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print) 31a. NAME OF CONTRACTING OFFICER (Type or print)
30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA 31c. DATE
BY
2PAGE OF
DOI, NPS, NER - NPNH
210 New York Ave.
Staten Island NY 10305
PNP
Mary Hallmon
28. NEGOTIATED AGREEMENT 29. AWARD
and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations,certifications, and specifications incorporated by reference in or attached to this contract.
copies to issuing office.) Contractor agrees to furnish
10 U.S.C. 3204(a) 41 U.S.C. 3304(a)
STANDARD FORM 1442 (REV. 12/2022) BACK
Continued...
and return
(Contractor is not required to sign this document.) Your offer on this
ITEM NO.
(A)
SUPPLIES/SERVICES
(B)
QUANTITY
(C)
UNIT
(D)
UNIT PRICE
(E)
AMOUNT
(F)
NAME OF OFFEROR OR CONTRACTOR
3 46
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
140P4524R0014
Header Text: Rehabilitate Sprinkler System in
Technology Museum. PMIS: 336375
Delivery: 12/17/2024
Delivery Location Code: 0009060095
NPS, Steamtown NHS
150 S. Washington Avenue
Scranton PA 18503 US
Period of Performance: 06/17/2024 to 12/17/2024
00010 Technology Sprinkler-Contractor is to furnish all equipment and materials
Product/Service Code: J045
Product/Service Description: MAINT/REPAIR/REBUILD
OF EQUIPMENT- PLUMBING, HEATING, AND WASTE
DISPOSAL EQUIPMENT
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
File details come from the government source that posted it. Updated .