This is a Request for Quote (RFQ) for lift rental services at Gettysburg National Military Park issued by the National Park Service (NPS), Northeast Regional Contracting office in Philadelphia, under solicitation number 140P4226Q0028.

The solicitation seeks rental of three pieces of heavy construction equipment for summer 2026 projects: (1) one 60-foot telescoping boom lift for 152 days (June 8 – November 7, 2026), (2) one 6,000-pound capacity 40-49 foot telehandler forklift for 152 days (same period), and (3) one 125-foot articulating boom lift for 61 days (August 3 – October 3, 2026). Equipment must be delivered to Gettysburg National Military Park's Maintenance Division at 405 Taneytown Road, Gettysburg, PA 17325. The contractor is responsible for all delivery, pickup, maintenance, and equipment repairs or replacement at no additional cost, with repairs required within 48 hours of notification and replacement within five business days. Quotes are due electronically by 12:00 PM EDT on June 1, 2026, submitted to eric_hubbell@ios.doi.gov. Technical questions must be submitted by 5:00 PM EDT on May 26, 2026. The acquisition is designated for women-owned small businesses (WOSB) with a 100% set-aside. Evaluation will use the Lowest Price Technically Acceptable process, with award based on technical capability, past performance/experience, and fixed price (including mobilization). The contractor must maintain liability insurance of at least $200,000 per person and $500,000 per occurrence and comply with OSHA regulations, prevailing wage requirements under the Service Contract Act, and all federal and state environmental laws.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

WOMEN-OWNED SMALL

BUSINESS (WOSB)

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES

1. REQUISITION NUMBER PAGE 1 OF

2. CONTRACT NUMBER 3.AWARD/EFFECTIVE

DATE

4. ORDER NUMBER 5. SOLICITATION NUMBER 6. SOLICITATION ISSUE

DATE

7. FOR SOLICITATION

INFORMATION CALL:

a. NAME b. TELEPHONE NUMBER (No collect calls)

8. OFFER DUE DATE/

LOCAL TIME

9. ISSUED BY

13b. RATING

14. METHOD OF SOLICITATION

CODE

15. DELIVER TO 16. ADMINISTERED BY CODE

18a. PAYMENT WILL BE MADE BY CODE17a. CONTRACTOR/

OFFEROR

CODE

FACILITY

CODE

CODE

TELEPHONE NUMBER

17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN

OFFER

18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK

BELOW IS CHECKED

REQUEST

FOR QUOTE

(RFQ)

INVITATION

FOR BID

(IFB)

REQUEST

FOR

PROPOSAL

(RFP)

SEE ADDENDUM

19.

ITEM NO.

20.

SCHEDULE OF SUPPLIES/SERVICES

21.

QUANTITY

22.

UNIT

23.

UNIT PRICE

24.

AMOUNT

(Use Reverse and/or Attach Additional Sheets as Necessary)

25. ACCOUNTING AND APPROPRIATION DATA 26. TOTAL AWARD AMOUNT (For Government Use Only)

28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN 29. AWARD OF CONTRACT: REFERENCE

. YOUR OFFER ON SOLICITATION

(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE

SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:

30a. SIGNATURE OF OFFEROR/CONTRACTOR

30b. NAME AND TITLE OF SIGNER (Type or print) 30c. DATE SIGNED

31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER)

31b. NAME OF CONTRACTING OFFICER (Type or print) 31c. DATE SIGNED

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

STANDARD FORM 1449 (REV. 11/2021)

Prescribed by GSA - FAR (48 CFR) 53.212

10. THIS ACQUISITION IS UNRESTRICTED OR

NORTH AMERICAN

INDUSTRY CLASSIFICATION

STANDARD (NAICS):

SIZE STANDARD:

13a. THIS CONTRACT IS A

RATED ORDER UNDER

THE DEFENSE PRIORITIES

AND ALLOCATIONS

SYSTEM - DPAS (15 CFR 700)

SET ASIDE: % FOR:

11. DELIVERY FOR FREE ON

BOARD (FOB) DESTINATION

UNLESS BLOCK IS MARKED

SEE SCHEDULE

12. DISCOUNT TERMS

ARE ARE NOT ATTACHED

ARE ARE NOT ATTACHED

27a. SOLICITATION INCORPORATES BY REFERENCE (FEDERAL ACQUISITION REGULATION) FAR 52.212-1, 52.212-4.

FAR 52.212-3 AND 52.212-5 ARE ATTACHED.

27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED.

8(A)

ECONOMICALLY

DISADVANTAGED

WOMEN-OWNED SMALL

BUSINESS (EDWOSB)

SERVICE-DISABLED

VETERAN-OWNED

SMALL BUSINESS

(SDVOSB)

HUBZONE SMALL

BUSINESS

SMALL BUSINESS

NOTE: OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30.

COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH

AND DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND

ON ANY ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS

SPECIFIED

DATED.

OFFER

ADDENDA

ADDENDA

140P4226Q0028

See Schedule See Schedule

DOI, NPS, NERO & NER SOUTH MABO

National Park Service Northeast Regional Contracting South/Philadelphia MABO 1234 Market Street, 20th Floor Philadelphia PA 19107

06/01/2026 1200 ED

0044033267

Eric Hubbell 4842697159

PNC 100.00

PNC

Brian McCabe

532412

$40

05/21/2026

0011282843

ADMINISTERED BY:

DOI, NPS, NERO & NER SOUTH MABO

National Park Service

Northeast Regional Contracting

South/Philadelphia MABO

1234 Market Street, 20th Floor

Continued...

STOCK RECORD (S/R)

STANDARD FORM 1449 (REV. 11/2021) BACK

19.

ITEM NO.

20.

SCHEDULE OF SUPPLIES/SERVICES

21.

QUANTITY

22.

UNIT

23.

UNIT PRICE

24.

AMOUNT

32a. QUANTITY IN COLUMN 21 HAS BEEN

RECEIVED INSPECTED AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED:

41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT

32b. SIGNATURE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32c. DATE

41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE

42a. RECEIVED BY (Print)

42b. RECEIVED AT (Location)

42c. DATE RECEIVED (MM/DD/YYYY) 42d. TOTAL CONTAINERS

40. PAID BY

32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f. TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE

32g. EMAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE

33. SHIP NUMBER 34. VOUCHER NUMBER 35. AMOUNT VERIFIED

CORRECT FOR

PARTIAL FINAL

37. CHECK NUMBER

38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER

36. PAYMENT

COMPLETE PARTIAL FINAL

ACCEPTED,

Philadelphia PA 19107 US

DELIVER TO:

NPS, Gettysburg NMP

1195 Baltimore Pike

Suite 100

Gettysburg PA 17325-2804 US

Rental of Lifts and Telehandler for Gettysburg

National Military Park (GETT)

00010 Renal of one (1) 60ft Telescoping Boom Lift, 152 days

Product/Service Code: W036

Product/Service Description: LEASE OR RENTAL

OF

EQUIPMENT- SPECIAL INDUSTRY MACHINERY

Delivery: 11/07/2026

Period of Performance: 06/08/2026 to

11/07/2026

00020 Rental of one (1) 6,000lb 40ft-49ft Telehandler

Forklift, 152 days

Product/Service Code: W036

Product/Service Description: LEASE OR RENTAL

OF

EQUIPMENT- SPECIAL INDUSTRY MACHINERY

Delivery: 11/07/2026

Period of Performance: 06/08/2026 to

11/07/2026

Continued...

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGES

NAME OF OFFEROR OR CONTRACTOR

SUPPLIES/SERVICES

(B)

UNIT

(D)

UNIT PRICE

(E)

AMOUNT

(F)

OPTIONAL FORM 336 (4-86)

Sponsored by GSA FAR (48 CFR) 53.110

ITEM NO.

(A)

QUANTITY

(C)

NSN 7540-01-152-8067

00030 Rental of one (1) 125ft Articulating Boom Lift, 61 days

Product/Service Code: W036

Product/Service Description: LEASE OR RENTAL

OF

EQUIPMENT- SPECIAL INDUSTRY MACHINERY

Delivery: 10/03/2026

Period of Performance: 08/03/2026 to

10/03/2026

REFERENCE NO. OF DOCUMENT BEING CONTINUED

PAGE

SECTION A - TABLE OF CONTENTS

SECTION DESCRIPTION PAGE

PART I - The Schedule

A Solicitation/Contract Form 4 B Schedule of Items 5 C Description/specifications/requirements 6 D Packaging and Marking 15 E Inspection and Acceptance 16 F Deliveries or Performance 17 G Contract Administration Data 18 H Special Contract Requirements 24

PART II - Contract Clauses

I Contract Clauses 27

PART III - List of Documents, Exhibits, and Other Attachments

J List of Attachments 40

PART IV - Representations and Instructions

K Representations, Certifications, and Other Statements of Offerors 41 L Instructions, Conditions, and Notices to Offerors 50 M Evaluation Factors for Award 55

SECTION B - SCHEDULE OF SERVICES

19.

ITEM

NO.

20.

SCHEDULE OF SERVICES

21.

QTY

22.

UNIT OF

MEASURE

23.

UNIT PRICE

24.

TOTAL

00010 Renal of one (1) 60’ Telescoping Boom Lift, 152 days

Each

00020 Rental of one (1) 6,000 lb 40’- 49’ Telehandler Forklift, 152 days

00030 Rental of one (1) 125’ Articulating Boom Lift, 61 days

Total $

NOTE: This acquisition utilizes Revolutionary FAR Updates (RFO) FAR 12 Acquisition of Commercial Products and Commercial Services - Specifically RFO FAR 12.201-1 - Simplified Procedures.

The contract includes the FAR Clause 52.217-8 - Option to Extend Services for up to six (6) months. If the Government elects to exercise FAR 52.217-8 - Option to Extend Services after the base period, the contractor is hereby notified that the Government will require continued performance of any services within the limits and at the unit prices specified in the Schedule of Services above, unless any of the unit prices require adjustment per revisions to the prevailing labor rates provided by the Secretary of Labor. The prices under this clause are hereby considered to be evaluated at the time of award of the base contract.

SECTION C - DESCRIPTION/SPECIFICATION/REQUIREMENTS

Gettysburg National Military Park

STATEMENT OF WORK

Lift Rental Services

NATIONAL PARK SERVICE NER – IR1

C.0 NATIONAL PARK SERVICE

The National Park Service (NPS) is a bureau of the U.S. Department of the Interior (DOI) that has been entrusted with the care of our national parks since 1916. The National Park System currently has 433 units (often referred to as parks), covering more than 85 million acres in all 50 states, the District of Columbia, and US territories.

The NPS also has more than 150 related areas that are linked in importance and purpose to places managed directly by the National Park Service by preserving important segments of the nation's natural and cultural heritage. They are designated by acts of Congress or by the Secretary of the Interior (affiliated areas). The majority of related areas are not units of the National Park Service and are managed by other government agencies or non-government organizations and landowners. The National Park Service is involved in related areas by directly managing the entire or sections of a related area, or by providing technical or financial assistance.

The NPS preserves unimpaired natural and cultural resources, and values of the National Park System for the enjoyment, education, and inspiration of this and future generations. The NPS cooperates with partners to extend the benefits of natural and cultural resource conservation and outdoor recreation throughout this country and the world.

The NPS – Business Service Contracting Division (BSCD) – Contracting Operations – Northeast Region – Philadelphia MABO. The NPS

– BSCD-Northeast issues contracts through the Federal Acquisition Regulation’s (FAR) for supplies, services, construction, A&E for Northeast Regional Parks only.

C.1 SPECIFIC PARK INFORMATION

C.1.1 GETTYSBURG NATIONAL MILITARY PARK (GETT)

Gettysburg National Military Park (GETT) is situated in the Piedmont Province east of Appalachian Mountains in south central Pennsylvania, encompasses over 5,989 acres of land. The park is fifteen miles east of South Mountain, which rises to 2,000 feet above sea level. The Battle of Gettysburg was the bloodiest battle of the American Civil War and was also the inspiration for President Abraham Lincoln’s immortal “Gettysburg Address”.

Significant sites on the battlefield began to be preserved almost immediately after the 1863 battle, and the park came under federal ownership in 1895. Administered by the National Park Service (NPS) since 1933, the park now incorporates a significant portion of land across which the battle, its aftermath and the commemoration occurred. The park attracts 1.8 million visitors each year and is open year-round. It offers visitors hiking trails, scenic car tours on over 40 miles of roads, and beautiful vistas overlooking the battlefield and nearby town. There are also over 1,400 monuments and 400 cannons, which dot the landscape.

GETT is home to the Gettysburg National Cemetery, Eternal Light Peace Memorial, which dedicated the 75th Anniversary of the Battle in 1938, the home and farm of General & resident Dwight D. Eisenhower, the David Wills House, where President Lincoln put the final touches on the famous Gettysburg Address. You can also visit famous battle sites, like McPherson Ridge, Oak Ridge, and Little Round Top where some of the most famous fighting happened. You can also find some breath-taking views of GETT with the Culp’s Hill Observation Tower and Oak Ridge Observation Tower.

For more information, please visits GETT’s website at: Gettysburg National Military Park (U.S. National Park Service)

C.2 BACKGROUND

The National Park Service requires rental services to furnish and deliver construction equipment in support of summer construction and preservation projects at Gettysburg National Military Park. Services include furninshing, delivery, and if necessary, repair/replacement of three pieces of rented heavy equipment.

C.3 PERIOD OF PERFORMANCE

C.3.1 SCHEDULE

Work is nominally to be performed during normal Park business hours between 7:00 AM and 4:30 PM, Monday through Friday.

For a list of federally recognized holidays see https://www.opm.gov/policy-data-oversight/pay-leave/federal-holidays.

The overall period of performance is 5/4/2026 through 10/2/2026. Specific rental periods are as follows:

Item Description Approx. Start Approx. End Days 1 60’ Telescoping Boom Lift 6/8/2026 11/7/2026 152 2 6,000 lbs 40’-49’ Telehandler Forklift 6/8/2026 11/7/2026 152 3 125’ Articulating Boom Lift 8/3/2026 10/3/2026 61

C.3.2 DELIVERY AND REMOVAL

Delivery service shall be coordinated with the Contracting Officer’s Representative:

Randall Hill 717-388-4474

Equipment shall be delivered to and picked up from:

Gettysburg National Military Park Maintenance Division 405 Taneytown Road Gettysburg, PA 17325

C.3.3 POST AWARD CONFERENCE/PERIODIC PROGRESS MEETINGS

The Contractor agrees to attend any post award conference convened by the contracting activity or contract administration office in accordance with Federal Acquisition Regulation Subpart 42.5. The contracting officer, https://www.opm.gov/policy-data-oversight/pay-leave/federal-holidays

Contracting Officers Representative (COR), and other Government personnel, as appropriate, may meet periodically with the contractor to review the contractor's performance. At these meetings the contracting officer will apprise the contractor of how the government views the contractor's performance and the contractor will apprise the Government of problems, if any, being experienced. Appropriate action shall be taken to resolve outstanding issues. These meetings shall be at no additional cost to the government.

C.5 TASKS

The Contractor shall provide all management, supervision, labor, material, supplies, and equipment and shall plan, schedule, coordinate, and assure effective performance of all services described herein.

The Contractor shall furnish, deliver, remove, and maintain specified rental equipment. The Contractor shall be responsible for repairs and/or replacement of non functional equipment as necessary at no additional cost.

C.6 RENTAL UNIT SPECIFICATIONS

C.6.1 TELESCOPIC BOOM LIFT

The Contractor shall provide equipment meeting the following specifications:

• Commercial item

• Gas or diesel powered

• Equipment must comply with applicable state and federal regulations

• Maximum Work Platform height capability 65 ft.

• Minimum Horizontal reach 57ft.

• Minimum platform capacity 550 lb.

• Minimum Platform Size: 36”x 96”

• Electrical Power in basket for power tools

C.6.2 TELEHANDLER FORKLIFT

The Contractor shall provide equipment meeting the following specifications:

• Commercial item

• Variable reach 40 to 49 ft.

• Equipment must comply with applicable state and federal regulations

• Maximum Load Capacity 6,000lbs.

• Minimum Height capacity: 40 ft.

• 4-wheel steering

• Gas or diesel fuel engine

• Attachments:

o Pallet Forks o Man Basket (4’x6’)

C.6.3 TELESCOPIC BOOM LIFT

The Contractor shall provide equipment meeting the following specifications:

• Gss or diesel powered

• Equipment must comply with applicable state and federal regulations

• Maximum Work Platform height capability 125 ft.

• Minimum Horizontal reach 60ft.

• Minimum platform capacity 550 lb.

• Minimum Platform Size 36”x 96”

• Electrical Power in basket for power tools

C.7 CONTRACTOR RESPONSIBLITIES

C.7.1 GENERAL

The contractor shall:

1. Be responsible for adherence to all Occupational Safety and Health Administration (OSHA) Regulation, specifically 29 CFR 1910 - General Industry.

2. Have adequate liability insurance and proper license to perform all work stated herein.

3. All workers to comply with Federal, State, and Local safety requirements.

4. Be held responsible for any damages to, and for maintenance and protection of existing structures and utilities.

5. Preserve and protect all existing vegetation such as trees, shrubs, and grass areas (on or adjacent to removed trees) that do not reasonably interfere with work.

6. Not park heavy equipment/vehicles and/or the stockpile of heavy materials off hard surface roads without the express written permission of the COR.

7. The Contractor, their employees, equipment, and materials may be subject to search by Law Enforcement when working in secure areas or on any Federal property within the Park.

C.7.2 PERFORMANCE QUALIFICATIONS

To ensure satisfactory performance, the Contractor shall, prior to award:

1. Expressly confirm capability to deliver the required equipment by the specified date(s).

2. Have demonstrated ability to repair or replace equipment in the event of a malfunction.

3. Provide details and points of contact for response to non-functional equipment, including repair logistics, equipment replacement process, and any additional applicable guarantees.

C.7.3 MAINTENANCE/MALFUNCTION RESPONSE

In the event of nonfunctional or malfunctioning equipment in the course of normal operation, the Contractor shall repair or replace faulty rental equipment at no cost to the Government on the following timetables:

1. Repair: Within forty-eight (48) hours of notification by NPS

2. Replacement: Within five (5) business days of notification by NPS.

C.7.5 PROHIBITION OF WEAPONS/FIREARMS

18 USC 930 is Federal law that supersedes Section 512 of Public Law 111-24 and prohibits the possession of a firearm or other dangerous weapon in a Federal facility. Federal facilities are buildings or parts thereof owned or leased by the Federal Government, where Federal employees are regularly present for the purpose of performing official duties. No weapon or firearms are authorized within ORCA at any time.

C.7.6 RESOURCE DAMAGE

All conduct outside of the specified work is subject to park rules and regulations concerning littering, wildlife harassment, collecting, resource damage and other topics as specified for the NPS in the Code of Federal Regulations title 36, which can be found at http://www.gpoaccess.gov/ecfr/

C.7.7 ENVIRONMENTAL REGULATIONS

All waste materials generated by any work under the contract performed on a Government installation shall at all times be handled, transported, stored, and disposed of by the contractor and by their subcontractors in accordance with all applicable Federal, state, and local laws, ordinances, regulations, court orders, and other types of rulings having the effect of the law, including, but not limited to:

1. Executive Order 12088, 13 October 1978, Federal Compliance with Pollution Control Standards;

2. Federal Water Pollution Control Act, as amended (33 U.S.C. 1251 ET SEQ);

3. Clean Air Act as amended (42 U.S.C. Sec 7401 ET SEQ);

4. Endangered Species Act, as amended (16 U.S.C. Sec 1531 ET SEQ);

5. Toxic Substances Control Act, as amended (15 U.S.C. Sec 2601, ET SEQ);

6. National Historic Preservation Act, as amended (16 U.S.C. Sec 470, ET SEQ);

7. Solid Waste Disposal Act, as amended (42 U.S.C. 6901 ET SEQ);

8. Archaeological and Historic Preservation Act, as amended (16 U.S.C. Sec 469, ET SEQ).

Should the United States Government be held liable for any neglect or improper actions by the contractor or any subcontractor regarding removal or disposal of any hazardous waste, the contractor shall reimburse the Government for all such liability.

C.7.9 HAZARDOUS MATERIAL IDENTIFICATION

Submit Safety Data Sheet (SDS)’s as required per 29 CFR 1910.1200 as amended. The contractor must provide one digital copy of each SDS for applicable hazardous chemicals used and/or provided in performance of any work under this contract.

C.7.11 TRAVEL

The contractor shall be responsible for all delivery, pick-ups and service/maintenance calls.

C.7.13 NOTIFICATION OF SUBCONTRACTING

The contractor shall within 14 days after award notify the Contracting Officer upon entering into any subcontract arrangement, as required by FAR 52.222-11 – Subcontracts (Labor Standards). The subcontractor shall have the experience and be equipped for such work. The written notification shall be completed:

1. Prime Contract Number and Subcontract Number (if applicable)

2. The name and address of the Prime Contractor.

3. The name and address of the subcontractor.

4. The date upon which the subcontract was entered into and its duration.

5. A detailed description of the work being subcontracted.

6. Project Name and Location of Work.

7. Identify the names of any intermediate subcontractors (if applicable) http://www.gpoaccess.gov/ecfr/

8. Must be signed by both Prime Contractor and Subcontractor

Subcontracting any portion of the contract shall not relieve the Prime Contractor of any responsibility under this contract. Any subcontract agreement shall contain all terms and conditions of the prime contract.

C.8 ROLES AND LIMITATIONS

C.8.2 THE ROLE OF GOVERNMENT PERSONNEL AND RESPONSIBILITY FOR CONTRACT ADMINISTRATION

1. Contracting Officer: The Contracting Officer (CO) has the overall responsibility for the administration of this contract. The CO alone, without delegation, is authorized to amend, modify, or deviate from the contract. Other responsibilities may be delegated to authorized representatives.

2. Contracting Officer's Representative (COR): The COR will be designated in writing at the time of award to assist the CO in the day-to-day on-site administration of the contract requirements. The responsibilities of the COR include, but are not limited to;

a. Determining the compliance and adequacy of performance by the Contractor in accordance with the terms and conditions of this contract;

b. Requesting removal of unsuitable contractor employees;

c. Ensuring adequacy of schedule and Quality Control Plan, including changes;

d. Ordering re-performance of unacceptable work or performance by other mean, etc.

3. Point-of-Contact (POC): The POC will be used if an official certified COR cannot be designated at the time of award. The POC will not be designated in writing and will assist the CO in the day-to-day on-site administration of the contract requirements.

C.8.3 DESIGNATION OF CONTRACTING OFFICERS REPRESENTATIVE (COR) AND/OR POINT-OF-CONTACT

1. The Contracting Officer will designate an individual as Contracting Officer's Representative (COR) at time of award of the contract in accordance with DIAR 1452.201-70 Authorities and Delegations (SEP 2011). The name will be designated on a letter or form.

2. The COR is responsible for administering the performance of work under this contract. In no event, however, will any understanding, agreement, modification, change order, or other matter deviating from the terms of this contract be effective or binding upon the Government unless formalized by a proper contractual documents executed by the Contracting Officer prior to completion of the contract.

3. The Contracting Officer should be informed as soon as possible of any actions or inactions by the Contractor or the Government which will change the required delivery or completion times stated in the contract, and the contract will be modified accordingly. (This does not apply to individual assignments which were issued by the Contracting Officer’s Representative provided they do not affect the delivery schedule or performance period stated in the contract.)

4. On all matters that pertain to the contract terms the Contractor must communicate with the Contracting Officer.

Whenever, in the opinion of the Contractor, the COR’s requests effort outside the scope of the contract, the Contractor should so advise the Contracting Officer’s Representative. If the COR persists and there still exists a disagreement as to proper contractual coverage, the CO should be notified immediately, preferably in writing if time permits. Proceeding with work without proper contractual coverage could result in nonpayment or necessitate submittal of a contract claim.

5. The COR is delegated full authority under this contract except for the following actions which are reserved for the Contracting Officer:

a. Changing or modifying any of the terms and conditions of the contract.

b. Directing the contractor to perform work or make deliveries not specifically required under the contract.

c. Directing the contractor to begin work prior to contract award date.

d. Waving or relaxing, in any way, the Government’s rights with regard to the contractor’s compliance with the specifications, price, delivery or any other terms or conditions of the contract.

e. Interfering with contractor’s management of its employees, including “supervising” or directing the work of the employees.

f. Making any commitments or approving any actions that would create any financial obligation on the part of the Government. As per Acquisition Policy and Procedures Memorandum (AP&P) 1443.01-04, personnel who direct any contracting actions without formally delegated contracting authority may be held liable for costs incurred for unauthorized contract actions.

g. Causing the contractor to incur costs not otherwise detailed in the contracting instrument with the expectation that such costs will be reimbursed by the Government.

h. Takins any action with respect to termination, other than notifying the Contracting Officer that action may be necessary and to assist with the process as requested.

i. Participating in negotiations with a contractor outside the presence of a Contracting Officer.

j. Rendering a decision on any dispute or question of fact under the Disputes clause of the contract.

6. The POC will be used if an official certified COR cannot be designated at the time of award. The POC will not be designated in writing and will assist the CO in the day-to-day on-site administration of the contract requirements and/or performance.

a. The POC is responsible for administering the performance of work under this contract. In no event, however, will any understanding, agreement, modification, change order, or other matter deviating from the terms of this contract be effective or binding upon the Government unless formalized by a proper contractual document executed by the CO prior to completion of the contract.

b. The CO should be informed as soon as possible of any actions or inactions by the Contractor or the Government which will change the required delivery or completion times stated in the contract, and the contract will be modified accordingly. (This does not apply to individual assignments which were issued by the OCO provided they do not affect the delivery schedule or performance period stated in the contract.)

c. On all matters that pertain to the contract terms the Contractor must communicate with the CO. Whenever, in the opinion of the Contractor, the POC requests effort outside the scope of the contract, the Contractor should so advise the CO. If the POC persists and there still exists a disagreement as to proper contractual coverage, the CO should be notified immediately, preferably in writing if time permits. Proceeding with work without proper contractual coverage could result in nonpayment or necessitate submittal of a contract claim.

d. The POC has limited authority under this contract and responsibilities may include, but are not limited to:

i. Determining the compliance and adequacy of performance by the Contractor in accordance with the terms and conditions of this contract;

II. Requesting removal of unsuitable contractor employees;

III. Ensuring adequacy of schedule and Quality Control Plan, including changes;

IV. Ordering re-performance of unacceptable work or performance by other means, etc.

V. Approval or invoices and submitted reports.

C.8.4 CONTRACTOR'S REPRESENTATIVE

The Contractor shall provide a contract representative for the performance of the work. The name of this person and an alternate(s) who act for the contractor when the Contractor is absent shall be designated in writing to the CO. The Contractor representative or alternate shall have full authority to act for the Contractor on all contract matters relating to daily operation of this contract. The Contractor representative and alternate(s) must be able to read, write, speak, and understand English without use of a translator. Under no circumstances shall any documents, Statement of Work, Work Schedules, Contractor submittals, Contractor plans, etc., be translated. All documentation shall be submitted in the English language.

C.8.6 OTHER CONTRACTS

The Government may undertake work with its own forces or award other contracts for additional work, and the Contractor shall fully cooperate with such other Contractors and Government employees and carefully fit its own work to such additional work as may be directed by the CO. The Contractor shall not commit or permit any act, which shall interfere with the performance of work by any other Contractor or by Government employees.

C.9 EXTENT OF OBLIGATION

The Government obligation for performance of this contract beyond the award price is contingent upon the availability of funds from which payment for contract purposes can be made. No legal liability on the part of the Government for any payment may arise for performance under this contract beyond the amount that has been authorized through the issuance of a contract modification or change order by the CO.

C.10 DEFINITIONS (Not included in Federal Acquisition Regulations)

Wherever in these provisions, or in other contract documents, the following terms, or pronouns in place of them, are used, the intent and meaning shall be interpreted as follows:

Calendar Days - Every day shown on the calendar, Saturdays, Sundays, and holidays included.

Change Order - An order issued to the Contractor by the Contracting Officer, pursuant to the “change” clause included in Section I of this contract, requiring work to be performed, within the general scope of the contract.

Contract Pay Item - A pay item designated on the bid schedule and described by a specification.

Contractor - The individual, partnership, joint venture, or corporation undertaking the execution of work under the terms of the contract and acting directly or through their agent, employees, or subcontractors.

Drawings - The approved documents and reproductions of these documents, including plan and profile sheets, cross sections, site plans, diagrams, layouts, schematics, descriptive literature, illustrations, schedules, and similar documents showing details for construction of a facility.

Equipment - All machinery and equipment, together with the necessary supplies for upkeep and maintenance, including tools and apparatus necessary for the proper construction and acceptable completion of the work.

Labor Standards Provisions - Those statutory and regulatory requirements pertaining to the Contractor’s employees and employment practices.

Materials - Any substances for use in the construction of the project and its appurtenances.

Notice of Noncompliance - A written notice from the Contracting Officer’s representative or inspector which documents, for the Contractor’s attention, specific performance deficiencies.

Specifications - A general term applied to all written directions and requirements pertaining to performance of work.

SECTION D - PACKAGING AND MARKING

{For this Contract, there are NO clauses in this Section}

SECTION E - INSPECTION AND ACCEPTANCE

SECTION F - DELIVERIES OR PERFORMANCE

SECTION G - CONTRACT ADMINISTRATION DATA

G.1 POST AWARD CONFERENCE

Prior to commencement of work, the CO, CS or COR and/or POC will arrange a meeting with the contractor to discuss the contract terms and work performance requirements. A work progress schedule will be proposed by the contractor at this meeting complete with a schedule of values. It will be scheduled as soon as possible after the date of the contract award. It is anticipated that this meeting will take place All dates and locations of the conference will be mutually agreed upon and may be held via Microsoft Teams, onsite, or a combination of both.

G.3 DESIGNATION OF CONTRACTING OFFICERS REPRESENTATIVE (COR) AND/OR POINT-OF-CONTACT (POC)

A. The Contracting Officer will designate an individual as Contracting Officer's Representative (COR) at time of award of the contract in accordance with DIAR 1452.201-70 Authorities and Delegations (SEP 2011). The name will be designated on a letter or form.

B. The COR is responsible for administering the performance of work under this contract. In no event, however, will any understanding, agreement, modification, change order, or other matter deviating from the terms of this contract be effective or binding upon the Government unless formalized by a proper contractual documents executed by the Contracting Officer prior to completion of the contract.

C. The Contracting Officer should be informed as soon as possible of any actions or inactions by the Contractor or the Government which will change the required delivery or completion times stated in the contract, and the contract will be modified accordingly. (This does not apply to individual assignments which were issued by the Contracting Officer’s Representative provided they do not affect the delivery schedule or performance period stated in the contract.)

D. On all matters that pertain to the contract terms the Contractor must communicate with the Contracting Officer.

Whenever, in the opinion of the Contractor, the COR’s requests effort outside the scope of the contract, the Contractor should so advise the Contracting Officer’s Representative. If the COR persists and there still exists a disagreement as to proper contractual coverage, the CO should be notified immediately, preferably in writing if time permits. Proceeding with work without proper contractual coverage could result in nonpayment or necessitate submittal of a contract claim.

E. The COR's major duties and responsibilities are contained in Contracting Officer Representative Letter. The COR is delegated full authority under this contract except for the following actions which are reserved for the Contracting Officer:

1. Approve Change Orders and Modifications

2. Take action to terminate the contract for default or Government convenience.

3. Make contract adjustments under the Differing Site Conditions clause.

4. Grant extensions of contract time.

5. Approve assignment of claims.

6. Make final decisions under the Disputes clause.

7. Make final acceptance under the contract.

8. Make final decisions under the Suspension of Work clause.

9. Make equitable adjustments.

10. Authorize change in amount of Payment Retention.

11. Approve subcontractors.

12. Approve payments with deductions or final payment.

13. Approve use and possession prior to completion.

14. Enforce the warranty provisions.

15. Issue any direction that would result in a possible change to contract requirements.

F. The POC will be used if an official certified COR cannot be designated at the time of award. The POC will not be designated in writing and will assist the CO in the day-to-day on-site administration of the contract requirements and/or performance.

• The POC is responsible for administering the performance of work under this contract. In no event, however, will any understanding, agreement, modification, change order, or other matter deviating from the terms of this contract be effective or binding upon the Government unless formalized by a proper contractual document executed by the CO prior to completion of the contract.

• The CO should be informed as soon as possible of any actions or inactions by the Contractor or the

Government which will change the required delivery or completion times stated in the contract, and the contract will be modified accordingly. (This does not apply to individual assignments which were issued by the OCO provided they do not affect the delivery schedule or performance period stated in the contract.)

• On all matters that pertain to the contract terms the Contractor must communicate with the CO.

Whenever, in the opinion of the Contractor, the POC requests effort outside the scope of the contract, the Contractor should so advise the CO. If the POC persists and there still exists a disagreement as to proper contractual coverage, the CO should be notified immediately, preferably in writing if time permits. Proceeding with work without proper contractual coverage could result in nonpayment or necessitate submittal of a contract claim.

G.4 ADMINISTRATIVE CONTRACTING OFFICE

(a) Contact Information:

Brian McCabe Contracting Officer National Park Service Telephone No. 202-339-7772 Email: brian_mccabe@ios.doi.gov

(b) The Contracting Officer (CO) is the only person authorized to approve changes or modify any of the requirements under this contract and notwithstanding any provisions contained elsewhere in this contract, the said authority remains solely with the CO. In the event the contractor effects any such change at the direction of any person other than the CO, the change will be considered made without authority and no adjustment will be made in the contract price to cover increase in costs incurred as a result thereof.

(c) Contractual problems, of any nature, which might occur during the life of the contract, must be handled in conformance with very specific public laws and regulations (e.g., Federal Acquisition Regulation), and must be mailto:brian_mccabe@ios.doi.gov referred to the CO for resolution. Only the CO is authorized to formally resolve such problems. Therefore, the contractor is hereby directed to bring all such contractual problems to the immediate attention of the CO.

Any request for contract changes/modifications shall be submitted to the CO.

(e) The contractor and the Government may agree to perform a no-cost field change. Field changes are made when the change appears to be mutually beneficial to all parties and would not require changing the negotiated line items.

All field changes must be approved by the CO prior to execution.

(f) All correspondence concerning this contract, such as requests for information (RFI), explanation of terms, and contract interpretation, shall be submitted to the CO.

FINAL PAYMENT

Final payment will be made only after receipt of all payrolls to include subcontractors, SF 1413 Statement of Acknowledgement for each subcontractor, warranty of construction, release of claims and any other documents requested by the contracting office as applicable. Contractor must provide a signed copy of the 'Release of Claims' to the Contract Administrator upon submittal of final invoice.

OCCUPATIONAL SAFETY AND HEALTH ACT (OSHA) INSPECTIONS

The contractor shall be subject to inspections under the OCCUPATIONAL SAFETY AND HEALTH ACT (OSHA) program by inspectors of the Department of Labor.

INTERIM AND FINAL INSPECTIONS

1. Upon delivery, the Contractor must contact the Government representative to perform an interim inspection of delivered equipment. Failure to contact the Government representative perform an interim inspection at delivery may result in the Contractor not being able to file a claim for damages at the time of pick-up.

2. The final pickup inspection will be onsite with the Contractor, the Contracting Officer’s Representative, and Contract Specialist/Contracting Officer (when possible).

INVOICING SUBMITTAL PROCEDURES

The contractor is required to submit to the CO/COR via email, a pencil copy of all pay applications prior to submission in Department of Treasury’s Invoice Processing Platform (IPP www.ipp.gov.

Once reviewed by the COR and considered correct, the COR shall provide the contractor a written recommendation that the contractor submit the application for payment in IPP. The reviewed and recommended documents that were part of the pencil copy may be uploaded to IPP with the application for payment.

Failure by the contractor to properly submit an application for payment in IPP releases the Government form any obligation to pay for services claimed; the pay application will be promptly rejected. Incomplete work or work that is http://www.ipp.gov/ indicated as being below standard may result in nonpayment, performance, and/or reperformance to the satisfactory of the COR.

G.5 SYSTEM FOR AWARD MANAGEMENT (SAM)

The General Service Administration (GSA) Office of Governmentwide Policy is consolidating the governmentwide acquisition and award support systems into one new system - the System for Award Management (SAM). SAM is streamlining processes, eliminating the need to enter the same data multiple times, and consolidating hosting to make the process of doing business with the government more efficient.

The Entity Management functional area of SAM, formerly Central Contractor Registration (CCR), Online Representations and Certifications (ORCA), and Federal Agency Registration (FedReg), is the primary database for the U.S. Federal Government to manage information on potential government business partners or federal financial assistance recipients.

If you have previously registered your entity in CCR, ORCA, or FedReg all of your entity’s information has been brought into SAM. You just need to set up a SAM account, migrate your roles and update/renew your entity record in SAM as needed. See the following website SAM.gov | Home. for more information and assistance on registering your entity in SAM. In order to be eligible for an award, potential contractors must comply with all requirements of FAR Clause 52.204- 7, System for Award Management.

G.6 ELECTRONIC INVOICING AND PAYMENT REQUIREMENTS - INVOICE PROCESSING PLATFORM (IPP) (FEBRUARY 2021)

Payment requests must be submitted electronically through the U. S. Department of the Treasury's Invoice Processing Platform System (IPP).

"Payment request" means any request for contract financing payment or invoice payment by the Contractor. To constitute a proper invoice, the payment request must comply with the requirements identified in the applicable Prompt Payment clause included in the contract, or the clause 52.212-4 Contract Terms and Conditions - Commercial Items included in commercial item contracts. The IPP website address is: https://www.ipp.gov.

Under this contract, the following documents are required to be submitted as an attachment to the IPP invoice:

Contractor Invoice which must include:

Contract/Purchase Order Number Project Name Identification of Specific Equipment being invoiced for Date(s) of Rental Period

The Contractor must use the IPP website to register access and use IPP for submitting requests for payment. The Contractor Government Business Point of Contact (as listed in SAM) will receive enrollment instructions via email from the Federal Reserve Bank of St. Louis (FRBSTL) within 3 - 5 business days of the contract award date. Contractor assistance with enrollment can be obtained by contacting the IPP Production Helpdesk via email IPPCustomerSupport@fiscal.treasury.gov or phone (866) 973-3131.

https://sam.gov/content/home

If the Contractor is unable to comply with the requirement to use IPP for submitting invoices for payment, the Contractor must submit a waiver request in writing to the Contracting Officer with its proposal or quotation.

(End of Local Clause)

G.7 NOTICE TO CONTRACTOR - CONTRACTOR PERFORMANCE ASSESSMENT REPORTING SYSTEM (CPARS) (DECEMBER 2015)

1) FAR 42.1502 directs all Federal agencies to collect past performance information on contracts. The Department of the Interior (DOI) has implemented the Contractor Performance Assessment Reporting System (CPARS) to comply with this regulation. One or more past performance evaluations will be conducted in order to record your contract performance as required by FAR 42.15.

2) The past performance evaluation process is a totally paperless process using CPARS. CPARS is a web-based system that allows for electronic processing of the performance evaluation report. Once the report is processed, it is available in the Past Performance Information Retrieval System (PPIRS) for Government use in evaluating past performance as part of a source selection action.

3) We request that you furnish the Contracting Officer (CO) with the name, position title, phone number, and email address for each person designated to have access to your firm's past performance evaluation(s) for the contract no later than 30 days after award. Each person granted access will have the ability to provide comments in the Contractor portion of the report and state whether or not the Contractor agrees with the evaluation, before returning the report to the Assessing Official (AO). Information in the report must be protected as source selection sensitive information not releasable to the public.

4) When your Contractor Representative(s) are registered in CPARS, they will receive an automatically generated email with detailed login instructions. Further details, systems requirements, and training information for CPARS is available at https://www.cpars.gov/.

5) Within 60 days after the end of a performance period, the AO will complete an interim or final past performance evaluation, and the report will be accessible at https://www.cpars.gov/.

a) Contractor Representatives may then provide comments in response to the evaluation or return the evaluation without comment.

b) Your comments should focus on objective facts in the AO's narrative and should provide your views on the causes and ramifications of the assessed performance.

c) All information provided should be reviewed for accuracy prior to submission.

d) If you elect not to provide comments, please acknowledge receipt of the evaluation by indicating "No comment" in the space provided, and then selecting “Accept the Ratings and Close the Evaluation”.

e) Your response is due within 60 calendar days after receipt of the CPAR. On day 15, the evaluation will become available in PPIRS-RC marked as “Pending” with or without comments and whether or not it has been closed.

f) If you do not sign and submit the CPAR within 60 days, it will automatically be returned to the Government and will be annotated: "The report was delivered/received by the contractor on (date). The contractor neither signed nor offered comment in response to this assessment."

6) The following guidelines apply concerning your use of the past performance evaluation:

https://www.cpars.gov/ https://www.cpars.gov/

a) Protect the evaluation as source selection information. After review, transmit the evaluation by completing and submitting the form through CPARS. If for some reason you are unable to view and/or submit the form through CPARS, contact the CO for instructions.

b) Strictly control access to the evaluation within your organization. Ensure the evaluation is never released to persons or entities outside of your control.

c) Prohibit the use of or reference to evaluation data for advertising, promotional material, pre-award surveys, responsibility determinations, production readiness reviews, or other similar purposes.

7) If you wish to discuss a past performance evaluation, you should request a meeting in writing to the CO no later than seven days following your receipt of the evaluation. The meeting will be held in person or via telephone or other means during your 60-day review period.

8) A copy of the completed past performance evaluation will be available in CPARS for your viewing and for Government use supporting source selection actions after it has been finalized.

SECTION H - SPECIAL CONTRACT REQUIREMENTS

SPECIAL CLAUSE 1 - RESTRICTIONS AGAINST DISCLOSURE

(a) The Contractor agrees, in the performance of this contract, to keep all information contained in source documents or other media furnished by the Government in the strictest confidence. The Contractor also agrees not to publish or otherwise divulge such information in whole or in part in any manner or form, or to authorize or permit others to do so, taking such reasonable measures as are necessary to restrict access to such information while in the Contractor's possession, to those employees needing such information to perform the work provided herein, i.e., on a "need to know" basis. The Contractor agrees to immediately notify in writing, the Contracting Officer, named herein, in the event that the Contractor determines or has reason to suspect a breach of this requirement.

(b) The Contractor agrees not to disclose any information concerning the work under this contract to any persons or individual unless prior written approval is obtained from the Contracting Officer. The Contractor agrees to insert the substance of this clause in any consultant agreement or subcontract hereunder.

(End of Clause)

SPECIAL CLAUSE 2 - INDEMNIFICATION

The contractor is an 'independent contractor' and shall obtain all necessary insurance to protect themselves from liability arising out of this contract. The contractor hereby agrees to indemnify and hold the Government harmless in connection with, any loss or liability from damage to or destruction of property or from injuries to or death of persons (including the agents and employees of both parties) if such damage, destruction, injury or death arises out of, or is caused by performance of work under this contract, unless such damage, destruction, injury or death is caused solely by the negligence of the Government, its agents or employees. The contractor agrees to include this clause, appropriately modified, in all subcontracts to be performed under this contract.

(End of Clause)

SPECIAL CLAUSE 3 - STOP WORK

(a) The Contracting Officer may, at any time, by written order to the Contractor, require the Contractor to stop all, or any part, of the work called for by this contract for a period of 30 days (unless otherwise stated) after the order is delivered to the Contractor, and for any further period to which the parties may agree. The order shall be specifically identified as a stop-work order issued under this clause. Upon receipt of the order, the Contractor shall immediately comply with its terms and take all reasonable steps to minimize the incurrence of costs allocable to the work covered by the order during the period of work stoppage. Within a period of 30 days (unless otherwise stated) after a stop-work is delivered to the Contractor, or within any extension of that period to which the parties shall have agreed, the Contracting Officer shall either-

(1) Cancel the stop-work order; or

(2) Terminate the work covered by the order as provided in RFO FAR 52.212-4.

(b) If a stop-work order issued under this clause is canceled or the period of the order or any extension thereof expires, the Contractor shall resume work. The Contracting Officer shall make an equitable adjustment in the delivery schedule or contract price, or both, and the contract shall be modified, in writing, accordingly, if-

(1) The stop-work order results in an increase in the time required for, or in the Contractor’s cost properly allocable to, the performance of any part of this contract; and

(2) The Contractor asserts its right to the adjustment within 30 days after the end of the period of work stoppage;

provided, that, if the Contracting Officer decides the facts justify the action, the Contracting Officer may receive and act upon the claim submitted at any time before final payment under this contract.

(c) If a stop-work order is not canceled and the work covered by the order is terminated for the…