This is a combined synopsis/solicitation (RFQ #140L4325Q0011) issued by the Bureau of Land Management (BLM) Vale District Office for vault toilet pumping services in South Vale, Oregon. The contract will be awarded as a firm-fixed-price small business set-aside under NAICS code 562991 (Septic Tank and Related Services) with a size standard of $9 million.

The scope includes pumping vault toilets at 15 different recreational sites throughout the South Vale District, with various vault sizes ranging from 130 to 1500 gallons. The performance period runs from April 1, 2025 through March 31, 2026 for the base year, with four one-year options through 2030. The contractor must provide all labor, materials, equipment, supervision, and transportation for pumping services with 5 days notice from BLM. Services include removing debris, cleaning/disinfecting vaults, and proper disposal at Clay Peak Landfill. Technical requirements include proper handling of waste, pre-charging vaults with clean water after pumping, and following specific cleaning procedures. The contractor must maintain required insurance coverage of $500,000 per person/occurrence. Quotes are to be submitted via email to the specified BLM contacts with pricing provided per vault basis using the attached spreadsheet.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Combined Synopsis/Solicitation

This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in FAR

Subpart 12.6, as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; proposals are being requested and a written solicitation will not be issued.

Solicitation no. 140L4325Q0011 has been issued as a Request For Quotationfor a firm fixed price commercial items services contract for Vale Oregon District Vault Toilet Pumping in South Vale, Oregon. at one lump sum price. For services, The scope of work includes locations of pumping services required to be serviced in South Vale, OR. The performance period is from April 1st, 2025 through March 31, 2025. The performance period includes a one-year

Base and 4 one-year options. The solicitation document and incorporated provisions and clauses are those in effect through Federal Acquisition Circular 2024-06 effective July 25, 2024. Options will be evaluated in accordance with provision 52.212-2.. Offerors are advised to submit a completed copy of the provision at 52.212-3, Offeror

Representations and Certifications - Commercial Items, with its offer. The clause at 52.212-4, Contract Terms and

Conditions - Commercial Items, applies to this acquisition. The clause at 52.212-5 Contract Terms and Conditions

Required to Implement Statutes Or Executive Orders - Commercial Items applies to this acquisition. This requirement is set-aside for SMALL BUSINESS. The NAICS code is 562991-Septic Tank and Related Services and the small business size standard is $9,000,000.00. The basis of award is the responsible offeror whose offer conforming to the solicitation will be most advantageous to the Government, price and other factors considered.

Award will be made to the responsible respondent pursuant to FAR subpart 9.1. Multiple awards may be made.

Responses shall be received via email at blm_or_so_952_mail@blm.gov, babecker@blm.gov, and mduane@blm.gov by the response due date and time.

SUPPLIES OR SERVICES AND PRICES/COSTS

This requirement is for one (1) Firm Fixed Price Services contract for Vault Toilet Pumping in South Vale, Oregon. Base Year:

FY2025 April 1, 2025 – March 31, 2026 Contractor shall furnish all labor, materials, equipment, (except for Government furnished property) supervision, transportation, and incidentals necessary for vault pumping services on an as needed basis in accordance with the terms, conditions, and specifications herein. BLM will notify contractor five (5) days prior to pumping.

CONTRACTOR TO QUOTE ON A PER VAULT BASIS.

Please use attached Excel Spread Sheet labeled ‘B08 Attachment 1 Vale District South Pumping’ when submitting quote.

mailto:blm_or_so_952_mail@blm.gov mailto:babecker@blm.gov mailto:mduane@blm.gov

Item

No. Description

Est.

Quantity

Unit of

Measure

Unit

Price Total

MALHEUR RESOURCE AREA

1 Antelope Reservoir Recreation Site

1000 gallon vault 2 EA $ $

Located approx. 12 miles west of Jordan Valley, OR

2 Birch Creek Ranch

1000 gallon vaults 1 EA $ $

Located approx. 45 miles NW of Jordan Valley, 3 Castle Rock Recreation Site

Located approx. 27 miles north of Juntura, OR

4 Chukar Park

500 gallon vault 4 EA $ $

Located approx. 7 miles north of Juntura, OR

5 Cow Lakes Reservoir Recreation Site

Located approx. 18 miles NW of Jordan Valley, 6 Leslie Gulch Site

250 gallon vault 4 EA $ $

Located approximately 17 miles west of

Rockville, OR

7 Oasis Rec. Site

1000 gallon vault 1 EA $ $

Located approx. 20 miles north of Ontario, OR

8 Owyhee Canyon Watchable Wildlife Site

Located approx. 13 miles west of Adrian, OR.

(One mile north of Snively Hot Springs)

9 Riverside Rec. Site

Located approx. 30 miles south of Juntura, OR

10 Rome Launch Site

1000 gallon vault 3 EA $ $

Located approximately 35 miles south from

Jordan Valley on State Highway 95

11 Snively Hot Spring

Located approx. 14 miles west of Adrian, OR

12 Three Forks Rec. Site

Located approx.. 34 miles south of Jordan Valley, 13 Twin Springs Recreation Site

Located approximately 30 miles SW of Vale, OR

14 Willow Creek Hot Springs

Located approx. 3 miles SW of Whitehorse

Ranch

15 Vale Washrack

1500 gallon vault 1 EA $ $

550 gallon vault 1 EA $ $

130 gallon vault 1 EA $ $

Located at Vale District Compound

Total Quote (Base): $

Total Option Year 1 (April 1, 2026- March 31, 2027):

Total Option Year 2 (April 1, 2027- March 31, 2028): $

Total Option Year 3 (April 1, 2028- March 31, 2029): $

Total Option Year 4 (April 1, 2029- March 31, 2030): $

Total Quote Base Plus all four Option Years: $

PERIOD OF PERFORMANCE: See Deliveries or Performance section.

THIS SOLICITATION IS SET ASIDE FOR SMALL BUSINESS

(End of Supplies or Services and Prices/Costs)

STATEMENT OF WORK

C.1.0 GENERAL:

Contractor shall furnish vault pumping services on an as needed basis which includes all equipment, supervision, transportation, labor, operating supplies, and incidentals necessary to pump, wash down, cleanup, disinfect, and dispose of all waste products removed from the vault toilets and washrack, in accordance with the following contract specifications and in accordance with State and Federal regulations.

C.2.0 DESCRIPTION:

C.2.1 See Sections B. All vaults located in the Vale District are listed in Section B. Some vaults may be pumped several times a year and others not at all. The Vale Washrack will be pumped quarterly. The purpose of this RFQ is to establish a price in the event the vault needs to be pumped.

C.2.2 Scheduling of Work: The BLM will notify the contractor five (5) days prior to pumping each designated site (not including Saturday and Sunday). Generally, the contractor may complete the required servicing between the hours of 8:00 a.m. and 5:00 p.m.

C.3.0 DEFINITIONS:

Sewage - liquid, semi-liquid, and solid waste matter.

Debris - all other refuse found in vault toilets and washrack.

C.4.0 TECHNICAL SPECIFICATIONS:

1. The Contractor shall furnish all toilet pumping equipment, tank truck, tools, approved disinfectant, and other equipment and supplies necessary to perform work in accordance with these specifications.

2. Water drafting equipment (if necessary, to get water from a lake, pond, or stream) shall consist of pumps, tanks, hoses, etc., and shall be completely separate from toilet waste pumping and hauling equipment.

3. All disinfecting solutions shall be approved by the Contracting Officers Representative (COR).

4. All equipment shall be in full accordance with any local, State, and county regulations.

5. The Contractor is responsible for all work completed including sub-contractors; all sub-contractors must meet the same requirements outlined in the contract as the primary Contractor.

a. The Contractor shall be properly licensed and is responsible for obtaining all necessary permits and licenses for pumping, hauling and disposing of the effluent.

b. The Contractor shall be responsible for making disposal arrangements, including disposal of all sewage, debris, and trash, and payments of all fees at Clay Peak Landfill.

C.4.1 Pumping Procedures: If there is an outside manhole available, sewage and debris should be removed through the manhole. If there is no manhole available, sewage and debris will have to be removed through the toilet riser.

1. All sewage and debris shall be removed from vault. Vaults may contain trash such as beverage containers, plastic bags, etc. Removal of these items is a requirement of the contract. Contractor shall be responsible for the removal, transport and proper disposal of trash and refuse found within the vault.

2. ALL DEBRIS REMOVED FROM THE VAULT SHALL BE PLACED INTO A LEAK PROOF

CONTAINER SO THAT NO CONTAMINATION, TO THE SURROUNDING GROUND,

WILL RESULT.

3. Pre-charge the vault with clean fresh water so that there is eight (8) inches of water covering the bottom under the toilet riser. Contractor shall pump all wet effluent from toilet vaults. Vaults must be pumped dry, with less than one inch of effluent remaining in the vault for each pumping. Immediately upon completion of pumping the vault, the Contractor shall charge the vault with approximately 80 gallons of clean water except where specified in Section 4.0. Contractor can use delineated sites on project maps for water supply.

Contractor shall ensure that a method is used that does not contaminate the water supply source (i.e., ensuring a different hose is used for clean water application). Although the Government is providing a water supply source for the contractor to use at some sites, it is the sole responsibility of the Contractor to ensure that proper hauling and servicing applications are followed. For areas annotated in Section 4.0 that do not have a water supply present, the contractor shall be required to provided adequate clean water to fulfill the aforementioned requirement.

4. Thoroughly clean and disinfect all contaminated areas resulting from the pumping process. Either sweep or wash all waste that is deposited on the concrete surrounding the manhole cover back into the vault, if possible. The waste that runs off the edge of the concrete, onto the dirt or into the gravel edge, will be an attractant for flies, a potential health risk, and an odor problem. This problem should be avoided.

5. Clean thoroughly around the manhole cover gasket area and replace the cover. The manhole cover MUST fit with an airtight seal so that the venting process of the vault toilet is not hampered.

C.4.2 Pumping Through the Toilet Riser When There is No Outside Manhole: Remove all debris and pump.

Extra care shall be taken to prevent waste spillage onto the interior floor and wall surface while removing debris and while pumping. The toilet paper dispenser and toilet riser shall be protected from damage and the toilet paper shall be covered with a waterproof material prior to removing debris or pumping, in order to prevent the paper from getting contaminated.

1. During the final cleanup, the interior floor surface and any wall surface that was contaminated by waste shall be thoroughly disinfected. Again, every effort shall be made to sweep or wash the spilled waste back into the vault. The Contractor shall not allow the spilled waste to be washed or swept out through the front door because the waste will collect at the edge of the concrete and the dirt (or gravel) and will become an attractant for flies, a possible health risk, and an odor problem.

2. Thoroughly wash and disinfect both the inside and outside of the toilet riser and the seat and cover. The toilet riser and seat shall be dry before the Contractor leaves the work site. Remove the waterproof covering that was protecting the toilet paper and make sure the paper did not get contaminated. If the paper did get contaminated, the Contractor shall properly dispose of the paper and furnish a new roll. The door handles or knobs shall also be disinfected and dry before the Contractor leaves the job site.

3. The Contractor may pump additional toilets that are part of this contract in order to “top off” or fill the pumper truck to capacity.

4. Contractor shall provide documentation of total gallons pumped for each trip.

5. Each unit shall be available for immediate use after the pumping and final cleanup. The Contractor shall not leave any toilet location until final cleanup is accomplished.

C.4.3 Drafting of Water: Contractor may draft fresh water (to be used for washing down the vault walls, emulsification of the waste, and for final cleanup) from lakes, ponds and streams under the following conditions:

a. Drafting shall be accomplished where it least interferes with the public use of the facility and at areas least viewed by the public.

b. No waste shall be introduced into any body of water.

c. All drafting hoses and apparatuses shall be clean and shall not be used for vault pumping procedures.

d. The Contracting Officer shall approve all sites used for drafting water.

C.4.4 Washrack: Waste is generated from a concrete slab-on-grade vehicle washrack. Washrack contains undercarriage spray bar as well as having a hand wand. Sediment basin to be pumped is 1500 gallons. Oil Separator is 550 gallons and sump pump is 130 gallons. The sediment basin and oil separator are tested annually for Total Petroleum Hydrocarbons (TPH) and Toxicity Characteristic. With these results a Liquid Waste Transport Manifest will be produced and sent to Clay Peak Landfill and a copy also provided to the contractor upon pumping of the washrack.

1. BLM shall remove cattle guard grate for pumping the sediment basin.

C.4.5 Off site Disposal of Sewage and Debris: The Contractor shall be properly licensed and shall be responsible for making disposal arrangements, including disposal of all effluent, debris, and trash, and payments of all fees.

1. Disposal shall conform to all Federal, State, and local laws and ordinances.

2. The Contractor shall be responsible to prevent spillage and to haul all waste material (sewage and debris) in watertight containers. Handling of all waste material shall be in accordance with all applicable health regulations.

3. All sewage and debris shall be disposed of at Clay Peak Landfill in Payette, Idaho.

C.4.6 Conduct of Personnel: The Contractor and his/her employees shall make every reasonable effort to prevent interference with the normal use and occupancy of recreational areas while engaged in the performance of the contract.

1. Due to the nature of the duties under the contract, the Contractor and his/her employees shall keep themselves and equipment presentable at all times. The Contracting Officer may, in writing, require the Contractor to remove from the work site any employee the Contracting Officer deems incompetent, careless, discourteous to the public, or is otherwise objectionable, or for theft, possession, and/or removal of materials, supplies, equipment or any government-owned property.

C.4.7 Resource Damage: Any damage or defacement that occurs to government property or land resources during the Contractors operations shall be repaired to its original condition at the Contractor’s expense. Onsite inspection will be made by the COR prior to the acceptance of work.

C.4.8 The below sites will be pumped utilizing the schedule services that are annotated. An Asterisk denotes sites that do not have a water supply present, the contractor shall be required to provided adequate clean water to fulfill the aforementioned requirement. Some sites have running water nearby, if Contractor does choose to use that water source refer to

Section C.4.3. Chukar Park has potable water available April through October.

(End of Statement of Work)

DISTRICT VAULT PUMPING, SOUTH VALE OREGON SOLICITATION NO. 140L4325Q0011

BLM, VALE, OR District Page 2 of 44

DELIVERIES OR PERFORMANCE

F.1.0 PERIOD OF PERFORMANCE

The contract shall commence from date of award for a period up to5 years, if options are exercised.

F.2.0 PROGRESS PLAN

At the prework conference, the Contractor shall provide to the COR a written "work progress plan" that details its proposed work force and schedule to provide for orderly completion of the work within the contract performance time. This work schedule must be acceptable to the Government. At a minimum, the schedule must reflect a work progress rate equal to the available amount of contract performance time.

The following clauses are incorporated by reference:

Clause Title Date

52.242-15 STOP WORK ORDER AUG 1989

End of Deliveries or Performance)

BLM, VALE, OR District Page 3 of 44

CONTRACT ADMINISTRATION DATA

The following local clauses are provided in full text:

CONTRACTOR PERFORMANCE ASSESSMENT REPORTING SYSTEM (JULY 2010)

(a) FAR 42.1502 directs all Federal agencies to collect past performance information on contracts. The

Department of the Interior (DOI) has implemented the Contractor Performance Assessment Reporting System

(CPARS) to comply with this regulation. One or more past performance evaluations will be conducted in order to record your contract performance as required by FAR42.15.

(b) The past performance evaluation process is a totally paperless process using CPARS. CPARS is a web-based system that allows for electronic processing of the performance evaluation report. Once the report is processed, it is available for Government use in evaluating past performance as part of a source selection action.

(c) We request that you furnish the Contracting Officer with the name, position title, phone number, and email address for each person designated to have access to your firm's past performance evaluation(s) for the contract no later than 30 days after award. Each person granted access will have the ability to provide comments in the Contractor portion of the report and state whether or not the Contractor agrees with the evaluation, before returning the report to the Assessing Official. The report information must be protected as source selection sensitive information not releasable to the public.

(d) When your Contractor Representative(s) (Past Performance Points of Contact) are registered in CPARS, they will receive an automatically-generated email with detailed login instructions. Further details, systems requirements, and training information for CPARS is available at https://www.cpars.gov/. The CPARS

User Manual, registration for On Line Training for Contractor Representatives, and a practice application may be found at this site.

(e) Within 60 days after the end of a performance period, the Contracting Officer will complete an interim or final past performance evaluation, and the report will be accessible at https://www.cpars.gov/. Contractor

Representatives may then provide comments in response to the evaluation, or return the evaluation without comment. Comments are limited to the space provided in Block 22. Your comments should focus on objective facts in the Assessing Official's narrative and should provide your views on the causes and ramifications of the assessed performance. In addition to the ratings and supporting narratives, blocks 1 - 17 should be reviewed for accuracy, as these include key fields that will be used by the Government to identify your firm in future source selection actions. If you elect not to provide comments, please acknowledge receipt of the evaluation by indicating ''No comment" in Block 22, and then signing and dating Block 23 of the form. Without a statement in Block 22, you will be unable to sign and submit the evaluation back to the Government. If you do not sign and submit the CPAR within 30 days, it will automatically be returned to the Government and will be annotated: "The report was delivered/received by the contractor on (date). The contractor neither signed nor offered comment in response to this assessment." Your response is due within 30 calendar days after receipt of the CPAR.

(f) The following guidelines apply concerning your use of the past performance evaluation:

(1) Protect the evaluation as "source selection information." After review, transmit the evaluation by completing and submitting the form through CPARS. If for some reason you are unable to view and/or submit the form through CPARS, contact the Contracting Officer for instructions.

(2) Strictly control access to the evaluation within your organization. Ensure the evaluation is never released to persons or entities outside of your control.

https://www.cpars.gov/

BLM, VALE, OR District Page 4 of 44

(3) Prohibit the use of or reference to evaluation data for advertising, promotional material, preaward surveys, responsibility determinations, production readiness reviews, or other similar purposes.

(g) If you wish to discuss a past performance evaluation, you should request a meeting in writing to the

Contracting Officer no later than seven days following your receipt of the evaluation. The meeting will be held in person or via telephone or other means during your 30- day review period.

(h) A copy of the completed past performance evaluation will be available in CPARS for your viewing and for

Government use supporting source selection actions after it has been finalized.

(End of clause)

ELECTRONIC INVOICING AND PAYMENT REQUIREMENTS – INVOICE PROCESSING PLATFORM (IPP)

(APR 2013)

Payment requests must be submitted electronically through the U.S. Department of the Treasury’s Invoice

Processing Platform System (IPP).

“Payment request” means any request for contract financing payment or invoice payment by the Contractor. To constitute a proper invoice, the payment request must comply with the requirements identified in the applicable

Prompt Payment clause included in the contract, or the clause 52.212-4 Contract Terms and Conditions –

Commercial Procucts or Commercial Services included in commercial products or commercial services contracts.

The IPP website address is: https://www.ipp.gov.

Under this contract, the following documents are required to be submitted as an attachment to the IPP invoice

1. Invoice billed according to contract line items and rates.

2. If final payment is billed, the last invoice shall state “FINAL”.

The Contractor must use the IPP website to register access and use IPP for submitting requests for payment. The

Contractor Government Business Point of Contract (as listed in SAM) will receive enrollment instructions via email from the Federal Reserve Bank of Boston (FRBB) prior to the contract award date, but no more than 3 – 5 business days of the contract award date. Contractor assistance with enrollment can be obtained by contacting the IPP

Production Helpdesk via email ippgroup@bos.frb.org or phone (866) 973-3131.

If the Contractor is unable to comply with the requirement to use IPP for submitting invoices for payment, the

Contractor must submit a waiver request in writing to the Contracting Officer with its proposal or quotation.

(End of Local Clause)

(End of Contract Administration Data) https://www.ipp.gov/ mailto:ippgroup@bos.frb.org

BLM, VALE, OR District Page 5 of 44

SPECIAL CONTRACT REQUIREMENTS

H.1.0 ACCESS

In the event of a site/facility closure, the Contractor shall not perform or make deliveries to the site/facility until it is reopened by the Government, unless otherwise instructed by the Contracting Officer or their designated representative.

H.2.0 WORK HOURS

Unless otherwise specified in Section C, Specifications, work hours under this contract shall be limited to the time between one-half hour before sunrise to one-half hour after sunset each day. No work will be done on Saturday, Sunday, or Federal holidays unless authorized by the COR.

H.3.0 ENVIRONMENTAL INTERRUPTION OF WORK

H.3.1 Environmental - The Contracting Officer, by issuance of a suspend work order, may direct the Contractor to shut down any work that may be subject to damage due to weather conditions, fire danger, or because it is impracticable to work during the winter season. The Contractor will be given a resume work order which will document the date the work suspension ends. An allowance has been included in the contract time for all environmental delays. The count of contract time will therefore continue during all periods of suspension due to normal weather conditions, including fire danger. The Contractor will not be entitled to additional contract time for any suspensions except to the extent that they are due to unusually severe weather conditions. The Contractor will not be entitled to additional monetary compensation for such suspensions regardless of duration.

H.3.2 Endangered Species - The Government may direct the Contractor to discontinue all operations in the event that listed or proposed threatened or endangered plants or animals protected under the Endangered Species

Act of 1973, as amended, or Federal candidate (Category 1 and 2), sensitive or state listed species, identified under BLM Manual 6840, are discovered to be present in or adjacent to the project area.

H.4.0 PRESERVATION OF HISTORICAL AND ARCHEOLOGICAL DATA

H.4.1 Public Law 93-291, May 24, 1974, provides for the preservation of scientific, prehistorical, and archeological data (including relics and specimens) which might otherwise be lost due to alteration of the terrain as a result of any Federal construction project.

H.4.2 The Contractor agrees that should any contractor employee, in the performance of this contract, discover evidence of possible scientific, prehistorical, historical, or archeological data the contractor will notify the

Contracting Officer immediately in writing giving the location and nature of the findings.

H.4.3 Where appropriate by reason of discovery, the Contracting Officer may order delays in the time of performance and/or changes in the work. If such delays and/or changes are ordered, the time of performance and contract price shall be adjusted in accordance with the applicable clauses in the Contract

Clauses Section of this contract.

H.4.4 The Contractor agrees to insert this requirement in all subcontracts which involve the performance of work on the terrain of the site.

H.5.0 ENVIRONMENTAL IMPACT

All waste materials generated by any work under the contract performed on a Government installation shall at all times be handled, transported, stored, and disposed of by the contractor and by his subcontractors in accordance with all applicable Federal, state, and local laws, ordinances, regulations, court orders, and other types of rulings having the effect of the law, including, but not limited to Executive Order 12088, 13

October 1978, Federal Compliance with Pollution Control Standards; the Federal Water Pollution Control

Act, as amended (33 U.S.C. 1251 ET SEQ); the Clean Air Act as amended (42 U.S.C. Sec 7401 ET SEQ);

the Endangered Species Act, as amended (16 U.S.C. Sec 1531, ET SEQ); the Toxic Substances Control

BLM, VALE, OR District Page 6 of 44

Act, as amended (15 U.S.C. Sec 2601, ET SEQ); the National Historic Preservation Act, as amended (16

U.S.C. Sec 470, ET SEQ); the Solid Waste Disposal Act, as amended (42 U.S.C. 6901 ET SEQ); and the

Archaeological and Historic Preservation Act, as amended (16 U.S.C. Sec 469, ET SEQ). Should the

United States Government be held liable for any neglect or improper actions by the contractor or any subcontractor regarding removal or disposal of any hazardous waste, the contractor shall reimburse the

Government for all such liability.

H.6.0 HAZARDOUS MATERIALS

Any material suspected of being hazardous that is encountered during performance of a project shall immediately be brought to the attention of the Contracting Officer, at which time a determination will be made as to whether hazardous material testing shall be performed. If the Contracting Officer directs the contractor to perform tests, and/or the material is found to be of a hazardous nature requiring additional protective measures, a contract modification may be required, subject to equitable adjustment under the terms of the contract. The contractor is advised that friable and/or non-friable asbestos-containing material may be encountered in project areas. Friable asbestos-containing material is any material that contains more than one percent asbestos by weight, and that hand pressure can crumble, pulverize or reduce to powder when dry. Non-friable asbestos containing materials are materials in which asbestos fibers are bound by a matrix material, saturation, impregnation or coating.

Non-friable asbestos-containing materials do not normally release airborne asbestos fiber during routine handling and end-use. However, excessive fiber concentrations may be produced during uncontrolled abrading, sanding, drilling, cutting, machining, removal, demolition, or other similar activities. 29 CFR

1910.1001 shall be referenced in the event asbestos-containing materials are encountered. Friable asbestos-containing materials are not authorized for use in new construction or maintenance projects.

H.7.0 GREEN PROCUREMENT REQUIREMENTS

In the performance of this service or construction contract, the Contractor shall make maximum use of products identified on the mandatory environmental purchasing list at the following links, if applicable:

• U.S. EPA Comprehensive Procurement Guidelines published at www.epa.gov/cpg/products.htm.

• USDA Biobased product listings published at www.biopreferred.gov.

• Energy Star® product listings published at www.energystar.gov/products.

• FEMP Low Standby Power product listings published at http://energy.gov/eere/femp/covered-product-categories

Contractor shall comply with all reporting requirements stated in the applicable clause(s):

• 52.223-1 Biobased Product Certification

• 52.223-2 Reporting of Biobased Products under Service and Construction Contracts

• 52.223-4 Recovered Material Certification

• 52.223-9 Estimate of Percentage of Recovered Material Content for EPA Designated Items

H.8.0 RESTORATION OF RESOURCES

H.8.1 Cleanup - The Contractor is responsible for cleaning up all camp and worksites before leaving the area.

Final payment or other alternative deemed feasible may be withheld until the Contractor has complied with this requirement.

H.8.2 Site and Access Roads – Site and public or private access roads damaged by the Contractor shall be restored to the same condition they were in at the commencement of work, at the expense of the Contractor.

H.9.0 UNAUTHORIZED PERSONNEL

http://www.epa.gov/cpg/products.htm http://www.bioprefferd.gov/ http://www.energystar.gov/products http://energy.gov/eere/femp/covered-product-categories http://energy.gov/eere/femp/covered-product-categories

BLM, VALE, OR District Page 7 of 44

The contractor shall inform all personnel working under his jurisdiction (including subcontractor and visiting supplier personnel) that access to restricted areas outside of the immediate work area; excluding direct haul and access routes, contracting and Civil Engineering offices and points of supply and storage; is prohibited. Circulation of said personnel will be limited to official business only. Persons in violation of the above will be apprehended and appropriately disciplined.

H.10.0 OREGON FARM/FOREST LABOR CONTRACTOR'S LICENSE

If the State of Oregon requires an Oregon Farm/Forest Labor Contractor's License, then the contractor awarded this contract and all first-tier subcontractors shall be required to obtain and maintain, during the term of this contract, such a license. Contractors not having a current license will be required to furnish evidence of having obtained such license within ten (10) days after receipt of written notification of contract award. Failure to obtain, keep and maintain a current license during the term of this contract or the extension thereof shall be a basis for termination for default.

Information on obtaining this license may be obtained from:

Bureau of Labor and Industries Contact: Licensing Unit

Wage and Hour Division Telephone: (503) 373-1463

3865 Wolverine St. NE; E-1 Fax: (503) 373-7636

Salem, OR 97305-1268

H.11.0 FIRE DANGER SEASON

If the COR allows the Contractor to continue work during periods of declared fire danger or season, the

Contractor shall comply with all applicable state laws relating to fire prevention and with all special conditions of work as directed by the COR and outlined in the attachment at the end of this section

The following clause is provided in full text:

FIRE REQUIREMENTS PROCEDURES OUTLINE [FOR OREGON, Dec 2013]

This outline covers the fire protection requirements of a contractor or private party who performs service or construction contracts on BLM land. In western Oregon, the BLM allows Oregon Forest Law (ORS) and Oregon

Administrative Rules (OAR) to apply to these operations on BLM lands rather than develop similar rules applicable only to BLM lands.

1. CLOSED FIRE SEASON

The closed fire season means that fire season has been declared. ORS 477.505 gives the State Forester the authority to establish the fire season. The authority has been delegated to the District Foresters around the state who issue public notices through the newspapers and radio when fire season will be closed for their individual districts.

Closed fire season depends upon the drying of forest fuels, rainfall, and time of year. During the closed fire season, the following requirements must be met:

• Fire tools must be on site;

• Fire extinguisher must be in all vehicles;

• Chainsaws must have a .023-inch mesh screen installed in the exhaust;

• Only unmodified saws are to be used in the forest;

• Approved spark arresters must be on all internal combustion engines;

• Watchman service must be provided for 3 hrs after shutdown of power equipment for the day;

• No smoking is permitted while working or traveling through any operations area in the forest;

• No use of explosives is permitted unless approved by the State Forester's representative;

• Permits to burn are required unless waived by a representative of the State Forester.

BLM, VALE, OR District Page 8 of 44

• Permits to operate power-driven machinery shall be obtained by the Contractor prior to commencing operations unless waived by a representative of the State Forester (ORS 47.625).

Changes or modifications to the above requirements are possible depending upon changes in State of Oregon law and requirements of the State Districts and Protective Associations.

2. FIRE PRECAUTION LEVELS

There are 4 fire precaution levels that begin with level 1 at the start of the closed fire season and can go through level 4 if conditions warrant. The fire precaution levels restrict certain forest operations as the fire danger increases.

It is the responsibility of the individual operating on forest land to know the precaution level for the day and take the correct fire precautions. There are no precaution levels prior to the closed fire season. Each fire precaution level requires adherence to the restrictions applicable to all lower levels in addition to the limits placed by that level.

Level 1 is the lowest level of fire danger usually occurring early in the season and perhaps again after significant rainfall during the season. All requirements listed above apply. Waivers may be issued by the State Districts or

Protective Associations and these MUST be approved by the BLM. Waivers will only be considered if the conditions on the work site are not as severe as predicted. The requirements for fire tools on site, screens installed in saws, and fire extinguishers with saws will not be waived.

Level 2 is the partial hootowl where saws can operate from first light in the morning until 1:00 p.m. in the afternoon.

From 1:00 p.m. until the end of the day saws are to be shut down. Waivers for operating beyond the 1:00 p.m.

shutdown will be evaluated on a site-by-site basis.

Level 3 is the partial shutdown of all forest industrial operations and shuts down contractor operations with few exceptions. Waivers may be issued on a site-by-site basis.

Level 4 is the general shutdown of all contractor operations. Waivers will not be issued. Landowners are permitted entry into their lands.

ORS. 477.066 requires that an operator on forest land take immediate action to control and extinguish a fire on forest land. The contractor shall take this action and notify the BLM and the nearest State of Oregon District office immediately.

OAR. 629-43-030 requires watchmen to be:

• Physically capable and experienced in operating any firefighting equipment on site.

• On duty for 3 hours after the shutdown of the last power-driven equipment for the day.

• Furnished adequate facilities for transportation and communications in order to summon assistance if needed.

• Patrolling and visually inspecting all sites where work was done during the day.

3. FIRE TOOLS REQUIRED DURING CLOSED FIRE SEASON

The operator/contractor shall furnish fire tools to all personnel on site using the following combinations.

NUMBER OF PERSONNEL_______________________________

1- 4 5 6 7 8 9 10 11 12 13 14

KIND OF TOOLS NUMBER OF TOOLS REQUIRED_________________________

Pulaskis 1 1 1 1 1 1 2 2 2 2 2

Shovels 2 2 2 3 3 3 3 4 4 5 5

Hazel hoes 1 2 3 3 4 5 5 5 6 6 6

BLM, VALE, OR District Page 9 of 44

In addition to the above handtools, the operator/contractor must provide a backpack pump can filled with water located with the tool box in a readily available area.

All shovels are to be size 0 or larger, long handled. All tools shall be sharp and ready for service. Fire extinguishers as follows:

For chainsaws - 8 oz. capacity by weight.

For vehicles - UL rating of at least 4 BC.

4. ADDITIONAL WATER SUPPLY

Contractor shall comply with ORS 477.615 during fire season when inside or within one-eighth of one mile of a state forest protection district and furnish additional water supply and equipment for use in fire suppression in conformity with the rules promulgated by the Oregon State Forester, when directed by the Oregon State Forester in writing. When required, all water supply and equipment components shall be maintained and ready for immediate use.

During fire season when operating a stationary internal combustion engine inside or within one eighth of one mile of a state forest protection district, Contractor shall comply with ORS 477.650 and provide a water supply, with equipment for its use in fire suppression for each engine, in conformity with the rules promulgated by the Oregon

State Forester. All water supply and equipment components shall be maintained and ready for immediate use.

(End of Section H)

BLM, VALE, OR District Page 10 of 44

CONTRACT CLAUSES

The following provision is incorporated by reference:

Clause Title Date

52.204-22 ALTERNATIVE LINE ITEM PROPOSAL JAN 2017

The following clauses are incorporated by reference:

Clause Title Date

52.203-12 LIMITATION ON PAYMENTS TO INFLUENCE CERTAIN FEDERAL

TRANSACTIONS

OCT 2010

52.204-13 SYSTEM FOR AWARD MANAGEMENT MAINTENANCE OCT 2018

52.204-18 COMMERCIAL AND GOVERNMENT ENTITY CODE MAINTENANCE AUG 2020

52.204-25 PROHIBITION ON CONTRACTING FOR CERTAIN

TELECOMMUNICATIONS AND VIDEO SURVEILLANCE SERVICES

OR EQUIPMENT

NOV 2021

52.209-10 PROHIBITION ON CONTRACTING WITH INVERTED DOMESTIC

CORPORATIONS

NOV 2015

52.219-28 POSTAWARD SMALL BUSINESS PROGRAM REREPRESENTATION JAN 2025

52.222-17 NONDISPLACEMENT OF QUALIFIED WORKERS MAY 2014

52.222-40 NOTICE OF EMPLOYEE RIGHTS UNDER THE NATIONAL LABOR

RELATIONS ACT

DEC 2010

52.232-4 PAYMENTS UNDER TRANSPORTATION CONTRACTS AND

TRANSPORTATION-RELATED SERVICES CONTRACTS

APR 1984

52.232-6 PAYMENT UNDER COMMUNICATION SERVICE CONTRACTS

WITH COMMON CARRIERS [regulated communication services by common carriers]

APR 1984

52.232-23 ASSIGNMENT OF CLAIMS MAY 2014

52.237-2 PROTECTION OF GOVERNMENT BUILDINGS, EQUIPMENT, AND

VEGETATION

APR 1984

52.237-3 CONTINUITY OF SERVICES JAN 1991

52.243-1 CHANGES – FIXED-PRICE AUG 1987

52.245-1 GOVERNMENT PROPERTY SEP 2021

52.245-1 GOVERNMENT PROPERTY – ALTERNATE I APR 2012

52.245-9 USE AND CHARGES APR 2012

52.246-20 WARRANTY OF SERVICES MAY 2001

52.249-1 TERMINATION FOR CONVENIENCE OF THE GOVERNMENT

(FIXED-PRICE) (SHORT FORM)

APR 1984

52.249-8 DEFAULT (FIXED-PRICE SUPPLY AND SERVICE) APR 1984

The following clauses are provided in full text:

52.204-21 – BASIC SAFEGUARDING OF COVERED CONTRACTOR INFORMATION SYSTEMS (NOV

2021)

(a) Definitions. As used in this clause—

Covered contractor information system means an information system that is owned or operated by a contractor that processes, stores, or transmits Federal contract information.

Federal contract information means information, not intended for public release, that is provided by or generated for the Government under a contract to develop or deliver a product or service to the Government, but not including information provided by the Government to the public (such as on public websites) or simple transactional information, such as necessary to process payments.

BLM, VALE, OR District Page 11 of 44

Information means any communication or representation of knowledge such as facts, data, or opinions, in any medium or form, including textual, numerical, graphic, cartographic, narrative, or audiovisual (Committee on

National Security Systems Instruction (CNSSI) 4009).

Information system means a discrete set of information resources organized for the collection, processing, maintenance, use, sharing, dissemination, or disposition of information (44 U.S.C. 3502).

Safeguarding means measures or controls that are prescribed to protect information systems.

(b) Safeguarding requirements and procedures.

(1) The Contractor shall apply the following basic safeguarding requirements and procedures to protect covered contractor information systems. Requirements and procedures for basic safeguarding of covered contractor information systems shall include, at a minimum, the following security controls:

(i) Limit information system access to authorized users, processes acting on behalf of authorized users, or devices (including other information systems).

(ii) Limit information system access to the types of transactions and functions that authorized users are permitted to execute.

(iii) Verify and control/limit connections to and use of external information systems.

(iv) Control information posted or processed on publicly accessible information systems.

(v) Identify information system users, processes acting on behalf of users, or devices.

(vi) Authenticate (or verify) the identities of those users, processes, or devices, as a prerequisite to allowing access to organizational information systems.

(vii) Sanitize or destroy information system media containing Federal Contract Information before disposal or release for reuse.

(viii) Limit physical access to organizational information systems, equipment, and the respective operating environments to authorized individuals.

(ix) Escort visitors and monitor visitor activity; maintain audit logs of physical access; and control and manage physical access devices.

(x) Monitor, control, and protect organizational communications (i.e., information transmitted or received by organizational information systems) at the external boundaries and key internal boundaries of the information systems.

(xi) Implement subnetworks for publicly accessible system components that are physically or logically separated from internal networks.

(xii) Identify, report, and correct information and information system flaws in a timely manner.

(xiii) Provide protection from malicious code at appropriate locations within organizational information systems.

(xiv) Update malicious code protection mechanisms when new releases are available.

http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3

BLM, VALE, OR District Page 12 of 44

(xv) Perform periodic scans of the information system and real-time scans of files from external sources as files are downloaded, opened, or executed.

(2) Other requirements. This clause does not relieve the Contractor of any other specific safeguarding requirements specified by Federal agencies and departments relating to covered contractor information systems generally or other Federal safeguarding requirements for controlled unclassified information (CUI) as established by

Executive Order 13556.

(c) Subcontracts. The Contractor shall include the substance of this clause, including this paragraph (c), in subcontracts under this contract (including subcontracts for the acquisition of commercial products or commercial services, other than commercially available off-the-shelf items), in which the subcontractor may have Federal contract information residing in or transiting through its information system.

(End of clause)

52.213-4 TERMS AND CONDITIONS-SIMPLIFIED ACQUISITIONS (OTHER THAN COMMERCIAL PRODUCTS

AND COMMERCIAL SERVICES) (JAN 2025)

(a) The Contractor shall comply with the following Federal Acquisition Regulation (FAR) clauses that are incorporated by reference:

(1) The clauses listed below implement provisions of law or Executive order:

(i) 52.203-19, Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements (JAN

2017) (section 743 of Division E, Title VII, of the Consolidated and Further Continuing Appropriations Act, 2015

(Pub. L. 113-235) and its successor provisions in subsequent appropriations acts (and as extended in continuing resolutions)).

(ii) 52.204-23, Prohibition on Contracting for Hardware, Software, and Services Developed or

Provided by Kaspersky Lab Covered Entities (DEC 2023) (Section 1634 of Pub. L. 115-91).

(iii) 52.204-25, Prohibition on Contracting for Certain Telecommunications and Video Surveillance

Services or Equipment. (NOV 2021) (Section 889(a)(1)(A) of Pub. L. 115-232).

(iv) 52.204-27, Prohibition on a ByteDance Covered Application (JUN 2023) (Section 102 of Division

R of Pub. L. 117-328), unless the agency grants an exception - see paragraph (b) of 52.204-27.

(v) 52.204–30, Federal Acquisition Supply Chain Security Act Orders—Prohibition. (Dec 2023) (Pub.

L. 115–390, title II).

(vi) 52.222-3, Convict Labor (JUN 2003) (E.O.11755).

(vii) 52.222-21, Prohibition of Segregated Facilities (APR 2015).

(viii) 52.222-26, Equal Opportunity (Sept 2016) (E.O.11246).

(ix) 52.225-13, Restrictions on Certain Foreign Purchases (FEB 2021) (E.O.s, proclamations, and statutes administered by the Office of Foreign Assets Control of the Department of the Treasury).

(x) 52.232-40, Providing Accelerated Payments to Small Business Subcontractors (MAR 2023) (31

U.S.C. 3903 and 10 U.S.C. 3801).

https://www.acquisition.gov/far/part-52#FAR_52_203_19 https://www.acquisition.gov/far/part-52#FAR_52_204_23 https://www.acquisition.gov/far/part-52#FAR_52_204_25 https://www.acquisition.gov/far/part-52#FAR_52_204_27 https://www.govinfo.gov/link/plaw/115/public/390 https://www.govinfo.gov/link/plaw/115/public/390 https://www.acquisition.gov/far/part-52#FAR_52_222_3 https://www.acquisition.gov/far/part-52#FAR_52_222_21 https://www.acquisition.gov/far/part-52#FAR_52_222_26 https://www.acquisition.gov/far/part-52#FAR_52_225_13 https://www.govinfo.gov/link/uscode/31/3903 https://www.govinfo.gov/link/uscode/31/3903 https://www.govinfo.gov/link/uscode/10/3801

BLM, VALE, OR District Page 13 of 44

(xi) 52.233-3, Protest After Award (AUG 1996) (31 U.S.C.3553).

(xii) 52.233-4, Applicable Law for Breach of Contract Claim (OCT 2004) (Pub. L. 108-77 and 108-78

(19 U.S.C. 3805 note)).

(2) Listed below are additional clauses that apply:

(i) 52.232-1, Payments (APR 1984).

(ii) 52.232-8, Discounts for Prompt Payment (FEB 2002).

(iii) 52.232-11, Extras (APR 1984).

(iv) 52.232-25, Prompt Payment (JAN 2017).

(v) 52.232-39, Unenforceability of Unauthorized Obligations (JUN 2013).

(vi) 52.233-1, Disputes (MAY 2014).

(vii) 52.244-6, Subcontracts for Commercial Products and Commercial Services (JAN 2025).

(viii) 52.253-1, Computer Generated Forms (JAN 1991).

(b) The Contractor shall comply with the following FAR clauses, incorporated by reference, unless the circumstances do not apply:

(1) The clauses listed below implement provisions of law or Executive order:

(i) 52.203-17, Contractor Employee Whistleblower Rights (NOV 2023) ( 41 U.S.C. 4712); this clause does not apply to contracts of DoD, NASA, the Coast Guard, or applicable elements of the intelligence community—see FAR 3.900(a).

(ii) 52.204-10, Reporting Executive Compensation and First-Tier Subcontract Awards (JUN 2020)(Pub.

L. 109-282) ( 31 U.S.C. 6101 note) (Applies to contracts valued at or above the threshold specified in

FAR 4.1403(a) on the date of award of this contract).

(iii) 52.222-19, Child Labor-Cooperation with Authorities and Remedies (JAN 2025) (E.O. 13126)

(Applies to contracts for supplies exceeding the micro-purchase threshold, as defined in 2.101 on the date of award of this contract).

(iv) 52.222-20, Contracts for Materials, Supplies, Articles, and Equipment., Contracts for

Materials, Supplies, Articles, and Equipment (JUN 2020) ( 41 U.S.C.chapter 65) (Applies to supply contracts over the threshold specified in FAR 22.602 on the date of award of this contract, in the United States, Puerto Rico, or the

U.S. Virgin Islands).

(v) 52.222-35, Equal Opportunity for Veterans (JUN 2020) ( 38 U.S.C. 4212) (Applies to contracts valued at or above the threshold specified in FAR 22.1303(a) on the date of award of this contract).

(vi) 52.222-36, Equal Employment for Workers with Disabilities (JUN 2020) ( 29 U.S.C. 793) (Applies to contracts over the threshold specified in FAR 22.1408(a) on the date of award of this contract, unless the work is to be performed outside the United States by employees recruited outside the United States). (For purposes of this https://www.acquisition.gov/far/part-52#FAR_52_233_3 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 https://www.govinfo.gov/link/plaw/108/public/77 https://www.govinfo.gov/link/uscode/19/3805 https://www.acquisition.gov/far/part-52#FAR_52_232_1 https://www.acquisition.gov/far/part-52#FAR_52_232_8 https://www.acquisition.gov/far/part-52#FAR_52_232_11 https://www.acquisition.gov/far/part-52#FAR_52_232_25 https://www.acquisition.gov/far/part-52#FAR_52_232_39 https://www.acquisition.gov/far/part-52#FAR_52_233_1 https://www.acquisition.gov/far/part-52#FAR_52_244_6 https://www.acquisition.gov/far/part-52#FAR_52_253_1 https://www.acquisition.gov/far/52.203-17#FAR_52_203_17 https://www.govinfo.gov/link/uscode/41/4712 https://www.acquisition.gov/far/3.900#FAR_3_900 https://www.acquisition.gov/far/52.204-10#FAR_52_204_10 http://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title31-section6101&num=0&edition=prelim https://www.acquisition.gov/far/4.1403#FAR_4_1403 https://www.acquisition.gov/far/52.222-19#FAR_52_222_19 https://www.acquisition.gov/far/2.101#FAR_2_101 https://www.acquisition.gov/far/52.222-20#FAR_52_222_20 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 https://www.acquisition.gov/far/52.222-35#FAR_52_222_35 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 https://www.acquisition.gov/far/22.1303#FAR_22_1303 https://www.acquisition.gov/far/52.222-36#FAR_52_222_36 https://www.acquisition.gov/far/22.1408#FAR_22_1408

BLM, VALE, OR District Page 14 of 44 clause, "United States" includes the 50 States, the District of Columbia, Puerto Rico, the Northern Mariana Islands, American Samoa, Guam, the U.S. Virgin Islands, and Wake Island.)

(vii) 52.222-37, Employment Reports on Veterans (JUN 2020) ( 38 U.S.C.