DISTRICT VAULT PUMPING N&S_VALE DO OR Federal contract opportunity
Solicitation number
140L4324Q0059
Issued by
Department of the Interior Bureau of Land Management Oregon-Washington

About this file

This is a solicitation for vault pumping services in Vale, Oregon. The Bureau of Land Management is seeking a contractor to pump vault toilets and a fish cleaning station located across two districts on a firm fixed price basis. Key requirements include pumping vaults on an as-needed basis using all necessary equipment and following state and federal regulations for waste disposal. The base period of performance is April 1, 2024 through March 31, 2025 with four optional one-year extensions. Sites are listed with estimated quantities, unit prices are to be provided, and emergency pumping services are also included. The solicitation closes on March 15, 2024.

View the file

Other files for this federal contract opportunity

Other files attached to DISTRICT VAULT PUMPING N&S_VALE DO OR, newest first.
File Type Posted
A04_North_Toilet_Loc_Heather_Hill_1.pdf PDF
A04_South_Toilets_LocS_Heather_Hill_1.pdf PDF
B03_-_WD_2015-5589.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SEE ADDENDUMIS CHECKED

CODE 18a. PAYMENT WILL BE MADE BY

CODE

FACILITYCODE

17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN OFFER

OFFEROR

LHA

PORTLAND OR 97204

1220 SW 3rd Avenue, 12th Floor

BLM OR-ST OFC PROC MGMT BR(OR952)

0004276562 CODE 16. ADMINISTERED BYCODE

X

X

562991

SIZE STANDARD:

% FOR:SET ASIDE:UNRESTRICTED ORLHA

REQUEST FOR

PROPOSAL

(RFP)

INVITATION

FOR BID (IFB)

10. THIS ACQUISITION ISCODE

REQUEST FOR

QUOTE (RFQ)

14. METHOD OF SOLICITATION

13b. RATING

NORTH AMERICAN INDUSTRY

CLASSIFICATION STANDARD

(NAICS):

SMALL BUSINESS

03/15/2024 1400 PD

03/08/2024

(503) 808-6294Kim Karalus (No collect calls)

INFORMATION CALL:

FOR SOLICITATION 8. OFFER DUE DATE/LOCAL TIMEb. TELEPHONE NUMBER a. NAME

4. ORDER NUMBER3. AWARD/ 6. SOLICITATION

140L4324Q0059

5. SOLICITATION NUMBER

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS 1. REQUISITION NUMBER PAGE OF

1 70 0040648062OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, & 30

TELEPHONE NO.

17a. CONTRACTOR/

VALE OR 97918

102 WAREHOUSE OREGON STREET

BLM-OR VALE DISTRICT OFFICE*

15. DELIVER TO

PORTLAND OR 97204

1220 SW 3rd Avenue, 12th Floor

9. ISSUED BY

7.

2. CONTRACT NO.

EFFECTIVE DATE

$9

18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK BELOW

ISSUE DATE

DELIVERY FOR FREE ON BOARD

(FOB) DESTINATION UNLESS

BLOCK IS MARKED

11.

SEE SCHEDULEX

12. DISCOUNT TERMS THIS CONTRACT IS A RATED

ORDER UNDER THE DEFENSE

PRIORITIES AND ALLOCATIONS

SYSTEM - DPAS (15 CFR 700)

13a.

SERVICE-DISABLED

VETERAN-OWNED

SMALL BUSINESS

(SDVOSB)

HUBZONE SMALL

BUSINESS

8(A)

BLM OR-ST OFC PROC MGMT BR(OR952)

WOMEN-OWNED SMALL

BUSINESS (WOSB)

ECONOMICALLY DISADVANTAGED

WOMEN-OWNED SMALL

BUSINESS (EDWOSB)

24.

AMOUNT

23.

UNIT PRICE

22.

UNIT

21.

QUANTITY

20.

SCHEDULE OF SUPPLIES/SERVICES

19.

ITEM NO.

VAULT TOILET PUMPING - BURNS DISTRICT

VENDOR POC: _______________________________

VENDOR TELEPHONE: _________________________

VENDOR EMAIL ADDRESS: _____________________

VENDOR UEI NUMBER: _______________________

TOTAL OFFER AMOUNT: $______________________

(Use Reverse and/or Attach Additional Sheets as Necessary)

HEREIN, IS ACCEPTED AS TO ITEMS:

XX

DATED

Matthew Duane

. YOUR OFFER ON SOLICITATION (BLOCK 5),

INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE SET FORTH

COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND DELIVER

ARE

ARE

31c. DATE SIGNED

27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA

31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER)

30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER (Type or print)

ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY ADDITIONAL

SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.

27a. SOLICITATION INCORPORATES BY REFERENCE (FEDERAL ACQUISITION REGULATION) FAR 52.212-1, 52.212-4. FAR 52.212-3

AND 52.212-5 ARE ATTACHED. ADDENDA

26. TOTAL AWARD AMOUNT (For Government Use Only)

OFFER

STANDARD FORM 1449 (REV. 11/2021)

Prescribed by GSA - FAR (48 CFR) 53.212

ARE NOT ATTACHED.

ARE NOT ATTACHED.

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

30b. NAME AND TITLE OF SIGNER (Type or print)

30a. SIGNATURE OF OFFEROR/CONTRACTOR

28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN

25. ACCOUNTING AND APPROPRIATION DATA

29. AWARD OF CONTRACT: REFERENCE

32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE

32c. DATE 32b. SIGNATURE OF AUTHORIZED GOVERNMENT REPRESENTATIVE

ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED:

32a. QUANTITY IN COLUMN 21 HAS BEEN

RECEIVED INSPECTED

40. PAID BY39. S/R VOUCHER NUMBER38. S/R ACCOUNT NUMBER

37. CHECK NUMBER

FINALPARTIAL

36. PAYMENT

FINALPARTIAL

35. AMOUNT VERIFIED

CORRECT FOR

34. VOUCHER NUMBER33. SHIP NUMBER

COMPLETE

32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE

42d. TOTAL CONTAINERS42c. DATE REC'D (YY/MM/DD)

42b. RECEIVED AT (Location)

42a. RECEIVED BY (Print)

41c. DATE41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER

41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT

STANDARD FORM 1449 (REV. 11/2021) BACK

24.

AMOUNT

23.

UNIT PRICE

22.

UNIT

21.

QUANTITY

20.

SCHEDULE OF SUPPLIES/SERVICES

19.

ITEM NO.

Delivery: 03/31/2025

Period of Performance: 04/01/2024 to 03/31/2029

00010 Vault Pumping N. Portion Vale District

Product/Service Code: S222

Product/Service Description: HOUSEKEEPING- WASTE

TREATMENT/STORAGE

Period of Performance: 04/01/2023 to 03/31/2025

00020 Vault Pumping S. Portion Vale District

Product/Service Code: S222

Product/Service Description: HOUSEKEEPING- WASTE

TREATMENT/STORAGE

Period of Performance: 04/01/2024 to 03/31/2025

00030 Vault Pumping N Portion Option Period 1

(Option Line Item)

Anticipated Exercise Date 10/01/2024

Product/Service Code: S222

Product/Service Description: HOUSEKEEPING- WASTE

TREATMENT/STORAGE

Period of Performance: 04/01/2025 to 03/31/2026

Continued ...

32f. TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE

32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT REPRESENTATIVE

70 2 of

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

NAME OF OFFEROR OR CONTRACTOR

3 70

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

140L4324Q0059

00040 Vault Pumping S Portion Option Period 1

(Option Line Item)

Anticipated Exercise Date 10/01/2024

Product/Service Code: S222

Product/Service Description: HOUSEKEEPING- WASTE

TREATMENT/STORAGE

00050 Vault Pumping N Portion Option Period 2

(Option Line Item)

Anticipated Exercise Date 10/01/2025

Product/Service Code: S222

Product/Service Description: HOUSEKEEPING- WASTE

TREATMENT/STORAGE

Period of Performance: 04/01/2026 to 03/31/2027

00060 Vault Pumping S Portion Option Period 2

(Option Line Item)

Anticipated Exercise Date 10/01/2025

Product/Service Code: S222

Product/Service Description: HOUSEKEEPING- WASTE

TREATMENT/STORAGE

Period of Performance: 04/01/2026 to 03/31/2027

00070 Vault Pumping N Portion Option Period 3

(Option Line Item)

Anticipated Exercise Date 10/01/2026

Product/Service Code: S222

Product/Service Description: HOUSEKEEPING- WASTE

TREATMENT/STORAGE

Period of Performance: 04/01/2027 to 03/31/2028

00080 Vault Pumping S Portion Option Period 3

(Option Line Item)

Anticipated Exercise Date 10/01/2026

Product/Service Code: S222

Product/Service Description: HOUSEKEEPING- WASTE

TREATMENT/STORAGE

Period of Performance: 04/01/2027 to 03/31/2028

00090 Vault Pumping N Portion Option Period 4

(Option Line Item)

Anticipated Exercise Date 10/01/2027

Product/Service Code: S222

Product/Service Description: HOUSEKEEPING- WASTE

TREATMENT/STORAGE

Period of Performance: 04/01/2028 to 03/31/2029

Continued ...

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

Sponsored by GSA

FAR (48 CFR) 53.110

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

NAME OF OFFEROR OR CONTRACTOR

4 70

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

140L4324Q0059

00100 Vault Pumping S Portion Option Period 4

(Option Line Item)

Anticipated Exercise Date 10/01/2027

Product/Service Code: S222

Product/Service Description: HOUSEKEEPING- WASTE

TREATMENT/STORAGE

Period of Performance: 04/01/2028 to 03/31/2029

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

Sponsored by GSA

FAR (48 CFR) 53.110

VAULT PUMPING, VALE, OR SOLICITATION NO. 140L4324Q0059

BLM VALE DISTRICT Page 5 of 70

SERVICES AND PRICES

This requirement is for one or more Firm Fixed Price Commercial Services Contracts for vault pumping services in Vale, OR. The contract contains a one-year Base plus four (4) one-year options.

Contractor shall furnish all labor, materials, equipment, (except for Government furnished property) supervision, transportation, and incidentals necessary for vault pumping services on an as needed basis in accordance with the terms, conditions, and specifications herein. BLM will notify contractor five (5) days prior to pumping.

CONTRACTOR TO QUOTE ON A PER VAULT BASIS.

BASE YEAR - 4/1/2024-3/31/2025

NORTH HALF

Item no. Item Description Qty Unit of

Measure Unit Price Total

0001 Spring Recreation Site- Located approx. 5 miles north of Huntington along Brownlee Res.

0001AA 1000 gallon vaults 1* EA 0001AB 8000 gallon vault (Fish Cleaning) 1* EA 0002 Bob Creek-

Located approx. 2 miles north of Copperfield, OR

0002AA 1000 gallon vault 1* EA 0003 Westfall-

Located approx. 1 mile north of Copperfield, OR

0003AA 1000 gallon vault 1* EA

0004 Emergency Pump- Various recreation sites in Baker Resource Area

0004AA 1000 gallon vault 2* EA

TOTAL

* Estimated Quantity EA = Each

SOUTH HALF

Item no. Item Description Qty Unit of

Measure Unit Price Total

0005 Leslie Gulch Site- Located approximately 17 miles west of Rockville, OR

0005AA 1000 gallon vaults 1* EA 0006 Owyhee Canyon Watchable

Wildlife Site- Located approx. 13 miles west of Adrian, OR. (One mile north of Snively Hot Springs)

0006AA 1000 gallon vault 1* EA 0007 Rome Launch Site-

Located approximately 35 miles south from Jordan Valley on State Highway 95

BLM VALE DISTRICT Page 6 of 70

0007AA 1000 gallon vaults 1* EA 0008 Snively Hot Spring-

Located approx. 14 miles west of Adrian, OR

0008AA 1000 gallon vaults 1* EA 0009 Vale Washrack-

Located at Vale District Compound

0009AA 2000 gallon vault 1* EA 0010 Emergency Pump-

Various recreation sites in Malheur Resource Area

0010AA 1000 gallon vault 2* EA

TOTAL

OPTION YEAR 1 – 4/1/2025-3/31/2026

NORTH HALF

Item no. Item Description Qty Unit of

Measure Unit Price Total

0001 Spring Recreation Site- Located approx. 5 miles north of Huntington along Brownlee Res.

0001AA 1000 gallon vaults 1* EA 0001AB 8000 gallon vault (Fish Cleaning) 1* EA 0002 Bob Creek-

Located approx. 2 miles north of Copperfield, OR

0002AA 1000 gallon vault 1* EA 0003 Westfall-

Located approx. 1 mile north of Copperfield, OR

0003AA 1000 gallon vault 1* EA

0004 Emergency Pump- Various recreation sites in Baker Resource Area

0004AA 1000 gallon vault 2* EA

TOTAL

SOUTH HALF

Item no. Item Description Qty Unit of

Measure Unit Price Total

0005 Leslie Gulch Site- Located approximately 17 miles west of Rockville, OR

0005AA 1000 gallon vaults 1 EA 0006 Owyhee Canyon Watchable

Wildlife Site- Located approx. 13 miles west of Adrian, OR. (One mile north of Snively Hot Springs)

0006AA 1000 gallon vault 1 EA 0007 Rome Launch Site-

BLM VALE DISTRICT Page 7 of 70

Located approximately 35 miles south from Jordan Valley on State Highway 95

0007AA 1000 gallon vaults 1 EA 0008 Snively Hot Spring-

Located approx. 14 miles west of Adrian, OR

0008AA 1000 gallon vaults 1 EA 0009 Vale Washrack-

Located at Vale District Compound

0009AA 2000 gallon vault 1 EA 0010 Emergency Pump-

Various recreation sites in Malheur Resource Area

0010AA 1000 gallon vault 2 EA

TOTAL

OPTION YEAR 2 – 4/1/2026-3/31/2027

NORTH HALF

Item no. Item Description Qty Unit of

Measure Unit Price Total

0001 Spring Recreation Site- Located approx. 5 miles north of Huntington along Brownlee Res.

0001AA 1000 gallon vaults 1* EA 0001AB 8000 gallon vault (Fish Cleaning) 1* EA 0002 Bob Creek-

Located approx. 2 miles north of Copperfield, OR

0002AA 1000 gallon vault 1* EA 0003 Westfall-

Located approx. 1 mile north of Copperfield, OR

0003AA 1000 gallon vault 1* EA

0004 Emergency Pump- Various recreation sites in Baker Resource Area

0004AA 1000 gallon vault 2* EA

TOTAL

SOUTH HALF

Item no. Item Description Qty Unit of

Measure Unit Price Total

0005 Leslie Gulch Site- Located approximately 17 miles west of Rockville, OR

0005AA 1000 gallon vaults 1* EA 0006 Owyhee Canyon Watchable

Wildlife Site-

BLM VALE DISTRICT Page 8 of 70

Located approx. 13 miles west of Adrian, OR. (One mile north of Snively Hot Springs)

0006AA 1000 gallon vault 1* EA 0007 Rome Launch Site-

Located approximately 35 miles south from Jordan Valley on State Highway 95

0007AA 1000 gallon vaults 1* EA 0008 Snively Hot Spring-

Located approx. 14 miles west of Adrian, OR

0008AA 1000 gallon vaults 1* EA 0009 Vale Washrack-

Located at Vale District Compound

0009AA 2000 gallon vault 1* EA 0010 Emergency Pump-

Various recreation sites in Malheur Resource Area

0010AA 1000 gallon vault 2* EA

TOTAL

OPTION YEAR 3 – 4/1/2027-3/31/2028

NORTH HALF

Item no. Item Description Qty Unit of

Measure Unit Price Total

0001 Spring Recreation Site- Located approx. 5 miles north of Huntington along Brownlee Res.

0001AA 1000 gallon vaults 1* EA 0001AB 8000 gallon vault (Fish Cleaning) 1* EA 0002 Bob Creek-

Located approx. 2 miles north of Copperfield, OR

0002AA 1000 gallon vault 1* EA 0003 Westfall-

Located approx. 1 mile north of Copperfield, OR

0003AA 1000 gallon vault 1* EA

0004 Emergency Pump- Various recreation sites in Baker Resource Area

0004AA 1000 gallon vault 2* EA

TOTAL

SOUTH HALF

Item no. Item Description Qty Unit of

Measure Unit Price Total

0005 Leslie Gulch Site- Located approximately 17 miles west of Rockville, OR

0005AA 1000 gallon vaults 1* EA

BLM VALE DISTRICT Page 9 of 70

0006 Owyhee Canyon Watchable Wildlife Site- Located approx. 13 miles west of Adrian, OR. (One mile north of Snively Hot Springs)

0006AA 1000 gallon vault 1* EA 0007 Rome Launch Site-

Located approximately 35 miles south from Jordan Valley on State Highway 95

0007AA 1000 gallon vaults 1* EA 0008 Snively Hot Spring-

Located approx. 14 miles west of Adrian, OR

0008AA 1000 gallon vaults 1* EA 0009 Vale Washrack-

Located at Vale District Compound

0009AA 2000 gallon vault 1* EA 0010 Emergency Pump-

Various recreation sites in Malheur Resource Area

0010AA 1000 gallon vault 2* EA

TOTAL

OPTION YEAR 4 – 4/1/2028-3/31/2029

NORTH HALF

Item no. Item Description Qty Unit of

Measure Unit Price Total

0001 Spring Recreation Site- Located approx. 5 miles north of Huntington along Brownlee Res.

0001AA 1000 gallon vaults 1* EA 0001AB 8000 gallon vault (Fish Cleaning) 1* EA 0002 Bob Creek-

Located approx. 2 miles north of Copperfield, OR

0002AA 1000 gallon vault 1* EA 0003 Westfall-

Located approx. 1 mile north of Copperfield, OR

0003AA 1000 gallon vault 1* EA

0004 Emergency Pump- Various recreation sites in Baker Resource Area

0004AA 1000 gallon vault 2* EA

TOTAL

SOUTH HALF

Item no. Item Description Qty Unit of

Measure Unit Price Total

0005 Leslie Gulch Site-

BLM VALE DISTRICT Page 10 of 70

Located approximately 17 miles west of Rockville, OR

0005AA 1000 gallon vaults 1* EA 0006 Owyhee Canyon Watchable

Wildlife Site- Located approx. 13 miles west of Adrian, OR. (One mile north of Snively Hot Springs)

0006AA 1000 gallon vault 1* EA 0007 Rome Launch Site-

Located approximately 35 miles south from Jordan Valley on State Highway 95

0007AA 1000 gallon vaults 1* EA 0008 Snively Hot Spring-

Located approx. 14 miles west of Adrian, OR

0008AA 1000 gallon vaults 1* EA 0009 Vale Washrack-

Located at Vale District Compound

0009AA 2000 gallon vault 1* EA 0010 Emergency Pump-

Various recreation sites in Malheur Resource Area

0010AA 1000 gallon vault 2* EA

TOTAL

PERIOD OF PERFORMANCE: See Deliveries or Performance section.

This is a TOTAL SMALL BUSINESS SET ASIDE

(End of Supplies/Services and Prices/Costs)

BLM VALE DISTRICT Page 11 of 70

STATEMENT OF WORK

North Half

C.1.0 GENERAL:

Contractor shall furnish vault pumping services on an as needed basis which includes all equipment, supervision, transportation, labor, operating supplies, and incidentals necessary to pump, wash down, cleanup, disinfect, and dispose of all waste products removed from the vault toilets and fish cleaning vault, in accordance with the following contract specifications and in accordance with State and Federal regulations.

C.2.0 DESCRIPTION:

C.2.1 See Sections B and J for pumping sites. All vaults located in the Vale District are listed in Section B. Some vaults may be pumped several times a year and others not at all. The purpose of this RFQ is to establish a price in the event the vault needs to be pumped.

C.2.2 Scheduling of Work: The BLM will notify the contractor five (5) days prior to pumping each designated site (not including Saturday and Sunday). Generally, the contractor may complete the required servicing between the hours of 8:00 a.m. and 5:00 p.m.

C.3.0 DEFINITIONS:

Sewage - liquid, semi-liquid, and solid waste matter.

Debris - all other refuse found in vault toilets and fish cleaning station.

C.4.0 TECHNICAL SPECIFICATIONS:

1. The Contractor shall furnish all toilet pumping equipment, tank truck, tools, approved disinfectant, and other equipment and supplies necessary to perform work in accordance with these specifications.

2. Water drafting equipment (if necessary, to get water from a lake, pond, or stream) shall consist of pumps, tanks, hoses, etc., and shall be completely separate from toilet waste pumping and hauling equipment.

3. All disinfecting solutions shall be approved by the Contracting Officers Representative (COR).

4. All equipment shall be in full accordance with any local, State, and county regulations.

5. The Contractor is responsible for all work completed including sub-contractors; all sub-contractors must meet the same requirements outlined in the contract as the primary Contractor.

a. The Contractor shall be properly licensed and is responsible for obtaining all necessary permits and licenses for pumping, hauling and disposing of the effluent.

b. The Contractor shall be responsible for making disposal arrangements, including disposal of all sewage, debris, and trash, and payments of all fees. The contractor shall follow state and federal laws in regards to disposal of the waste.

BLM VALE DISTRICT Page 12 of 70

C.4.1 Pumping Procedures: If there is an outside manhole available, sewage and debris should be removed through the manhole. If there is no manhole available, sewage and debris will have to be removed through the toilet riser.

1. All sewage and debris shall be removed from vault. Vaults may contain trash such as beverage containers, plastic bags, etc. Removal of these items is a requirement of the contract. Contractor shall be responsible for the removal, transport and proper disposal of trash and refuse found within the vault.

2. ALL DEBRIS REMOVED FROM THE VAULT SHALL BE PLACED INTO A LEAK PROOF

CONTAINER SO THAT NO CONTAMINATION, TO THE SURROUNDING GROUND,

WILL RESULT.

3. Pre-charge the vault with clean fresh water so that there is eight (8) inches of water covering the bottom under the toilet riser. Contractor shall pump all wet effluent from toilet vaults. Vaults must be pumped dry, with less than one inch of effluent remaining in the vault for each pumping.

Immediately upon completion of pumping the vault, the Contractor shall charge the vault with approximately 80 gallons of clean water except where specified in Section 4.0. Contractor can use delineated sites on project maps for water supply. Contractor shall ensure that a method is used that does not contaminate the water supply source (i.e., ensuring a different hose is used for clean water application). Although the Government is providing a water supply source for the contractor to use at some sites, it is the sole responsibility of the Contractor to ensure that proper hauling and servicing applications are followed. For areas annotated in Section 4.0 that do not have a water supply present, the contractor shall be required to provided adequate clean water to fulfill the aforementioned requirement.

4. Thoroughly clean and disinfect all contaminated areas resulting from the pumping process. Either sweep or wash all waste that is deposited on the concrete surrounding the manhole cover back into the vault, if possible. The waste that runs off the edge of the concrete, onto the dirt or into the gravel edge, will be an attractant for flies, a potential health risk, and an odor problem. This problem should be avoided.

5. Clean thoroughly around the manhole cover gasket area and replace the cover. The manhole cover MUST fit with an airtight seal so that the venting process of the vault toilet is not hampered.

C.4.2 Pumping Through the Toilet Riser When There is No Outside Manhole: Remove all debris and pump. Extra care shall be taken to prevent waste spillage onto the interior floor and wall surface while removing debris and while pumping. The toilet paper dispenser and toilet riser shall be protected from damage and the toilet paper shall be covered with a waterproof material prior to removing debris or pumping, in order to prevent the paper from getting contaminated.

1. During the final cleanup, the interior floor surface and any wall surface that was contaminated by waste shall be thoroughly disinfected. Again, every effort shall be made to sweep or wash the spilled waste back into the vault. The Contractor shall not allow the spilled waste to be washed or swept out through the front door because the waste will collect at the edge of the concrete and the dirt (or gravel) and will become an attractant for flies, a possible health risk, and an odor problem.

2. Thoroughly wash and disinfect both the inside and outside of the toilet riser and the seat and cover. The toilet riser and seat shall be dry before the Contractor leaves the work site. Remove the

BLM VALE DISTRICT Page 13 of 70 waterproof covering that was protecting the toilet paper and make sure the paper did not get contaminated. If the paper did get contaminated, the Contractor shall properly dispose of the paper and furnish a new roll. The door handles or knobs shall also be disinfected and dry before the Contractor leaves the job site.

3. The Contractor may pump additional toilets that are part of this contract in order to “top off” or fill the pumper truck to capacity.

4. Contractor shall provide documentation of total gallons pumped for each trip.

5. Each unit shall be available for immediate use after the pumping and final cleanup. The Contractor shall not leave any toilet location until final cleanup is accomplished.

C.4.3 Drafting of Water: Contractor may draft fresh water (to be used for washing down the vault walls, emulsification of the waste, and for final cleanup) from lakes, ponds and streams under the following conditions:

a. Drafting shall be accomplished where it least interferes with the public use of the facility and at areas least viewed by the public.

b. No waste shall be introduced into any body of water.

c. All drafting hoses and apparatuses shall be clean and shall not be used for vault pumping procedures.

d. The Contracting Officer shall approve all sites used for drafting water.

C.4.4 Fish Cleaning Station: The fish cleaning vault system consists of one vault with two compartments. One being approximately 5200 gallons and the other approximately 2700 gallons.

Contractor shall pump the smaller compartment completely dry and leave approximately 150 gallons in the larger compartment. The contractor shall follow state and federal laws in regards to disposal of this waste.

C.4.5 Off-site Disposal of Sewage, Debris and Fish Materials: The Contractor shall be properly licensed and shall be responsible for making disposal arrangements, including disposal of all effluent, debris, and trash, and payments of all fees.

1. Disposal shall conform to all Federal, State, and local laws and ordinances.

2. The Contractor shall be responsible to prevent spillage and to haul all waste material (sewage and debris) in watertight containers. Handling of all waste material shall be in accordance with all applicable health regulations.

b. The Contractor shall be responsible for making disposal arrangements, including disposal of all sewage, debris, and trash, and payments of all fees. The contractor shall follow state and federal laws in regards to disposal of the waste.

C.4.6 Conduct of Personnel: The Contractor and his/her employees shall make every reasonable effort to prevent interference with the normal use and occupancy of recreational areas while engaged in the performance of the contract.

BLM VALE DISTRICT Page 14 of 70

1. Due to the nature of the duties under the contract, the Contractor and his/her employees shall keep themselves and equipment presentable at all times. The Contracting Officer may, in writing, require the Contractor to remove from the work site any employee the Contracting Officer deems incompetent, careless, discourteous to the public, or is otherwise objectionable, or for theft, possession, and/or removal of materials, supplies, equipment or any government-owned property.

C.4.7 Resource Damage: Any damage or defacement that occurs to government property or land resources during the Contractors operations shall be repaired to its original condition at the Contractor’s expense. Onsite inspection will be made by the COR prior to the acceptance of work.

C.4.8 The below sites will be pumped utilizing the schedule services that are annotated. An Asterisk (*) denotes sites that do not have a water supply present, the contractor shall be required to provided adequate clean water to fulfill the aforementioned requirement. Some sites have running water nearby, if Contractor does choose to use that water source refer to Section C.4.3. Spring Rec has potable water available April through October.

BAKER RESOURCE AREA

1. *Bassar Diggins*

1000 gallon vault 1 Ea

2. Spring Recreation Site

1000 gallon vaults 5 Ea

8000 gallon vault (Fish Cleaning) 1 Ea

3. Swedes Landing

1000 gallon vault 2 Ea

4. Oasis

1000 gallon vault 1 Ea

5. *Copper Creek*

1000 gallon vault 2 Ea

6. *Airstrip*

1000 gallon vault 2 Ea

7. *Bob Creek*

1000 gallon vault 2 Ea

8. *Westfall*

1000 gallon vault 2 Ea

BLM VALE DISTRICT Page 15 of 70

C.5 GOVERNMENT FURNISHED MATERIALS

a. Key to open vault pumping access doors

b. Key to recreation site gates as needed

C.6 ATTACHMENTS

a. Transportation map showing facility locations

South Half

C.1.0 GENERAL:

Contractor shall furnish vault pumping services on an as needed basis which includes all equipment, supervision, transportation, labor, operating supplies, and incidentals necessary to pump, wash down, cleanup, disinfect, and dispose of all waste products removed from the vault toilets and washrack, in accordance with the following contract specifications and in accordance with State and Federal regulations.

C.2.0 DESCRIPTION:

C.2.1 See Sections B and J for pumping sites. All vaults located in the Vale District are listed in Section B. Some vaults may be pumped several times a year and others not at all. The purpose of this RFQ is to establish a price in the event the vault needs to be pumped.

C.2.2 Scheduling of Work: The BLM will notify the contractor five (5) days prior to pumping each designated site (not including Saturday and Sunday). Generally, the contractor may complete the required servicing between the hours of 8:00 a.m. and 5:00 p.m.

C.3.0 DEFINITIONS:

Sewage - liquid, semi-liquid, and solid waste matter.

Debris - all other refuse found in vault toilets and washrack.

C.4.0 TECHNICAL SPECIFICATIONS:

6. The Contractor shall furnish all toilet pumping equipment, tank truck, tools, approved disinfectant, and other equipment and supplies necessary to perform work in accordance with these specifications.

7. Water drafting equipment (if necessary, to get water from a lake, pond, or stream) shall consist of pumps, tanks, hoses, etc., and shall be completely separate from toilet waste pumping and hauling equipment.

8. All disinfecting solutions shall be approved by the Contracting Officers Representative (COR).

9. All equipment shall be in full accordance with any local, State, and county regulations.

BLM VALE DISTRICT Page 16 of 70

10. The Contractor is responsible for all work completed including sub-contractors; all sub-contractors must meet the same requirements outlined in the contract as the primary Contractor.

a. The Contractor shall be properly licensed and is responsible for obtaining all necessary permits and licenses for pumping, hauling and disposing of the effluent.

b. b. The Contractor shall be responsible for making disposal arrangements, including disposal of all sewage, debris, and trash, and payments of all fees. The contractor shall follow state and federal laws in regards to disposal of the waste.

C.4.1 Pumping Procedures: If there is an outside manhole available, sewage and debris should be removed through the manhole. If there is no manhole available, sewage and debris will have to be removed through the toilet riser.

6. All sewage and debris shall be removed from vault. Vaults may contain trash such as beverage containers, plastic bags, etc. Removal of these items is a requirement of the contract. Contractor shall be responsible for the removal, transport and proper disposal of trash and refuse found within the vault.

7. ALL DEBRIS REMOVED FROM THE VAULT SHALL BE PLACED INTO A LEAK PROOF

CONTAINER SO THAT NO CONTAMINATION, TO THE SURROUNDING GROUND,

WILL RESULT.

8. Pre-charge the vault with clean fresh water so that there is eight (8) inches of water covering the bottom under the toilet riser. Contractor shall pump all wet effluent from toilet vaults. Vaults must be pumped dry, with less than one inch of effluent remaining in the vault for each pumping.

Immediately upon completion of pumping the vault, the Contractor shall charge the vault with approximately 80 gallons of clean water except where specified in Section 4.0. Contractor can use delineated sites on project maps for water supply. Contractor shall ensure that a method is used that does not contaminate the water supply source (i.e., ensuring a different hose is used for clean water application). Although the Government is providing a water supply source for the contractor to use at some sites, it is the sole responsibility of the Contractor to ensure that proper hauling and servicing applications are followed. For areas annotated in Section 4.0 that do not have a water supply present, the contractor shall be required to provided adequate clean water to fulfill the aforementioned requirement.

9. Thoroughly clean and disinfect all contaminated areas resulting from the pumping process. Either sweep or wash all waste that is deposited on the concrete surrounding the manhole cover back into the vault, if possible. The waste that runs off the edge of the concrete, onto the dirt or into the gravel edge, will be an attractant for flies, a potential health risk, and an odor problem. This problem should be avoided.

10. Clean thoroughly around the manhole cover gasket area and replace the cover. The manhole cover MUST fit with an airtight seal so that the venting process of the vault toilet is not hampered.

C.4.2 Pumping Through the Toilet Riser When There is No Outside Manhole: Remove all debris and pump. Extra care shall be taken to prevent waste spillage onto the interior floor and wall surface while removing debris and while pumping. The toilet paper dispenser and toilet riser shall be

BLM VALE DISTRICT Page 17 of 70 protected from damage and the toilet paper shall be covered with a waterproof material prior to removing debris or pumping, in order to prevent the paper from getting contaminated.

6. During the final cleanup, the interior floor surface and any wall surface that was contaminated by waste shall be thoroughly disinfected. Again, every effort shall be made to sweep or wash the spilled waste back into the vault. The Contractor shall not allow the spilled waste to be washed or swept out through the front door because the waste will collect at the edge of the concrete and the dirt (or gravel) and will become an attractant for flies, a possible health risk, and an odor problem.

7. Thoroughly wash and disinfect both the inside and outside of the toilet riser and the seat and cover. The toilet riser and seat shall be dry before the Contractor leaves the work site. Remove the waterproof covering that was protecting the toilet paper and make sure the paper did not get contaminated. If the paper did get contaminated, the Contractor shall properly dispose of the paper and furnish a new roll. The door handles or knobs shall also be disinfected and dry before the Contractor leaves the job site.

8. The Contractor may pump additional toilets that are part of this contract in order to “top off” or fill the pumper truck to capacity.

9. Contractor shall provide documentation of total gallons pumped for each trip.

10. Each unit shall be available for immediate use after the pumping and final cleanup. The Contractor shall not leave any toilet location until final cleanup is accomplished.

C.4.3 Drafting of Water: Contractor may draft fresh water (to be used for washing down the vault walls, emulsification of the waste, and for final cleanup) from lakes, ponds and streams under the following conditions:

a. Drafting shall be accomplished where it least interferes with the public use of the facility and at areas least viewed by the public.

b. No waste shall be introduced into any body of water.

c. All drafting hoses and apparatuses shall be clean and shall not be used for vault pumping procedures.

d. The Contracting Officer shall approve all sites used for drafting water.

C.4.4 Washrack: Waste is generated from a concrete slab-on-grade vehicle washrack. Washrack contains undercarriage spray bar as well as having a hand wand. Sediment basin to be pumped is 1500 gallons. Oil Separator is 550 gallons and sump pump is 130 gallons. The sediment basin and oil separator are tested annually for Total Petroleum Hydrocarbons (TPH) and Toxicity Characteristic. With these results a Liquid Waste Transport Manifest will be produced and sent to Clay Peak Landfill and a copy also provided to the contractor upon pumping of the washrack.

1. BLM shall remove cattle guard grate for pumping the sediment basin.

BLM VALE DISTRICT Page 18 of 70

C.4.5 Offsite Disposal of Sewage and Debris: The Contractor shall be properly licensed and shall be responsible for making disposal arrangements, including disposal of all effluent, debris, and trash, and payments of all fees.

3. Disposal shall conform to all Federal, State, and local laws and ordinances.

4. The Contractor shall be responsible to prevent spillage and to haul all waste material (sewage and debris) in watertight containers. Handling of all waste material shall be in accordance with all applicable health regulations.

The Contractor shall be responsible for making disposal arrangements, including disposal of all sewage, debris, and trash, and payments of all fees. The contractor shall follow state and federal laws in regards to disposal of the waste.

C.4.6 Conduct of Personnel: The Contractor and his/her employees shall make every reasonable effort to prevent interference with the normal use and occupancy of recreational areas while engaged in the performance of the contract.

2. Due to the nature of the duties under the contract, the Contractor and his/her employees shall keep themselves and equipment presentable at all times. The Contracting Officer may, in writing, require the Contractor to remove from the work site any employee the Contracting Officer deems incompetent, careless, discourteous to the public, or is otherwise objectionable, or for theft, possession, and/or removal of materials, supplies, equipment or any government-owned property.

C.4.7 Resource Damage: Any damage or defacement that occurs to government property or land resources during the Contractors operations shall be repaired to its original condition at the Contractor’s expense. Onsite inspection will be made by the COR prior to the acceptance of work.

C.4.8 The below sites will be pumped utilizing the schedule services that are annotated. An Asterisk (*) denotes sites that do not have a water supply present, the contractor shall be required to provided adequate clean water to fulfill the aforementioned requirement. Some sites have running water nearby, if Contractor does choose to use that water source refer to Section C.4.3.

MALHEUR RESOURCE AREA

1. Antelope Reservoir Recreation Site

500 gallon vaults 2 Ea

2. Birch Creek Ranch

100 gallon vault 1 Ea

3. *Castle Rock Recreation Site*

1000 gallon vault 2 Ea

BLM VALE DISTRICT Page 19 of 70

4. Chukar Park

500 gallon vaults 4 Ea

1000 gallon vaults 2 Ea

5. Cow Lakes Reservoir Recreation Site

500 gallon vault 2 Ea

6. Leslie Gulch Site

250 gallon vaults 4 Ea

1000 gallon vaults 4 Ea

7. *Owyhee Canyon Watchable Wildlife Site*

1000 gallon vault 1 Ea

8. Riverside Rec. Site

1000 gallon vault 1 Ea

9. Rome Launch Site

1000 gallon vaults 2 Ea

10. *Snively Hot Spring*

1000 gallon vaults 1 Ea

11. *Twin Springs Recreation Site*

1000 gallon vaults 2 Ea

12. *Willow Creek Hot Springs*

1000 gallon vault 1 Ea

13. Vale Washrack

1500 gallon vault 1 Ea

550 gallon vault 1 Ea

130 gallon vault 1 Ea

C.5 GOVERNMENT FURNISHED MATERIALS

a. Key to open vault pumping access doors

BLM VALE DISTRICT Page 20 of 70

b. Key to recreation site gates as needed

c. Liquid Waste Transport Manifest for Washrack

C.6 ATTACHMENTS

a. Transportation map showing facility locations.

(End of Statement of Work)

INSPECTION AND ACCEPTANCE

The following clause is incorporated by reference:

Clause Title Date

52.246-1 CONTRACTOR INSPECTION REQUIREMENTS APR 1984

(End of Inspection and Acceptance)

DELIVERIES OR PERFORMANCE

F.1.0 PERIOD OF PERFORMANCE

The contract shall commence from April 1, 2024 for a period up to 5 years if options are exercised.

F.2.0 PROGRESS PLAN

At the prework conference, the Contractor shall provide to the COR a written "work progress plan" that details its proposed work force and schedule to provide for orderly completion of the work within the contract performance time. This work schedule must be acceptable to the Government. At a minimum, the schedule must reflect a work progress rate equal to the available amount of contract performance time.

The following clause is incorporated by reference:

Clause Title Date

52.242-15 STOP WORK ORDER AUG 1989

(End of Deliveries or Performance)

BLM VALE DISTRICT Page 21 of 70

CONTRACT ADMINISTRATION DATA

The following local clauses are provided in full text:

CONTRACTOR PERFORMANCE ASSESSMENT REPORTING SYSTEM (JULY 2010)

(a) FAR 42.1502 directs all Federal agencies to collect past performance information on contracts. The Department of the Interior (DOI) has implemented the Contractor Performance Assessment Reporting System (CPARS) to comply with this regulation. One or more past performance evaluations will be conducted in order to record your contract performance as required by FAR42.15.

(b) The past performance evaluation process is a totally paperless process using CPARS. CPARS is a web-based system that allows for electronic processing of the performance evaluation report. Once the report is processed, it is available for Government use in evaluating past performance as part of a source selection action.

(c) We request that you furnish the Contracting Officer with the name, position title, phone number, and email address for each person designated to have access to your firm's past performance evaluation(s) for the contract no later than 30 days after award. Each person granted access will have the ability to provide comments in the Contractor portion of the report and state whether or not the Contractor agrees with the evaluation, before returning the report to the Assessing Official. The report information must be protected as source selection sensitive information not releasable to the public.

(d) When your Contractor Representative(s) (Past Performance Points of Contact) are registered in CPARS, they will receive an automatically-generated email with detailed login instructions. Further details, systems requirements, and training information for CPARS is available at https://www.cpars.gov/. The CPARS User Manual, registration for On Line Training for Contractor Representatives, and a practice application may be found at this site.

(e) Within 60 days after the end of a performance period, the Contracting Officer will complete an interim or final past performance evaluation, and the report will be accessible at https://www.cpars.gov/. Contractor Representatives may then provide comments in response to the evaluation, or return the evaluation without comment. Comments are limited to the space provided in Block 22. Your comments should focus on objective facts in the Assessing Official's narrative and should provide your views on the causes and ramifications of the assessed performance. In addition to the ratings and supporting narratives, blocks 1 - 17 should be reviewed for accuracy, as these include key fields that will be used by the Government to identify your firm in future source selection actions. If you elect not to provide comments, please acknowledge receipt of the evaluation by indicating ''No comment" in Block 22, and then signing and dating Block 23 of the form. Without a statement in Block 22, you will be unable to sign and submit the evaluation back to the Government. If you do not sign and submit the CPAR within 30 days, it will automatically be returned to the Government and will be annotated: "The report was delivered/received by the contractor on (date). The contractor neither signed nor offered comment in response to this assessment." Your response is due within 30 calendar days after receipt of the CPAR.

(f) The following guidelines apply concerning your use of the past performance evaluation:

(1) Protect the evaluation as "source selection information." After review, transmit the evaluation by completing and submitting the form through CPARS. If for some reason you are unable to view and/or submit the form through CPARS, contact the Contracting Officer for instructions.

(2) Strictly control access to the evaluation within your organization. Ensure the evaluation is never released to persons or entities outside of your control.

https://www.cpars.gov/ http://www.cpars.csd.disa.milj/ https://www.cpars.gov/ http://www.cpars.csd.disa.mil/

BLM VALE DISTRICT Page 22 of 70

(3) Prohibit the use of or reference to evaluation data for advertising, promotional material, preaward surveys, responsibility determinations, production readiness reviews, or other similar purposes.

(g) If you wish to discuss a past performance evaluation, you should request a meeting in writing to the Contracting Officer no later than seven days following your receipt of the evaluation. The meeting will be held in person or via telephone or other means during your 30- day review period.

(h) A copy of the completed past performance evaluation will be available in CPARS for your viewing and for Government use supporting source selection actions after it has been finalized.

(End of clause)

ELECTRONIC INVOICING AND PAYMENT REQUIREMENTS – INVOICE PROCESSING PLATFORM (IPP)

(APR 2013)

Payment requests must be submitted electronically through the U.S. Department of the Treasury’s Invoice Processing Platform System (IPP).

“Payment request” means any request for contract financing payment or invoice payment by the Contractor. To constitute a proper invoice, the payment request must comply with the requirements identified in the applicable Prompt Payment clause included in the contract, or the clause 52.212-4 Contract Terms and Conditions – Commercial Products and Commercial Services included in commercial products and commercial services contracts. The IPP website address is: https://www.ipp.gov.

Under this contract, the following documents are required to be submitted as an attachment to the IPP invoice

1. Invoice billed according to contract line items and rates.

The Contractor must use the IPP website to register access and use IPP for submitting requests for payment. The Contractor Government Business Point of Contract (as listed in SAM) will receive enrollment instructions via email from the Federal Reserve Bank of Boston (FRBB) prior to the contract award date, but no more than 3 – 5 business days of the contract award date. Contractor assistance with enrollment can be obtained by contacting the IPP Production Helpdesk via email ippgroup@bos.frb.org or phone (866) 973-3131.

If the Contractor is unable to comply with the requirement to use IPP for submitting invoices for payment, the Contractor must submit a waiver request in writing to the Contracting Officer with its proposal or quotation.

(End of Local Clause)

(End of Contract Administration Data) https://www.ipp.gov/ mailto:ippgroup@bos.frb.org

BLM VALE DISTRICT Page 23 of 70

SPECIAL CONTRACT REQUIREMENTS

1.0 ACCESS

In the event of a site/facility closure, the Contractor shall not perform or make deliveries to the site/facility until it is reopened by the Government, unless otherwise instructed by the Contracting Officer or their designated representative.

2.0 WORK HOURS

Unless otherwise specified in Section C, Specifications, work hours under this contract shall be limited to the time between one-half hour before sunrise to one-half hour after sunset each day. No work will be done on Saturday, Sunday, or Federal holidays unless authorized by the COR.

3.0 ENVIRONMENTAL INTERRUPTION OF WORK

3.1 Environmental - The Contracting Officer, by issuance of a suspend work order, may direct the Contractor to shut down any work that may be subject to damage due to weather conditions, fire danger, or because it is impracticable to work during the winter season. The Contractor will be given a resume work order which will document the date the work suspension ends. An allowance has been included in the contract time for all environmental delays. The count of contract time will therefore continue during all periods of suspension due to normal weather conditions, including fire danger. The Contractor will not be entitled to additional contract time for any suspensions except to the extent that they are due to unusually severe weather conditions. The Contractor will not be entitled to additional monetary compensation for such suspensions regardless of duration.

3.2 Endangered Species - The Government may direct the Contractor to discontinue all operations in the event that listed or proposed threatened or endangered plants or animals protected under the Endangered Species Act of 1973, as amended, or Federal candidate (Category 1 and 2), sensitive or state listed species, identified under BLM Manual 6840, are discovered to be present in or adjacent to the project area.

4.0 PRESERVATION OF HISTORICAL AND ARCHEOLOGICAL DATA

4.1 Public Law 93-291, May 24, 1974, provides for the preservation of scientific, prehistorical, and archeological data (including relics and specimens) which might otherwise be lost due to alteration of the terrain as a result of any Federal construction project.

4.2 The Contractor agrees that should any contractor employee, in the performance of this contract, discover evidence of possible scientific, prehistorical, historical, or archeological data the contractor will notify the Contracting Officer immediately in writing giving the location and nature of the findings.

4.3 Where appropriate by reason of discovery, the Contracting Officer may order delays in the time of performance and/or changes in the work. If such delays and/or changes are ordered, the time of performance and contract price shall be adjusted in accordance with the applicable clauses in the Contract Clauses Section of this contract.

4.4 The Contractor agrees to insert this requirement in all subcontracts which involve the performance of work on the terrain of the site.

5.0 ENVIRONMENTAL IMPACT

All waste materials generated by any work under the contract performed on a Government installation shall at all times be handled, transported, stored, and disposed of by the contractor and by his subcontractors in accordance with all applicable Federal, state, and local laws, ordinances, regulations, court orders, and other types of rulings having the effect of the law, including, but not limited to Executive Order 12088, 13 October 1978, Federal Compliance with Pollution Control Standards; the Federal Water Pollution Control Act, as amended (33 U.S.C. 1251 ET SEQ); the Clean Air Act as amended (42 U.S.C. Sec 7401 ET SEQ);

the Endangered Species Act, as amended (16 U.S.C. Sec 1531, ET SEQ); the Toxic Substances Control Act, as amended (15 U.S.C. Sec 2601, ET SEQ); the National Historic Preservation Act, as amended (16 U.S.C. Sec 470, ET SEQ); the Solid Waste Disposal Act, as amended (42 U.S.C. 6901 ET SEQ); and the

BLM VALE DISTRICT Page 24 of 70

Archaeological and Historic Preservation Act, as amended (16 U.S.C. Sec 469, ET SEQ). Should the United States Government be held liable for any neglect or improper actions by the contractor or any subcontractor regarding removal or disposal of any hazardous waste, the contractor shall reimburse the Government for all such liability.

6.0 HAZARDOUS MATERIALS

Any material suspected of being hazardous that is encountered during performance of a project shall immediately be brought to the attention of the Contracting Officer, at which time a determination will be made as to whether hazardous material testing shall be performed. If the Contracting Officer directs the contractor to perform tests, and/or the material is found to be of a hazardous nature requiring additional protective measures, a contract modification may be required, subject to equitable adjustment under the terms of the contract. The contractor is advised that friable and/or non-friable asbestos-containing material may be encountered in project areas. Friable asbestos-containing material is any material that contains more than one percent asbestos by weight, and that hand pressure can crumble, pulverize or reduce to powder when dry. Non-friable asbestos containing materials are materials in which asbestos fibers are bound by a matrix material, saturation, impregnation or coating.

Non-friable asbestos-containing materials do not normally release airborne asbestos fiber during routine handling and end-use. However, excessive fiber concentrations may be produced during uncontrolled abrading, sanding, drilling, cutting, machining, removal, demolition, or other similar activities. 29 CFR

1910.1001 shall be referenced in the event asbestos-containing materials are encountered. Friable asbestos-containing materials are not authorized for use in new construction or maintenance projects.

7.0 GREEN PROCUREMENT REQUIREMENTS

In the performance of this service or construction contract, the Contractor shall make maximum use of products identified on the mandatory environmental purchasing list at the following links, if applicable:

• U.S. EPA Comprehensive Procurement Guidelines published at www.epa.gov/cpg/products.htm.

• USDA Biobased product listings published at www.biopreferred.gov.

• Energy Star® product listings published at www.energystar.gov/products.

• FEMP Low Standby Power product listings published at http://energy.gov/eere/femp/covered-product-categories

Contractor shall comply with all…