Sol_140L4323Q0109.pdf
PDF 3 MB Posted
- Attached to
- ABANDON VEHICLE & SITE CLEANUP Federal contract opportunity
- Solicitation number
- 140L4323Q0109
About this file
This is a solicitation for abandon vehicle removal and site cleanup services across multiple districts in Oregon for the Bureau of Land Management. The contractor will provide towing and disposal of abandon vehicles up to 30,000 pounds, including any trash or hazardous materials found within. Additional services include downhill yarding of vehicles over 30 yards and full- or half-day site cleanup, with three days to complete each task. Pricing is provided on a firm fixed price basis for a one-year base period and four one-year option periods. Set-asides include total small business and HUBZone small business. The response due date is June 6, 2023, and award is expected by June 19, 2023.
View the file
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SEE ADDENDUMIS CHECKED
CODE 18a. PAYMENT WILL BE MADE BY
CODE
FACILITYCODE
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN OFFER
OFFEROR
LHA
PORTLAND OR 97204
1220 SW 3rd Avenue, 12th Floor
BLM OR-ST OFC PROC MGMT BR(OR952)
CODE 16. ADMINISTERED BYCODE
X
X
X
488410
SIZE STANDARD:
100.00 % FOR:SET ASIDE:UNRESTRICTED ORLHA
RFPIFB
10. THIS ACQUISITION ISCODE
RFQ
14. METHOD OF SOLICITATION
13b. RATING
NAICS:
SMALL BUSINESS
06/06/2023 1700 PD
05/19/2023
5038086102Deric Blum (No collect calls)
INFORMATION CALL:
FOR SOLICITATION 8. OFFER DUE DATE/LOCAL TIMEb. TELEPHONE NUMBER a. NAME
4. ORDER NUMBER3. AWARD/ 6. SOLICITATION
140L4323Q0109
5. SOLICITATION NUMBER
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS 1. REQUISITION NUMBER PAGE OF
1 212 0040607149OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, & 30
TELEPHONE NO.
17a. CONTRACTOR/
Multiple Destinations
15. DELIVER TO
PORTLAND OR 97204
1220 SW 3rd Avenue, 12th Floor
9. ISSUED BY
7.
2. CONTRACT NO.
EFFECTIVE DATE
$9
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK BELOW
ISSUE DATE
DELIVERY FOR FOB DESTINA-
TION UNLESS BLOCK IS
MARKED
11.
SEE SCHEDULEX
12. DISCOUNT TERMS
THIS CONTRACT IS A
RATED ORDER UNDER
DPAS (15 CFR 700)
13a.
SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
HUBZONE SMALL
BUSINESS
8(A)
BLM OR-ST OFC PROC MGMT BR(OR952)
WOMEN-OWNED SMALL BUSINESS
(WOSB) ELIGIBLE UNDER THE WOMEN-OWNED
SMALL BUSINESS PROGRAM
EDWOSB
24.
AMOUNT
23.
UNIT PRICE
22.
UNIT
21.
QUANTITY
20.
SCHEDULE OF SUPPLIES/SERVICES
19.
ITEM NO.
Period of Performance: 06/01/2023 to 05/31/2024
ACCOUNT CODE FOR ALL DISTRICTS TO SHARE
00010 Towing & Clean-up Base Yr - All Districts 23XL1644 Product/Service Code: R499 Product/Service Description: SUPPORT-
PROFESSIONAL: OTHER
Delivery Location Code: 0004276602 Continued ...
(Use Reverse and/or Attach Additional Sheets as Necessary)
HEREIN, IS ACCEPTED AS TO ITEMS:
XX
DATED
Andrea Hart
. YOUR OFFER ON SOLICITATION (BLOCK 5),
INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE SET FORTH
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND DELIVER
ARE
ARE
31c. DATE SIGNED
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA
31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER)
30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER (Type or print)
ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY ADDITIONAL
SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.
27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1, 52.212-4. FAR 52.212-3 AND 52.212-5 ARE ATTACHED. ADDENDA
26. TOTAL AWARD AMOUNT (For Govt. Use Only)
OFFER
STANDARD FORM 1449 (REV. 2/2012)
Prescribed by GSA - FAR (48 CFR) 53.212
ARE NOT ATTACHED.
ARE NOT ATTACHED.
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
30b. NAME AND TITLE OF SIGNER (Type or print)
30a. SIGNATURE OF OFFEROR/CONTRACTOR
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN
25. ACCOUNTING AND APPROPRIATION DATA
29. AWARD OF CONTRACT:
REF.
32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE
32c. DATE 32b. SIGNATURE OF AUTHORIZED GOVERNMENT REPRESENTATIVE
ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED:
32a. QUANTITY IN COLUMN 21 HAS BEEN
RECEIVED INSPECTED
40. PAID BY39. S/R VOUCHER NUMBER38. S/R ACCOUNT NUMBER
37. CHECK NUMBER
FINALPARTIAL
36. PAYMENT
FINALPARTIAL
35. AMOUNT VERIFIED
CORRECT FOR
34. VOUCHER NUMBER33. SHIP NUMBER
COMPLETE
32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE
42d. TOTAL CONTAINERS42c. DATE REC'D (YY/MM/DD)
42b. RECEIVED AT (Location)
42a. RECEIVED BY (Print)
41c. DATE41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER
41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT
STANDARD FORM 1449 (REV. 2/2012) BACK
24.
AMOUNT
23.
UNIT PRICE
22.
UNIT
21.
QUANTITY
20.
SCHEDULE OF SUPPLIES/SERVICES
19.
ITEM NO.
BLM-OR MEDFORD DISTRICT OFFICE*
3040 BIDDLE ROAD
MEDFORD OR 97504 US
Period of Performance: 06/15/2023 to 06/14/2024
00011 Towing & Clean-up Base Yr - Prineville 18X
Product/Service Code: R499
Product/Service Description: SUPPORT-
PROFESSIONAL: OTHER
Delivery Location Code: 0004276573
BLM-OR PRINEVILLE DISTRICT OFFICE*
3050 NE THIRD ST
PRINEVILLE OR 97754 US
Period of Performance: 06/15/2023 to 06/14/2024
00012 Towing & Clean-up Base Yr - Prineville 19X
Product/Service Code: R499
Product/Service Description: SUPPORT-
PROFESSIONAL: OTHER
Delivery Location Code: 0004276573
BLM-OR PRINEVILLE DISTRICT OFFICE*
3050 NE THIRD ST
PRINEVILLE OR 97754 US
Continued ...
32f. TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE
32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT REPRESENTATIVE
212 2 of
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
NAME OF OFFEROR OR CONTRACTOR
3 212
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
140L4323Q0109
Period of Performance: 06/15/2023 to 06/14/2024
00013 Towing & Clean-up Base Yr - Prineville 20X
Product/Service Code: R499
Product/Service Description: SUPPORT-
PROFESSIONAL: OTHER
Delivery Location Code: 0004276573
BLM-OR PRINEVILLE DISTRICT OFFICE*
3050 NE THIRD ST
PRINEVILLE OR 97754 US
Period of Performance: 06/15/2023 to 06/14/2024
ACCOUNT CODE FOR ALL DISTRICTS TO SHARE
00014 Towing & Clean-up Base Yr - Vale District
Product/Service Code: R499
Product/Service Description: SUPPORT-
PROFESSIONAL: OTHER
Delivery Location Code: 0004276563
BLM-OR VALE DISTRICT OFFICE*
100 OREGON STREET
VALE OR 97918 US
Period of Performance: 06/15/2023 to 06/14/2024
ACCOUNT CODE FOR ALL DISTRICTS TO SHARE
00020 Towing & Clean-up Option Yr 1 - All Districts
(Option Line Item)
Anticipated Exercise Date 06/14/2024
Product/Service Code: R499
Product/Service Description: SUPPORT-
PROFESSIONAL: OTHER
Period of Performance: 06/15/2024 to 06/14/2025
ACCOUNT CODE FOR ALL DISTRICTS TO SHARE
00030 Towing & Clean-up Option Yr 2 - All Districts
(Option Line Item)
Anticipated Exercise Date 06/14/2025
Product/Service Code: R499
Continued ...
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
NAME OF OFFEROR OR CONTRACTOR
4 212
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
140L4323Q0109
Product/Service Description: SUPPORT-
PROFESSIONAL: OTHER
Period of Performance: 06/15/2025 to 06/14/2026
ACCOUNT CODE FOR ALL DISTRICTS TO SHARE
00040 Towing & Clean-up Option Yr 3 - All Districts
(Option Line Item)
Anticipated Exercise Date 06/14/2026
Product/Service Code: R499
Product/Service Description: SUPPORT-
PROFESSIONAL: OTHER
Period of Performance: 07/15/2026 to 06/14/2027
ACCOUNT CODE FOR ALL DISTRICTS TO SHARE
00050 Towing & Clean-up Option Yr 4 - All Districts
(Option Line Item)
Anticipated Exercise Date 06/14/2027
Product/Service Code: R499
Product/Service Description: SUPPORT-
PROFESSIONAL: OTHER
Period of Performance: 06/15/2027 to 06/14/2028
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
MULTI-DISTRICT TOWING & CLEANUP, OR SOLICITATION NO. 140L4323Q0109
BLM MEDFORD DISTRICT Page 5 of 212
SERVICES AND PRICES
This requirement is for one (1) or multiple Firm Fixed Price Commercial Services Contract(s) for Abandoned
Vehicle Removal and Site Cleanup throught Oregon. The contract(s) contains a one-year Base plus additional four
(4) one-year term options. Interested offerors may quote on some or all CLINS’s however, they shall quote all items under selected CLIN’s.
BASE PERIOD
CLIN 0001 – PRINEVILLE DISTRICT – Crooks, Deschutes, Lakeview County, Oregon
Item
No. Item Description
Est.
Quantity UoM Unit Price Total
1 Class A Tow 2 Ea.
2.1 Class B Tow (Vehicles, Bare Frames)
10 Ea.
2.2 Class B Tow (RV’s, Boats)
3 Ea.
3 Class C Tow 4 Ea.
4 Down Hill Yarding up to
30 yards
Ea.
5 Down Hill Yarding over
30 yards
1 Ea.
6 Site Cleanup Full Day 5 Ea.
7 Site Cleanup Half Day 5 Ea.
8 Emergency Tow 3 Ea.
Total
CLIN 0002 – MEDFORD DISTRICT – Josephine, Jackson, Douglas County, Oregon
No. Item Description
Est.
Quantity UoM Unit Price Total
1 Class A Tow 1 Ea.
2.1 Class B Tow (Vehicles, Bare Frames)
6 Ea.
2.2 Class B Tow (RV’s, Boats)
1 Ea.
3 Class C Tow 2 Ea.
4 Down Hill Yarding up to
30 yards
1 Ea.
6 Site Cleanup Full Day 2 Ea.
7 Site Cleanup Half Day 1 Ea.
8 Emergency Tow 1 Ea.
BLM MEDFORD DISTRICT Page 6 of 212
CLIN 0003 – NORTHWEST OREGON DISTRICT – Benton, Lane, Lincoln, Linn, Marion, Pulk, Tillamook, Yamhill County, Oregon
Item
No. Item Description
Est.
Quantity UoM Unit Price Total
1 Class A Tow 1 Ea.
2.1 Class B Tow (Vehicles, Bare Frames)
6 Ea.
2.2 Class B Tow (RV’s, Boats)
1 Ea.
3 Class C Tow 2 Ea.
4 Down Hill Yarding up to
30 yards
1 Ea.
6 Site Cleanup Full Day 2 Ea.
7 Site Cleanup Half Day 1 Ea.
CLIN 0004 – VALE DISTRICT – Grant, Harney and Malheur County, Oregon
No. Item Description
Est.
Quantity UoM Unit Price Total
1 Class A Tow 1 Ea.
2.1 Class B Tow (Vehicles, Bare Frames)
6 Ea.
2.2 Class B Tow (RV’s, Boats)
1 Ea.
3 Class C Tow 2 Ea.
4 Down Hill Yarding up to
30 yards
1 Ea.
6 Site Cleanup Full Day 2 Ea.
7 Site Cleanup Half Day 1 Ea.
** Estimated Quantity **
Class A Tow = vehicle exceeding 20,000 (GVW)
Class B Tow = passenger vehicle, truck, or van, camping trailer up to ¾ ton size not exceeding 5,000 (GVW).
Class C Tow = vehicle exceeding 10,000 (GVW)
Down Hill Yarding up to 30 Yards = Not all vehicles, as needed basis
Down Hill yarding over 30 yards = Not all vehicles, as needed basis
Site Cleanup = after photograph review by COR, as needed basis
BLM MEDFORD DISTRICT Page 7 of 212
Option Period 1
CLIN 0011 – PRINEVILLE DISTRICT – Crooks, Deschutes, Lakeview County, Oregon
No. Item Description
Est.
Quantity UoM Unit Price Total
1 Class A Tow 2 Ea.
2.1 Class B Tow (Vehicles, Bare Frames)
10 Ea.
2.2 Class B Tow (RV’s, Boats)
3 Ea.
3 Class C Tow 4 Ea.
4 Down Hill Yarding up to
30 yards
1 Ea.
6 Site Cleanup Full Day 5 Ea.
7 Site Cleanup Half Day 5 Ea.
CLIN 0012 – MEDFORD DISTRICT – Josephine, Jackson, Douglas County, Oregon
No. Item Description
Est.
Quantity UoM Unit Price Total
1 Class A Tow 1 Ea.
2.1 Class B Tow (Vehicles, Bare Frames)
6 Ea.
2.2 Class B Tow (RV’s, Boats)
1 Ea.
3 Class C Tow 2 Ea.
4 Down Hill Yarding up to
30 yards
1 Ea.
6 Site Cleanup Full Day 2 Ea.
7 Site Cleanup Half Day 1 Ea.
BLM MEDFORD DISTRICT Page 8 of 212
CLIN 0013 – NORTHWEST OREGON DISTRICT – Benton, Lane, Lincoln, Linn, Item
No. Item Description
Est.
Quantity UoM Unit Price Total
1 Class A Tow 1 Ea.
2.1 Class B Tow (Vehicles, Bare Frames)
6 Ea.
2.2 Class B Tow (RV’s, Boats)
1 Ea.
3 Class C Tow 2 Ea.
4 Down Hill Yarding up to
30 yards
1 Ea.
6 Site Cleanup Full Day 2 Ea.
7 Site Cleanup Half Day 1 Ea.
CLIN 0014 – VALE DISTRICT – Grant, Harney and Malheur County, Oregon
No. Item Description
Est.
Quantity UoM Unit Price Total
1 Class A Tow 1 Ea.
2.1 Class B Tow (Vehicles, Bare Frames)
6 Ea.
2.2 Class B Tow (RV’s, Boats)
1 Ea.
3 Class C Tow 2 Ea.
4 Down Hill Yarding up to
30 yards
1 Ea.
6 Site Cleanup Full Day 2 Ea.
7 Site Cleanup Half Day 1 Ea.
BLM MEDFORD DISTRICT Page 9 of 212
Option Period 2
CLIN 0021 – PRINEVILLE DISTRICT – Crooks, Deschutes, Lakeview County, Oregon
No. Item Description
Est.
Quantity UoM Unit Price Total
1 Class A Tow 2 Ea.
2.1 Class B Tow (Vehicles, Bare Frames)
10 Ea.
2.2 Class B Tow (RV’s, Boats)
3 Ea.
3 Class C Tow 4 Ea.
4 Down Hill Yarding up to
30 yards
1 Ea.
6 Site Cleanup Full Day 5 Ea.
7 Site Cleanup Half Day 5 Ea.
CLIN 0022 – MEDFORD DISTRICT – Josephine, Jackson, Douglas County, Oregon
No. Item Description
Est.
Quantity UoM Unit Price Total
1 Class A Tow 1 Ea.
2.1 Class B Tow (Vehicles, Bare Frames)
6 Ea.
2.2 Class B Tow (RV’s, Boats)
1 Ea.
3 Class C Tow 2 Ea.
4 Down Hill Yarding up to
30 yards
1 Ea.
6 Site Cleanup Full Day 2 Ea.
7 Site Cleanup Half Day 1 Ea.
BLM MEDFORD DISTRICT Page 10 of 212
CLIN 0023 – NORTHWEST OREGON DISTRICT – Benton, Lane, Lincoln, Linn, Item
No. Item Description
Est.
Quantity UoM Unit Price Total
1 Class A Tow 1 Ea.
2.1 Class B Tow (Vehicles, Bare Frames)
6 Ea.
2.2 Class B Tow (RV’s, Boats)
1 Ea.
3 Class C Tow 2 Ea.
4 Down Hill Yarding up to
30 yards
1 Ea.
6 Site Cleanup Full Day 2 Ea.
7 Site Cleanup Half Day 1 Ea.
CLIN 0024 – VALE DISTRICT – Grant, Harney and Malheur County, Oregon
No. Item Description
Est.
Quantity UoM Unit Price Total
1 Class A Tow 1 Ea.
2.1 Class B Tow (Vehicles, Bare Frames)
6 Ea.
2.2 Class B Tow (RV’s, Boats)
1 Ea.
3 Class C Tow 2 Ea.
4 Down Hill Yarding up to
30 yards
1 Ea.
6 Site Cleanup Full Day 2 Ea.
7 Site Cleanup Half Day 1 Ea.
BLM MEDFORD DISTRICT Page 11 of 212
Option Period 3
CLIN 0031 – PRINEVILLE DISTRICT – Crooks, Deschutes, Lakeview County, Oregon
No. Item Description
Est.
Quantity UoM Unit Price Total
1 Class A Tow 2 Ea.
2.1 Class B Tow (Vehicles, Bare Frames)
10 Ea.
2.2 Class B Tow (RV’s, Boats)
3 Ea.
3 Class C Tow 4 Ea.
4 Down Hill Yarding up to
30 yards
1 Ea.
6 Site Cleanup Full Day 5 Ea.
7 Site Cleanup Half Day 5 Ea.
CLIN 0032 – MEDFORD DISTRICT – Josephine, Jackson, Douglas County, Oregon
No. Item Description
Est.
Quantity UoM Unit Price Total
1 Class A Tow 1 Ea.
2.1 Class B Tow (Vehicles, Bare Frames)
6 Ea.
2.2 Class B Tow (RV’s, Boats)
1 Ea.
3 Class C Tow 2 Ea.
4 Down Hill Yarding up to
30 yards
1 Ea.
6 Site Cleanup Full Day 2 Ea.
7 Site Cleanup Half Day 1 Ea.
BLM MEDFORD DISTRICT Page 12 of 212
CLIN 0033 – NORTHWEST OREGON DISTRICT – Benton, Lane, Lincoln, Linn, Item
No. Item Description
Est.
Quantity UoM Unit Price Total
1 Class A Tow 1 Ea.
2.1 Class B Tow (Vehicles, Bare Frames)
6 Ea.
2.2 Class B Tow (RV’s, Boats)
1 Ea.
3 Class C Tow 2 Ea.
4 Down Hill Yarding up to
30 yards
1 Ea.
6 Site Cleanup Full Day 2 Ea.
7 Site Cleanup Half Day 1 Ea.
CLIN 0034 – VALE DISTRICT – Grant, Harney and Malheur County, Oregon
No. Item Description
Est.
Quantity UoM Unit Price Total
1 Class A Tow 1 Ea.
2.1 Class B Tow (Vehicles, Bare Frames)
6 Ea.
2.2 Class B Tow (RV’s, Boats)
1 Ea.
3 Class C Tow 2 Ea.
4 Down Hill Yarding up to
30 yards
1 Ea.
6 Site Cleanup Full Day 2 Ea.
7 Site Cleanup Half Day 1 Ea.
BLM MEDFORD DISTRICT Page 13 of 212
Option Period 4
CLIN 0041 – PRINEVILLE DISTRICT – Crooks, Deschutes, Lakeview County, Oregon
No. Item Description
Est.
Quantity UoM Unit Price Total
1 Class A Tow 2 Ea.
2.1 Class B Tow (Vehicles, Bare Frames)
10 Ea.
2.2 Class B Tow (RV’s, Boats)
3 Ea.
3 Class C Tow 4 Ea.
4 Down Hill Yarding up to
30 yards
1 Ea.
6 Site Cleanup Full Day 5 Ea.
7 Site Cleanup Half Day 5 Ea.
CLIN 0042 – MEDFORD DISTRICT – Josephine, Jackson, Douglas County, Oregon
No. Item Description
Est.
Quantity UoM Unit Price Total
1 Class A Tow 1 Ea.
2.1 Class B Tow (Vehicles, Bare Frames)
6 Ea.
2.2 Class B Tow (RV’s, Boats)
1 Ea.
3 Class C Tow 2 Ea.
4 Down Hill Yarding up to
30 yards
1 Ea.
6 Site Cleanup Full Day 2 Ea.
7 Site Cleanup Half Day 1 Ea.
BLM MEDFORD DISTRICT Page 14 of 212
CLIN 0043 – NORTHWEST OREGON DISTRICT – Benton, Lane, Lincoln, Linn, Item
No. Item Description
Est.
Quantity UoM Unit Price Total
1 Class A Tow 1 Ea.
2.1 Class B Tow (Vehicles, Bare Frames)
6 Ea.
2.2 Class B Tow (RV’s, Boats)
1 Ea.
3 Class C Tow 2 Ea.
4 Down Hill Yarding up to
30 yards
1 Ea.
6 Site Cleanup Full Day 2 Ea.
7 Site Cleanup Half Day 1 Ea.
CLIN 0044 – VALE DISTRICT – Grant, Harney and Malheur County, Oregon
No. Item Description
Est.
Quantity UoM Unit Price Total
1 Class A Tow 1 Ea.
2.1 Class B Tow (Vehicles, Bare Frames)
6 Ea.
2.2 Class B Tow (RV’s, Boats)
1 Ea.
3 Class C Tow 2 Ea.
4 Down Hill Yarding up to
30 yards
1 Ea.
6 Site Cleanup Full Day 2 Ea.
7 Site Cleanup Half Day 1 Ea.
PERIOD OF PERFORMANCE: See Deliveries or Performance section.
(End of Supplies/Services and Prices/Costs)
BLM MEDFORD DISTRICT Page 15 of 212
STATEMENT OF WORK
GENERAL
The contractor shall provide all necessary personnel, materials, and facilities to perform removal of abandon vehicles and site cleanup services in accordance with the Performance Work Statement requirements identified in
Section 4.1. The specific tasks to be performed are towing Class A- Class C vehicles collection of all trash at identified site cleanup locations, and proper recycling, disassembling, and disposal of solid waste in accordance with
40 CFR and Oregon State rules and regulations.
SCHEDULE OF PRICES
The above tables provide firm fixed unit prices for this Purchase Order of a Base Year plus Four (4) Option Years.
Quantities are estimated to develop the Purchase Order ceiling amount. However, actual service quantities requested may vary as needed and like for like equivalent.
PERFORMANCE WORK STATEMENT
The Bureau of Land Management (BLM), Medford, Northwest Oregon, Prineville, and Vale Districts are contracting for the removal and disposal of abandon vehicles and solid waste site cleanup.
When services are required, the COR will identify which task(s) will apply. The quantities are estimated and may not be the actual quantities needed on the Purchase Order. Once unit and ceiling prices are established, differing quantities of each item may be ordered at the Purchase Order prices, but shall not exceed the total ceiling value for each CLIN. Each item may be ordered similar to a Like for Like Exchange. For example, the price for two cars may be similar to the price for one down-hill yarding. So, the COR could potentially order either.
4.1.1 TASKS
TASK 1 -Tow and Disposal of Abandoned Vehicles: The Government Contracting Officer’s Representative (COR) will identify vehicles and site cleanup locations for the Contractor by sending an email message to the Contractor’s
Point of Contact (POC). The Contractor will have three (3) calendar days to remove the abandoned vehicle(s) and any trash found on and in the abandon vehicle. Identified Site cleanup not associated with vehicles follow the same performance task as abandon vehicles. The Contractor shall notify the COR within 24 hours of scheduled pickup(s) to coordinate with BLM personnel and to complete the Abandoned Vehicle Liability Report required by Law
Enforcement. Each District has the authority to call up to 3 Emergency Tows each calendar year for the Contractor to respond and remove an abandon vehicle within 24 hours.
The Contractor shall then submit four (4) photographs (photos) of each site location to the COR for inspection.
All photos shall include GPS coordinates of the site and a date stamp. Additionally, the following are required to meet completion of this task.
• Photo 1 shall document the entirety of the site to include the abandon vehicle(s) and all trash prior to removal and cleanup.
• Photo 2 shall document the vehicle identification number and/or
• Photo 3 shall document the vehicle on the tow truck.
• Photo 4 shall document the entirety of the site post removal and cleanup.
Once the COR has verified the site location is clean and the abandon vehicle and all trash have been removed, the
Contractor will be sent the Abandon Vehicle Report of Liability, required by Law Enforcement, to sign and return to the COR by email. It is the Contractor’s responsibility to perform their due diligence by obtaining and submitting
Department of Motor Vehicle forms.
The Contractor shall remove and dispose of Class A, B, and C vehicles. Any trash, vehicle parts or waste leaks and falls off the vehicle during tow and transport is the Contractor’s responsibility and it must be collected and removed
BLM MEDFORD DISTRICT Page 16 of 212 off Public Lands. Removal and disposal comprise all materials including, but not limited to, black and gray waste, fuel, propane cylinders, and trash found within and on the vehicle(s). All trash must be disposed of at a state approved landfill facility and receipt for the location the trash was disposed and amounts of debris must be provided to the COR along with the Photos identified above. Contractor shall follow all Oregon State and Federal laws, including 40CFR and RCRA.
Contractor shall not damage area when removing vehicle(s). Contractor shall make every effort to repair or remove any spilled fluids or trash resulting from removal of vehicle. The Contractor will be liable for any damage(s) incurred resulting from removal of vehicle including, but not limited to, damage to trees, streams, rivers, road systems, and existing wildlife habitats.
Should an abandon vehicle become missing at the time of mobilization, the COR will have up to four (4) calendar days, once Contractor reports a missing vehicle or site, to order a Like for Like Exchange within 75 miles of the original site.
TASK 1.2 – PRINEVILLE:
Removal work in Deschutes and Crook counties is dependent on the availability of a contractor to complete work within a consolidated timeline outside of snowy season and while obeying fire restrictions. Due to both seasonality and dynamic nature of resident campers in the Eastern Oregon District of Prineville, the COR will identify which task(s) will apply within a reasonable number of mobilizations. The (COR) has identified vehicles and site cleanup locations for Prineville district in Attachment 1, intended for the first year of this contract. The contractor should plan for a minimum 15 calendar days of work in the Prineville district, to remove the vehicles and any trash found on and in the abandoned vehicle.
TASK 2 -Down Hill Yarding: Contractor shall furnish all necessary labor, equipment (including personal protective equipment), transportation, supervision and materials to safely recover hillside vehicles. This task will be on an as needed basis. The COR will notify the Contractor by an email message when a vehicle is less than or greater than 30 yards for any downhill yarding prior to commencing any work. The Contractor will have three (3) calendar days to complete the yarding and tow of vehicle unless requested as an emergency tow.
TASK 3 -Site Cleanup: The Contractor shall collect, remove, recycle, and dispose of all trash (including, but not limited to, metal, tires, black and gray waste, household furniture, and appliances) at a state approved landfill facility not located on Public Lands. A receipt for the location the trash was disposed and/ or recycled and the amount of debris must be provided to the COR. This is on an as needed basis and must be approved by the COR by email prior to commencing work. The Contractor will have three (3) calendar days to complete site cleanups.
TASK 4 -Emergency Tows: may be requested when vehicles are restricting public access or other BLM missions within each District. The contractor shall respond to up to 3 emergency tows/year in each District, in a Like for Like
Exchange, within 24 hours of an official COR request.
4.1.2 DEFINITIONS
Abandon Vehicle Report of Liability: relieves the Bureau of Land Management (BLM) of liability and ownership of the vehicle and all contents within become that of the Contractor.
Class A Vehicle: recreational vehicles are motor homes; 30-40ft length, (GVW) up to 20,000lbs. This includes all trash, black and gray waste, fuel, propane cylinders, and debris found on and in the vehicle.
Class B Vehicle: recreational vehicles are campervans, passenger vehicles, trucks, vans, and/or camping trailers up to ¾ ton in size, (GVW) not to exceed 5,000lbs. This includes all trash, black and gray waste, fuel, propane cylinders, and debris found on and in the vehicle.
Class C Vehicle: RVs are characterized by a distinctive alcove which fits over the truck cab; 20-30ft length, (GVW) not exceed 10,000lbs. This includes all trash, black and gray waste, fuel, propane cylinders, and debris found on and in the vehicle.
BLM MEDFORD DISTRICT Page 17 of 212
Site Cleanup: All trash, metal, tires, black and gray waste, and/or appliances at an identified site location is to be collected and disposed of off Public Lands and at a state approved landfill facility. This service item is determined on an as needed basis and will be determined by the Contracting Officer’s Representative (COR) after reviewing photographs. This may be a half-day (five (5) yards) or a full-day (ten (10) yards).
4.1.3 ACCESS
Access to abandoned vehicle and site cleanup areas will be via travel over BLM road systems with a variety of road surfaces, i.e., gravel, oiled or natural/dirt. Contractors accessing areas behind locked gates are responsible for obtaining permission to access federal lands across non-federal lands. Documentation of permission shall be provided to the BLM upon request.
The Contractor is responsible for the security of their materials. Any material left at a site would be at the
Contractor’s own risk should they be lost, stolen, or damaged.
Standard Access: Access is defined as (1) passable with a 2-wheel drive vehicle although a 4-wheel drive may sometimes be required. Contractor shall be responsible for verifying road accessibility with COR prior to extraction.
Gates: Some services may need to be performed behind locked gates. The Contractor shall immediately lock gates after their entry or exit. Keys will be issued to the Contractor by the Contracting Officer Representative (COR). The
Contractor shall request key(s) at least two days in advance of their need to enter an area behind locked gates. The key(s) shall be returned to the COR, in a usable condition, within five calendar days of completing work in the specific resource area. The Contractor will be charged
$100.00 for each key lost or key returned in an unusable condition. The final acceptance will be withheld until all gate keys have been returned or arrangements have been made for the lost key charge.
4.1.4 CONTRACTOR FURNISHED ITEMS
The Contractor shall furnish all necessary labor, equipment (including personal protective equipment), transportation, supervision, and materials to perform the contracted services. The Contractor shall comply with all
State Safety and Occupational Safety and Health Administration, Oregon State Health Authority, Environmental
Protection Agency, Department of Environmental Quality, and Department of Transportation for all operations.
Contractor shall follow Oregon state law in the proper disposal and recycling of all vehicular and/or trailer components. All equipment used by the Contractor shall be in good working order (i.e. no leaking fluids, no frayed cabling, etc.).
The Contractor shall furnish and use a GPS device or mobile application with photo, coordinates, and date stamp capabilities for contract compliance.
4.1.5 GOVERNMENT FURNISHED PROPERTY
The Government will provide the following items:
a. Map of Resource areas and transportation maps.
b. Gate Keys (where required).
c. Coordinates (latitude and longitude) of vehicle locations.
All Government-furnished property must be returned to the Government prior to the final acceptance.
4.1.6 INVOICING
The Contractor shall be cognizant of each District area as it relates to invoicing. The Contractor may submit invoices in accordance with the "Electronic Invoicing and Payment Requirements - Invoice Processing Platform {IPP) V3
(SEP 2017)" Contract Clause in Section 3 no more frequently than once per month.
4.1.7 PERFORMANCE MEASUREMENT
BLM MEDFORD DISTRICT Page 18 of 212
The Contractor shall have three (3) calendar days to perform tow(s), dispose of identified abandoned vehicle(s), and/or perform site cleanup(s). The Contractor shall notify the COR within 24 hours of scheduled pickup(s) to coordinate with BLM personnel and to complete the Abandoned Vehicle Report required by Law Enforcement.
Timely task completion and notification shall be measured for service acceptance and compliance with contract terms and conditions. If the contractor fails to meet the terms of the contract, the COR will hold a performance meeting with the Contractor POC to identify the reasons for failure and determine if they may be rectified. Repeated violations that show a pattern of non-performance may result in termination.
In accordance with FAR 12.403(c), the Government intends to exercise its right to terminate this Purchase Order for
Cause if these terms and conditions are not met, notwithstanding the excusable delays described in FAR 52.212-4.
4.2 PACKAGING AND MARKING
All communications and deliveries shall include the Purchase Order number and project name of "Abandoned
Vehicle Removal" in their subject title.
4.3 INSPECTION AND ACCEPTANCE
Contractor performance will be measured by timely completion of the work statement tasks as assigned by the COR.
The Contractor shall notify the COR within twenty-four (24) hours of completion of scheduled pickup(s) by email.
This notification email shall include submission of the four photos identified in Section 4.1.1-TASKS for each pickup. The COR will respond within three (3) business days whether each pickup is accepted, and the Contractor may include it on the next monthly invoice for services.
4.4 PERFORMANCE
Contractor performance shall be during daylight hours of the normal work week, excluding Federal Holidays, Monday through Friday, 6.00 AM to 6:00 PM Pacific Time.
(End of Statement of Work)
BLM MEDFORD DISTRICT Page 19 of 212
INSPECTION AND ACCEPTANCE
The following clause is incorporated by reference:
Clause Title Date
52.246-1 CONTRACTOR INSPECTION REQUIREMENTS APR 1984
(End of Inspection and Acceptance)
BLM MEDFORD DISTRICT Page 20 of 212
DELIVERIES OR PERFORMANCE
F.1.0 PERIOD OF PERFORMANCE
The contract shall commence from date of award for a period up to 5 years if options are exercised.
Services to be performed will be coordinated with the COR via email.
F.2.0 PROGRESS PLAN
At the prework conference, the Contractor shall provide to the COR a written "work progress plan" that details its proposed work force and schedule to provide for orderly completion of the work within the contract performance time. This work schedule must be acceptable to the Government. At a minimum, the schedule must reflect a work progress rate equal to the available amount of contract performance time.
The following clause is incorporated by reference:
52.242-15 STOP WORK ORDER AUG 1989
(End of Deliveries or Performance)
BLM MEDFORD DISTRICT Page 21 of 212
CONTRACT ADMINISTRATION DATA
The following local clauses are provided in full text:
CONTRACTOR PERFORMANCE ASSESSMENT REPORTING SYSTEM (JULY 2010)
(a) FAR 42.1502 directs all Federal agencies to collect past performance information on contracts. The
Department of the Interior (DOI) has implemented the Contractor Performance Assessment Reporting System
(CPARS) to comply with this regulation. One or more past performance evaluations will be conducted in order to record your contract performance as required by FAR42.15.
(b) The past performance evaluation process is a totally paperless process using CPARS. CPARS is a web-based system that allows for electronic processing of the performance evaluation report. Once the report is processed, it is available in the Past Performance Information Retrieval System (PPIRS) for Government use in evaluating past performance as part of a source selection action.
(c) We request that you furnish the Contracting Officer with the name, position title, phone number, and email address for each person designated to have access to your firm's past performance evaluation(s) for the contract no later than 30 days after award. Each person granted access will have the ability to provide comments in the Contractor portion of the report and state whether or not the Contractor agrees with the evaluation, before returning the report to the Assessing Official. The report information must be protected as source selection sensitive information not releasable to the public.
(d) When your Contractor Representative(s) (Past Performance Points of Contact) are registered in CPARS, they will receive an automatically-generated email with detailed login instructions. Further details, systems requirements, and training information for CPARS is available at http://www.cpars.csd.disa.milJ. The CPARS
User Manual, registration for On Line Training for Contractor Representatives, and a practice application may be found at this site.
(e) Within 60 days after the end of a performance period, the Contracting Officer will complete an interim or final past performance evaluation, and the report will be accessible at http://www.cpars.csd.disa.mil/. Contractor
Representatives may then provide comments in response to the evaluation, or return the evaluation without comment. Comments are limited to the space provided in Block 22. Your comments should focus on objective facts in the Assessing Official's narrative and should provide your views on the causes and ramifications of the assessed performance. In addition to the ratings and supporting narratives, blocks 1 - 17 should be reviewed for accuracy, as these include key fields that will be used by the Government to identify your firm in future source selection actions. If you elect not to provide comments, please acknowledge receipt of the evaluation by indicating ''No comment" in Block 22, and then signing and dating Block 23 of the form. Without a statement in Block 22, you will be unable to sign and submit the evaluation back to the Government. If you do not sign and submit the CPAR within 30 days, it will automatically be returned to the Government and will be annotated: "The report was delivered/received by the contractor on (date). The contractor neither signed nor offered comment in response to this assessment." Your response is due within 30 calendar days after receipt of the CPAR.
(f) The following guidelines apply concerning your use of the past performance evaluation:
(1) Protect the evaluation as "source selection information." After review, transmit the evaluation by completing and submitting the form through CPARS. If for some reason you are unable to view and/or submit the form through CPARS, contact the Contracting Officer for instructions.
http://www.cpars.csd.disa.milj/ http://www.cpars.csd.disa.mil/
BLM MEDFORD DISTRICT Page 22 of 212
(2) Strictly control access to the evaluation within your organization. Ensure the evaluation is never released to persons or entities outside of your control.
(3) Prohibit the use of or reference to evaluation data for advertising, promotional material, preaward surveys, responsibility determinations, production readiness reviews, or other similar purposes.
(g) If you wish to discuss a past performance evaluation, you should request a meeting in writing to the
Contracting Officer no later than seven days following your receipt of the evaluation. The meeting will be held in person or via telephone or other means during your 30- day review period.
(h) A copy of the completed past performance evaluation will be available in CPARS for your viewing and for
Government use supporting source selection actions after it has been finalized.
(End of clause)
ELECTRONIC INVOICING AND PAYMENT REQUIREMENTS – INVOICE PROCESSING PLATFORM (IPP)
(APR 2013)
Payment requests must be submitted electronically through the U.S. Department of the Treasury’s Invoice
Processing Platform System (IPP).
“Payment request” means any request for contract financing payment or invoice payment by the Contractor. To constitute a proper invoice, the payment request must comply with the requirements identified in the applicable
Prompt Payment clause included in the contract, or the clause 52.212-4 Contract Terms and Conditions –
Commercial Products and Commercial Services included in commercial products and commercial services contracts. The IPP website address is: https://www.ipp.gov.
Under this contract, the following documents are required to be submitted as an attachment to the IPP invoice
1. Invoice billed according to contract line items and rates.
The Contractor must use the IPP website to register access and use IPP for submitting requests for payment. The
Contractor Government Business Point of Contract (as listed in SAM) will receive enrollment instructions via email from the Federal Reserve Bank of Boston (FRBB) prior to the contract award date, but no more than 3 – 5 business days of the contract award date. Contractor assistance with enrollment can be obtained by contacting the IPP
Production Helpdesk via email ippgroup@bos.frb.org or phone (866) 973-3131.
If the Contractor is unable to comply with the requirement to use IPP for submitting invoices for payment, the
Contractor must submit a waiver request in writing to the Contracting Officer with its proposal or quotation.
(End of Local Clause)
(End of Contract Administration Data) https://www.ipp.gov/ mailto:ippgroup@bos.frb.org
BLM MEDFORD DISTRICT Page 23 of 212
SPECIAL CONTRACT REQUIREMENTS
1.0 ACCESS
In the event of a site/facility closure, the Contractor shall not perform or make deliveries to the site/facility until it is reopened by the Government, unless otherwise instructed by the Contracting Officer or their designated representative.
2.0 WORK HOURS
Unless otherwise specified in Section C, Specifications, work hours under this contract shall be limited to the time between one-half hour before sunrise to one-half hour after sunset each day. No work will be done on Saturday, Sunday, or Federal holidays unless authorized by the COR.
3.0 ENVIRONMENTAL INTERRUPTION OF WORK
3.1 Environmental - The Contracting Officer, by issuance of a suspend work order, may direct the Contractor to shut down any work that may be subject to damage due to weather conditions, fire danger, or because it is impracticable to work during the winter season. The Contractor will be given a resume work order which will document the date the work suspension ends. An allowance has been included in the contract time for all environmental delays. The count of contract time will therefore continue during all periods of suspension due to normal weather conditions, including fire danger. The Contractor will not be entitled to additional contract time for any suspensions except to the extent that they are due to unusually severe weather conditions. The Contractor will not be entitled to additional monetary compensation for such suspensions regardless of duration.
3.2 Endangered Species - The Government may direct the Contractor to discontinue all operations in the event that listed or proposed threatened or endangered plants or animals protected under the Endangered Species
Act of 1973, as amended, or Federal candidate (Category 1 and 2), sensitive or state listed species, identified under BLM Manual 6840, are discovered to be present in or adjacent to the project area.
4.0 PRESERVATION OF HISTORICAL AND ARCHEOLOGICAL DATA
4.1 Public Law 93-291, May 24, 1974, provides for the preservation of scientific, prehistorical, and archeological data (including relics and specimens) which might otherwise be lost due to alteration of the terrain as a result of any Federal construction project.
4.2 The Contractor agrees that should any contractor employee, in the performance of this contract, discover evidence of possible scientific, prehistorical, historical, or archeological data the contractor will notify the
Contracting Officer immediately in writing giving the location and nature of the findings.
4.3 Where appropriate by reason of discovery, the Contracting Officer may order delays in the time of performance and/or changes in the work. If such delays and/or changes are ordered, the time of performance and contract price shall be adjusted in accordance with the applicable clauses in the Contract
Clauses Section of this contract.
4.4 The Contractor agrees to insert this requirement in all subcontracts which involve the performance of work on the terrain of the site.
5.0 ENVIRONMENTAL IMPACT
All waste materials generated by any work under the contract performed on a Government installation shall at all times be handled, transported, stored, and disposed of by the contractor and by his subcontractors in accordance with all applicable Federal, state, and local laws, ordinances, regulations, court orders, and other types of rulings having the effect of the law, including, but not limited to Executive Order 12088, 13
October 1978, Federal Compliance with Pollution Control Standards; the Federal Water Pollution Control
Act, as amended (33 U.S.C. 1251 ET SEQ); the Clean Air Act as amended (42 U.S.C. Sec 7401 ET SEQ);
the Endangered Species Act, as amended (16 U.S.C. Sec 1531, ET SEQ); the Toxic Substances Control
BLM MEDFORD DISTRICT Page 24 of 212
Act, as amended (15 U.S.C. Sec 2601, ET SEQ); the National Historic Preservation Act, as amended (16
U.S.C. Sec 470, ET SEQ); the Solid Waste Disposal Act, as amended (42 U.S.C. 6901 ET SEQ); and the
Archaeological and Historic Preservation Act, as amended (16 U.S.C. Sec 469, ET SEQ). Should the
United States Government be held liable for any neglect or improper actions by the contractor or any subcontractor regarding removal or disposal of any hazardous waste, the contractor shall reimburse the
Government for all such liability.
6.0 HAZARDOUS MATERIALS
Any material suspected of being hazardous that is encountered during performance of a project shall immediately be brought to the attention of the Contracting Officer, at which time a determination will be made as to whether hazardous material testing shall be performed. If the Contracting Officer directs the contractor to perform tests, and/or the material is found to be of a hazardous nature requiring additional protective measures, a contract modification may be required, subject to equitable adjustment under the terms of the contract. The contractor is advised that friable and/or non-friable asbestos-containing material may be encountered in project areas. Friable asbestos-containing material is any material that contains more than one percent asbestos by weight, and that hand pressure can crumble, pulverize or reduce to powder when dry. Non-friable asbestos containing materials are materials in which asbestos fibers are bound by a matrix material, saturation, impregnation or coating.
Non-friable asbestos-containing materials do not normally release airborne asbestos fiber during routine handling and end-use. However, excessive fiber concentrations may be produced during uncontrolled abrading, sanding, drilling, cutting, machining, removal, demolition, or other similar activities. 29 CFR
1910.1001 shall be referenced in the event asbestos-containing materials are encountered. Friable asbestos-containing materials are not authorized for use in new construction or maintenance projects.
7.0 GREEN PROCUREMENT REQUIREMENTS
In the performance of this service or construction contract, the Contractor shall make maximum use of products identified on the mandatory environmental purchasing list at the following links, if applicable:
• U.S. EPA Comprehensive Procurement Guidelines published at www.epa.gov/cpg/products.htm.
• USDA Biobased product listings published at www.biopreferred.gov.
• Energy Star® product listings published at www.energystar.gov/products.
• FEMP Low Standby Power product listings published at http://energy.gov/eere/femp/covered-product-categories
Contractor shall comply with all reporting requirements stated in the applicable clause(s):
• 52.223-1 Biobased Product Certification
• 52.223-2 Affirmative Procurement of Biobased Products under Service and Construction Contracts
• 52.223-4 Recovered Material Certification
• 52.223-9 Estimate of Percentage of Recovered Material Content for EPA Designated Items
• 52.223-15 Energy Efficiency in Energy Consuming Products
• 52.223-17 Affirmative Procurement of EPA Designated Items in Service and Construction Contracts
8.0 RESTORATION OF RESOURCES
http://www.epa.gov/cpg/products.htm http://www.bioprefferd.gov/ http://www.energystar.gov/products http://energy.gov/eere/femp/covered-product-categories http://energy.gov/eere/femp/covered-product-categories
BLM MEDFORD DISTRICT Page 25 of 212
8.1 Cleanup - The Contractor is responsible for cleaning up all camp and worksites before leaving the area.
Final payment or other alternative deemed feasible may be withheld until the Contractor has complied with this requirement.
8.2 Site and Access Roads – Site and public or private access roads damaged by the Contractor shall be restored to the same condition they were in at the commencement of work, at the expense of the Contractor.
9.0 UNAUTHORIZED PERSONNEL
The contractor shall inform all personnel working under his jurisdiction (including subcontractor and visiting supplier personnel) that access to restricted areas outside of the immediate work area; excluding direct haul and access routes, contracting and Civil Engineering offices and points of supply and storage; is prohibited. Circulation of said personnel will be limited to official business only. Persons in violation of the above will be apprehended and appropriately disciplined.
10.0 OREGON FARM/FOREST LABOR CONTRACTOR'S LICENSE
If the State of Oregon requires an Oregon Farm/Forest Labor Contractor's License, then the contractor awarded this contract and all first-tier subcontractors shall be required to obtain and maintain, during the term of this contract, such a license. Contractors not having a current license will be required to furnish evidence of having obtained such license within ten (10) days after receipt of written notification of contract award. Failure to obtain, keep and maintain a current license during the term of this contract or the extension thereof shall be a basis for termination for default.
Information on obtaining this license may be obtained from:
Bureau of Labor and Industries Contact: Licensing Unit
Wage and Hour Division Telephone: (503) 373-1463
3865 Wolverine St. NE; E-1 Fax: (503) 373-7636
Salem, OR 97305-1268
11.0 FIRE DANGER SEASON
If the COR allows the Contractor to continue work during periods of declared fire danger or season, the
Contractor shall comply with all applicable state laws relating to fire prevention and with all special conditions of work as directed by the COR and outlined in the attachment at the end of this section.
The following clause is provided in full text:
BLM MEDFORD DISTRICT Page 26 of 212
FIRE REQUIREMENTS PROCEDURES OUTLINE [FOR OREGON, Dec 2013]
This outline covers the fire protection requirements of a contractor or private party who performs service or construction contracts on BLM land. In western Oregon, the BLM allows Oregon Forest Law (ORS) and Oregon
Administrative Rules (OAR) to apply to these operations on BLM lands rather than develop similar rules applicable only to BLM lands.
1. CLOSED FIRE SEASON
The closed fire season means that fire season has been declared. ORS 477.505 gives the State Forester the authority to establish the fire season. The authority has been delegated to the District Foresters around the state who issue public notices through the newspapers and radio when fire season will be closed for their individual districts.
Closed fire season depends upon the drying of forest fuels, rainfall, and time of year. During the closed fire season, the following requirements must be met:
• Fire tools must be on site;
• Fire extinguisher must be in all vehicles;
• Chainsaws must have a .023-inch mesh screen installed in the exhaust;
• Only unmodified saws are to be used in the forest;
• Approved spark arresters must be on all internal combustion engines;
• Watchman service must be provided for 3 hrs after shutdown of power equipment for the day;
• No smoking is permitted while working or traveling through any operations area in the forest;
• No use of explosives is permitted unless approved by the State Forester's representative;
• Permits to burn are required unless waived by a representative of the State Forester.
• Permits to operate power-driven machinery shall be obtained by the Contractor prior to commencing operations unless waived by a representative of the State Forester (ORS 47.625).
Changes or modifications to the above requirements are possible depending upon changes in State of Oregon law and requirements of the State Districts and Protective Associations.
2. FIRE PRECAUTION LEVELS
There are 4 fire precaution levels that begin with level 1 at the start of the closed fire season and can go through level 4 if conditions warrant. The fire precaution levels restrict certain forest operations as the fire danger increases.
It is the responsibility of the individual operating on forest land to know the precaution level for the day and take the correct fire precautions. There are no precaution levels prior to the closed fire season. Each fire precaution level requires adherence to the restrictions applicable to all lower levels in addition to the limits placed by that level.
Level 1 is the lowest level of fire danger usually occurring early in the season and perhaps again after significant rainfall during the season. All requirements listed above apply. Waivers may be issued by the State Districts or
Protective Associations and these MUST be approved by the BLM. Waivers will only be considered if the conditions on the work site are not as severe as predicted. The requirements for fire tools on site, screens installed in saws, and fire extinguishers with saws will not be waived.
Level 2 is the partial hootowl where saws can operate from first light in the morning until 1:00 p.m. in the afternoon.
From 1:00 p.m. until the end of the day saws are to be shut down. Waivers for operating beyond the 1:00 p.m.
shutdown will be evaluated on a site-by-site basis.
Level 3 is the partial shutdown of all forest industrial operations and shuts down contractor operations with few exceptions. Waivers may be issued on a site-by-site basis.
Level 4 is the general shutdown of all contractor operations. Waivers will not be issued. Landowners are permitted entry into their lands.
ORS. 477.066 requires that an operator on forest land take immediate action to control and extinguish a fire on forest land. The contractor shall take this action and notify the BLM and the nearest State of Oregon District office immediately.
OAR. 629-43-030 requires watchmen to be:
BLM MEDFORD DISTRICT Page 27 of 212
• Physically capable and experienced in operating any firefighting equipment on site.
• On duty for 3 hours after the shutdown of the last power-driven equipment for the day.
• Furnished adequate facilities for transportation and communications in order to summon assistance if needed.
• Patrolling and visually inspecting all sites where work was done during the day.
3. FIRE TOOLS REQUIRED DURING CLOSED FIRE SEASON
The operator/contractor shall furnish fire tools to all personnel on site using the following combinations.
NUMBER OF PERSONNEL_______________________________
1- 4 5 6 7 8 9 10 11 12 13 14
KIND OF TOOLS NUMBER OF TOOLS REQUIRED_________________________
Pulaskis 1 1 1 1 1 1 2 2 2 2 2
Shovels 2 2 2 3 3 3 3 4 4 5 5
Hazel hoes 1 2 3 3 4 5 5 5 6 6 6
In addition to the above handtools, the operator/contractor must provide a…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .