Sol_140L4322Q0025.pdf
PDF 19 MB Posted
- Attached to
- FY22 NORTHWEST OREGON YOUNG STAND MGMT
- Solicitation number
- 140L4322Q0025
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SEE ADDENDUMIS CHECKED
CODE 18a. PAYMENT WILL BE MADE BY
CODE
FACILITYCODE
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN OFFER
OFFEROR
LHA
PORTLAND OR 97204
1220 SW 3rd Avenue, 12th Floor
BLM OR-ST OFC PROC MGMT BR(OR952)
0004276580 CODE 16. ADMINISTERED BYCODE
X
X
X
115310
SIZE STANDARD:
100.00 % FOR:SET ASIDE:UNRESTRICTED ORLHA
RFPIFB
10. THIS ACQUISITION ISCODE
RFQ
14. METHOD OF SOLICITATION
13b. RATING
NAICS:
SMALL BUSINESS
02/18/2022 1700 PS
02/04/2022
5033183024Amir Khan (No collect calls)
INFORMATION CALL:
FOR SOLICITATION 8. OFFER DUE DATE/LOCAL TIMEb. TELEPHONE NUMBER a. NAME
4. ORDER NUMBER3. AWARD/ 6. SOLICITATION
140L4322Q0025
5. SOLICITATION NUMBER
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS 1. REQUISITION NUMBER PAGE OF
1 116 0040559571OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, & 30
TELEPHONE NO.
17a. CONTRACTOR/
SALEM OR 97306
1717 FABRY RD SE
BLM-OR SALEM DISTRICT OFFICE*
15. DELIVER TO
PORTLAND OR 97204
1220 SW 3rd Avenue, 12th Floor
9. ISSUED BY
7.
2. CONTRACT NO.
EFFECTIVE DATE
$8.00
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK BELOW
ISSUE DATE
DELIVERY FOR FOB DESTINA-
TION UNLESS BLOCK IS
MARKED
11.
SEE SCHEDULE
12. DISCOUNT TERMS
THIS CONTRACT IS A
RATED ORDER UNDER
DPAS (15 CFR 700)
13a.
SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
HUBZONE SMALL
BUSINESS
8(A)
BLM OR-ST OFC PROC MGMT BR(OR952)
WOMEN-OWNED SMALL BUSINESS
(WOSB) ELIGIBLE UNDER THE WOMEN-OWNED
SMALL BUSINESS PROGRAM
EDWOSB
24.
AMOUNT
23.
UNIT PRICE
22.
UNIT
21.
QUANTITY
20.
SCHEDULE OF SUPPLIES/SERVICES
19.
ITEM NO.
NWOD Young Stand Management
VENDOR POC: _______________________________
VENDOR TELEPHONE: _________________________
VENDOR EMAIL ADDRESS: _____________________
VENDOR DUNS NUMBER: _______________________
TOTAL OFFER AMOUNT: $______________________
(Use Reverse and/or Attach Additional Sheets as Necessary)
HEREIN, IS ACCEPTED AS TO ITEMS:
XX
DATED
Brant Sylvester
. YOUR OFFER ON SOLICITATION (BLOCK 5),
INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE SET FORTH
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND DELIVER
ARE
ARE
31c. DATE SIGNED
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA
31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER)
30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER (Type or print)
ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY ADDITIONAL
SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.
27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1, 52.212-4. FAR 52.212-3 AND 52.212-5 ARE ATTACHED. ADDENDA
26. TOTAL AWARD AMOUNT (For Govt. Use Only)
OFFER
STANDARD FORM 1449 (REV. 2/2012)
Prescribed by GSA - FAR (48 CFR) 53.212
ARE NOT ATTACHED.
ARE NOT ATTACHED.
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
30b. NAME AND TITLE OF SIGNER (Type or print)
30a. SIGNATURE OF OFFEROR/CONTRACTOR
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN
25. ACCOUNTING AND APPROPRIATION DATA
29. AWARD OF CONTRACT:
REF.
32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE
32c. DATE 32b. SIGNATURE OF AUTHORIZED GOVERNMENT REPRESENTATIVE
ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED:
32a. QUANTITY IN COLUMN 21 HAS BEEN
RECEIVED INSPECTED
40. PAID BY39. S/R VOUCHER NUMBER38. S/R ACCOUNT NUMBER
37. CHECK NUMBER
FINALPARTIAL
36. PAYMENT
FINALPARTIAL
35. AMOUNT VERIFIED
CORRECT FOR
34. VOUCHER NUMBER33. SHIP NUMBER
COMPLETE
32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE
42d. TOTAL CONTAINERS42c. DATE REC'D (YY/MM/DD)
42b. RECEIVED AT (Location)
42a. RECEIVED BY (Print)
41c. DATE41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER
41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT
STANDARD FORM 1449 (REV. 2/2012) BACK
24.
AMOUNT
23.
UNIT PRICE
22.
UNIT
21.
QUANTITY
20.
SCHEDULE OF SUPPLIES/SERVICES
19.
ITEM NO.
Delivery: 09/30/2022
Period of Performance: 05/01/2022 to 06/15/2022
00010 Cascades
Product/Service Code: F999
Product/Service Description: OTHER ENVIRONMENTAL
SERVICES
Period of Performance: 03/01/2022 to 09/30/2022
00020 Mary's Peak
Product/Service Code: F999
Product/Service Description: OTHER ENVIRONMENTAL
SERVICES
Period of Performance: 03/01/2022 to 09/30/2022
00030 Siuslaw
Product/Service Code: F999
Product/Service Description: OTHER ENVIRONMENTAL
SERVICES
Continued ...
32f. TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE
32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT REPRESENTATIVE
116 2 of
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
NAME OF OFFEROR OR CONTRACTOR
3 116
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
140L4322Q0025
Period of Performance: 03/01/2022 to 09/30/2022
00040 Tillamook
Product/Service Code: F999
Product/Service Description: OTHER ENVIRONMENTAL
SERVICES
Period of Performance: 03/01/2022 to 09/30/2022
00050 Upper Willamette
Product/Service Code: F999
Product/Service Description: OTHER ENVIRONMENTAL
SERVICES
Period of Performance: 03/01/2022 to 09/30/2022
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
Northwest Oregon Young Stand Management
BLM Northwest Oregon District, Oregon
SOLICITATION NO. 140L4322Q0025
Streamlined Solicitation for Commercial Items (FAR 12.603)
In the event of a site/facility closure, the Contractor shall not perform or make deliveries to the site/facility until it is reopened by the Government, unless instructed otherwise by the Contracting Officer or their designated representative.
Combined Synopsis/Solicitation
This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in FAR
Subpart 12.6, as supplemented with additional information included in this notice. This announcement constitutes the only solicitation.
Solicitation no. 140L4322Q0025 has been issued as a Request for Quotation for a firm fixed price commercial items services contract for pre-commercial thinning, manual maintenance, and tubing maintenance on the Northwest Oregon District of the BLM in Oregon. Work is centered in Salem, Springfield, and Tillamook Oregon.
The scope of work includes Perform pre-commercial thinning, manual maintenance (cutting brush, vegetation, and hardwoods), and tubing maintenance in project areas in compliance with the terms and specifications contained herein.
The performance period is from 3/1/22 and ending 9/30/2022.
1. Location of Work: All project areas are located within the BLM-managed lands in Cascades, Mary’s
Peak, Upper Willamette, Siuslaw, and Tillamook Field Offices of the Northwest Oregon District.
The Vicinity Map shows the general locations of the project areas and Project Area Maps show specific project locations. (See Attachment: “Northwest Oregon BLM District Vicinity Map and
Field Office Project Area Maps”).
The solicitation document and incorporated provisions and clauses are those in effect through Federal
Acquisition Circular 2022-02 published January 14, 2022.
The most current version of SCA WD 1977-0079 will be incorporated at time of award.
The following factors shall be used to evaluate offers:
Award will be made to the responsible firm whose quote is most advantageous to the
Government, price and other factors considered. Other factors for this solicitation include past performance of the quoter. Past performance information may be based on the
Government’s knowledge of and previous experience with the quoter, or other reasonable basis. The Government will evaluate option quantities at the same unit price as the successful quote(s). Evaluation of options will not obligate the Government to exercise the option(s).
Offerors are advised to submit a completed copy of the provision at 52.212-3, Offeror Representations and
Certifications - Commercial Items, with its offer.
This requirement is set-aside for SMALL BUSINESS. The NAICS code is 115310 and the small business size standard is $1 million. The basis of award is the responsible offeror whose offer conforming to the solicitation will be most advantageous to the Government, price and other factors considered. Award will be made to the responsible respondent pursuant to FAR subpart 9.1.
Responses shall be received via email to: Amir Khan at akhan@blm.gov by the response due date and time.
Quotes are due by February 18th, 2022, 5:00 p.m. PST.
mailto:akhan@blm.gov
SCHEDULE OF ITEMS
This requirement is for a Firm Fixed Price Commercial Items Services contract for pre-commercial thinning, manual maintenance, and tubing maintenance on the Northwest Oregon District of the BLM in
Oregon. Work is centered in Salem, Springfield, and Tillamook Oregon.
PERFORMANCE TIME:
Cascades Field Office, Salem, OR.
Item # Item Description Quantity Unit of Measure Unit Price Total
1 PCT 16x16 ft spacing 129 Acre
Manual Maintenance 4 - foot clearing 13 Acre
Marys Peak Field Office, Salem, OR.
Item # Item Description Quantity Unit of Measure Unit Price Total
Manual Maintenance 4 - foot clearing on up to 50% of trees.
410 Acre
Siuslaw Field Office, Springfield, OR.
Item # Item Description Quantity Unit of Measure Unit Price Total
4 PCT 14 x 14 ft. spacing 125 Acre
Tillamook Field Office, Tillamook, OR.
Item # Item Description Quantity Unit of Measure Unit Price Total
Manual Maintenance 4 - foot clearing 142 Acre
6 Tubing maintenance 179 Acre
Upper Willamette Field Office, Springfield, OR.
Item # Item Description Quantity Unit of Measure Unit Price Total
7 PCT 12x12 ft spacing 37 Acre
Manual Maintenance 4 - foot clearing 95 Acre
TOTAL QUOTE: __________________
For all items: 1 Calendar Day per 12 acres
Cascades Field Office, Salem, OR.
Item # Item Description Start work date
1 PCT 16x16 ft spacing 1-May-22
2 Manual Maintenance 4 - foot clearing 1-May-22
Marys Peak Field Office, Salem, OR.
Item # Item Description Start work date
Manual Maintenance 4 - foot clearing on up to 50% of trees.
1-Jun-22
Siuslaw Field Office, Springfield, OR.
Item # Item Description Start work date
4 PCT 14 x 14 ft. spacing 1-Oct-22
Tillamook Field Office, Tillamook, OR.
Item # Item Description Start work date
5 Manual Maintenance 4 - foot clearing 1-Jun-22
6 Tubing maintenance 1-Jun-22
Upper Willamette Field Office, Springfield, OR.
Item # Item Description Start work date
7 PCT 12x12 ft spacing 1-Sep-22
8 Manual Maintenance 4 - foot clearing 1-May-22
Estimated Quantity
AC = Acre
ESTIMATED START WORK: May 1, 2022
STATEMENT OF WORK (SOW)
PRE-COMMERCIAL TREE THINNING, MANUAL MAINTENANCE, AND TUBE MAINTENANCE
1.0 GENERAL
1.1 Scope of Work - Perform pre-commercial thinning, manual maintenance (cutting brush, vegetation, and hardwoods), and tubing maintenance in project areas in compliance with the terms and specifications contained herein.
1.2 Location of Work - All project areas are located within the BLM-managed lands in Cascades, Mary’s Peak, Upper Willamette, Siuslaw, and Tillamook Field Offices of the Northwest
Oregon District. The Vicinity Map shows the general locations of the project areas and Project
Area Maps show specific project locations.
1.3 Boundaries of Project Areas - Project area boundaries are indicated on Project Area Maps.
Where boundaries are not obvious, they have been marked with flagging. In many cases adjacent timber stands, recent timber sale boundaries and roads, or other natural or man-made features clearly define the boundaries as shown on Project Area Maps. (Upon request, the COR will also provide electronic files of Project Area Maps to the Contractor).
1.4 Access
Access to most project areas is by all-weather and seasonal roads. Exceptions are shown on individual Project Area Maps. Some roads may require four-wheel-drive vehicles.
The project areas may be behind locked gates which will require BLM keys, private keys, or both. Access will be discussed at the pre-work conference. If gates are locked with BLM locks, keys may be issued to the Contractor by the COR/PI at the appropriate BLM office located in either Springfield, Salem or Tillamook. If gates are privately owned and have no BLM lock, the Contractor shall be responsible for securing access, including acquiring keys to unlock the gates to access project areas. All gates with locks shall be locked immediately after entry or exit by the Contractor.
Gate keys checked out from the BLM shall be returned to the COR/PI within five calendar days of completing work on the specific project area(s). Final payment shall be withheld until all gate keys checked out have been returned. A charge of $500 dollars will be assessed and deducted from the final payment amount for each BLM key not returned.
1.5 Seasonal Restrictions– Work in some project units may be limited to spring and summer months. Typical seasonal restrictions are: from March 1 to July 15 or from March 1 to July 1.
Seasonal restrictions shall be identified on the project area maps. No work shall be done outside of the specified season of operation.
1.6 Security of Materials - The Contractor may, at its own discretion, leave its equipment and/or
Government-furnished material at the work site. However, the Contractor shall be responsible for its equipment and/or the Government-furnished material if it should be lost, stolen, or damaged. The Contractor shall reimburse the Government for all lost, wasted, or damaged
Government-furnished material.
2.0 DEFINITIONS
Bamboo stake - Round bamboo stake 48 inches or 36 inches in length used to support tree seedling protection tubes.
Branch collar - Basal enlargement of the branch at its point of attachment to the tree bole (see
Illustration No. 5).
Branch stub - The portion of a pruned branch extending beyond the branch collar (see
Brush - Woody stems of shrub species normally under twenty (20) feet in height at maturity.
Examples include, blackberry, California hazel, cascara, ceanothus, devil’s club, elderberry, huckleberry, manzanita, oceanspray, rhododendron, salal, salmonberry, Scotch broom, thimbleberry, and vine maple. Brush does not include ferns or grass.
Buffer - An untreated area measuring a specified distance from the edge of any flowing stream, standing water, or seasonal wetland.
Competitive brush, trees, or vegetation – Trees, brush, or vegetation required to be cut.
Conifer tree - An evergreen cone-bearing tree with needle-type foliage such as Douglas-fir, ponderosa pine, Sitka spruce, true firs, western hemlock, western redcedar, or western white pine.
Cut leave tree - A tree noted during inspection as a tree that should not have been cut.
Cut slope - The excavated portion of the road prism that is adjacent to and uphill from the roadbed.
Damaged tree - A leave tree or reserve tree that has been injured as a result of the Contractor’s activities. Examples include, but are not limited to, the following: completely severed tree boles, broken tops or stems, trees buried by slash created by the Contractor’s operations, trees with torn or scraped bark, partial or complete cutting of the branch collar, or having more than the specified amount of the live crown (branch-bearing portion of the tree) removed.
DBH – Diameter of the tree at breast height, measured at a point 4 ½ feet above ground level on the uphill side of the tree.
Epicormic growth - Small branches that originate from dormant buds along the tree bole (see
Fall, felled, or cut - Sawing or chopping completely through stems so that stumps are no more than six (6) inches tall, with no live limbs remaining on the stumps of cut trees.
Fill slope - The fill portion of the road prism adjacent to and downhill from the roadbed.
Girdling - Making two (2) parallel unbroken cuts around the tree. The distance between the top and the bottom of the cut shall not exceed eight (8) inches. Cuts must penetrate at least 1/4 inch, but not more than one (1) inch into the wood of the tree. Trees shall be girdled below the lowest uncut live limb on the tree.
Hardwood tree - A deciduous tree which sometimes has a single well-defined trunk and normally attains a height of greater than twenty (20) feet at maturity. Includes, but is not limited to, species such as red alder, bigleaf maple, cherry, madrone, white oak, and red alder.
Sprouting hardwood species may be in the form of multi-stemmed clumps. Does not include cascara.
Laminated root rot - A root disease caused by the fungus Phellinus weirii that is widespread in the Pacific Northwest and readily kills Douglas-fir and true fir species.
Leave stem - The largest, most vigorous stem of a multi-stemmed hardwood clump.
Leave trees - Conifer trees and hardwood trees that are not to be cut, girdled, or damaged.
Lodged - Cut vegetation, brush or surplus trees that are supported by or are covering a leave tree or reserve tree that causes it to bend or lean.
Non-native Plants - Plant species that are not native to the Pacific Northwest. Includes, but is not limited to, species such as Himalaya blackberry, evergreen blackberry, Scotch broom, holly, and reed canary grass.
Reserve trees - Trees designated by species or marking that in addition to leave trees, shall not be cut, girdled or damaged. This also includes trees marked with paint, trees posted with signs, and other trees identified as reserve trees identified by a Project Inspector.
Roadbed - Includes the running surface, shoulder, and ditch line of the road.
Road prism - Includes the roadbed and the cut and fill slopes.
Running surface - That portion of the road for movement of vehicles which may be asphalt, natural, or gravel surfaced. Running surface includes turnouts and curve widening.
Shoulder - A variable distance between the outside edge of the running surface and start of the fill slope or ditch line.
Sight distance - The area cleared and/or pruned on the inside of a road curve to maintain clear visibility for vehicles through the corner.
Slash – Any material which has been cut by the Contractor and any other slash as specified herein.
Surplus trees - Live conifer or hardwood trees which are not leave trees or reserve trees, and are competing for growing space with selected leave trees.
Swiss needle cast- A needle disease of Douglas-fir trees caused by the fungus Phaeocryptopus gaeumannii, common in the coastal forests of Oregon and Washington that causes foliage
(needles) to yellow and drop off prematurely.
Terminal leader - The uppermost portion of the bole of the tree (from the uppermost whorl to the top of the tree).
Tree Bole - The main central stem (trunk) of the tree.
Tube - Tubular plastic mesh that is eighteen (18) inches to thirty (30) inches in length and four
(4) inches in diameter used to protect seedlings from animal damage.
Uncut surplus trees - Trees that have not been cut to provide the required spacing for leave trees, and/or stumps with live limbs.
Unit - Refers to an individual plantation or individual project area.
Vegetation - All brush, ferns, grasses, and other herbaceous (non-woody) plants. Does not include trees.
Whorl – A cluster of branches arranged horizontally around the tree bole.
3.0 CONTRACTOR-FURNISHED ITEMS
3.1 Property and Services - The Contractor shall furnish all labor and materials necessary to perform pre-commercial thinning, manual maintenance, and tubing maintenance, including but not limited to chainsaws or other cutting tools, loppers, pole saws and ladders.
3.2 Operating Permits - Oregon State law requires a permit (Notification of Operation) to operate power-driven machinery. This requirement applies to chainsaws and weed eaters. The
Contractor must obtain these permits and must have them filled out prior to the start work date.
Permits are available at the Oregon Department of Forestry Office in Salem, Oregon, or at local
Oregon Department of Forestry Offices.
3.3 Crew Requirements
3.3.1 The Contractor shall maintain an adequate work force at all times to ensure timely completion of the work.
3.3.2 The Contractor shall provide documentation summarizing crew supervisor and crew member tree planting experience to demonstrate qualifications to complete work.
3.3.3 Crews must be kept together at all times working as a crew under control of a supervisor rather than as individuals in separate areas. The Contractor shall keep the COR informed of crew location and any time a project area is completed or a new project area is started. Prior notice must be given to the COR if there is to be a significant change in crew personnel or working schedule.
3.3.4 Oregon state safety regulations require that crew members shall not work alone and accessibility to emergency transportation shall be provided by the Contractor at all times.
3.4 Supervisor Requirements - The contractor shall designate one English-literate, experienced, non-laboring, supervisor who is knowledgeable in the pre-commercial thinning, manual maintenance, site preparation, and tree pruning contract specifications and in supervision.
Persons who are designated by the contractor as supervisor must actually perform in that capacity by (1) making periodic inspections of the crew's work; (2) advising them of deficient work; and (3) providing instructions for correcting deficiencies. One supervisor shall supervise no more than twelve (12) crew members at any one time. Should the supervisor fail to adequately perform these duties, the Government has the right to request replacement of that crew supervisor. Any changes in supervisory designations must be submitted in writing to the
COR at least 24 hours prior to the change taking effect.
3.5 Work Camps - The Contractor shall obtain written authorization from the Cascades, Marys
Peak, Upper Willamette, or Tillamook Field Manager prior to camping on BLM-administered lands. All fire regulations and permits shall be followed. All garbage and refuse shall be removed from the camp site(s) by the Contractor and disposed of at a site approved by the COR before final payment is made. See Migrant Seasonal Agriculture Workers Protection Act
Registration for further information regarding requirements work camps.
3.6 Project Area Clean-up – All boxes, bags or any other refuse, debris, or garbage left by the
Contractor shall be cleaned up as each unit is completed. All such debris, garbage, or refuse shall be properly disposed by the Contractor before final payment is made.
4.0 GOVERNMENT-FURNISHED PROPERTY
4.1 The amounts of materials delivered by the Government will be determined by the Contractor's daily production rate.
4.2 Upon receipt of any of these materials, the Contractor shall be responsible for their protection from damage, loss, or destruction.
4.3 Upon daily completion or termination of work, all unused Government-furnished materials shall be returned to the point where they were delivered. Materials shall then be rebundled, boxed, or stacked neatly.
5.0 SPECIFIC TASKS
Item # 7 Pre commercial Tree Thinning to 12’ x 12’ Variable Spacing
5.1.1 Selection of Leave Trees - Select approximately 303 vigorous, well-formed leave trees per acre averaging 12’ x 12’ spacing. Spacing may vary up to 50% (8’ to 24’) in order to select the best leave tree, as long as the unit-level average tree count falls within 10% of 303 trees per acre. No trees larger than 10” DBH shall be cut. No tree smaller than both 1” dbh and less than
20ft height shall be left. Tree species selection priority will be directed by Field Office CORs and is listed below for Upper Willamette Field Offices.
5.1.3 Upper Willamette Field Office - If the conifer trees are of equal size, health and form, leave trees shall be selected in the following species priority:
a. Western white pine or sugar pine
b. Western redcedar
c. Douglas-fir
d. Western hemlock
e. All other conifers
f. Select red alder as a leave trees when there are no conifers available.
g. When bigleaf maple or bigleaf maple clumps are the only leave trees available, select the largest, healthiest maple sprout as a leave tree. Cut all other sprouts.
Item # 4 Pre commercial Tree Thinning to 14’ x 14’ Variable Spacing
5.1.1 Selection of Leave Trees - Select approximately 222 vigorous, well-formed leave trees per acre averaging 14’ x 14’ spacing. Spacing may vary up to 50% (8’ to 24’) in order to select the best leave tree, as long as the unit-level average tree count falls within 10% of 222 trees per acre. No trees larger than 10” DBH shall be cut. No tree smaller than both 1” dbh and less than and is listed below for the Siuslaw Field Office.
5.1.2 Siuslaw Field Office - If the conifer trees are of equal size, health and form, leave trees shall be selected in the following species priority:
a. All conifers
b. Red Alder when no conifers available
c. When bigleaf maple or bigleaf maple clumps are the only leave trees available, select the largest, healthiest sprout as a leave tree. Cut all other sprouts.
5.1.3 Item # 2 Pre commercial Tree Thinning to 16’ x 16’ Variable Spacing
5.1.4 Selection of Leave Trees - Select approximately 170 vigorous, well-formed leave trees per acre averaging 16’ x 16’ spacing. Spacing may vary up to 50% (8’ to 24’) in order to select the best leave tree, as long as the unit-level average tree count falls within 10% of 170 trees per acre. No trees larger than 10” DBH shall be cut. No tree smaller than both 1” dbh and less than and is listed below for Cascades Field Offices.
5.1.5 Cascades Field Office - If the conifer trees are of equal size, health and form, leave trees shall be selected in the following species priority:
a. All pine species
b. Noble fir
c. Douglas-fir
d. All other conifers
e. Select red alder as a leave trees when there are no conifers available.
f. When bigleaf maple or big leaf maple clumps are the only leave trees available, select the largest, healthiest maple sprout as a leave tree. Cut all other sprouts.
6.0 Item # 2, 3, 5, and 8 Manual Maintenance With 4-foot Clearing
6.1 No conifers will be cut. Hardwoods with a DBH of 12 inches or greater and 20 feet and further from a conifer will be left as leave trees.
6.2 Selection of Leave Trees - Select all conifer and specified hardwood trees as leave trees. Leave tree species will be specified on task order.
6.3 Treatment of Brush and Hardwood Trees
6.4 Cut at the base all vegetation within a four (4) foot radius of all leave trees that range between
6 (6) inches and seven (7) feet in height. This includes portions of plants that overhang an imaginary cylinder within the four (4) foot radius around the above-specified leave trees.
Cut all hardwood trees within 15 feet radius (horizontal distance) of leave trees over two (2) feet tall. Hardwood trees that are outside the fifteen (15) foot radius of conifer trees but have limbs that overhang the imaginary cylinder within the four (4) foot radius around the above-specified leave trees shall be cut, girdled, or limbed so that the limb is no longer impinging on the leave tree.
6.5 Radius distance will be measured from the leave tree stem to the nearest edge of the crowns of surplus trees and brush.
6.6 Girdle hardwood trees ten (10) inches DBH or larger, except fell them within falling distance of roads. Cut hardwood trees in a manner to minimize damage to leave trees. In some units the
COR may require the contractor to cut all bigleaf maple stumps down to a six (6) inch stump height.
Item 3 - Manual Maintenance With 4-foot Clearing – up to 50% of trees
7 No conifers will be cut. Hardwoods with a DBH of 12 inches or greater and 20 feet and further from a conifer will be left as leave trees.
5.2.2 Selection of Leave Trees - Select 50% of conifer and specified hardwood trees as leave trees.
Leave tree species will be specified on task order.
5.2.3 Treatment of Brush and Hardwood Trees
5.2.4 Cut at the base all vegetation within a four (4) foot radius of all leave trees that range between
6 (6) inches and seven (7) feet in height. This includes portions of plants that overhang an imaginary cylinder within the four (4) foot radius around the above-specified leave trees.
Target species to remove is Big leaf maple.
Cut all hardwood trees within 15 feet radius (horizontal distance) of leave trees over two (2) feet tall. Hardwood trees that are outside the fifteen (15) foot radius of conifer trees but have limbs that overhang the imaginary cylinder within the four (4) foot radius around the above-specified leave trees shall be cut, girdled, or limbed so that the limb is no longer impinging on the leave tree.
5.2.5 Radius distance will be measured from the leave tree stem to the nearest edge of the crowns of surplus trees and brush.
5.2.6 Girdle hardwood trees ten (10) inches DBH or larger, except fell them within falling distance of roads. Cut hardwood trees in a manner to minimize damage to leave trees. In some units the
COR may require the contractor to cut all bigleaf maple stumps down to a six (6) inch stump height.
5.2.7 Treatment of Scotch Broom and Ceanothus
All ceanothus, Scotch broom greater than one (1) foot in height or one quarter (1/4) inch in diameter within the project area boundaries shall be cut.
5.3 Item # 6 – Tubing Maintenance
5.3.1 Perform tubing maintenance on all planted western redcedar trees. The original tubes and stakes may have been pulled off by big game or damaged by mechanical brush cutting. Existing tube and stake installations may require varying degrees of maintenance to bring the tube and stake installations into compliance with the specifications of the contract. Maintenance treatments may include pulling terminal leaders up to a straight position within the tube (without damaging the terminal leaders of the trees), reinstalling or replacing the original 30-inch tubes and four (4) foot long bamboo stakes on western red cedar trees. One 30 inch tube shall be installed on each planted western redcedar seedling. Each 30 inch tube shall be supported by one (1), four (4) foot long bamboo stake. The bamboo stake shall enter the tube through the top diamond-shaped mesh opening and shall be woven in and out of the tube a minimum of six (6) times on all 30 inch tubes. Each 24 inch tube shall be supported by one (1), three (3) foot long bamboo stake. The bamboo stake shall enter the tube through the top diamond-shaped mesh opening and shall be woven in and out of the tube a minimum of five (5) times on all 24 inch tubes. The small end of the bamboo stake shall be driven into the ground to a depth that leaves no more than four (4) inches protruding above the top of 30 inch tubes, and no more than two (2) inches protruding above the top of tubes. The bamboo stake is driven into the ground to a depth of at least 14 inches on 30 inch tubes and to a depth of at least
12 inches on 24 inch tubes.
Where rocky ground prevents driving the stake the full depth on the first attempt, the stake shall be moved to a different location until the tube is securely held in a vertical position over the seedling. Stakes which are broken during installation shall be discarded and replaced with a new stake. The bottom of the tube shall be in contact with the ground and centered around the seedling. The maximum allowed lean of the tube from vertical is one
(1) inch measured from the top of the tube. When reinstalling tubes, care shall be taken to prevent damage to the seedling as the tube is placed over it. A seedling with skinned bark, a broken terminal leader, a curled leader inside the tube, or a leader protruding through the side of the tube will be regarded as unsatisfactorily tubed during inspection. Tubes and seedlings shall be arranged so that each seedling leader is free to grow vertically
(terminal leaders and lower limbs are in a straight or vertical position within the tube). When a seedling is no longer free to grow within the tube, the tube shall be removed from the seedling.
6.0 QUALITY ASSURANCE PLAN/INSPECTION
6.1 The Government will perform inspection surveys as a basis for acceptance, payment, and recommendations for adjustments in work quality while work is in progress.
6.1.2 Administrative surveys: The Government will conduct a walk through and perform periodic measurements to monitor the quality of work. If the work quality is found deficient on the administrative survey, a formal survey will be performed.
6.1.3 Formal surveys (Applies to both Contractor Quality Control and Government Quality
Assurance): Inspections will be made on a series of plots as described below.
6.1.4 Inspection data will be gathered from a series of well-distributed, randomly-selected plots of a uniform size. The plot size will be determined by the Inspector. The total sample size will be at least one (1) percent of each item in each project area. The Contractor is encouraged to observe inspections while they are being made.
6.1.5 As the basis for payment, inspections for compliance with specifications will be made for work units reported as completed by the Contractor. In general, work units are the same mapped units submitted with task orders. If applicable, large units may be divided into work units. Work units will be inspected separately and will not be averaged with any other area for acceptance or payment.
6.1.6 Reserve trees found in an inspection plot will not be counted as leave trees that should be on the plot. However, reserve trees found cut or damaged in an inspection plot shall be counted as cut or damaged leave trees.
6.2 Items 1, 4, and 7 Pre-commercial Thinning Trees – Project Inspectors will record the following information for each Thinning plot:
Number of leave trees and reserve trees on the plot.
Number of leave trees and reserve trees that should be on the plot.
Number of surplus trees, brush, and non-native plants that have not been treated in accordance with contract specifications (unsevered from stump, low live limbs, etc.).
Number of leave trees that have not been selected in accordance with contract specifications (too few, too many, improper tree choice, etc.).
Number of leave trees and reserve trees that have not been protected in accordance with contract specifications.
6.3 Items 2, 3, 5, and 8 Manual Maintenance - Project Inspectors will record the following information for each Manual Maintenance plot:
Number of leave trees and reserve trees on the plot.
Number of leave trees and reserve trees that should be on the plot.
Number of leave trees or reserve trees where brush, vegetation, or hardwood trees have not been cut or girdled in accordance with the contract specifications
(damaged leave trees or reserve trees; high stumps; leave trees or reserve trees lodged with slash; brush, vegetation, and trees not cut to height and radius specifications, improper girdles, etc.).
6.4 Item 6 Tubing Maintenance - Project Inspectors will record the following information for each tubing maintenance plot:
The following information will be recorded for each plot inspected: a. Number of seedlings that should be tubed b. Seedlings requiring tubing, but not tubed c. Improper number of weaves d. Improper depth of placement of bamboo stake e. Improper end of bamboo inserted in the ground f. Excessive lean - stake not vertical g. Seedling damaged during installation.
7.0 ACCEPTANCE
7.1 Work quality percentages are derived for each project area from data developed from inspection plots. An Acceptable Quality Level (AQL) of 90 percent is required for all items. Calculated tree counts must be within 10% of the desired tree count for Bid Items
0001AA, 0001AB, and 0001AC. The number of errors divided by the number of trees or plots is the error rate. This rate expressed as a percentage, subtracted from 100 percent, and rounded to the nearest percent provides the basic work quality percentage. Listed below are examples of how work quality percentages are determined for each Item.
7.2 Example for Item(s) 1,3, and 6 Pre-commercial Thinning Trees:
Number of leave and reserve trees on the plots. = 90
Number of surplus trees, and trees that have not been treated in accordance with contract specifications
(e.g., two with low live limbs, plus one with a high stump). = 3
Number of leave trees that have not been selected in accordance with contract specifications, (e.g., one too few selected, plus one improper choice). = 2
Number of leave trees and reserve trees that have not been treated in accordance with contract specifications, (e.g., one damaged reserve tree). = 1
Total number of errors = 6
Work quality percentage:
100% - (6 ¸ 90 x 100) = 6.6
100 - 6.6 = 93.4% = 93%
7.3 Example for Items 2, 4, and 7 – Manual Maintenance:
Number of leave trees and reserve trees on the plots = 87
Number of leave trees where vegetation has not been treated in accordance with the contract specifications (two with uncut brush, one with a high stump, and one lodged with slash) = 4
Number of leave trees that have not been selected in accordance with contract specifications, (e.g., one too few selected, plus one improper choice). = 2
Number of leave trees and reserve trees that have not been treated in accordance with contract specifications, (e.g., one damaged reserve tree). = 1
Total number of errors = 7
Work quality percentage:
100% - (7 ¸ 87 x 100) = 8.0
100 - 8.0 = 92% = 92%
7.3 Example for Tubing Maintenance:
The COR will record the following information for each Tube Maintenance plot:
a. Number of trees that should be tubed.
b. Number of trees requiring tubing, but not tubed.
c. Number of tubes that have not been maintained or installed in accordance with the contract specifications (improper number of weaves, improper depth of placement of the bamboo stake, improper end of the bamboo inserted in the ground, excessive lean from vertical, damaged tree seedling, etc.)
UNACCEPTABLE QUALITY LEVEL
7.5.1 Based on inspection results, if the work quality percentage falls below 90% the Contracting
Officer will immediately notify the Contractor in writing and instruct the Contractor to improve the quality of the work. If the quality of the work is not raised to an acceptable level within two (2) consecutive workdays after written notification, the Contracting
Officer may issue a Suspend Work Order, or an official cure notice may be issued by the
Contracting Officer.
7.5.2 If lodged trees, high stumps, uncut surplus trees, brush, non-native plants, improper girdles, unpruned, improperly pruned, uncut vegetation, improperly installed tubes and stakes, or improper treatment of slash are the primary reason for unsatisfactory work, the Contractor shall rework areas designated by the Government until satisfactory work quality is achieved.
8.0 REINSPECTION - ALL ITEMS
8.1 Reinspection will be made after each rework. Once the AQL is reached, payment will be made in accordance with 9.0.
8.2 The Contractor shall be liable for extra costs incurred by the Government as a result of its performance, or lack of performance, to conduct the second reinspection and subsequent reinspections of any one unit. The Contractor shall also be liable for extra costs incurred by the Government as a result of its performance, or lack of performance, to conduct the third and subsequent reinspections within any one item where the reason for unsatisfactory work quality is substantially the same as previous inspections. Costs include, but are not limited to, inspection time, administrative costs, and vehicle operating costs. If the COR determines that the AQL cannot be achieved, the Contractor shall be paid for the percentage of satisfactory work completed as determined by inspection.
9.0 PAYMENT
9.1 Payment will be made for each item on an individual project area basis as project areas are inspected and accepted. Payment for accepted work is based on the work quality percentage determined through the inspection analysis.
9.2 Work quality percentages are derived from data collected on inspection plots. The final work quality percentage times the unit price determines the unit pay rate. A WORK
QUALITY PERCENTAGE OF 90 PERCENT OR HIGHER WILL RESULT IN FULL
PAYMENT.
10.0 REMEASUREMENT OF UNITS - ALL ITEMS
The Contractor may, at any time during the course of the contract, request re-measurement of any unit if he feels that the acreage stated in the contract is incorrect. If re-measurement indicates that a variance of five (5) percent or less exists, the Contractor will pay for the actual cost of the re-measurement. Under this condition, payment for the unit will be made on the acreage stated in the contract. If re-measurement indicates the actual variance is greater than five (5) percent, payment for the unit will be based on the re-measured acreage.
Acreage is measured on the horizontal plane.
Existing improved road areas shown on the project maps are not included in the unit acres, these road areas include cut slopes, ditch lines, running surface, turn-outs, and landings.
One thousand linear feet along roads equals one acre. These acres have been deducted from the unit acres.
11.0 CONTRACTING OFFICER'S REPRESENTATIVE DEFINITION
The “Contracting Officer’s Representative (COR)” is the on-the-ground administrator for the Contracting Officer.
12.0 PROJECT INSPECTOR DEFINITION
“Project Inspector” means the person designated by the COR to perform, as needed, on-the-job Government inspection of work accomplished by the Contractor.
13.0 RESPONSIBILITIES OF THE CONTRACTING OFFICER'S REPRESENTATIVE
AND PROJECT INSPECTOR
13.1 The COR’s authorities and responsibilities are defined in the COR’s Designation Letter.
The COR is authorized to clarify technical requirements, and to review and approve work which is clearly within the scope of work. The COR is NOT authorized to issue changes pursuant to the changes clause or to in any other way modify the scope of work.
13.2 The Project Inspector is responsible for checking the Contractor's compliance with the technical specifications, drawings, work schedule, and labor provisions at the site of the work.
14.0 NOTICE TO PROCEED
After award of contract, the COR will issue to the Contractor a written notice to proceed.
Issuance of the notice may be delayed for a reasonable time, at the discretion of the
Government, if adverse soil, vegetative, or climatological conditions exist.
The Contractor shall perform no preliminary work prior to receipt of the written notice to proceed. Contract time starts on the effective date of the notice to proceed.
15.0 CONTRACT TIME
The Contractor shall begin work within five (5) calendar days from the effective date of the
Notice to Proceed. The Contractor shall continue performance of the work under the contract without delay or interruption except by causes beyond his control as defined by contract clauses, or by the receipt of a "Suspend Work Order" issued by the Government. Failure to do so may be cause for action under the "Default" clause. The Contractor shall complete all work required within the time specified in the Schedule of Items.
16.0 PROGRESS PLAN
At the pre-work conference, the Contractor shall provide to the COR a written "work progress plan" that details his proposed work force and schedule to provide for orderly completion of the work within the contract performance time. This work schedule must be acceptable to the
Government. At a minimum, the schedule should reflect a work progress rate equal to the available amount of contract performance time. The unit sequence work schedule will be determined by the COR at the pre-work conference and may be subject to change because of normal variations in weather conditions or discovery of a variation in a protected species activity, at no change in contract time or price. Note seasonal restrictions listed in the Access
Section (D.1-1(d))
Work shall progress in accordance with the established schedule. If the Contractor's progress falls 20 percent behind the established work schedule, the Contractor's right to proceed may terminate for default if satisfactory progress is not attained within three (3) working days after receipt by the Contractor of a written notice of deficient performance.
17.0 PROSECUTION OF THE WORK
The capacity of the Contractor's plant, method of operation, and forces employed shall, at all times during the continuance of the contract, be subject to the approval of the Contracting
Officer and shall be such as to assure the completion of the work within the specified period of time.
If work is seriously or chronically deficient, the Contractor's right to proceed may be suspended until the performance problems can be resolved and work may resume. The contract time will continue to run during any such period of suspension.
The Contracting Officer may, in writing, require the Contractor to remove from the work any employee found to be working in an unsafe manner.
18.0 ENVIRONMENTAL INTERRUPTION OF WORK
Environmental - The Contracting Officer, by issuance of a suspend work order, may direct the
Contractor to shut down any work that may be subject to damage due to weather conditions or fire danger. The Contractor will be given a resume work order which will document the date the work suspension ends. An allowance has been included in the contract time for short term environmental delays up to one day at a time. The count of contract time will therefore continue during work interruptions of one day or less, but the count of contract time will stop during work interruptions in excess of one day at a time. All periods of interruptions directed by the
Government will be documented. The Contractor will not be entitled to additional monetary compensation for such suspensions regardless of duration.
Endangered Species - The Government may direct the Contractor to discontinue all operations in the event that listed or proposed threatened or endangered plants or animals protected under the Endangered Species Act of 1973, as amended, or Federal candidate (Category 1 and 2), sensitive or state listed species, identified under BLM Manual 6840, are discovered to be present in or adjacent to the project area. Actions taken under this paragraph shall be subject to the Suspension of Work clause in Section I, FAR 52.242-14.
19.0 PRESERVATION OF HISTORICAL AND ARCHEOLOGICAL RESOURCES
If, in connection with operations under this contract, the Contractor, subcontractors, or the employees of any of them, discovers, encounters or becomes aware of any objects or sites of cultural value on the project area, such as historical or prehistorical ruins, graves or grave markers, fossils, or artifacts, the Contractor shall immediately suspend all operations in the vicinity of the cultural value and shall notify the COR in writing of the findings. No objects of cultural resource value may be removed. Operations may resume at the discovery site upon receipt of written instructions. Actions taken under this paragraph shall be subject to the
Suspension of Work clause in Section I, FAR 52.242-14.
20.0 SUBCONTRACTS
If the contractor desires to subcontract any work under the contract, it shall obtain the
Contracting Officer's written consent. The request to subcontract shall contain the following information:
a. Name of subcontractor
b. Description and amount of supplies or services to be subcontracted. The Contractor shall insert in any subcontracts all applicable clauses contained in the contract.
21.0 RESTORATION OF RESOURCES
Cleanup - The Contractor is responsible for cleaning up all camp and worksites before leaving the area. Final payment may be withheld until the Contractor has complied with this requirement.
Access Roads - Public or private access roads damaged by the Contractor shall be restored, at his expense, to the same condition they were in at the commencement of work.
22.0 FIRE DANGER SEASON
If the COR allows the Contractor to continue work during periods of Closed Fire Season, the
Contractor shall comply with all applicable State laws relating to fire prevention and with all special conditions of work as directed by the COR.
23.0 UNDOCUMENTED WORKERS
This contract involves the employment of unskilled labor working under arduous field conditions. Such employment may be attractive to persons coming from foreign countries, sometimes illegally. Bidders are reminded that it is a crime to bring into the United States, transport within the United States, and to harbor aliens who do not have a proper visa for entry and working in this country (8 U.S.C. ' 1323-1325). If violations are suspected by the COR during the performance of work on this (these) project(s) they will be reported to the U.S.
Immigration and Naturalization Service for investigation and appropriate action. Conviction of the Contractor for commission of a criminal offense referred to herein will be deemed sufficient cause for default and the initiation of debarment or suspension proceedings to prevent the Contractor from receiving future Government contracts.
24.0 MIGRANT SEASONAL AGRICULTURAL WORKERS PROTECTION ACT
REGISTRATION
As set forth in Title 29, Part 500 of the Code of Federal Regulations, Migrant and Seasonal
Agricultural Worker Protection, the Contractor shall maintain all necessary U.S. Department of Labor registrations during the performance period of this contract. Failure to maintain a valid registration is grounds for termination of this contract.
In compliance with the Migrant and Seasonal Agricultural Worker Protection Act, the
Contractor shall provide the following to meet minimum safety and health standards for housing employees when camping on Federal lands:
a. A shelter to provide protection from the elements. Where heat adequate for weather conditions is not provided, other arrangements should be made to protect the workers from the cold.
b. Sanitary facilities for storing food. Ice chests or coolers, with ice supply made from potable water replenished as necessary, to meet the requirement for storage of perishable food items.
c. An adequate and convenient potable water supply, approved by the appropriate health authority, in each camp for drinking and cooking purposes. As an alternative, commercial bottled water may be used.
d. Toilet and hand washing facilities adequate for the capacity of the camp, at not less than a
1:15 ratio, supplied with adequate toilet paper. Such facilities shall be maintained in a sanitary condition.
e. Fly-tight, rodent-tight, impervious, cleanable or single service containers to be used for the storage of garbage. Such containers shall be kept clean and emptied when full.
f. Basic first aid supplies under the charge of a person trained to administer first aid.
h. A laundry tray or tub for every 30 workers, or transportation, at least weekly, to a commercial laundromat for all…
This is the start of the file's text. The full file is on GovTribe.