SOLICITATION, OFFER,

AND AWARD

2. TYPE OF SOLICITATION

6. PROJECT NO. 4. CONTRACT NO. 5. REQUISITION/PURCHASE REQUEST NO.

PAGE OF PAGES

7. ISSUED BY CODE 8. ADDRESS OFFER TO

SOLICITATION

(Construction, Alteration, or Repair)

1. SOLICITATION NO. 3. DATE ISSUED

IMPORTANT -- The "offer" section on the reverse must be fully completed by offeror.

9.

INFORMATION

a. NAME b. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder."

CALL:

FOR

SEALED BID (IFB)

NEGOTIATED (RFP)

0040601352

COLORADO STATE OFFICE

2850 YOUNGFIELD STREET

LAKEWOOD CO 80215

LRA

cnguyen@blm.gov

Chau Nguyen 3032393678

1x 01/12/2023

140L1723R0005

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date)

Bureau of Land Management, Department of the Interior, Colorado State Office, Lakewood, Colorado has a requirement for the following work: Road and parking area reconstruction, construction and maintenance; road obliteration; recreation and administrative site maintenance; clearing and grubbing; culvert installation and repair; sign installation and repair; installation and maintenance of erosion controls; cattle guard installation and repair; material haul; haul and placement of imported material and other related work as described in the Statement of Work to be issued for each Task Order.

11. The Contractor shall begin performance

12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

award, notice to proceed. The performance period is mandatory negotiable. (See ________________________________________________.)

13. ADDITIONAL SOLICITATION REQUIREMENTS:

a. Sealed offers in original and is not required.is, b. An offer guarantee

c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

(date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

d. Offers providing less than

12b. CALENDAR DAYSYES NO

(If "YES", indicate within how many calendar days after award in Item 12b.)

10 365 calendar days and complete it within ________________ ________________ calendar days after receiving

03/03/2023

NSN 7540-01-155-3212

x x x x copies to perform the work required are due at the place specified in Item 8 by _____________ ___________________ (hour) local time calendar days for Government acceptance after the date offers are due will not be considered and will be rejected . _________________

STANDARD FORM 1442 (Rev. 4-85)

Prescribed by GSA

FAR(48 CFR) 53.236-1(d)

17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within ____________________ calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in item 13d. Failure to insert any number means the offeror accepts the minimum in item 13d.)

14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code) 15. TELEPHONE NO. (Include area code)

16. REMITTANCE ADDRESS (Include only if different than item 14.)

CODE FACILITY CODE

AMOUNTS

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGEMENT OF AMENDMENTS

OFFER (Must be fully completed by offeror)

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT NO.

DATE.

20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print) 20b. SIGNATURE 20c. OFFER DATE

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN

(4 copies unless otherwise specified)

ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

26. ADMINISTERED BY CODE 27. PAYMENT WILL BE MADE BY

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

(Contractor is required to sign this document and return (Contractor is not required to sign this document.)

Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award.

No further contractual document is necessary.

30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print) 31a. NAME OF CONTRACTING OFFICER (Type or print)

30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA 31c. DATE

BY

2PAGE OF

COLORADO STATE OFFICE

2850 YOUNGFIELD STREET

LAKEWOOD CO 80215

LRA

Chau Nguyen

28. NEGOTIATED AGREEMENT 29. AWARD

Contractor agrees to furnish and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, copies to issuing office.)

10 U.S.C. 2304(c) 41 U.S.C. 253(c)

STANDARD FORM 1442 (REV. 4-85) BACK

Continued...

ITEM NO.

(A)

SUPPLIES/SERVICES

(B)

QUANTITY

(C)

UNIT

(D)

UNIT PRICE

(E)

AMOUNT

(F)

NAME OF OFFEROR OR CONTRACTOR

3 43

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

140L1723R0005

A prebid site tour will be provided on February

24, 2023 at 2 PM local time. Vendors shall meet at LSFO front desk (455 Emerson, Craig, CO). For questions, please contact Aaron Clubb at

970-244-3186.

Delivery Location Code: 0004276316

BLM-CO COLORADO STATE OFFICE*

2850 YOUNGFIELD STREET

LAKEWOOD CO 80215 US

Period of Performance: 04/13/2023 to 04/12/2026

00010 LSFO IDR ROAD AND CONSTRUCTION FY2023

Product/Service Code: Y1PZ

Product/Service Description: CONSTRUCTION OF

OTHER NON-BUILDING FACILITIES

Delivery: 04/12/2024

Period of Performance: 04/13/2023 to 04/12/2024

00020 LSFO IDR ROAD AND CONSTRUCTION FY2024

(Option Line Item)

04/13/2024

Product/Service Code: Y1PZ

Product/Service Description: CONSTRUCTION OF

OTHER NON-BUILDING FACILITIES

Delivery: 04/12/2025

Period of Performance: 04/13/2024 to 04/12/2025

00030 LSFO IDR ROAD AND CONSTRUCTION FY2025

(Option Line Item)

04/13/2025

Product/Service Code: Y1PZ

Product/Service Description: CONSTRUCTION OF

OTHER NON-BUILDING FACILITIES

Delivery: 04/12/2026

Period of Performance: 04/13/2025 to 04/12/2026

Construction Contraction Administration

Continued ...

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

Sponsored by GSA

FAR (48 CFR) 53.110

ITEM NO.

(A)

SUPPLIES/SERVICES

(B)

QUANTITY

(C)

UNIT

(D)

UNIT PRICE

(E)

AMOUNT

(F)

NAME OF OFFEROR OR CONTRACTOR

4 43

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

140L1723R0005

Federal Acquisition Regulation (FAR) 36.211(b) requires agencies provide description of policies and procedures that apply to definitization of equitable adjustments for change orders under construction contracts and data on the time required to definitize equitable adjustments for change orders under construction contracts. This information can be found at:

https://www.doi.gov/pam/acquisition/policy/constru ctioncontract.

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

Sponsored by GSA

FAR (48 CFR) 53.110

Type of Contract: Road and Site Maintenance, Fixed-price, Indefinite Delivery Requirements

Contract County: Moffat

Type of Construction: Highway

NAICS: 237310 SIZE STD: $39.5M SET-ASIDE: Total Small Business

Statements of Magnitude:

Total Project (3 Years) Between $25,000.00 and $200,000.00

COR Contracting Officer (CO)

Name: Aaron Clubb

Email: aclubb@blm.gov

Chau Nguyen(Contracting Officer /

PRIMARY CONTACT

cnguyen@blm.gov / 303-239-3678 mailto:aclubb@blm.gov mailto:nroush@blm.gov

Site Visit: See Section L, Clause 52.236-27, Site Visit (Also Section I, Clauses 52.236-02, Differing Site Conditions and 52.236-03, Site Investigation and Conditions Affecting the Work, will be included in the resultant award)

Questions Due: 31 January 2023 2:00 pm Local Mountain Time All questions must be submitted in writing. No questions will be accepted via phone calls.

In accordance with this Solicitation Part IV – Representation and Instructions See Section L, Clause 52.236-27, paragraph(c)

Proposal Submittal Information: Due Date: Due Date: 3 March 2023 at 5pm Local Mountain Time In accordance with this Solicitation Part IV – Representation and Instructions See Section L, Instructions, Conditions and Notices to Offerors, and Section M, Evaluation Factors for Award.

Award Selection Process: Past Performance Price Tradeoff

Table of Contents

SECTION B – SCHEDULE OF ITEMS

SECTION C: SPECIFICATIONS/DRAWINGS

SECTION D: PACKAGING AND MARKING

SECTION E: INSPECTION AND ACCEPTANCE

SECTION F: DELIVERIES OR PERFORMANCE

SECTION G: CONTRACT ADMINISTRATION DATA

SECTION H: SPECIAL CONTRACT REQUIRMENTS

SECTION I: CONTRACT CLAUSES

SECTION J: LIST OF ATTACHMENTS

SECTION K: REPRESENTATIONS, CERTIFCATIONS, AND OTHER STATEMENTS OF OFFERORS

SECTION L: INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS

SECTION M: EVALUATION FACTORS FOR AWARD

SIGNATURE EXTENSION PAGE

All persons participating in a "joint venture" shall sign as contractors, when submitting a bid. Spaces are provided below for additional signatures. If a written acceptance is required, then all signatures on the bid will be required on the written acceptance.

By: By:

Name & Title: Name & Title:

Address: Address:

By: By:

Name & Title: Name & Title:

Address: Address:

By: By:

Name & Title: Name & Title:

Address: Address:

For persons involved in a "partnership" this proposal must be signed in the partnership name. The contractor shall be prepared to furnish the Government, upon demand, a list of all partners, and proof that they have authority to sign for the partnership.

SECTION B – SCHEDULE OF ITEMS

The quantities of supplies and services specified in the Schedule of Items and the Sample Task Order are for evaluation purposes only.

Offerors shall provide total prices for each Sample Task Order for each field office in which they desire to propose. Quantities and type of work included in sample task orders are estimates of typical quantity/types of work expected to be performed. See section J for pricing attachments.

PRICE

SCHEDULE

Item No. Description Quantity Unit Total Price

0010 LSFO IDR ROAD AND CONSTRUCTION FY2023 1 LS $

Period of Performance: Task Order Dependent

(END OF SECTION)

SECTION C: SPECIFICATIONS/DRAWINGS

The attachments to the description/specifications/scope of work are listed in Section J and are hereby made part of this solicitation and any resultant contract.

The total estimated maximum value of all combined orders under the awarded requirements contract is $200,000.00 and determined by combining the expected value of all known projects and anticipated volume based upon historical data. There is no guarantee of award of any work; however, awardees are granted exclusive rights to any work that arises within their respective geological area of award.

Annual estimated values for each field office are as follows:

Little Snake Field Office: $25K-$200K

SECTION D: PACKAGING AND MARKING

Packaging and marking of deliverables shall be IAW the Contractor’s standard commercial practices.

SECTION E: INSPECTION AND ACCEPTANCE

CLAUSES INCORPORATED BY REFERENCE

Clause Title Date

52.246-12 Inspection of Construction August 1996

52.246-21 Warranty of Construction March 1994

DIAR 1452.201-70 Authorities and Delegations September 2011

FINAL INSPECTION AND ACCEPTANCE (Task Order Specific)

Final completion of the punch list items, submission of all required submittals, and final cleanup of the project site shall be accomplished before the contract’s required task order completion date. The Contracting Officer or his/her designated representative will perform final inspection. Acceptance of the work will occur only upon written notice of acceptance by the Contracting Officer or any other warranted Contracting Officer at the National Operations Center (NOC), Bureau of Land Management (BLM) performing authorized duties in conjunction with this contract.

SECTION F: DELIVERIES OR PERFORMANCE

CLAUSES INCORPORATED BY REFERENCE

Clause Title Date

52.211-13 Time Extensions September 2000

52.242-14 Suspension of Work April 1984

CLAUSES INCORPORATED BY FULL TEXT

52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK April 1984 ALTERNATE 1 April 1984

The Contractor shall be required to

(a) commence work under this contract within 10 calendar days (unless otherwise specified on the Task Order) after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and

(c) complete the entire work ready for use not later than the completion date established in each individual task order. The time stated for completion shall include final cleanup of the premises.

Note: Contractor must give notice of completion of each Task Order to the Contracting Officer’s Representative (COR).

SECTION G: CONTRACT ADMINISTRATION DATA

CLAUSES INCORPORATED BY FULL TEXT

DIAPR 2010-14 CONTRACTOR PERFORMANCE ASSESSMENT REPORTING SYSTEM July 2010

(a) FAR 42.1502 directs all Federal agencies to collect past performance information on contracts. The Department of the Interior (DOI) has implemented the Contractor Performance Assessment Reporting System (CPARS) to comply with this regulation. One or more past performance evaluations will be conducted in order to record your contract performance as required by FAR42.15.

(b) The past performance evaluation process is a totally paperless process using CPARS. CPARS is a web-based system that allows for electronic processing of the performance evaluation report. Once the report is processed, it is available in the Past Performance Information Retrieval System (PPIRS) for Government use in evaluating past performance as part of a source selection action.

(c) We request that you furnish the Contracting Officer with the name, position title, phone number, and email address for each person designated to have access to your firm's past performance evaluation(s) for the contract no later than 30 days after award.

Each person granted access will have the ability to provide comments in the Contractor portion of the report and state whether or not the Contractor agrees with the evaluation, before returning the report to the Assessing Official. The report information must be protected as source selection sensitive information not releasable to the public.

(d) When your Contractor Representative(s) (Past Performance Points of Contact) are registered in CPARS, they will receive a n automatically-generated email with detailed login instructions. Further details, systems requirements, and training information for CPARS is available at http://www.cpars.gov. The CPARS User Manual, registration for On Line Training for Contractor Representatives, and a practice application may be found at this site.

(e) Within 60 days after the end of a performance period, the Contracting Officer will complete an interim or final past performance evaluation and the report will be accessible at http://www.cpars.gov. Contractor Representatives may then provide comments in response to the evaluation, or return the evaluation without comment. Comments are limited to the space provided in Block 22. Your comments should focus on objective facts in the Assessing Official's narrative and should provide your views on the causes and ramifications of the assessed performance. In addition to the ratings and supporting narratives, blocks 1 - 17 should be reviewed for accuracy, as these include key fields that will be used by the Government to identify your firm in future source selection actions. If you elect not to provide comments, please acknowledge receipt of the evaluation by indicating ''No comment" in Block 22, and then signing and dating Block 23 of the form. Without a statement in Block 22, you will be unable to sign and submit the evaluation back to the Government. If you do not sign and submit the CPAR within 30 days, it will automatically be returned to the Government and will be annotated: "The report was delivered/received by the contractor on (date). The contractor neither signed nor offered comment in response to this assessment." Your response is due within 30 calendar days after receipt of the CPAR.

(f) The following guidelines apply concerning your use of the past performance evaluation:

(1) Protect the evaluation as "source selection information." After review, transmit the evaluation by completing and submitting the form through CPARS. If for some reason you are unable to view and/or submit the form through CPARS, contact the Contracting Officer for instructions.

(2) Strictly control access to the evaluation within your organization. Ensure the evaluation is never released to persons or entities outside of your control.

(3) Prohibit the use of or reference to evaluation data for advertising, promotional material, pre-award surveys, responsibility determinations, production readiness reviews, or other similar purposes.

(g) If you wish to discuss a past performance evaluation, you should request a meeting in writing to the Contracting Officer no later than seven days following your receipt of the evaluation. The meeting will be held in person or via telephone or other means during your 30-day review period.

(h) A copy of the completed past performance evaluation will be available in CPARS for your viewing and for Government use supporting source selection actions after it has been finalized.

DIAPR 2011-04 ELECTRONIC INVOICING AND PAYMENT REQUIREMENTS- INVOICE PROCESSING PLATFORM (IPP) April 2013 Payment requests must be submitted electronically through the U. S. Department of the Treasury's Internet Payment Platform System

(IPP).

"Payment request" means any request for contract financing payment or invoice payment by the Contractor. To constitute a pro per invoice, the payment request must comply with the requirements identified in the applicable Prompt Payment clause included in the contract, or the clause 52.212-4 Contract Terms and Conditions – Commercial Items included in commercial item contracts. The IPP website address is: https://www.ipp.gov.

Under this contract, the following documents are required to be submitted as an attachment to the IPP invoice:

http://www.cpars.gov/ http://www.cpars.gov/ http://www.ipp.gov/

Format and Content: Use the Project Manual table of contents as a guide to establish line items for the schedule of values. Provide at least one line item for each Specification Section.

Each invoice shall be submitted on the Contractor’s letterhead or invoice form with the following:

1. Invoice date and Government Contract Number

2. Billing period specified with beginning and ending dates. The beginning date must not be later than the completion date or within any previous billing dates.

3. The accounting must follow the approved schedule of values as described in the specification attachment.

4. Total amount due for the billing period

5. Certification of Progress Payment

6. Payrolls (Mail weekly)

7. Substantiation of Subcontractor Payment

8. 52.223-9 Certification with final payment request.

9. A Release of Claims (See 1452.204-70) with a request for final payment.

A Progress Report (may be included in Progress Meeting Notes) shall be submitted to support each invoice and shall include a summary of work performed during the period of performance identified on the invoice, which at a minimum must include:

1. ACTIVITY: Description of the previous month’s project activities and the planned activities for the next month. Also, Describe activities performed on contingency task(s), percent complete, task or deliverable schedule and identify any issues or concerns that may affect the performance and/or completion of the task(s);

2. PERCENTAGE COMPLETE: In accordance with the accepted Schedule of Values, for each task/deliverable: identify the percentage completed during the month and the cumulative percentage completed;

3. SCHEDULE: Reconcile progress of each task/deliverable with the schedule identified for each; submit a revised schedule as required.

4. ISSUES OR CONCERNS: Identify issues and/or concerns that may affect the project Statement of Work (SOW) or schedule.

5. OTHER INFORMATION: Any other information required in the Contract to be included in the Progress Report.

The Contractor must use the IPP website to register access and use IPP for submitting requests for payment. The Contractor Government Business Point of Contact (as listed in SAM) will receive enrollment instructions via email from the Federal Reserve Bank of Boston (FRBB) within 3 – 5 business days of the contract award date. Contractor assistance with enrollment can be obtained by contacting the IPP Production Helpdesk via email ippgroup@bos.frb.org or phone (866) 973-3131.

If the Contractor is unable to comply with the requirement to use IPP for submitting invoices for payment, the Contractor must submit a waiver request in writing to the Contracting Officer with its proposal or quotation.

mailto:ippgroup@bos.frb.org

G-1 GOVERNMENT POINTS OF CONTACT

Contracting Office Bureau of Land Management, Colorado State Office 2850 Youngfield Street Lakewood, CO 80215-7093

Chau Nguyen, cnguyen@blm.gov, 303-239-3678

G-2 LOCAL INTERNET PAYMENT PLATFORM (IPP) HOTLINE

To check payment status, contact the Payment Hotline at 877-480-9724 or 303-236-2850. You will need to leave a message with the following information:

1. Company Name

2. Contract Number

3. Invoice Number

4. Invoice Amount

5. A brief description of why you are calling

6. Your contact information

If you do not receive a callback from the Payment Hotline within 72 hours, please contact the Contract Officer with the day and time you contacted the Payment Hotline.

SECTION H: SPECIAL CONTRACT REQUIRMENTS

H-1 WORK HOURS

The performance period established for this contract is based upon all work being conducted during regular working hours between 7:30am and 4:30pm, Monday through Friday, excluding government holidays. If the Contractor desires to carry on work outside regular hours, including Saturdays, Sundays, and Government holidays, a request must be submitted to the Contracting Officer in sufficient time to allow satisfactory arrangements to be made by the Government for access to the work site and inspection.

H-2 COMMUNICATIONS

“Time” for communications received after 3:00pm, after 12:00 pm locally on Fridays, or after 12:00 pm locally prior to a holiday will not start until the next business day. All times are local Mountain Standard Time.

H-3 FIRE DANGER SEASON

If the Contracting Officer Representative (COR) allows the Contractor to continue work during periods of declared fire danger or season, the Contractor shall comply with all applicable state laws relating to fire prevention and with all special conditions of work as directed by the COR.

H-4 DRAWINGS

(a) Typical Drawings. Any drawings titled typical are general only and dimensions of each structure will be fixed by the Contracting Officer to adapt the design to existing conditions at the structure location.

(b) Reduced Size Drawings. Any drawings identified as "REDUCED SIZE DRAWINGS" appearing in the solicitation are photographically reduced in size. Accordingly, measurements and dimensions should not be taken or be based on any numerical scales shown. Prospective Offerors desiring to review a copy of the full size drawings may contact the Contracting Officer identified in the solicitation.

mailto:cnguyen@blm.gov

H-5 PRESERVATION OF HISTORICAL AND ARCHEOLOGICAL DATA

(a) The Historic and Archeological Data Preservation Act of 1974, provides for the preservation of historical and archeological data that might otherwise be lost as the result of alterations to the terrain caused by a federal or federally licensed activity or program.

(b) If, in connection with operations under this contract, the Contractor, subcontractors, or the employees of any of them, discovers, encounters or becomes aware of any possible historical or archeological data, objects or sites of cultural value on the project area, such as historical ruins, graves or grave markers, fossils, or artifacts, the Contractor shall immediately suspend all operations in the vicinity of the cultural value and shall notify the Contracting Officer in writing, giving the location and nature of the findings. No objects of cultural resource value may be removed.

(c) Where appropriate by reason of discovery, the Contracting Officer may order delays in the time of performance and/or changes in the work. If such delays and/or changes are ordered, the time of performance and contract price shall be adjusted in accordance with the Changes clause.

(d) The Contractor will be responsible for protecting the cultural resources within the affected area from damage. In addition, the contractor will be liable for all damage to the identified cultural resources caused by their actions or the actions of their agents or representatives. The Contractor shall immediately notify the Contracting Officer or his representative if any damage occurs to any cultural resource and immediately suspend work in the area in which damage has occurred until authorized to proceed.

H-6 EXTENT OF OBLIGATION

The Government obligation for performance of this contract beyond the initial award(s) is contingent upon the availability of funds from which payment for contract purposes can be made. No legal liability on the part of the Government for any payment may arise for performance under this contract beyond the amount that has been authorized through the issuance of contract modification, or change order by the Contracting Officer.

H-7 SAFETY AND QUALITY CONTROL PLAN

Following contract award, the contractor must provide effective quality assurance and safety plans for acceptance by the Government.

H-8 FEDERAL HOLIDAYS

The following Federal Legal Holidays are observed:

New Year’s Day President’s Day Independence Day Columbus Day Thanksgiving Day

Martin Luther King, Jr. Day Memorial Day Labor Day Veterans Day Christmas Juneteenth

H-9 URGENT AND EMERGENCY WORK

For task orders that require short response time due to urgent or emergency needs, a unit price multiplier (as shown in the Offeror’s proposal) will be applied to contract unit prices to compensate for the Contractor’s adjustment of schedule, overtime, overhead costs and other costs associated with short response. Emergency work will be considered work requiring the Contractor to be on site and working within 24-hours of notice to proceed, Urgent Work will be considered work requiring the Contractor to be on site and working within 14 days of notice to proceed

H-10 ECONOMIC PRICE ADJUSTMENT

An economic price adjustment that provides for upward and downward revision of the stated unit prices may be negotiated once per year at the end of each contract year for the future year extension. Price adjustments shall be based on actual increases or decreases in specified costs of materials and/or fuel and proper documentation provided as justification (Please refer to FAR 52.216-4.). Only those items denoted by an asterisk within the schedule of items will be considered for an adjustment under the aforementioned clause.

H-11 INDEFINITE DELIVERY REQUIREMENT (IDR) AWARD AND TASK ORDERS

By design, an IDR contract allows the Government to respond to various emergencies and project needs rapidly, without committing to a specific quantity or type of work at the award of the Contract. The award process “pre-qualifies” the Contractor for the work and establishes unit prices. When a specific project is initiated, a task order will be provided to the Contractor that outlines the schedule of items, associated price, directions and maps, equipment needs, dates, and project location.

H-12 LIMITATIONS ON SUBCONTRACTING REPORTING In accordance with 52.219-14 Limitations on Subcontracting, the prime contractor must perform at least 15% of the cost of the contract, excluding the cost of materials with its own employees and employees of a similarly situated subcontractor. A similarly situated subcontractor is a small business concern subcontractor that is a participant of the same SBA program that qualified the prime contractor as an eligible offeror and awardee of the contract. The contractor is responsible for ensuring compliance with the Limitation on Subcontracting.

At the conclusion of the period of performance and prior to final payment, the contractor shall submit a Limitation on Subcontracting Report directly to the Contracting Officer. The following information is required as part of the report: 1) the total amount paid to the Prime during the performance period broken out by labor and materials 2) list of Similarly Situated Subcontractors and the amounts paid to each during the performance period broken out by labor and materials 3) list of any other subcontractors and the amounts paid to each during the performance period broken out by labor and materials.

If the Contracting Officer review of the report finds that the contractor is not in compliance for the period of performance, the contractor will be notified in writing. Penalties for failure to comply are described in 13 CFR 125.6(h) which states:

Whoever violates the requirements set forth in paragraph (a) of this section shall be subject to the penalties prescribed in 15 U.S.C.

645(d), except that the fine shall be treated as the greater of $500,000 or the dollar amount spent, in excess of permitted levels, by the entity on subcontractors. A party's failure to comply with the spirit and intent of a subcontract with a similarly situated entity may be considered a basis for debarment on the grounds, including but not limited to, that the parties have violated the terms of a Government contract or subcontract pursuant to FAR 9.406-2(b)(1)(i) (48 CFR 9.406-2(b)(1)(i)).

H-13 KEY PERSONNEL

(a) The contractor shall assign to this contract the following key personnel who will have the full authority to act on behalf of the Contractor during performance of efforts hereunder:

To be determined during negotiations (Individual names shall be included in the resultant contract as an attachment. Revisions in accordance with the provisions of this clause will be made by superseding letters to be included as a bilateral contract modification.)

Supervision shall be the responsibility of the Contractor. Any Contract employee problems in performance, attendance, or other personal problems shall be referred to the on-site Supervisor to be referred on to the Contractor.

(b) During the first year of performance, the Contractor shall make no substitutions of those personnel unless the substitution is necessitated by illness, death, termination of employment, or otherwise approved by the CO. The Contractor shall notify the CO within 15 calendar days after the occurrence of any of these events and provide information required by paragraph (c) below. After the initial year, the Contractor shall submit the information required by paragraph (c) to the CO at least 15 calendar days prior to making any permanent substitution.

(c) Substitution of key personnel shall require the written approval of the CO. The Contractor shall provide an explanation of the circumstances necessitating the proposed substitution, complete resumes for the proposed substitutes, and any additional information requested by the CO. Proposed substitutions should have comparable qualifications to those of the persons being replaced. The CO will notify the Contractor within 15 calendar days after receipt of all required information of the decision on substitutions. The key listing of personnel shall be modified by superseding letters as a bilateral contract modification as stated in (a) above.

(d) The Government reserves the right to refuse any contractor employees recommended or referred by the Contractor.

PART II – CONTRACT CLAUSES

SECTION I: CONTRACT CLAUSES

CLAUSES INCORPORATED BY REFERENCE

Clause Title Date

52.202-1 Definitions June 2020

52.203-3 Gratuities April 1984

52.203-5 Covenant Against Contingent Fees May 2014

52.203-7 Anti-Kickback Procedures June 2020

52.203-8 Cancellation, Rescission, and Recovery of Funds for Illegal or Improper Activity May 2014

52.203-10 Price Or Fee Adjustment For Illegal Or Improper Activity May 2014

52.203-12 Limitation On Payments To Influence Certain Federal Transactions June 2020

52.203-17 Contractor Employee Whistleblower Rights and Requirement to Inform Employees of Whistleblower Rights

June 2020

52.204-4 Printed or Copied Double-Sided on Postconsumer Fiber Content Paper May 2011

52.204-9 Personal Verification Contractor Personnel January 2011

52.204-10 Reporting Executive Compensation and First-Tier Subcontract Awards June 2020

52.204-13 System for Award Management Maintenance October 2018

52.209-6 Protecting the Government's Interest When Subcontracting With Contractors Debarred, Suspended, or Proposed for Debarment

November 2021

52.209-9 Updates of Publicly Available Information Regarding Responsibility Matters October 2018

52.209-10 Prohibition on Contracting with Inverted Domestic Corporations November 2015

52.215-2 Audit and Records – Negotiation June 2020

52.215-8 Order of Precedence- Uniform Contract Format October 1997

52.215-21 Requirements for Certified Cost or Pricing Data and Data Other than Certified Cost or Pricing Data – Modifications Alternate III

November 2021

52.219-6 Notice of Total Small Business Set Aside November 2020 52.219-8 Utilization of Small Business Concerns October 2022 52.219-14 Limitations on Subcontracting October 2022 52.219-28 Post-Award Small Business Program Representation October 2022 52.222-1 Notice To The Government Of Labor Disputes February 1997

52.222-3 Convict Labor June 2003

52.222-4 Contract Work Hours and Safety Standards Act - Overtime Compensation May 2018

52.222-6 Construction Wage Requirements August 2018 52.222-7 Withholding of Funds May 2014 52.222-8 Payrolls and Basic Records July 2021 52.222-9 Apprentices and Trainees July 2005 52.222-10 Compliance with Copeland Act Requirements February 1988

52.222-11 Subcontracts (Labor Standards) May 2014 52.222-12 Contract Termination-Debarment May 2014 52.222-13 Compliance with Construction Wage Rate Requirements and Related Act Regulations May 2014

52.222-14 Disputes Concerning Labor Standards February 1988 52.222-15 Certification of Eligibility May 2014 52.222-21 Prohibition of Segregated Facilities April 2015 52.222-26 Equal Opportunity September 2016 52.222-27 Affirmative Action Compliance Requirements for Construction April 2015 52.222-31 52.222-31 Construction Wage Rate Requirements - Price Adjustment (Percentage August 2018 52.222-32 Construction Wage Rate Requirements – Price Adjustment (Actual Method) August 2018 52.222-35 Equal Opportunity for Veterans June 2020

52.222-36 Equal Opportunity for Workers with Disabilities June 2020 52.222-37 Employment Reports on Veterans June 2020 52.222-40 Notification of Employee Rights Under the National Labor Relations Act December 2010

52.222-50 Combating Trafficking in Persons November 2021 52.222-54 Employment Eligibility Verification May 2022 52.222-55 Establishing a Minimum Wage for Contractors 13658 January 2022 52.223-2 Affirmative Procurement of Biobased Products Under Service and Construction

Contracts September 2013

52.223-3 Hazardous Material Identification and Material Safety Data February 2021 52.223-5 Pollution Prevention and Right-to-Know Information May 2011 52.223-6 Drug Free Workplace May 2001

52.223-15 Energy Efficiency in Energy-Consuming Products May 2020 52.223-17 Affirmative Procurement of EPA-designated Items in Service and Construction

Contracts August 2018

52.223-18 Encouraging Contractor Policy to Ban Text Messaging While Driving June 2020

52.225-13 Restrictions on Certain Foreign Purchases February 2021

52.227-1 Authorization and Consent June 2020

52.227-4 Patent Indemnity – Construction Contracts December 2007

52.228-2 Additional Bond Security October 1997

52.228-5 Insurance – Work on a Government Installation January 1997

52.228-11 Pledges of Assets February 2021

52.228-12 Prospective Subcontractor Requests for Bonds December 2022

52.228-13 Alternative Payment Protections July 2000 52.228-14 Irrevocable Letter of Credit November 2014 52.228-15 Performance and Payment Bond – Construction June 2020 52.229-3 Federal, State And Local Taxes February 2013 52.232-5 Payments under Fixed-Price Construction Contracts May 2014

52.232-16, Alt 1 Progress Payments March 2000 52.232-17 Interest May 2014

52.232-23 Assignment Of Claims May 2014

52.232-27 Prompt Payment for Construction Contracts January 2017

52.232-33 Payment by Electronic Funds Transfer-- System for Award Management October 2018

52.232-39 Unenforceability of Unauthorized Obligations June 2013

52.232-40 Providing Accelerated Payments to Small Business Subcontractors November 2021

52.233-1, Alt 1 Disputes December 1991

52.233-3 Protest After Award August 1996 52.233-4 Applicable Law for Breach of Contract Claim October 2004 52.236-2 Differing Site Conditions April 1984 52.236-3 Site Investigation and Conditions Affecting the Work April 1984

52.236-5 Material and Workmanship April 1984 52.236-6 Superintendence by the Contractor April 1984 52.236-7 Permits and Responsibilities November 1991 52.236-8 Other Contracts April 1984 52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements. April 1984

52.236-10 Operations and Storage Areas April 1984 52.236-11 Use and Possession Prior to Completion April 1984

52.236-12 Cleaning up April 1984

52.236-13 Accident Prevention November 1991

52.236-14 Availability and Use of Utility Services April 1984

52.236-15 Schedules for Construction Contracts April 1984

52.236-17 Layout of Work April 1984 52.236-21 Alt 1 Specifications and Drawings for Construction April 1984

52.236-26 Preconstruction Conference February 1995 52.242-13 Bankruptcy July 1995 52.242-14 Suspension of Work April 1984

52.243-4 Changes June 2007

52.244-6 Subcontracts for Commercial Items December 2022

52.245-9 Use and Charges April 2012

52.246-12 Inspection of Construction August 1996

52.246-21 Warranty of Construction March 1994 52.248-3 Value Engineering – Construction October 2020 52.249-2, Alt 1 Termination for Convenience of the Government (Fixed-Price), Alternate 1 September 1996

52.249-3 Termination for Convenience of the Government (Dismantling, Demolition, or Removal of Improvements

April 2012

52.249-10, Alt I Default (Fixed-Price Construction) April 1984 52.253-1 Computer Generated Forms January 1991

DIAR 1452.203-70 Restrictions on Endorsements – Department of the Interior July 1996

DIAR 1452.204-70 Release of Claims – Department of the Interior July 1996

DIAR 1452.215-70 Examination of Records – Department of the Interior April 1984

DIAR 1452.236-70 Prohibition Against Use of Lead-Based Paint – Department of the Interior July 1996

DIAR 1452.237-70 Information Collection – Department of the Interior July 1996

CLAUSES INCORPORATED BY FULL TEXT

52.203-99 PROHIBITION ON CONTRACTING WITH ENTITIES THAT REQUIRE CERTAIN INTERNAL

CONFIDENTIALITY AGREEMENTS (DEVIATION 2015-02)

(a) The contractor shall not require employees or subcontractors seeking to report fraud, waste, or abuse to sign or comply with internal confidentiality agreements or statements prohibiting or otherwise restricting such employees or subcontractors from lawfully reporting such fraud, waste, or abuse to a designated investigative or law enforcement representative of a Federal department or agency authorized to receive such information.

(b) The contractor shall notify employees that the prohibition and restrictions of any internal confidentiality agreements covered by this clause are no longer in effect.

(c) The prohibition in paragraph (a) of this clause does not contravene requirements applicable to Standard Form 312, Form 4414, or any other form issued by a Federal department or agency governing the nondisclosure of classified information.

(d)(1) In accordance with section 743 of Division E, Title VII, of the Consolidated and Further Continuing Resolution Appropriations Act, 2015 (Pub. L. 113-235), use of funds appropriated (or otherwise made available) under that or any other Act may be prohibited, if the Government determines that the contractor is not in compliance with the provisions of this clause.

(2) The Government may seek any available remedies in the event the contractor fails to comply with the provisions of this clause.

52.211-12 Liquidated Damages-Construction.

As prescribed in 11.503(b), insert the following clause in solicitations and contracts:

Liquidated Damages-Construction (Sept 2000)

(a) If the Contractor fails to complete the work within the time specified in the contract, the Contractor shall pay liquidated damages to the Government in the amount of will be determined on each individual Task Order, if needed for each calendar day of delay until the work is completed or accepted.

(b) If the Government terminates the Contractor’s right to proceed, liquidated damages will continue to accrue until the work is completed. These liquidated damages are in addition to excess costs of repurchase under the Termination clause.

(End of clause)

52.216-4 ECONOMIC PRICE ADJUSTMENT – LABOR AND MATERIAL Jan 1997

(a) The Contractor shall notify the Contracting Officer if, at any time during contract performance, the rate of pay for labor (including fringe benefits) or the unit prices for material shown in the Schedule either increase or decrease. The Contractor shall furnish this notice within 60 days after the increase or decrease, or within any additional period that the Contracting Officer may approve in writing, but not later than the date of final payment under this contract. The notice shall include the Contractor’s proposal for an adjustment in the contract unit prices to be negotiated under paragraph (b) of this clause, and shall include, in the form required by the Contracting Officer, supporting data explaining the cause, effective date, and amount of the increase or decrease and the amount of the Contractor’s adjustment proposal.

(b) Promptly after the Contracting Officer receives the notice and data under paragraph (a) of this clause, the Contracting Officer and the Contractor shall negotiate a price adjustment in the contract unit prices and its effective date. However, the Contracting Officer may postpone the negotiations until an accumulation of increases and decreases in the labor rates (including fringe benefits) and unit prices of https://www.acquisition.gov/content/11503-contract-clauses#i1114065 material shown in the Schedule results in an adjustment allowable under subparagraph (c)(3) of this clause. The Contracting Officer shall modify this contract

(1) to include the price adjustment and its effective date and

(2) to revise the labor rates (including fringe benefits) or unit prices of material as shown in the Schedule to reflect the increases or decreases resulting from the adjustment. The Contractor shall continue performance pending agreement on, or determination of, any adjustment and its effective date.

(c) Any price adjustment under this clause is subject to the following limitations:

(1) Any adjustment shall be limited to the effect on unit prices of the increases or decreases in the rates of pay for labor (including fringe benefits) or unit prices for material shown in the Schedule. There shall be no adjustment for --

(i) Supplies or services for which the production cost is not affected by such changes;

(ii) Changes in rates or unit prices other than those shown in the Schedule; or

(iii) Changes in the quantities of labor or material used from those shown in the Schedule for each item.

(2) No upward adjustment shall apply to supplies or services that are required to be delivered or performed before the effective date of the adjustment, unless the Contractor’s failure to deliver or perform according to the delivery schedule results from causes beyond the Contractor’s control and without its fault or negligence, within the meaning of the Default clause.

(3) There shall be no adjustment for any change in rates of pay for labor (including fringe benefits) or unit prices for material which would not result in a net change of at least 3 percent of the then-current total contract price. This limitation shall not apply, however, if, after final delivery of all contract line items, either party requests an adjustment under paragraph (b) of this clause.

(4) The aggregate of the increases in any contract unit price made under this clause shall not exceed 10 percent of the original unit price.

There is no percentage limitation on the amount of decreases that may be made under this clause.

(d) The Contracting Officer may examine the Contractor’s books, records, and other supporting data relevant to the cost of labor (including fringe benefits) and material during all reasonable times until the end of 3 years after the date of final payment under this contract or the time periods specified in Subpart 4.7 of the Federal Acquisition Regulation (FAR), whichever is earlier.

52.217-8 Option to Extend Services.

As prescribed in 17.208(f), insert a clause substantially the same as the following:

Option to Extend Services (Nov 1999)

The Government may require continued performance of any services within the limits and at the rates specified in the contract. These rates may be adjusted only as a result of revisions to prevailing labor rates provided by the Secretary of Labor. The option provision may be exercised more than once, but the total extension of performance hereunder shall not exceed 6 months. The Contracting Officer may exercise the option by written notice to the Contractor within 15 days. (End of clause)

52.217-9 Option to Extend the Term of the Contract.

As prescribed in 17.208(g), insert a clause substantially the same as the following:

Option to Extend the Term of the Contract (Mar 2000)

(a) The Government may extend the term of this contract by written notice to the Contractor within 15 days provided that the Government gives the Contractor a preliminary written notice of its intent to extend at least 30 days before the contract expires. The preliminary notice does not commit the Government to an extension.

(b)If the Government exercises this option, the extended contract shall be considered to include this option clause.

(c)The total duration of this contract, including the exercise of any options under this clause, shall not exceed 04/2026.

(End of clause)

52.216-18 ORDERING August 2020

(a) Any supplies and services to be furnished under this contract shall be ordered by issuance of delivery orders or task orders by the individuals or activities designated in the Schedule. Such orders may be issued from 13 April 2023 – 12 April 2024(base year), 13 April 2024 – 12 April 2025 (option year 1), 13 April 2025 – 12 April 2026(option year 2).

(b) All delivery orders or task orders are subject to the terms and conditions of this contract. In the event of conflict between a delivery order or task order and this contract, the contract shall control.

(c) A delivery orderor task orderis considered "issued" when—

(1) If sent by mail (includes transmittal by U.S. mail or private delivery service), the Government deposits the order in the mail;

(2) If sent by fax, the Government transmits the order to the Contractor 's fax number; or

(3) If sent electronically, the Government either—

(i) Posts a copy of the delivery orderor task orderto a Government document access system, and notice is sent to the Contractor ; or

(ii) Distributes the delivery orderor task ordervia email to the Contractor 's email address.

(d) Orders maybe issued by methods other than those enumerated in this clause only if authorized in the contract .

52.216-19 ORDER LIMITIATIONS Oct 1995 (End of clause) https://www.acquisition.gov/content/17208-solicitation-provisions-and-contract-clauses#i1103156 https://www.acquisition.gov/content/17208-solicitation-provisions-and-contract-clauses#i1103156

(a) Minimum order. When the Government requires supplies or services covered by this contract in an amount of less than $2000, the Government is not obligated to purchase, nor is the Contractor obligated to furnish, those supplies or services under the contract.

(b) Maximum order. The Contractor is not obligated to honor --

(1) Any order for a single item in excess of $50,000 or

(2) Any order for a combination of items in excess of $75,000 or

(3) A series of orders from the same ordering office within 120 days that together call for quantities exceeding the limitation in subparagraph (b)(1) or (2) of this section.

(c) If this is a requirements contract (i.e., includes the Requirements clause at subsection 52.216-21 of the Federal Acquisition Regulation (FAR)), the Government is not required to order a part of any one requirement from the Contractor if that requirement exceeds the maximum-order limitations in paragraph (b) of this section.

(d) Notwithstanding paragraphs (b) and (c) of this section, the Contractor shall honor any order exceeding the maximum order limitations in paragraph (b), unless that order (or orders) is returned to the ordering office within 10 days after issuance, with written notice stating the Contractor’s intent not to ship the item (or items) called for and the reasons. Upon receiving this notice, the Government may acquire the supplies or services from another source.

52.216-21 REQUIREMENTS October 1995

(a) This is a requirements contract for the supplies or services specified, and effective for the period stated, in the Schedule. The quantities of supplies or services specified in the Schedule are estimates only and are not purchased by this contract. Except as this contract may otherwise provide, if the Government’s requirements do not result in orders in the quantities described as “estimated’’ or “maximum” in the Schedule, that fact shall not constitute the basis for an equitable price adjustment.

(b) Delivery or performance shall be made only as authorized by orders issued in accordance with the…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .