Sol_140G0222R0012.pdf

PDF 476 KB Posted

Attached to
Monitoring Wells Harlan Indiana
Solicitation number
140G0222R0012
Issued by

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOLICITATION, OFFER,

AND AWARD

2. TYPE OF SOLICITATION

6. PROJECT NO. 4. CONTRACT NO. 5. REQUISITION/PURCHASE REQUEST NO.

PAGE OF PAGES

7. ISSUED BY CODE 8. ADDRESS OFFER TO

SOLICITATION

(Construction, Alteration, or Repair)

1. SOLICITATION NO. 3. DATE ISSUED

IMPORTANT -- The "offer" section on the reverse must be fully completed by offeror.

9.

INFORMATION

a. NAME b. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder."

CALL:

FOR

SEALED BID (IFB)

NEGOTIATED (RFP)

0040561414

USGS OAG DENVER ACQUISITION BRANCH

PO BOX 25046

204 DENVER FEDERAL CENTER

DENVER CO 80225-0046

GDB

Sean Jones 303-236-9314

1x 02/01/2022

140G0222R0012

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date)

This Combined Synopsis/Solicitation Notice is to announce the U.S. Department of the

Interior (DOI), U.S. Geological Survey (USGS) has a requirement for the Drilling/

Construction of (7) wells, for monitoring in the covered area of Harlan Indiana, USA in accordance with Attachment 1- Statement of Work.

The solicitation is being issued as a Request For Proposal (RFP). The policies contained in FAR Part 13 Simplified Acquisition in conjunction with the policies and procedures for solicitation, evaluation and award prescribed in Part 15, as appropriate, shall be used for this acquisition.

This is a 100% Small Business Set-aside. The associated NAICS code is 237110 Water and Sewer Line and Related Structures Construction; which as a small business size standard of $39.5M.

In accordance with FAR 36.204 Disclosure of the magnitude of construction projects, the estimated construction price is (a) Less than $25,000.

An organized sites visit/tour for all seven drill sites has been scheduled for

Wednesday, 02/16/2022 at 11:00am EST. Site Tour/Visit Participants will meet Shawn

Continued ...

11. The Contractor shall begin performance

12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

award, notice to proceed. The performance period is mandatory negotiable. (See ________________________________________________.)

13. ADDITIONAL SOLICITATION REQUIREMENTS:

a. Sealed offers in original and is not required.is, b. An offer guarantee

c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

(date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

d. Offers providing less than

12b. CALENDAR DAYSYES NO

(If "YES", indicate within how many calendar days after award in Item 12b.)

10 90 calendar days and complete it within ________________ ________________ calendar days after receiving

03/04/2022

NSN 7540-01-155-3212

x x x x copies to perform the work required are due at the place specified in Item 8 by _____________ ___________________ (hour) local time calendar days for Government acceptance after the date offers are due will not be considered and will be rejected . _________________

STANDARD FORM 1442 (Rev. 4-85)

Prescribed by GSA

FAR(48 CFR) 53.236-1(d)

17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within ____________________ calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in item 13d. Failure to insert any number means the offeror accepts the minimum in item 13d.)

14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code) 15. TELEPHONE NO. (Include area code)

16. REMITTANCE ADDRESS (Include only if different than item 14.)

CODE FACILITY CODE

AMOUNTS

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGEMENT OF AMENDMENTS

OFFER (Must be fully completed by offeror)

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT NO.

DATE.

20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print) 20b. SIGNATURE 20c. OFFER DATE

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN

(4 copies unless otherwise specified)

ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

26. ADMINISTERED BY CODE 27. PAYMENT WILL BE MADE BY

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

(Contractor is required to sign this document and return (Contractor is not required to sign this document.)

Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award.

No further contractual document is necessary.

30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print) 31a. NAME OF CONTRACTING OFFICER (Type or print)

30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA 31c. DATE

BY

2PAGE OF

USGS OAG DENVER ACQUISITION BRANCH

PO BOX 25046

204 DENVER FEDERAL CENTER

DENVER CO 80225-0046

GDB

Sean Jones

28. NEGOTIATED AGREEMENT 29. AWARD

Contractor agrees to furnish and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, copies to issuing office.)

10 U.S.C. 2304(c) 41 U.S.C. 253(c)

STANDARD FORM 1442 (REV. 4-85) BACK

Continued...

ITEM NO.

(A)

SUPPLIES/SERVICES

(B)

QUANTITY

(C)

UNIT

(D)

UNIT PRICE

(E)

AMOUNT

(F)

NAME OF OFFEROR OR CONTRACTOR

3 54

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

140G0222R0012

Naylor just north of the Hwy 37 and Bull Rapids

Road intersection, outside of Harlan, Indiana

46741, approximately at (41°12'28.6"N

84°54'11.8"W).Vendors interested in attending the

Sites Visit shall notify Shawn Naylor, snaylor@usgs.gov, and CC Sean M. Jones, smjones@usgs.gov by email, by not later than

11:00am EST on the workday prior to the site visit. The email message shall include: the firm name, address, and website; and, each visitor name, email address and phone number. Each visitor must have a government-issued, picture ID such as a driver license. No questions will be asked/answered during the site visit. All

Questions must be in writing by email to the

Contracting Officer, Sean M. Jones, smjones@usgs.gov. Questions are due by

02/25/2022. Questions received after this time will be considered late and may not receive a response.

All requirements for preparation, submission, and receipt of offer contained in this solicitation and its amendments shall be adhered to.

USGS POC is Sean M. Jones, smjones@usgs.gov

303-236-9314.

Delivery Location Code: 0006366883

USGS Indiana Water Science Center

5957 Lakeside Boulevard

Indianapolis IN 46278 US

Period of Performance: 03/20/2022 to 06/18/2022

00010 Services, non-personal to provide all plant, equipment, supervision, labor and materials

(unless otherwise provided herein) necessary to

Drill Seven Monitoring Wells in NE Indiana for the USGS Indiana Water Science Center IAW with the attached SOW and Terms and Conditions.

Product/Service Code: Y1NE

Product/Service Description: CONSTRUCTION OF

WATER SUPPLY FACILITIES

Contract Type: Firm-Fixed Price

Continued ...

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

Sponsored by GSA

FAR (48 CFR) 53.110

ITEM NO.

(A)

SUPPLIES/SERVICES

(B)

QUANTITY

(C)

UNIT

(D)

UNIT PRICE

(E)

AMOUNT

(F)

NAME OF OFFEROR OR CONTRACTOR

4 54

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

140G0222R0012

Technical POC: Shawn Naylor, snaylor@usgs.gov

Billing POC: Deborah Battleson, (614) 430-7701, dbattleson@usgs.gov

Contract Specialist: Sean Jones, (303) 236-9314, smjones@usgs.gov

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

Sponsored by GSA

FAR (48 CFR) 53.110

USGS SOLICITATION: 140G0222R0012

TABLE OF CONTENTS

SECTION A. SOLICITATION/CONTRACT FORM

SECTION B. SUPPLIES OR SERVICES AND PRICES/COSTS

SECTION C. DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK

C.1. Work Statement C.2. GS0301 General Requirements. (JUL 2001) C.3. GS0339 Green Acquisition. (JUL 2018)

SECTION D. PACKAGING AND MARKING

D.1. GS0208 Drilling - Preservation and Packaging (OCT 1997)

SECTION E. INSPECTION AND ACCEPTANCE

E.1. 52.252-2 Clauses Incorporated by Reference. (FEB 1998)

E.1.1. 52.246-12 -- Inspection of Construction. (Aug. 1996)

E.1.2. 52.246-13 – Inspection – Dismantling, Demolition, or Removal of Improvements (Aug 1996) 13

E.1.3. 52.204-14 Service Contract Reporting Requirements. (OCT 2016)

E.1.4. 52.204-25 Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment. (NOV 2021)

E.2. GS0209 Drilling - Inspection and Acceptance (OCT 1997) E.3. GS0725 Demonstration of Satisfactory Operation. (JUL 2001)

SECTION F. DELIVERIES OR PERFORMANCE

F.1. 52.211-10 Commencement, Prosecution, and Completion of Work. (APR 1984) F.2. GS0914 Period of Performance/Notice to Proceed – Drilling (JUL 2001) F.3. GS0919 Legal Holidays. (JUN 2021)

SECTION G. CONTRACT ADMINISTRATION DATA

G.1. Electronic Invoicing and Payment Requirements - Invoice Processing Platform (IPP) (April 2013) 15 G.2. GS1126 Invoicing and Performance Statements (Construction). (JUL 2001)

SECTION H. SPECIAL CONTRACT REQUIREMENTS

H.1. 1452.201-70 AUTHORITIES AND DELEGATIONS (SEP 2011)

H.2. GS0203 Drilling - Site Prep Restoration (OCT 1997) H.3. GS0204 Drilling – Permits (OCT 1997) H.4. GS0205 Drilling - Toilet Facilities (OCT 1997) H.5. GS0206 Drilling - Abandoned Hole (OCT 1997) H.6. GS0207 Drilling - Contractor Representative (MAY 2005) H.7. GS0210 Drilling - Drilling Equipment (OCT 1997) H.8. GS0211 Drilling - Government Liability For Damage (OCT 1997) H.9. GS0215 Drilling - Compliance with Applicable Laws (OCT 1997) H.10. GS0216 Drilling – Investigation (OCT 1997) H.11. GS0217 Drilling - Contractor Responsibility (OCT 1997) H.12. GS0221 Drilling - Representative of the Government (OCT 1997) H.13. GS0347 Indoor Air Quality During Construction (MAR 2008) H.14. GS1306 Performance and Payment Bonds. (MAY 2003) H.15. GS1315 Drill Site Protection and Restoration (JUL 2001) H.16. GS1316 Drilling Down Time (JUL 2001) H.17. GS1346 Compliance with Occupational Safety and Health Act – Government Owned Facilities/Equipment. (APR 2003) H.18. GS1354 List of Subcontractors (Construction (JUL 2001)

SECTION I. SECTION I - CONTRACT CLAUSES

I.1. 52.202-1 Definitions. (JUN 2020) I.2. 52.203-3 Gratuities. (APR 1984) I.3. 52.203-5 Covenant Against Contingent Fees. (MAY 2014) I.4. 52.203-6 Restrictions on Subcontractor Sales to the Government. (JUN 2020) I.5. 52.203-7 Anti-Kickback Procedures. (JUN 2020) I.6. 52.203-8 Cancellation, Rescission, and Recovery of Funds for Illegal or Improper Activity.

(MAY 2014)

I.7. 52.203-10 Price or Fee Adjustment for Illegal or Improper Activity. (MAY 2014) I.8. 52.203-12 Limitation on Payments to Influence Certain Federal Transactions. (JUN 2020) I.9. 52.203-17 Contractor Employee Whistleblower Rights and Requirement To Inform Employees of Whistleblower Rights. (JUN 2020) I.10. 52.203-18 Prohibition on Contracting with Entities that Require Certain Internal Confidentiality Agreements or Statements--Representation. (Jan 2017) I.11. 52.203-19 Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements.

(Jan 2017) I.12. 52.204-4 Printed or Copied Double-Sided on Postconsumer Fiber Content Paper. (MAY 2011)

I.13. 52.204-9 Personal Identity Verification of Contractor Personnel. (JAN 2011) I.14. 52.204-10 Reporting Executive Compensation and First-Tier Subcontract Awards. (JUN 2020)

I.15. 52.204-13 System for Award Management Maintenance. (OCT 2018) I.16. 52.209-6 Protecting the Government's Interest When Subcontracting With Contractors Debarred, Suspended, or Proposed for Debarment. (NOV 2021) I.17. 52.209-9 Updates of Publicly Available Information Regarding Responsibility Matters. (OCT 2018) 22 I.18. 52.209-10 Prohibition on Contracting With Inverted Domestic Corporations. (NOV 2015) I.19. 52.211-13 Time Extensions. (SEP 2000) I.20. 52.215-2 Audit and Records - Negotiation. (JUN 2020) I.21. 52.215-8 Order of Precedence - Uniform Contract Format. (OCT 1997) I.22. 52.219-4 Notice of Price Evaluation Preference for HUBZone Small Business Concerns (SEP 2021) 22 I.23. 52.219-8 Utilization of Small Business Concerns. (OCT 2018) I.24. 52.219-9 Small business subcontracting plan. (NOV 2021) I.25. 52.219-16 Liquidated Damages - Subcontracting Plan. (SEP 2021) I.26. 52.219-28 Post-Award Small Business Program Representation. (SEP 2021) I.27. 52.222-3 Convict Labor. (JUN 2003) I.28. 52.222-4 Contract Work Hours and Safety Standards - Overtime Compensation. (MAY 2018) 25 I.29. 52.222-6 Construction Wage Rate Requirements. (AUG 2018) I.30. 52.222-7 Withholding of Funds. (MAY 2014) I.31. 52.222-8 Payrolls and Basic Records. (JUL 2021) I.32. 52.222-9 Apprentices and Trainees. (JUL 2005) I.33. 52.222-10 Compliance with Copeland Act Requirements. (FEB 1988) I.34. 52.222-11 Subcontracts (Labor Standards). (MAY 2014) I.35. 52.222-12 Contract Termination - Debarment. (MAY 2014) I.36. 52.222-13 Compliance With Construction Wage Rate Requirements and Related Regulations.

(MAY 2014)

I.37. 52.222-14 Disputes Concerning Labor Standards. (FEB 1988) I.38. 52.222-15 Certification of Eligibility. (MAY 2014) I.39. 52.222-21 Prohibition of segregated facilities. (APR 2015) I.40. 52.222-26 Equal Opportunity. (SEP 2016) I.41. 52.222-27 Affirmative Action Compliance Requirements for Construction. (APR 2015) I.42. 52.222-35 Equal Opportunity for Veterans. (JUN 2020) I.43. 52.222-36 Equal Opportunity for Workers with Disabilities. (JUN 2020) I.44. 52.222-37 Employment Reports on Veterans. (JUN 2020) I.45. 52.222-40 Notification of Employee Rights Under the National Labor Relations Act. (DEC 2010) 25 I.46. 52.222-50 Combating Trafficking in Persons. (NOV 2021) I.47. 52.222-54 Employment Eligibility Verification. (NOV 2021) I.48. 52.222-55 Minimum Wages Under Executive Order 13658. (JAN 2022) I.49. 52.223-2 Affirmative Procurement of Biobased Products Under Service and Construction Contracts. (SEP 2013) I.50. 52.223-3 Hazardous Material Identification and Material Safety Data. (FEB 2021) I.51. 52.223-5 Pollution Prevention and Right-to-Know Information. (MAY 2011) I.52. 52.223-6 Drug-Free Workplace. (MAY 2001) I.53. 52.223-10 Waste Reduction Program. (MAY 2011)

I.54. 52.223-11 Ozone-Depleting Substances. (JUN 2016) I.55. 52.223-15 Energy Efficiency in Energy-Consuming Products. (MAY 2020) I.56. 52.223-17 Affirmative Procurement of EPA-designated Items in Service and Construction Contracts. (AUG 2018) I.57. 52.223-18 Encouraging Contractor Policies to Ban Text Messaging While Driving. (JUN 2020)

I.58. 52.225-9 Buy American - Construction Materials. (NOV 2021) I.59. 52.225-13 Restrictions on Certain Foreign Purchases. (FEB 2021) I.60. 52.227-1 Authorization and Consent. (JUN 2020) I.61. 52.228-2 Additional Bond Security. (OCT 1997) I.62. 52.228-5 Insurance - Work on a Government Installation. (JAN 1997) I.63. 52.228-11 Pledges of Assets. (FEB 2021) I.64. 52.228-12 Prospective Subcontractor Requests for Bonds. (MAY 2014) I.65. 52.228-14 Irrevocable Letter of Credit. (NOV 2014) I.66. 52.228-15 Performance and Payment Bonds - Construction. (JUN 2020) I.67. 52.229-3 Federal, State, and Local Taxes. (FEB 2013) I.68. 52.232-5 Payments Under Fixed-Price Construction Contracts. (MAY 2014) I.69. 52.232-17 Interest. (MAY 2014) I.70. 52.232-23 Assignment of Claims. (MAY 2014) I.71. 52.232-27 Prompt payment for construction contracts. (JAN 2017) I.72. 52.232-33 Payment by Electronic Funds Transfer - System for Award Management. (OCT 2018) 30 I.73. 52.232-39 Unenforceability of Unauthorized Obligations. (JUN 2013) I.74. 52.232-40 Providing Accelerated Payments to Small Business Subcontractors. (NOV 2021) I.75. 52.233-1 Disputes. (MAY 2014) I.76. 52.233-3 Protest after Award. (AUG 1996) I.77. 52.233-4 Applicable Law for Breach of Contract Claim. (OCT 2004) I.78. 52.236-1 Performance of Work by the Contractor. (APR 1984) I.79. 52.236-2 Differing Site Conditions. (APR 1984) I.80. 52.236-3 Site Investigation and Conditions Affecting the Work. (APR 1984) I.81. 52.236-5 Material and Workmanship. (APR 1984) I.82. 52.236-6 Superintendence by the Contractor. (APR 1984) I.83. 52.236-7 Permits and Responsibilities. (NOV 1991) I.84. 52.236-8 Other Contracts. (APR 1984) I.85. 52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements.

(APR 1984)

I.86. 52.236-10 Operations and Storage Areas. (APR 1984) I.87. 52.236-11 Use and Possession Prior to Completion. (APR 1984) I.88. 52.236-12 Cleaning Up. (APR 1984) I.89. 52.236-13 Accident Prevention. (NOV 1991) I.90. 52.236-14 Availability and Use of Utility Services. (APR 1984) I.91. 52.236-15 Schedules for Construction Contracts. (APR 1984) I.92. 52.236-21 Specifications and Drawings for Construction. (FEB 1997) I.93. 52.236-26 Preconstruction Conference. (FEB 1995) I.94. 52.242-13 Bankruptcy. (JUL 1995) I.95. 52.242-14 Suspension of Work. (APR 1984) I.96. 52.243-4 Changes. (JUN 2007) I.97. 52.244-6 Subcontracts for Commercial Products and Commercial Services. (JAN 2022) I.98. 52.246-21 Warranty of Construction. (MAR 1994) I.99. 52.248-3 Value Engineering - Construction. (OCT 2020) I.100. 52.249-2 Termination for Convenience of the Government (Fixed-Price). (APR 2012) - Alternate I (SEP 1996) I.101. 52.249-10 Default (Fixed-Price Construction). (APR 1984) I.102. 52.252-6 Authorized Deviations in Clauses. (APR 1984) I.103. 1452.203-70 Restriction on Endorsements (JUL 1996) I.104. 1452.204-70 Release of Claims (JUL 1996) I.105. 1452.228-70 Liability Insurance (JUL 1996) I.106. GS0211 Deobligation of Unexpended Funds (OCT 1997)

I.107. GS1326 Indemnity. (JUL 2001) I.108. GS1338 Notice to the Government of Delays. (JUL 2001) I.109. GS1346 Compliance With Occupational Safety and Health Act – Government-Owned Facilities/Equipment. (APR 2003) I.110. GS1348 Accident Reporting. (APR 2003) I.111. GS1354 List of Subcontractors (Construction). (JUL 2001) I.112. GS1440 Wage Determination Applicable. (JUL 2001)

SECTION J. SECTION J - LIST OF DOCUMENTS, EXHIBITS AND OTHER

ATTACHMENTS

SECTION K. REPRESENTATIONS, CERTIFICATIONS, AND OTHER STATEMENTS OF

BIDDERS 34

K.1. 52.252-1 Solicitation Provisions Incorporated by Reference. (FEB 1998) K.1.1. 52.203-18 – Prohibition on Contracting with Entities that Require Certain Internal Confidentiality Agreements or Statements--Representation. (Jan 2017)

K.1.2. 52.203-19 – Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements. (Jan 2017)

K.1.3. 52.204-19 Incorporation by Reference of Representations and Certifications. (DEC 2014)

K.2. 52.204-8 Annual Representations and Certifications. (JAN 2022) K.3. 52.204-16 Commercial and Government Entity Code Reporting. (AUG 2020) K.4. 52.204-24 Representation Regarding Certain Telecommunications and Video Surveillance Services or Equipment (NOV 2021) K.5. 52.204-20 Predecessor of Offeror. (AUG 2020) K.6. 52.209-7 Information Regarding Responsibility Matters. (OCT 2018) K.7. 52.222-23 Notice of Requirement for Affirmative Action to Ensure Equal Employment Opportunity for Construction. (FEB 1999) K.8. 52.225-10 Notice of Buy American Requirement - Construction Materials. (MAY 2014) K.9. 52.252-5 Authorized Deviations in Provisions. (NOV 2020) K.10. GS1920 Driller's Equipment and Qualifications (JUL 2001)

SECTION L. INSTRUCTIONS, CONDITIONS, AND NOTICES TO BIDDERS

L.1. 52.204-7 System for Award Management. (Oct 2018) L.2. 52.204-13 System for Award Management Maintenance. (Oct 2018) L.3. 52.204-16 Commercial and Government Entity Code Reporting. (AUG 2020) L.4. 52.204-17 Ownership or Control of Offeror. (AUG 2020) L.5. 52.204-18 Commercial and Government Entity Code Maintenance. (AUG 2020) L.6. 52.209-2 Prohibition on Contracting with Inverted Domestic Corporations--Representation.

(Nov 2015) L.7. 52.209-6 Protecting the Governments Interest When Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment. (NOV 2021) L.8. 52.209-10 Prohibition on Contracting With Inverted Domestic Corporations. (Nov 2015) L.9. 52.214-34 Submission of Offers in the English Language (APR 1991) L.10. 52.214-35 Submission of Offers in U.S. Currency (APR 1991) L.11. 52.215-1 Instructions to Offerors - Competitive Acquisition. (NOV 2021)

L.12. INSTRUCTIONS TO OFFERORS – SUPPLEMENT TO 52.215-1

L.13. Proposal Submission L.14. 1452.215-71 Use and Disclosure of Proposal Information—Department of the Interior (APR 1984) 48 L.15. 52.216-1 Type of Contract. (APR 1984) L.16. 52.222-5 Construction Wage Rate Requirements-Secondary Site of the Work. (MAY 2014)48 L.17. 52.222-5 Addendum L.18. 52.233-2 Service of Protest. (SEP 2006) L.19. 52.236-27 Site Visit (Construction). (FEB 1995) - Alternate I (FEB 1995)

Site Tour/Visit Participants will meet Shawn Naylor just north of the Hwy 37 and Bull Rapids Road intersection, outside of Harlan, Indiana 46741, approximately at (41°12'23.0"N 84°54'11.7"W)

L.20. 52.236-27 Site Visit addendum L.21. 52.236-28 Preparation of Proposals – Construction (OCT 1997)

L.22. Offer Pricing Requirements L.23. Question Cutoff L.24. Proposal Submission L.25. GS0218 Drilling - Contractor Evaluation (OCT 1997) L.26. GS0220 Drilling – Preaward (OCT 1997)

SECTION M. EVALUATION FACTORS FOR AWARD

M.1. GS2320 Evaluation Factors (MAR 2019) M.2. GS2335 Evaluation and Award – Negotiated

SECTION A. SOLICITATION/CONTRACT FORM

Standard Form 1442.

SECTION B. SUPPLIES OR SERVICES AND PRICES/COSTS

Each offer shall be subdivided into the following pricing categories:

Total offer price Then break down the total offer into the following:

o Division 01 – General Requirements o Division 13 – Special Construction o Overhead and profit

See Section L Clause 52.236-28 Preparation of Proposal - Construction

SECTION C. DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK

C.1. Work Statement See Attachment 1 – Statement of Work

In accordance with FAR 36.204 Disclosure of the magnitude of construction projects, the estimated construction price is (a) Less than $25,000.

C.2. GS0301 General Requirements. (JUL 2001) The contractor shall furnish all facilities, labor, supervision and materials to provide goods/services in accordance with the terms and conditions herein and the specifications set forth in Attachment 1, entitled Attachment 1 – Statement of Work.

(End of Local Clause)

C.3. GS0339 Green Acquisition. (JUL 2018) The USGS is committed to promoting the natural environment and protecting the health and well-being of people. In the performance of work under this contract, the Contractor shall exert its best efforts to provide services in a manner that will promote the natural environment and protect health and well-being. Green purchasing or environmentally preferable contracting includes the initiatives described below:

Alternative Fuels and Vehicles are described at http://www.afdc.energy.gov/afdc/

Biobased Products are described at http://www.biopreferred.gov/

Energy efficient products are described at http://energystar.gov/products for Energy Star products and at http://www.eere.energy.gov/femp/procurement for FEMP designated products.

Environmentally Preferable Computers are described at http://www.epeat.net

Significant New Alternatives Program (SNAP) are described at http://www.epa.gov/snap/overview-snap

The Comprehensive Procurement Guidelines promote the use of recovered and recycled products at https://www.epa.gov/smm/comprehensive-procurement-guideline-cpg-program

Water efficient products and services are described at https://www.epa.gov/watersense (End of Local Clause) https://www.acquisition.gov/far/36.204 http://www.afdc.energy.gov/afdc/ http://www.biopreferred.gov/ http://energystar.gov/products http://www.epeat.net/ http://www.epa.gov/snap/overview-snap https://www.epa.gov/smm/comprehensive-procurement-guideline-cpg-program https://www.epa.gov/watersense

SECTION D. PACKAGING AND MARKING

D.1. GS0208 Drilling - Preservation and Packaging (OCT 1997) Preservation, packaging and packing for shipment of all deliverable packing items called for by this contract shall be in accordance with commercial practice, adequate to ensure acceptance by common carrier at the most economical rates and safe arrival at destination.

(End of Local Clause)

SECTION E. INSPECTION AND ACCEPTANCE

E.1. 52.252-2 Clauses Incorporated by Reference. (FEB 1998) This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):

http://www.acquisition.gov/far/ http://www.acquisition.gov/diar/

E.1.1. 52.246-12 -- Inspection of Construction. (Aug. 1996)

E.1.2. 52.246-13 – Inspection – Dismantling, Demolition, or Removal of Improvements (Aug 1996) E.1.3. 52.204-14 Service Contract Reporting Requirements. (OCT 2016)

E.1.4. 52.204-25 Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment. (NOV 2021)

(End of Clause)

E.2. GS0209 Drilling - Inspection and Acceptance (OCT 1997) All inspections and acceptance will take place at the drill site(s). Inspection of final products will be conducted by the government representative and will consist of examination for 1) compliance with the terms of the contract; 2) thoroughness with respect to content; and 3) quality with respect to generally acceptable professional standards.

(End of Local Clause)

E.3. GS0725 Demonstration of Satisfactory Operation. (JUL 2001) The demonstration of satisfactory operation of the equipment and/or system shall include the actual operation of all elements of the equipment and/or system in order to establish that the equipment and/or system is one complete operating unit. The contractor shall demonstrate to the Contracting Officer or an authorized representative that the equipment and/or system will meet all the operating specifications of the contract. At time of demonstration of satisfactory operation, the contractor shall thoroughly acquaint the Geological Survey personnel with all aspects of the maintenance of the equipment and/or system.

(End of Local Clause) https://www.acquisition.gov/far/52.252-2 http://www.acquisition.gov/far/ http://www.acquisition.gov/diar/ https://www.acquisition.gov/far/52.246-12 https://www.acquisition.gov/far/52.246-13 https://www.acquisition.gov/far/52.204-14 https://www.acquisition.gov/far/52.204-25

SECTION F. DELIVERIES OR PERFORMANCE

F.1. 52.211-10 Commencement, Prosecution, and Completion of Work. (APR 1984) The Contractor shall be required to (a) commence work under this contract within 5 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 90 calendar days after the date the Contractor receives the notice to proceed. The time stated for completion shall include final cleanup of the premises.

(End of Clause)

F.2. GS0914 Period of Performance/Notice to Proceed – Drilling (JUL 2001)

(a) The contractor shall be mobilized at the drill site and commence drilling within 10 calendar days after issuance of a notice to proceed by the Contracting Officer or authorized representative. The Government will provide verbal, facsimile or e-mail notice to the contractor within one work day after the written notice is issued.

(b) The period of performance of this contract shall be 90 calendar days from issuance of notice to proceed.

(End of Local Clause)

F.3. GS0919 Legal Holidays. (JUN 2021)

The following legal holidays are observed by this Government agency:

New Year's Day January 01 Martin Luther King's Birthday 3rd Monday in January Presidents Day 3rd Monday in February Memorial Day Last Monday in May Juneteenth National Independence Day June 19 Independence Day July 04 Labor Day 1st Monday in September Columbus Day 2nd Monday in October Veterans Day November 11 Thanksgiving Day 4th Thursday in November Christmas Day December 25

When a holiday falls on Saturday or Sunday, it is observed on the adjacent Friday or Monday, respectively.

In addition to the holidays listed above, the contractor agrees to observe leave days or closures designated by Federal Statute, Executive Order, or Presidential Proclamation.

https://www.acquisition.gov/far/52.211-10

SECTION G. CONTRACT ADMINISTRATION DATA

G.1. Electronic Invoicing and Payment Requirements - Invoice Processing Platform (IPP) (April 2013) Payment requests must be submitted electronically through the U. S. Department of the Treasury's Internet Payment Platform System (IPP).

"Payment request" means any request for contract financing payment or invoice payment by the Contractor.

To constitute a proper invoice, the payment request must comply with the requirements identified in the applicable Prompt Payment clause included in the contract, or the clause 52.212-4 Contract Terms and Conditions - Commercial Items included in commercial item contracts. The IPP website address is:

https://www.ipp.gov.

Under this contract, the following documents are required to be submitted as an attachment to the IPP invoice:

A copy of the Contractor’s internally generated invoice Price breakdown reflecting the labor hours, rates charged and material costs (invoice) Payroll statement shall be submitted with each invoice and must receive prior approval from the

COR and CO – contractor can use their own form or refer to Attachment 4 – Certified Payroll Form

Final invoice must also include a Release of Claims Form DI-137 – refer to Attachment 5 – Release of Claims

The Contractor must use the IPP website to register, access and use IPP for submitting requests for payment. The Contractor Government Business Point of Contact (as listed in CCR) will receive enrollment instructions via email from the Federal Reserve Bank of Boston (FRBB) within 3 - 5 business days of the contract award date. Contractor assistance with enrollment can be obtained by contacting the IPP Production Helpdesk via email ippgroup@bos.frb.org or phone (866) 973-3131.

If the Contractor is unable to comply with the requirement to use IPP for submitting invoices for payment, the Contractor must submit a waiver request in writing to the Contracting Officer with its proposal or quotation.

G.2. GS1126 Invoicing and Performance Statements (Construction). (JUL 2001)

(a) The contractor's invoice must be marked "ORIGINAL" and submitted with two additional copies to the below designated billing office:

Original: U.S. Department of the Treasury’s Internet Payment Platform System (IPP)

Copy: U.S. Department of the Interior USGS Indiana Water Science Center Attn: To be determined at time of award 5957 Lakeside Boulevard Indianapolis, IN 46278

Copy: U.S. Geological Survey Denver Federal Center, Denver Acquisition Branch Attn: Sean M. Jones PO Box 25046, MS 204 Denver, CO 80225-0046

Note: Payroll statement must be submitted with each invoice and the final invoice must include a release of claims.

(b) Invoices for progress payments may be submitted no more frequently than monthly.

(c) Invoices for progress payments must be accompanied by a contract Performance Statement, which shall show in detail the estimated percentage of completion and value of completed performance for each https://www.ipp.gov/ separately priced line item or, if applicable, each of the significant construction categories contained in the approved Schedule of Prices.

(d) See clause 52.232-5 for certification requirements.

SECTION H. SPECIAL CONTRACT REQUIREMENTS

H.1. 1452.201-70 AUTHORITIES AND DELEGATIONS (SEP 2011)

(a) The Contracting Officer is the only individual authorized to enter into or terminate this contract, modify any term or condition of this contract, waive any requirement of this contract, or accept nonconforming work.

(b) The Contracting Officer will designate a Contracting Officer's Representative (COR) at time of award.

The COR will be responsible for technical monitoring of the contractor's performance and deliveries. The COR will be appointed in writing, and a copy of the appointment will be furnished to the Contractor.

Changes to this delegation will be made by written changes to the existing appointment or by issuance of a new appointment.

(c) The COR is not authorized to perform, formally or informally, any of the following actions:

(1) Promise, award, agree to award, or execute any contract, contract modification, or notice of intent that changes or may change this contract;

(2) Waive or agree to modification of the delivery schedule;

(3) Make any final decision on any contract matter subject to the Disputes Clause;

(4) Terminate, for any reason, the Contractor's right to proceed;

(5) Obligate in any way, the payment of money by the Government.

(d) The Contractor shall comply with the written or oral direction of the Contracting Officer or authorized representative(s) acting within the scope and authority of the appointment memorandum.

The Contractor need not proceed with direction that it considers to have been issued without proper authority. The Contractor shall notify the Contracting Officer in writing, with as much detail as possible, when the COR has taken an action or has issued direction (written or oral) that the Contractor considers to exceed the COR's appointment, within 3 days of the occurrence. Unless otherwise provided in this contract, the Contractor assumes all costs, risks, liabilities, and consequences of performing any work it is directed to perform that falls within any of the categories defined in paragraph (c) prior to receipt of the Contracting Officer's response issued under paragraph (e) of this clause.

(e) The Contracting Officer shall respond in writing within 30 days to any notice made under paragraph (d) of this clause. A failure of the parties to agree upon the nature of a direction, or upon the contract action to be taken with respect thereto, shall be subject to the provisions of the Disputes clause of this contract.

(f) The Contractor shall provide copies of all correspondence to the Contracting Officer and the COR.

(g) Any action(s) taken by the Contractor, in response to any direction given by any person acting on behalf of the Government or any Government official other than the Contracting Officer or the COR acting within his or her appointment, shall be at the Contractor's risk.

(End of Clause)

H.2. GS0203 Drilling - Site Prep Restoration (OCT 1997)

After completion of all other work described herein and before final acceptance by the government representative, the site shall be restored (to the appropriate state restoration requirement applicable) to its original condition. Such restoration may include but is not restricted to the following:

1. All equipment belonging to the contractor shall be removed from the site;

2. Holes shall be filled in and depressions and tire ruts smoothed out; and

3. Any debris associated with the drilling shall be cleaned up and removed.

The work specified in this contract shall not be considered complete, nor shall the final invoice for the work be approved, until site restoration is completed to the satisfaction of the representative.

(End of Local Clause)

H.3. GS0204 Drilling – Permits (OCT 1997)

The contractor shall be responsible for obtaining the necessary permits and for the disposal of all water pumped under this contract. The contractor shall be held as having examined the conditions in the field and shall have the responsibility of determining the system(s) to use as well as obtaining the necessary permits for using them. Potential hazards during period of low temperatures can result from clogging of ditches by ice causing additional water to spread from the drainage ways onto the roadways and then freeze. The contractor shall provide all necessary means to prevent erosion or sedimentation along the ditches and shall maintain the culverts and ditches during the period of discharge to them.

https://www.acquisition.gov/diar/part-1452-solicitation-provisions-and-contract-clauses#Section_1452_201_70_T48_5075847112

(End of Local Clause)

H.4. GS0205 Drilling - Toilet Facilities (OCT 1997)

The contractor shall provide and maintain sanitary toilet facilities for his personnel, which shall be removed upon completion of this contract, leaving the premises clean.

(End of Local Clause)

H.5. GS0206 Drilling - Abandoned Hole (OCT 1997)

A satisfactory well that is acceptable under these specifications shall be completed to the depth designated by the government representative. Any hole that does not satisfy the requirements described herein and which cannot be made acceptable shall be declared an abandoned hole. Any hole in which the contractor voluntarily stops work and/or fails to complete in a satisfactory manner shall be considered as abandoned by him. An abandoned well is of no value to the government; therefore, no payment will be made for the drilling, casing, development or supplies of the abandoned well. An abandoned well shall be filled with puddled clay, cement, and/or fine drilling cuttings from the bottom of the hole to the land surface by contractor at his own expense. The contractor shall then move to another government designated location and drill a second hole in accordance with these specifications.

(End of Local Clause)

H.6. GS0207 Drilling - Contractor Representative (MAY 2005) The contractor shall have an experienced foreman or driller, with full authority to act on behalf of the contractor in directing all field operations, constantly in charge of the work at the drill site when work is underway. This representative shall be experienced in cable installation of casing and well development as described herein. This representative must be acceptable to the government representative in the event that he becomes unacceptable to the representative, the contractor shall receive written notice from the government and shall replace him with an acceptable representative within five (5) working days of receipt of the notice.

(End of Local Clause)

H.7. GS0210 Drilling - Drilling Equipment (OCT 1997) The contractor shall maintain all equipment in satisfactory operating condition for the duration of the contract. If, based on the work completed to date the equipment is considered unsatisfactory by the government representative, thus endangering performance under this contract, the representative shall notify the contractor of such in writing, and a copy of such notification shall be sent to the contracting officer for corrective action. The contractor shall then cease work immediately and within ten (10) days of receipt of notice replace the unsatisfactory equipment with equipment approved by the government representative. Acceptance of replacement equipment shall be made only by the government.

(End of Local Clause)

H.8. GS0211 Drilling - Government Liability For Damage (OCT 1997) The government will not be liable for any injury to contractor liability personnel or damage to contractor injury or property unless such injury or damage is due to negligence on the part of the government.

(End of Local Clause)

H.9. GS0215 Drilling - Compliance with Applicable Laws (OCT 1997)

In the performance of this contract, the contractor shall comply with and give all stipulations and representations required by any applicable federal, state, municipal, or local law or executive order or any applicable rules, orders, regulations, or requirements, of any government department or bureau. Nothing herein contained shall be considered as preventing the contractor from contesting in good faith the validity of such law, rule, order, regulations, or requirement or any charge that the contractor has not complied therewith. The contractor, at his own expense, shall obtain and maintain the necessary permits, franchises, licenses, or other authorities such as those required by the interstate commerce commission for lawfully performing the services required under this contract.

H.10. GS0216 Drilling – Investigation (OCT 1997) A. The contractor acknowledges that he has taken steps reasonable and necessary to ascertain the nature and location of the work, and that he has investigated and satisfied himself as to the general and local conditions which can effect the work or his costs, including but not limited to:

(1) conditions bearing upon transportation, disposal, handling and storage of materials;

(2) the availability of labor, water, electric power, and roads;

(3) uncertainties of weather, river stages, tides, or similar physical conditions at the site;

(4) the conformation and conditions of the site; and

(5) the character of equipment and facilities needed preliminary to and during work performance.

The contractor also acknowledges that he has satisfied himself as to the character, quality and quantity of surface and subsurface materials or obstacles to be encountered insofar as this information is reasonably ascertainable from an inspection of the site, including all exploratory work done by the government, as well as from the drawings and specifications made a part of this contract. Any failure to the contractor to take the actions described and acknowledged in this paragraph will not relieve the contractor from responsibility for estimating properly the difficulty and cost of successfully performing the work, or for proceeding to successfully perform the work without additional expense to the government.

B. The government assumes no responsibility for any conclusions or interpretations made by the contractor based on the information made available by the government. Nor does the government assume responsibility for any understanding reached or representation made concerning conditions which can affect the work by any of its officers or agents before the execution of this contract, unless that understanding or representation is expressly stated in this contract.

(End of Local Clause)

H.11. GS0217 Drilling - Contractor Responsibility (OCT 1997)

Damages. The contractor shall be responsible for any damages to persons or property that occur as a result of the contractor's fault or negligence and shall take proper safety and health precautions to protect the work, the workers, the public and the property of others. The contractor shall assume all responsibility for damage to his equipment whether from elements, vandalism, operation under the contract, or moving to, from or between drilling locations.

Materials. The contractor shall also be responsible for all materials delivered and work performed until completion and acceptance of the entire work, except for any completed unit of work which may have accepted under the contract.

Safety and Health. The contractor shall take all reasonable precautions in the performance of the work under this contract to protect the safety and health of contractor employees, government employees, and the public shall comply with all applicable safety and health regulations and requirements (including reporting requirements) of the government. The contracting officer shall notify, in writing, the contractor of any noncompliance with the provisions of this clause and the corrective action to be taken. After receipt of such notice, the contractor shall immediately take such corrective action. In the event that the contractor fails to comply with said regulations or requirements of the government, the contracting officer may, without prejudice to any other legal or contractual rights of the government, issue an order stopping all or any part of the work thereafter. A start order for resumption of the work may be used at the discretion of the contracting officer. The contracting officer shall make no claim for an extension of time or for compensation of damages by reason of or in connection with, such stop-work orders.

(End of Local Clause)

H.12. GS0221 Drilling - Representative of the Government (OCT 1997) The government representative will be present at the drilling site during all work performed including, but not limited to, drilling, moving to and from sites, and restoration. In the event the government representative is unable to be at the site, an alternate will be designated by him. The responsibility of the alternate will be to oversee the operations. Any decision, technical or otherwise, will be made by the government representative.

H.13. GS0347 Indoor Air Quality During Construction (MAR 2008)

(a) The contractor shall control contaminants at the source and/or operate the space in such a manner that the GSA indicator levels for carbon monoxide (CO), carbon dioxide (CO2 ), and formaldehyde (HCHO) are not exceeded. The indicator levels for office areas shall be:

CO - 9 parts per million (ppm) time-weighted average (TWA - 8-hour sample);

CO2 - 1000 ppm (TWA);

formaldehyde - 0.1 ppm (TWA).

(b) The contractor shall make a reasonable attempt to apply insecticides, paints, glues, adhesives, and heating, ventilating and air conditioning (HVAC) system cleaning compounds with highly volatile or irritating organic compounds, outside of working hours. The contractor shall provide at least 72 hours advance notice to the Government before applying noxious chemicals in occupied spaces, and adequately ventilate those spaces during and after application.

(c) To the greatest extent possible, contractor shall sequence the installation of finish materials so that materials that will be high emitters of Volatile Organic Compounds (VOCs) are installed and allowed to cure before installing interior finish materials, especially soft materials that are woven, fibrous, or porous in nature, that may adsorb contaminants and release them over time.

(d) Where demolition or construction work occurs adjacent to occupied space, contractor shall erect appropriate barriers (noise, dust, odor, etc.) and take necessary steps to minimize interference with the occupants. This includes maintaining acceptable temperature, humidity and ventilation in the occupied areas during window removal, window replacement, or similar types of work.

(e) A final flush-out period of 48 to 72 hours should be provided before occupancy. Contractor shall ventilate with 100 percent outside air at the recommended air change rate (ASHRAE Standard 62) during installation of materials and finishes. If outside air would cause unacceptable inside temperature levels, humidity levels, and/or air quality, an alternate ventilation plan may be submitted to the Contracting Officer for approval.

(f) The contractor shall promptly investigate indoor air quality (IAQ) complaints and shall implement the necessary controls to address the complaint when requested to do so by the Contracting Officer.

(g) The Government reserves the right to conduct independent IAQ assessments and detailed studies in space it occupies, as well as in space serving the Government-leased space (e.g., common use areas, mechanical rooms, HVAC systems, etc.). The contractor shall assist the Government in its assessments and detailed studies by making available information on building operations and contractor activities, and providing access to space for assessment and testing, if required, and implement corrective measures required by the Contracting Officer.

(End of Local Clause)

H.14. GS1306 Performance and Payment Bonds. (MAY 2003) The offeror to whom award is made shall deliver good and sufficient performance and payment bonds (Standard Forms 25 and 25A) to the Contacting Officer, within 10 calendar days after receipt of award.

Bonds must be furnished in the following amounts: Performance bond - 100% of the total contract amount, payment bonds - 100% of the total contract amount.

(End of Local Clause)

H.15. GS1315 Drill Site Protection and Restoration (JUL 2001) The contractor shall be responsible for the transportation of all its equipment, materials, and supplies to and from the drilling site. The contractor shall be responsible for conducting drilling operations in such a manner as to minimize damage to the drill site and environment. Upon completion of work at the site, the contractor will remove all its equipment and clean up the drill site as directed by the COR. Oil or any non-soluble liquids or materials shall not be drained onto or left at the drilling site.

(End of Local Clause)

H.16. GS1316 Drilling Down Time (JUL 2001) Down time attributable to equipment malfunction or crew incapacity will be at no cost to the Government.

If down time is expected to exceed 8 hours, the contractor must bring in a comparable rig and/or capable crew to continue contract performance.

H.17. GS1346 Compliance with Occupational Safety and Health Act – Government Owned Facilities/Equipment. (APR 2003) Performance of work hereunder shall comply with the provisions of the Occupational Health and Safety Act of 1970, as amended (OSHA). If, at any time during the performance of this contract, the Government-furnished facilities and/or equipment do not conform to OSHA standards, the contractor must so notify the Contracting Officer, in writing, including a recommendation of the corrective action needed.

(End of Local Clause)

H.18. GS1354 List of Subcontractors (Construction (JUL 2001) For purposes of monitoring compliance with the insurance and payroll reporting requirements of this contract, the contractor shall furnish a listing of all subcontractors to the Contracting Officer within 10 calendars days after contract award.

SECTION I. SECTION I - CONTRACT CLAUSES

I.1. 52.202-1 Definitions. (JUN 2020)

I.2. 52.203-3 Gratuities. (APR 1984)

I.3. 52.203-5 Covenant Against Contingent Fees. (MAY 2014)

I.4. 52.203-6 Restrictions on Subcontractor Sales to the Government. (JUN 2020)

I.5. 52.203-7 Anti-Kickback Procedures. (JUN 2020)

I.6.…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .