Sol_140G0122Q0178.pdf
PDF 316 KB Posted
- Attached to
- CERC Boiler Replacement Federal contract opportunity
- Solicitation number
- 140G0122Q0178
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_140G0122Q0178_Amd_0002.pdf | ||
| B09_Attachment_6_R1_Boiler_Replacement_SOW_Rev_1_0001.docx | DOCX document | |
| Sol_140G0122Q0178_Amd_0001.pdf | ||
| B08_Attachment_5_Statement_and_Acknowledgement_of_Subcontractor_SF1413-13e.pdf | ||
| B08_Attachment_3_Form_DI-137_Release_of_Claims.pdf | ||
| B08_Attachment_2_Payment_Bond_SF25A-16d.pdf | ||
| B08_Attachment_1_WD_MO20220036.pdf | ||
| B08_Attachment_4_Payroll_WH-347.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOLICITATION, OFFER,
AND AWARD
2. TYPE OF SOLICITATION
6. PROJECT NO. 4. CONTRACT NO. 5. REQUISITION/PURCHASE REQUEST NO.
PAGE OF PAGES
7. ISSUED BY CODE 8. ADDRESS OFFER TO
SOLICITATION
(Construction, Alteration, or Repair)
1. SOLICITATION NO. 3. DATE ISSUED
IMPORTANT -- The "offer" section on the reverse must be fully completed by offeror.
9.
INFORMATION
a. NAME b. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder."
CALL:
FOR
SEALED BID (IFB)
NEGOTIATED (RFP)
0040587583
USGS OAG RESTON ACQUISITION BRANCH
205 NATIONAL CENTER
12201 SUNRISE VALLEY DRIVE
RESTON VA 20192
GRB
Kimberly Schneider 0000
107/12/2022
140G0122Q0178
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date)
CERC Boilers and Separator Replacement
100% Total Small Business Set-aside
Reference FAR FAR 52.236-27A*1 for Site Visit Date & Time
See Section L.1 for Instructions to Offerors and Section M for Evaluation Factors
Davis Bacon Applies
*Section F for list of Deliverables*
*Reference 52.228-13 Alternative Payment Protections*
11. The Contractor shall begin performance
12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
award, notice to proceed. The performance period is mandatory negotiable. (See ________________________________________________.)
13. ADDITIONAL SOLICITATION REQUIREMENTS:
a. Sealed offers in original and is not required.is, b. An offer guarantee
c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
(date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
d. Offers providing less than
12b. CALENDAR DAYSYES NO
(If "YES", indicate within how many calendar days after award in Item 12b.)
10 90 calendar days and complete it within ________________ ________________ calendar days after receiving
FAR 52.211-10
07/28/2022
NSN 7540-01-155-3212
x x x x copies to perform the work required are due at the place specified in Item 8 by _____________ ___________________ (hour) local time calendar days for Government acceptance after the date offers are due will not be considered and will be rejected . _________________
STANDARD FORM 1442 (Rev. 4-85)
Prescribed by GSA
FAR(48 CFR) 53.236-1(d)
17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within ____________________ calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in item 13d. Failure to insert any number means the offeror accepts the minimum in item 13d.)
14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code) 15. TELEPHONE NO. (Include area code)
16. REMITTANCE ADDRESS (Include only if different than item 14.)
CODE FACILITY CODE
AMOUNTS
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGEMENT OF AMENDMENTS
OFFER (Must be fully completed by offeror)
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT NO.
DATE.
20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print) 20b. SIGNATURE 20c. OFFER DATE
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN
(4 copies unless otherwise specified)
ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
26. ADMINISTERED BY CODE 27. PAYMENT WILL BE MADE BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
(Contractor is required to sign this document and return (Contractor is not required to sign this document.)
Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award.
No further contractual document is necessary.
30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print) 31a. NAME OF CONTRACTING OFFICER (Type or print)
30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA 31c. DATE
BY
2PAGE OF
USGS OAG RESTON ACQUISITION BRANCH
205 NATIONAL CENTER
12201 SUNRISE VALLEY DRIVE
RESTON VA 20192
GRB
Kimberly Schneider
28. NEGOTIATED AGREEMENT 29. AWARD
Contractor agrees to furnish and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, copies to issuing office.)
10 U.S.C. 2304(c) 41 U.S.C. 253(c)
STANDARD FORM 1442 (REV. 4-85) BACK
Continued...
ITEM NO.
(A)
SUPPLIES/SERVICES
(B)
QUANTITY
(C)
UNIT
(D)
UNIT PRICE
(E)
AMOUNT
(F)
NAME OF OFFEROR OR CONTRACTOR
3 47
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
140G0122Q0178
CERC Boilers and Separator Replacement
Delivery: 90 Days After Award
Delivery Location Code: 0006366840
USGS Columbia Environmental Researc
4200 New Haven Road
Columbia MO 65201 US
00010 The Contractor shall provide all labor, materials, tools, equipment and supervision necessary for the replacement of two boilers and one separator located at the Columbia
Environmental Research Center (CERC) in accordance with the Statement of Work (SOW) herein.
Product/Service Code: Z1HB
Product/Service Description: MAINTENANCE OF
GOVERNMENT-OWNED GOVERNMENT-OPERATED (GOGO) R&D
FACILITIES
For questions on this solicitation contact
Kimberly Schneider, krschneider@usgs.gov.
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
Section B - Supplies or Services B-1 Schedule of Items
Section C - Description/Specifications C-1 Statement of Work C-2 GS0339 Green Acquisition (JUL 2018)
Section E - Inspection and Acceptance E-1 52.246-12 Inspection of Construction. (AUG 1996) E-2 52.246-13 Inspection - Dismantling, Demolition, or Removal of Improvements. (AUG 1996)
Section F - Deliveries or Performance F-1 Deliverables F-2 52.211-10 Commencement, Prosecution, and Completion of Work. (APR 1984) F-3 52.242-14 Suspension of Work. (APR 1984) F-4 GS0919 Legal Holidays (JUN 2021)
Section G - Contract Administration Data G-1 GS0231 Technical Liaison-Technical Direction (NOV 2014) G-2 GS1126 Invoicing and Performance Statements (JUL 2001) G-3 GS1131 Unilateral Deobligation of Unexpended Funds (MAY 2013) G-4 GS1354 List of subcontractors (Construction) (JUL 2001) G-5 DOI ELECTRONIC INVOICING Electronic Invoicing and Payment Requirements - Invoice Processing Platform (IPP) (April 2013)
Section H - Special Contract Requirements H-1 GS1326 Indemnity (JUL 2001) H-2 GS1338 Notice to Government of Delays (JUL 2001) H-3 GS1346 Compliance with OSHA-Govt owned Facilities/Equipment (APR 2003) H-4 GS1348 Accident Reporting (APR 2003) H-5 GS1440 Wage Determination Applicable (JUL 2001)
H-6 1452.209-70 ORGANIZATIONAL CONFLICT OF INTEREST DISCLOSURE (NOV 2007)
Section I - Contract Clauses I-1 52.204-13 System for Award Management Maintenance. (OCT 2018) I-2 52.204-18 Commercial and Government Entity Code Maintenance. (AUG 2020) I-3 52.204-19 Incorporation by Reference of Representations and Certifications. (DEC 2014) I-4 52.209-6 Protecting the Government's Interest When Subcontracting With Contractors Debarred, Suspended, or Proposed for Debarment. (NOV 2021) I-5 52.209-10 Prohibition on Contracting With Inverted Domestic Corporations. (NOV 2015) I-6 52.213-4 Terms and Conditions - Simplified Acquisitions (Other Than Commercial Products and Commercial Services). (JAN 2022) I-7 52.215-8 Order of Precedence - Uniform Contract Format. (OCT 1997) I-8 52.219-28 Post-Award Small Business Program Rerepresentation. (SEP 2021) I-9 52.222-6 Construction Wage Rate Requirements. (AUG 2018) I-10 52.222-7 Withholding of Funds. (MAY 2014) I-11 52.222-8 Payrolls and Basic Records. (JUL 2021) I-12 52.222-9 Apprentices and Trainees. (JUL 2005) I-13 52.222-10 Compliance With Copeland Act Requirements. (FEB 1988) I-14 52.222-11 Subcontracts (Labor Standards). (MAY 2014) I-15 52.222-12 Contract Termination - Debarment. (MAY 2014) I-16 52.222-13 Compliance With Construction Wage Rate Requirements and Related Regulations. (MAY 2014) I-17 52.222-14 Disputes Concerning Labor Standards. (FEB 1988) I-18 52.222-15 Certification of Eligibility. (MAY 2014) I-19 52.222-27 Affirmative Action Compliance Requirements for Construction. (APR 2015) I-20 52.222-30 Construction Wage Rate Requirements-Price Adjustment (None or Separately Specified Method). (AUG 2018) I-21 52.223-2 Affirmative Procurement of Biobased Products Under Service and Construction Contracts. (SEP 2013) 24 I-22 52.223-6 Drug-Free Workplace. (MAY 2001) I-23 52.223-17 Affirmative Procurement of EPA-designated Items in Service and Construction Contracts. (AUG 2018) I-24 52.223-18 Encouraging Contractor Policies To Ban Text Messaging While Driving. (JUN 2020) I-25 52.225-9 Buy American - Construction Materials. (NOV 2021)
I-26 52.225-25 Prohibition on Contracting with Entities Engaging in Certain Activities or Transactions Relating to Iran- Representation and Certifications. (JUN 2020) I-27 52.227-4 Patent Indemnity--Construction Contracts. (DEC 2007) I-28 52.228-2 Additional Bond Security. (OCT 1997) I-29 52.228-5 Insurance - Work on a Government Installation. (JAN 1997) I-30 52.228-11 Individual Surety-Pledge of Assets. (FEB 2021) I-31 52.228-12 Prospective Subcontractor Requests for Bonds. (MAY 2014) I-32 52.228-13 Alternative Payment Protections. (JUL 2000) I-33 52.228-14 Irrevocable Letter of Credit. (NOV 2014) I-34 52.232-5 Payments Under Fixed-Price Construction Contracts. (MAY 2014) I-35 52.232-23 Assignment of Claims. (MAY 2014) I-36 52.232-27 Prompt Payment for Construction Contracts. (JAN 2017) I-37 52.236-2 Differing Site Conditions. (APR 1984) I-38 52.236-3 Site Investigation and Conditions Affecting the Work. (APR 1984) I-39 52.236-5 Material and Workmanship. (APR 1984) I-40 52.236-7 Permits and Responsibilities. (NOV 1991) I-41 52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements. (APR 1984) I-42 52.236-12 Cleaning Up. (APR 1984) I-43 52.236-13 Accident Prevention. (NOV 1991) I-44 52.236-21 Specifications and Drawings for Construction. (FEB 1997) I-45 52.236-26 Preconstruction Conference. (FEB 1995) I-46 52.243-5 Changes and Changed Conditions. (APR 1984) I-47 52.252-6 Authorized Deviations in Clauses. (NOV 2020) I-48 52.253-1 Computer Generated Forms. (JAN 1991) I-49 1452.225-70 Use of Foreign Construction Materials (JUL 1996) I-50 1452.228-70 Liability Insurance (JUL 1996) I-51 1452.236-70 Prohibition Against Use of Lead-based Paint (JUL 1996) I-52 52.219-6 Notice of Total Small Business Set-Aside (DEVIATION 2019-01)
Section J - List of Documents, Exhibits, and Other Attachments Section K - Representations, Certifications, and Other Statements of Bidders
K-1 52.204-8 Annual Representations and Certifications. (MAY 2022) K-2 52.204-24 Representation Regarding Certain Telecommunications and Video Surveillance Services or Equipment.
(NOV 2021)
K-3 52.222-22 Previous Contracts and Compliance Reports. (FEB 1999)
Section L - Instructions, Conditions, and Notices to Bidders L-1 Instructions to Offerors L-2 52.204-7 System for Award Management. (OCT 2018) L-3 52.204-16 Commercial and Government Entity Code Reporting. (AUG 2020) L-4 52.204-22 Alternative Line Item Proposal. (JAN 2017) L-5 52.211-6 Brand name or equal. (AUG 1999) L-6 52.216-1 Type of Contract. (APR 1984) L-7 52.222-5 Construction Wage Rate Requirements-Secondary Site of the Work. (MAY 2014) L-8 52.222-23 Notice of Requirement for Affirmative Action To Ensure Equal Employment Opportunity for Construction.
(FEB 1999)
L-9 52.225-10 Notice of Buy American Requirement - Construction Materials. (MAY 2014) L-10 52.236-27 Site Visit (Construction). (FEB 1995) - Alternate I (FEB 1995) L-11 52.252-1 Solicitation Provisions Incorporated by Reference. (FEB 1998) L-12 52.252-5 Authorized Deviations in Provisions. (NOV 2020) L-13 1452.215-71 Use and Disclosure of Proposal Information-Department of the Interior. (APR 1984) L-14 1452.233-2 Service of Protest
Section M - Evaluation Factors for Award M-1 Evaluation Factors Evaluation Factors
Section B - Supplies or Services B-1 Schedule of Items
CLIN CLIN Description Qty UOM Unit Price Total Price
00010AA Removal and disposal of necessary equipment in accordance with the Statement of Work (SOW). 1 LS
00010AB "Brand name or equal to" Lochinvar Model KBN-507 Boiler 2 EA
00010AC Coalescing water/dirt Separator in accordance with the Statement of Work (SOW). 1 EA
00010AD Installation and testing of necessary equipment in accordance with the Statement of Work (SOW). 1 LS
Total
Section C - Description/Specifications C-1 Statement of Work
The Columbia Environmental Research Center (CERC) located at 4200 New Haven Road, Columbia, Missouri has a requirement for the replacement of two Lochinvar boilers, model # KBN-501 and the installation of a coalescing water/dirt separator. The existing boilers have failed as a result of poor water quality.
The coalescing water/dirt separator comparable to Westermeyer Model WAC2F is required to prevent future premature failures from poor water quality. Water is received from a local Public Water District and is treated by a local water treatment firm but the solids content of the water is high and is causing early heat exchanger failures in these high efficiency condensing boilers.
Replacement equipment for the boilers shall be "brand name or equal to" the Lochinvar Knight KBN-501 boilers that are in place so they can be plumbed in quickly and without additional costs for rerouting supply water piping.
Current system data: Two Lochinvar Knight Boilers:
Lochinvar Model KBN-501; Serial numbers: 1820 110385063 and 1818 110177770
Input: 500,000 BTU/H Minimum Input: 100,000 BTU/H Output: 451,0000 BTU/H Maximum inlet gas pressure: 14 IN/WC Minimum inlet gas pressure: 4 IN/WC Manifold pressure: -0.2 IN/WC Maximum Water Pressure: 160 psi Maximum Heating Temperature: 210° F 98.8° C For use with Natural Gas Factory equipped for operation at 0 to 4,500¿ above sea level
The existing boilers are 16" (40.6 cm) wide, 42" 106.6 cm) tall, and 35" (88.9 cm) deep. The existing boilers are set on an elevated concrete pad in the mechanical room and plumbed in meeting the minimum required manufacture's service clearance recommendations. There is very little space for altering the existing inlet and outlet water lines or the existing vent piping. Replacement boilers must fit in the existing space and contractors are cautioned that there is extremely limited space for altering the existing configuration.
Work shall include the removal and proper disposal of the existing boilers and air separator and complete installation and performance testing of two new gas fired boilers. The contractor shall provide all accessories necessary to complete this boiler replacement project. The contractor shall remove the existing Taco air control and provide and install a new coalescing water/dirt separator. The contractor is responsible for any piping modifications necessary to install the coalescing separator. The separator shall be a high velocity air and dirt separator designed to eliminate entrained air and separate debris associated with start-up and maintenance of hydronic systems. The separator shall be constructed in accordance with the most recent addendum of Section VIII, Division 1 of the ASME Boiler and Pressure Vessel Code.
Controls for the boilers are integrated to the building automation system. The automation controls system is AutomatedLogic. The contractor shall ensure that the automated controls are fully functional prior to acceptance of the project by the Government. Providing Lochinvar KBN-501 boilers will eliminate the necessity for modification to the existing automated controls.
Deliverables:
The contractor shall remove and dispose of two existing hot water boilers and an existing air separator. Equipment and components removed shall be recycled to the maximum extent practicable.
The contractor shall provide and install two new hot water boilers equivalent in heating capacity to the existing boilers.
The contractor shall provide and install a new air/dirt separator with associated piping modifications as necessary.
The contractor shall provide start up and verification of proper operation of the new boilers and air/dirt separator.
The contractor shall provide operators manuals (minimum of 2) and training on the boilers operation to a minimum of two CERC employees.
The contractor shall provide a minimum warranty of 1 year parts and labor plus the standard manufacturer's warranty.
General Conditions:
The existing boilers are located in the mechanical room of a large research building on ground level. Access is through a 4' (1.2 meter) doorway.
The contractor shall be responsible for demolition of existing mechanical aspects of the HVAC system which will be removed to make room for retrofit equipment. Disposal shall be in accordance with all local, state, and federal regulations.
The contractor shall perform the work during NORMAL hours only. Exceptions shall be requested a minimum of 48 hours in advance. Contractor shall minimize to the maximum extent possible the period of time for boiler installation. The specified time of day in which the work may be performed is:
Weekdays (Monday-Friday) from 7:00 a.m. to 4:30 p.m.
Work shall not be completed on Federal holidays.
The contractor shall perform all work in accordance with all Federal, State, and local laws, codes, and regulations in connection with the execution of the work required.
A pre-construction conference will be scheduled after contract award. The contractor is requested to provide a written schedule for the work. The schedule shall indicate the dates the contractor and/or subcontractors will be on site. The schedule shall indicate the start date and completion date. When preparing the schedule, the contractor shall consider lead times for material procurement, and shall consider the permitted hours of work indicated in Time of Work Performance clause above. The contractor shall notify the USGS TECHNICAL LIAISON immediately if any anticipated on-site date is expected to change from the original schedule. The conference building is used on a first-come-first-serve basis for various activities such as instructional classes and scientific presentations. Schedules must be adhered to in order to minimize conflicts that may affect the contractor's access to the work site.
The contractor shall maintain the work site in a clean and neat manner. All materials to be discarded shall be removed from the building and grounds at the end of each work day. There is inadequate storage space at the work site to provide storage for large items. The contractor shall make provisions for storing or scheduling delivery of large items. If necessary the contractor may temporarily park a storage trailer at the site at a location agreed upon by the contractor and the USGS TECHNICAL LIAISON
The contractor shall be responsible for the transportation and disposal of all debris and material to be discarded from the worksite and the facility. The facility does not have adequate trash receptacles for such items. Should the contractor desire to place on site a dumpster to facilitate debris and material removal a request to the COR, including the size of container and anticipated dates needed, shall be given a minimum of 48 hours in advance of the scheduled date. The USGS TECHNICAL LIAISON will identify an acceptable location for placement of the dumpster.
All equipment and materials furnished and installed by the contractor shall be approved by Underwriters Laboratories, Inc., and shall be UL-Listed.
The contractor shall furnish all materials necessary for this work. The contractor shall provide all labor for the complete installation of the retrofit including restoring all surfaces to their original condition. Any damages that occur as a result of this work shall be corrected by the contractor at no additional cost to the Government.
The contractor or subcontractors shall be manufacturer-approved installers of any boiler equipment that will be used and be able to furnish a written single source warranty for labor and materials.
The contractor shall be responsible for visiting the work site to verify general and local conditions that can affect the cost thereof. Failure to do so will not relieve the contractor of his/her responsibility for estimating properly the difficulty or cost of successfully furnishing the materials and performing the work required to carry out the contract in accordance with the true intent and meaning of the specifications without additional cost to the government.
Any changes affecting the scope of work shall be originated from or approved by the contracting officer.
All materials and workmanship shall be subject to the inspection and approval of the USGS TECHNICAL LIAISON. All work unsatisfactorily performed shall be promptly corrected and made acceptable to the Government at no additional cost.
Government shall furnish no materials for completion of the project. The contractor is responsible for complying with all Federal, State, and local laws, codes, and regulations in connection with the execution of the work required.
Upon completion of the contracted work, the contractor shall notify the USGS TECHNICAL LIAISON. The USGS TECHNICAL LIAISON will schedule an inspection of the work site, and will perform the inspection at the site to determine if all the work performed by the contractor meets the requirements of the Statement of Work. The contractor may be present at the site during the final inspection by the USGS TECHNICAL LIAISON. The date of acceptance of the work by the Government will be determined by the Government after the final inspection has been performed; punch list items are identified, and are corrected.
The contractor shall provide initial start-up operations training to a minimum of one USGS employee and provide a minimum of two copies of owners/maintenance operations manuals for any piece of equipment installed.
The Contractor shall be required to complete the project within 90 days from date of award. The time stated for completion shall include final cleanup of the premises.
C-2 GS0339 Green Acquisition (JUL 2018)
The USGS is committed to promoting the natural environment and protecting the health and well-being of people. In the erformance of work under this contract, the Contractor shall exert its best efforts to provide services in a manner that will promote the natural environment and protect health and well-being. Green purchasing or environmentally preferable contracting includes the initiatives described below:
Alternative Fuels and Vehicles are described at http://www.afdc.energy.gov/afdc/
Biobased Products are described at http://www.biopreferred.gov/
Energy efficient products are described at http://energystar.gov/products for Energy Star products and at http://www.eere.energy.gov/femp/procurement for FEMP designated products.
Environmentally Preferable Computers are described at http://www.epeat.net
Significant New Alternatives Program (SNAP) are described at http://www.epa.gov/snap/overview-snap The Comprehensive
Procurement Guidelines promote the use of recovered and recycled products at https://www.epa.gov/smm/comprehensive-procurement-guideline-cpg-program
Water efficient products and services are described at https://www.epa.gov/watersense
Section E - Inspection and Acceptance E-1 52.246-12 Inspection of Construction. (AUG 1996)
(a) Definition. Work includes, but is not limited to, materials, workmanship, and manufacture and fabrication of components.
(b) The Contractor shall maintain an adequate inspection system and perform such inspections as will ensure that the work performed under the contract conforms to contract requirements. The Contractor shall maintain complete inspection records and make them available to the Government. All work shall be conducted under the general direction of the Contracting Officer and is subject to Government inspection and test at all places and at all reasonable times before acceptance to ensure strict compliance with the terms of the contract.
(c) Government inspections and tests are for the sole benefit of the Government and do not -
(1) Relieve the Contractor of responsibility for providing adequate quality control measures;
(2) Relieve the Contractor of responsibility for damage to or loss of the material before acceptance;
(3) Constitute or imply acceptance; or
(4) Affect the continuing rights of the Government after acceptance of the completed work under paragraph (i) below.
(d) The presence or absence of a Government inspector does not relieve the Contractor from any contract requirement, nor is the inspector authorized to change any term or condition of the specification without the Contracting Officer's written authorization.
(e) The Contractor shall promptly furnish, at no increase in contract price, all facilities, labor, and material reasonably needed for performing such safe and convenient inspections and tests as may be required by the Contracting Officer. The Government may charge to the Contractor any additional cost of inspection or test when work is not ready at the time specified by the Contractor for inspection or test, or when prior rejection makes reinspection or retest necessary. The Government shall perform all inspections and tests in a manner that will not unnecessarily delay the work. Special, full size, and performance tests shall be performed as described in the contract.
(f) The Contractor shall, without charge, replace or correct work found by the Government not to conform to contract requirements, unless in the public interest the Government consents to accept the work with an appropriate adjustment in contract price. The Contractor shall promptly segregate and remove rejected material from the premises.
(g) If the Contractor does not promptly replace or correct rejected work, the Government may (1) by contract or otherwise, replace or correct the work and charge the cost to the Contractor or (2) terminate for default the Contractor's right to proceed.
(h) If, before acceptance of the entire work, the Government decides to examine already completed work by removing it or tearing it out, the Contractor, on request, shall promptly furnish all necessary facilities, labor, and material. If the work is found to be defective or nonconforming in any material respect due to the fault of the Contractor or its subcontractors, the Contractor shall defray the expenses of the examination and of satisfactory reconstruction. However, if the work is found to meet contract requirements, the Contracting Officer shall make an equitable adjustment for the additional services involved in the examination and reconstruction, including, if completion of the work was thereby delayed, an extension of time.
(i) Unless otherwise specified in the contract, the Government shall accept, as promptly as practicable after completion and inspection, all work required by the contract or that portion of the work the Contracting Officer determines can be accepted separately. Acceptance shall be final and conclusive except for latent defects, fraud, gross mistakes amounting to fraud, or the Government's rights under any warranty or guarantee.
(End of clause)
E-2 52.246-13 Inspection - Dismantling, Demolition, or Removal of Improvements. (AUG 1996)
(a) Unless otherwise designated by the specifications, all workmanship performed under the contract is subject to Government inspection at all times and places where dismantling or demolition work is being performed. The Contractor shall furnish promptly, and at no increase in contract price, all reasonable facilities, labor, and materials necessary for safe and convenient inspection by the Government. The Government shall perform inspections in a manner that will not unduly delay the work.
(b) The Contractor is responsible for damage to property caused by defective workmanship. The Contractor shall promptly segregate and remove from the premises any unsatisfactory facilities, materials, and equipment used in contract performance, and promptly replace them with satisfactory items. If the Contractor fails to proceed at once in a workmanlike manner with performance of the work or with the correction of defective workmanship, the Government may
(1) by contract or otherwise, replace the facilities, materials, and equipment or correct the workmanship and charge the cost to the Contractor and (2) terminate for default the Contractor's right to proceed. The Contractor and any surety shall be liable, to the extent specified in the contract for any damage or cost of repair or replacement.
Section F - Deliveries or Performance F-1 Deliverables
Deliverable Reference Due Deliver To Payment Bond/Irrevocable Letter of Credit Section I: 52.228-13Within 7 calendar days after receipt of contract award CO
Proof of Liability Insurance Section I: 1452.228-
Within 7 calendar days after receipt of contract award CO
Invoices Section G: DOI Electronic Invoicing, GS1126
Invoices for progress payments may be submitted no more frequently than monthly
IPP, Reference GS1126 for additional POC required submission
DI-137 Release of Claims Section I: 1452- 204-70 Submitted with final invoice IPP, Reference GS1126
Weekly payroll for contractor and each subcontractor Section I: 52.222-8
Within 7 days after regular payment date of the payroll week covered
CO, Ref: FAR 22.406-6(c)
SF1413 Statement and Acknowledgement of Subcontractor
Section G: GS1354 Within 7 calendar days after award CO
F-2 52.211-10 Commencement, Prosecution, and Completion of Work. (APR 1984)
The Contractor shall be required to (a) commence work under this contract within 10 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 90 calendar days after the Contractor receives the notice to proceed. The time stated for completion shall include final cleanup of the premises.
(End of clause)
* The Contracting Officer shall specify either a number of days after the date the contractor receives the notice to proceed, or a calendar date.
F-3 52.242-14 Suspension of Work. (APR 1984)
F-4 GS0919 Legal Holidays (JUN 2021)
The following legal holidays are observed by this Government agency:
New Year's Day January 01
Martin Luther King's Birthday 3rd Monday in January
Presidents Day 3rd Monday in February
Memorial Day Last Monday in May
Juneteenth National Independence Day June 19
Independence Day July 04
Labor Day 1st Monday in September
Columbus Day 2nd Monday in October
Veterans Day November 11
Thanksgiving Day 4th Thursday in November
Christmas Day December 25
When a holiday falls on Saturday or Sunday, it is observed on the adjacent Friday or Monday, respectively.
In addition to the holidays listed above, the contractor agrees to observe leave days or closures designated by Federal Statute, Executive Order, or Presidential Proclamation.
Section G - Contract Administration Data G-1 GS0231 Technical Liaison-Technical Direction (NOV 2014)
(a) The performance required herein shall be subject to the technical direction of the Technical Liaison (TL) as identified below. As used herein, "technical direction" is defined as direction to the contractor that fills in details, suggests possible lines of approach, or otherwise supplements the scope of the work set forth herein and shall not constitute a new assignment, and does not supersede or modify any article or clause of this contract.
(b) The Technical Liaison is not authorized to perform, formally or informally, any of the following actions:
(1) Promise, award, agree to award, or execute any contract modification, or notice of intent that changes or may change this contract;
(2) Waive or agree to modification of the delivery schedule;
(3) Make any final decision on any contract matter subject to the
Disputes Clause;
(4) Terminate, for any reason, the contractor's right to proceed;
(5) Obligate in any way, the payment of money by the Government. Only a warranted Contracting Officer is authorized to obligate funds on this or any other contract action.
(c) The contractor shall immediately notify the Contracting Officer in writing if the Technical Liaison has taken an action (or fails to take action) or issues direction (written or oral) that the contractor considers to exceed the above limitations.
(d) The Technical Liaison assigned for this contract is:
Name: **provided upon award**
Telephone Number: []
Email: []
Address Line 1: []
Address Line 2: []
Address Line 3: []
(e) Only the Contracting Officer may designate a different Technical
Liaison.
G-2 GS1126 Invoicing and Performance Statements (JUL 2001)
Invoicing and Performance Statements (Construction)
(a) A copy of each invoice submitted with an IPP payment request must be submitted to:
*to be provided upon award*
(b) Invoices for progress payments may be submitted no more frequently than monthly.
(c) Invoices for progress payments must be accompanied by a contract Performance Statement, which shall show in detail the estimated percentage of completion and value of completed performance for each separately priced line item or, if applicable, each of the significant construction categories contained in the approved Schedule of Prices.
(d) See clause 52.232-5 for certification requirements.
G-3 GS1131 Unilateral Deobligation of Unexpended Funds (MAY 2013)
The contractor shall submit all invoices under the award no later than 90 calendar days after the period of performance has expired, unless a request for extension has been submitted to the Contracting Officer. After 120 days has passed since the expiration of the performance period, the government reserves the right to issue a unilateral modification deobligating any unexpended funds, and to initiate closeout procedures.
G-4 GS1354 List of subcontractors (Construction) (JUL 2001)
For purposes of monitoring compliance with the insurance and payroll reporting requirements of this contract, the contractor shall furnish a listing of all subcontractors to the Contracting Officer within 7 calendars days after contract award.
G-5 DOI ELECTRONIC INVOICING Electronic Invoicing and Payment Requirements - Invoice Processing Platform (IPP) (April 2013)
Payment requests must be submitted electronically through the U. S. Department of the Treasury's Invoice Processing Platform System (IPP).
'Payment request' means any request for contract financing payment or invoice payment by the Contractor. To constitute a proper invoice, the payment request must comply with the requirements identified in the applicable Prompt Payment clause included in the contract, or the clause 52.212-4 Contract Terms and Conditions - Commercial Items included in commercial item contracts. The IPP website address is: https://www.ipp.gov.
Under this contract, the following documents are required to be submitted as an attachment to the IPP invoice [Contracting Officer to edit and include the documentation required under this contract]:
The Contractor must use the IPP website to register access and use IPP for submitting requests for payment. The Contractor Government Business Point of Contact (as listed in SAM) will receive enrollment instructions via email from the Federal Reserve Bank of St. Louis (FRBSTL) within 3 - 5 business days of the contract award date. Contractor assistance with enrollment can be obtained by contacting the IPP Production Helpdesk via email IPPCustomerSupport@fiscal.treasury.gov or phone (866) 973-3131.
If the Contractor is unable to comply with the requirement to use IPP for submitting invoices for payment, the Contractor must submit a waiver request in writing to the Contracting Officer with its proposal or quotation.
(End of Local Clause)
Section H - Special Contract Requirements H-1 GS1326 Indemnity (JUL 2001)
The contractor herein is "an independent contractor" and shall obtain all necessary insurance to protect himself from liability arising out of this contract. The contractor hereby agrees to indemnify and hold the Government harmless in connection with, any loss or liability from damage to or destruction of property or from injuries to or death of persons (including the agents and employees of both parties) if such damage, destruction, injury or death arises out of, or is caused by performance of work under this contract, unless such damage, destruction, injury or death is caused solely by the active negligence of the Government, its agents or employees. The contractor agrees to include this clause, appropriately modified, in all subcontracts to be performed under this contract.
H-2 GS1338 Notice to Government of Delays (JUL 2001)
In the event the contractor encounters difficulty in meeting performance requirements, or when it anticipates difficulty in complying with the contract delivery schedule or date, or whenever the contractor has knowledge that any actual or potential situation is delaying or threatens to delay the timely performance of this contract, the contractor shall immediately notify the contracting officer and the COR (if one has been designated), in writing, giving pertinent details.
This data shall be informational only in character. Notice under this provision shall not be construed as a waiver by the Government of any delivery schedule or date or of any rights or remedies provided by law or under this contract.
H-3 GS1346 Compliance with OSHA-Govt owned Facilities/Equipment (APR 2003)
Compliance with Occupational Safety and Health Act -- Government-Owned Performance of work hereunder shall comply with the provisions of the Occupational Health and Safety Act of 1970, as amended (OSHA). If, at any time during the performance of this contract, the Government-furnished facilities and/or equipment do not conform to OSHA standards, the contractor must so notify the Contracting Officer, in writing, including a recommendation of the corrective action needed.
H-4 GS1348 Accident Reporting (APR 2003)
If an accident occurs on Government-controlled facilities, a report must be provided to the Contracting Officer's Representative and the Contracting Officer within 48 hours. An accident is defined as an event which causes injury, illness, or loss or damage to Government-owned or private property. The contractor will cooperate with any ensuing Government accident investigation.
H-5 GS1440 Wage Determination Applicable (JUL 2001)
In the performance of this contract, the contractor shall comply with the requirements of U.S. Department of Labor Wage Determination Number MO20220036 dated 5/27/2022. The wage determination is incorporated into this contract as Attachment 1
H-6 1452.209-70 ORGANIZATIONAL CONFLICT OF INTEREST DISCLOSURE (NOV 2007)
1. Definition. Organizational conflict of interest means that because of other activities or relationships with other persons, a person is unable or potentially unable to render impartial assistance or advice to the Government, or the person�s objectivity in performing the contract work is or might be otherwise impaired, or a person has an unfair competitive advantage.
2. Disclosure. By submission of this offer, offeror represents that it is not aware of any information bearing on the existence of any actual or potential organizational conflicts of interest in connection with this solicitation or any resulting contract, except as provided in its disclosure statement. In the disclosure statement, list any potential or actual organizational conflicts of interest. Describe all relevant information concerning any past, present, or planned interests bearing on whether this firm (including its chief executives and directors, any proposed consultants or subcontractors) may have a potential organizational conflict of interest. If no potential or actual conflicts exist, so indicate with a check mark:
____ No potential or actual organizational conflicts of interest are known.
3. Failure to provide the disclosure or representation will be deemed a minor informality (FAR 14.405) and the offeror will be required to promptly correct the omission. Refusal to provide the disclosure or representation and any additional information as required will result in disqualification of the offeror for award.
4. The contractor agrees that, if after award he discovers an organizational conflict of interest with respect to this contract, he shall make an immediate and full disclosure in writing to the Contracting Officer, which shall include a description of the action which the contractor has taken or proposes to take to avoid, eliminate, or neutralize the conflict. The Government may, however, terminate the contract for the convenience of the Government if it would be in the best interests of the Government.
5. In the event that the contractor was aware of organizational conflict of interest prior to the award of this contract and failed to disclose the conflict to the Contracting Officer, the Government may terminate the contract at no cost to the Government.
6. If the Contracting Officer determines that a potential or actual conflict exists, the offeror will not receive an award unless the conflict can be avoided or otherwise resolved through the inclusion of a special contract clause or other appropriate means. The terms of any special clause are subject to negotiation. Offerors should refer to FAR Subpart 9.5 for policies and procedures for avoiding, neutralizing, or mitigating organizational conflicts of interest.
Alternate 1:
When a potential or actual organizational conflict of interest is known to the Government, replace paragraph 2 with:
2. The contracting officer considers that there is potential for organizational conflicts of interest involving this procurement or services to be performed under the resultant contract, as follows:
[ CO fill in ]
By submission of this offer, offeror represents that it is not aware of any information bearing on the existence of any actual or potential organizational conflicts of interest in connection with this solicitation or any resulting contract, except as provided in its disclosure statement. In the disclosure statement, list any potential or actual organizational conflicts of interest. Describe all relevant information concerning any past, present, or planned interests bearing on whether this firm (including its chief executives and directors, any proposed consultants or subcontractors) may have a potential organizational conflict of interest. If no potential or actual conflicts exist, so indicate with a check mark:
____ No potential or actual organizational conflicts of interest exist.
(End of Clause)
Section I - Contract Clauses I-1 52.204-13 System for Award Management Maintenance. (OCT 2018)
I-2 52.204-18 Commercial and Government Entity Code Maintenance. (AUG 2020)
I-3 52.204-19 Incorporation by Reference of Representations and Certifications. (DEC 2014)
I-4 52.209-6 Protecting the Government's Interest When Subcontracting With Contractors Debarred, Suspended, or Proposed for Debarment. (NOV 2021)
I-5 52.209-10 Prohibition on Contracting With Inverted Domestic Corporations. (NOV 2015)
I-6 52.213-4 Terms and Conditions - Simplified Acquisitions (Other Than Commercial Products and Commercial Services). (JAN 2022)
(a) The Contractor shall comply with the following Federal Acquisition Regulation (FAR) clauses that are incorporated by reference:
(1) The clauses listed below implement provisions of law or Executive order:
(i) 52.203-19, Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements (JAN 2017) (section 743 of Division E, Title VII, of the Consolidated and Further Continuing Appropriations Act, 2015 (Pub. L. 113-235) and its successor provisions in subsequent appropriations acts (and as extended in continuing resolutions)).
(ii) 52.204-23, Prohibition on Contracting for Hardware, Software, and Services Developed or Provided by Kaspersky Lab and Other Covered Entities (NOV 2021) (Section 1634 of Pub. L. 115-91).
(iii) 52.204-25, Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment.
(NOV 2021) (Section 889(a)(1)(A) of Pub. L. 115-232).
(iv) 52.222-3, Convict Labor (JUN 2003) (E.O. 11755).
(v) 52.222-21, Prohibition of Segregated Facilities (APR 2015).
(vi) 52.222-26, Equal Opportunity (SEP 2016) (E.O. 11246).
(vii) 52.225-13, Restrictions on Certain Foreign Purchases (FEB 2021) (E.O.s, proclamations, and statutes administered by the Office of Foreign Assets Control of the Department of the Treasury).
(viii) 52.233-3, Protest After Award (AUG 1996) (31 U.S.C. 3553).
(ix) 52.233-4, Applicable Law for Breach of Contract Claim (OCT 2004) (Pub. L. 108-77, 108-78 (19 U.S.C. 3805 note).
(2) Listed below are additional clauses that apply:
(i) 52.232-1, Payments (APR 1984).
(ii) 52.232-8, Discounts for Prompt Payment (FEB 2002).
(iii) 52.232-11, Extras (APR 1984).
(iv) 52.232-25, Prompt Payment (JAN 2017).
(v) 52.232-39, Unenforceability of Unauthorized Obligations (JUN 2013).
(vi) 52.232-40, Providing Accelerated Payments to Small Business Subcontractors (NOV 2021).
(vii) 52.233-1, Disputes (MAY 2014).
(viii) 52.244-6, Subcontracts for Commercial Products and Commercial Services (JAN 2022).
(ix) 52.253-1, Computer Generated Forms (JAN 1991).
(b) The Contractor shall comply with the following FAR clauses, incorporated by reference, unless the circumstances do not apply:
(1) The clauses listed below implement provisions of law or Executive order:
(i) 52.204-10, Reporting Executive Compensation and First-Tier Subcontract Awards (JUN 2020) (Pub. L. 109-282) (31 U.S.C. 6101 note) (Applies to contracts valued at or above the threshold specified in FAR 4.1403(a) on the date of award of this contract).
(ii) 52.222-19, Child Labor-Cooperation with Authorities and Remedies (JAN 2022) (E.O. 13126). (Applies to contracts for supplies exceeding the micro-purchase threshold, as defined in FAR 2.101 on the date of award of this contract).
(iii) 52.222-20, Contracts for Materials, Supplies, Articles, and Equipment (JUN 2020) (41 U.S.C. chapter 65) (Applies to supply contracts over the threshold specified in FAR 22.602 on the date of award of this contract, in the United States, Puerto Rico, or the U.S. Virgin Islands).
(iv) 52.222-35, Equal Opportunity for Veterans (JUN 2020) (38 U.S.C. 4212) (Applies to contracts valued at or above the threshold specified in FAR 22.1303(a) on the date of award of this contract).
(v) 52.222-36, Equal Employment for Workers with Disabilities (JUN 2020) (29 U.S.C. 793) (Applies to contracts over the threshold specified in FAR 22.1408(a) on the date of award of this contract, unless the work is to be performed outside the United States by employees recruited outside the United States). (For purposes of this clause, "United States" includes the 50 States, the District of Columbia, Puerto Rico, the Northern Mariana Islands, American Samoa, Guam, the U.S.
Virgin Islands, and Wake Island.)
(vi) 52.222-37, Employment Reports on Veterans (JUN 2020) (38 U.S.C. 4212) (Applies to contracts valued at or above the threshold specified in FAR 22.1303(a) on the date of award of this contract).
(vii) 52.222-41, Service Contract Labor Standards (AUG 2018) (41 U.S.C. chapter 67) (Applies to service contracts over $2,500 that are subject to the Service Contract Labor Standards statute and will be performed in the United States, District of Columbia, Puerto Rico, the Northern Mariana Islands, American Samoa, Guam, the U.S. Virgin Islands, Johnston Island, Wake Island, or the outer Continental Shelf).
(viii)(A) 52.222-50, Combating Trafficking in Persons (NOV 2021) (22 U.S.C. chapter 78 and E.O. 13627) (Applies to all solicitations and contracts).
(B) Alternate I (MAR 2015) (Applies if the Contracting Officer has filled in the following information with regard to applicable directives or notices: Document title(s), source for obtaining document(s), and contract performance location outside the United States to which the document applies).
(ix) 52.222-55, Minimum Wages for Contractor Workers Under Executive Order 14026 (JAN 2022) (Applies when 52.222- 6 or 52.222-41 are in the contract and performance in whole or in part is in the United States (the 50 States, the District of Columbia, Puerto Rico, the Northern Mariana Islands, American Samoa, Guam, the U.S. Virgin Islands, Johnston Island, Wake Island, and the outer Continental Shelf as defined in the Outer Continental Shelf Lands Act (43 U.S.C. 1331, et seq.))).
(x) 52.222-62, Paid Sick Leave Under Executive Order 13706 (JAN 2022) (E.O. 13706) (Applies when 52.222-6 or 52.222-41 are in the contract and performance in whole or in part is in the United States (the 50 States and the District of Columbia.))
(xi) 52.223-5, Pollution Prevention and Right-to-Know Information (MAY 2011) (E.O. 13423) (Applies to services performed on Federal facilities).
(xii) 52.223-11, Ozone-Depleting Substances and High Global Warming Potential Hydrofluorocarbons (JUN 2016) (E.O.
13693)(applies to contracts for products as prescribed at FAR 23.804(a)(1)).
(xiii) 52.223-12, Maintenance, Service, Repair, or Disposal of Refrigeration Equipment and Air Conditioners (JUN 2016) (E.O. 13693) (Applies to maintenance, service, repair, or disposal of refrigeration equipment and air conditioners).
(xiv) 52.223-15, Energy Efficiency in Energy-Consuming Products (MAY 2020) (42 U.S.C. 8259b) (Unless exempt pursuant to 23.204, applies to contracts when energy-consuming products listed in the ENERGY STAR® Program or Federal Energy…