Sol_140G0122Q0112.pdf

PDF 303 KB Posted

Attached to
CERC Well No. 1 Cleaning Federal contract opportunity
Solicitation number
140G0122Q0112
Issued by
Department of the Interior US Geological Survey Office of Acquisitions and Grants

View the file

Other files for this federal contract opportunity

Other files attached to CERC Well No. 1 Cleaning, newest first.
File Type Posted
B08_Attachment_3_Form_DI-137_Release_of_Claims.pdf PDF
B08_Attachment_4_Payroll_WH-347.pdf PDF
B08_Attachment_2_Payment_Bond_SF25A-16d.pdf PDF
B08_Attachment_1_WD_MO20220036.pdf PDF
B08_Attachment_5_Statement_and_Acknowledgement_of_Subcontractor_SF1413-13e.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOLICITATION, OFFER,

AND AWARD

2. TYPE OF SOLICITATION

6. PROJECT NO. 4. CONTRACT NO. 5. REQUISITION/PURCHASE REQUEST NO.

PAGE OF PAGES

7. ISSUED BY CODE 8. ADDRESS OFFER TO

SOLICITATION

(Construction, Alteration, or Repair)

1. SOLICITATION NO. 3. DATE ISSUED

IMPORTANT -- The "offer" section on the reverse must be fully completed by offeror.

9.

INFORMATION

a. NAME b. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder."

CALL:

FOR

SEALED BID (IFB)

NEGOTIATED (RFP)

0040574666

USGS OAG RESTON ACQUISITION BRANCH

205 NATIONAL CENTER

12201 SUNRISE VALLEY DRIVE

RESTON VA 20192

GRB

Kimberly Schneider 0000

105/04/2022

140G0122Q0112

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date)

CERC Well No. 1 Cleaning

100% Small Business Set-aside

See Section L.1 for Instructions to Offerors and Section M for Evaluation Factors

Davis Bacon Applies

*Section F for list of Deliverables*

*Reference 52.228-13 Alternative Payment Protections*

11. The Contractor shall begin performance

12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

award, notice to proceed. The performance period is mandatory negotiable. (See ________________________________________________.)

13. ADDITIONAL SOLICITATION REQUIREMENTS:

a. Sealed offers in original and is not required.is, b. An offer guarantee

c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

(date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

d. Offers providing less than

12b. CALENDAR DAYSYES NO

(If "YES", indicate within how many calendar days after award in Item 12b.)

7 14 calendar days and complete it within ________________ ________________ calendar days after receiving

52.211-10

05/24/2022

NSN 7540-01-155-3212

x x x x copies to perform the work required are due at the place specified in Item 8 by _____________ ___________________ (hour) local time calendar days for Government acceptance after the date offers are due will not be considered and will be rejected . _________________

STANDARD FORM 1442 (Rev. 4-85)

Prescribed by GSA

FAR(48 CFR) 53.236-1(d)

17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within ____________________ calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in item 13d. Failure to insert any number means the offeror accepts the minimum in item 13d.)

14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code) 15. TELEPHONE NO. (Include area code)

16. REMITTANCE ADDRESS (Include only if different than item 14.)

CODE FACILITY CODE

AMOUNTS

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGEMENT OF AMENDMENTS

OFFER (Must be fully completed by offeror)

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT NO.

DATE.

20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print) 20b. SIGNATURE 20c. OFFER DATE

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN

(4 copies unless otherwise specified)

ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

26. ADMINISTERED BY CODE 27. PAYMENT WILL BE MADE BY

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

(Contractor is required to sign this document and return (Contractor is not required to sign this document.)

Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award.

No further contractual document is necessary.

30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print) 31a. NAME OF CONTRACTING OFFICER (Type or print)

30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA 31c. DATE

BY

2PAGE OF

USGS OAG RESTON ACQUISITION BRANCH

205 NATIONAL CENTER

12201 SUNRISE VALLEY DRIVE

RESTON VA 20192

GRB

Kimberly Schneider

28. NEGOTIATED AGREEMENT 29. AWARD

Contractor agrees to furnish and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, copies to issuing office.)

10 U.S.C. 2304(c) 41 U.S.C. 253(c)

STANDARD FORM 1442 (REV. 4-85) BACK

Continued...

ITEM NO.

(A)

SUPPLIES/SERVICES

(B)

QUANTITY

(C)

UNIT

(D)

UNIT PRICE

(E)

AMOUNT

(F)

NAME OF OFFEROR OR CONTRACTOR

3 43

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

140G0122Q0112

CERC Well No. 1 Cleaning

Delivery: 14 Days After Receipt Of Order

Delivery Location Code: 0006366840

USGS Columbia Environmental Researc

4200 New Haven Road

Columbia MO 65201 US

00010 The Contractor shall provide all labor, materials, tools, equipment and supervision necessary for the cleaning and rehabilitation of

Well No. 1 located at the Columbia Environmental

Research Center (CERC) in accordance with the

Statement of Work (SOW) herein.

Product/Service Code: Z1NE

Product/Service Description: MAINTENANCE OF WATER

SUPPLY FACILITIES

For questions on this solicitation contact

Kimberly Schneider, krschneider@usgs.gov.

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

Sponsored by GSA

FAR (48 CFR) 53.110

Section B - Supplies or Services B-1 Schedule of Items

Section C - Description/Specifications C-1 Statement of Work C-2 GS0339 Green Acquisition (JUL 2018)

Section E - Inspection and Acceptance E-1 52.246-12 Inspection of Construction. (AUG 1996) E-2 52.246-13 Inspection - Dismantling, Demolition, or Removal of Improvements. (AUG 1996)

Section F - Deliveries or Performance F-1 Deliverables F-2 52.211-10 Commencement, Prosecution, and Completion of Work. (APR 1984) F-3 52.242-14 Suspension of Work. (APR 1984) F-4 GS0919 Legal Holidays (JUN 2021)

Section G - Contract Administration Data G-1 GS0231 Technical Liaison-Technical Direction (NOV 2014) G-2 GS1126 Invoicing and Performance Statements (JUL 2001) G-3 GS1131 Unilateral Deobligation of Unexpended Funds (MAY 2013) G-4 GS1354 List of subcontractors (Construction) (JUL 2001) G-5 DOI ELECTRONIC INVOICING Electronic Invoicing and Payment Requirements - Invoice Processing Platform (IPP) (April 2013)

Section H - Special Contract Requirements H-1 GS1326 Indemnity (JUL 2001) H-2 GS1338 Notice to Government of Delays (JUL 2001) H-3 GS1346 Compliance with OSHA-Govt owned Facilities/Equipment (APR 2003) H-4 GS1348 Accident Reporting (APR 2003) H-5 GS1440 Wage Determination Applicable (JUL 2001)

H-6 1452.209-70 ORGANIZATIONAL CONFLICT OF INTEREST DISCLOSURE (NOV 2007)

Section I - Contract Clauses I-1 52.204-13 System for Award Management Maintenance. (OCT 2018) I-2 52.204-18 Commercial and Government Entity Code Maintenance. (AUG 2020) I-3 52.204-19 Incorporation by Reference of Representations and Certifications. (DEC 2014) I-4 52.204-25 Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment. (NOV 2021) I-5 52.209-6 Protecting the Government's Interest When Subcontracting With Contractors Debarred, Suspended, or Proposed for Debarment. (NOV 2021) I-6 52.209-10 Prohibition on Contracting With Inverted Domestic Corporations. (NOV 2015) I-7 52.213-4 Terms and Conditions - Simplified Acquisitions (Other Than Commercial Products and Commercial Services). (JAN 2022) I-8 52.215-8 Order of Precedence - Uniform Contract Format. (OCT 1997) I-9 52.219-28 Post-Award Small Business Program Rerepresentation. (SEP 2021) I-10 52.222-6 Construction Wage Rate Requirements. (AUG 2018) I-11 52.222-7 Withholding of Funds. (MAY 2014) I-12 52.222-8 Payrolls and Basic Records. (JUL 2021) I-13 52.222-9 Apprentices and Trainees. (JUL 2005) I-14 52.222-10 Compliance With Copeland Act Requirements. (FEB 1988) I-15 52.222-11 Subcontracts (Labor Standards). (MAY 2014) I-16 52.222-12 Contract Termination - Debarment. (MAY 2014) I-17 52.222-13 Compliance With Construction Wage Rate Requirements and Related Regulations. (MAY 2014) I-18 52.222-14 Disputes Concerning Labor Standards. (FEB 1988) I-19 52.222-15 Certification of Eligibility. (MAY 2014) I-20 52.222-27 Affirmative Action Compliance Requirements for Construction. (APR 2015) I-21 52.223-2 Affirmative Procurement of Biobased Products Under Service and Construction Contracts. (SEP 2013) 21 I-22 52.223-3 Hazardous Material Identification and Material Safety Data. (FEB 2021) - Alternate I (JUL 1995) I-23 52.223-6 Drug-Free Workplace. (MAY 2001) I-24 52.223-17 Affirmative Procurement of EPA-designated Items in Service and Construction Contracts. (AUG 2018) I-25 52.223-18 Encouraging Contractor Policies To Ban Text Messaging While Driving. (JUN 2020)

I-26 52.225-9 Buy American - Construction Materials. (NOV 2021) I-27 52.225-25 Prohibition on Contracting with Entities Engaging in Certain Activities or Transactions Relating to Iran- Representation and Certifications. (JUN 2020) I-28 52.227-4 Patent Indemnity--Construction Contracts. (DEC 2007) I-29 52.228-2 Additional Bond Security. (OCT 1997) I-30 52.228-5 Insurance - Work on a Government Installation. (JAN 1997) I-31 52.228-11 Individual Surety-Pledge of Assets. (FEB 2021) I-32 52.228-12 Prospective Subcontractor Requests for Bonds. (MAY 2014) I-33 52.228-13 Alternative Payment Protections. (JUL 2000) I-34 52.228-14 Irrevocable Letter of Credit. (NOV 2014) I-35 52.232-5 Payments Under Fixed-Price Construction Contracts. (MAY 2014) I-36 52.232-23 Assignment of Claims. (MAY 2014) I-37 52.232-27 Prompt Payment for Construction Contracts. (JAN 2017) I-38 52.236-3 Site Investigation and Conditions Affecting the Work. (APR 1984) I-39 52.236-5 Material and Workmanship. (APR 1984) I-40 52.236-7 Permits and Responsibilities. (NOV 1991) I-41 52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements. (APR 1984) I-42 52.236-12 Cleaning Up. (APR 1984) I-43 52.236-13 Accident Prevention. (NOV 1991) I-44 52.243-5 Changes and Changed Conditions. (APR 1984) I-45 52.252-6 Authorized Deviations in Clauses. (NOV 2020) I-46 52.253-1 Computer Generated Forms. (JAN 1991) I-47 1452.203-70 Restriction on Endorsements (JUL 1996) I-48 1452.204-70 Release of Claims (JUL 1996) I-49 1452.225-70 Use of Foreign Construction Materials (JUL 1996) I-50 1452.228-70 Liability Insurance (JUL 1996) I-51 1452.236-70 Prohibition Against Use of Lead-based Paint (JUL 1996) I-52 52.219-6 Notice of Total Small Business Set-Aside (DEVIATION 2019-01)

Section J - List of Documents, Exhibits, and Other Attachments Section K - Representations, Certifications, and Other Statements of Bidders

K-1 52.204-8 Annual Representations and Certifications. (JAN 2022) K-2 52.204-24 Representation Regarding Certain Telecommunications and Video Surveillance Services or Equipment.

(NOV 2021)

K-3 52.222-22 Previous Contracts and Compliance Reports. (FEB 1999)

Section L - Instructions, Conditions, and Notices to Bidders L-1 Instructions to Offerors L-2 52.204-7 System for Award Management. (OCT 2018) L-3 52.204-16 Commercial and Government Entity Code Reporting. (AUG 2020) L-4 52.204-22 Alternative Line Item Proposal. (JAN 2017) L-5 52.216-1 Type of Contract. (APR 1984) L-6 52.222-5 Construction Wage Rate Requirements-Secondary Site of the Work. (MAY 2014) L-7 52.222-23 Notice of Requirement for Affirmative Action To Ensure Equal Employment Opportunity for Construction.

(FEB 1999)

L-8 52.225-10 Notice of Buy American Requirement - Construction Materials. (MAY 2014) L-9 52.236-27 Site Visit (Construction). (FEB 1995) L-10 52.252-1 Solicitation Provisions Incorporated by Reference. (FEB 1998) L-11 52.252-5 Authorized Deviations in Provisions. (NOV 2020) L-12 1452.215-71 Use and Disclosure of Proposal Information-Department of the Interior. (APR 1984) L-13 1452.233-2 Service of Protest

Section M - Evaluation Factors for Award M-1 Evaluation Factors

Section B - Supplies or Services B-1 Schedule of Items

Item No. Description UOMQty Unit

Price Total

Amount

00010 CERC Well No. 1 Cleaning in accordance with the Statement of Work

(SOW) LS 1

Section C - Description/Specifications C-1 Statement of Work

CERC WELL NO. 1 CLEANING/REHABILITATION

I. GENERAL INFORMATION

a. INTRODUCTION. The Department of the Interior (DOI), U.S. Geological Survey (USGS), Columbia Environmental Research Center (CERC) 4200 New Haven Road, Columbia, MO 65202 has a requirement for cleaning and rehabilitation of a deep well, Well No. 1 which is the primary source of research water for all studies conducted at the laboratory.

b. BACKGROUND. The Columbia Environmental Research Center (CERC) conducts research needed to address national and international environmental contaminant issues and effects of habitat alterations on aquatic and terrestrial ecosystems. The A3 Main Building at the CERC is a 34,019 square foot research laboratory building that houses several research laboratories, office space, and a 6,000 square foot research wet laboratory.

Well No. 1 is rated to pump 700 gallons per minute (gpm) and is the primary source of research water for all studies conducted at the laboratory. It is the most critical equipment at this center. A back up well is available for water supply while Well No. 1 is out of service, but it is not designed for, or capable of fulfilling all water requirements at the center.

When Well No. 1 is taken out of service for repairs it is imperative that the contractor work quickly to restore the well to normal operations.

c. DEFINITION/APPLICABLE DOCUMENTS. N/A.

d. SCOPE. The contractor shall provide all materials, labor, equipment, travel and supervision necessary to clean and provide rehabilitation of a deep well, Well No. 1.

II. WORK REQUIREMENTS

a. EXISTING SITE CONDITIONS.

i. Well No. 1 is a vertical turbine pump, Gould Model 9-11CHC-GP-MA-441-02 installed at a depth of 660¿ (201 meter) and was installed in January 2021. It is powered by a 200 Hp three phase 480-volt, 1750 RPM electric motor. The pump is a 11-CHC-9 Gould 9 stage pump with stainless steel collets and bronze wear rings.

b. TECHNICAL REQUIREMENTS.

i. The contractor shall perform the following:

1. Perform pump test to collect baseline data.

2. Pull the well motor, column pipe and shaft and pump.

3. Inspect the motor mechanically and electrically, inspect the column pipe, pump shaft, combination couplings, bearings, sleeves, collars, and pump for unusual wear conditions.

4. Install submersible 300gpm test pumping equipment.

5. Perform televised underground survey. Video shall be provided to the government 2 days after filming.

6. Perform airburst technology treatment process on the entire well-bore formation from 446¿ to 1080¿ along with a 10,000 gallon /200 ppm chlorine solution with 10-gallon chlorine enhancer as a second final treatment.

7. Pull existing airburst technology equipment & test pumping equipment.

8. Bail as needed.

9. Perform televised underground survey. Video shall be provided to the government 2 days after filming.

10. Reinstall owners pumping equipment and perform pump test to collect baseline data.

c. DELIVERABLES.

i. The Contractor shall provide video of all surveys within two (2) calendar days of recording.

ii. The Contractor shall provide a written performance summary after testing that provides all pertinent data relevant to the new equipment to include actual pump depth, water flow, static water level, discharge GPM, discharge pressure, and pumping level.

d. WARRANTY. The Contractor shall warranty all workmanship to meet the specifications set forth in this Statement of Work. Additionally, the Contractor shall warranty all Contractor workmanship for a (minimum) period of 12 months from the date of Government acceptance.

III. SUPPORTING INFORMATION.

a. GOVERNMENT FURNISHED PROPERTY (GFP): None.

b. SECURITY. Building access shall be coordinated with the Facility Manager or USGS Technical Liaison.

c. PLACE OF PERFORMANCE. USGS, Columbia Environmental Research Center (CERC), 4200 New Haven Road, Columbia, MO 65201

d. PERIOD OF PERFORMANCE.

i. 14 calendar days after NTP

1. CERC facility personnel shall make the site available to the Contractor 24 hours a day until project completion.

e. SPECIAL CONSIDERATIONS

i. The CERC normal facility business hours are 7:00 AM to 4:30 PM, Monday thru Friday.

ii. CERC facility personnel shall make the site available to the Contractor 24 hours a day until project completion.

iii. Utility/Service Interruptions: The Facility Manager and USGS Technical Liaison shall be notified not less than 3 calendar days in advance of any interruptions of building utility/services. The contractor shall describe in writing the work to be done and the time and duration of the interruption. No work shall be done until approval is received from the USGS Technical Liaison.

iv. The contractor shall be responsible for complying with all National, Federal, State and local laws, codes and regulations in connection with the execution of the contract.

v. Contractor is responsible for visiting the worksite to verify measurements and to ascertain the nature and location of the work to be performed and the general and local conditions which can affect the work or the cost thereof. Failure to do so will not relieve the contractor of his responsibility for estimating properly the difficulty or cost of successfully performing the work.

vi. Occupancy: During construction the Government will occupy the existing facility. The contractor shall not restrict nearby pedestrian or vehicular traffic to this facility and shall coordinate construction with the Contracting Officer to minimize conflicts and to facilitate usage. The contractor shall perform the work so as not to interfere with ongoing operations.

vii. Any changes affecting the scope of work shall be originated from and approved by the Contracting Officer.

viii. All materials and workmanship shall be subject to the inspection and approval of the USGS Technical Liaison. All work unsatisfactorily performed shall be promptly corrected and made acceptable to the Government at no additional Cost.

ix. Final inspection and acceptance shall be performed with the contractor, on site by the USGS Technical Liaison upon completion of job performance.

x. MATERIALS. The contractor shall furnish all supplies, materials, and equipment necessary for performance of the work included in this contract unless otherwise specified. Materials and supplies to be used shall be commercially available products of reputable manufacturers or suppliers and shall be of a quality to conform to applicable Federal Specifications.

xi. SPECIFICATIONS. In any case of discrepancy in the specifications, the matter shall be immediately submitted to the Contracting Officer, without whose decision said discrepancy shall not be adjusted by the Contractor, save only at his own risk and expense. Any changes affecting the scope of the work shall originate from and be approved by the Contracting Officer.

xii. SCHEDULING CONTRACT WORK. The contractor shall make necessary arrangement with the Facility Manager and USGS Technical Liaison to perform the work and shall arrange and schedule his work so that the minimum amount of interference with government activities will result.

xiii. USE OF BUILDING FACILITIES. The contractor may use utility services and toilet facilities of the building subject to approval of the Facility Manager.

xiv. CONDITIONS AFFECTING THE WORK. It will be the responsibility of the contractor to inspect the site, determine quality of work involved. Compare the specifications with the work to be done, and inform themselves as to all conditions, including other work, if any, being performed. Failure to do so will in no way relieve the successful contractor from the necessity of furnishing any materials or performing any work that may be required to carry out the contract in accordance with the true intent and meaning of the specifications without additional cost to the Government.

xv. EMPLOYEES. The contractor shall be responsible at all times for the supervision and control of the employees that may be assigned to render services under the contract. Fully qualified work personnel shall be available for work on the date this purchase order begins and shall be maintained throughout the period of performance.

xvi. LICENSES-PERMITS. The contractor shall, without additional expense to the Government, be responsible for obtaining any necessary licenses or permits, and for complying with any Federal, State, and Municipal laws, codes and regulations in connection with the execution of the work.

xvii. ACCIDENT PREVENTION AND FIRE HAZARDS. The contractor shall take all necessary precautions to prevent fires or injury to the public, building occupant(s), or damage to property of others during the performance of this contract. For the purpose of this contract, the public or building occupant shall include all persons not employed by the contractor or a subcontractor working under his/her direction. If welding is required, permission shall be obtained from the COTR.

xviii. INDEMNITY. The contractor shall confine all work on Government premises to areas authorized or approved by the Contracting Officer or COTR. The contractor shall save and keep harmless and indemnify the Government against any and all liability claims, and costs of whatsoever kind and nature of injury to or death of any person or persons and for loss or damage to any property (Government or otherwise) occurring in connection with or in any way incident to or arising out of the occupancy, use, service, operations, or performance of work in connection with this contract, resulting in whole or part from the negligent acts or omissions of the contractor.

xix. GREEN ACQUISITIONS. The USGS is committed to promoting the natural environment and protecting the health and well-being of people. In the performance of work under this contract, the Contractor shall exert its best efforts to provide services in a manner that will promote the natural environment and protect health and well-being. Green purchasing or environmentally preferable contracting includes the initiatives described below:

1. Alternative Fuels and Vehicles are described at http://www.afdc.energy.gov/afdc/

2. Biobased Products are described at http://www.biopreferred.gov/

3. Energy efficient products are described at http://energystar.gov/products for Energy Star products and at http://www.eere.energy.gov/femp/procurement for FEMP designated products

4. Environmentally Preferable Computers are described at http://www.epeat.net

5. Significant New Alternatives Program (SNAP) are described at http://www.epa.gov/snap/overview-snap

6. The Comprehensive Procurement Guidelines promote the use of recovered and recycled products at http://www3.epa.gov/epawaste/conserve/tools/cpg/index.htm

7. Water efficient products and services are described at http://www3.epa.gov/watersense/about_us/what_is_ws.htm

C-2 GS0339 Green Acquisition (JUL 2018)

The USGS is committed to promoting the natural environment and protecting the health and well-being of people. In the erformance of work under this contract, the Contractor shall exert its best efforts to provide services in a manner that will promote the natural environment and protect health and well-being. Green purchasing or environmentally preferable contracting includes the initiatives described below:

Alternative Fuels and Vehicles are described at http://www.afdc.energy.gov/afdc/

Biobased Products are described at http://www.biopreferred.gov/

Energy efficient products are described at http://energystar.gov/products for Energy Star products and at http://www.eere.energy.gov/femp/procurement for FEMP designated products.

Environmentally Preferable Computers are described at http://www.epeat.net

Significant New Alternatives Program (SNAP) are described at http://www.epa.gov/snap/overview-snap The Comprehensive

Procurement Guidelines promote the use of recovered and recycled products at https://www.epa.gov/smm/comprehensive-procurement-guideline-cpg-program

Water efficient products and services are described at https://www.epa.gov/watersense

Section E - Inspection and Acceptance E-1 52.246-12 Inspection of Construction. (AUG 1996)

(a) Definition. Work includes, but is not limited to, materials, workmanship, and manufacture and fabrication of components.

(b) The Contractor shall maintain an adequate inspection system and perform such inspections as will ensure that the work performed under the contract conforms to contract requirements. The Contractor shall maintain complete inspection records and make them available to the Government. All work shall be conducted under the general direction of the Contracting Officer and is subject to Government inspection and test at all places and at all reasonable times before acceptance to ensure strict compliance with the terms of the contract.

(c) Government inspections and tests are for the sole benefit of the Government and do not -

(1) Relieve the Contractor of responsibility for providing adequate quality control measures;

(2) Relieve the Contractor of responsibility for damage to or loss of the material before acceptance;

(3) Constitute or imply acceptance; or

(4) Affect the continuing rights of the Government after acceptance of the completed work under paragraph (i) below.

(d) The presence or absence of a Government inspector does not relieve the Contractor from any contract requirement, nor is the inspector authorized to change any term or condition of the specification without the Contracting Officer's written authorization.

(e) The Contractor shall promptly furnish, at no increase in contract price, all facilities, labor, and material reasonably needed for performing such safe and convenient inspections and tests as may be required by the Contracting Officer. The Government may charge to the Contractor any additional cost of inspection or test when work is not ready at the time specified by the Contractor for inspection or test, or when prior rejection makes reinspection or retest necessary. The Government shall perform all inspections and tests in a manner that will not unnecessarily delay the work. Special, full size, and performance tests shall be performed as described in the contract.

(f) The Contractor shall, without charge, replace or correct work found by the Government not to conform to contract requirements, unless in the public interest the Government consents to accept the work with an appropriate adjustment in contract price. The Contractor shall promptly segregate and remove rejected material from the premises.

(g) If the Contractor does not promptly replace or correct rejected work, the Government may (1) by contract or otherwise, replace or correct the work and charge the cost to the Contractor or (2) terminate for default the Contractor's right to proceed.

(h) If, before acceptance of the entire work, the Government decides to examine already completed work by removing it or tearing it out, the Contractor, on request, shall promptly furnish all necessary facilities, labor, and material. If the work is found to be defective or nonconforming in any material respect due to the fault of the Contractor or its subcontractors, the Contractor shall defray the expenses of the examination and of satisfactory reconstruction. However, if the work is found to meet contract requirements, the Contracting Officer shall make an equitable adjustment for the additional services involved in the examination and reconstruction, including, if completion of the work was thereby delayed, an extension of time.

(i) Unless otherwise specified in the contract, the Government shall accept, as promptly as practicable after completion and inspection, all work required by the contract or that portion of the work the Contracting Officer determines can be accepted separately. Acceptance shall be final and conclusive except for latent defects, fraud, gross mistakes amounting to fraud, or the Government's rights under any warranty or guarantee.

(End of clause)

E-2 52.246-13 Inspection - Dismantling, Demolition, or Removal of Improvements. (AUG 1996)

Section F - Deliveries or Performance F-1 Deliverables

Deliverable Reference Due Deliver To Payment Bond/Irrevocable

Letter of Credit Section I: 52.228-13 Within 7 calendar days after receipt of contract award CO

Proof of Liability Insurance Section I: 1452.228-

Within 7 calendar days after receipt of contract award CO

Invoices Section G: DOI

Electronic Invoicing, GS1126

Invoices for progress payments may be submitted no more frequently than monthly

IPP, Reference GS1126 for additional POC required submission

DI-137 Release of Claims Section I: 1452.204- 70 Submitted with final invoice IPP, Reference GS1126

Weekly Payroll for contractor and each subcontractor Section I: 52.222-8

Within 7 days after regular payment date of the payroll week covered CO, Ref: FAR 22.406-6(c)

SF1413 Statement and Acknowledgement of

Subcontractor Section G: GS1354 Within 7 calendar days after award CO

F-2 52.211-10 Commencement, Prosecution, and Completion of Work. (APR 1984)

The Contractor shall be required to (a) commence work under this contract within 7 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 14 calendar days after the date the Contractor receives the notice to proceed. The time stated for completion shall include final cleanup of the premises.

(End of clause)

* The Contracting Officer shall specify either a number of days after the date the contractor receives the notice to proceed, or a calendar date.

F-3 52.242-14 Suspension of Work. (APR 1984)

F-4 GS0919 Legal Holidays (JUN 2021)

The following legal holidays are observed by this Government agency:

New Year's Day January 01

Martin Luther King's Birthday 3rd Monday in January

Presidents Day 3rd Monday in February

Memorial Day Last Monday in May

Juneteenth National Independence Day June 19

Independence Day July 04

Labor Day 1st Monday in September

Columbus Day 2nd Monday in October

Veterans Day November 11

Thanksgiving Day 4th Thursday in November

Christmas Day December 25

When a holiday falls on Saturday or Sunday, it is observed on the adjacent Friday or Monday, respectively.

In addition to the holidays listed above, the contractor agrees to observe leave days or closures designated by Federal Statute, Executive Order, or Presidential Proclamation.

Section G - Contract Administration Data G-1 GS0231 Technical Liaison-Technical Direction (NOV 2014)

(a) The performance required herein shall be subject to the technical direction of the Technical Liaison (TL) as identified below. As used herein, "technical direction" is defined as direction to the contractor that fills in details, suggests possible lines of approach, or otherwise supplements the scope of the work set forth herein and shall not constitute a new assignment, and does not supersede or modify any article or clause of this contract.

(b) The Technical Liaison is not authorized to perform, formally or informally, any of the following actions:

(1) Promise, award, agree to award, or execute any contract modification, or notice of intent that changes or may change this contract;

(2) Waive or agree to modification of the delivery schedule;

(3) Make any final decision on any contract matter subject to the

Disputes Clause;

(4) Terminate, for any reason, the contractor's right to proceed;

(5) Obligate in any way, the payment of money by the Government. Only a warranted Contracting Officer is authorized to obligate funds on this or any other contract action.

(c) The contractor shall immediately notify the Contracting Officer in writing if the Technical Liaison has taken an action (or fails to take action) or issues direction (written or oral) that the contractor considers to exceed the above limitations.

(d) The Technical Liaison assigned for this contract is:

Name: *to be provided upon award*

Telephone Number: []

Email: []

Address Line 1: []

Address Line 2: []

Address Line 3: []

(e) Only the Contracting Officer may designate a different Technical

Liaison.

G-2 GS1126 Invoicing and Performance Statements (JUL 2001)

Invoicing and Performance Statements (Construction)

(a) A copy of each invoice submitted with an IPP payment request must be submitted to:

*to be provided upon award*

(b) Invoices for progress payments may be submitted no more frequently than monthly.

(c) Invoices for progress payments must be accompanied by a contract Performance Statement, which shall show in detail the estimated percentage of completion and value of completed performance for each separately priced line item or, if applicable, each of the significant construction categories contained in the approved Schedule of Prices.

(d) See clause 52.232-5 for certification requirements.

G-3 GS1131 Unilateral Deobligation of Unexpended Funds (MAY 2013)

The contractor shall submit all invoices under the award no later than 90 calendar days after the period of performance has expired, unless a request for extension has been submitted to the Contracting Officer. After 120 days has passed since the expiration of the performance period, the government reserves the right to issue a unilateral modification deobligating any unexpended funds, and to initiate closeout procedures.

G-4 GS1354 List of subcontractors (Construction) (JUL 2001)

For purposes of monitoring compliance with the insurance and payroll reporting requirements of this contract, the contractor shall furnish a listing of all subcontractors to the Contracting Officer within 7 calendars days after contract award.

G-5 DOI ELECTRONIC INVOICING Electronic Invoicing and Payment Requirements - Invoice Processing Platform (IPP) (April 2013)

Payment requests must be submitted electronically through the U. S.

Department of the Treasury's Invoice Processing Platform System (IPP).

'Payment request' means any request for contract financing payment or invoice payment by the Contractor. To constitute a proper invoice, the payment request must comply with the requirements identified in the applicable Prompt Payment clause included in the contract, or the clause

52.212-4 Contract Terms and Conditions - Commercial Items included in commercial item contracts. The IPP website address is: https://www.ipp.gov.

Under this contract, the following documents are required to be submitted as an attachment to the IPP invoice [Contracting Officer to edit and include the documentation required under this contract]:

The Contractor must use the IPP website to register access and use IPP for submitting requests for payment. The Contractor Government Business Point of Contact (as listed in SAM) will receive enrollment instructions via email from the Federal Reserve Bank of St. Louis (FRBSTL) within 3 - 5 business days of the contract award date. Contractor assistance with enrollment can be obtained by contacting the IPP Production Helpdesk via email

IPPCustomerSupport@fiscal.treasury.gov or phone (866) 973-3131.

If the Contractor is unable to comply with the requirement to use IPP for submitting invoices for payment, the Contractor must submit a waiver request in writing to the Contracting Officer with its proposal or quotation.

(End of Local Clause)

Section H - Special Contract Requirements H-1 GS1326 Indemnity (JUL 2001)

The contractor herein is "an independent contractor" and shall obtain all necessary insurance to protect himself from liability arising out of this contract. The contractor hereby agrees to indemnify and hold the Government harmless in connection with, any loss or liability from damage to or destruction of property or from injuries to or death of persons (including the agents and employees of both parties) if such damage, destruction, injury or death arises out of, or is caused by performance of work under this contract, unless such damage, destruction, injury or death is caused solely by the active negligence of the Government, its agents or employees. The contractor agrees to include this clause, appropriately modified, in all subcontracts to be performed under this contract.

H-2 GS1338 Notice to Government of Delays (JUL 2001)

In the event the contractor encounters difficulty in meeting performance requirements, or when it anticipates difficulty in complying with the contract delivery schedule or date, or whenever the contractor has knowledge that any actual or potential situation is delaying or threatens to delay the timely performance of this contract, the contractor shall immediately notify the contracting officer and the COR (if one has been designated), in writing, giving pertinent details.

This data shall be informational only in character. Notice under this provision shall not be construed as a waiver by the Government of any delivery schedule or date or of any rights or remedies provided by law or under this contract.

H-3 GS1346 Compliance with OSHA-Govt owned Facilities/Equipment (APR 2003)

Compliance with Occupational Safety and Health Act -- Government-Owned Performance of work hereunder shall comply with the provisions of the Occupational Health and Safety Act of 1970, as amended (OSHA). If, at any time during the performance of this contract, the Government-furnished facilities and/or equipment do not conform to OSHA standards, the contractor must so notify the Contracting Officer, in writing, including a recommendation of the corrective action needed.

H-4 GS1348 Accident Reporting (APR 2003)

If an accident occurs on Government-controlled facilities, a report must be provided to the Contracting Officer's Representative and the Contracting Officer within 48 hours. An accident is defined as an event which causes injury, illness, or loss or damage to Government-owned or private property. The contractor will cooperate with any ensuing Government accident investigation.

H-5 GS1440 Wage Determination Applicable (JUL 2001)

In the performance of this contract, the contractor shall comply with the requirements of U.S. Department of Labor Wage Determination Number MO20220036 dated 4/22/2022. The wage determination is incorporated into this contract as Attachment 1

H-6 1452.209-70 ORGANIZATIONAL CONFLICT OF INTEREST DISCLOSURE (NOV 2007)

1. Definition. Organizational conflict of interest means that because of other activities or relationships with other persons, a person is unable or potentially unable to render impartial assistance or advice to the Government, or the person�s objectivity in performing the contract work is or might be otherwise impaired, or a person has an unfair competitive advantage.

2. Disclosure. By submission of this offer, offeror represents that it is not aware of any information bearing on the existence of any actual or potential organizational conflicts of interest in connection with this solicitation or any resulting contract, except as provided in its disclosure statement. In the disclosure statement, list any potential or actual organizational conflicts of interest. Describe all relevant information concerning any past, present, or planned interests bearing on whether this firm (including its chief executives and directors, any proposed consultants or subcontractors) may have a potential organizational conflict of interest. If no potential or actual conflicts exist, so indicate with a check mark:

____ No potential or actual organizational conflicts of interest are known.

3. Failure to provide the disclosure or representation will be deemed a minor informality (FAR 14.405) and the offeror will be required to promptly correct the omission. Refusal to provide the disclosure or representation and any additional information as required will result in disqualification of the offeror for award.

4. The contractor agrees that, if after award he discovers an organizational conflict of interest with respect to this contract, he shall make an immediate and full disclosure in writing to the Contracting Officer, which shall include a description of the action which the contractor has taken or proposes to take to avoid, eliminate, or neutralize the conflict. The Government may, however, terminate the contract for the convenience of the Government if it would be in the best interests of the Government.

5. In the event that the contractor was aware of organizational conflict of interest prior to the award of this contract and failed to disclose the conflict to the Contracting Officer, the Government may terminate the contract at no cost to the Government.

6. If the Contracting Officer determines that a potential or actual conflict exists, the offeror will not receive an award unless the conflict can be avoided or otherwise resolved through the inclusion of a special contract clause or other appropriate means. The terms of any special clause are subject to negotiation. Offerors should refer to FAR Subpart 9.5 for policies and procedures for avoiding, neutralizing, or mitigating organizational conflicts of interest.

Alternate 1:

When a potential or actual organizational conflict of interest is known to the Government, replace paragraph 2 with:

2. The contracting officer considers that there is potential for organizational conflicts of interest involving this procurement or services to be performed under the resultant contract, as follows:

[ CO fill in ]

By submission of this offer, offeror represents that it is not aware of any information bearing on the existence of any actual or potential organizational conflicts of interest in connection with this solicitation or any resulting contract, except as provided in its disclosure statement. In the disclosure statement, list any potential or actual organizational conflicts of interest. Describe all relevant information concerning any past, present, or planned interests bearing on whether this firm (including its chief executives and directors, any proposed consultants or subcontractors) may have a potential organizational conflict of interest. If no potential or actual conflicts exist, so indicate with a check mark:

____ No potential or actual organizational conflicts of interest exist.

(End of Clause)

Section I - Contract Clauses I-1 52.204-13 System for Award Management Maintenance. (OCT 2018)

I-2 52.204-18 Commercial and Government Entity Code Maintenance. (AUG 2020)

I-3 52.204-19 Incorporation by Reference of Representations and Certifications. (DEC 2014)

I-4 52.204-25 Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment. (NOV 2021)

I-5 52.209-6 Protecting the Government's Interest When Subcontracting With Contractors Debarred, Suspended, or Proposed for Debarment. (NOV 2021)

I-6 52.209-10 Prohibition on Contracting With Inverted Domestic Corporations. (NOV 2015)

I-7 52.213-4 Terms and Conditions - Simplified Acquisitions (Other Than Commercial Products and Commercial Services). (JAN 2022)

(c) FAR 52.252-2, Clauses Incorporated by Reference (FEB 1998). This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):

https://acquisition.gov

I-8 52.215-8 Order of Precedence - Uniform Contract Format. (OCT 1997)

I-9 52.219-28 Post-Award Small Business Program Rerepresentation. (SEP 2021)

(1) The Contractor represents that it [ ] is, [ ] is not a small business concern under NAICS Code 237110 assigned to contract number TBD.

(2) (Complete only if the Contractor represented itself as a small business concern in paragraph (h)(1) of this clause.) The Contractor represents that it [ ] is, [ ] is not, a small disadvantaged business concern as defined in 13 CFR 124.1002.

(3) (Complete only if the Contractor represented itself as a small business concern in paragraph (h)(1) of this clause.) The Contractor represents that it [ ] is, [ ] is not a women-owned small business concern.

(i) It [ ] is, [ ] is not a WOSB concern eligible under the WOSB Program, has provided all the required documents to the WOSB Repository, and no change in circumstances or adverse decisions have been issued that affects its eligibility; and

(ii) It [ ] is, [ ] is not a joint venture that complies with the requirements of 13 CFR part 127, and the representation in paragraph (h)(4)(i) of this clause is accurate for each WOSB concern eligible under the WOSB Program participating in the joint venture. The Contractor shall enter the name or names of the WOSB concern eligible under the WOSB Program and other small businesses that are participating in the joint venture: [ ]. Each WOSB concern eligible under the WOSB Program participating in the joint venture shall submit a separate signed copy of the WOSB representation.

(i) It [ ] is, [ ] is not an EDWOSB concern eligible under the WOSB Program, has provided all the required documents to the WOSB Repository, and no change in circumstances or adverse decisions have been issued that affects its eligibility;

and

(ii) It [ ] is, [ ] is not a joint venture that complies with the requirements of 13 CFR part 127, and the representation in paragraph (h)(5)(i) of this clause is accurate for each EDWOSB concern participating in the joint venture. The Contractor shall enter the name or names of the EDWOSB concern and other small businesses that are participating in the joint venture: [ ]. Each EDWOSB concern participating in the joint venture shall submit a separate signed copy of the EDWOSB representation.

(6) (Complete only if the Contractor represented itself as a small business concern in paragraph (h)(1) of this clause.) The Contractor represents that it [ ] is, [ ] is not a veteran-owned small business concern.

(7) (Complete only if the Contractor represented itself as a veteran-owned small business concern in paragraph (h)(6) of this clause.) The Contractor represents that it [ ] is, [ ] is not a service-disabled veteran-owned small business concern.

(i) It [ ] is, [ ] is not a HUBZone small business concern listed, on the date of this representation, on the List of Qualified HUBZone Small Business Concerns maintained by the Small Business Administration, and no material changes in ownership and control, principal office, or HUBZone employee percentage have occurred since it was certified in accordance with 13 CFR part 126; and

(ii) It [ ] is, [ ] is not a HUBZone joint venture that complies with the requirements of 13 CFR part 126, and the representation in paragraph (h)(8)(i) of this clause is accurate for each HUBZone small business concern participating in the HUBZone joint venture. The Contractor shall enter the names of each of the HUBZone small business concerns participating in the HUBZone joint venture: [ ]. Each HUBZone small business concern participating in the HUBZone joint venture shall submit a separate signed copy of the HUBZone representation.

[Contractor to sign and date and insert authorized signer's name and title.]

I-10 52.222-6 Construction Wage Rate Requirements. (AUG 2018)

I-11 52.222-7 Withholding of Funds. (MAY 2014)

I-12 52.222-8 Payrolls and Basic Records. (JUL 2021)

I-13 52.222-9 Apprentices and Trainees. (JUL 2005)

I-14 52.222-10 Compliance With Copeland Act Requirements. (FEB 1988)

I-15 52.222-11 Subcontracts (Labor Standards). (MAY 2014)

I-16 52.222-12 Contract Termination - Debarment. (MAY 2014)

I-17 52.222-13 Compliance With Construction Wage Rate Requirements and Related Regulations. (MAY 2014)

I-18 52.222-14 Disputes Concerning Labor Standards. (FEB 1988)

I-19 52.222-15 Certification of Eligibility. (MAY 2014)

I-20 52.222-27 Affirmative Action Compliance Requirements for Construction. (APR 2015)

I-21 52.223-2 Affirmative Procurement of Biobased Products Under Service and Construction Contracts. (SEP 2013)

I-22 52.223-3 Hazardous Material Identification and Material Safety Data. (FEB 2021) - Alternate

I (JUL 1995)

I-23 52.223-6 Drug-Free Workplace. (MAY 2001)

I-24 52.223-17 Affirmative Procurement of EPA-designated Items in Service and Construction Contracts. (AUG 2018)

I-25 52.223-18 Encouraging Contractor Policies To Ban Text Messaging While Driving. (JUN 2020)

I-26 52.225-9 Buy American - Construction Materials. (NOV 2021)

(a) Definitions. As used in this clause-

Commercially available off-the-shelf (COTS) item- (1) Means any item of supply (including construction material) that is-

(i) A commercial product (as defined in paragraph (1) of the definition of "commercial product" at Federal Acquisition Regulation (FAR) 2.101);

(ii) Sold in substantial quantities in the commercial marketplace; and

(iii) Offered to the Government, under a contract or subcontract at any tier, without modification, in the same form in which it is sold in the commercial marketplace; and

(2) Does not include bulk cargo, as defined in 46 U.S.C. 40102(4), such as agricultural products and petroleum products.

Construction material means an article, material, or supply brought to the construction site by the Contractor or a subcontractor for incorporation into the building or work. The term also includes an item brought to the site preassembled from articles, materials, or supplies. However, emergency life safety systems, such as emergency lighting, fire alarm, and audio evacuation systems, that are discrete systems incorporated into a public building or work and that are produced as complete systems, are evaluated as a single and distinct construction material regardless of when or how the individual parts or components of those systems are delivered to the construction site.

This is the start of the file's text. The full file is on GovTribe.