Sol_140D0426Q0808.pdf

PDF 625 KB Posted

Attached to
Fence & Stump Removal Services Federal contract opportunity
Solicitation number
140D0426Q0808
Issued by
Department of the Interior Departmental Offices Interior Business Center

About this file

This is a Request for Quotations (RFQ) for fence and stump removal services at Hains Point Golf Course in Washington, DC, issued by the National Park Service under solicitation number 140D0426Q0808. The work involves removal of approximately 1,120 fence posts and 2,000 tree stumps along a 2.1-mile chain link fence perimeter through grubbing (extraction by digging/pulling) rather than grinding. The period of performance is 30 calendar days from the date of award, with a quotation due date of 5:00 PM Eastern Time on August 17, 2026, and questions due by August 13, 2026. This is a Total Small Business Set-Aside with an anticipated Firm Fixed Price award of a single purchase order.

The solicitation requires contractors to retain an ASCA-certified or ISA-certified arborist to determine which trees are protected and which stumps/posts can be removed, with approximately 70 percent of work expected within the Critical Root Zone of protected trees. Key requirements include compliance with tree care industry standards, utility location and hand excavation within 18 inches of marked utilities, backfilling with approved topsoil and seeding/stabilization on the same day as extraction, provision of daily before/during/after photos, traffic control measures, and submission of a Stormwater Pollution Prevention Plan. The NAICS code is 561730 (Landscaping Service, $9.5M size standard), with Product Service Code S208 (Housekeeping – Landscaping/Groundskeeping). Quotations must include technical capability, staffing qualifications with ISA-certified arborist credentials, past performance references from the past three years, and separate pricing with assumptions clearly noted. Award will be based on best value using a tradeoff methodology where non-price factors (technical capability and past performance combined) are more important than price.

View the file

Other files for this federal contract opportunity

Other files attached to Fence & Stump Removal Services, newest first.
File Type Posted
Attachment_2_Past_Performance_Template.docx DOCX document
Attachment_3_Department_of_Labor_Wage_Determination_2015-4281_Rev_38.pdf PDF
Attachment_1_Limitation_on_Subcontracting_Report_Template.xlsx XLSX spreadsheet

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

WOMEN-OWNED SMALL

BUSINESS (WOSB)

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES

1. REQUISITION NUMBER PAGE 1 OF

2. CONTRACT NUMBER 3.AWARD/EFFECTIVE

DATE

4. ORDER NUMBER 5. SOLICITATION NUMBER 6. SOLICITATION ISSUE

DATE

7. FOR SOLICITATION

INFORMATION CALL:

a. NAME b. TELEPHONE NUMBER (No collect calls)

8. OFFER DUE DATE/

LOCAL TIME

9. ISSUED BY

13b. RATING

14. METHOD OF SOLICITATION

CODE

15. DELIVER TO 16. ADMINISTERED BY CODE

18a. PAYMENT WILL BE MADE BY CODE17a. CONTRACTOR/

OFFEROR

CODE

FACILITY

CODE

CODE

TELEPHONE NUMBER

17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN

OFFER

18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK

BELOW IS CHECKED

REQUEST

FOR QUOTE

(RFQ)

INVITATION

FOR BID

(IFB)

REQUEST

FOR

PROPOSAL

(RFP)

SEE ADDENDUM

19.

ITEM NO.

20.

SCHEDULE OF SUPPLIES/SERVICES

21.

QUANTITY

22.

UNIT

23.

UNIT PRICE

24.

AMOUNT

(Use Reverse and/or Attach Additional Sheets as Necessary)

25. ACCOUNTING AND APPROPRIATION DATA 26. TOTAL AWARD AMOUNT (For Government Use Only)

28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN 29. AWARD OF CONTRACT: REFERENCE

. YOUR OFFER ON SOLICITATION

(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE

SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:

30a. SIGNATURE OF OFFEROR/CONTRACTOR

30b. NAME AND TITLE OF SIGNER (Type or print) 30c. DATE SIGNED

31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER)

31b. NAME OF CONTRACTING OFFICER (Type or print) 31c. DATE SIGNED

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

STANDARD FORM 1449 (REV. 11/2021)

Prescribed by GSA - FAR (48 CFR) 53.212

10. THIS ACQUISITION IS UNRESTRICTED OR

NORTH AMERICAN

INDUSTRY CLASSIFICATION

STANDARD (NAICS):

SIZE STANDARD:

13a. THIS CONTRACT IS A

RATED ORDER UNDER

THE DEFENSE PRIORITIES

AND ALLOCATIONS

SYSTEM - DPAS (15 CFR 700)

SET ASIDE: % FOR:

11. DELIVERY FOR FREE ON

BOARD (FOB) DESTINATION

UNLESS BLOCK IS MARKED

SEE SCHEDULE

12. DISCOUNT TERMS

ARE ARE NOT ATTACHED

ARE ARE NOT ATTACHED

27a. SOLICITATION INCORPORATES BY REFERENCE (FEDERAL ACQUISITION REGULATION) FAR 52.212-1, 52.212-4.

FAR 52.212-3 AND 52.212-5 ARE ATTACHED.

27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED.

8(A)

ECONOMICALLY

DISADVANTAGED

WOMEN-OWNED SMALL

BUSINESS (EDWOSB)

SERVICE-DISABLED

VETERAN-OWNED

SMALL BUSINESS

(SDVOSB)

HUBZONE SMALL

BUSINESS

SMALL BUSINESS

NOTE: OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30.

COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH

AND DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND

ON ANY ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS

SPECIFIED

DATED.

OFFER

ADDENDA

ADDENDA

140D0426Q0808

See Schedule See Schedule

Interior Business Center, AQD Acquisition Services Directorate 381 Elden Street Suite 2000A Herndon VA 20170

08/17/2026 1700 ED

D34 100.00

D34

561730

$9.5

08/12/2026

ADMINISTERED BY:

Interior Business Center, AQD

Acquisition Services Directorate

381 Elden Street

Suite 2000A

Herndon VA 20170 USA

Continued...

STOCK RECORD (S/R)

STANDARD FORM 1449 (REV. 11/2021) BACK

19.

ITEM NO.

20.

SCHEDULE OF SUPPLIES/SERVICES

21.

QUANTITY

22.

UNIT

23.

UNIT PRICE

24.

AMOUNT

32a. QUANTITY IN COLUMN 21 HAS BEEN

RECEIVED INSPECTED AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED:

41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT

32b. SIGNATURE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32c. DATE

41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE

42a. RECEIVED BY (Print)

42b. RECEIVED AT (Location)

42c. DATE RECEIVED (MM/DD/YYYY) 42d. TOTAL CONTAINERS

40. PAID BY

32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f. TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE

32g. EMAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE

33. SHIP NUMBER 34. VOUCHER NUMBER 35. AMOUNT VERIFIED

CORRECT FOR

PARTIAL FINAL

37. CHECK NUMBER

38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER

36. PAYMENT

COMPLETE PARTIAL FINAL

ACCEPTED,

Fence & Stump Removal Services

Period of Performance: 08/24/2026 to

09/23/2026

00010 Removal of existing tree stumps

Product/Service Code: S208

Product/Service Description: HOUSEKEEPING-

LANDSCAPING/GROUNDSKEEPING

00020 Removal of existing post

Product/Service Code: S208

Product/Service Description: HOUSEKEEPING-

LANDSCAPING/GROUNDSKEEPING

RFQ 140D0426Q0808 Fence & Stump Removal Project Page 1 of 33

National Park Service

Hains Point Golf Course

Fence & Stump Removal Project

SUMMARY:

This is a combined synopsis/solicitation for commercial services prepared in accordance with Revolutionary Federal Acquisition Regulation Overhaul (RFO) Part 12. This announcement constitutes the only solicitation. Quotes are being requested and a separate written solicitation will not be issued.

Solicitation 140D0426Q0808 is issued as a Request for Quotations (RFQ) for Fence & Stump Removal services for Hains Point Golf Course.

This acquisition is set-aside for small business concerns. This solicitation incorporates provisions and clauses by reference. The full text of provisions and clauses may be accessed electronically at www.acquisition.gov.

North American Industrial Classification System (NAICS): 561730 – Landscaping Service (Size Standard $9.5M).

Product Service Code (PSC): S208 Housekeeping – Landscaping/Groundskeeping

Period of Performance (PoP): 30 calendar days from date of award

Quotation Due Date: Quotes submitted in response to this RFQ shall be received no later than 5:00 PM Eastern Time, August, 17 2026, to be considered for award. See Section 5 for submission instructions.

Questions Due Date: Questions shall be sent via email to: AQDOpsSupport@ibc.doi.gov no later than 5:00 PM Eastern Time on August 13, 2026.

Points of Contact: The RFQ point of contact is (AQDOpsSupport@ibc.doi.gov).

Attachments:

Attachment 1 Limitation on Subcontracting Report Template

Attachment 2 Past Performance Template

Attachment 3 Department of Labor Wage Determination 2015-4281 Rev 38 http://www.acquisition.gov/ mailto:AQDOpsSupport@ibc.doi.gov

RFQ 140D0426Q0808 NPS GWMP Hazardous Tree and Debris Removal Services Page 2 of 34

SECTION 1 - INTRODUCTION

1.1 General

This is a combined synopsis/solicitation for commercial services prepared in accordance with RFO Part 12. This announcement constitutes the only solicitation. Quotes are being requested and a separate written solicitation will not be issued. Solicitation 140D0426Q0808 is issued as a Request for Quotations (RFQ) for Fence & Stump Removal services for Hains Point Golf Course. The National Park Service (NPS) requires removal of existing tree stumps and metal fence posts with concrete bases by means of “grubbing” as mentioned in 1.1.2 of this SOW, identified as being within the CRZ of a protected tree.

This acquisition is set-aside for small business concerns. This solicitation incorporates provisions and clauses by reference. The full text of provisions and clauses may be accessed electronically at www.acquisition.gov.

The applicable North American Industrial Classification System (NAICS) Code is 561730 – Landscaping Service (Size Standard $9.5M). The Product or Service Code (PSC) is S208 Housekeeping – Landscaping/Groundskeeping.

1.2 Set-Aside Information

This RFQ is a Total Small Business Set Aside. Only one (1) Purchase Order will be awarded as a result of this RFQ. The selected Quoter shall provide all services sought under this RFQ.

1.3 Anticipated Award Type

As a result of this RFQ, the Government anticipates awarding a Firm Fixed Price (FFP) type Purchase Order.

1.4 Period of Performance

The anticipated Period of Performance for this Purchase Order is:

Period of Performance

30 calendar days after date of award

1.5 CLIN Structure and Pricing Schedule

Contract Period

CLIN

# Description PoP CLIN

Type Price

N/A 10 Removal of existing tree stumps 30 calendar days after date of award

FFP TBD

20 Removal of existing post FFP TBD

1.6 Place of Performance

The required Place of Performance is Hains Point Golf Course, Washington DC.

http://www.acquisition.gov/

RFQ 140D0426Q0808 NPS GWMP Hazardous Tree and Debris Removal Services Page 3 of 34

SECTION 2 – STATEMENT OF WORK

I. PROJECT DESCRIPTION:

A. The Hains Point Golf Course (HPGC) has a 2.1 mile long chain link fence surrounding its perimeter which is slated for removal.

B. The contractor shall provide all labor, supervision, materials, tools, supplies, transportation, barricades, signs, traffic control measures/coordination and equipment incidental to the removal of a tree stump and/or fence post both within and beyond the CRZ, in accordance with tree care industry standards and best management practices (BMPs) while working at the Hains Point Golf Course.

Fence posts and interfering existing stumps within the footprint of the existing fenceline will be removed by means of grubbing (extraction by digging/pulling stumps, not stump grinding).

C. The contractor shall submit a detailed work plan for NPS review prior to project commencement.

D. The CRZ of each protected tree follows this 1:1.5 formula: DBH (diameter at breast height (in inches) at 4’ above grade) X 1.5’ = radius in feet. The radius stretched outwardly in every direction from the tree’s buttress flair is the tree’s CRZ. Example: 10” dbh X 1.5’ = 15’ radius which = 30’ diameter CRZ + the diameter of the trunk at grade (buttress flair).

E. NPS has not identified the location and size of every stump and post. NPS has estimated that there are approximately 1,120 posts and 2,000 stumps along the

2.1 mile long section of fencing. Some of these posts and stumps may have been removed by NPS staff at the time of contract award. Approximately 70% of the posts and stumps are expected to be within the CRZ of living trees along the corridor. The lump sum contract shall be based on the work required to remove the actual amount of posts and stumps on site and the numbers provided shall be used as an approximate quantity only.

II. SCOPE OF WORK:

A. Task: Removal of existing tree stumps and metal fence posts with concrete bases by means of “grubbing” as mentioned in 1.1.2 of this SOW, identified as being within the CRZ of a protected tree.

1. It shall be the responsibility of the contractor to retain an ASCA (American Society of Consulting Arborists) Certified Consulting Arborist or ISA (International Society of Arboriculture) Certified Arborist to determine which trees are affected by the fence and stump removal work including which trees shall be protected, which trees shall not be protected, and which trees

RFQ 140D0426Q0808 NPS GWMP Hazardous Tree and Debris Removal Services Page 4 of 34 shall be removed. The arborist shall provide a brief written report supporting their recommendation on each tree and shall submit this information to the National Mall & Memorial Parks (NAMA) Urban Forester.

The report shall include at a minimum: species; DBH; condition; reason for decision and justification of decision (e.g., ISA standards, ANSI A300 standards, TRAQ qualification).

a) Contactor shall provide Arborist’s report and recommendations to NPS at least 3 business days prior to anticipated start of work around the reference tree.

b) Once plan is approved, contractor can commence work.

2. There are numerous utilities located within the limits of work. It is the contractor’s responsibility to hire a private locator to locate these items in the work area. Utilities shown on the plans are based on record drawings and are approximate only.

a) Any excavation within 18” of a marked utility shall be via hand tools, pneumatic, or hydro excavation to prevent damage to the utility.

b) Hand work, hydro-vac, and/or pneumatic excavation with SSAT (Supersonic Air Tool, AKA AirSpade). AirSpade work shall be performed with mechanical backboard in place to capture soil from migrating away from site during excavation. The dry soil shall be used in backfilling excavated areas. Hydro-vac spoils shall be hauled from site and disposed of following federal, state, and local DOT and dumping regulations.

c) The contractor may elect to utilize stump grinding in areas where utilities or hardscape infrastructure may be impacted by grubbing operations as recommended by their certified arborist and with approval from NPS.

III. STUMP GRUBBING REQUIREMENTS

A. “Grub” or dig stump from ground. Remove all woody portions down to 1” diameter roots. Before, during, and after photos are required daily of each 150 linear feet of work (about 15 fence posts). Upload the photos and reports to NPS Sharepoint/Teams Site.

1. Work performed beyond the CRZ of a protected tree may simply follow the urban forester’s approved work plan previously submitted by the contractor.

2. The holes created by the extraction of the stumps and fence posts shall be backfilled with NAMA approved topsoil and seeded/stabilized on the same day the hole was created as required by the approved DOEE plan. If backfill ing cannot be completed the same day, the contractor is responsible

RFQ 140D0426Q0808 NPS GWMP Hazardous Tree and Debris Removal Services Page 5 of 34 for protecting the excavation until it can be properly backfilled utilizing plates, fencing, or other protective measures as approved by NPS.

a) Examples of topsoil providers, in no particular order are:

(1) Stancills

(2) TE Woods

(3) Egypt Farms

(4) JK Enterprises

B. The following requirements apply when working in the CRZ of a tree to be protected as recommended by the contractor’s arborist and approved by the

NPS.

1. The contractor’s arborist shall be on site during all working hours either performing the work or directly physically overseeing the project.

2. When grubbing a stump or pulling fence posts with concrete bases within the Critical Root Zone (CRZ = 1:1.5 ratio) of a protected tree, the contractor shall deconflict the objects from the roots of the protected tree by root pruning as far from the buttress roots of the protected tree as possible.

a) Tools acceptable for this work are: stump grinder, sharp vibratory plow, a power root pruning machine made-for-the-purpose, pneumatic excavation and hand-tools such as hand saws, power saw, sharp spade shovel, loppers, pocket-snips.

b) Any/all work performed within the CRZ of any tree shall be performed by or overseen by an ISA certified arborist or MD./Va. Licensed Tree Expert.

c) The root pruning required to deconflict stumps and concrete bases shall be performed 360 degrees around each excavated object to a minimum depth of 14”.

C. The contractor shall adhere to DOEE, NAMA, and all other federal, state and local environmental requirements in the form of proper usage of environmental controls.

IV. STUMP GRINDING REQUIREMENTS

A. Stump grinding is only allowed in lieu of grubbing where approved by NPS due to utility or infrastructure conflicts as recommend by their certified arborist.

B. Should grinding be used, grind depth shall continue until the machine grinds through the bottom of the stump. Laterally, grind all roots down to 1” diameter throughout entire root mat. Backfill stump hole with NAMA approved topsoil and in accordance with plans. See Topsoil Requirements in the next section.

V. TOPSOIL REQUIREMENTS

RFQ 140D0426Q0808 NPS GWMP Hazardous Tree and Debris Removal Services Page 6 of 34

A. Shall be a screened, natural, surface soil, in a friable condition and contain less than 3 percent subsoil. The topsoil shall be free of hardpan material, stones and clods larger than 1/2 inch in diameter, sticks, tree or shrub roots, debris, toxic substances (i.e. residual herbicides) and other material detrimental to plant growth. The area and the topsoil shall be free of undesirable plants or plant parts such as, but not limited to, bermudagrass, nut sedge, mugwort, Johnson grass, quack grass, Canada thistle or noxious weeds as set forth in the Federal Seed Act.

B. Contractor shall notify NPS of location of all sources of the topsoil and furnish the NPS a certified report from the agricultural experiment station or approved agricultural laboratory of an analysis performed not more than 60 days prior to the date of submission. The topsoil shall be certified to meet the following requirements

1. Shall be a natural, original surface soil of a sandy loam texture with a mechanical analysis of 50% -65% sand, 15-25% silt and 10-35% clay.

2. Shall have at least 2%, but not more than 5%, organic matter.

3. Soil pH shall 5.5 to pH 7.2 inclusive unless otherwise specified.

4. Soil salinity by electrical conductivity measurement shall not exceed 600 parts per million (ppm) as determined by Black, Editor "Method of Soil Analysis", Part 2, published by the American Society of Agronomy, 1965.

5. The soil nutrient level shall be between 70-265 lbs. /acre of magnesium, 65-205 lbs./acre of phosphorous (P2O5), and 85-320 lbs./acre of potassium (K2O).

6. Agricultural limestone at not more than 5 pounds per cubic yard of topsoil may be used to adjust an acidic condition and shall be thoroughly mixed by volume.

7. Topsoil which has been synthesized by blending materials which individually do not meet the requirements of this specification will not be accepted even though the resulting blend meets the organic matter, mechanical analysis, Ph and soluble salts requirements.

8. Topsoil shall not be delivered or handled in a frozen or muddy condition.

VI. SEEDING/SOD AND STABILIZATION REQUIREMENTS

A. Contractor shall follow the approved DOEE plans for general vegetative and stabilization requirements at a minimum.

B. The contractor shall consult the NAMA Turf Manual for seeding requirements and confirm mix selection is in accordance with the manual for the areas to be stabilized.

1. The approved DOEE plans require erosion control matting (ECM) be installed in areas that are larger than 10 SF. The control matting may not have any plastic or synthetic materials.

RFQ 140D0426Q0808 NPS GWMP Hazardous Tree and Debris Removal Services Page 7 of 34

2. The contractor may elect to install sod in lieu of the seeding and ECM provided it meets the requirements of NAMA’s Turf Manual.

VII. AREA OF OPERATIONS

A. The work shall occur in areas as shown on the approved DOEE plans following the existing fence line. All remaining posts and stumps shall be removed via grubbing (pulling) unless authorized by NAMA due to utility or infrastructure constraints.

B. Any stump whose remaining root zone is expected to fall under the centerline of the fence shall be removed. If there is any question as to whether the stump falls into this category, contractor shall request written confirmation from NPS before excavating.

C. Contractor may utilize the Hains Point Boneyard as identified on the approved plans for staging equipment and materials.

VIII. PROTECTION OF GOVERNMENT PROPERTY

A. The Contractor shall assume full liability and responsibility for any loss or damage to Government property caused by his operations and shall assume full responsibility for any and all damages or claims for damage for injury to persons, property or equipment which might result from any service performed under this contract. The Contractor shall be responsible for the repair or replacement of all damaged government property caused by his operations.

B. Tree and Turf Protection: All motorized and non-motorized equipment used shall be conveyed and staged on industry appropriate turf protection mats (e.g.

Alturna mats, Trak-Mats, ½” plywood, etc.) designed for the purpose of protecting soil, turf and Critical Root Zones (CRZ’s) when operating off of paved surfaces. At no time shall “over-the-road” DOT tires be in direct contact with soil, turf, or critical root zones. Extra wide, low PSI "floatation tires" made for the purpose may be approved by NPS on a case by case basis. Written approval shall be received before these vehicles enter any unprotected areas that are not paved.

1. Should this equipment be approved, contractor shall rinse all sediment from the equipment and tires to an appropriate area to prevent sediments from reaching paved surfaces or waterways and ensure inlet protection is installed in all areas where this equipment enters and exits paved surfaces.

IX. PERMITS AND RESPONSIBILITIES

RFQ 140D0426Q0808 NPS GWMP Hazardous Tree and Debris Removal Services Page 8 of 34

A. NPS has received plan approval from DOEE and will by the time of construction have a DOB BCIV permit for the work. Contractor will be responsible for contacting DOEE to schedule pre-construction inspection.

Contractor shall notify NPS of time and day of inspection once scheduled.

B. The contractor shall be responsible for all damages to persons or property that occur as a result of the contractor’s negligence and shall take proper safety and health precautions to protect the work, the workers, the public and the property of others.

C. The contractor shall be responsible for all materials delivered and work performed until completion and acceptance of the entire work.

D. This work requires coverage under the EPA Construction General Permit (CGP). NPS shall obtain coverage under the CGP. Contractor will be responsible for proving a Stormwater Pollution Prevention Plan (SWPPP) for the work and completing all required inspections while work is active.

X. ON-SITE SUPERVISOR:

A. As a minimum, the contractor must provide one on-site supervisor to direct all contract personnel and maintenance operations.

B. The on-site supervisor shall be fluent in the English language in order to effectively communicate with the contractor’s employees and/or subcontractors as well as the COR and other Government personnel.

C. If the on-site supervisor is not present or otherwise absent, the contractor shall provide an alternate supervisor to manage and direct all contract personnel and operations. The alternate supervisor shall possess the same qualifications as the on-site supervisor.

D. The onsite supervisor shall be available for phone calls during all working hours.

E. When working within the CRZ of any tree, a current ISA Certified Arborist shall be on the job site at all times and shall be the primary contact with the Government's technical representative responsible for controlling the quality of work and inspecting all completed work in order to ensure that contract performance requirements are met. The contractor shall provide the arborist’s certification ID for verification before work begins, and any time there is a change in the onsite arborist. Certification and currency will be subject to verification by the government utilizing the ISA database.

XI. CONDUCT:

RFQ 140D0426Q0808 NPS GWMP Hazardous Tree and Debris Removal Services Page 9 of 34

A. The contractor’s employees shall, at all times while on the job site, whether on or off duty, conduct themselves in a professional, orderly and safe manner.

Rudeness, fighting, being under the influence of alcohol and/or drugs or bringing and/or consuming alcohol and/or drugs, gambling, soliciting, stealing, and any immoral or otherwise undesirable conduct shall not be permitted on the job site and shall result in immediate and permanent removal from the job site of any employee engaging in such conduct.

XII. SITE MAINTENANCE:

A. The contractor shall maintain the work site in a safe, neat and orderly manner. All supplies and equipment on the project site shall be stored to preclude any damage.

B. Limited space may be provided for the storage of materials, which shall be stored in a clean and neat condition as approved by the COR. This is not guaranteed; thus the contractor must be prepared to transit the entire operational footprint daily.

C. All mud, dirt, debris, foreign objects or spills of any kind from the contractor’s operations shall be cleaned up daily or as requested by the COR.

D. All contractor generated refuse and waste, including stumps, wood chips, posts, concrete and other materials removed during performance of the work shall be hauled from the work site daily and legally disposed. Refuse and waste material shall be hauled in trucks with tight fitting covers to prevent spillage on roadways.

E. The contractor shall prepare a Temporary Traffic Control Plan if Ohio Drive and/or the bicycle/pedestrian lane are to be impacted by equipment, vehicles, or other work for an extended period of time. At a minimal, signage and flaggers shall be in place when the lanes are impacted for vehicles and equipment entering/exiting the roadway. Anytime the traffic control plan needs to be implemented for an extended duration, the contractor shall contact NPS prior to closing the lanes.

F. It shall be the contractor’s responsibility to take whatever measures are necessary to assure the protection of the Government assets and to perform the work so as to cause minimal disruption of ongoing activities near occupied areas.

This shall include coordinating any impacts to golf course operations.

G. The contractor assumes the risk and responsibility for the loss or damage to the Government furnished property.

H. Any/all turf protection mats shall be removed from turf nightly. No mats to remain on soil/turf overnight.

RFQ 140D0426Q0808 NPS GWMP Hazardous Tree and Debris Removal Services Page 10 of 34

XIII. ENVIRONMENTAL CONCERNS AND SAFETY STANDARDS:

A. The contractor and each of their employees shall work in compliance with all applicable OSHA, Federal, state and local safety laws and regulations (e.g.

CFR29, etc).

B. While within the CRZ of any NAMA tree, the contractor shall be in compliance with ANSI Z133.1 standards unless waived in writing by NPS.

C. The contractor shall provide and ensure that all personnel at the work site use the proper Personal Protective Equipment (PPE) required by OSHA regulations and ANSI standards.

D. The contractor shall take all necessary precautions for safety and shall provide reasonable protection to prevent damage, injury or loss to persons, properties, equipment and vehicles.

E. The NAMA Resource Management staff will perform necessary nesting bird and bat surveys at appropriate times of year. It is only after their confirmation of all-clear can the contractor begin their overhead tree manipulations.

F. In the event of an emergency the contractor should first call 911. For other nonemergency issues requiring a law enforcement officer, the US Park Police watch desk may be reached at (202) 438-1617.

G. Damage caused by the contractor to any properties, including utilities, shall be repaired or replaced to the satisfaction of the Government at the expense of the contractor. The Government, at its sole direction, may elect to repair or replace the damaged property, and deduct such costs from monies due the contractor.

H. The contractor shall not leave any tools, parts and/or supplies unattended in the public area at any time while performing work.

I. The contractor shall report damage caused to US Government trees or landscape immediately to the COR or NAMA staff Arborist.

XIV. VEHICLE OPERATIONS

A. Contractor personnel operating motor vehicles used in performance of this contract shall have a valid state operator’s license and shall operate all motor vehicles in accordance with applicable laws. The contractor’s vehicles shall have an identification tag clearly visible while on site.

B. All vehicles shall be registered and insured in accordance with all applicable laws and regulations.

RFQ 140D0426Q0808 NPS GWMP Hazardous Tree and Debris Removal Services Page 11 of 34

XV. QUALITY ASSURANCE

A. When the contractor considers work is acceptable to the Government and complete, the contractor shall inform the COR that the work is complete and ready for inspection. The COR will inspect the work on-site in consultation with the NPS staff. In the event that the work is not acceptable, the contractor shall record a list of items noted by the Government to be corrected. A subsequent inspection may take place in order to review the corrected items.

B. Upon completion, the contractor shall provide the government with a work/treatment log denoting the work performed by specimen. The work log shall utilize standard industry terms and include any tree health or hazard concerns noted during work performance. Contractor work log entries will be used to build historical tree health data archives and better inform urban forest management decisions within the park.

C. The Contractor shall submit all invoices through www.ipp.gov within 30 days of work performed. All Invoices will have the work performed broken out on them along with the location site clearly defined. Failure of the contractor to upload an attached copy of the invoice and any requested documentation through IPP.gov will result in invoice being rejected.

XVI. PERIOD OF PERFORMANCE:

A. Within 30 calendar days of date of award.

SECTION 3 - ADMINISTRATION

3.1 Contractor Administration

TBD at Time of Award

3.2 Government Administration

The Contracting Officer (CO) for this Order is:

Contracting Officer: TBD

Department of the Interior / Interior Business Center / Acquisition Services Directorate

The Program Manager and Contracting Officer’s Representative (COR) for this Order is:

TBD at Award

RFQ 140D0426Q0808 NPS GWMP Hazardous Tree and Debris Removal Services Page 12 of 34

SECTION 4 – QUOTATION PREPARATION & SUBMISSION INSTRUCTIONS

The following instructions to the Quoter are included as an addendum to Federal Acquisition Regulation (FAR) provision 52.212-1. The Quoter shall reply to this request as follows.

4.1 Quotation Preparation Instructions

To be considered for award, a Quotation shall contain the following Quoter information:

• Company Name

• Mailing Address and Website

• Company Size Status

• SAM Unique Entity Identifier (UEI)

• Complete business mailing address as it appears in the System for Award

Management (SAM) at www.sam.gov

• Contact name, phone number, and e-mail address

• RFQ Number

• Quotation Number

• Date submitted and Quote Expiration Date

• Technical and Price Quote

Quoters are required to be registered in the System for Award Management (SAM) at www.sam.gov as of the date the quotation is submitted. The quoter’s SAM registration shall remain in “active” status through award, and if selected for award must remain in active status until the contract expires.

Quotations that do not meet all the requirements specified in this RFQ may not be considered.

4.2 Quote Organization Instructions

Your quote shall become the property of the Government and will not be returned. If your quote contains information that you do not wish disclosed to the public or used by the Government for any purpose other than evaluation of your quote, such restrictions shall be clearly indicated on each sheet containing such information. Prior to submission of your quote, the Quoter is expected to reach an understanding of the requirements of this solicitation. If such a review establishes the need for correction, such information should immediately be brought to the attention of the Contracting Officer so that the matter can be resolved. The Government reserves the right to request such additional information as may be necessary to determine the Quoter’s qualifications for award of a Purchase Order or to clarify any aspects of the technical and/or business quotes. Such information shall be furnished promptly upon the Government’s request. Copies of the successful quote will be retained only as needed for contract administration and monitoring.

RFQ 140D0426Q0808 NPS GWMP Hazardous Tree and Debris Removal Services Page 13 of 34

4.3 Quotation Package Submission Requirements

The Quoter is required to complete and submit their quote in the following format in order to be considered for award:

Volume Number Section Number and Contents

Cover Letter

Includes:

• Company Name

• Mailing Address and Website

• Company Size Status

• SAM Unique Entity Identifier (UEI)

• Complete business mailing address as it appears in the System for Award Management (SAM) at www.sam.gov

• Contact name, phone number, and e-mail address

• RFQ Number

• Quotation Number

• Date submitted and Quote Expiration Date

VOLUME 1

Technical*

Section 1: Technical Capability

Includes:

• Technical Capabilities and Approach

• Staffing and Organizational Experience

• Staffing Experience Narrative

• Organizational Experience Narrative

• Technical Assumptions

Section 2: Past Performance

Includes:

• Attachment 3: Past Performance Template

VOLUME 2

Price

Section 1: Pricing Quote

Includes:

• Price Assumptions

*Note - Quoters shall not include any pricing related information in their Technical quotes.

Page Limitation: The technical submission is limited in length to 30 pages.

Required Components of Each Volume & Section

VOLUME 1 – TECHNICAL:

RFQ 140D0426Q0808 NPS GWMP Hazardous Tree and Debris Removal Services Page 14 of 34

Section 1 – Technical Capability

This section may include introductory language which describes the services of the vendor, its history, its achievements, and/or its areas of specialization. This section shall provide specific information on the topics related to the Government Statement of Work (SOW).

Technical Capabilities and Approach –

Technical Capabilities demonstrate how the quote for fence & stump removal services conform to the Statement of Work (SOW) contained in the RFQ. Approach is the Quoter’s methodology, management, and resources to achieve safe, timely, efficient, cost effective, and high-quality results, with special emphasis on cost control methods.

Staffing and Organizational Experience:

Staffing Experience is the extent, depth, and relevance of experience of Contractor’s employees as it relates the SOW. Staffing Experience includes the identification of staffing’s critical skills, knowledge, and technical expertise relevant to the services specified. Organizational Experience is defined as the Organization’s experience and history in providing fence & stump removal services as required by this RFQ. It includes the Organization’s pertinent skills specific to the RFQ and any special or unique characteristics of the Organization which would make it especially qualified to perform the required work activities.

The Quoter must:

1) Provide a staffing narrative including relevant experience and qualifications. The Contractor must demonstrate the quality and depth of experience of staff in meeting the requirements of this RFQ. Resumes / Certifications are not required except for the records needed to demonstrate compliance with the requirement for current ISA (International Society of Arboriculture) certified arborist credential or shall possess the current credential of LTE (Licensed Tree Expert) in the state of Maryland, Virginia, or in the District of Columbia. The contractor shall provide the arborist’s certification ID for verification before work begins, and any time there is a change in the onsite arborist. Certification and currency will be subject to verification by the government utilizing the ISA database.

2) Provide a narrative describing the organization current capabilities, qualifications, and experience for assuring performance of this requirement. The narrative must describe clearly and thoroughly the Organization’s experience, expertise, knowledge and management strategy in providing fence & stump removal services.

Technical Assumptions, Conditions, and/or Exceptions

Quoters must submit, under separate cover, all (if any) assumptions, conditions, or exceptions with any of the terms and conditions of this RFQ. If not noted in this section of your quote, it will be assumed that the quoter proposes no assumptions for award and agrees to comply with all of the terms and conditions as set forth herein. It is not the

RFQ 140D0426Q0808 NPS GWMP Hazardous Tree and Debris Removal Services Page 15 of 34 responsibility of the Government to seek out and identify assumptions, conditions, or exceptions buried within the quoter’s quote.

Section 2 – Contractor’s Past Performance

This section of the Quotation must describe the company’s past performance in performing work related to fence & stump removal services described in the Statement of Work.

The Quoter must:

• Provide three to five recent and relevant references using Attachment 3 Past Performance Template. (Recent is defined as within the past three years of this RFQ issuance date. Relevant is defined as work of similar type in complexity, magnitude, and scope of the work described in the accompanying SOW.) The submittal shall include rationale supporting your assertion of relevance and how it was determined that the work performed previously was the same or similar in nature, size and complexity to the work specified by this solicitation. Quoters are required to explain what aspects of the contracts are deemed relevant to the proposed effort, and to what aspects of the proposed effort they relate. Discuss in detail the quality in performance of each identified relevant contract.

• It is recommended that the Quoter alert their References that their names have been submitted in response to this RFQ and that the Contacts are authorized to provide past/present performance information related to the listed contracts at the DOI’s request.

• If more than five contracts/ orders are submitted in this section, the Government shall only review the first five. Any additional contracts/orders submitted will not be evaluated.

To ensure that Volume I is evaluated strictly on its merit, no pricing information is to be included in the above sections.

VOLUME 2 - PRICING

Section 1 - Price Quote

Your Price portion shall be a separate volume from the Technical portion. No other price quote will be accepted.

The Department of Labor Wage Determination is attached (Attachment 3) for those categories that are not exempt from Service Contract Labor Standards requirements.

Price Assumptions, Conditions, and/or Exceptions:

Quoters shall indicate, in this section only, if any price related assumptions have been made, conditions have been stipulated or exceptions have been taken with the statement of work as written. If not noted in section of this volume of the quote, it will be assumed that the Quoter’s quote reflects no price assumptions for award and agrees to comply with all of the terms and conditions set forth herein. It is not the responsibility of the Government to seek out and identify assumptions, conditions, or exceptions buried within

RFQ 140D0426Q0808 NPS GWMP Hazardous Tree and Debris Removal Services Page 16 of 34 the Quoter’s quote. Accordingly, any price related assumptions listed in any other Volume or Section shall be null and void.

4.4 Submission of Questions

Questions regarding this RFQ shall be sent via email to: AQDOpsSupport@ibc.doi.gov.

Questions shall be submitted no later than 5:00 PM Eastern Time on August 13, 2026.

4.5 Submission of Quotations

The Quotation shall be submitted via EMAIL no later than the date and time specified. It is the quoter’s responsibility to ensure/verify that the Government receives its submission on or before this date and time. A Quotation received later than this date and time may not be considered.

Other General Information The Government reserves the right to contact a Quoter regarding their quote including to request additional discounts.

The Government reserves the right to not issue an award from this RFQ. This is an RFQ only and in no way obligates the Government to award a Purchase Order or to reimburse the Contractor for any costs incurred in preparing the response to this RFQ.

4.6 Quotation Submission Deadline

Quotations shall be submitted NO LATER THAN 5:00 PM Eastern Time, August, 17 2026

Quotations shall be sent via EMAIL to the Contracting Officer at:

AQDOpsSupport@ibc.doi.gov.

SECTION 5 – EVALUATION FACTORS FOR AWARD

Basis for Award: The basis of award will be Best Value to the Government using a tradeoff methodology of price and non-price factors. One Purchase Order will be awarded to the responsible Quote provider whose quote, conforming to the RFQ, will be the most advantageous to the Government, considering all price and non-price factors. The Quote provider receiving award may not necessarily be the lowest Price or have the highest Technical rating. The Government reserves the right not to make any award resulting from this solicitation. Award may only be made upon a responsibility determination in accordance with FAR 9.104-1.

Non-Price Factors 1 and 2 (Technical Capability and Past Performance, respectively) are of equal importance, and when combined, are more important than Factor 3 - Price.

The following Non-Price and Price Factors shall be used to determine the service provider whose Quote represents the best overall value to the Government-

Factor 1: Technical Capability - includes the following subfactors:

mailto:%20AQDOpsSupport@ibc.doi.gov

RFQ 140D0426Q0808 NPS GWMP Hazardous Tree and Debris Removal Services Page 17 of 34

Subfactor 1A: Technical Capabilities and Approach

Subfactor 1B: Staffing and Organizational Experience

Subfactor 1C: Technical Assumptions, Conditions, and/or Exceptions

Factor 2: Past Performance

Factor 3: Price – includes the following subfactors:

Subfactor 3A: Price

Subfactor 3B: Pricing Assumptions, Conditions, and/or Exceptions

Factor 1: Technical Capability

Subfactor 1A: Technical Capabilities and Approach

Technical Capabilities will be evaluated based on the extent to which the quoted fence & stump removal services conform to the SOW contained in the RFQ. Approach will be evaluated based on the extent to which the quote demonstrates the Quoter’s methodology, management, and resources achieve safe, timely, efficient, cost effective, and high-quality results, with a special emphasis on cost control methods.

Subfactor 1B: Staffing and Organizational Experience

Staffing Experience will be evaluated based on the extent, depth, and relevance of experience of Contractor’s employees as it relates to the SOW. Staffing Experience will be evaluated based on the extent to which the quote demonstrates the identified staffing’s critical skills, knowledge, and technical expertise are relevant to the services specified. This includes staffing of a current ISA (International Society of Arboriculture) certified arborist credential or shall possess the current credential of LTE (Licensed Tree Expert) in the state of Maryland, Virginia, or in the District of Columbia. The contractor shall provide the arborist’s certification ID for verification before work begins, and any time there is a change in the onsite arborist. Certification and currency will be subject to verification by the government utilizing the ISA database.

Organizational Experience will be evaluated based on the extent to which the quote demonstrates the business’ experience and history in providing fence & stump removal services as required by this RFQ. It includes the organization’s pertinent skills specific to the RFQ and any special or unique characteristics of the business which would make it especially qualified to perform the required work activities, including physical resources for meeting the technical requirements.

Subfactor 1C: Technical Assumptions, Conditions, and/or Exceptions

Technical Assumptions, Conditions, or Exceptions will be evaluated for risk and may render a quote unacceptable and result in removal from competition.

After review of the Quoter’s Technical Capability, the Government will correlate their findings with one of the ratings shown below:

RFQ 140D0426Q0808 NPS GWMP Hazardous Tree and Debris Removal Services Page 18 of 34

Factor 1: Technical Capability Adjectival Ratings

Adjectival Rating Description

Exceptional Exceeds specified minimum performance or technical requirements in a way beneficial to the Government.

Acceptable Meets specified minimum performance or technical requirements.

Marginal There is doubt regarding whether an aspect of the quote meets a specified minimum performance or technical requirement, but any such uncertainty is correctable.

Unacceptable Fails to meet specified minimum performance or technical requirements. The quote has one or more deficiencies and is not awardable.

EVALUATION OF FACTOR 2: PAST PERFORMANCE FACTOR

Past Performance information is evaluated as a predictor of future contract performance.

Using past performance information for each Contractor, the Government will assess the probability that requirements will be successfully completed in accordance with contract terms and conditions. The Government’s evaluation of past performance will be based on information obtained via any method the CO deems necessary.

Factor 2 Past Performance shall be evaluated using a pre-determined Confidence Rating System. A confidence rating will be assigned to each Quoter based on the following:

• The Quoter’s in-depth knowledge and successful implementation of relevant and recent contracts of similar scope and complexity.

• The lack of recent and relevant past performance information will result in the assignment of a Neutral rating (i.e. neither favorable nor unfavorable) for this factor. After review of the Quoter’s Past Performance, the Government will correlate their findings with one of the ratings shown below:

Factor 2: Past Performance

Confidence Ratings

Rating Description

High Confidence

The Government has high confidence the Quoter will successfully perform the required effort based on the analysis of the Quoter’s past performance record.

RFQ 140D0426Q0808 NPS GWMP Hazardous Tree and Debris Removal Services Page 19 of 34

Moderate Confidence

The Government has some confidence the Quoter will successfully perform the required effort based on the analysis of the Quoter’s past performance record.

Low Confidence

The Government has minimal confidence the Quoter will successfully perform the required effort based on the analysis of the Quoter’s past performance record.

Neutral No significant performance record is identified.

EVALUATION OF FACTOR 3: PRICE FACTOR

Subfactor 3A: Price Price will be evaluated based on adequate price competition in addition to an analysis of the Quoter’s price assumptions, an analysis of the overall price and components of the overall price, an analysis of discounts provided, and for price fairness and reasonableness.

All Vendor terms, conditions, and agreements adhere to applicable Federal laws, regulations and otherwise satisfy the Government’s needs. Price will be used to perform a tradeoff analysis between and among quote providers to compare and tradeoff against non-price factors of the competitors to determine best value.

Subfactor 3B: Pricing Assumptions, Conditions, and/or Exceptions

Price Assumptions, Conditions, or Exceptions will be evaluated for risk and may render a quote unacceptable and result in removal from competition.

SECTION 6 – CONTRACT CLAUSES

FAR 52.252-2 Clauses Incorporated by Reference (FEB 1998)

This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es): https://acquisition.gov/

The contract clauses included by reference are:

FAR Clause Title Date

52.203-6 Restrictions on Subcontractor Sales to the Government ALT I NOV 2021

52.203-17 Contractor Employee Whistleblower Rights NOV 2023

52.203-19 Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements JAN 2017

52.204-13 System for Award Management Maintenance MAR 2026

RFQ 140D0426Q0808 NPS GWMP Hazardous Tree and Debris Removal Services Page 20 of 34

FAR Clause Title Date

52.204-14 Service Contract Reporting Requirements MAR 2026

52.209-6 Protecting the Government’s Interest When Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment

MAY 2026

52.209-10 Prohibition on Contracting with Inverted Domestic Corporations MAY 2026

52.212-4 Contract Terms and Conditions—Commercial Products and Commercial Services MAR 2026

52.219-6 Notice of Total Small Business Set-Aside JAN 2026

52.219-16 Liquidated Damages - Subcontracting Plan JAN 2026

52.222-3 Convict Labor JUN 2003

52.222-35 Equal Opportunity for Veterans MAY 2026

52.222-36 Equal Opportunity for Workers with Disabilities MAY 2026

52.222-37 Employment Reports on Veterans MAY 2026

52.222-40 Notification of Employee Rights Under the National Labor Relations Act

DEC2010

52.222-41 Service Contract Labor Standards AUG 2018

52.222-42 Statement of Equivalent Rates for Federal Hires MAY 2014

52.222-43 Fair Labor Standards Act and Service Contract Labor Standards— Price Adjustment (Multiple Year and Option Contracts)

AUG 2018

52.222-50 Combating Trafficking in Persons MAY 2026

52.222-54 Employment Eligibility Verification MAY 2026

52.222-55 Minimum Wages for Contractor Workers Under Executive Order 14026

JAN 2022

52.222-62 Paid Sick Leave Under Executive Order 13706 JAN 2022

52.226-8 Encouraging Contractor Policies to Ban Text Messaging While Driving

MAY 2024

52.227-1 Authorization and Consent JUN 2020

52.228-5 Insurance—Work on a Government Installation JAN 1997

52.232-33 Payment by Electronic Funds Transfer—System for Award Management

OCT 2018

52.232-40 Providing Accelerated Payments to Small Business Subcontractors MAR 2023

RFQ 140D0426Q0808 NPS GWMP Hazardous Tree and Debris Removal Services Page 21 of 34

FAR Clause Title Date

52.233-3 Protest after Award AUG 1996

52.233-4 Applicable Law for Breach of Contract Claim OCT 2004

52.240-91 Security Prohibitions and Exclusions DEC 2025

Clauses Incorporated by Full Text

FAR 52.219-14 Limitations On Subcontracting (OCT 2022) (DEVIATION JAN 2026)

(a) This clause does not apply to the unrestricted portion of a partial set-aside.

(b) Definition. Similarly situated entity, as used in this clause, means a first-tier subcontractor, including an independent contractor, that—

(1) Has the same small business program status as that which qualified the prime contractor for the award (e.g., for a small business set-aside contract, any small business concern, without regard to its socioeconomic status); and

(2) Is considered small for the size standard under the North American Industry Classification System (NAICS) code the prime contractor assigned to the subcontract.

(c) Applicability. This clause applies only to—

(1) Contracts that have been set aside for any of the small business concerns identified in 19.000(a)(3);

(2) Part or parts of a multiple-award contract that have been set aside for any of the small…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .