This solicitation requests proposals for a firm fixed price construction contract to repair the roof at Wingate Elementary School in Fort Wingate, New Mexico. The contractor will provide all labor, materials, supervision, and incidentals to re-roof two buildings totaling approximately 62,000 square feet with a new mechanically attached single ply TPO or equivalent silicone membrane roof system. The period of performance is 150 calendar days from notice to proceed. The solicitation is set aside for Indian small business economic enterprises and is estimated to be valued between $250,000 to $500,000. The contract will be awarded by the Bureau of Indian Affairs New Mexico Navajo South Agency Facility Management office.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOLICITATION, OFFER,
AND AWARD
2. TYPE OF SOLICITATION
6. PROJECT NO. 4. CONTRACT NO. 5. REQUISITION/PURCHASE REQUEST NO.
PAGE OF PAGES
7. ISSUED BY CODE 8. ADDRESS OFFER TO
SOLICITATION
(Construction, Alteration, or Repair)
1. SOLICITATION NO. 3. DATE ISSUED
IMPORTANT -- The "offer" section on the reverse must be fully completed by offeror.
9.
INFORMATION
a. NAME b. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder."
CALL:
FOR
SEALED BID (IFB)
NEGOTIATED (RFP)
0040616850
Indian Education Acquisition Office
1011 Indian School Rd.
Suite 352A Albuquerque NM 87104
A23
Mary Jane Johnson 5058034259
107/25/2023
140A2323Q0558
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date)
THIS IS A SOLICITATION REQUESTING FOR A PROPOSAL FOR A FIRM FIXED PRICE CONTRACT FOR
THE ROOF REPAIR AT WINGATE ELEMENTARY SCHOOL IN FORT WINGATE, NEW MEXICO. THE
CONTRACTOR SHALL PROVIDE ALL LABOR, MATERIALS, SUPERVISION AND INCIDENTALS NECESSARY
IN ACCORDANCE WITH THE STATEMENT OF WORK.
- SECTION A - CONTRACT FORM
- SECTION B - SUPPLIES OR SERVICES AND PRICES
- SECTION C - DESCRIPTION AND SPECIFICATIONS
- SECTION E - INSPECTION AND ACCEPTANCE
- SECTION F - DELIVERIES OR PERFORMANCE
- SECTION G - CONTRACT ADMINISTRATION DATA
- SECTION H - SPECIAL CONTRACT REQUIREMENTS
- SECTION I - CONTRACT CLAUSES
- SECTION J - LIST OF ATTACHMENTS
- SECTION K - RESPRESENTATIONS, CERTIFICATIONS, AND OTHER STATEMENTS OF OFFERORS OR
RESPONDENTS
- SECTION L - INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS OR RESPONSDENTS
- SECTION M - EVALUATION FACTORS FOR AWARD
Continued ...
11. The Contractor shall begin performance within
12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
award, notice to proceed. The performance period is mandatory negotiable. (See ________________________________________________.)
13. ADDITIONAL SOLICITATION REQUIREMENTS:
a. Sealed offers in original and is not required.is, b. An offer guarantee
c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
(date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
d. Offers providing less than
12b. CALENDAR DAYSYES NO
(If "YES", indicate within how many calendar days after award in Item 12b.)
10 150 calendar days and complete it within ________________ ________________ calendar days after receiving
FAR 211.10
08/21/2023
NSN 7540-01-155-3212
x x x x copies to perform the work required are due at the place specified in Item 8 by _____________ ___________________ (hour) local time calendar days for Government acceptance after the date offers are due will not be considered and will be rejected . _________________
STANDARD FORM 1442 (Rev. 8/2014)
Prescribed by GSA
FAR(48 CFR) 53.236-1(d)
17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within ____________________ calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in item 13d. Failure to insert any number means the offeror accepts the minimum in item 13d.)
14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code) 15. TELEPHONE NO. (Include area code)
16. REMITTANCE ADDRESS (Include only if different than item 14.)
CODE FACILITY CODE
AMOUNTS
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGEMENT OF AMENDMENTS
OFFER (Must be fully completed by offeror)
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT NO.
DATE.
20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print) 20b. SIGNATURE 20c. OFFER DATE
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN
(4 copies unless otherwise specified)
ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
26. ADMINISTERED BY CODE 27. PAYMENT WILL BE MADE BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
(Contractor is required to sign this document and return (Contractor is not required to sign this document.)
Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award.
No further contractual document is necessary.
30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print) 31a. NAME OF CONTRACTING OFFICER (Type or print)
30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA 31c. DATE
BY
2PAGE OF
Indian Education Acquisition Office 1011 Indian School Rd.
Suite 352A Albuquerque NM 87104
A23
Mary Jane Johnson
28. NEGOTIATED AGREEMENT 29. AWARD
Contractor agrees to furnish and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.
copies to issuing office.)
10 U.S.C. 2304(c) 41 U.S.C. 3304(a)
STANDARD FORM 1442 (REV. 8/2014) BACK
Continued...
ITEM NO.
(A)
SUPPLIES/SERVICES
(B)
QUANTITY
(C)
UNIT
(D)
UNIT PRICE
(E)
AMOUNT
(F)
NAME OF OFFEROR OR CONTRACTOR
3 74
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
140A2323Q0558
THIS IS AN INDIAN SMALL BUSINESS ECONOMIC
ENTERPRISE (ISBEE) SET ASIDE.
IN ACCORDANCE WITH FAR 36.204, DISCLOSURE OF THE
MAGNITUDE OF CONSTRUCTION PROJECT IS ESTIMATED
SHOULD BE IN THE FOLLOWING PRICE RANGE OF
(d)BETWEEN $250,000.00 TO $500,000.00.
Contractor shall provide all labor, materials, tools, equipment, transportation and supervision necessary to re-roof with a new mechanically attached, single ply, white 60 mil TPO Membrane ore equivalent Silicone existing roof on building
1593 and 1592 section A&B at Wingate Elementary
School, 12 Painted Horse Trail, Ft. Wingate, NM.
The existing roof leaks and water starting to go inside the interior damaging ceiling tiles and walls.
Delivery: 150 Days After Notice to Proceed
Delivery Location Code: 0009061918
BIE WINGATE ELEMENTARY SCHOOL
PO Box 1
12 Painted Horse Trail
FORT WINGATE NM 87316 US
00010 Re-roof existing roof w new TPO
Product/Service Code: Z1CA
Product/Service Description: MAINTENANCE OF
SCHOOLS
Period of Performance: 09/04/2023 to 02/29/2024
Point of Contact: Stanley Henderson, Acting
Facility Manager, Telephone No. 505-488-6428, EMAIL ADDRESS: stanley.henderson@bie.edu.
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
SOLICITATION NO.: 140A2323Q0558
CONSTRUCTION OF ROOF REPAIR WES
Mountain School
SECTION B: PRICE SCHEDULE
B.1 REQUIRED WORK
The proposed work consists of the contractor shall provide all labor, materials, transportation, supervision, and incidentals necessary to repair the TPO roof at Wingate Elementary School in Fort Wingate, New Mexico, in the accordance with the Statement of Work.
Period of Performance: (150) calendar days from the issuance of the Notice to Proceed.
B.2 PROJECT LOCATION Project is located in 12 Painted Horse Trail, Fort Wingate, New Mexico
B.3 OFFEROR’S SCHEDULE
OFFEROR’s SCHEDULE
Propose your best prices projects in accordance with the Statement of Work (SOW) and attachments. Price Proposals must be submitted following the price schedule/format herein. Incomplete price proposals will not be considered for award.
Price Schedule
Description Quantity Price Labor and Materials Reroofing Bldg
1592 1 JOB
Labor and Materials Reroofing Bldg
1593 1 JOB
Mobilization/Demobilization 1 JOB
SUB-TOTAL
General Contracting's Overhead & Profit 1 JOB
Bonding Navajo Nation TAXES All Applicable State Taxes
TOTAL:
Mountain School
SECTION C:
Statement of Work Re-roofing Project
Building #1592- Sections A & B & Building #1593 Dining Room/Kitchen and Gym Hallway
A. Statement of Work Summary:
The Bureau of Indian Affairs, New Mexico Navajo South Agency Facility Management in Fort Wingate, New Mexico solicits licensed Construction Contractor to furnish and install a new top layer of roofing system for the following location: Fort Wingate Elementary School Building #1592, sections A and B, and
Building #1593, Dining Room, Kitchen, and Hallway next to Gymnasium areas located at 12 Painted Horse
Trail, Fort Wingate, NM 87316.
B. Scope of Work Parameter(s):
The re-roofing project shall comprise of a new mechanically attached, single-ply, white 60 mil TPO membrane or equivalent Silicone membrane over the existing roof; see attached diagram, wings A and B. Wings A and B and Dining room, Kitchen and Gym Hallway are approximately combined
62,000 square feet. Tapered insulation board shall have a minimum slope of 1/4-inch per foot and shall have an R-value of 30. All low surface areas where ponding occurs shall have crickets or tapered insulation installed to allow for positive drainage. Roofing membrane and flashing shall terminate on top of parapet wall and shall not be exposed to the outside stone wall surface. All new metal drip edge, gutters and downspouts shall be 24 gage pre-finished metal and color shall be selected by NM
Navajo South Agency Facility Management Staff. Install flashing on pipe vents and curbs to meet a minimum of 6-inches height above roof top. Replace all air vents with new metal screened air vents.
Install walk pads next to serviceable mechanical roof equipment and at roof edge access.
All existing roof waste material including membrane, insulation, one-way air vents, metal flashing, metal downspouts, gutters, loose granular sand, tree debris, and other roofing materials that will be replaced shall be removed and dispose off-site to an approved land fill.
All work and installation shall be performed per manufacturer's specifications and protocols, including industry standard practices as relevant to the systems being used on this Project.
Building #1592, Section A & B shall receive a complete new TPO, or equivalent Silicone roofing system as described in this section.
Mountain School
Building #1593, Dining Room, Kitchen and Gym Hallway shall receive a complete new TPO, or equivalent Silicone roofing system as described in this section.
C. Pre-Proposal Contact/Coordination:
All pre-bid/proposal inquires by Contractors for clarifications, site specifics and/or project logistics, including site visits can directed to or arranged with NM Navajo South Agency Facility Management
Office, Contracting Officer's Representative (COR).
D. Contractor's Responsibilities/Conditions:
1. All labor; equipment; materials/supplies; rentals; tools; insurances; taxes; safety; security;
staging/storage; full time supervision; worker/owner/property protection; temporary utilities/hookups.
2. Traffic control; fall protection; deliveries; notifications/filings; permits, control measures on dust, noise, contamination; general ground/soil restoration; daily & final site cleanup; housekeeping;
trash/debris disposal, etc.
3. Any & all damages that may evolve from carelessness, negligence, irresponsibleness, including accidents to, but not limited to the BIE and their tenant’s property, assets, investments, etc. Any discoveries of hazardous and contaminant materials shall be reported immediately.
4. Any and all damages to existing property caused by contractor as result of but not limited to demolition, installation, deliveries, including the patching and repair of existing building equipment, components and/or systems. All costs to repair, patch, finish, replace and fixes shall be the responsibility of the contractor and will carry or warrant no time extensions or contract modifications.
5. Shall always adhere to and be compliance with any and all applicable Federal, State, City & pertinent
Local regulations, statues and laws. No on site burning or burying is allowed.
6. Warranty all roof work, installation, and materials for twenty (20) years for TPO roofing system.
Warranties shall start from the final completion date or Owner's acceptance, but not limited to defective materials, workmanship, malfunctions, etc. Manufacturer warranty document shall contain school name and building number(s). Include a two (2) year workmanship warranty for all roofing work.
7. It shall be the sole responsibility of the Contractor prior to bidding, to conduct field verification of actual dimensions, materials, angles (skew), slopes, alignment and all existing conditions shall be the sole responsibility of the Contractor.
8. Temporarily seal loose edge of membrane with approved overnight seal at the end of each day to comply with manufacturer's instructions, and to maintain a watertight building.
Mountain School
E. Considerations and Factors:
Proposing Contractors are asked to factor in or take into consideration the following as part of their bid/proposals and projected schedules while undertaking this project.
1. The pertinent contents of this Statement of Work as applicable to the Project's requirements, protocols, scheduling, particularly the work scope and materials shall become and made a binding part of and in conjunction with the Contractor's overall Construction Contract with the BIE, thereby contractors are specifically asked to pay careful attention in their examination and familiarity with the documents.
2. The school building will be occupied during the construction duration wherein phasing, partial/sectional completions, temporary fencing/barricading, traffic control, other measures and protection shall be necessary to accommodate operations and safety with the least amount of disruption.
3. Coordination and cooperation with the Wingate Elementary School and BIE employees/vehicle traffic, their accesses & exits, control and coordination of noise, odors, vibration, and other distracting or disruptive activities that will impact operations.
4. All work to take place only during normal workdays with no weekends or holidays only in the event special prior approval is obtained from the Contracting Officer through arrangements with the
Contracting Officers Representative.
5. Review time for technical and material submittal compilation and submission to the BIE and to the
Contracting Officer's Representative for approval prior to any work or installation, which includes
RFI’s and CORs.
F. Post Contract Award Prerequisites:
1. Insurance Certificates as required/in conformance with BIE Contracting provisions.
2. Contractor's Itemized Schedule of Values in the applicable CSI Divisions acceptable by Owner.
3. Site plan with locations of contractor’s offices, staging, yards, storages, waste bins, haulage roads.
4. Project specific Contractor's Safety and Health Plan, including Accident Prevention Plan.
5. Detailed Contractors Project Schedule.
6. Site specific narrative work plan delineating how, where, when, whom of overall undertaking.
7. Provide technical submittals/illustrative details & shop drawings/data to COR.
8. Other Information/Documents as required by the BIE.
G. Temporary Facilities & Utilities:
Contractor shall provide a secure staging and storage area near the building. It shall be the responsibility of the Contractor to provide their own temporary electrical power with generators and portable toilets for their workers. No part of the BIE or Wingate Elementary School building, or facilities will be used for storage or administrative purposes by the contractor.
Mountain School
H. Shop Drawings/Submittals/Mockups:
Successful Contractor shall compile, assemble, and formally submit all required information and/or action material submittals/shop drawings on the different material types being proposed to the BIE Contracting
Officer's Representative (COR) for review and approval prior to commencing with any work or installation.
I. Close out Requirements:
As requisite for final payment, the Contractor shall provide to the BIE's Contracting Officer and its COR the following:
1. Specified quantities of extra/spare materials for each of the different materials, products used.
2. Manufacturer Warranties for each building which identifies each building number and location for entire new work/installation against defective materials workmanship, etc. Include a one (2) year workmanship warranty for all roofing work.
3. Demolition debris haulage tickets, manifests, landfill tickets.
4. As Built record drawings, systems demonstration of maintenance and upkeep.
5. Documentation shall include all certified payroll reports and release of claims.
J. Performance Specification/Requirements:
Proposing Contractors shall prepare and submit their bids/cost proposals in accordance with and predicated on using the following Owner's Performance Specifications as the baseline guide/requirement to furnish, install, and execute the replacement of TPO single-ply roofing system.
1. As preferred by Owner, PVC- JP Stevens Single-ply membrane Roofing Systems shall be the basis for the new mechanically attached TPO (white) roofing system for submittals, materials and installation or approved equal or better roofing manufacturer.
2. Provide new TPO or Equivalent Silicone roofing components from a single source roofing manufacturer or approved supplier.
3. Proposed systems shall meet or exceed the performance requirements of, but not limited to IBC, NRCA, ASTM standards in their respective resistance testing for breaking strength, tearing strength, brittleness point, resistance to water absorption, water vapor permeance, puncture resistance, and other applicable properties.
4. Provide TPO or Equivalent Silicone roofing manufacturer data sheets and include other roofing materials to be used for complete roofing system.
5. At all roofing penetrations, Contractor shall utilize molded TPO sealant pockets by PVC JP-
Stevens Single-ply Roofing Systems or approved equal or better.
K. General Requirements:
Mountain School
1. WORKING HOURS
Hours of work will be from 0800-430 (Monday -Friday).
If a Federal holiday falls on a scheduled workday, the contractor shall be responsible for rescheduling work for the first day post-holiday.
Federal Holidays:
New Year’s Day – January 1
Martin Luther King Day – 3rd Monday in January
President’s Day- 3rd Monday in February
Memorial Day -: last Monday in May
Juneteenth: June 20
Independence Day – 4 July
Labor Day – 1st Monday in September
Columbus Day – 2nd Monday in October
Veteran ‘s Day – 11 November
Thanksgiving Day- 4th Thursday in November
Christmas Day – 25 December
2. SCHOOL RESPONSIBILITY
Provide access to property.
3. SAFETY
The contractor will ensure that his employees use good safety practices. COR will spot checks daily. The contractor shall make sure that his crew is wearing the proper PPE”s
4. DISPOSAL OF REFUSE
REQUIREMENT: Remove from the site refuse (including food scraps and the like) resulting from the work under Contract. Handle refuse in a manner so as to confine the material completely and prevent dust emission. Provide bins / trash containers for this purpose. Rubbish and debris resulting from work of the Contractor shall be cleared away from time to time and the site maintained in a reasonably clean and orderly condition at all times. Upon completion of work, all tools’ appliances, equipment, and surplus material shall be removed from the premises and unless otherwise directed, the finished work left in a neat, clean and serviceable condition acceptable to the COR.
Mountain School
5. DISPOSAL OF CONTAMINANTS
a. GENERALLY: Properly dispose of solid, liquid, and gaseous contaminants in accordance with all statutory and contractual requirements.
b. GASEOUS CONTAMINANTS: Discharge in such a manner that they will be diluted with fresh air sufficiently to reduce toxicity to an acceptable level.
c. LIQUID CONTAMINANTS: 'Subject to statutory and local requirements, liquid contaminants may be diluted with water to a level of quality acceptable in the sewer system. If this is not permitted, store in approved vessels for disposal at approved locations.
d. SOLID CONTAMINANTS: Dispose by removal from site to approved locations or as otherwise directed by the Superintendent.
6. DELIVERABLES
a. Daily Construction Reports, Monthly Progress Report, Interim and Final Inspection Reports.
b. As-Built drawings on editable AutoCAD sent to CA for final As-Built submission.
1. Three (3) sets of full size As-Built drawings. As-Built drawings shall be prepared in the current AutoCAD and Adobe Acrobat PDF electronic file formats.
2. Provide 2 CDR disks of each format to COR.
c. Warranties required under the construction subcontract.
d. Release of Claims with Release of Claims from Contractor.
e. Supervise the performance of subcontractors on site, ensuring that work is performed in a safe manner and in accordance with contract specifications.
7. BACKGROUND CLEARANCE AND SAFETY ORIENTATION
a. Safety orientation is required by all contractors to be provided by the Tribally and federally charted institutions. Safety and Security Department and/or Facilities Department. The safety orientation is required for all employees of the contractors and subcontractors prior to starting work.
b. Background Clearance is required for 2 primary contractors (i.e. Superintendent and Foreman) and 1 employee for each sub-contractor (or as determined by the COR). Contractor employees and sub-contractors shall complete a DOI Access/eQIP clearance online, to be coordinated with the COR. Employees will require an escort until background clearance has been approved.
c. Contractor/Employee Identification, Sign-In/Out Procedure.
1. All employees (contractors and subcontractors) shall sign in/out daily at the Facilities
Department and/or in project binder.
2. All employees shall wear a nametag, other identifying apparel with company logo or obtain a badge from the Facilities Department.
8. EROSION CONTROL
Prevent erosion of soil from any lands used or occupied in the execution of the work under the Contract.
9. FINAL CLEANING
Before practical completion, clean throughout the work area. Remove waste, surplus materials and rubbish.
Mountain School
10. QUALITY ASSURANCE
The government will periodically evaluate the contractor’s performance by appointing a representative(s) to monitor performance to ensure services are received. The government representative will evaluate the contractor’s performance through intermittent on-site inspections of the contractor's quality control program and receipt of complaints from base personnel. The government may inspect each task as completed or increase the number of quality control inspections if deemed appropriate because of repeated failures discovered during quality control inspections or because of repeated customer complaints. Likewise, the government may decrease the number of quality control inspections if merited by performance. The government will also investigate complaints received from various customers located on the installation. The contractor shall be responsible for initially validating customer complaints. However, the government representative shall make final determination of the validity of customer complaint(s) in cases of disagreement with customer(s).
END OF STATEMENT OF WORK
Mountain School
SECTION E – INSPECTION AND ACCEPTANCE
E.1 52.246-12 INSPECTION OF CONTRUCTION AUG 1996
(a) Definition."Work" includes, but is not limited to, materials, workmanship, and manufacture and fabrication of components.
(b) The Contractor shall maintain an adequate inspection system and perform such inspections as will ensure that the work performed under the contract conforms to contract requirements. The Contractor shall maintain complete inspection records and make them available to the Government. All work shall be conducted under the general direction of the Contracting Officer and is subject to Government inspection and test at all places and at all reasonable times before acceptance to ensure strict compliance with the terms of the contract.
(c) Government inspections and tests are for the sole benefit of the Government and do not-
(1) Relieve the Contractor of responsibility for providing adequate quality control measures;
(2) Relieve the Contractor of responsibility for damage to or loss of the material before acceptance;
(3) Constitute or imply acceptance; or
(4) Affect the continuing rights of the Government after acceptance of the completed work under paragraph (i) of this- section.
(d) The presence or absence of a Government inspector does not relieve the Contractor from any contract requirement, nor is the inspector authorized to change any term or condition of the specification without the Contracting Officer’s written authorization.
(e) The Contractor shall promptly furnish, at no increase in contract price, all facilities, labor, and material reasonably needed for performing such safe and convenient inspections and tests as may be required by the Contracting Officer. The Government may charge to the Contractor any additional cost of inspection or test when work is not ready at the time specified by the Contractor for inspection or test, or when prior rejection makes reinspection or retest necessary. The Government shall perform all inspections and tests in a manner that will not unnecessarily delay the work. Special, full size, and performance tests shall be performed as described in the contract.
(f) The Contractor shall, without charge, replace or correct work found by the Government not to conform to contract requirements, unless in the public interest the Government consents to accept the work with an appropriate adjustment in contract price. The Contractor shall promptly segregate and remove rejected material from the premises.
(g) If the Contractor does not promptly replace or correct rejected work, the Government may-
(1) By contract or otherwise, replace or correct the work and charge the cost to the Contractor; or
(2) Terminate for default the Contractor’s right to proceed.
(h) If, before acceptance of the entire work, the Government decides to examine already completed work by removing it or tearing it out, the Contractor, on request, shall promptly furnish all necessary facilities, labor, and material. If the work is found to be defective or nonconforming in any material respect due to the fault of the Contractor or its subcontractors, the Contractor shall defray the expenses of the examination and of satisfactory reconstruction.
However, if the work is found to meet contract requirements, the Contracting Officer shall make an equitable adjustment for the additional services involved in the examination and reconstruction, including, if completion of the work was thereby delayed, an extension of time.
(i) Unless otherwise specified in the contract, the Government shall accept, as promptly as practicable after completion and inspection, all work required by the contract or that portion of the work the Contracting Officer determines can be accepted separately. Acceptance shall be final and conclusive except for latent defects, fraud, gross mistakes amounting to fraud, or the Government’s rights under any warranty or guarantee.
(End of clause)
END OF SECTION E
Mountain School
SECTION F -- DELIVERIES OR PERFORMANCE
F.1 52.211-10 Commencement, Prosecution, and Completion of Work Apr 1984
The Contractor shall be required to (a) commence work under this contract within ten (10) calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 150 (one hundred fifty) calendar days. The time stated for completion shall include final cleanup of the premises.
F.2 52.211-13 TIME EXTENSIONS SEPT 2000
Time extensions for contract changes will depend upon the extent, if any, by which the changes cause delay in the completion of the various elements of construction. The change order granting the time extension may provide that the contract completion date will be extended only for those specific elements related to the changed work and that the remaining contract completion dates for all other portions of the work will not be altered. The change order also may provide an equitable readjustment of liquidated damages under the new completion schedule. (End of clause)
F.3 52.211-18 VARIATION IN ESTIMATED QUANTITY APR 1984
If the quantity of a unit-priced item in this contract is an estimated quantity and the actual quantity of the unit-priced item varies more than 15 percent above or below the estimated quantity, an equitable adjustment in the contract price shall be made upon demand of either party. The equitable adjustment shall be based upon any increase or decrease in costs due solely to the variation above 115 percent or below 85 percent of the estimated quantity. If the quantity variation is such as to cause an increase in the time necessary for completion, the Contractor may request, in writing, an extension of time, to be received by the Contracting Officer within 10 days from the beginning of the delay, or within such further period as may be granted by the Contracting Officer before the date of final settlement of the contract.
Upon the receipt of a written request for an extension, the Contracting Officer shall ascertain the facts and make an adjustment for extending the completion date as, in the judgment of the Contracting Officer, is justified.
F.4 52.236-01 PERFORMANCE OF WORK BY THE CONTRACTOR APR 1984
The Contractor shall perform on the site, and with its own organization, work equivalent to at least fifteen percent (15%) of the total amount of work to be performed under the contract. This percentage may be reduced by a supplemental agreement to this contract if, during performing the work, the Contractor requests a reduction and the Contracting Officer determines that the reduction would be to the advantage of the Government.
F.5 52.236-15 SCHEDULES FOR CONSTRUCTION CONTRACTS APR 19845
(a) The Contractor shall, within five days after the work commences on the contract or another period of time determined by the Contracting Officer, prepare and submit to the Contracting Officer for approval three copies of a practicable schedule showing the order in which the Contractor proposes to perform the work, and the dates on which the Contractor contemplates starting and completing the several salient features of the work (including acquiring materials, plant, and equipment). The schedule shall be in the form of a progress chart of suitable scale to indicate appropriately the percentage of work scheduled for completion by any given date during the period. If the Contractor fails to submit a schedule within the time prescribed, the Contracting Officer may withhold approval of progress payments until the Contractor submits the required schedule.
(b) The Contractor shall enter the actual progress on the chart as directed by the Contracting Officer, and upon doing so shall immediately deliver three copies of the annotated schedule to the Contracting Officer. If, in the opinion of the Contracting Officer, the Contractor falls behind the approved schedule, the Contractor shall take steps necessary to improve its progress, including those that may be required by the Contracting Officer, without additional cost to the Government. In this circumstance, the Contracting Officer may require the Contractor to increase the number of
Mountain School shifts, overtime operations, days of work, and/or the amount of construction plant, and to submit for approval any supplementary schedule or schedules in chart form as the Contracting Officer deems necessary to demonstrate how the approved rate of progress will be regained.
(c) Failure of the Contractor to comply with the requirements of the Contracting Officer under this clause shall be grounds for a determination by the Contracting Officer that the Contractor is not prosecuting the work with sufficient diligence to ensure completion within the time specified in the contract. Upon making this determination, the Contracting Officer may terminate the Contractor’s right to proceed with the work, or any separable part of it, in accordance with the default terms of this contract.
(End of clause)
F.6 52.242-14 SUSPENSION OF WORK APR 1984
(a) The Contracting Officer may order the Contractor, in writing, to suspend, delay, or interrupt all or any part of the work of this contract for the period of time that the Contracting Officer determines appropriate for the convenience of the Government.
(b) If the performance of all or any part of the work is, for an unreasonable period of time, suspended, delayed, or interrupted (1)by an act of the Contracting Officer in the administration of this contract, or (2)by the Contracting Officer’s failure to act within the time specified in this contract (or within a reasonable time if not specified), an adjustment shall be made for any increase in the cost of performance of this contract (excluding profit) necessarily caused by the unreasonable suspension, delay, or interruption, and the contract modified in writing accordingly.
However, no adjustment shall be made under this clause for any suspension, delay, or interruption to the extent that performance would have been so suspended, delayed, or interrupted by any other cause, including the fault or negligence of the Contractor, or for which an equitable adjustment is provided for or excluded under any other term or condition of this contract.
(c) A claim under this clause shall not be allowed-
(1) For any costs incurred more than 20 days before the Contractor shall have notified the Contracting Officer in writing of the act or failure to act involved (but this requirement shall not apply as to a claim resulting from a suspension order); and
(2) Unless the claim, in an amount stated, is asserted in writing as soon as practicable after the termination of the suspension, delay, or interruption, but not later than the date of final payment under the contract.
(End of clause)
END OF SECTION F
Mountain School
SECTION G: CONTRACT ADMINISTATION DATA
G.1 CONTRACT ADMINISTRATION - GOVERNMENT
All administrative questions shall be directed to only electronic copies will be accepted:
Mary Jane Johnson, Contracting Officer BIA-Central Regional Office - Division of Acquisition Operations 1011 Indian School RD NW Albuquerque, New Mexico 87104 Telephone No.: (505) 803-4259 Email: maryjane.johnson@bie.edu
G.2 CONTRACT ADMINISTRATION CONTRACTOR
Designate a person whom the Government may contact during the period of the contract for prompt action on matters pertaining to the administration of the contract. Authorized Administrator is:
Company Name: __________________________________________
POC: ___________________________________________
Address: ____________________________________________
Telephone No. ____________________________________________
G.3 CONTRACTING OFFICER'S REPRESENTATIVE
A. The Contracting Officer shall designate a Contracting Officer's Representative (COR) who will represent the Contracting Officer in the technical phase of the work. The COR's duties, responsibilities, and limitations of authority will be set forth in a written COR designation letter. A copy of the COR designation letter will be made available to the Contractor.
B. The COR is not authorized to make any changes to the terms and conditions of this contract. Only the Contracting Officer is authorized to make any changes to the contract by a properly written signed modification to the contract.
C. The Contracting Officer is the only official who can legally commit or obligate the Government for expenditure of public funds.
G.4 INVOICE AND PAYMENT
Electronic Invoicing and Payment Requirements- Invoice Processing Platform (IPP) (April 2013)
Payment requests must be submitted electronically through the U. S. Department of the
Treasury's Invoice Processing Platform System (IPP).
"Payment request" means any request for contract financing payment or invoice payment by the Contractor . To constitute a proper invoice, the payment request must comply with the requirements identified in the applicable Prompt Payment clause included in the contract, or the clause 52.212-4 Contract Terms and Conditions - Commercial Items included in commercial item contracts. The IPP website address is: https://www.ipp .gov.
Mountain School
Under this contract, the following documents are required to be submitted as an attachment to the IPP invoice [CO to edit and include the documentation required under this contract]:
- A copy of the contractor’s invoice shall be included with the IPP invoice. If no invoice is attached, the Invoice will be rejected.
The Contractor must use the IPP website to register access and use IPP for submitting requests for payment. The Contractor Government Business Point of Contact (as listed in SAM) will receive enrollment instructions via email from the Federal Reserve Bank of Boston (FRBB) prior to the contract award date, but no more than 3 - 5 business days of the contract award date. Contractor assistance with enrollment can be obtained by contacting the IPP Production
Helpdesk via email ippgroup@bos .frb.org or phone (866) 973-3131.
If the Contractor is unable to comply with the requirement to use IPP for submitting invoices for payment, the Contractor must submit a waiver request in writing to the Contracting Officer with its proposal or quotation.
END OF SECTION G
Mountain School
SECTION H -- SPECIAL CONTRACT REQUIREMENTS
H.1 Tribal Taxes, Requirements and/or Restrictions
(a) Special attention is called to FAR Clause 52.236-7, Permits and Responsibilities and FAR Clause 52.229-3, Federal, State, and Local Taxes. Offerors are responsible for contacting the tribe or tribal organization involved with regard to any requirements regarding tribal taxes, royalties and/or other applicable tribal laws or ordinances. Any costs associated with this section shall be included in the contractor's bid.
(b) Offerors are responsible for contacting the Office of the Navajo Nation Tax Commission and the Office of Labor Relations for tribal taxes. Current available information is identified at this link: Office of the Navajo Tax Commission (navajo-nsn.gov) for more information on Navajo Nation Tax Commission.
H.2 Modification Proposal - Cost Breakdown
The Contractor, in connection with any proposal he makes for a contract modification, shall furnish a price breakdown, itemized as required by the Contracting Officer (CO). Unless otherwise directed, the breakdown shall be in sufficient detail to permit an analysis of all material, labor, equipment, subcontract, and overhead costs, as well as profit, and shall cover all work involved in the modification, whether such work was deleted, added, or changed. Any amount claimed for subcontractors shall be supported by a similar price breakdown. In addition, if the proposal includes a time extension, a justification thereof shall also be furnished. The proposal, together with the price breakdown and time extension justification, shall be furnished by the date specified by the Contracting Officer.
H.3 POST AWARD CONFERENCES – Firm Fixed Price Contracts
The Contracting Officer shall conduct monthly post award meetings with the contractor and the Contracting Officer’s Representative (COR). Discussions at these meetings will center on the contractor’s performance to determine if the contractor is meeting and performing in accordance with the contract terms and conditions. The Contracting Officer will ensure that minutes of the meetings are taken and copies provided to attendees.
H.4 Changes
The contractor shall not perform any of contingent sum work, until the Contracting Officer issues a modification authorizing performance of work in accordance with FAR clause 52.243-04, Changes and 52.243-5, Changes and Changed Conditions.
The Contractor shall promptly notify the Contracting Officer, in writing, of subsurface or any physical conditions for those indicated in this contract or unknown physical conditions at the site before proceeding with the work.
The change orders request shall be forward to the Contracting Officer by memorandum outlining the need and justification for the change order. Upon receipt of the change order request the Contracting Officer will request a cost proposal from the Contractor. All cost proposal shall be in detail and itemized, showing price breakdown in sufficient detail to permit and analysis of cost for material, labor, equipment, hours, taxes, insurance, bonds, overhead costs, profit, and complete description of work involved in the change order, including any time extension.
In an emergency situation, the Contracting Officer may grant a telephone approval, and immediately the Contractor shall follow through by submitting a written cost proposal to the Contracting Officer. The Contracting Officer will issue a contract modification to authorize the work for the “emergency”.
H.5 Contractor Safety Program Requirements
The Contractor shall establish a safety program, which is consistent of FAR Clause 52.236-13 and also shall include at a minimum the following requirements.
A. Safety Program Submittal: Within 10 days following the awarding of a contract, the Contractor shall submit in writing to the Contracting Officer a proposed comprehensive safety program for approval. The Contractor’s safety program shall detail policies, procedures and plans that will be implemented to ensure the safety and health of employees and visitors at the job site. The Contractor shall prepare a list of major hazards associated with the contract work and provide in the safety program means to minimize the hazards.
http://www.tax.navajo-nsn.gov/ http://www.tax.navajo-nsn.gov/
Mountain School
B. Pre-Construction Safety Meeting: Representative of the Contractor shall meet with the Contracting Officer’s Representative and the Contracting Officer prior to the start of construction to review the safety program and discuss implementation of the health and safety provisions pertinent to the work under this contract. The Contractor should be prepared to discuss, in detail, the measures to be taken to control the hazards associated with the major phases of the work under this contract. This meeting shall be devoted mainly to a discussion of the manner in which the Contractor intends to administer the health and safety program, delegation of responsibility for implementing the program, and determination of what shall be presented in the written safety program.
C. Contractor Housekeeping Requirement: Good housekeeping, including provision and facilities for routine scrap removal, shall be maintained in all areas within the Contractor’s scope of operations. Any and all garbage shall be stored and removed to an approved dumpsite as specified by the permitting Agency. The construction yard(s) shall be restored to their natural condition or better as required by the permitting requirements and in accordance with Tribal, State, and Federal Law (i.e. applicable OSHA construction standards).
D. Contractor Contamination Requirement: Handling, storage, and disposal of toxic materials of any nature shall be carried out in a manner so as not to contaminate or pollute public and/or private property, water supplies, rivers, lakes, reservoirs, streams, or the atmosphere. Disposal of all materials, including waste, garbage, and sewage, shall comply with all local, tribal, state and federal regulations (i.e. Clean Air and Water Act).
H.6 Subcontracting and Subcontractors
A. Selection of Subcontractors. Except as provided in DIAR Clause 1452.204-71, Indian Preference, the contractor and each subcontractor shall be free to select their subcontractors. Each subcontractor shall be capable of performing in a satisfactory manner, all work included in its subcontract. The contractor shall submit or require the submission of the following information to the Contracting Officer.
1. The Name and Address of each Subcontractor.
2. A detailed description of the work covered by each subcontractor.
3. A statement that the subcontractor has adequate resources and is capable of performing the work.
B. Furnish Copies of Subcontractors. No subcontractor will be allowed to perform any work on the project site until the conditions in (a) above have been met.
C. Contractor’s Responsibility for Subcontractors. The Contractor shall be responsible for the acts of all subcontractors and their employees when performing work at the project site, regardless of subcontractors’ contractual relationship to the contractor. The contractor shall cause to be removed from the work at the project site any subcontractor or employee thereof whom the Contracting Officer, in writing finds to be incompetent, careless, or otherwise objectionable. Failure of any subcontractor to complete the work described in its subcontract in a satisfactory manner, or without delay, will not excuse the contractor from any delay in the completion of the entire contract.
H.7 Requirement for Execution of Surety Bonds
Each surety company bond (performance and payment) which purports to have been executed by an agent or attorney-in-fact, for the corporate surety, is required to have submitted within a power of attorney to the signatory agent or attorney-in-fact, and executed by the corporate surety upon a date reasonable approximately to the date of the bond.
Such power of attorney shall in each instance be retained with the bond.
A. Bid Bond –Due at the time of award.
B. Performance Bond – The amount of the performance bond shall be 100% of the original contract price.
C. Payment Bond – The amount of the payment bond shall be 100% of the original contract price.
D. Individual Surety – The bidders shall comply with FAR Clause 52.228-11, Pledges of Assets.
H.8 Determination and Extension of Contract Time
The calendar days, stated under Section F.1 – FAR 52.211-10, allowed for the performance of the contract is based upon the work to be performed and weather conditions that are normally anticipated in the area that may prevent work.
Mountain School
Request for time extensions because of weather conditions shall not be granted except in the case of unusually severe weather or “Act of Nature” unanticipated by this contract.
H.9 HOURS AND DAYS OF WORK
A. The performance time allowed under this contract is based on a forty-hour workweek. The Contractor shall provide a minimum 10-calendar day written advance notice to the Contracting Officer of the actual work schedule, affording adequate opportunity to respond and to schedule Government personnel. Work on Saturdays, Sundays, Government and/ or Tribal holidays is not contemplated, however the Contractor shall make every effort to inform (in writing) the Government of his intentions concerning work on weekends and/or holidays (at least 10 calendar days in advance) so that the Government may accommodate the work (requiring inspection and/or oversight) or respond otherwise.
The Contractor is required to update his construction schedule and submit (to the CO) for review and approval if the work outside the normal 40 hours workweek exceeds 2 weeks and it must be approved prior to the work beginning.
B. In no case shall work be performed on holidays and/or weekends without the approval of the CO. The Contractor shall be allowed to work on items of this contract that do not require government inspection and/or oversight at any time including Saturdays, Sundays, and holidays during the construction period shown herein provided the Contractor inform the CO in writing within the time frame specified above. Any costs associated with government inspections and/or oversight on weekends and holidays, or as a result of contractor induced delays or mistakes in the work, shall be deducted from the progress payments in accordance with 4(C) below.
The Contractor may dispute the deductions, in writing, to the Contracting Officer in accordance with 4(C).
Any quantities of work (as reflected in the bid schedule) that is completed outside the normal work week shall be measured and paid for at the contract unit price bid provided the work meets the requirements of this contract. However, with respect to the quality control item unless agreed to by the CO in writing quality control hours incurred as a result of contractor induced delays or mistakes will not be paid for.
C. The COR shall prepare a detailed breakdown of government expenses incurred as a result of government personnel working in excess of the normal 40 hour work week to accommodate the contractor and shall submit this report to the CO (with a copy to the contractor) for reimbursement through a progress payment adjustment.
The CO shall notify the contractor 10 working days in advance of making the adjustment in the next progress payment so that the Contractor is given the opportunity to review the report and any expenses claimed. Should the Contractor dispute the government expense report, the disputed items shall be submitted to the CO in writing within the time frame given by the CO and the CO shall make a final determination (within 20 working days of receipt of the disputed items).
D. The Contractor shall submit to the CO the name and legal address of each supervisor to be employed under this contract prior to his entrance on duty. Copies shall be provided to the CO for their records.
H.10 CONTRACTOR SECURITY REQUIREMENTS
At the Pre-construction Conference [or prior to beginning work on the contract], the Contractor shall provide a list of all on-site personnel, including sub-contractors (including second and third-tier subcontractors) and suppliers, to the Contracting Officer. The contractor shall update this list when changes occur. Contractor personnel not listed may be denied access to the school facility.