About this file

This is a Request for Proposal (RFP) for ramp replacement at three buildings located at 1342, 1344, and 1346 Spruce Street in Towaoc, Colorado, issued by the Bureau of Indian Affairs (BIA) Central Contracting Office. The solicitation is a competitive Indian Small Business Economic Enterprise (ISBEE) set-aside acquisition with a proposal acceptance period of 90 days. The project involves demolishing existing platforms and constructing new ADA-compliant entryway ramps with high corrosion-resistant materials, proper drainage, and structural stability.

Key performance requirements include safely removing rusted metal components, disposing of debris in accordance with environmental regulations, and constructing new platforms that meet ADA accessibility standards. The contract stipulates a 10-day notice to proceed after bond approval, with work to be completed within 90 calendar days. Contractors must attend a pre-work conference, provide a safety program submittal, and perform work between 8:00 a.m. and 4:00 p.m. MST, Monday through Friday. The solicitation number is 140A1626Q0013, with a proposal deadline of February 6, 2026 at 1700 local time, and the contract will be awarded to the qualified contractor with the lowest total evaluated price.

View the file

Other files for this federal contract opportunity

Other files attached to Ramp Replacement at UMU Agency, newest first.
File Type Posted
SAP_Entryway_Ramps_Amendment_1_0001.pdf PDF
Sol_140A1626Q0013_Amd_0001.pdf PDF
WD_CO20260001-00.pdf PDF
SAP_Entryway_Ramps.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(See ).

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid and "bidder".

SOLICITATION

1. SOLICITATION NO.

5. REQUISITION/PURCHASE REQUEST NO.

CODE

6. PROJECT NO.

8. ADDRESS OFFER TO

4. CONTRACT NO.

7. ISSUED BY

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying number, date)

11. The contractor shall begin performance within

12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES", indicate within how many calendar days after award in Item 12b.)

13. ADDITIONAL SOLICITATION REQUIREMENTS:

a. Sealed offers in original and

b. An offer guarantee

c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

d. Offers providing less than

STANDARD FORM 1442 (REV. 12/2022)

Prescribed by GSA - FAR (48 CFR) 53.236-1(d) calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.

is, is not required.

local time containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

(date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes copies to perform the work required are due at the place specified in Item 8 by (hour) award, YES NO notice to proceed. This performance period is mandatory negotiable.

calendar days and complete it within calendar days after receiving

a. NAME b. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

12b. CALENDAR DAYS

2. TYPE OF SOLICITATION

NEGOTIATED (RFP) REQUEST FOR PROPOSAL

3. DATE ISSUED PAGE OF

SEALED BID (IFB) INVITATION FOR BID

9. FOR

INFORMATION CALL

PAGES

140A1626Q0013

BIA CENTRAL 00016

12201 Sunrise Valley Drive Contracting Office Mail Stop-244 Reston VA 20192

Kurt Egner kurt.egner@bia.gov

0044032188

A16

Kurt Egner 0000000000

01/07/2026

02/06/2026

10 90

This is a competitive ISBEE set-aside acquisition. All responsible ISBEEs may submit a proposal for consideration in accordance with these and other terms and conditions of the solicitation. Offerors are required to submit a completed Section K and the Indian Affairs Indian Economic Enterprise

Representation Form with submission.

The Government reserves the right to cancel this solicitation before the closing date.

Proposal Acceptance Period: Proposals shall be good for 90 days post solicitation closing date.

Solicitation Deadline: See Block 13.

Site Visit: Contractors may contact the Technical Point of Contact (TPOC) listed in the Scope of Work.

Notice to Proceed (NTP): The NTP will be issued within 10 calendar days of the approval of the required performance and payment bonds.

Continued...

1 24

17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement by the Government in writing within stated in Item 13d. Failure to insert any number means the offeror accepts the minimum in Item 13d.)

OFFER (Must be fully completed by offeror)

AMOUNTS

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AWARD (To be completed by Government)

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code)

CODE FACILITY CODE

15. TELEPHONE NO. (Include area code)

16. REMITTANCE ADDRESS (Include only if different than Item 14.)

20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print)

21. ITEMS ACCEPTED:

22. AMOUNT

26. ADMINISTERED BY

30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print)

31c. DATE

STANDARD FORM 1442 (REV. 12/2022) BACK

31b. UNITED STATES OF AMERICA

BY

31a. NAME OF CONTRACTING OFFICER (Type or print)

29. AWARD (Contractor is not required to sign this document.) Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.

30b. SIGNATURE 30c. DATE

28. NEGOTIATED AGREEMENT (Contractor is required to sign this document and return and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.

copies to issuing office.) Contractor agrees to furnish

24. SUBMIT INVOICES TO ADDRESS SHOWN IN

(4 copies unless otherwise specified)

23. ACCOUNTING AND APPROPRIATION DATA

ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO THE UNITED STATES CODE AT

27. PAYMENT WILL BE MADE BY

10 U.S.C. 3204(a) ( ) 41 U.S.C. 3304(a) ( )

20b. SIGNATURE 20c. OFFER DATE

Continued...

AMENDMENT

NUMBER

DATE.

Kurt Egner

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGES

NAME OF OFFEROR OR CONTRACTOR

SUPPLIES/SERVICES

(B)

UNIT

(D)

UNIT PRICE

(E)

AMOUNT

(F)

OPTIONAL FORM 336 (4-86)

Sponsored by GSA FAR (48 CFR) 53.110

ITEM NO.

(A)

QUANTITY

(C)

NSN 7540-01-152-8067

140A1626Q0013

Period of Performance: Ninety (90) calendar days after issuance of NTP.

Magnitude of Construction: Between $100,000 and

$250,000.

Special attention is called to FAR Clause

52.236-7, Permits and Responsibilities and FAR

Clause 52.229-3, Federal, State, and Local

Taxes. Offerors are responsible for contacting the tax authorities and tribe or tribal organization involved with regard to any requirements regarding state taxes, tribal taxes, royalties and/or other applicable tribal laws or ordinances. Any costs associated with this section shall be included in the contractor¿s firm fixed price proposal.

Contractor is responsible for contacting the appropriate TERO office for coordination and approvals.

Award will be made to the qualified contractor with the lowest total evaluated price to the government (Base + All Options).

Point(s) of Contact:

Contracting: Kurt Egner, kurt.egner@bia.gov

Section B - Supplies or Services/Prices Section E - Inspection and Acceptance

E-1 52.246-12 Inspection of Construction. (AUG 1996) Section F - Deliveries or Performance

F-1 52.211-10 Commencement, Prosecution, and Completion of Work. (APR 1984) F-2 52.242-14 Suspension of Work. (APR 1984)

Section I - Contract Clauses I-1 52.211-12 Liquidated Damages - Construction. (SEP 2000) I-2 52.228-13 Alternative Payment Protections. (JUL 2000) I-3 52.252-2 Clauses Incorporated by Reference. (FEB 1998) I-4 52.252-6 Authorized Deviations in Clauses. (NOV 2020) I-5 1452.228-70 Liability Insurance (JUL 1996)

Section J - List of Documents, Exhibits and Other Attachments Section K - Representations, Certifications, and Other Statements of Bidders

K-1 52.204-8 Annual Representations and Certifications. (JAN 2025) K-2 52.204-24 Representation Regarding Certain Telecommunications and Video Surveillance Services or Equipment.

(NOV 2021)

K-3 52.204-26 Covered Telecommunications Equipment or Services-Representation. (OCT 2020) K-4 52.209-2 Prohibition on Contracting With Inverted Domestic Corporations-Representation. (NOV 2015) K-5 52.209-11 Representation by Corporations Regarding Delinquent Tax Liability or a Felony Conviction under any Federal Law. (FEB 2016) K-6 52.219-1 Small Business Program Representations. (FEB 2024) K-7 52.225-25 Prohibition on Contracting with Entities Engaging in Certain Activities or Transactions Relating to Iran- Representation and Certifications. (JUN 2020)

Section L - Instructions,Conditions, and Notices to Bidders L-1 52.204-7 System for Award Management. (NOV 2024) L-2 52.204-22 Alternative Line Item Proposal. (JAN 2017) L-3 52.222-5 Construction Wage Rate Requirements-Secondary Site of the Work. (MAY 2014) L-4 52.225-10 Notice of Buy American Requirement - Construction Materials. (MAY 2014) L-5 52.236-27 Site Visit (Construction). (FEB 1995) L-6 52.252-1 Solicitation Provisions Incorporated by Reference. (FEB 1998) L-7 52.252-5 Authorized Deviations in Provisions. (NOV 2020)

Section B - Supplies or Services/Prices Scope of Work Replacement of Platforms for Buildings 1342, 1344 and 1346 Spruce Street, Towaoc, Colorado 81334 Technical POC: Sharron Hammond Email: sharon.hammond@bia.gov

1.1 GENERAL.

a. Description. Provide labor, oversight, materials, and equipment to remove & replace the entryway ramps for buildings located at 1342, 1344 and 1346 Spruce Street in Towaoc, Colorado.

Work shall be provided in accordance with all Terms, Conditions, General, Specific and Technical Provision, Exhibits, Attachments, Maps, Drawings, etc. contained herein or incorporated by Reference. This includes all mandatory provisions of the Federal Acquisition Regulation (FAR), whether referenced or not, current at time of award.

b. Background. The current platforms exhibit significant rust, deterioration, and structural deficiencies, creating unsafe conditions for occupants and visitors. Additionally, the platforms do not meet current Americans with Disabilities Act (ADA) accessibility standards. This project will provide new, durable, and ADA-compliant platforms that meet all applicable building codes and safety regulations.

c. Notice of Set Aside. In accordance with Department of the Interior Acquisiton Regulation 1480, this procurement is set aside for Indian Small Business Economic Enterprises (ISBEEs).

d. Contractor Responsibility. Contractor¿s work and responsibility shall include, but are not limited to, supply of equipment/materials, all planning, programming, administration, management, supervision, and inspection required to assure all equipment/materials are acquired and services are conducted in accordance with the contract and all applicable laws, regulations, or directives. The Contractor shall insure all work meets or exceeds specifications. The prime Contractor shall be responsible for ensuring all subcontractors comply with the provisions of this contract. All materials shall be installed in accordance with the manufacturer¿s recommendations and/or applicable building standards unless specifically stated otherwise in the specifications.

e. Performance Required. Special consideration of the Contractor is directed to the fact that the required accuracy, thoroughness, safety, and progress of this work are essential to the intended purpose. The contractor must be cognizant of the difficulties involved and of the contingencies which may arise, and must make certain that their personnel, equipment, transportation facilities and supply of materials are always adequate to ensure complete compliance with all provisions of these specifications. The work shall be done under professional supervision by competent employees. All contract services shall be in accordance with the submitted documents, and any additions, revisions or deletions must be approved by the Contracting Officer or his/her authorized representative.

f. Completion of Work. Completion of work shall include acceptable performance of all aspects of this contract.

g. Conditions:

1. The Bureau of Indian Affairs reserves the right to cancel all, or part of the work described in this Request for Quote if costs exceed anticipated funding. Department of Labor Wage Rates apply to this work and are attached at the end of this document. The Contractor is required to provide certified payroll documents for all work performed under this request.

2. Pre-Work Conference. The contractor will be required to attend a pre-work conference at least one week prior to beginning work, during which time the Contractor shall supply the Technical POC with an Safety Program Submittal.

3. Hours and Days of Work.

Work may be conducted between the hours of 8:00 a.m. and 4:00 p.m. MST, Monday through Friday. No work shall be performed outside of these times, or on federal Holidays, unless approved by the Technical POC in advance.

New Year's Day (January 1st)

Martin Luther King Day (3rd Monday in January) President's Day (3rd Monday in February) Memorial Day (Last Monday in May) Juneteenth (June 19th) Independence Day (July 4th) Labor Day (1st Monday in September) Columbus Day (2nd Monday in October) Veterans Day (November 11th) Thanksgiving Day (4th Thursday in November) Christmas Day (December 25th)

When one of the above designated holidays falls on a Sunday, the following Monday is observed as a legal holiday. When a legal holiday falls on a Saturday, the preceding Friday is observed as a holiday. Work shall be scheduled around the above listed Federal holidays except as specified herein or as approved by the POC.

4. Payment Procedure/Additional Work. At no time should the contractor do additional work without prior authorization of the Contracting Officer, and no work shall be performed that will cause the Contractor to exceed the contract price. Work performed without a binding contract document authorizing such work shall result in the Contractor not being paid for that work performed. During the course of the contract, any additional work determined to be needed may be requested by the Project Manager to the Contracting Officer for a Contract Modification.

5. Contract Start and Completion Dates. Work should commence within 14 calendar days of receipt of notice to proceed and may proceed at any mutually agreeable time within that time frame. Work will be completed within 30 days

(30) days of the issuance of the notice to proceed. The notice to proceed will be issued upon receipt and approval of all required performance and payments bonds. All services will be completed as scheduled, unless weather or circumstances beyond the control of either party occur requiring a delay in the work. The Government reserves the right to delay or stop work as needed to accommodate higher priorities, time allowed for completion will be adjusted accordingly.

6. Wage Rates: Department of Labor wage rates apply to this work and are included. The contractor is required to provide payroll documents for all work performed under this contract.

7. Safeguarding Property: The Contractor shall, at all times prior to delivery, take care to protect and preserve all materials, supplies, and equipment of every description (including material and property which may be Government owned) and all work performed. All reasonable requests of the Technical POC or his/her authorized representative to enclose or specially protect such property shall be complied with. If so determined by the Technical POC that material, equipment, supplies, and work performed are not adequately protected by the Contractor, such property may be protected by the Government and the cost thereof may be charged to the Contractor or deducted from any payment due to them.

8. The Contractor will notify the Technical POC or his/her authorized representative, upon commencement of work activities, and difficulties, interruption, or suspension of work, and when the required work has been completed. The Contractor shall update the Technical POC, or their authorized representative, no less than once weekly on status of work being done.

9. The scope of work only contains approximate measurements for reference. It is required that each interested contractor visit the job site prior to submitting a quote. The Contractor is responsible for quantities, materials, critical dimensions and work conditions used to calculate a proposal.

10. SITE VISIT: The Scope of Work only contains approximate measurements for reference. Each interested contractor should visit the job site and assume responsibility for quantities, materials, critical dimensions and work conditions used to calculate a quote.

Contractors will contact the office for a site visit to be scheduled. The POC¿s contact information is as follows:

Technical POC: Sharon Hammond Email: sharon.hammond@bia.gov

1.2 CONTRACTOR SUBMITTALS.

a. Pre-Construction Safety Meeting: Meet with representatives of the Contracting Officer to discuss and develop a mutual understanding relative to administration of the overall safety program.

b. As-built drawings of the completed ramps.

1.3 ACCIDENT REPORTING. The Contractor shall maintain accurate accident records and report accidents as prescribed by the Technical POC. Accidents shall be reported within 24 hours of occurrence, and all serious accidents (those resulting in death or injury requiring medical attention or lost time) shall be reported immediately.

1.4 DAMAGE REPORTS. In all instances where Government property, equipment, natural features, landscape, or trees are damaged by contract employees, an immediate notification shall be made to the Technical POC. A full report of the incident and extent of such damage shall be submitted to the Technical POC within two working days of occurrence, excluding weekends and holidays.

1.5 CONTRACT EMPLOYEES. All contract employees shall conduct themselves in a proper and courteous manner at all times. Contract employees shall comply with all provisions of Title 36, Chapter III, Part 327, CFR and obey all posted signs and regulations in the performance of the work under this contract. Being under the influence of or consuming alcoholic beverages or controlled substances by the Contractor or employees while on duty is prohibited.

2.1 SPECIAL REQUIREMENTS:

a. Security.

At the Pre-construction Conference (and prior to beginning work on the contract), the Contractor shall provide a list of all on-site personnel, including sub-contractors (including second and third-tier subcontractors) and suppliers, to the Contracting Officer (note: after award, an SF1413 is required to be completed and returned to the Contracting Officer for each subcontract entered into). The contractor shall update this list when changes occur. Contractor personnel not listed may be denied access to a facility. Contractor personnel will be restricted to designated working areas and any personnel violating this policy may lose access to the facility. Contractor personnel shall have photo identification at all times while working on BIA facilities. Contractors shall provide the COR with 24 hours of advance notice of every delivery to the site (e.g., concrete, lumber, etc...) and provide the company name, delivery person, and phone number of the firm(s) making deliveries. Otherwise, access to a facility may be denied.

b. Electronic Invoicing and Payment Requirements - Invoice Processing Platform (IPP)

Payment requests must be submitted electronically through the U. S. Department of the Treasury's Invoice Processing Platform System (IPP).

"Payment request" means any request for contract financing payment or invoice payment by the Contractor. To constitute a proper invoice, the payment request must comply with the requirements identified in the applicable Prompt Payment clause included in the contract. The IPP website address is: https://www.ipp.gov.

Under this contract, the following documents are required to be submitted as an attachment to the IPP invoice: Refer to FAR 52.232-5 Payments under FP Construction Contracts, FAR 52.232-16 Progress Payments, and FAR 52-232-27 Prompt Payment for Construction Contracts. The Contractor must use the IPP website to register access and use IPP for submitting requests for payment. The Contractor Government Business Point of Contact (as listed in SAM) will receive enrollment instructions via email from the Federal Reserve Bank of St. Louis (FRBSTL) within 3 - 5 business days of the contract award date. Contractor assistance with enrollment can be obtained by contacting the IPP Production Helpdesk via email IPPCustomerSupport@fiscal.treasury.gov or phone (866) 973-3131.

If the Contractor is unable to comply with the requirement to use IPP for submitting invoices for payment, the Contractor must submit a waiver request in writing to the Contracting Officer when submitting their quote.

c. SAM Registration: The successful offeror will be required to be registered with (SAM) System for Award Management, (https://www.sam.gov/) to do business with the government. (NOTE: Pay careful attention when typing in the SAM website address on your browser). Offerors must complete their registration in SAM in order to be eligible to quote for this contract.

d. Failure to provide all information requested on the quote sheet or failure to complete SAM registration may be https://www.sam.gov/ grounds for considering the quote unresponsive.

e. Applicable Publications. Performance of all services will assure complete safety to public visitors, Government employees, contractor employees, and all other persons in the area.

The Contractor will perform technical work in accordance with applicable publications. They include but are not limited to:

Standards AND Publications (Latest Editions):

• Colorado State Codes, Laws, and Regulations

f. Guarantee: The contractor shall offer a guarantee that the work is complete in accordance with all specifications and in compliance with all national, state, and local laws.

3.1 GENERAL SPECIFICATIONS:

General. Provide labor, materials, and equipment to remove & replace entryway ramps for three buildings in Towaoc, CO.

Work shall be provided in accordance with all Terms, Conditions, General, Specific and Technical Provision, Exhibits, Attachments, Maps, Drawings, etc. contained herein or incorporated by Reference. This includes all mandatory provisions of the Federal Acquisition Regulation (FAR), whether referenced or not, current at time of award.

A. Work to be performed. The work to be performed is as follows:

1. Demolition of previous ramps

a. Safely demolish and remove existing platforms, rusted metal components, and any haz.ardous materials.

b. Dispose of all debris in accordance with environmental regulations.

2. Installation of new ramps;

a. Construct new platforms at each building.

b. Include all applicable ADA-compliant features including, but not limited to, ensure designs incorporate ADA requirements for platform height, ramp slope, turning radius, guardrails, and handrail extensions.

c. Ensure proper drainage, anchoring, and structural stability.

d. Select materials with high corrosion resistance (e.g., galvanized steel, aluminum, composite decking, or pressure-treated lumber).

e. Provide as-built drawings and warranty documentation.

f. Conduct a final walkthrough and obtain client approval.

g. Train facility representatives on maintenance and cleaning requirements.

END OF SCOPE OF WORK

PRICE SCHEDULE

Propose your best prices for each of the work orders/projects in accordance with the Statement of Work (SOW) and attachments. Price Proposals must be submitted following the price schedule/format herein.

CLIN DESCRIPTION UNIT UNIT PRICE TOTAL PRICE

Ramp Replacement

1 Job

Subtotal $

TERO (if applicable) $

Total $

Section E - Inspection and Acceptance E-1 52.246-12 Inspection of Construction. (AUG 1996)

(a) Definition. Work includes, but is not limited to, materials, workmanship, and manufacture and fabrication of components.

(b) The Contractor shall maintain an adequate inspection system and perform such inspections as will ensure that the work performed under the contract conforms to contract requirements. The Contractor shall maintain complete inspection records and make them available to the Government. All work shall be conducted under the general direction of the Contracting Officer and is subject to Government inspection and test at all places and at all reasonable times before acceptance to ensure strict compliance with the terms of the contract.

(c) Government inspections and tests are for the sole benefit of the Government and do not -

(1) Relieve the Contractor of responsibility for providing adequate quality control measures;

(2) Relieve the Contractor of responsibility for damage to or loss of the material before acceptance;

(3) Constitute or imply acceptance; or

(4) Affect the continuing rights of the Government after acceptance of the completed work under paragraph (i) below.

(d) The presence or absence of a Government inspector does not relieve the Contractor from any contract requirement, nor is the inspector authorized to change any term or condition of the specification without the Contracting Officer's written authorization.

(e) The Contractor shall promptly furnish, at no increase in contract price, all facilities, labor, and material reasonably needed for performing such safe and convenient inspections and tests as may be required by the Contracting Officer. The Government may charge to the Contractor any additional cost of inspection or test when work is not ready at the time specified by the Contractor for inspection or test, or when prior rejection makes reinspection or retest necessary. The Government shall perform all inspections and tests in a manner that will not unnecessarily delay the work. Special, full size, and performance tests shall be performed as described in the contract.

(f) The Contractor shall, without charge, replace or correct work found by the Government not to conform to contract requirements, unless in the public interest the Government consents to accept the work with an appropriate adjustment in contract price. The Contractor shall promptly segregate and remove rejected material from the premises.

(g) If the Contractor does not promptly replace or correct rejected work, the Government may (1) by contract or otherwise, replace or correct the work and charge the cost to the Contractor or (2) terminate for default the Contractor's right to proceed.

(h) If, before acceptance of the entire work, the Government decides to examine already completed work by removing it or tearing it out, the Contractor, on request, shall promptly furnish all necessary facilities, labor, and material. If the work is found to be defective or nonconforming in any material respect due to the fault of the Contractor or its subcontractors, the Contractor shall defray the expenses of the examination and of satisfactory reconstruction. However, if the work is found to meet contract requirements, the Contracting Officer shall make an equitable adjustment for the additional services involved in the examination and reconstruction, including, if completion of the work was thereby delayed, an extension of time.

(i) Unless otherwise specified in the contract, the Government shall accept, as promptly as practicable after completion and inspection, all work required by the contract or that portion of the work the Contracting Officer determines can be accepted separately. Acceptance shall be final and conclusive except for latent defects, fraud, gross mistakes amounting to fraud, or the Government's rights under any warranty or guarantee.

(End of clause)

Section F - Deliveries or Performance F-1 52.211-10 Commencement, Prosecution, and Completion of Work. (APR 1984)

The Contractor shall be required to (a) commence work under this contract within 10 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 90 calendar days. The time stated for completion shall include final cleanup of the premises.

(End of clause)

* The Contracting Officer shall specify either a number of days after the date the contractor receives the notice to proceed, or a calendar date.

F-2 52.242-14 Suspension of Work. (APR 1984)

(a) The Contracting Officer may order the Contractor, in writing, to suspend, delay, or interrupt all or any part of the work of this contract for the period of time that the Contracting Officer determines appropriate for the convenience of the Government.

(b) If the performance of all or any part of the work is, for an unreasonable period of time, suspended, delayed, or interrupted (1) by an act of the Contracting Officer in the administration of this contract, or (2) by the Contracting Officer's failure to act within the time specified in this contract (or within a reasonable time if not specified), an adjustment shall be made for any increase in the cost of performance of this contract (excluding profit) necessarily caused by the unreasonable suspension, delay, or interruption, and the contract modified in writing accordingly. However, no adjustment shall be made under this clause for any suspension, delay, or interruption to the extent that performance would have been so suspended, delayed, or interrupted by any other cause, including the fault or negligence of the Contractor, or for which an equitable adjustment is provided for or excluded under any other term or condition of this contract.

(c) A claim under this clause shall not be allowed (1) for any costs incurred more than 20 days before the Contractor shall have notified the Contracting Officer in writing of the act or failure to act involved (but this requirement shall not apply as to a claim resulting from a suspension order), and (2) unless the claim, in an amount stated, is asserted in writing as soon as practicable after the termination of the suspension, delay, or interruption, but not later than the date of final payment under the contract.

Section I - Contract Clauses Clause Database Clause Number Clause Title

FAR 52.204-10 Reporting Executive Compensation and First-Tier Subcontract Awards. (JUN 2020)

FAR 52.204-13 System for Award Management Maintenance. (OCT 2018)

FAR 52.204-19 Incorporation by Reference of Representations and Certifications.

(DEC 2014)

FAR 52.204-21 Basic Safeguarding of Covered Contractor Information Systems.

(NOV 2021)

FAR 52.204-23

Prohibition on Contracting for Hardware, Software, and Services Developed or Provided by Kaspersky Lab Covered Entities. (DEC 2023)

FAR 52.204-25 Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment. (NOV 2021)

FAR 52.204-27 Prohibition on a ByteDance Covered Application. (JUN 2023)

FAR 52.209-6

Protecting the Government's Interest When Subcontracting With Contractors Debarred, Suspended, Proposed for Debarment, or Voluntarily Excluded. (JAN 2025)

FAR 52.209-10 Prohibition on Contracting With Inverted Domestic Corporations.

(NOV 2015)

FAR 52.211-13 Time Extensions. (SEP 2000) FAR 52.219-6 Notice of Total Small Business Set-Aside. (NOV 2020) FAR 52.219-8 Utilization of Small Business Concerns. (JAN 2025) FAR 52.219-28 Postaward Small Business Program Rerepresentation. (JAN 2025) FAR 52.222-3 Convict Labor. (JUN 2003)

FAR 52.222-4 Contract Work Hours and Safety Standards - Overtime Compensation. (MAY 2018)

FAR 52.222-6 Construction Wage Rate Requirements. (AUG 2018) FAR 52.222-7 Withholding of Funds. (MAY 2014) FAR 52.222-8 Payrolls and Basic Records. (JUL 2021) FAR 52.222-9 Apprentices and Trainees. (JUL 2005) FAR 52.222-10 Compliance With Copeland Act Requirements. (FEB 1988) FAR 52.222-11 Subcontracts (Labor Standards). (MAY 2014) FAR 52.222-12 Contract Termination - Debarment. (MAY 2014)

FAR 52.222-13 Compliance With Construction Wage Rate Requirements and Related Regulations. (MAY 2014)

FAR 52.222-14 Disputes Concerning Labor Standards. (FEB 1988) FAR 52.222-15 Certification of Eligibility. (MAY 2014) FAR 52.222-36 Equal Opportunity for Workers with Disabilities. (JUN 2020) FAR 52.222-50 Combating Trafficking in Persons. (NOV 2021) FAR 52.222-54 Employment Eligibility Verification. (JAN 2025)

FAR 52.222-55 Minimum Wages for Contractor Workers Under Executive Order

14026. (JAN 2022)

FAR 52.222-62 Paid Sick Leave Under Executive Order 13706. (JAN 2022) FAR 52.225-9 Buy American - Construction Materials. (OCT 2022) FAR 52.225-13 Restrictions on Certain Foreign Purchases. (FEB 2021)

FAR 52.226-1 Utilization of Indian Organizations and Indian-Owned Economic Enterprises. (JUN 2000)

FAR 52.226-7 Drug-Free Workplace. (MAY 2024)

FAR 52.226-8 Encouraging Contractor Policies To Ban Text Messaging While Driving. (MAY 2024)

FAR 52.227-4 Patent Indemnity--Construction Contracts. (DEC 2007) FAR 52.228-12 Prospective Subcontractor Requests for Bonds. (DEC 2022) FAR 52.228-14 Irrevocable Letter of Credit. (NOV 2014) FAR 52.228-15 Performance and Payment Bonds - Construction. (JUN 2020) FAR 52.232-5 Payments Under Fixed-Price Construction Contracts. (MAY 2014) FAR 52.232-16 Progress Payments. (NOV 2021) FAR 52.232-27 Prompt Payment for Construction Contracts. (JAN 2017) FAR 52.232-33 Payment by Electronic Funds Transfer - System for Award

Clause Database Clause Number Clause Title Management. (OCT 2018)

FAR 52.232-39 Unenforceability of Unauthorized Obligations. (JUN 2013)

FAR 52.232-40 Providing Accelerated Payments to Small Business Subcontractors.

(MAR 2023)

FAR 52.233-1 Disputes. (MAY 2014) FAR 52.233-3 Protest After Award. (AUG 1996) FAR 52.233-4 Applicable Law for Breach of Contract Claim. (OCT 2004) FAR 52.236-2 Differing Site Conditions. (APR 1984) FAR 52.236-3 Site Investigation and Conditions Affecting the Work. (APR 1984) FAR 52.236-5 Material and Workmanship. (APR 1984) FAR 52.236-6 Superintendence by the Contractor. (APR 1984) FAR 52.236-7 Permits and Responsibilities. (NOV 1991)

FAR 52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements. (APR 1984)

FAR 52.236-10 Operations and Storage Areas. (APR 1984) FAR 52.236-11 Use and Possession Prior to Completion. (APR 1984) FAR 52.236-12 Cleaning Up. (APR 1984) FAR 52.236-13 Accident Prevention. (NOV 1991) FAR 52.236-14 Availability and Use of Utility Services. (APR 1984) FAR 52.236-26 Preconstruction Conference. (FEB 1995)

FAR 52.240-1

Prohibition on Unmanned Aircraft Systems Manufactured or Assembled by American Security Drone Act-Covered Foreign Entities.

FAR 52.243-5 Changes and Changed Conditions. (APR 1984)

FAR 52.244-6 Subcontracts for Commercial Products and Commercial Services.

(JAN 2025)

FAR 52.246-21 Warranty of Construction. (MAR 1994)

FAR 52.249-1 Termination for Convenience of the Government (Fixed-Price) (Short Form). (APR 1984)

FAR 52.249-10 Default (Fixed-Price Construction). (APR 1984) DIAR 1452.201-70 Authorities and delegations. (SEP 2011)

DIAR 1452.215-70 Examination of Records by the Department of the Interior (APR 1984)

DIAR 1452.215-71 Use and Disclosure of Proposal Information-Department of the Interior. (APR 1984)

DIAR 1452.224-1 Privacy Act Notification DIAR 1452.233-2 Service of Protest DIAR 1452.236-70 Prohibition Against Use of Lead-based Paint (JUL 1996)

DIAR 1452.280-1 Notice of Indian Small Business Economic Enterprise set-aside.

(FEB 2021)

DIAR 1452.280-2 Notice of Indian Economic Enterprise set-aside. (FEB 2021) DIAR 1452.280-3 Indian Economic Enterprise subcontracting limitations. (FEB 2021) DIAR 1452.280-4 Indian Economic Enterprise representation. (FEB 2021)

DOI Local Clauses 52.223-23 52.223-23, Sustainable Products and Services (MAY 2024)

(DEVIATION FEB 2025)

I-1 52.211-12 Liquidated Damages - Construction. (SEP 2000)

(a) If the Contractor fails to complete the work within the time specified in the contract, the Contractor shall pay liquidated damages to the Government in the amount of $183 for each calendar day of delay until the work is completed or accepted.

(b) If the Government terminates the Contractor's right to proceed, liquidated damages will continue to accrue until the work is completed. These liquidated damages are in addition to excess costs of repurchase under the Termination clause.

I-2 52.228-13 Alternative Payment Protections. (JUL 2000)

(a) The Contractor shall submit one of the following payment protections: A payment bond or an irrevocable letter of credit

(ILC).

(b) The amount of the payment protection shall be 100 percent of the contract price.

(c) The submission of the payment protection is required within 10 days of contract award.

(d) The payment protection shall provide protection for the full contract performance period plus a one-year period.

(e) Except for escrow agreements and payment bonds, which provide their own protection procedures, the Contracting Officer is authorized to access funds under the payment protection when it has been alleged in writing by a supplier of labor or material that a nonpayment has occurred, and to withhold such funds pending resolution by administrative or judicial proceedings or mutual agreement of the parties.

(f) When a tripartite escrow agreement is used, the Contractor shall utilize only suppliers of labor and material that signed the escrow agreement.

(End of clause)

I-3 52.252-2 Clauses Incorporated by Reference. (FEB 1998)

This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):

https://www.acquisition.gov/

(End of clause)

I-4 52.252-6 Authorized Deviations in Clauses. (NOV 2020)

(a) The use in this solicitation or contract of any Federal Acquisition Regulation (48 CFR Chapter 1) clause with an authorized deviation is indicated by the addition of (DEVIATION) after the date of the clause.

(b) The use in this solicitation or contract of any Department of the Interior Acquisition Regulation (48 CFR Chapter 14) clause with an authorized deviation is indicated by the addition of (DEVIATION) after the name of the regulation.

(End of clause)

I-5 1452.228-70 Liability Insurance (JUL 1996)

(a) The Contractor shall procure and maintain during the term of this contract and any extension thereof liability insurance in form satisfactory to the Contracting Officer by an insurance company which is acceptable to the Contracting Officer.

The named insured parties under the policy shall be the Contractor and the United States of America. The amounts of the insurance shall be not less than as follows:

$500000 each person*

$100000 each occurrence*

$100000 property damage*

(b) Each policy shall have a certificate evidencing the insurance coverage. The insurance company shall provide an endorsement to notify the Contracting Officer 30 days prior to the effective date of cancellation or termination of the policy or certificate; or modification of the policy or certificate which may adversely affect the interest of the Government in such insurance. The certificate shall identify the contract number, the name and address of the Contracting Officer, as well as the insured, the policy number and a brief description of contract services to be performed. The contractor shall furnish the Contracting Officer with a copy of an acceptable insurance certificate prior to beginning the work.

*These amounts to be set by the Contracting Officer.

Section J - List of Documents, Exhibits and Other Attachments Attachment

Number Title Date

1 SAP Entryway Ramps 01/07/2026

2 WD CO20260001-00 01/07/2026

Section K - Representations, Certifications, and Other Statements of Bidders K-1 52.204-8 Annual Representations and Certifications. (JAN 2025)

(a)(1) The North American Industry Classification System (NAICS) code for this acquisition is [insert NAICS code].

(2) The small business size standard is [insert size standard].

(3) The small business size standard for a concern that submits an offer, other than on a construction or service acquisition, but proposes to furnish an end item that it did not itself manufacture, process, or produce is 500 employees, or 150 employees for information technology value-added resellers under NAICS code 541519, if the acquisition-

(i) Is set aside for small business and has a value above the simplified acquisition threshold;

(ii) Uses the HUBZone price evaluation preference regardless of dollar value, unless the offeror waives the price evaluation preference; or

(iii) Is an 8(a), HUBZone, service-disabled veteran-owned, economically disadvantaged women-owned, or women-owned small business set-aside or sole-source award regardless of dollar value.

(b)(1) If the provision at 52.204-7, System for Award Management, is included in this solicitation, paragraph (d) of this provision applies.

(2) If the provision at 52.204-7, System for Award Management, is not included in this solicitation, and the Offeror has an active registration in the System for Award Management (SAM), the Offeror may choose to use paragraph (d) of this provision instead of completing the corresponding individual representations and certifications in the solicitation. The Offeror shall indicate which option applies by checking one of the following boxes:

___ (i) Paragraph (d) applies.

___ (ii) Paragraph (d) does not apply and the offeror has completed the individual representations and certifications in the solicitation.

(c)(1) The following representations or certifications in SAM are applicable to this solicitation as indicated:

(i) 52.203-2, Certificate of Independent Price Determination. This provision applies to solicitations when a firm-fixed-price contract or fixed-price contract with economic price adjustment is contemplated, unless-

(A) The acquisition is to be made under the simplified acquisition procedures in Part 13;

(B) The solicitation is a request for technical proposals under two-step sealed bidding procedures; or

(C) The solicitation is for utility services for which rates are set by law or regulation.

(ii) 52.203-11, Certification and Disclosure Regarding Payments to Influence Certain Federal Transactions. This provision applies to solicitations expected to exceed $150,000.

(iii) 52.203-18, Prohibition on Contracting with Entities that Require Certain Internal Confidentiality Agreements or Statements-Representation. This provision applies to all solicitations.

(iv) 52.204-3, Taxpayer Identification. This provision applies to solicitations that do not include provision at 52.204-7, System for Award Management.

(v) 52.204-5, Women-Owned Business (Other Than Small Business). This provision applies to solicitations that-

(A) Are not set aside for small business concerns;

(B) Exceed the simplified acquisition threshold; and

(C) Are for contracts that will be performed in the United States or its outlying areas.

(vi) 52.204-26, Covered Telecommunications Equipment or Services-Representation. This provision applies to all solicitations.

(vii) 52.209-2, Prohibition on Contracting with Inverted Domestic Corporations-Representation.

(viii) 52.209-5, Certification Regarding Responsibility Matters. This provision applies to solicitations where the contract value is expected to exceed the simplified acquisition threshold.

(ix) 52.209-11, Representation by Corporations Regarding Delinquent Tax Liability or a Felony Conviction under any Federal Law. This provision applies to all solicitations.

(x) 52.214-14, Place of Performance-Sealed Bidding. This provision applies to invitations for bids except those in which the place of performance is specified by the Government.

(xi) 52.215-6, Place of Performance. This provision applies to solicitations unless the place of performance is specified by the Government.

(xii) 52.219-1, Small Business Program Representations (Basic, Alternates I, and II). This provision applies to solicitations when the contract is for supplies to be delivered or services to be performed in the United States or its outlying areas, or when the contracting officer has applied part 19 in accordance with 19.000(b)(1)(ii).

(A) The basic provision applies when the solicitations are issued by other than DoD, NASA, and the Coast Guard.

(B) The provision with its Alternate I applies to solicitations issued by DoD, NASA, or the Coast Guard.

(C) The provision with its Alternate II applies to solicitations that will result in a multiple-award contract with more than one NAICS code assigned.

(xiii) 52.219-2, Equal Low Bids. This provision applies to solicitations when contracting by sealed bidding and the contract is for supplies to be delivered or services to be performed in the United States or its outlying areas, or when the contracting officer has applied part 19 in accordance with 19.000(b)(1)(ii).

(xiv) 52.222-22, Previous Contracts and Compliance Reports. This provision applies to solicitations that include the clause at 52.222-26, Equal Opportunity.

(xv) 52.222-25, Affirmative Action Compliance. This provision applies to solicitations, other than those for construction, when the solicitation includes the clause at 52.222-26, Equal Opportunity.

(xvi) 52.222-38, Compliance with Veterans' Employment Reporting Requirements. This provision applies to solicitations when it is anticipated the contract award will exceed the simplified acquisition threshold and the contract is not for acquisition of commercial products or commercial services.

(xvii) 52.223-1, Biobased Product Certification. This provision applies to solicitations that require the delivery or specify the use of biobased products in USDA-designated product categories; or include the clause at 52.223-2, Reporting of Biobased Products Under Service and Construction Contracts.

(xviii) 52.223-4, Recovered Material Certification. This provision applies to solicitations that are for, or specify the use of, EPA-designated items.

(xix) 52.223-22, Public Disclosure of Greenhouse Gas Emissions and Reduction Goals-Representation. This provision applies to solicitations that include the provision at 52.204-7.

(xx) 52.225-2, Buy American Certificate. This provision applies to solicitations containing the clause at 52.225-1.

(xxi) 52.225-4, Buy American-Free Trade Agreements-Israeli Trade Act Certificate. (Basic, Alternates II and III.) This provision applies to solicitations containing the clause at 52.225-3.

(A) If the acquisition value is less than $50,000, the basic provision applies.

(B) If the acquisition value is $50,000 or more but is less than $100,000, the provision with its Alternate II applies.

(C) If the acquisition value is $100,000 or more but is less than $102,280, the provision with its Alternate III applies.

(xxii) 52.225-6, Trade Agreements Certificate. This provision applies to solicitations containing the clause at 52.225-5.

(xxiii) 52.225-20, Prohibition on Conducting Restricted Business Operations in Sudan-Certification. This provision applies to all solicitations.

(xxiv) 52.225-25, Prohibition on Contracting with Entities Engaging in Certain Activities or Transactions Relating to Iran- Representation and Certifications. This provision applies to all solicitations.

(xxv) 52.226-2, Historically Black College or University and Minority Institution Representation. This provision applies to solicitations for research, studies, supplies, or services of the type normally acquired from higher educational institutions.

(2) The following representations or certifications are applicable as indicated by the Contracting Officer:

[Contracting Officer check as appropriate.]

[ ] (i) 52.204-17, Ownership or Control of Offeror.

[ ] (ii) 52.204-20, Predecessor of Offeror.

[ ] (iii) 52.222-18, Certification Regarding Knowledge of Child Labor for Listed End Products.

[ ] (iv) 52.222-48, Exemption from Application of the Service Contract Labor Standards to Contracts for Maintenance, Calibration, or Repair of Certain Equipment-Certification.

[ ] (v) 52.222-52, Exemption from Application of the Service Contract Labor Standards to Contracts for Certain Services- Certification.

[ ] (vi) 52.227-6, Royalty Information.

[ ] (A) Basic.

[ ] (B) Alternate I.

[ ] (vii) 52.227-15, Representation of Limited Rights Data and Restricted Computer Software.

(d) The Offeror has completed the annual representations and certifications electronically in SAM accessed through https://www.sam.gov. After reviewing the SAM information, the Offeror verifies by submission of the offer that the representations and certifications currently posted electronically that apply to this solicitation as indicated in paragraph (c) of this provision have been entered or updated within the last 12 months, are current, accurate, complete, and applicable to this solicitation (including the business size standard applicable to the NAICS code referenced for this solicitation), as of the date of this offer and are incorporated in this offer by reference (see FAR 4.1201); except for the changes identified below [offeror to insert changes, identifying change by clause number, title, date]. These amended representation(s) and/or certification(s) are also incorporated in this offer and are current, accurate, and complete as of the date of this offer.

(End of provision)

K-2 52.204-24 Representation Regarding Certain Telecommunications and Video Surveillance Services or Equipment. (NOV 2021)

The Offeror shall not complete the representation at paragraph (d)(1) of this provision if the Offeror has represented that it "does not provide covered telecommunications equipment or services as a part of its offered products or services to the Government in the performance of any contract, subcontract, or other contractual instrument" in paragraph (c)(1) in the provision at 52.204-26, Covered Telecommunications Equipment or Services-Representation, or in paragraph (v)(2)(i) of the provision at 52.212-3, Offeror Representations and Certifications-Commercial Products and Commercial Services.

The Offeror shall not complete the representation in paragraph (d)(2) of this provision if the Offeror has represented that it "does not use covered telecommunications equipment or services, or any equipment, system, or service that uses covered telecommunications equipment or services" in paragraph (c)(2) of the provision at 52.204-26, or in paragraph (v)(2)(ii) of the provision at 52.212-3.

(a) Definitions. As used in this provision-

Backhaul, covered telecommunications equipment or services, critical technology, interconnection arrangements, reasonable inquiry, roaming, and substantial or essential component have the meanings provided in the clause 52.204-…