This document is Amendment 0001 to Request for Quotation (RFQ) #140A0526Q0004 for Remediation & Site Characterization services in Kotzebue, Alaska. The amendment was issued on August 17, 2026, with an effective date of August 6, 2026, by the Bureau of Indian Affairs (BIA) Pacific office located in Sacramento, California. The RFQ is set aside 100% for Indian Small Business Economic Enterprises (ISBEEs). All interested parties submitting quotations must complete blocks 8 and 15A-C of the amendment and include the completed page 1 with their quotation. The period of performance runs from September 1, 2026, to August 31, 2027. All terms and conditions of the original solicitation remain unchanged, and offers must acknowledge receipt of this amendment prior to the hour and date specified in the original solicitation or risk rejection.
The amendment's primary purpose is to publicly release all questions asked on the solicitation to date and BIA's responses. Key clarifications include: up to 16 test pits and/or soil borings are authorized for delineation; the Work Plan and Sampling and Analysis Plan may be combined into a single document; the number of wells requiring repair or replacement is unknown but historically has been 0-3; groundwater monitoring consists of a single event; product recovery activities may be needed if free product is encountered, with 2 of 16 wells previously showing free product; and soil and groundwater samples will be analyzed for DRO, PAHs, and VOCs following Alaska Department of Environmental Conservation regulations and guidance. Additionally, the Kotzebue 2024-2025 Site Characterization Report is attached as reference material, and the contractor must follow Alaska DEC standards for sample collection and analysis frequencies.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
E. IMPORTANT: is not is required copies to the issuing office.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
7.ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. is extended. is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
Previous edition unusable
PAGESOF
Contractor
The hour and date specified for receipt of Offers to sign this document and return
Jodi Zachary
See continuation page
BIA PACIFIC 00013
2800 COTTAGE WAY ROOM W2820
Contracting Office Sacramento CA 95825
DOI, BIA PACIFIC
Contracting Office
2800 COTTAGE WAY ROOM W2800
Sacramento CA 95825
A13
A13
140A0526Q0004
08/17/2026
08/06/2026
1 4
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGES
NAME OF OFFEROR OR CONTRACTOR
SUPPLIES/SERVICES
(B)
UNIT
(D)
UNIT PRICE
(E)
AMOUNT
(F)
OPTIONAL FORM 336 (4-86)
Sponsored by GSA FAR (48 CFR) 53.110
ITEM NO.
(A)
QUANTITY
(C)
NSN 7540-01-152-8067
140A0526Q0004/0001
This RFQ is Set Aside 100% for Indian Small
Business Economic Enterprises (ISBEEs).
The purpose of Amendment 0001 is to publicly release all questions that have been asked on the solicitation to date and the answers provided by BIA.
All interested parties submitting a quotation must complete blocks 8 and 15A-C of this
Amendment AND INCLUDE the completed page 1 of this Amendment with their quotation.
All terms and conditions of the solicitation remain unchanged.
Period of Performance: 09/01/2026 to
08/31/2027
RFQ #140A0526Q0004
Remediation & Site Characterization - Kotzebue, AK
Amendment 0001 Questions & Answers
1. Can previous site characterization reports be provided?
The previous BIA report is attached. Historic reports are available from DEC or on their website.
2. Please confirm the additional delineation to be performed as part of this project is limited to the 16 locations identified in the PWS.
Up to 16 test pits and/or soil borings are authorized.
3. Are the Work Plan and Sampling and Analysis Plan intended to be separate documents, or may they be combined into a single document?
They may be combined in a single document.
4. The PWS identifies previous damage/loss of monitoring wells that may require repair or replacement. How many wells should the contractor assume require repair or replacement?
Unknown. During previous projects, some contractors were not prepared to repair any, resulting in lost sampling opportunities. In the past damaged or lost well points have been 0-3.
5. The PWS mentions evaluation of multi-season, tide-influenced groundwater dynamics.
Can BIA clarify this aspect and state whether groundwater monitoring is limited to a single event or multiple events, and if multiple events, how many?
For this contract groundwater monitoring consists of a single event. Groundwater dynamics are mentioned for contractor awareness.
6. Task 3 requires product recovery activities, if applicable, until no sheen/product is detected.
Since product recovery could continue for years, can BIA clarify the requirements for product recovery activities that should be included in the proposal?
During well monitoring and sampling free product could potentially be encountered. In that case DEC may request some product recovery action, such as installing a sorbent boom or similar effort prior to departure. Any further efforts would occur under a separate contract.
7. How many wells should contractors assume will require product recovery activities?
Previously, free product has been detected in 2 of the 16 monitoring wells.
8. For IDW soils requiring off-site disposal, can the soils be transported to and managed at the KIC landfarm where other contaminated soils are currently being managed?
The Alaska DEC is the regulatory authority responsible for IDW requirements.
9. Are there established rates for soil treatment at the KIC landfarm?
This question is for KIC.
10. Are there page limits or specific instructions for the technical response?
No page limit. Quotation contents are listed in the RFQ beginning on page 14 of 16.
https://sam.gov/workspace/contract/opp/e974675b4716496d9d346c4f7f77efe8/view
11. Please make available relevant historical documentation, particularly the Kotzebue 2024- 2025 Site Characterization Report.
Attached.
12. In absence of historical condition data, it is assumed that 2 of the 16 groundwater monitoring wells will require replacement.
At the close of the previous effort, one well was known to be obstructed (MW06). In the past damaged or lost well points have been 0-3.
13. Analyses are assumed at AK101 (GRO), AK102/103 (DRO/RRO), SW8260 (VOC), and SW8270-SIM (PAH) for both soil and groundwater.
Soil and groundwater samples will be analyzed for DRO, PAHs and VOCs following Alaska DEC regulations and guidance.
14. Assume 2 soil samples per test pit/soil boring targeting (1) highest PID in the vadose zone and (2) the interval at the soil-water interface.
Soil and groundwater samples will be collected following Alaska DEC regulations and guidance.
15. It is assumed that duplicate samples will be collected at 10% and MS/MSD at 5% frequencies for each analysis and medium.
Soil and groundwater samples will be collected following Alaska DEC regulations and guidance.
| Amendment of solicitation/modification of contract |
| Contract ID code |
| Amendment/modification number |
| Effective date |
| Requisition/purchase requisition number |
| Project number |
| Issued by |
| Code |
| Administered by |
| Code |
| Name and address of contractor |
| Code |
| Facility code |
| Amendment of solicitation number |
| Dated |
| Modification of contract/order number |
| Dated |
| This item only applies to amendments of solicitations |
| Accounting and appropriation data |
| This item applies only to modifications of contracts/orders. |
| This change order is issued pursuant to: |
| The above numbered contract/order is modified to reflect the administrative changes |
| This supplemental agreement is entered into pursuant to authority of: |
| Other |
| Important: |
| Description of amendment/modification |
| Name and title of signer |
| Contractor/offeror |
| Date signed |
| Name and title of contracting officer |
| Signature of Contracting Officer |
| Date signed |
| Previous edition unusable |
| Standard form 30 (rev. 11/2016) |
| Continuation sheet |
| Reference Number |
| Name of Offeror or Contractor |
| OPTIONAL FORM 336 (4-86)) |
Sponsored by GSA FAR (48 CFR) 53.110
File details come from the government source that posted it. Updated .