SEE ADDENDUMIS CHECKED
CODE 18a. PAYMENT WILL BE MADE BY
CODE
FACILITYCODE
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN OFFER
OFFEROR
91S8 CODE 16. ADMINISTERED BYCODE
X
X
238220
SIZE STANDARD:
% FOR:SET ASIDE:UNRESTRICTED OR91S8
RFPIFB
10. THIS ACQUISITION ISCODE
RFQ
14. METHOD OF SOLICITATION
13b. RATING
NAICS:
SMALL BUSINESS
06/27/2020 1630 PS
06/12/2020
707-562-9205TIFFANY HURT
(No collect calls)
INFORMATION CALL:
FOR SOLICITATION 8. OFFER DUE DATE/LOCAL TIMEb. TELEPHONE NUMBER a. NAME
4. ORDER NUMBER3. AWARD/ 6. SOLICITATION
1291S820R4002
5. SOLICITATION NUMBER
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS 1. REQUISITION NUMBER PAGE OF
1 29 1001791OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, & 30
TELEPHONE NO.
17a. CONTRACTOR/
VALLEJO CA 94592-1110
1323 CLUB DR
PACIFIC SOUTHWEST REGION
USDA FOREST SERVICE
15. DELIVER TO
VALLEJO CA 94592-1110
1323 CLUB DR
PACIFIC SOUTHWEST REGION
9. ISSUED BY
7.
2. CONTRACT NO.
EFFECTIVE DATE
$16.50
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK BELOW
ISSUE DATE
DELIVERY FOR FOB DESTINA-
TION UNLESS BLOCK IS
MARKED
11.
SEE SCHEDULEX
12. DISCOUNT TERMS
THIS CONTRACT IS A
RATED ORDER UNDER
DPAS (15 CFR 700)
13a.
SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
HUBZONE SMALL
BUSINESS
8(A)
USDA FOREST SERVICE
WOMEN-OWNED SMALL BUSINESS
(WOSB) ELIGIBLE UNDER THE WOMEN-OWNED
SMALL BUSINESS PROGRAM
EDWOSB
24.
AMOUNT
23.
UNIT PRICE
22.
UNIT
21.
QUANTITY
20.
SCHEDULE OF SUPPLIES/SERVICES
19.
ITEM NO.
0597 - FC12 - San Bernardino NF HVAC Project (M.DeBelina) Delivery: 08/01/2020 Period of Performance: 08/01/2020 to 10/31/2020
Removal and replacement of HVAC Units at Skyforest, Oak Glen, Mill Creek, Keenwild, Del Rosa, Fawnskin and Waterman Stations on the San Bernardino National Forest
Continued ...
(Use Reverse and/or Attach Additional Sheets as Necessary)
HEREIN, IS ACCEPTED AS TO ITEMS:
DATED
TIFFANY P. HURT
. YOUR OFFER ON SOLICITATION (BLOCK 5),
INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE SET FORTH
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND DELIVER
ARE
ARE
31c. DATE SIGNED
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA
31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER)
30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER (Type or print)
ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY ADDITIONAL
SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.
27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1, 52.212-4. FAR 52.212-3 AND 52.212-5 ARE ATTACHED. ADDENDA
26. TOTAL AWARD AMOUNT (For Govt. Use Only)
OFFER
STANDARD FORM 1449 (REV. 2/2012)
Prescribed by GSA - FAR (48 CFR) 53.212
ARE NOT ATTACHED.
ARE NOT ATTACHED.
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
30b. NAME AND TITLE OF SIGNER (Type or print)
30a. SIGNATURE OF OFFEROR/CONTRACTOR
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN
25. ACCOUNTING AND APPROPRIATION DATA
29. AWARD OF CONTRACT:
REF.
32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE
32c. DATE 32b. SIGNATURE OF AUTHORIZED GOVERNMENT REPRESENTATIVE
ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED:
32a. QUANTITY IN COLUMN 21 HAS BEEN
RECEIVED INSPECTED
40. PAID BY39. S/R VOUCHER NUMBER38. S/R ACCOUNT NUMBER
37. CHECK NUMBER
FINALPARTIAL
36. PAYMENT
FINALPARTIAL
35. AMOUNT VERIFIED
CORRECT FOR
34. VOUCHER NUMBER33. SHIP NUMBER
COMPLETE
32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE
42d. TOTAL CONTAINERS42c. DATE REC'D (YY/MM/DD)
42b. RECEIVED AT (Location)
42a. RECEIVED BY (Print)
41c. DATE41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER
41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT
STANDARD FORM 1449 (REV. 2/2012) BACK
24.
AMOUNT
23.
UNIT PRICE
22.
UNIT
21.
QUANTITY
20.
SCHEDULE OF SUPPLIES/SERVICES
19.
ITEM NO.
0001 Removal and replacement of HVAC Units at
Skyforest, Oak Glen, Mill Creek, Keenwild, Del
Rosa, Fawnskin and Waterman Stations on the San
Bernardino National Forest
32f. TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE
32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT REPRESENTATIVE
29 2 of
SECTION C - STATEMENT OF WORK
San Bernardino National Forest HVAC Project
C.1 Scope of contract
San Bernardino National Forest HVAC Project
Contractors are required to perform a site visit at each listed location prior to submitting bid. It is the responsibility of the contractor to field verify all information prior to submitting a bid.
This project consists of removing existing HVAC units and replacing existing units with new units. Disposing or recycling existing units and any debris from the project. The existing HVAC units include but are not limited to split units and roof top package units. The existing systems will be evaluated when HVAC units are removed to reveal any damage or need to upgrade existing system. All installation includes removal, disposal or recycling, inspection of existing system, repair work of damage to building due to removal and or installation of HVAC units, and when approved repair existing system. Ensure building is water and rodent proof after work is completed. Any repairs made to the building or surrounding area will need to match the existing surfaces (for example removing a section of stucco from an exterior wall when the project is completed the new stucco repair shall match the existing stucco’s color and texture where applicable). The new HVAC units will use current California compliant refrigerant such as R410A. The new units shall be the specified units listed below or an approved equal. Replace condensing units and furnace units/ air handlers at identified locations on the list. In addition, replace thermostats (as needed), line sets (as needed), electrical disconnects (as needed).
Perform additional work for each system that is on the list. Before new units are installed inspect the overall existing HVAC system. For example, inspect supply ducts, return ducts, all registers, strapping and hardware, plenums, and all other items needed for each HVAC unit to operate.
Provide inspection findings of each existing system before replacing new units. Provide repair solutions where applicable.
Goals for this project are as follows:
The ability to control building temperatures using updated thermostats to monitor and control building temperatures while keeping occupants comfortable during use.
Cool and heat buildings using new and energy efficient units with seer values that are equal or greater than what is required by California state law. Where applicable new units shall be standard manufactured HVAC equipment.
Upgrading the mechanical, plumbing, ventilation, and electrical to code on each new unit installed as needed and applicable to the project.
Price considerations- product value relative to the initial cost of each project.
Environmental considerations- replace R-22 refrigerant units with current California compliant refrigerant units such as R-410A
The Contractor shall provide all labor, materials, and equipment to complete the contract. The contractor is responsible for securing all permits, fees and requirements from state and local county offices. The contractor shall field verify all material measurements and quantities before ordering supplies. The Government will not reimburse the contractor for excess material ordered.
The contractor shall provide temporary traffic safety control in areas that have high traffic usage during the life expectancy of the project.
C.2 Project Locations, Current unit, and additional work (Contractor to Verify)
Site Name, address, HVAC Type Site Name Address Current HVAC Make, model and size Addition Work Required
Sky Forest South
28104 HWY 18
Sky forest CA 92385
LENNOX 2.5-Ton A/C - 90 Plus Natural Gas – A/C Horizontal Split System
1. Horizontal Split System Unit Replacement - Horizontal 90 plus 2.5 Ton A/C Split System Unit (Natural Gas) Horizontal Furnace Low NOx, Upflow/Horizontal Gas Furnace, 93% AFUE, 66,000 Btuh, Power Saver Constant Torque, 1 Stage, 1.5-3 Ton, ML193UH070XE36B Cat #: 17A54 or approved equal
2. Horizontal Evaporator Coil CH23-31 Horizontal Indoor Coil, 2.5 Ton, Cased Cat #: 63J69 or approved equal
3. A/C Condenser Merit Series, Air Conditioner Condensing Unit, 2.5 Ton, 14 SEER, 1 Stage, R-410A, ML14XC1- 030-230 Cat #: 12X49 or approved equal
1. High altitude kit
2. Connect electrical to existing
115v switch at furnace locations
3. Outdoor 30 Amp Disconnect Box, 10-gauge electrical Whip and Fuses
4. New Breaker if required
5. All required low voltage wiring.
6. All required gas piping, sediment trap, and gas flex
7. Hang with all thread and
Unistrut (May use existing)
8. Connect to existing sheet metal with any required insulated sheet metal transitions
9. Filtration Required
10. All required UV rated PVC for 90 plus 2” flue for fresh air and exhaust (may use existing 2” PVC)
(Note: must add and use rodent-proof ends outside)
11. New Condensation Pump and hosing
12. All required UV rated PVC for the condensation drain
13. No Ductwork required (may use existing KD Ductwork and plenums)
14. Fabricate new A/C stands to fit condenser
15. Startup and verify operations
16. Keep existing Thermostat
Sky Forest South Middle
28104 HWY 18
Sky forest CA 92385
LENNOX 2.5-Ton A/C - 90 Plus Natural Gas – A/C Horizontal Split System
1. Horizontal Split System Unit Replacement- Horizontal 90 plus
2.5 Ton A/C Split System Unit
Natural Gas
Horizontal Furnace Low NOx, Upflow/Horizontal Gas Furnace, 93% AFUE, 66,000 Btuh, Power Saver Constant Torque, 1 Stage, 1.5-3 Ton, ML193UH070XE36B Cat #: 17A54 or approved equal.
2. Horizontal Evaporator Coil
CH23-31 Horizontal Indoor Coil, 2.5 Ton, Cased Cat #:
63J69 or approved equal.
3. A/C Condenser Merit Series, Air Conditioner Condensing Unit, 2.5 Ton, 14 SEER, 1 Stage, R-410A, ML14XC1-030-230 Cat #:
12X49 or approved equal.
4. High altitude kit
5. Connect electrical to existing 115v switch at furnace locations
6. Outdoor 30 Amp Disconnect Box, 10-gauge electrical Whip and Fuses
7. New Breaker if required
8. All required low voltage wiring.
9. All required gas piping, sediment trap, and gas flex
10. Hang with all thread and Unistrut
(May use existing)
11. Connect to existing sheet metal with any required insulated sheet metal transitions
12. Filtration Required
13. All required UV rated PVC for 90 plus 2” flue for fresh air and exhaust (may use existing 2”
PVC)
(Note: must add and use rodent-proof ends outside)
14. New Condensation Pump and hosing
15. All required UV rated PVC for the condensation drain
16. No Ductwork required (may use existing KD Ductwork and plenums)
17. Fabricate new A/C stands to fit condenser
18. Startup and verify operations
19. Keep existing Thermostat
Sky Forest North Middle
28104 HWY 18
Sky forest CA 92385
LENNOX 2-Ton A/C - 90 Plus Natural Gas – A/C upflow Split System
NORTH MIDDLE
Existing LENNOX 2-Ton A/C - 90 Plus Natural Gas – A/C UPFLOW Split System
1. UPFLOW Split System Unit Replacement - UPFLOW 90 plus
2 Ton A/C Split System Unit (Natural Gas)
Up flow Furnace Low Nox Merit Series, Upflow/Horizontal Gas Furnace, 93% AFUE, 44,000 Btuh, Power Saver Constant Torque, 1 Stage, 1.5-3 Ton, ML193UH045XE36B Cat #: 17A52 or approved equal.
2. Up flow Evaporator Coil
ADP LC18/36T9BG
Upflow/Downflow Indoor Coil, 1.5- 3 Ton, Cased Cat #: Y1727 or approved equal.
3. A/C Condenser Merit Series, Air Conditioner Condensing Unit, 2 Ton, 14 SEER, 1 Stage, R-410A, ML14XC1-024-230 Cat #:
12X45 or approved equal.
4. High altitude kit
5. Connect electrical to existing 115v switch at furnace locations
6. Outdoor 30 Amp Disconnect Box, 10-gauge electrical Whip and Fuses
7. New Breaker if required
8. All required low voltage wiring.
9. All required gas piping, sediment trap, and gas flex
10. Connect to existing sheet metal with any required insulated sheet metal transitions
11. Filtration Required
12. All required UV rated PVC for 90 plus 2” flue for fresh air and exhaust (may use existing 2”
PVC)
(Note: must add and use rodent-proof ends outside)
13. New Condensation Pump and hosing
14. All required UV rated PVC for the condensation drain
15. No Ductwork required (may use existing KD Ductwork and plenums)
16. Fabricate new A/C stands to fit condenser
17. Startup and verify operations
18. Keep existing Thermostat
Sky Forest North
28104 HWY 18
Sky forest CA 92385
LENNOX 2.5-Ton A/C
– LENNOX Horizontal Evaporator Coil and YORK 90 Plus Natural Gas Furnace – Horizontal Split System
1. Horizontal Split System Unit Replacement - Horizontal 90 plus
2.5 Ton A/C Split System Unit
(Natural Gas)
Horizontal Furnace Furnace: Low NOx, Upflow/Horizontal Gas Furnace, 93% AFUE, 66,000 Btuh, Power Saver Constant Torque, 1 Stage, 1.5-3 Ton, ML193UH070XE36B Cat #: 17A54 or approved equal.
2. Horizontal Evaporator Coil CH23-31 Horizontal Indoor Coil, 2.5 Ton, Cased Cat #:
63J69 or approved equal.
3. A/C Condenser Merit Series, Air Conditioner Condensing Unit, 2.5 Ton, 14 SEER, 1 Stage, R-410A, ML14XC1-030-230 Cat #:
12X49 or approved equal.
4. High altitude kit
5. Connect electrical to existing 115v switch at furnace locations
6. Outdoor 30 Amp Disconnect Box, 10-gauge electrical Whip and Fuses
7. New Breaker if required
8. All required low voltage wiring.
9. All required gas piping, sediment trap, and gas flex
10. Hang with all thread and Unistrut
(May use existing)
11. Connect to existing sheet metal with any required insulated sheet metal transitions
12. Filtration Required
13. All required UV rated PVC for 90 plus 2” flue for fresh air and exhaust (may use existing 2”
PVC)
(Note: must add and use rodent-proof ends outside)
14. New Condensation Pump and hosing
15. All required UV rated PVC for the condensation drain
16. No Ductwork required (may use existing KD Ductwork and plenums)
17. Fabricate new A/C stands to fit condenser
18. Startup and verify operations Keep existing Thermostat
Oak Glen Barracks
39326 Clear Water Dr Oak Glen, CA 92399
RUUD 3 Ton Propane/Electric Rooftop Down-Shot
1. Package Unit Replacement, 3 Ton Propane/Electric Rooftop Package Unit
LRP14GX36-072EP
Gas/Electric Residential Packaged Unit, 14 SEER, 72,000 Btuh, 3 Ton, R-410A, Low NOx, Merit Series Cat #: 18C95 or approved equal.
2. Propane conversion kit ALPKT841 Cat #: 11U77 or approved equal.
3. Roof curb Uni Products MSMP6DSA Small Adjustable Roof Curb Cat #: Y7975 or approved equal.
4. High altitude kit
5. 2 Dropdown insulated Sheet Metal
Plenums.
6. Outdoor30 Amp Disconnect Box, 10-gauge electrical Whip and Fuses
7. New breaker if required
8. All required low voltage wiring.
9. All required gas piping connections, sediment trap, and gas flex.
10. Crane Service
11. All required UV rated PVC for the condensation drain
12. Startup and verify operations
13. DUCTWORK will need to be all replaced with new R-8 insulated Mylar ductwork
14. Keep existing Thermostat
Oak Glean Garage
39326 Clear Water Dr Oak Glen, CA 92399
BDP
587ANZ042080AAAF
3.5 Ton
Propane/Electric Rooftop Down-Shot
1. Package Unit Replacement 3 Ton Propane/Electric Rooftop Package Unit
LRP14GX36-072EP
Gas/Electric Residential Packaged Unit, 14 SEER, 72,000 Btuh, 3 Ton, R-410A, Low NOx, Merit Series Cat #: 18C95 or approved equal.
2. Propane conversion kit ALPKT841 Cat #: 11U77 or approved equal
3. Roof curb Uni Products MSMP6DSA Small Adjustable Roof Curb Cat #: Y7975 or approved equal.
4. High altitude kit
5. 2 Dropdown insulated Sheet Metal
Plenums.
6. Outdoor30 Amp Disconnect Box, 10-gauge electrical Whip and Fuses
7. New breaker if required
8. All required low voltage wiring.
9. All required gas piping connections, sediment trap, and gas flex.
10. Crane Service
11. All required UV rated PVC for the condensation drain
12. Startup and verify operations
13. Keep existing Thermostat
Mill Creek Visitor Lobby
34701 Mill Creek RD Mentone, CA 92359
CARRIER 3.5 Ton Heat-Pump 50VT- A42---31-- Rooftop Side-Shot, or approved equal
1. Package Unit Replacement -3.5 Ton Heat-Pump Rooftop Package Unit
2. Lennox, LRP14HP42EP Heat Pump Residential Packaged Unit, 14 SEER, 40,000 Btuh, 3.5 Ton, R-410A, Merit Series Cat #: 18D12 or approved equal.
3. Roof curb
4. Uni Products MSMP6DLA
Large Adjustable Roof Curb Cat #: Y7976 or approved equal.
5. 60 Amp Disconnect Box, 8-gauge electrical Whip and Fuses
6. New Breaker if required
7. All required low voltage wiring.
8. Crane Service
9. Connect to exiting sheet metal elbows with any required insulated sheet metal transitions
10. All required UV rated PVC for the condensation drain
11. Startup and verify operations
12. No needed Ductwork inside the building
13. Keep existing Thermostat
Mill Creek Barracks
34701 Mill Creek RD Mentone, CA 92359
YORK 4 Ton Propane/Electric
D1NH048N06506C
Rooftop Side-Shot
1. Package Unit Replacement 3.5 Ton Propane/Electric Rooftop Package Unit
LRP14GX42-072EP
Gas/Electric Residential Packaged Unit, 14 SEER, 72,000 Btuh, 3.5 Ton, R-410A, Low NOx, Merit Series Cat #: 18C96 or approved equal.
2. Propane conversion kit ALPKT841 Cat #: 11U77 or approved equal.
3. Roof curb Uni Products MSMP6DLA Large Adjustable Roof CurbCat #: Y7976 or approved equal.
4. Outdoor 30 Amp Disconnect Box, 10-gauge electrical Whip and Fuses
5. New Breaker if required
6. All required low voltage wiring.
7. All required gas piping connections, sediment trap, and gas flex.
8. Crane Service
9. Connect to exiting sheet metal elbows with any required insulated sheet metal transitions
10. All required UV rated PVC for the condensation drain
11. Startup and verify operations
12. Replace Ductwork inside the building size according to 3.5 ton unit.
13. Keep existing Thermostat
Keenwild Fire Station
28599 HWY 243
MTN Center, CA 92561
RHEEM 5-Ton A/C – 80% Propane –
1. 5 Ton HORIZONTAL Split System Unit Replacement - HORIZONTAL
Horizontal Split System
80% Furnace and 5 Ton A/C Split System Unit (PROPANE)
Horizontal Furnace Low Nox Merit Series, Upflow/Horizontal Gas Furnace, 80% AFUE, 110,000 Btuh, Power Saver Constant Torque, 1 Stage, 3- 5 Ton, ML180UH110XE60C Cat #: 81W25 or approved equal
2. Horizontal Evaporator Coil ADP LH42/62E9C Horizontal Indoor Coil, 3.5-5 Ton, 21 in.
Height, Cased Cat #: Y1741 or approved equal.
3. A/C Condenser Merit Series, Air Conditioner Condensing Unit, 5 Ton, 14 SEER, 1 Stage, R-410A, ML14XC1-060- 230 Cat #: 12X60 or approved equal.
4. Propane conversion kit Lennox 604888-12 Natural to Propane Conversion Kit Cat #:
11K49 or approved equal.
5. High altitude kit
6. Connect electrical to existing 115v switch at furnace locations
7. Furnace stands required
8. Outdoor 30 Amp Disconnect Box, 10-gauge electrical Whip and Fuses
9. New Breaker if required
10. All required low voltage wiring.
11. All required gas piping, sediment trap, and gas flex
12. All required 5” double-wall flue for exhaust
13. Safety water switch
14. Secondary pan
15. All required UV rated PVC for the condensation drain
16. Cut In New Return Can in North
Upstairs Room with 14x14x12” can and 14”x14” filter grill and supply new 1” 14”x14” filter
17. Run new 12” duct 30’ from furnace return plenum to new cut 14x14x12” can.
18. Seal necessary ductwork on the second floor
19. Install New Thermostat
20. Startup and verify operations
21. Perform all needed electrical to code as applicable.
Waterman Fire Station
23525 Hillview Dr San Bernardino, CA
92404
CARRIER 3-Ton 90 Plus Natural Gas - Downflow Split System
1. Split System Unit Replacement Downflow 90 plus - 3 Ton A/C Split System Unit (Natural Gas)
2. Furnace Low Nox Merit Series, Downflow Gas Furnace, 93% AFUE, 66,000 Btuh, Power Saver Constant Torque, 1 Stage, 1.5-3 Ton, ML193DF070XE36B Cat #: 17A61 or approved equal
3. Downflow Evaporator Coil
ADP LC18/36T9BG
Upflow/Downflow Indoor Coil, 1.5- 3 Ton, Cased Cat #: Y1727 or approved equal
4. A/C Condenser Merit Series, Air Conditioning Condensing Unit, 14 SEER, 3 Ton, 1 Stage, R-410A, ML14XC1-036-230C Cat #:
18C26 or approved equal.
5. New 5” filter and rack for Downflow Healthy Climate HCC16-28 Filter Cabinet 17-1/4 x 28-1/2 x 7 in.Cat #: Y2920 or approved equal.
Healthy Climate HCF16-13 Replacement Box Filter, MERV 13, 16" x 25" x 5" Cat #: 19L16 or approved equal.
6. High altitude kit
7. Outdoor 30 Amp Disconnect Box, 10-gauge electrical Whip and Fuses
8. New Breaker if required
9. All required low voltage wiring.
10. All required gas piping, sediment trap, and gas flex
11. Connect to existing sheet metal with any required insulated sheet metal transitions
12. All required UV rated PVC for 90 plus 2” flue for fresh air and exhaust (existing concentric kit)
13. All required UV rated PVC for the condensation drain
14. Startup and verify operations
15. No needed Ductwork inside the building (Ductwork all in the slab)
16. Keep existing Thermostat
Fawnskin Fire Garage
41374 N Shore Dr, Fawnskin, CA 92333
WILLIAMS LOW-BOY
Side-Shot Heater (Millivolt System)
HEATER ONLY –
Natural Gas
1. Williams Low-Boy Millivolt - Side-Shot Heater 22K BTU Input/15400K BTU Output or approved equal.
2. High altitude kit
3. Relocate furnace (TO CENTER
OF NORTH WALL IN ROOM)
4. Relocate existing ½ Gas piping
10’ (TO CENTER OF NORTH
WALL IN ROOM)
½ Piping is underneath the building and easily accessible
5. All required ½ black iron piping and fittings
6. Run and install new 18-gauge low voltage wiring if applicable for thermostat
7. Use 24-gauge 20x20 or equivalent sheet metal outside in new location and seal
8. Rough Patch old existing hole after removal and seal
9. Startup and verify operations
10. Install new Heat only Thermostat
Del Rosa Hotshot Office
4121 Quail Canyon Road San Bernardino
CA 92404
LENNOX 3.5-Ton A/C
– 80% Natural Gas – Horizontal Split System
1. Horizontal Split System Unit Replacement
(NOTE: New 3 Ton Size - Horizontal 80% – A/C Split System Unit (Natural Gas)
Horizontal Furnace Ultra Low Nox Elite Series, Upflow/Horizontal Gas Furnace, 80% AFUE, 60,000 Btuh, Power Saver
Constant Torque, 1 Stage, 1.5-3 Ton, EL180UH060NE36A
Cat #: 15F79 or approved equal.
2. Horizontal Evaporator Coil ADP LH18/36D9A, Indoor Coil Cat #: Y1734 or approved equal.
3. A/C Condenser Merit Series, Air Conditioning Condensing Unit, 14 SEER, 3 Ton, 1 Stage, R-410A, ML14XC1-036-230C Cat #: 18C26 or approved equal.
4. Connect electrical to existing 115v switch at furnace locations
5. Outdoor 30 Amp Disconnect Box, 10-gauge electrical Whip and Fuses
6. New Breaker if required
7. All required low voltage wiring.
8. All required gas piping, sediment trap, and gas flex
9. Hang with all thread and Unistrut
10. Install new supply and return insulated plenums
11. Filtration Required
12. All required 4” double-wall flue for exhaust
13. Safety water switch
14. Secondary pan
15. All required UV rated PVC for the condensation drain
16. All New Ductwork required
17. Install New Thermostat if required
18. Startup and verify operations
C.3 – Time of Performance
91 Calendar Days
Estimated Start date: 1 August 2020
Contractor must begin work within 10 days of the effective date of the Notice to Proceed.
C.4 – Pre-Bid Tour
A Pre-bid tour will be held on 19 June 2020 at 10:00 a.m.
Meeting Location:
San Bernardino NF Supervisors Office 602 S. Tippecanoe Ave.
San Bernardino, CA 92408
Site visit Point of Contact (POC):
Manuel Villegas (COR) Email: manuel.villegas@usda.gov Phone: (909) 382-2614
Contracting Officer:
T. Paige Hurt Email: tiffany.hurt@usda.gov
C.5 – Price Range
The Government estimate for this project is between $100,000 and $145,000.
C.6 - Restrictions on Work
1. In accordance with the fire plan, included in attachments.
2. When the Contracting Officer (or designated representative) determines that adverse weather has made access too dangerous or that continued vehicular travel would cause unacceptable road damage.
3. No work on holidays without prior written approval of the Contracting Officer.
C.7 - Worker's Compensation Insurance
The Contractor shall provide evidence of Worker's Compensation Insurance or a written explanation as to why the Contractor is exempt from the requirement. NOTE: The Contractor working alone is not required to carry the insurance.
C.8 – Special Conditions Affecting Work
a. Work Hours. Work hours are from 8:00am to 5:00pm Monday through Friday.
Weekend or holiday work is not allowed at any time during construction without written approval from the Contracting Officer.
b. Safety, Emergency Communications and Evacuation. Contractor shall be responsible for the safety of the Contractor’s employees, Subcontractor’s employees, Government employees associated with the project, and any visitors to the site both Government and private. The Contractor shall submit a project safety plan to the Contracting Officer for review prior to commencement of work. The project safety plan shall comply with the appropriate California mailto:manuel.villegas@usda.gov mailto:tiffany.hurt@usda.gov
OSHA and Federal OSHA rules and regulations and must include a medical evacuation and emergency communications plan.
c. Highway Permits. Contractor shall be responsible for securing any overload or over width limit permits required for the transport of materials or equipment to the project site. The Contractor shall be responsible for conducting a thorough reconnaissance of all routes leading to the site.
d. Security. The Contractor shall be responsible for his own equipment and materials supplied to the site. All equipment not equipped with a key lock system shall be secured in such a manner as to make it inoperable to the average person at the end of each working day. All hand tools and other equipment shall be secured at the end of each working day. On Fridays all construction debris, trash, and refuse shall be properly stored in dumpsters or trash bins or removed from the site. The Contractor shall not hold the Government liable for any theft or vandalism inflicted on his equipment and materials.
e. Fire Prevention. The Contractor shall comply with the Fire Plan included in the Contract.
f. Protection of Resources. Contractor shall thoroughly clean all equipment prior to delivery to the project site to remove weeds, mud, grease and oil buildup from the tires, wheels, tracks, engines and engine compartments, and other surfaces. Spills of petroleum products and other hazardous substances shall be reported, contained, and removed in accordance with all applicable Local, State and Federal laws and regulations.
g. Site Inspection: Prospective bidders are strongly encouraged to attend the Pre-bid tour to inspect the project site prior to the bid reply date. In no event shall the failure to inspect site conditions constitute grounds for a claim after contract award. (See Section L, FAR 52.236-27, SITE VISIT).
h. Questions: Prospective bidders desiring an explanation of the solicitation, drawings, specifications, etc. must submit requests in writing to the Contracting Officer. Cut-off date for any RFI’s will be 1 week prior to the closing date of the solicitation. Oral explanations or instructions given before the award of a contract will not be binding.
i. Business Operations: Contractor’s work shall not interfere with business operations at the designated locations.
C.9 – Project Site Cleanup
Project site cleanup includes the daily removal and proper disposal of all trash, debris, and residue off of National Forest Land. All spills of petroleum products including leak spots from parked vehicles shall be removed and properly disposed of according to all Local, State, and Federal regulations and laws governing such disposal. The Contractor is required to dispose of all construction debris and removed equipment off of Forest Service lands in accordance with Federal, State, and local requirements.
C.10 – Contractor Qualifications and Licenses
Contractor must possess a current and valid C-20, “Warm-Air Heating, Ventilating and Air- Conditioning Contractor- HVAC Contractor” license issued by the State of California to perform the applicable contract work.
C.11 – Prevailing Wage This contract is subject to Davis-Bacon Act prevailing wage requirements. See FAR Clause 52.222-6.
C.12 – Buy America Act This contract is subject to the Buy American Act. See FAR Clause 52.225-9.
C.13 – Conditions Affecting Award of Contract Contractors are directed to Section K, L and M of this contract. These sections contain questions and evaluation criteria that must be answered fully and completely by prospective bidders to be considered for award.
C.14 – Warranty Contractor shall warranty all equipment, material, design, and/or workmanship for a period of not less than 1 year from the final date of acceptance. See FAR Clause 52.246-21. All manufacturers’ equipment warranty information shall be submitted to the Contracting Officer prior to project completion. See Specifications for additional Warranty requirements specific to this project.
C.15 – Maps, Drawings and Specifications
Specifications where applicable
SECTION D—SPECIAL TASK ORDER PROVISIONS
N/A
SECTION E--INSPECTION AND ACCEPTANCE
Quality Control
The Contractor shall conduct inspections in accordance with the Quality Control Plan provided to the Contracting Officer. The Quality Control Plan shall be approved by the Contracting Officer prior to the start of work. The Contracting Officer may implement quality control measures in additional to those provided by the Contractor.
Acceptance
The Contracting Officer will accept only completed work for evaluation. When notified by the Contractor of completed of work, such work will be evaluated for quality against the specification of this task order. The evaluation will include but is not limited to a review of the quality control measures performed by the Contractor. Only work described by the Contractor as completed will be evaluated.
Work is deemed acceptable when final Contracting Officer/Contracting Officer Representative inspection indicates at least 90% quality achievement of the task order specifications described Section C.
Pre-work Conference
Prior to commencement of work, the Contractor shall meet with the Contracting Officer to discuss contract terms, work performance requirements and work progress schedules. Also, at this meeting such things as sanitation, camping requirements, fire prevention and suppression plans will be developed. The meeting will be held at a time and place determined by the Contracting Officer.
SECTION F--DELIVERIES OR PERFORMANCE
FAR 52.252-2 Clauses Incorporated by Reference (FEB 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):
www.acquisition.gov/far/
FEDERAL ACQUISITION REGULATION (48 CFR CHAPTER 1) CLAUSES
52.242-14 Suspension of Work (APR 1984)
AGAR 452.211-74 Period of Performance (FEB 1988)
The period of performance of this contract is 365 calendar days with four option years.
SECTION G--CONTRACT ADMINISTRATION DATA
Contract Release. The following supplements the Payments clause in Section I:
Before final payment will be made the Contractor shall sign a release of all claims against the Government arising by virtue of this contract, other than claims, in stated amounts, that the Contractor has specifically excepted from the operation of the release. A release may also be required of the assignee if the Contractor's claim to amounts payable under this contract has been assigned under the Assignment of Claims Act of 1940 (31 U.S.C. 3727 and 41 U.S.C. 15).
Invoices.
Payment will be made from the contractor’s invoice. All invoices are to be submitted via the electronic Invoice Processing Platform (IPP). This is a mandatory requirement initiated by the
U.S. Department of Treasury and you can find more information at this website https://www.ipp.gov/index.htm. There is no pre-award registration.
After award of a contract, please make sure that your company registers promptly at https://www.ipp.gov/vendors/enrollment-vendors.htm to establish your account. The one-time enrollment in IPP means a series of emails will be sent to the point of contact (POC) established in your System for Award Management (SAM) account at www.sam.gov. So, please verify that the POC’s email address is up to date in your company’s SAM account prior to starting the IPP enrollment process. If you have questions on the IPP enrollment process, the help desk phone number is 1-866-973-3131.
The following supplements Clause 52.232-1, Payments:
The Contracting Officer may retain up to 10 percent of the invoiced amount if the contractor is behind schedule at the time the invoice is presented. “Behind schedule” means that the percentage of work completed is less than the percentage of time used.
GOVERNMENT-FURNISHED PROPERTY
N/A
SECTION H—SPECIAL CONTRACT REQUIREMENTS
N/A
SECTION I – CLAUSES & PROVISIONS
FAR 52.252-1 -- SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB
1998) This solicitation incorporates one or more solicitation provisions by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. The offeror is cautioned that the listed provisions may include blocks that must be completed by the offeror and submitted with its quotation or offer. In lieu of submitting the full text of those provisions, the offeror may identify the provision by paragraph identifier and provide the appropriate information with its quotation or offer. Also, the full text of a solicitation provision may be accessed electronically at this/these address(es):
www.aquisition.gov/far/ (End of provision)
FAR 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address (es):
www.aquisition.gov/far/
(End of Clause)
Clauses and Provisions Incorporated by Reference:
FAR 52.204-7 System for Award Management OCT 2018 FAR 52.204-13 System for Award Management Maintenance OCT 2018 FAR 52.212-1 Instruction to Offerors- Commercial Items OCT 2018 FAR 52.212-4 Contract Terms and Conditions- Commercial Items OCT 2018 FAR 52.219-28 Post-Award small business Program Representation JUL 2013 FAR 52.223-3 Hazardous Material Identification and Material Safety Data Alternate I Alt I JUL 1995 FAR 52.223-18 Encouraging Contractor Policies to Ban text Messaging While Driving
AUG 2011
FAR 52.228-5 Insurance – Work on a Government Installation JAN 1997 FAR 52.232-40 Providing Accelerated Payment to Small Business Subcontractors DEC 2013 FAR 52.233-4 Applicable Law for Breach of Contract Claim OCT 2004 FAR 52.237-1 Site Visit APR 1984 FAR 52.237-2 Protections of Government Building, Equipment, and Vegetation APR 1984 FAR 52.237-3 Continuity of Services JAN 1991 FAR 52.242-14 Suspension of Work APR 1984 FAR 52.246-4 Inspection of Services – Fixed-Price AUG 1996
Clauses & Provisions in Full Text:
FAR 52.212-5 CONTRACT TERMS AND CONDITIONS REQUIRED TO IMPLEMENT
STATUTES OR EXECUTIVE ORDERS -- COMMERCIAL ITEMS (JAN 2020)
(a) The Contractor shall comply with the following Federal Acquisition Regulation (FAR) clauses, which are incorporated in this contract by reference, to implement provisions of law or Executive orders applicable to acquisitions of commercial items:
(1) 52.203-19, Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements (Jan 2017) (section 743 of Division E, Title VII, of the Consolidated and Further Continuing Appropriations Act, 2015 (Pub. L. 113-235) and its successor provisions in subsequent appropriations acts (and as extended in continuing resolutions)).
(2) 52.204-23, Prohibition on Contracting for Hardware, Software, and Services Developed or Provided by Kaspersky Lab and Other Covered Entities (Jul 2018) (Section 1634 of Pub. L. 115-91).
(3) 52.204-25, Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment. (Aug 2019) (Section 889(a)(1)(A) of Pub. L. 115-232).
(4) 52.209-10, Prohibition on Contracting with Inverted Domestic Corporations (Nov 2015).
(5) 52.233-3, Protest After Award (Aug 1996) (31 U.S.C. 3553).
(6) 52.233-4, Applicable Law for Breach of Contract Claim (Oct 2004) (Public Laws 108- 77 and 108-78 (19 U.S.C. 3805 note)).
(b) The Contractor shall comply with the FAR clauses in this paragraph (b) that the Contracting Officer has indicated as being incorporated in this contract by reference to implement provisions of law or Executive orders applicable to acquisitions of commercial items:
_X_ (1) 52.203-6, Restrictions on Subcontractor Sales to the Government (Sept 2006), with Alternate I (Oct 1995) (41 U.S.C. 4704 and 10 U.S.C. 2402).
_X_ (2) 52.203-13, Contractor Code of Business Ethics and Conduct (Oct 2015) (41 U.S.C. 3509)).
__ (3) 52.203-15, Whistleblower Protections under the American Recovery and Reinvestment Act of 2009 (June 2010) (Section 1553 of Pub. L. 111-5). (Applies to contracts funded by the American Recovery and Reinvestment Act of 2009.)
__ (4) 52.204-10, Reporting Executive Compensation and First-Tier Subcontract Awards (Oct 2018) (Pub. L. 109-282) (31 U.S.C. 6101 note).
__ (5)[Reserved].
__ (6) 52.204-14, Service Contract Reporting Requirements (Oct 2016) (Pub. L. 111-117, section 743 of Div. C).
__ (7) 52.204-15, Service Contract Reporting Requirements for Indefinite-Delivery Contracts (Oct 2016) (Pub. L. 111-117, section 743 of Div. C).
_X_ (8) 52.209-6, Protecting the Government’s Interest When Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment. (Oct 2015) (31 U.S.C. 6101 note).
__ (9) 52.209-9, Updates of Publicly Available Information Regarding Responsibility Matters (Oct 2018) (41 U.S.C. 2313).
__ (10)[Reserved].
__ (11) (i) 52.219-3, Notice of HUBZone Set-Aside or Sole-Source Award (Nov 2011) (15 U.S.C.657a).
__ (ii) Alternate I (Nov 2011) of 52.219-3.
__ (12) (i) 52.219-4, Notice of Price Evaluation Preference for HUBZone Small Business Concerns (Oct 2014) (if the offeror elects to waive the preference, it shall so indicate in its offer) (15 U.S.C. 657a).
__ (ii) Alternate I (Jan 2011) of 52.219-4.
__ (13)[Reserved]
__ (14) (i) 52.219-6, Notice of Total Small Business Set-Aside (Nov 2011) (15 U.S.C.644).
__ (ii) Alternate I (Nov 2011).
__ (iii) Alternate II (Nov 2011).
__ (15) (i) 52.219-7, Notice of Partial Small Business Set-Aside (June 2003) (15 U.S.C.
644).
__ (ii) Alternate I (Oct 1995) of 52.219-7.
__ (iii) Alternate II (Mar 2004) of 52.219-7.
_X_ (16) 52.219-8, Utilization of Small Business Concerns (Oct 2018) (15 U.S.C.
637(d)(2) and (3)).
__ (17) (i) 52.219-9, Small Business Subcontracting Plan (Aug 2018) (15 U.S.C.
637(d)(4)) __ (ii) Alternate I (Nov 2016) of 52.219-9.
__ (iii) Alternate II (Nov 2016) of 52.219-9.
__ (iv) Alternate III (Nov 2016) of 52.219-9.
__ (v) Alternate IV (Aug 2018) of 52.219-9 __ (18) 52.219-13, Notice of Set-Aside of Orders (Nov 2011) (15 U.S.C. 644(r)).
_X_ (19) 52.219-14, Limitations on Subcontracting (Jan 2017) (15 U.S.C.637(a)(14)).
__ (20) 52.219-16, Liquidated Damages-Subcontracting Plan (Jan 1999) (15 U.S.C.
637(d)(4)(F)(i)).
__ (21) 52.219-27, Notice of Service-Disabled Veteran-Owned Small Business Set-Aside (Oct 2019) (15 U.S.C. 657f).
__ (22) 52.219-28, Post Award Small Business Program Representation (Jul 2013) (15 U.S.C. 632(a)(2)).
__ (23) 52.219-29, Notice of Set-Aside for, or Sole Source Award to, Economically Disadvantaged Women-Owned Small Business Concerns (Dec 2015) (15 U.S.C. 637(m)).
__ (24) 52.219-30, Notice of Set-Aside for, or Sole Source Award to, Women-Owned Small Business Concerns Eligible Under the Women-Owned Small Business Program (Dec 2015) (15 U.S.C. 637(m)).
_X_ (25) 52.222-3, Convict Labor (June 2003) (E.O.11755).
_X_ (26) 52.222-19, Child Labor-Cooperation with Authorities and Remedies (Jan 2020) (E.O.13126).
_X_ (27) 52.222-21, Prohibition of Segregated Facilities (Apr 2015).
_X_ (28) (i) 52.222-26, Equal Opportunity (Sept 2016) (E.O.11246).
__ (ii) Alternate I (Feb 1999) of 52.222-26.
_X_ (29) (i) 52.222-35, Equal Opportunity for Veterans (Oct 2015) (38 U.S.C. 4212).
__ (ii) Alternate I (July 2014) of 52.222-35.
_X_ (30) (i) 52.222-36, Equal Opportunity for Workers with Disabilities (Jul 2014) (29 U.S.C.793).
__ (ii) Alternate I (July 2014) of 52.222-36.
_X_ (31) 52.222-37, Employment Reports on Veterans (Feb 2016) (38 U.S.C. 4212).
_X_ (32) 52.222-40, Notification of Employee Rights Under the National Labor Relations Act (Dec 2010) (E.O. 13496).
__ (33) (i) 52.222-50, Combating Trafficking in Persons (Jan 2019) (22 U.S.C. chapter 78 and E.O. 13627).
__ (ii) Alternate I (Mar 2015) of 52.222-50 (22 U.S.C. chapter 78 and E.O. 13627).
_X_ (34) 52.222-54, Employment Eligibility Verification (Oct 2015). (Executive Order 12989). (Not applicable to the acquisition of commercially available off-the-shelf items or certain other types of commercial items as prescribed in 22.1803.)
__ (35) (i) 52.223-9, Estimate of Percentage of Recovered Material Content for EPA– Designated Items (May 2008) (42 U.S.C. 6962(c)(3)(A)(ii)). (Not applicable to the acquisition of commercially available off-the-shelf items.)
__ (ii) Alternate I (May 2008) of 52.223-9 (42 U.S.C. 6962(i)(2)(C)). (Not applicable to the acquisition of commercially available off-the-shelf items.)
__ (36) 52.223-11, Ozone-Depleting Substances and High Global Warming Potential Hydrofluorocarbons (Jun 2016) (E.O. 13693).
__ (37) 52.223-12, Maintenance, Service, Repair, or Disposal of Refrigeration Equipment and Air Conditioners (Jun 2016) (E.O. 13693).
__ (38) (i) 52.223-13, Acquisition of EPEAT®-Registered Imaging Equipment (Jun 2014) (E.O.s 13423 and 13514).
__ (ii) Alternate I (Oct 2015) of 52.223-13.
__ (39) (i) 52.223-14, Acquisition of EPEAT®-Registered Televisions (Jun 2014) (E.O.s 13423 and 13514).
__ (ii) Alternate I (Jun 2014) of 52.223-14.
__ (40) 52.223-15, Energy Efficiency in Energy-Consuming Products (Dec 2007) (42 U.S.C. 8259b).
__ (41) (i) 52.223-16, Acquisition of EPEAT®-Registered Personal Computer Products (Oct 2015) (E.O.s 13423 and 13514).
__ (ii) Alternate I (Jun 2014) of 52.223-16.
_X_ (42) 52.223-18, Encouraging Contractor Policies to Ban Text Messaging While Driving (Aug 2011) (E.O. 13513).
__ (43) 52.223-20, Aerosols (Jun 2016) (E.O. 13693).
__ (44) 52.223-21, Foams (Jun 2016) (E.O. 13693).
__ (45) (i) 52.224-3 Privacy Training (Jan 2017) (5 U.S.C. 552 a).
__ (ii) Alternate I (Jan 2017) of 52.224-3.
_X_ (46) 52.225-1, Buy American-Supplies (May 2014) (41 U.S.C. chapter 83).
__ (47) (i) 52.225-3, Buy American-Free Trade Agreements-Israeli Trade Act (May 2014) (41 U.S.C. chapter 83, 19 U.S.C. 3301 note, 19 U.S.C. 2112 note, 19 U.S.C. 3805 note, 19 U.S.C. 4001 note, Pub. L. 103-182, 108-77, 108-78, 108-286, 108-302, 109-53, 109-169, 109- 283, 110-138, 112-41, 112-42, and 112-43.
__ (ii) Alternate I (May 2014) of 52.225-3.
__ (iii) Alternate II (May 2014) of 52.225-3.
__ (iv) Alternate III (May 2014) of 52.225-3.
__ (48) 52.225-5, Trade Agreements (Oct 2019) (19 U.S.C. 2501, et seq., 19 U.S.C. 3301 note).
_X_ (49) 52.225-13, Restrictions on Certain Foreign Purchases (June 2008) (E.O.’s, proclamations, and statutes administered by the Office of Foreign Assets Control of the Department of the Treasury).
__ (50) 52.225-26, Contractors Performing Private Security Functions Outside the United States (Oct 2016) (Section 862, as amended, of the National Defense Authorization Act for Fiscal Year 2008; 10 U.S.C. 2302 Note).
__ (51) 52.226-4, Notice of Disaster or Emergency Area Set-Aside (Nov 2007) (42 U.S.C. 5150).
__ (52) 52.226-5, Restrictions on Subcontracting Outside Disaster or Emergency Area (Nov 2007) (42 U.S.C. 5150).
__ (53) 52.232-29, Terms for Financing of Purchases of Commercial Items (Feb 2002) (41 U.S.C.4505, 10 U.S.C.2307(f)).
__ (54) 52.232-30, Installment Payments for Commercial Items (Jan 2017) (41 U.S.C.4505, 10 U.S.C.2307(f)).
_X_ (55) 52.232-33, Payment by Electronic Funds Transfer-System for Award Management (Oct 2018) (31 U.S.C. 3332).
__ (56) 52.232-34, Payment by Electronic Funds Transfer-Other than System for Award Management (Jul 2013) (31 U.S.C.3332).
__ (57) 52.232-36, Payment by Third Party (May 2014) (31 U.S.C.3332).
__ (58) 52.239-1, Privacy or Security Safeguards (Aug 1996) (5 U.S.C. 552a).
__ (59) 52.242-5, Payments to Small Business Subcontractors (Jan 2017) (15 U.S.C.
637(d)(13)).
__ (60) (i) 52.247-64, Preference for Privately Owned U.S.-Flag Commercial Vessels (Feb 2006) (46 U.S.C. Appx. 1241(b) and 10 U.S.C. 2631).
__ (ii) Alternate I (Apr 2003) of 52.247-64.
__ (iii) Alternate II (Feb 2006) of 52.247-64.
(c) The Contractor shall comply with the FAR clauses in this paragraph (c), applicable to commercial services, that the Contracting Officer has indicated as being incorporated in this contract by reference to implement provisions of law or Executive orders applicable to acquisitions of commercial items:
__ (1) 52.222-17, No displacement of Qualified Workers (May 2014)(E.O. 13495).
_X_ (2) 52.222-41, Service Contract Labor Standards (Aug 2018) (41 U.S.C. chapter 67).
_X_ (3) 52.222-42, Statement of Equivalent Rates for Federal Hires (May 2014) (29 U.S.C. 206 and 41 U.S.C. chapter 67).
_X_ (4) 52.222-43, Fair Labor Standards Act and Service Contract Labor Standards-Price Adjustment (Multiple Year and Option Contracts) (Aug 2018) (29 U.S.C. 206 and 41 U.S.C.
chapter 67).
__ (5) 52.222-44, Fair Labor Standards Act and Service Contract Labor Standards-Price Adjustment (May 2014) (29 U.S.C. 206 and 41 U.S.C. chapter 67).
__ (6) 52.222-51, Exemption from Application of the Service Contract Labor Standards to Contracts for Maintenance, Calibration, or Repair of Certain Equipment-Requirements (May 2014) (41 U.S.C. chapter 67).
__ (7) 52.222-53, Exemption from Application of the Service Contract Labor Standards to Contracts for Certain Services-Requirements (May 2014) (41 U.S.C. chapter 67).
__ (8) 52.222-55, Minimum Wages Under Executive Order 13658 (Dec 2015).
__ (9) 52.222-62, Paid Sick Leave Under Executive Order 13706 (Jan 2017) (E.O.
13706).
__ (10) 52.226-6, Promoting Excess Food Donation to Nonprofit Organizations (May 2014) (42 U.S.C. 1792).
(d) Comptroller General Examination of Record. The Contractor shall comply with the provisions of this paragraph (d) if this contract was awarded using other than sealed bid, is in excess of the simplified acquisition threshold, and does not contain the clause at 52.215-2, Audit and Records-Negotiation.
(1) The Comptroller General of the United States, or an authorized representative of the Comptroller General, shall have access to and right to examine any of the Contractor’s directly pertinent records involving transactions related to this contract.
(2) The Contractor shall make available at its offices at all reasonable times the records, materials, and other evidence for examination, audit, or reproduction, until 3 years after final payment under this contract or for any shorter period specified in FAR subpart 4.7, Contractor Records Retention, of the other clauses of this contract. If this contract is completely or partially terminated, the records relating to the work terminated shall be made available for 3 years after any resulting final termination settlement. Records relating to appeals under the disputes clause or to litigation or the settlement of claims arising under or relating to this contract shall be made available until such appeals, litigation, or claims are finally resolved.
(3)As used in this clause, records include books, documents, accounting procedures and practices, and other data, regardless of type and regardless of form. This does not require the Contractor to create or maintain any record that the Contractor does not maintain in the ordinary course of business or pursuant to a provision of law.
(e) (1) Notwithstanding the requirements of the clauses in paragraphs (a), (b), (c), and (d) of this clause, the Contractor is not required to flow down any FAR clause, other than those in this paragraph (e)(1) in a subcontract for commercial items. Unless otherwise indicated below, the extent of the flow down shall be as required by the clause-
(i) 52.203-13, Contractor Code of Business Ethics and Conduct (Oct 2015) (41 U.S.C.
3509).
(ii) 52.203-19, Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements (Jan 2017) (section 743 of Division E, Title VII, of the Consolidated and Further Continuing Appropriations Act, 2015 (Pub. L. 113-235) and its successor provisions in subsequent appropriations acts (and as extended in continuing resolutions)).
(iii) 52.204-23, Prohibition on Contracting for Hardware, Software, and Services Developed or Provided by Kaspersky Lab and Other Covered Entities (Jul 2018) (Section 1634 of Pub. L. 115-91).
(iv) 52.204-25, Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment. (Aug 2019) (Section 889(a)(1)(A) of Pub. L. 115-232).
(v) 52.219-8, Utilization of Small Business Concerns (Oct 2018) (15 U.S.C.637(d)(2) and (3)), in all subcontracts that offer further subcontracting opportunities. If the subcontract (except subcontracts to small business concerns) exceeds $700,000 ($1.5 million for construction of any public facility), the subcontractor must include 52.219-8 in lower tier subcontracts that offer subcontracting opportunities.
(vi) 52.222-17, No displacement of Qualified Workers (May 2014) (E.O. 13495). Flow down required in accordance with paragraph (l) of FAR clause 52.222-17.
(vii) 52.222-21, Prohibition of Segregated Facilities (Apr 2015).
(viii) 52.222-26, Equal Opportunity (Sept 2015) (E.O.11246).
(ix) 52.222-35, Equal Opportunity for Veterans (Oct 2015) (38 U.S.C.4212).
(x) 52.222-36, Equal Opportunity for Workers with Disabilities (Jul 2014) (29 U.S.C.793).
(xi) 52.222-37, Employment Reports on Veterans (Feb 2016) (38 U.S.C.4212)
(xii) 52.222-40, Notification of Employee Rights Under the National Labor Relations Act (Dec 2010) (E.O. 13496). Flow down required in accordance with paragraph (f) of FAR clause 52.222-40.
(xiii) 52.222-41, Service Contract Labor Standards (Aug 2018) (41 U.S.C. chapter 67).
(xiv) (A) 52.222-50, Combating Trafficking in Persons (Jan 2019) (22 U.S.C. chapter 78 and E.O 13627).
(B) Alternate I (Mar 2015) of 52.222-50(22 U.S.C. chapter 78 and E.O 13627).
(xv)…