Sol - 040ADV-24-R-0045 Press Floor.pdf
PDF 792 KB Posted
- Solicitation number
- 040ADV-24-R-0045
- Issued by
-
Government Publishing Office
About this file
This document is a Solicitation for an A&E Design-Build contract to prepare and renovate the installation site for an 8-Color Printing Press manufactured by Koenig & Bauer at the Government Publishing Office (GPO) in Washington, DC.
The key details are:
- The GPO intends to award a firm fixed-price contract for this Design-Build project on Building C, 2nd Floor.
- The contractor must design and construct a foundation that is compatible with the printing press and the building, and must also install an exhaust delivery system.
- Proposals are due by July 15, 2024 and the period of performance is 91 calendar days after the notice to proceed.
- The government will evaluate proposals based on technical/management approach, past performance, and key personnel. Award will be made to the offeror whose proposal is deemed most advantageous.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
1. SOLICITATION NUMBER
040ADV-24-R-0045
2. TYPE OF SOLICITATION
SEALED BID (IFB)
NEGOTIATED (RFP)
3. DATE ISSUED PAGE OF PAGES
1 33
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
4. CONTRACT NUMBER 5. REQUISITION/PURCHASE REQUEST NUMBER
PR-24-GPO-2592
6. PROJECT NUMBER
7. ISSUED BY CODE GPO 8. ADDRESS OFFER TO
GPO
732 North Capitol St NW Washington, DC, 20401, US
9. FOR INFORMATION
CALL:
a. NAME
WHITE, TROY D
b. TELEPHONE NUMBER (Include area code) (NO COLLECT CALLS)
SOLICITATION
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid and "bidder".
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying number, date)
11. The contractor shall begin performance within 7 calendar days and complete it within 91 calendar days after receiving award, notice to proceed. This performance period is mandatory negotiable. (See ).
12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES", indicate within how many calendar days after award in Item 12b.)
YES NO
13. ADDITIONAL SOLICITATION REQUIREMENTS:
12b. CALENDAR DAYS
a. Sealed offers in original and copies to perform the work required are due at the place specified in Item 8 by 11:00 (hour) local time 07/15/2024 (date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
b. An offer guarantee is, is not required.
c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
d. Offers providing less than calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.
STANDARD FORM 1442 (REV. 8/2014)
OFFER (Must be fully completed by offeror)
14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code) 15. TELEPHONE NUMBER (Include area code)
16. REMITTANCE ADDRESS (Include only if different than Item 14.)
CODE FACILITY CODE
17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in Item 13d. Failure to insert any number means the offeror accepts the minimum in Item 13d.)
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT
NUMBER
DATE.
20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print) 20b. SIGNATURE 20c. OFFER DATE
21. ITEMS ACCEPTED:
AWARD (To be completed by Government)
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
28. NEGOTIATED AGREEMENT (Contractor is required to sign this document and return copies to issuing office.) Contractor agrees to furnish and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.
29. AWARD (Contractor is not required to sign this document.) Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.
30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print)
31a. NAME OF CONTRACTING OFFICER (Type or print)
30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA
BY
31c. DATE
STANDARD FORM 1442 (REV. 8/2014) BACK
AMOUNTS
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN
(4 copies unless otherwise specified)
ITEM
See Schedule
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
10 U.S.C. 2304(c) ( ) 41 U.S.C. 3304(a) ( )
26. ADMINISTERED BY 27. PAYMENT WILL BE MADE BY
TABLE OF CONTENTS:
1. Listing of Incorporated Purchase Requisitions
2. Section B - Supplies or Services and Prices/Costs
3. Section C - Description/Specifications/Work Statement
4. Section D - Packaging and Marking
5. Section E - Inspection and Acceptance Terms
6. Section F - Delivery or Performance
7. Section G - Contract Administration Data
8. Section H - Special Contract Requirements
9. Section I - Contract Clauses
10. Section J - List of Documents, Exhibits, and other Attachments
11. Section K - Representations, Certifications, and Other Statements of Offerors
12. Section L - Instructions, Conditions and Notices to Offerors
13. Section M - Evaluation Factors for Award
SECTION B – SCHEDULE of SUPPLIES/ SERVICES
B.1 CONTRACT TYPE
The Government Publishing Office intends to issue a firm fixed price contract.
A&E Design-Build to prepare/renovate an installation site for a recently acquired 8-Color Printing press manufactured by Koenig & Bauer at Building C, 2nd Floor Project as described in the statement of work. The services shall be provided in accordance with the terms and conditions set forth herein.
Period of Performance: completed and delivered within 91 days from NTP.
Price Breakdown – The price breakdown shall justify the contractor’s firm fixed price quote for this requirement.
CLIN Description Unit of Measurement
Quantity Total Firm Fixed Price
DESIGN DEVELOPMENT
SUBMISSION. Provide initial work of The Contractor required to represent the project as a set of drawings conveying the major intent of the project work.
LOT 1 $
CONSTRUCTION DOCUMENT
SUBMISSION. Provide a checklist of all submittals, certifications, tests, and inspections required per drawing and specification section
LOT 1
0003 100% DRAWINGS SUBMISSION. LOT 1 $
Total Price:
B.2 DESIGN:
Architect Services and Engineering Design coordination for the preparation of designs, plans, specifications, construction administration and cost estimates. Duties shall be performed by a firm who regularly engages in Architectural design and related services. The design shall comply with the requirement of:
- 2nd Floor Re-purpose Design Diagram
Scope of Work for Design-Build
C-241 Koenig & Bauer 8-Color Printer Base Construction (A&E Design-Build)
C1. OVERVIEW
Plant Operations is seeking a qualified contractor that can deliver a Design-build project to prepare/renovate an installation site for a recently acquired 8-Color Printing press manufactured by Koenig & Bauer. The printer’s model number is “RA106 X- 8+L SW4 SPC ALV3”. The installation site is located on the second floor of Building C, room C- 241, at the Government Publishing Office (GPO) Located in Washington DC
The selected contractor must regularly engage in Architectural and Engineering Design and Construction. The contractor must retain all the applicable services of design firm.
The Contractor will be required to supply a design and perform the necessary modifications to the space to maximize compatibility between the Printing Press and the facility. The constructed base must satisfy all machine specifications such as strength, flatness, stiffness, and other requirements as depicted in the drawings. The Base must also be in accordance with applicable codes of National Design and Construction Standards.
GPO intends to award a firm fixed price contract to the offeror whose proposal addresses all the requirements in accordance with the factors and sub-factors in the Request for Proposal (RFP). The qualified contractor shall submit a price and technical proposal to perform the work.
C2. BACKGROUND AND FACILITY
A. Existing Site Conditions
1. GPO is located at 732 N. Capitol Street Washington, DC 20401. Uses for Room C-241 previously included manufacturing space for printed paper production. Directly Adjacent is a 6- Color Press still in operation. Adjacent space uses include personnel offices, storage, and miscellaneous mechanical equipment. The tentative space for the 8- color printer is between column rows E and D and column rows 20 and 15 as shown in the provided building map.
2. The room is an area sectioned off from the rest of the floor by a metal fence. There are two points of secured entry into the area. The metal fence will be moved by others prior to construction.
3. There is currently no equipment, stored materials, or any other obstructions occupying the space where the 8-color press foundation will go. GPO will work to maintain that throughout the period of performance.
4. The floor is constructed from concrete. Please refer to the Floor and Framing plan for detailed information on the GPO structure. The visible floor is not the original floor since other modifications have been done to the slab at unknown dates.
5. One of the requirements of the machine is related to vibration. Please refer to the Vibration report conducted by Cerami in January of 2024 as it outlines the current dynamic properties of the space.
6. Results of lead testing done in Room C-241. XRF testing showed the presence of lead-based paint in the following areas:
(i) Col 2E14 – All Beige Areas
(ii) Col 2E15 – Entire Column, Beige and White areas
(iii) Col 2E16 – Entire Column, Beige and White areas
(iv) Col 2E17 – All Beige areas
(v) South Wall – All Beige areas
All other areas showed lower levels of lead present. GPO’s safety officer doesn’t think it needs abatement so that decision will be left to the contractor. If any work will be required to disturb the areas listed above, then it will be the responsibilities of the contractor to complete.
B. Site Visit A pre-bid walkthrough will be held on June 11, 2024 at 11:00 am EST Questions may not be asked on site or directed to individuals. All questions shall be in writing and submitted to the CO by the specified deadline date of June 13, 2024 at 11:00 am EST. An attempt to provide responses for questions that do not make the deadline will be made, but there is no guarantee that they will be answered.
If you would like to be in attendance for the site visit, please email: twhite@gpo.gov and llgallegos@gpo.gov by 11:00 am EST June 10, 2024. Upon arrival at GPO Please stop by the GPO Visitor Center to exchange your driver’s license for a GPO Visitor Badge to enter the building.
mailto:twhite@gpo.gov mailto:llgallegos@gpo.gov
C. Government Furnished Information
1. Pictures taken by the Contractor are only permitted of the installation site and any equipment directly associated with the project.
2. All available record drawings will be provided upon request to the Contractor. They should not however, be considered “as built”. These drawing files are provided without warranty or obligation as to the accuracy or information contained in the files. All information in the files must be independently verified by the user. Any user must agree to indemnify and hold the GPO harmless from all claims, damages, losses, and expenses, including, but not limited to, attorney fees arising out of the use of the Computer Aided Design and Drafting (CAD) drawing files.
3. The following architectural drawings and any other necessary documentation of the building shall be provided to the Contractors for their analysis:
(i) Pictures of the installation site. Included are pictures of the floor, the surrounding area, and the ceiling of the space below the installation site.
(ii) Drawings of the 8-color Printing Press from Koenig & Bauer Model no. “RA106 X-
8+L SW4 SPC ALV3”.
(iii) Floor Plans of GPO Building C
(iv) Architectural drawings and Framing plans of GPO Building C dated 1938.
(v) A Vibration Analysis Report conducted by Cerami of the floor’s dynamic properties at present.
C3. PROJECT
D. Tasks
1. The Contractor will conduct a preliminary analysis of the building’s structure to determine the site’s feasibility to house the printing press.
2. The Contractor will design and construct a foundation that is compatible with the building in addition to the machine itself. When determining the foundation’s compatibility with the building, its impact beyond the installation site must be examined.
3. The Contractor will consult with the printer manufacturer and review any documentation to incorporate all specifications into the printer base design.
4. The Contractor will design and install an exhaust delivery system from the 2nd floor installation site to the 3rd floor Pipe & Sheetmetal Storage Closet, room C318. The exhaust from the 8- Color Press will deliver directly into open air through a window. Proper flow must be maintained throughout the entire line.
5. The Contractor will give the completed installation site floor and printer base a finish similar to the adjacent area. This may include but is not limited to a GPO-approved paint or a laminate.
6. The Contractor will conduct a dynamic assessment of the installation site post construction to validate the vibrational stability of the base. This is to ensure the new construction has not caused any adverse static or dynamic effect to the floor as determined in the vibrational analysis.
E. General Contractor Requirements
1. The Contractor will perform all work and provide all the labor, materials, and equipment needed to meet this Scope of Work. The government shall not loan or provide any labor or equipment.
2. The government is not responsible for costs incurred due to mismanagement of labor or lack of proper equipment.
3. The Contractor shall provide a certified Construction/Project Manager as outlined in the specifications to oversee and provide Quality Control during the construction period.
4. Personnel assigned to perform services under this scope shall always be under the direction and control of the Contractor. The Contractor shall monitor the performance of its employees to ensure all aspects of this scope are properly fulfilled.
5. If the Contractor finds clarification necessary with respect to the scope of the services to be performed hereunder, he/she shall request, in writing, such clarification from the CO or COR.
6. The Contractor shall provide a minimum notice of 72 hours to the COR for any work that is required to be done by others so the COR can schedule the work in advance.
C4. DESIGN PERIOD
A. Design Requirements
1. The Contractor must develop plans from field verification on-site and GPO-provided supplementary drawings. The contractor is responsible for on-site verification of existing conditions affecting design which may include crawling, use of ladders, selective disruptive research (coordinate with GPO), and discussions with engineering personnel.
2. The contractor must not incorporate elements into the foundation’s design that would require changes to be made to the 8- Color printing press. The machine has already been manufactured and changes are to be considered impossible.
3. The Contractor must consider adjacent systems and components (architectural as well as utility systems) to avoid construction change orders due to unforeseen site conditions.
4. The Contractor will design a foundation that ensures the static and dynamic loads of the 8-Color printing press, and its environment, are properly accounted for. GPO shall then be provided with a memo on loading scenarios that may compromise the integrity of the printing press and/or building.
5. The Contractor must attend 3 interim review project meetings at 35%, 95% and 100% milestone deliverables with COR and designated GPO staff. The contractor will record and provide meeting minutes within 35 hours to all attendees for review, comment, and concurrence. Incorporate appropriate comments, finalize the meeting minutes, and submit the final meeting minutes within one week of meetings.
6. The Contractor must provide design period services to include drawings and specifications in addition to on-site meetings with professional and administrative staff, site investigative work, and review of supplementary documents. The Contractor is responsible for professional quality and technical accuracy in providing GPO with documents.
A. The Contractor must provide competent design period services with staff and consultants adequately knowledgeable in:
• manufacturing space design and construction
• the various subordinate design disciplines including but not limited to mechanical, structural, civil engineering.
• other building/utility systems as required.
7. The Contractor must verify necessary architectural and utility system components for the building to provide a full and complete design of a foundation for the 8-Color Press. This includes, but is not limited to items such as:
a. Existing conditions verification – upgrades to meet current codes.
b. Clearance verification – space conflicts/interstitial space
c. Mechanical properties – Vibration sources, Vibration impact
d. Structural conflicts - through floor penetrations, load distribution of adjacent machinery, etc.
e. Adjacent Machinery – Static and dynamic load impact
8. GPO design period services to include Design Development, Construction Documents, and Quality Assurance/Quality Control (QA/QC). All submissions and related work for each design phase must conform to the requirements in this document.
9. The Contractor must resolve Conflicting Criteria with the COR.
C5. SUBMISSION REQUIREMENTS
i. Design Development Design Development includes initial work of The Contractor required to represent the project as a set of drawings conveying the major intent of the project work. At this stage of project design, the physical layout of the new work should be shown.
ii. Construction Documents The Contractor must provide a checklist of all submittals, certifications, tests, and inspections required per drawing and specification section. This checklist will show all products requiring submittals in the form of shop drawings, data sheets, manufacturer cut sheets, etc. as well as all other items shown as required submittal items including, but not limited to, reports, system evaluations, testing, operating and maintenance manuals, etc.
The Contractor must provide 100% drawings in AutoCAD and pdf. Specifications in Word electronic formats for construction period use by GPO. A share-point site or email with hyperlink click and download such as Procore is encouraged for ease of transfer.
iii. Drawings
• Drawings must be normally in plan view, at a scale where work required is clear, legible, and easy to interpret.
• Drawings must be independent for demolition, architectural, mechanical, structural, civil, etc., and must show, on separate views, required demolition and reconstruction details for each function.
• Drawings must be prepared using AutoCAD 2018 or newer (or equivalent) and plotted on 30" x 42” sheets.
• Final drawings must bear GPO title block and nomenclature. Drawings must be on the same type and size sheets. All views, elevations, sections, etc., must be complete to ensure total contractor compliance without any ambiguities, or subject to various interpretations.
• All drawings are required to show existing conditions as of the date of the design submission.
• All sheets of drawings must contain A/E official stamp with professional seal and signature along with the name and address of the firm.
4. Specifications
• Specifications must be prepared and submitted individually in latest version of Microsoft Word.
• The Contractor must review and edit applicable sections of the specifications for completeness, relevance, and correctness. The intent is to provide specifications suitable for the project intention and detailed enough to enable the contractor to perform the work in the simplest and practical manner.
• Where a particular item is referenced in the specifications, consult with COR for direction on which item to select. The contractor must not be provided options or choices to make selections but must be provided the specific selection.
• The Contractor must obtain the name and type of specialty materials and equipment required for use on the project.
• Construction tolerances must be specified in detail in all specification sections or identified on plans.
• Legal precedence of "specifications over drawings" must not be used to resolve design ambiguities between drawings and specifications, or to justify omission of drawings or notes required for clarity.
• Contradiction, ambiguity, or statements subject to various interpretations, must be corrected to reflect a single clear intention.
F. Quality Assurance/ Quality Control (QA/QC) To reduce design errors and omissions, the Contractor must develop and execute a QA/QC plan that demonstrates the project plans and specifications have gone through a rigorous, thorough review and coordination effort.
These plans must include, but is not limited to, methods to verify the leveling and vibrational tolerances of the machine. The Contractor will work with the Machine Manufacturer to validate the acceptance of the 8-Color press foundation.
The COR, GPO, AHJ, or other Safety Personnel may conduct inspections of work or working environment at any time; full cooperation with reviewing personnel is mandatory. The Contractor shall accomplish corrective work required prior to performing further construction.
C6. CONSTRUCTION PERIOD
G. General Requirements
1. The Contractor will make any required modifications to the installation site as indicated by the Construction Documents.
2. The Contractor shall follow the designer’s recommendations for any work entailed by their design such as materials or methods to be used. Any disagreements shall be resolved by the COR.
3. The Contractor shall give the COR advance notice of any demolition in the work schedule, whether it be for investigation or construction.
4. Contractor shall ensure all nearby adjacent surfaces and areas are protected from damage during the period of construction and should any damage occur, it will be the responsibility of the Contractor to repair before the end of the contract period.
5. The Contractor will give the completed installation site floor and printer base a finish similar to the adjacent area. This may include but is not limited to paint or a laminate.
6. In the event of accidents of any kind, the Contractor shall furnish GPO with copies of all accident reports at the same time they are forwarded to any other parties, without delay, for review.
7. The Contractor must maintain all construction permits visible and updated as required.
8. The Contractor shall prohibit smoking in and adjacent to construction areas.
9. The Contractor will prevent accidental smoke detector operation.
H. Fire and Safety
1. Develop a plan detailing project specific, fire-safety measures. Conduct meetings with the Building’s facilities management to determine the type and capabilities of the fire-suppression systems on site.
2. Maintain site and building access free and unobstructed to facility emergency services.
3. All temporary construction partitions must meet fire-safety requirements.
4. Temporary heating and electrical installations must comply with OSHA 1926, NFPA 241 and NFPA
70.
5. Contractor furnished fire extinguishers must be provided and maintained in construction areas and in temporary storage areas. Extinguishers must be raised two feet off the floor.
6. Flammable and combustible liquids must be stored, disposed and used in accordance with
OSHA 1926, NFPA 241 and NFPA 30.
7. Existing fire protection must not be impaired, and a fire watch must be provided should protection become impaired. Notify the COR and Fire Inspector if these conditions are expected or occur.
8. Perform Hot Work in accordance with NFPA 241 and NFPA 51B. The Contractor must obtain and fill out a GPO Hot work permit from the COR prior to the start of Hot Work
I. Site Protection
1. No dust and debris should get into the production area on the same floor.
2. The Contractor shall provide, erect and maintain catch platforms, lights, barriers/walls, weather protection, warning signs and other items as required for proper protection of the public, occupants of the building and workmen engaged in work and adjacent construction.
3. The Contractor shall not close or obstruct walkways, passageways or stairways. The Contractor shall also not store or place materials in passageways, stairs or other means of egress and shall conduct operations with minimum traffic interference.
J. Cleanup and Restoration
1. Contractor shall remove waste generated from the worksite on a scheduled basis. Waste shall be deposited in an appropriate dumpster provided by the Contractor, located in an area approved by the COR and removed from the grounds weekly or when full. The Contractor is responsible for the procurement of waste services, and no government leased, or owned dumpster shall be used to dispose of construction waste.
2. Damage of interior and exterior items such as walls, ceiling tile, and any other Government owned equipment shall be repaired/replaced at no cost to the Government.
3. Should the Asbestos-containing material (ACM) outlined in the “existing site conditions” section of this document be disturbed, the following regulations apply:
(i) The Contractor is totally responsible for all the cost for the abatement work if they would fail to find the hazardous materials during the site visit and would not include the cost in the bid price.
(ii) Contractor will abate and remediate areas containing asbestos materials, lead based paint, rectify any code deficiencies including gaps in the Conceptual design and as required by GPO. Even though GPO tried to find all the hazardous materials in the area, there might still be some which were not discovered in the survey. If the Contractor suspects new ACM or lead-based paint, the COR shall be contacted immediately.
(iii) The removal and disposal of any hazardous material shall be in accordance with EPA Regulations and the Contractor shall submit the related documents to the COR. The Primary Contractor shall be responsible for submitting any documents that are required by EPA Regulations.
4. Upon completion of work, the Contractor is responsible for any punch list items accrued during the final walkthrough by the COR. This contract will not be fulfilled until all items are addressed in a timely manner, inspected by the COR, and have written approval.
K. Government Furnishings
1. Services
• GPO will provide house services such as 120V house Electrical, water, etc.
• GPO will oversee all matters relating to facilities equipment and systems such as HVAC, electricity, plumbing, etc. Any adjustments to these utilities will be handled internally by the Facilities Management or by others.
2. Loading Dock
• Loading Dock hours of operations are from 7:00 AM to 2:30 PM, Monday thru Friday.
Coordinate with the COR for usage.
• The address of loading dock is 44 H Street, NW, Washington, DC 20401.
• Equipment or materials shall not exceed what can be handled by GPO’s elevators as listed below.
• Oversized payloads will require special handling by the Contractor. If any part or equipment exceeds 20,000 lbs., it shall be delivered through the wall or windows. If the wall or window is demolished for the work, the Contractor restores the wall and window to the original condition.
3. Elevators
• Use of freight elevators for the transportation of materials and equipment is provided. The max specifications of the freight elevators are as follows:
(a) Height - 7' 6"
(b) Width - 7' 0"
(c) Length - 10' 0"
(d) Weight - 20,000 lbs.
4. Material Storage
• The Contractor shall confine storage of materials on the job site to areas approved by the
COR and shall not unnecessarily encumber the premises or overload any portion with materials to a greater extent than the structure design load.
• Verify available storage space at the job site with COR prior to bid opening. Any additional off-site space required is the responsibility of the Contractor. Allocate the available storage areas and coordinate their use with the other trades on the job.
5. Parking
• The Contractor is to pay $9/day/vehicle and the space is limited due to multiple ongoing construction projects. The Contractor shall limit the number of Contractor vehicles on site to an appropriate level. Coordinate with the COR for proper parking if standard lot spaces are not being used.
L. GPO Regulations
1. Crane Work
• Any crane work will be scheduled on weekends (Saturdays and Sundays) or Federal Holidays approved by the COR. The cost resulting from weekend work and Federal Holidays shall be included in the bid price.
2. Gas-Powered Vehicles
• Propane Gas Powered Forklifts shall be used during weekend work, Federal holidays, or off hours (4pm- 10:30pm) with GPO’s approval and permission.
3. Security
• Contractor’s vehicles, work bags, toolboxes, material, etc. will be inspected upon arrival and checked when leaving the premises of the building. Luis Gallegos (COR, work cell: 202-285- 8480) or Andrew Watts (work cell: 202- 904-8358) will be the Points of Contact and escort the Contractors to the locations when they arrive.
• The Contractor shall safeguard all Government Property in the work area. At the close of each work period, equipment shall be secured and/or taken away from the work site daily.
• The Contractor shall cooperate with those in authority on the premises to prevent the entrance and exit of all workers and/or others whose presence is forbidden or undesirable.
• Follow the FY24 Contractor Security Requirements.
C7. PERIOD OF PERFORMANCE
A timeline based on A/E contract award of approximately July 2024 is offered below.
a. During the process of the work the CO and COR will conduct periodic reviews with The Contractor to review progress. The Contractor must perform the work required within the limits of the following schedule.
Predesign Meeting with GPO staff Day 0 Technical Kickoff Meeting +3 days, Day 3 Design Submit 35% Conceptual Design Development (DD) Review Package
+18 days, Day 21
GPO Review +7 days, Day 28 Design Submit 95% Design Development (DD) Review Package
+14 days, Day 42
GPO Review +7 days, Day 49 Submit 100% Construction Document (CD) Review Package
+14 days, Day 63
GPO Review +7 days, Day 70 Construction NTP +14 days, Day 84 QA/QC of Construction, Substantial Completion, and Punchlist Review.
+7 Days, Day 91
• All work to be completed within 13 weeks (91 days) of the Notice to Proceed (NTP).
Submission of Design timeline, safety plans, quality control plan, schedules, pre‐construction submittals, etc. shall be required to be submitted within 14 days of the Construction NTP.
• Contractor must submit a Critical Path Method (CPM) schedule for both the Design and Construction phase with estimated dates.
• Work Schedule Work will be performed during normal business hours 7:00 AM until 3:00 PM. Coordinate working schedule with the COR prior to beginning construction. Any work to be performed outside normal business hours and on weekends or holidays will need to be coordinated with the COR three (3) days prior.
• Federal Legal Holidays
New Year’s Day January 1 Martin Luther King’s Birthday Third Monday in January President’s Day Third Monday in February Memorial Day Last Monday in May Juneteenth June 19 Independence Day July 4 Labor Day First Monday in September Columbus Day Second Monday in November Veteran’s Day November 11 Thanksgiving Day Fourth Thursday in November Christmas Day December 25
C8. PRIVACY STATEMENT
Information Security: The C&A requirements do not apply; a Security Accreditation Package is not required.
Incidental exposure to protected health information may occur from accessing the work site. Staff will follow all Privacy & Security policies and procedures.
C9. POST CONSTRUCTION QUALITY VALIDATION AND CONTRACT CLOSE-OUT
• MMAR 52.246‐21 Warranty of Construction, the Contractor is to provide a one (1) year warranty period, from the date of final acceptance of the work, covering defects related to all work performed and any materials/equipment included in the project.
• Vibration Analysis – The Contractor shall provide GPO with a report on the dynamic properties of the base conducted by a third party. This report should try and mirror the variables used in the report conducted by Cerami prior to construction so that the data sets are comparable.
• Closeout – The Contractor shall provide a two week notice to the COR for the onsite Final Walkthrough and Punch List for Acceptance as well as other planned milestones.
• The Contractor must submit the record drawings showing any changes or modifications to the Bid Documents reflected on the hard-copy set of “as-builts”; Drawings must be individually marked “Record Drawing” and submitted in a single package as follows;
a. Drawings in AutoCAD (DWG) format of the entire project shall be delivered electronically.
b. Drawings must represent final project with all demolished and/or removed items deleted from the .dwg files.
c. Drawings in (PDF) format of the entire project in addition to 1 set of full size 30 x 42" drawings.
C10. TECHNICAL EVALUATION CRITERIA:
A. Past Performance
• An offeror is expected to have at least five (5) years of Design-Build Experience.
• Offerors must submit a two-page (maximum) narrative describing the company's design-build experience providing the types of services performed are of a similar complexity to the work solicited.
• Offerors must be familiar with the design and construction of foundations for sensitive equipment. Preferably they have experience working with printing presses specifically.
• Your company must have provided these types of services to either a government or Commercial entity for the minimum number of years noted above.
B. Key Personnel and Personnel Management:
• The offerors must have qualified personnel and submit details of their credentials with their proposals.
C. Quality Plan
• The offerors must have a qualified plan and describe their approach to constructing the base foundation for the printing press in accordance to the manufacturers specifications.
D. Schedule
• The offerors must submit a copy of the tentative schedule or timeline to work.
E. Price
• The offerors will be rated based on Best Value.
Section D – Section D - Packaging and
Marking
NONE
[end section D]
Section E - Inspection and Acceptance Terms
E.1 Quality
The Contractor must use the best commercial industry standards for all services performed. The approval of shop drawings and submittals by the government is in the nature of an aid to the Contractor but shall not relieve the Contractor from his responsibility to construct the work in accordance with the Contract Drawings and all the conditions of the SOW, unless any changes from such Contract Drawings and SOW, indicated on the shop drawings, shall be called to the attention of the COR and his approval is given in writing.
The approval of shop drawings does not relieve the Contractor of his responsibility to coordinate the work of the several trades and subcontractors, nor is it under any circumstances to be construed as a check or approval of dimensions or quantities. All the dimensions on the drawings shall be verified by the contractor before starting the work.
E.2 Inspection and Approval of Written Deliverables N/A.
E.3 Inspection at Destination All reports submitted will be reviewed and approved by COR to ensure that all aspects of the SOW are addressed.
[End Section E]
Section F - Delivery or Performance
F2 PLACE OF PERFORMANCE
Government Publishing Office
732 North Capitol Street
NW)
Washington, DC 20401
Section G - Contract Administration Data
Notwithstanding the offeror’s responsibility for total management responsibility during the performance of the contract, the administration of the contract will require maximum coordination with the GPO points of contact during performance of the contract.
G1 CONTRACTING OFFICER (CO)
Troy White U.S. Government Publishing Office Acquisition Services Room: A530 Stop: AS 732 North Capitol St NW Washington DC 20401 Email: twhite@gpo.gov
G2 CONTRACTING OFFICER'S AUTHORITY
The Contracting Officer is the only person authorized to make or approve any changes in any of the mailto:twhite@gpo.gov requirements of this contract and notwithstanding any provisions contained elsewhere in this contract, the said authority remains solely the Contracting Officers. In the event the Contractor makes any changes at the direction of any person other than the Contracting Officer, the change will be considered to have been made at the contractor’s risk. No adjustment will be made in the contract terms and conditions of this contract, including price.
G3 CONTRACT SPECIALIST
(CS) TBD
Contract Specialist Acquisition Services, Email: TBD
G4 CONTRACTING OFFICER’S REPRESENTATIVE (COR)
After award, the GPO will designate one or more persons as the Contracting Officer's Representative (COR).
The COR may be changed at any time by the GPO without prior notice to the Contractor by a unilateral modification to the Contract.
The responsibilities and limitations of the COR are as follows:
The COR is responsible for the technical aspects of the project and serves as technical liaison with the Contractor. The COR is also responsible for the final inspection and acceptance of all equipment, services, reports, and such other responsibilities as may be specified in this contract.
The COR is not authorized to make any commitments or otherwise obligate the GPO or authorize any changes, which affect the quantity, quality, scope, or Contract price. All request for changes shall be referred to the Contracting Officer directly or through the COR. No such changes shall be made without the expressed prior authorization of the Contracting Officer. If the Contractor performs a service that alters the current cost, quantity, or scope without prior written approval from the CO, the Contractor does so at his/her own risk. The COR may designate an alternate COR(s) to act for the COR by naming such alternate(s) in writing and transmitting a copy of such designation through the Contracting Officer to the Contractor.
G5 INVOICE SUBMISSION
Contracting Officer (CO) Troy White
Contract Specialist TBD
Contracting Officer’s Representative (COR)
Luis Gallegos
Invoice Mailing Address:
US Government Publishing Office (GPO) Comptroller North Capitol & H Streets, NW Mail Stop: FMCS Washington, DC 20401 (202) 512-0874 Or invoiceGPO@gpo.gov
G6 PAYMENT METHOD
Payments under this contract will be made by the GPO by electronic funds transfer (EFT) NOTICE
The following solicitation provisions and/or contract clauses pertinent to this section are hereby incorporated by reference: Materials Management Acquisition Regulation (MMAR)
52.232.34 May 1999- Payment by Electronic Funds Transfer Other Than Central Contractor Registration
Effective January 1, 1999, payments on all GPO purchase orders will only be made by electronic fund transfer (EFT) unless you are granted a waiver. A waiver can only be granted if you certify below in writing that you do not have an account with a financial institution or an authorized payment agent and return the certification to the Contracting Officer.
[End of Section G]
Section H - Special Contract Requirements None
[End of Section H]
Section I: Contract Clauses
Clauses incorporated by reference
Article Number Reference Text
52.249-8 52.249-8 Default (Fixed-Price Supply and Service) (APR 1984)
52.249-2 52.249-2 Termination for Convenience of the Government (Fixed-Price) (APR 2012)
52.246-4 52.246-4 Inspection of Services-Fixed-Price (AUG 1996)
52.242-13 52.242-13 Bankruptcy (JULY 1995)
52.239-1 52.239-1 Privacy or Security Safeguards (AUG 1996)
52.233-3 52.233-3 Protest after Award (AUG 1996) mailto:invoiceGPO@gpo.gov
52.232-33 52.232-33 Payment by Electronic Funds Transfer-System for Award Management (JUL 2013)
52.232-23 52.232-23 Assignment of Claims (MAY 2014)
52.232-17 52.232-17 Interest (MAY 2014)
52.228-5 52.228-5 Insurance-Work on a Government Installation (JAN 1997)
52.209-6 52.209-6 Protecting the Government's Interest When Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment (OCT 2015)
52.211-5 52.211-5 Material Requirements (AUG 2000)
52.204-6 52.204-6 Unique Entity Identifier (Oct 2016)
52.203-7 52.203-7Anti-Kickback Procedures (MAY 2014)
Clauses incorporated by full text
52.212-4, CONTRACT TERMS AND CONDITIONS— COMMERCIAL ITEMS (FEB 2002)
(a) Inspection/Acceptance. The Contractor shall only tender for acceptance those items that conform to the requirements of this contract. The Government reserves the right to inspect or test any supplies or services that have been tendered for acceptance. The Government may require repair or replacement of nonconforming supplies or re-performance of nonconforming services at no increase in contract price.
The Government must exercise its post-acceptance rights—
(1) Within a reasonable time after the defect was discovered or should have been discovered; and
(2) Before any substantial change occurs in the condition of the item, unless the change is due to the defect in the item.
(b) Assignment. The Contractor or its assignee may assign its rights to receive payment due as a result of performance of this contract to a bank, trust company, or other financing institution, including any Federal lending agency in accordance with the Assignment of Claims Act (31 U.S.C. 3727). However, when a third party makes payment (e.g., use of the Government-wide commercial purchase card), the Contractor may not assign its rights to receive payment under this contract.
(c) Changes. Changes in the terms and conditions of this contract may be made only by written agreement of the parties.
(d) Disputes. Failure of the parties to this contract to reach agreement on any request for equitable adjustment, claim, appeal or action arising under or relating to this contract shall be a dispute to be resolved in accordance with the clause at MMAR 52.233- 1, Disputes, which is incorporated herein by reference. The Contractor shall proceed diligently with performance of this contract, pending final resolution of any dispute arising under the contract.
(e) Definitions. The clause at MMAR 52.202-1, Definitions, is incorporated herein by reference.
(f) Excusable delays. The Contractor shall be liable for default unless nonperformance is caused by an occurrence beyond the reasonable control of the Contractor and without its fault or negligence such as, acts of God or the public enemy, acts of the Government in either its sovereign or contractual capacity, fires, floods, epidemics, quarantine restrictions, strikes, unusually severe weather, and delays of common carriers.
The Contractor shall notify the Contracting Officer in writing as soon as it is reasonably possible after the commencement of any excusable delay, setting forth the full particulars in connection therewith, shall remedy such occurrence with all reasonable dispatch, and shall promptly give written notice to the Contracting Officer of the cessation of such occurrence.
(g) Invoice. (1) The Contractor shall submit an original invoice and three copies (or electronic invoice, if authorized) to the address designated in the contract to receive invoices.
An invoice must include—
(i) Name and address of the Contractor; (ii)Invoice date and number;
(iii) Contract number, contract line item number and, if applicable, the order number;
(iv) Description, quantity, unit of measure, unit price and extended price of the items delivered;
(v) Shipping number and date of shipment, including the bill of lading number and weight of shipment if shipped on Government bill of lading;
(vi) Terms of any discount for prompt payment offered;
(vii) Name and address of official to whom payment is to be sent;
(viii) Name, title, and phone number of person to notify in event of defective invoice; and
(ix) Taxpayer Identification Number (TIN). The Contractor shall include its TIN on the invoice only if required elsewhere in this contract.
(x) Electronic funds transfer (EFT) banking information.
(A) The Contractor shall include EFT banking information on the invoice only if required elsewhere in this contract.
(B) If EFT banking information is not required to be on the invoice, in order for the invoice to be a proper invoice, the Contractor shall have submitted correct EFT banking information in accordance with the applicable solicitation provision, contract clause (e.g., 52.232-33, Payment by Electronic Funds Transfer—
Central Contractor Registration, or 52.232-34, Payment by Electronic Funds Transfer—Other Than Central Contractor Registration), or applicable agency procedures.
(C) EFT banking information is not required if the Government waived the requirement to pay by EFT.
(h) Patent indemnity. The Contractor shall indemnify the Government and its officers, employees and agents against liability, including costs, for actual or alleged direct or contributory infringement of, or inducement to infringe, any United States or foreign patent, trademark or copyright, arising out of the performance of this contract, provided the Contractor is reasonably notified of such claims and proceedings.
(i) Payment. Payment shall be made for items accepted by the Government that have been delivered to the delivery destinations set forth in this contract. In connection with any discount offered for early payment, time shall be computed from the date of the invoice. For the purpose of computing the discount earned, payment shall be considered to have been made on the date which appears on the payment check or the specified payment date if an electronic funds transfer payment is made.
(j) Risk of loss. Unless the contract specifically provides otherwise, risk of loss or damage to the supplies provided under this contract shall remain with the Contractor until, and shall pass to the Government upon:
(1) Delivery of the supplies to a carrier, if transportation is f.o.b. origin; or
(2) Delivery of the supplies to the Government at the destination specified in the contract, if transportation is f.o.b. destination.
(k) Taxes. The contract price includes all applicable Federal, State, and local taxes and duties.
(l) Termination for the Government’s convenience. The Government reserves the right to terminate this contract, or any part hereof, for its sole convenience. In the event of such termination, the Contractor shall immediately stop all work hereunder and shall immediately cause any and all of its suppliers and subcontractors to cease work. Subject to the terms of this contract, the Contractor shall be paid a percentage of the contract price reflecting the percentage of the work performed prior to the notice of termination, plus reasonable charges the Contractor can demonstrate to the satisfaction of the Government using its standard record keeping system, have resulted from the termination. The Contractor shall not be required to comply with the cost accounting standards or contract cost principles for this purpose. This paragraph does not give the Government any right to audit the Contractor’s records. The Contractor shall not be paid for any work performed or costs incurred which reasonably could have been avoided.
(m) Termination for cause. The Government may terminate this contract, or any part hereof, for cause in the event of any default by the Contractor, or if the Contractor fails to comply with any contract terms and conditions, or fails to provide the Government, upon request, with adequate assurances of future performance. In the event of termination for cause, the Government shall not be liable to the Contractor for any amount for supplies or services not accepted, and the Contractor shall be liable to the Government for any and all rights and remedies provided by law. If it is determined that the Government improperly terminated this contract for default, such termination shall be deemed a termination for convenience.
(n) Title. Unless specified elsewhere in this contract, title to items furnished under this contract shall pass to the Government upon acceptance, regardless of when or where the Government takes physical possession.
(o) Warranty. The Contractor warrants and implies that the items delivered hereunder are merchantable and fit for use for the particular purpose described in this contract.
(p) Limitation of liability. Except as otherwise provided by an express warranty, the Contractor will not be liable to the Government for consequential damages resulting from any defect or deficiencies in accepted items.
(q) Other compliances. The Contractor shall comply with all applicable Federal, State and local laws, executive orders, rules and regulations applicable to its performance under this contract.
(r) Compliance with laws unique to Government contracts.
The Contractor agrees to comply with 31 U.S.C. 1352 relating to limitations on the use of appropriated funds to influence certain Federal contracts; 18 U.S.C. 431 relating to officials not to benefit; 40 U.S.C. 327, et seq., Contract Work Hours and Safety Standards Act; 41 U.S.C. 51-58, Anti-Kickback Act of 1986; 41U.S.C. 265 and 10
U.S.C. 2409 relating to whistleblower protections; 49 U.S.C. 40118, Fly American; and 41 U.S.C. 423 relating to procurement integrity.
(s) Order of precedence. Any inconsistencies in this solicitation or contract shall be resolved by giving precedence in the following order:
(1) The schedule of supplies/services.
(2) The Assignments, Disputes, Payments, Invoice, Other Compliances, and Compliance with Laws Unique to Government Contracts paragraphs of this clause.
(3) The clause at 52.212-5.
(4) Addenda to this solicitation or contract, including any license agreements for computer software.
(5) Solicitation provisions if this is a solicitation.
(6) Other paragraphs of this clause.
(7) The Standard Form 1449.
(8) Other documents, exhibits, and attachments.
(9) The specification.
52.233-2 SERVICE OF PROTEST (AUG 1996)
Agency protests filed with…