SOI Document.pdf
PDF 370 KB Posted
- Solicitation number
- 25SOI15739
- Issued by
- Walworth County, South Dakota
About this file
The document is a Request for Statements of Interest (SOI) issued by the South Dakota Department of the Military for a repair and improvement project at the Yankton RC facility. The project involves replacing broken asphalt pavement for an access road and personal occupant vehicle (POV) parking lot, capturing drainage, installing new security fencing and gates to meet ATFP standoff distance requirements, and improving overall site infrastructure. Interested engineering firms are requested to submit a Statement of Interest electronically by 4:00 PM MT on July 15, 2025, with the project designed and ready for bid advertisement no later than January 2026.
The estimated construction budget is $420,000.00, though this amount is subject to change. Firms will be evaluated on a 100-point scoring system covering project approach, team expertise, project management, quality assurance, availability, facility familiarity, resources, and past performance. The technical review committee will select the firm based on these criteria, with submissions limited to 20 pages. Additional services such as construction administration and inspection will be negotiated separately if the project proceeds to the construction phase. Interested firms should submit their qualifications directly to the Engineering Manager via email, highlighting their capabilities across the specified evaluation criteria.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEPARTMENT OF THE
MILITARY
STATE OF SOUTH DAKOTA
July 1, 2025
RE: REQUEST FOR STATEMENTS OF INTEREST
Repair Paved POV and Entrance Road – Yankton RC Yankton, SD
CFMO# 467116
The South Dakota Department of the Military is soliciting Statements of Interest from firms interested in providing professional Engineering services for the above referenced project. This project scope will involve site investigative, design development, and bidding services for the following project scope:
Improve broken up asphalt pavement access road and personal occupant vehicle (POV) parking lot by replacing with new pavement designed for associated vehicle traffic. Capture drainage on north side of POV lot and pipe under parking lot to reduce slip/fall hazards. Relocate/install new security fencing and gate to prevent vehicles from approaching building to meet ATFP standoff distance requirements. Estimated construction budget for the project is $420,000.00 but be advised that this number is subject to change.
The project will need to be designed and ready for bid advertisement no later than January 2026. Additional services such as construction administration/inspection will be negotiated later should the project proceed to the construction phase. Firms desiring to be considered for providing professional services for this project should send a Statement of Interest that outlines their qualifications and experience for this project. Statements of Interest should clearly address each of the following criteria:
1. Project approach and methodology to meet the project requirements (10 pts);
2. Project teams specialized expertise, capabilities, and technical competence to meet the project requirements (10 pts);
3. Ability and proven history in handling special project constraints (Projects of Similar Scope, Time/Schedule, and Cost) (10 pts).
4. Proposed project management techniques. (10 pts);
5. QA/QC process for development of construction plans and specifications in order to ensure accuracy and completeness along with verification that owner requirements are met (10 pts);
6. Firms’ policy when errors and/or omissions are found in the design, when it is not value added to the state? (10 pts);
7. Availability to the project locale (20 pts);
8. Familiarity with the project facility (20 pts);
9. Resources available to perform the work, including any specialized services and their roles within the project, within the specified time limits for the project. Resumes of team member’s professional accomplishments and experience with similar projects to be included. (10 pts);
10. Record of past performance, including price, schedule, and cost data from previous projects, quality of work, ability to meet schedules, cost control, and contract administration. All projects within the last 5 years with the Dept. of the Military must be included. (10 pts).
A technical review committee will review the submissions and select the firm based on the criteria shown above. The committee respectfully requests that statements of interest be limited to 20 pages or less. Interested firms shall submit an electronic copy via email no later than 4:00 PM, MT, July 15, 2025. Submissions and questions may be directed to me at Cullen.Jorgensen@state.sd.us. Thank you for your interest in this project, we look forward to working with you.
Respectfully, Cullen Jorgensen Engineering Manager