SN159205ExbDSpecs.doc
DOC document 41 KB Posted
- Attached to
- Replace Pipes and Sand Media SN159205 15 SR #4
- Solicitation number
- 0000000882
- Issued by
- Sonoma County, California
About this file
This is a specifications document (Exhibit D) for a pipe and sand media replacement project at the Sonoma Developmental Center's Water Treatment Plant in Eldridge, California. The scope of work involves removing and replacing corroded pipe systems, filter media, and water filter sections in four water filters, with all work to be performed at 15000 Arnold Drive. The project requires contractors to work Monday through Friday from 7:00 AM to 3:30 PM, excluding state holidays. A mandatory pre-bid conference and site visit is required for bidders to examine the work areas. The contractor must coordinate with SDC water treatment staff to ensure water demand can be met during the project, and all piping, filter pits, and equipment must be disinfected per AWWA Standards before returning to service.
The contractor must provide a two-year written warranty as a condition of payment, covering all workmanship defects which must be repaired at the contractor's expense. The work must comply with various California building codes (2013 editions) including Building, Mechanical, Plumbing, Electrical, and Fire codes, as well as Title 19 State Fire Marshal Regulations. The contractor is responsible for verifying all field measurements, sizes, and quantities of materials needed, and must submit data on new filter media for approval before the project begins. Any damage to existing facilities must be repaired at the contractor's expense.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SN159204SR_3ExbDSpecs-Addition.doc | DOC document | |
| SN159205_15SR_4ifb.doc | DOC document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Specifications
Exhibit D
SONOMA DEVELOPMENTAL CENTER
15000 ARNOLD DR.
ELDRIDGE, CA 95431
SR#4 REPLACE PIPES AND SAND MEDIA
I. GENERAL
A. Scope of work:
The contractor shall provide all materials, labor, tools, transportation, equipment, supervision, and other services necessary to remove and replace existing corroded pipe system , filter media and water filter sections as noted on the project drawings.
B. Project Location:
This project is located on the grounds of Sonoma Developmental Center at 15000 Arnold Drive, Eldridge, CA 95431 at the SDC Water Treatment Plant.
C. Project Description
Project includes the removal and replacement of existing sand media in (4) four water filters, removal and replacement of deteriorated piping as shown on the project drawings.
D. Reference Codes and Standards:
The reference documents below (latest edition unless otherwise indicated), form a part of these specifications.
20013 California Building Code
20013 California Mechanical Code
20013 California Plumbing Code
20013 California Electrical Code
20013 California Fire Code
Title 19 - State Fire Marshal Regulations
II.
JOB CONDITIONS
1. Coordinate and schedule all work with the Chief of Plant Operations III or designee.
2. Contractors will be required to sign in at Plant Operations every day that work is performed.
3. Work hours shall be Monday thru Friday, 7:00 am to 3:30 pm. No work shall take place on State holidays.
4. Prior to beginning this project the contractor shall coordinate with SDC water treatment staff to ensure water demand can be met.
5. Disinfection of all piping, filter pits and equipment associated with this contract will be performed by the Contractor per applicable AWWA Standards prior to the system being returned to service.
6. All existing equipment, piping and valves shall be protected from damage during construction.
7. Contractor shall document configuration of piping and location of drain holes in filter pits prior to removal of existing piping.
8. It is the responsibility of the Contractor to verify in the field actual sizes and quantities of pipe, fittings, and all related parts and materials.
9. Contractor to submit data on new filter media for approval prior to project start date.
10. All new and temporary construction, including equipment and accessories shall be secured in such a manner, at all times, as to preclude damage.
11. Any damage to existing facilities above or below grade shall be the responsibility of the Contractor to repair at no cost to the State. Any necessary repairs shall be made to the satisfaction of the Chief of Plant Operations III before contract work continues. These repairs shall be completed in a timely manner to avoid disruption of service.
12. Testing, when required, will be in accordance with all pertinent codes and regulations.
III. SITE VISIT
At the mandatory pre-bid conference and site visit bidders shall visit the site and carefully examine the areas in question as to conditions, which may affect proper execution of the work. All dimensions and quantities shall be determined or verified by the Contractor.
IV.
COMPLETION
A. Prior to demobilization from site, the work shall be reviewed by the Chief of Plant Operations and the Contractor. All defects shall be noted, including noncompliance with the specifications of the recommendations of Manufacturer, and shall be itemized in a punch list. These items must be corrected immediately by the Contractor to satisfaction of the State and Manufacturer prior to demobilization.
B. All warranties of this specification shall have been submitted for approval and shall have been accepted at time of contract award.
V.
WARRANTY
1. A written two year warranty shall be provided by the contractor as a condition of payment.
2. All defects in workmanship shall be satisfactorily repaired by and at sole expense of contractor.
3. Any delay on part of contractor to meet schedule for repair of warranty work established by the Chief of Plant Operations or designee shall constitute breach of this Contract and State may proceed to have defects remedied, with costs involved paid by the contractor.
End