SMYU20-1001 SUBMITTAL-REGISTER.PDF
PDF 45 KB Posted
- Attached to
- Repair to Runway/Airfield Marking at Osan AB
- Solicitation number
- W91QVN20R0080
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SMYU20-1001 Site Plan.pdf | ||
| A21. Sol W91QVN20R0080.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(a) (b) (c) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
Line
Acti vity
Trans-mittal #
Specification Section
SD
# Submittal Description Item Submitted Paragraph #
Classificati on: GOVT or A/E Revwr Submit
Approval Needed
By
Material Needed
By Action Code
Date Of Action
Date FWD to APPR / Auth Date RCD From
CONTR
Date FWD To
Other Revwr
Date
RCD
From Other Revwr
Action Code
Date Of Action
Mailed To
CONTR/
Date RCD From
APPR
Authority Remarks
1 01 32 01.00 10 01 Preconstruction Submittals Preliminary Project Schedule 3.4.1 G
2 01 32 01.00 10 01 Preconstruction Submittals Initial Project Schedule 3.4.2 G
3 01 32 01.00 10 01 Preconstruction Submittals Periodic Schedule Updates 3.4.3 G
4 01 33 00 01 Preconstruction Submittals Submittal register 1.8 G
5 01 35 26 01 Preconstruction Submittals SAFETY PLAN /ACCIDENT
PREVENTION PLAN (APP) 1.6 G
6 01 35 26 6 Test Reports Accident Reports 1.11.2
7 01 45 00.00 10 01 Preconstruction Submittals Quality Control Plan 3.2 G
8 Preconstruction Submittals Phasing Plans G
9 33 82 00 7 Certificates Key Personnel Resume 1.6.2.2 G
10 01 33 00 2 Shop Drawings 100% Contract Drawings 1.1.1 G
11 Shop Drawings Detailed Marking Drawings G
12 01 58 00 2 Shop Drawings Construction Project Sign 1.4 G
13 Product Data Equipment for Airfield Markings G
14 Certificates Equipment List G
15 Samples Airfield Marking Paint G
16 Test Reports All Marking Paints G
17 Manufacture's Instructions Airfield Markings G
18 33 70 02.00 10 2 Shop Drawings As-Built Drawings 1.4.2 G
19 01 78 00 11 Closeout Submittals Checklist for Form DD1351 1.9 G
APPROVING AUTHORITY
(d)
CONTRACTOR SCHEDULE
DATES
CONTRACTOR
ACTION
TITLE: 2014-OMA-SPECIFICATIONS_REVISION1_2015
SUBMITTAL REGISTER
JOB NAME: REPAIR RUNWAY/AIRFIELD MARKINGS, FY20
LOCATION: OSAN AB
CONTRACT NO:
CONTRACTOR:
Submittal Register