Smokey Circle Floor Replacement Statement of Work.pdf

PDF 247 KB Posted

Attached to
Smokey Circle Floor Replacement Federal contract opportunity
Solicitation number
127EAX24Q0043
Issued by
Department of Agriculture Assistant Secretary for Departmental Management

About this file

This document is a Statement of Work (SOW) for the Smokey Circle Floor Replacement project. The SOW outlines the requirements for the contractor to remove and dispose of the existing 1,201 square feet of linoleum flooring in single-wide manufactured homes and replace it with new wood grain vinyl flooring, including any necessary subfloor repairs and reinstallation of molding. The key objectives are to furnish all required supervision, materials, equipment, and labor to complete the floor replacement work in accordance with the specifications.

The contractor must submit various deliverables, including a proposed project plan, material approvals, weekly status reports, and proof of required permits and licenses. The work must comply with all applicable federal, state, and local regulations. The project site is located in Grants, New Mexico, and the buildings may be occupied during the work, requiring advance notification to residents. The solicitation number is 127EAX24Q0043, and the contracting agency is the Department of Agriculture Assistant Secretary for Departmental Management.

View the file

Other files for this federal contract opportunity

Other files attached to Smokey Circle Floor Replacement, newest first.
File Type Posted
BioPreferred.pdf PDF
Davis-Bacon Act WD NM20240004.pdf PDF
127EAX24Q0043 8(a) Smokey Circle RFQ.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

US Department of Agriculture (USDA)

Statement of Work

Contents Project General Information

1.0 Scope of Work

2.0 Background

Contractor Requirements

3.0 Technical Requirements / Tasks

4.0 Government Furnished

5.0 Deliverables / Schedule

6.0 Travel

7.0 Contractor’s Key Personnel

8.0 Security Requirements

9.0 Data Rights

10.0 Section 508 – Electronic and Information Technology Standards Attachment

Project Smokey Circle quarters Floor replacement.

Cibola National Forest and National Grasslands

General Information

1.0 Scope of Work (Base)

The Contractor shall furnish all supervision, materials, equipment, vehicles, tools, parts, labor, transportation, and miscellaneous items needed to remove, dispose, and replace the existing 1,201 square feet of Linoleum flooring with new vinyl flooring within the Single wide manufactured base home. Upon Removal of the old linoleum flooring contractor shall reinstall any damaged sub flooring, moisture barrier and new wood grain vinyl flooring as well as any molding that may be required.

All work shall be in accordance with the plans and specifications contained herein. No changes to the specifications, terms, or conditions of this Request for Quotations (RFQ) shall be made without the prior approval of the Contracting Officer in writing. All submittals for changes or substitutions will be subject to a maximum review time of 10 business days and notice of acceptance or rejection will be sent to the contractor by the CO or COR. The contractor is responsible for complying with all applicable regulations and obtaining all permits for this work.

2.0 Background

Smokey Circle located in Grants New Mexico is the site of multiple single wide trailers manufactured in 1993. The existing flooring is linoleum flooring that has suffered water damage from the Swamp coolers that were located on the rooves of these trailers as mentioned above. These trailers will require new subflooring, moisture barrier and flooring. Most of the water damage has occurred with the kitchen, living area and laundry rooms.

These trailers serve as seasonal quarters for Forest Service Personnel and may be occupied during project time frame.

Any work to be done in an occupied trailer shall require a 72-hour notice before work can be started to allow for proper notification of residence.

Contractor Requirements

3.0 Technical Requirements / Tasks

The option to the base contract is to replace the existing Linoleum Flooring, damaged subflooring, insulation and moisture barrier materials if any and replace with new insulation, subflooring, moisture barrier and new wood grain vinyl flooring.

Flooring shall be scuffing resistant and low maintenance/ upkeep. Submission of flooring type and color shall be approved by COR/GTM prior to installation.

• Installation of new insulation, subflooring, moisture barrier and new wood grain vinyl flooring.

• Installation of new Oak Gray 6 mil X 6in X 36 in waterproof Interlocking Vinyl Plank Flooring.

• Installation and removal of all floor molding materials.

• Base contract building is a single story 1,201 sq ft. manufactured home.

• Must meet all federal, state, city, and county regulations and requirements.

• Contractor responsible for acquiring permits and achieving/exceeding all permit requirements.

• DEMOLITION: Work shall include removal of old flooring materials. Care shall be taken to ensure no damage is done to surrounding areas or other items on the installation area. Any damage shall be repaired. Contractor shall, upon removal of flooring materials, inspect existing floor and subfloor structures to ensure all flooring and supporting structures are adequate for new flooring. Any damaged supporting structures shall be reported to the COR and an agreed upon change order price shall be used for replacement of any floor joists, or other supporting structures. and/or insulation.

• Old Flooring material shall be removed from the site and legally disposed of.

• NEW FLOORING INSTALLATION: Upon removal of old flooring and installation of new floor and sub flooring materials contractor shall conduct a structural assessment for all flooring supporting structures and install a minimum R-13 insulation in any needed area due to new installation activity.

4.0 Government Furnished

The Government will not be furnishing any equipment or supplies to aid with the removal or installation of units or equipment. The government will provide restroom facilities for workers within regular business hours.

5.0 Deliverables / Schedule

Any additions or substitutions must be submitted in writing to the Contract Officer with Justification and reasoning for addition or substitution. Submittals will be discussed and approved/denied in no more than eight working days after submittal date. The buildings will be occupied during this install. A 72 hours’ notice is required: prior to start work; for any utility disconnection period; and prior to entering building. As the building may be occupied, any open-air areas within the workspace shall be mitigated by coverings that meet standard industry and construction standards/practice.

Submittals: Construction timeline a minimum of 3 workdays prior to start of work. Copy of contractor’s relevant licenses.

Copy(s) of Structural survey(s) and recommendation of substructure repair items to be approved/rejected to COR/CO.

Copies of manufacturers information to or exceed contract specifications.

Key Deliverables

Item No. Deliverable Objective Due 1 Submission of material Approval of flooring material must be submitted Prior to Installation 2 Proposed Project Plan Defining the responsibilities, timeline, risks and milestones of contract objectives. Ref. Subtask 4.1.3 No later than five (5) business days after contract award

3 Warranty/manufacturer information

Report documenting tasks & issues weekly. Ref Task 5.1

Prior to the contract closeout

Key Deliverables Item No.

Deliverable / Item Title

Description Frequency Reference Delivery Format

Due By

3 weekly Status Report

Weekly report documenting tasks and issues identified during the week

Once per week

Ref. SOO, Page 3, Section 4.2.1, Functional Tasks

Via email to

COR

The Friday of every week after contract award

4 Permits, License, Certifications

Proof of Permits, license and certifications obtained since date of contract award

Prior to start of work.

Ref. SOO, Page 6, Section 5.1.3, Call Order Report Details

Via email to

COR

No later than a week prior to start of work.

Insert Deliverables / Schedule Here

6.0 Travel

The Mt Taylor Smokey Circle site is located off I-40, exit # 85, in Grants NM. After exiting I40 W at exit #85 veer to the right. At the stoplight head straight onto Sante Fe Ave. Turn right onto First St, then at the stop sign for the intersection with E. Roosevelt Ave. Turn right. Within 0.15 miles, turn left on University Blvd then an immediate right through the gate to get onto Smokey Circle.

7.0 Contractor’s Key Personnel

Crew Foreman- Must be certified and licensed.

Flooring Crew

8.0 Security Requirements

N/A

9.0 Data Rights

10.0 Section 508 – Electronic and Information Technology Standards

Attachment

Project
General Information
1.0 Scope of Work (Base)
2.0 Background
Contractor Requirements
3.0 Technical Requirements / Tasks
4.0 Government Furnished
5.0 Deliverables / Schedule
6.0 Travel
7.0 Contractor’s Key Personnel
8.0 Security Requirements
9.0 Data Rights
10.0 Section 508 – Electronic and Information Technology Standards
Attachment

File details come from the government source that posted it. Updated .