About this file

This document is a draft Request for Information (RFI) for the Strategic Missile Integration Complex (SMIC) at Hill Air Force Base, Utah. The SMIC supports testing and integration for the Intercontinental Ballistic Missile (ICBM) Minuteman III weapon system.

The RFI aims to identify potential sources to provide operations and maintenance support for the SMIC, which includes performing weapon system and subsystem testing, anomaly investigation, and life extension research. The government is seeking information on the contractor's experience with ICBM assets and testing, resource planning, procurement and maintenance of equipment and tools, and transition planning. The RFI notes the government is considering an Indefinite Delivery Indefinite Quantity (IDIQ) contract with separate task orders. Proposed contract types and pricing arrangements are requested. The solicitation is being conducted by the Department of the Air Force Materiel Command Nuclear Weapons Center.

View the file

Other files

File Type Posted
Strategic Missile Integration Complex RFI.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DRAFT

Strategic Missile Integration Complex (SMIC) Request For Information (RFI)

18 April 2024

AFNWC/NME

6054 Dogwood Ave, Hill AFB

REQUEST FOR INFORMATION

SECTION 1: DESCRIPTION OF SERVICES

1.1. INTRODUCTION

1.2. BACKGROUND

1.3. OBJECTIVES

1.4. SCOPE

1.5. PERIOD OF PERFORMANCE

1.6. REQUIREMENTS

1.7. TECHNICAL SUPPORT

1.8. EQUIPMENT

1.9. TESTING

SECTION 2: GENERAL INFORMATION

2.1. SAFETY REQUIREMENT

2.2. SECURITY REQUIREMENT

2.3. PHYSICAL SECURITY REQUIREMENTS

2.4. HOURS OF OPERATION

2.5. QUALITY CONTROL

2.6. QUALITY ASSURANCE

2.7. ENVIRONMENTAL CONTROLS

2.8. TRAINING

2.9. KEY PERSONNEL

2.10. SPECIAL QUALIFICATIONS

2.11. ASSOCIATE CONTRACTOR AGREEMENT

2.12. CYBERSECURITY

2.13. PROGRAM PROTECTION PLAN

2.14. CONTINUATION OF ESSENTIAL DOD CONTRACTOR SERVICES DURING CRISIS

2.15. TRANSITION PLAN

2.16. PHASE OUT/FOLLOW-ON

2.17. DATA RIGHTS

2.18. SCIENTIFIC TECHNICAL INFORMATION

SECTION 3: SECTION III: GOVERNMENT PROPERTY

3.1. GOVERNMENT PROPERTY AND SERVICE

SECTION 1: DESCRIPTION OF SERVICES

1.1. INTRODUCTION

1.1.1. The contractor shall provide all personnel, technical expertise, weapon system testing, maintenance, tools, materials, supervision, non-personal services, and others as defined in this document. The contractor shall perform to the standards in this document.

1.2. BACKGROUND

1.2.1. The Strategic Missile Integration Complex (SMIC) primary mission is to support the Air Force Nuclear Weapons Center (AFNWC) portfolio for simulated testing of the Minuteman III (MMIII) Intercontinental Ballistic Missile (ICBM) weapon system. The SMIC provides a test environment for system integration and operational testing of procedural changes, hardware and software modifications and upgrades to the ICBM weapon system. The SMIC can perform system test and anomaly investigations without affecting the alert status of the fielded weapon system. The SMIC provides in-depth analysis and test capability with specialized test equipment for the Minuteman III (MMIII) ICBM weapon system. In support of this mission, the contractor shall conduct Operation and Maintenance (O&M) support, engineering and testing services, and technical support on behalf of the AFNWC MMIII Systems Directorate (SD) at Hill Air Force Base (HAFB) Utah and support limited testing at the missile wing as directed. The primary focus of the SMIC is to support fielded ICBM weapon systems. For the purposes of this document, the term ICBM constitutes all AFNWC portfolio programs. Non-ICBM programs are not part of the AFNWC portfolio. The SMIC facilities include a Minuteman A-Modified Integration Facility (MAMIF) Launch Facility (LF), Minuteman Electronic Integration Facility (MEIF) LF, B-System LF (in caretaker status), Minuteman A-Modified Integration Facility (MAMIF) Launch Control Center (LCC), and Minuteman Electronic Integration Facility II (MEIF II) LCC, as well as multiple laboratories, work areas, and office spaces throughout buildings 1203, 1204, 1538, and 1540.

1.3. OBJECTIVES

1.3.1. The contractor shall provide O&M support at the SMIC and will support ICBM test workloads through the details addressed in this document.

1.3.2. The contractor shall provide Technical Data Packages (TDP) as addressed in this document.

1.4. SCOPE

1.4.1. The SMIC assesses modifications to ICBM systems prior to fielding to ensure replacement systems meet weapon system specifications as authorized and directed by AFI 63- 101 Integrated Life Cycle Management.

1.4.2. Contractor services to be performed at SMIC include:

• Operate and maintain SMIC weapon system equipment, test laboratories and test support equipment.

BURRESS, HOLLY R CTR USAF AFMC AFNWC/NMET

I think most of the actual maintenance on facilities has to be done by CE still right?

SABIN, MICHAEL K CIV USAF AFMC AFNWC/NMET

Yes

BURRESS, HOLLY R CTR USAF AFMC AFNWC/NMET

Do we also need to add facility management and equipment custodians or is that part of O&M.

SABIN, MICHAEL K CIV USAF AFMC AFNWC/NMET

Part of O&M

• Review test plans and directives

• Schedule and conduct tests and provide associated reports

• Recommend test equipment replacements or upgrades

• Design and perform upgrades to unique test equipment as required

• Integrate and/or install test equipment and systems

• Perform fabrication tasks associated with testing and maintenance

• Perform configuration management associated with test stand and facilities

• Develop and deliver technical data

• Procure equipment for new capabilities or needed replacements as directed.

• Perform cybersecurity for all assigned systems and facilities

• Provide financial reporting

• Provide performance and cost reporting

• Coordinate calibration of equipment through Precision Measurement Equipment

Laboratory (PMEL) Designated Equipment Custodian

• Perform equipment custodian responsibilities for accountable property

• Provide secured area escorting personnel for visitors

• Facility maintenance Support

1.4.3. The contractor shall accomplish all tasks at SMIC and provide wing test support on a limited basis.

1.5. PERIOD OF PERFORMANCE

1.5.1. The proposed Indefinite Delivery Indefinite Quantity contract will have a fifteen-year ordering period and a sixteen-year performance period, with an option to extend services of the contract in accordance with FAR 52.217-8 for an additional 6-months at the end of the contract. The O&M effort will have a basic period of performance of five-years with 2 five-year options and a 6-month option to extend service at the end of the contract.

1.6. REQUIREMENTS

1.6.1. The contractor shall support SMIC workloads through approved task orders from the

CO.

1.6.2. SMIC sustainment efforts (e.g. maintenance tasks, equipment replacement) are funded and directed by Air Force Nuclear Weapons Center, Minuteman III Systems Directorate, Integration Division (AFNWC/NME) and testing tasks are funded and directed by AFNWC/NM.

Non-ICBM workloads will be funded by test customers for their individual tests. The contractor will be permitted to actively pursue additional SMIC workloads to keep test facilities fully employed. Non-ICBM workloads will be charged a maintenance factor to supplement SMIC maintenance costs. Cost proposals for non-ICBM customers shall be prepared as part of this work scope. Proposal preparation costs will be allowable and charged to non-ICBM customers.

1.6.3. Task orders for non-ICBM tests will be individually proposed by the contractor using established rates based on test customer Statement of Objectives or Statement of Work (SOO or SOW).

1.6.4. Maintenance factor funding collected will be used by the contractor to supplement O&M costs (e.g. equipment maintenance, lab labor and material, etc.).

1.6.5. The contractor shall track and control engineering changes to delivered drawings and technical data within a configuration management plan, regardless of the origin or the level of the change. Final, updated baseline for all delivered technical data and drawings shall be delivered six months prior to the end of the PoP.

1.7. TECHNICAL SUPPORT

1.7.1. The contractor shall provide technical support at the SMIC for accomplishing test equipment and weapon system facility maintenance, ICBM weapons system support, and conducting tests on ICBM and non-ICBM workloads.

1.7.2. Contractor shall maintain critical skills required to maintain and operate all SMIC equipment.

1.7.3. All technical support shall be IAW the latest versions of SMIC and MMIII Technical data packages.

1.7.4. Contractor shall provide support to include operating SMIC test equipment and conducting tests.

1.7.5. Contractor shall maintain SMIC test equipment conditions to be operationally available at least 95% of the time.

1.7.6. Contractor shall design and install replacement equipment or upgrades as approved and directed by the Contracting Office (CO) within the specified time to mitigate equipment downtime.

1.7.7. Contractor shall develop and maintain a SMIC Operations and Maintenance program.

1.7.8. Contractor shall establish and maintain the government approved plans including but not limited to: Safety, Security, Maintenance, Program Protection, Quality Assurance, and Training.

1.7.9. Technical support may also be performed by the contractor at other locations, as directed by the CO.

1.7.10. Test support for ICBM programs shall be IAW the latest versions of AFNWC Handbooks 99-1102, 99-1103, and 99-1104.

1.7.11. The contractor shall purchase necessary maintenance services from manufacturers of software and hardware for SMIC equipment and facility equipment that supports testing. The license shall include data rights per the instructions in the clauses of the contract.

1.7.12. If software updates are provided by the manufacturer, then software updates/maintenance agreements may be purchased by the contractor to allow continued use and support as required.

1.7.13. All hardware/software maintenance and service updates procured will directly support SMIC workload and will require approval from the CO when valued above $10,000.

1.7.14. Replacement hardware/software will be purchased for the government by the contractor as required to sustain equipment as part of the normal operation and maintenance of SMIC capabilities.

1.7.15. All hardware/software to be procured will directly support SMIC workload and will require justification to the CO prior to approval when valued above $10,000.

1.7.16. If contractor budgeted funds that include routine maintenance and equipment replacement costs become insufficient to meet maintenance requirements the contactor shall notify the CO. The CO will contact the AFNWC/NME representative to prioritize tasks. The CO will then inform the contractor of the established priorities.

1.7.17. Design, fabricate, repair, and maintain special test fixtures as required that are associated with test conduct.

1.8. EQUIPMENT

1.8.1. EQUIPMENT PURCHASES

1.8.1.1. Contractor shall procure parts and equipment to sustain operations at the SMIC under $250,000 and as directed by the Government.

1.8.1.2. Contractor shall provide a proposed spare parts and equipment list yearly to forecast SMIC sustainment requirements over an eight-year period (i.e., prior year, current year, two budget years, and four projected years) per AFMAN 63-143.

1.8.1.3. Contractor shall procure parts for repair or replacement of equipment at SMIC as directed by the Government.

1.8.1.4. The contractor shall provide dedicated personnel to support all SMIC material and equipment purchases and procurement activities. Support also includes equipment and material procurement tracking and reporting and direct support of SMIC equipment roadmaps and long-range equipment forecasts of future purchases.

1.8.2. EQUIPMENT CALIBRATION

1.8.2.1. The contractor shall ensure all measurement equipment used during testing is calibrated, or monitored by equipment that is calibrated.

1.8.2.2. Calibration shall be traceable to the National Institute of Standards and Technology (NIST) IAW Air Force T.O. 00-20-14.

1.8.2.3. The government will provide calibration services from Air Force Metrology and Calibration Program (AFMETCAL) Precision Measurement Equipment Laboratory (PMEL) at Hill Air Force Base.

1.8.2.4. Contractor shall monitor equipment calibration status and due dates on all SMIC equipment, fill out necessary requests for service, and transport equipment to and from AFMETCAL PMEL per the required calibration schedule, unless other arrangements are made prior to expiration of calibration.

1.8.2.5. Contractor is responsible for complying with equipment transportation requirements. If PMEL services are not available or the need to expedite support and mission requirements demand calibrated equipment, the contractor may obtain calibrated equipment with CO approval for any costs exceeding $20,000. Calibration costs will be paid for under O&M.

1.8.3. INVENTORY MANAGEMENT

1.8.3.1. For all items required to be on CA/CRL, SPRAM, or other accountable property systems of record, the contractor shall inventory and account for, per government requirements IAW FAR 52.245-1.

1.8.3.2. The contractor shall assist with maintaining the CA/CRL, SPRAM accounts including receiving training, accepting assistant equipment custodian appointments, requesting additions and deletions from equipment lists and assist with all other duties needed to maintain these accounts. The contractor shall also participate in all government inventories, asset related audits, and inspections of equipment.

1.8.3.3. The contractor shall maintain a list of all SMIC equipment and make inventory reports available to the government annually and upon request. The contractor shall identify all items with an initial procurement cost (or estimated current value) over $5,000 that should be included on the CA/CRL account. The contractor shall notify the Government of items that should be removed from the CA/CRL.

1.8.4. SHIPPING AND RECEIVING

1.8.4.1. The contractor shall be responsible for the receipt, transportation, storage, and handling of government equipment and materials.

1.8.4.2. Transportation of Government equipment may be accomplished by the contractor, commercial carrier or by Government vehicles as arranged by the contractor.

1.8.4.3. The contractor shall oversee handling of equipment transported to or from the

SMIC.

1.9. TESTING

1.9.1. At the direction of AFNWC/NME the contractor shall conduct testing at the SMIC for ICBM weapon systems and support equipment.

1.9.2. TEST SCHEDULE FORECASTING

1.9.2.1. The contractor shall meet weekly or as required with the SMIC MMIII Program Office to schedule and forecast maintenance, sustainment and engineering efforts, testing, and site visits. The contractor shall provide schedule forecasts for each weapon system facility and SMIC lab, weekly or as required to the SMIC MMIII program office.

1.9.2.2. The contractor shall maintain the SMIC schedule and manage resources to efficiently perform testing.

1.9.2.3. The contractor shall project and budget each PoP for sustainment tests, materials, and maintenance contracts based upon historical data.

1.9.2.4. An AFNWC/NME Test and Evaluation representative will set priorities when scheduling conflicts arise and will review all schedules for approval as required.

1.9.2.5. Prioritized tasks will also include third party maintenance support contracts and materials.

1.9.2.6. AFNWC/NME will provide final approval authority for all testing at the SMIC.

1.9.3. Test Plans and Reports

1.9.3.1. For SMIC unique equipment, the contractor shall develop test plans and reports according to AFNWC Handbooks 99-1102, 99-1103, and 99-1104.

1.9.3.2. The contractor shall review all test customers’ test plans, procedures, and configuration requests, and provide feedback to test customers.

1.9.3.3. The contractor shall provide test data, configuration files, and other related test outputs to the test customer and Test Management team.

1.9.4. TRAVEL

1.9.4.1. The contractor shall travel to technical symposiums, conferences, technical interchanges, etc., to communicate test capabilities to prospective customers.

1.9.4.2. The contractor shall travel to support maintenance and sustainment of SMIC equipment.

1.9.4.3. The contractor shall travel for government approved training.

1.9.4.4. The contractor shall travel to support Simulated Electronic Launch Minuteman (SELM) testing at the wings.

SECTION 2: GENERAL INFORMATION

2.1. SAFETY REQUIREMENT

2.1.1. The contractor shall provide support for Environment, Safety & Occupational Health (ESOH) during lab operations. The ESOH Officer shall maintain a Safety Plan that documents the contractor’s understanding and commitment to Occupational Safety standards and directives, and all other ESOH requirements.

2.1.2. The government reserves the right to utilize a third-party investigation team such as the Air Force Safety Center or independent contractor to investigate any ESOH related incidents or observations at SMIC. Resulting reports shall be coordinated with the CO to correct any findings.

2.2. SECURITY REQUIREMENT

2.2.1. The contractor shall comply with security requirements contained in National Industrial Security Program Operating Manual DoD 5220.22-M, DD Form 254, ICBMSD INSTRUCTION OI 16-01 Information Security Program Management, and NRC Orders EA-05-090.

2.2.2. Contractor shall maintain a classified hardware/document control database.

2.2.3. Contractor personnel performing work under this contract must:

2.2.4. Have appropriate security clearances per form DD254.

2.2.5. Be responsible for providing employees security training and briefings as required per form DD254.

2.2.6. Prepare proper paperwork for accessing Hill Air Force Base and receiving access badges.

2.2.7. RESTRICTED AREA BADGE (RAB)

2.2.7.1. For personnel who require unescorted access to SMIC secured areas. A RAB may also grant escort privileges for the SMIC.

2.2.8. ENTRY AUTHORIZATION LIST (EAL)

2.2.8.1. EALs may be used for personnel who require unescorted access to SMIC secured areas and are not permanent residents but visit regularly or for an extended period. For testing support EALs, the contractor is responsible to submit and coordinate EAL documentation specific to the test task order or test customer. Other test oversight organizations shall coordinate directly with MMIII program office for approval and EAL access.

2.2.9. The contractor shall perform all applicable system security tasks required to obtain and maintain initial or interim accreditations, including an Authority to Operate (ATO), ATO with Conditions, Interim Authorization to Test (IATT), Authorization to Connect (ATC), certificate of net worthiness, emergency action message (EAM) certification, Joint Interoperability Test Center (JITC) certification, and security test and evaluation (STE).

2.2.10. The contractor shall adhere to security requirements IAW DoDI 5200.48_DFAFI16- 1403, Controlled Unclassified Information, DoDM 5200.01V1_AFMAN 16-1404V1, Information Security Program: Overview, Classification & Declassification, DoDM 5200.01V2_AFMAN 16- 1404V2, Information Security Program: Marking of Classified Information, DoDM 5200.01V3_AFMAN 16-1404V3, Information Security Program: Protection of Classified Information, DoDM 5220.22V2_AFMAN 16-1406V2 AFMC Supplement, National Industrial Security Program: Industrial Security Procedures for Government Activities, AFI10-701, OPSEC, DODIO-2000.16V1_AFI10-245-O_AFMCSUP-O, Antiterrorism (AT) Program Implementation, 32 CFR Part 117, National Industrial Security Program Operating Manual (NISPOM), DoD 5200.2-R Personnel Security Program, AFI 31-120 Security Forces Systems and Administration, DD Form 254 DoD Contract Security Classification Specification, and applicable host Government activity Operation Instruction (OI)(s)/procedures.

2.3. PHYSICAL SECURITY REQUIREMENTS

2.3.1. SECURITY OFFICER (SO)

2.3.1.1. The contractor shall staff on-site SO to support Government directed security management IAW the PWS, the program DD-254, and AFNWC integrated security requirements.

2.3.1.2. The SO shall coordinate and support all SMIC AFNWC security requirements and responsibilities directly with MMIII security representatives.

2.3.2. The contractor shall be responsible for safeguarding all government property provided for contractor use. At the close of each work period, government facilities, property, and materials provided for contractor use shall be secured.

2.3.3. KEYS, LOCKS, AND KEYCARDS

2.3.3.1. All facility keys, locks, and key cards, hereafter referred to as keys, shall be provided by the government. The contractor supplied locks shall not be used except for filing cabinets, desks and areas containing only contractor owned or personal items.

2.3.3.2. Keys for secured areas shall be issued to individuals using form IMT 1207 to be checked out to the contractor on a daily basis.

2.3.3.3. The contractor shall establish and implement methods of ensuring that all keys issued to the contractor by the government are not lost or misplaced and are not used by unauthorized persons. No keys issued to the contractor by the government shall be duplicated.

The contractor shall develop procedures covering key control that shall be included in the quality assurance plan. Such procedures shall include turn-in of any issued keys by personnel who no longer require access to locked areas.

2.3.3.4. The contractor shall report the occurrences of a lost or duplicate key to the SMIC

SO.

2.3.3.5. The contractor shall be responsible for controlling access to all active secure controlled areas including buildings 1203, 1204, 1538, 1540, AMLF, B-LF and other controlled areas as designated in the DD254.

2.3.3.6. The contractor shall be responsible for responding to Intrusion Detection System (IDS) alarms and performing quarterly alarm checks that are coordinated and results reported to HAFB 75th IDS POC.

2.3.4. LOCK COMBINATIONS

2.3.4.1. The contractor shall establish and implement methods of ensuring that all lock combinations are not revealed to unauthorized persons.

2.3.4.2. The contractor shall ensure that lock combinations are changed when personnel having access to the combinations no longer have a need to know such combinations. These procedures shall be included in the contractor’s security Standard Operating Procedures.

2.4. HOURS OF OPERATION

2.4.1. NORMAL HOURS OF OPERATION

2.4.1.1. The contractor shall provide services during the SMIC work week. Work schedules shall remain flexible. The contractor is responsible for designating work hours for their employees but at a minimum shall be available as required by the AFNWC/NME according to the area assigned. This may vary depending on project or event. Work on non-scheduled workdays or before or after normal duty hours may be permitted to meet test customer needs and maintenance requirements of this document depending on availability of funding.

Alternative work schedules may need to be implemented to support unique testing needs of test customers.

2.4.2. RECOGNIZED HOLIDAYS

2.4.2.1. The contractor is not required to provide service on the following days: New Year’s Day, Martin Luther King Day, Presidents Day, Memorial Day, Juneteenth, Independence Day, Labor Day, Columbus Day, Veterans Days, Thanksgiving Day, and Christmas Day through New Year’s Day. If the holiday falls on Saturday, it is observed on Friday. If the holiday falls on a Sunday, it is observed on Monday.

2.4.3. EMERGENCY SERVICES

2.4.3.1. On occasion, the contractor may be required to respond to alarms in secured areas or support high priority operations outside of the normal duty hours described above.

2.5. QUALITY CONTROL

2.5.1. QUALITY CONTROL PROGRAM

2.5.1.1. In compliance with the clause entitled “Inspection of Services”, 52.246-5, the Contractor shall establish a complete Quality Control Program to ensure the requirements of this contract are provided as specified.

2.5.1.2. Contractor shall maintain the SMIC quality control plan and provide updates as required.

2.5.1.3. The contracting officer shall notify the contractor of acceptance or required modifications to the plan before contract start date. The contractor shall make appropriate modifications (at no additional cost to the government) and obtain acceptance of the plan by the contracting officer before the start of the first operational performance period.

2.5.1.4. After acceptance of the quality control plan the contractor shall receive the CO’s acceptance in writing of any proposed change to his QC program.

2.5.1.5. The contractor shall establish and maintain a test customer survey process and track results through the Quality Assurance Program Plan

2.5.1.6. The contractor shall establish and maintain a government approved configuration management program for GFE provided for contractor use and design of upgrades.

2.5.1.7. Modifications to equipment shall not be authorized without permission from the government. Changes/upgrades to equipment shall be tracked from beginning to completion.

2.5.1.8. The contractor shall document changes to Technical Data Packages and other drawings, operations and maintenance manuals, and standard operating procedures as applicable. The contractor shall maintain meeting minutes documenting approvals and ensure record of approving authority is documented.

2.5.1.9. The contractor shall coordinate and communicate test requirements and associated facility requirements with HAFB Civil Engineering, AFNWC/NWI Security and Safety, Fire Protection and AFNWC/NME to gain approval as required.

2.6. QUALITY ASSURANCE

2.6.1. The government shall evaluate the contractor’s performance by appointing a Contracting Officer Representative (COR) to monitor performance to ensure services are received.

2.6.2. The COR shall evaluate the contractor’s performance through on-site inspections of the contractor’s quality control program compliance and receipt of feedback from test customers or Air Force personnel.

2.7. ENVIRONMENTAL CONTROLS

2.7.1. COMPLIANCE WITH LAWS AND REGULATIONS

2.7.1.1. The contractor shall be knowledgeable of and comply with all applicable Interstate, Federal, State, and Local laws, regulations, and requirements regarding environmental protection. In the event environmental laws/regulations change during the term of this contract, the contractor is required to comply as such laws come into effect. If there is an increase or decrease in cost because of the change, the contractor shall inform the Contracting Officer pursuant to notice requirements and negotiate a modification to the contract.

2.7.2. MATERIAL STORAGE AND USE

2.7.2.1. The contractor shall follow manufacturer’s guidelines and professional recommendations for control of humidity, temperature, cleanliness, and materials handling.

This may include hazardous materials. The contractor shall work with and dispose of various hazardous materials in accordance with AFI 32-7086, Hazardous Material Management and locally developed operating instructions.

2.7.3. ENVIRONMENTAL AND HAZARDOUS MATERIAL MANAGEMENT

2.7.3.1. The contractor shall comply with Federal, State, and local environmental laws including HAFB Hazardous Waste Management Plan; AFI32-7086_HILLAFBSUP Hazardous Material Management; LMBP 91-06 Hazardous Materials Management Program; Air Quality:

HAFB Title V Operating Permit; LMBP 91-11, HAFB Clean Air Act Compliance Certification Program; HAFB instruction 48-106 Hazard Communication Program; HAFB Integrated Spill

2.7.3.2. Prevention, Control, and Countermeasures Plan Volumes 1 and 2. The contractor shall use the US Air Force EESOH-MIS at HAFB to track SMIC Hazardous Material inventory, usage, and authorization. The government does not acknowledge other systems for Hazardous Material management, including contractor managed systems. The Government shall provide support for contractor’s use of and verify contractor’s compliance to EESOH-MIS.

2.8. TRAINING

2.8.1. The contractor shall establish and maintain an employee training program to ensure employees are trained in safety, security, quality, operation and maintenance of weapon system and test equipment, systems engineering, Nuclear Certified Equipment, test conduct, and environmental management.

2.9. KEY PERSONNEL

2.9.1. Core contractor employees (key senior staff) shall have at least 10 years’ experience maintaining and/or testing on ICBM or other complex weapon system components and subsystems.

2.9.2. The Contractor must provide personnel that have experience with ICBM weapon systems maintenance and operations.

2.9.3. The Contractor shall certify employee qualifications and maintain a database of employee qualifications. Records shall be made available for Government review.

2.10. SPECIAL QUALIFICATIONS

2.10.1. The contractor shall provide qualified engineers, engineering specialists, programmers, and technicians. Contractor engineering staff shall provide critical skills to include electrical, mechanical, software or computer science, test, and systems engineering.

2.10.2. Engineers shall have a minimum of a Bachelor degree from an Accreditation Board for Engineering and Technology (ABET) accredited college in engineering, physics, mathematics, engineering technology or computer science.

2.10.3. The contractor must retain engineers that know and understand the theory of system tests, test stand operations and maintenance, and data acquisition.

2.10.4. The contractor must retain Engineering Specialists that are familiar with SMIC test stands or have a minimum of five years’ experience with ICBM systems, or have unique experience and capabilities such as designing, operating, maintaining, specifying and use of capabilities that are applicable to the SMIC’s workload.

2.10.5. Engineers shall be knowledgeable of SMIC facility interfaces for electrical power, air conditioning & heating, security, and safety systems to successfully meet requirements during design, integration and installation of proposed test/lab stand changes.

2.10.6. Technicians shall have a minimum of two years’ work experience in a technical field, be a high school graduate and have at least two years of college or four years equivalent experience in a scientific/technical field performing drafting, data collection, data organization and analysis, and technical document preparation necessary for use in technical studies and reports.

2.10.7. Program Managers shall possess as a minimum, a Bachelor degree from an accredited university and 10 years management experience.

2.11. ASSOCIATE CONTRACTOR AGREEMENT

2.11.1. The Contractor shall enter into Associate Contractor Agreements (ACA) for any portion of the contract requiring joint participation in the accomplishment of the Government’s requirement. The agreements shall include the basis for sharing information, data, technical knowledge, expertise, and/or resources essential to the sustainment of the MMIII weapon system which shall ensure the greatest degree of cooperation for the development of the program to meet the terms of the contract.

2.11.2. ACAs shall include the following general information:

• Identify the associate contractors and their relationships.

• Identify the program involved and the relevant Government contracts of the associate contractors.

• Describe the associate contractor interfaces by general subject matter.

• Specify the categories of information to be exchanged or support to be provided.

• Include the expiration date (or event) of the ACA.

• Identify potential conflicts between relevant Government contracts and the ACA;

include agreements on protection of proprietary data and restrictions on employees.

2.11.3. A copy of such agreement shall be provided to the Contracting Officer for review before execution of the document by the cooperating contractors.

2.11.4. The SMIC Contractor is not relieved of any contract requirements or entitled to any adjustments to the contract terms because of a failure to resolve a disagreement with an associate contractor.

2.11.5. Liability for the improper disclosure of any proprietary data contained in or referenced by any agreement shall rest with the parties to the agreement, and not the Government.

2.11.6. All costs associated with the agreements are included in the negotiated cost of this contract. Agreements may be amended as required by the Government during the performance of this contract.

2.12. CYBERSECURITY

2.12.1. The contractor shall ensure all DOD information systems maintain an appropriate level of confidentiality, integrity, authentication, nonrepudiation, and availability that reflect a balance among the importance and sensitivity of the information and information assets;

documented and resolves threats and vulnerabilities; the trustworthiness of users and interconnecting systems; the impact of impairment or destruction to the DOD information system; and cost effectiveness IAW Department of Defense Instruction (DODI) 8500.01, Cybersecurity.

2.12.2. The contractor shall perform all applicable system security tasks required to obtain and maintain initial and interim accreditations, including Authorization to Operate (ATO), Interim ATO, Interim Authorization to Test (IATT), Authorizations to Connect (ATC) certificate of net worthiness, emergency action message (EAM) certification, Joint Interoperability Test Center (JITC) certification, and security test and evaluation (STE).

2.12.3. The contractor shall conduct system accreditation with the Defense Security Service (DSS) IAW the DOD 5220.22-M and Supplement 1, National Industrial Security Program Operating Manual (NISPOM). [CDRL A101, DI-ADMN-80239, Information Systems Accreditation Documentation]

2.12.4. The contractor shall conduct Government-owned system security accreditation, documentation development, and testing based on DODI 8510.01, Risk Management Framework (RMF) for DoD Information Technology (IT) and DODI 8500.01, Cybersecurity.

2.12.5. The contractor shall assess changes to the accredited system, changed risks, or security related impacts.

2.12.6. The contractor shall develop, maintain, and make available updated artifacts to support DODI 8510.01, Risk Management Framework (RMF) for DoD Information Technology

(IT).

2.12.7. The contractor shall, with IA certified personnel, support System Security Working Groups (SSWG), Engineering Review Boards (ERB), Deficiency Review Boards (DRB), Risk Management Boards (RMB), and other meetings on an as needed basis and as determined by the Government.

2.12.8. The contractor shall evaluate change proposals, e.g., ECPs, task change proposals (TCP), configuration change proposals (CCP), waivers, and deviations. Evaluations shall address cost, schedule, performance, and Cybersecurity impacts/risks, and meet change board documentation requirements.

2.12.9. The contractor shall conduct and document security testing using Defense Information Systems Agency (DISA)-approved tools, guides, etc., IAW DODI 8500.01, Cybersecurity. Contractor personnel performing Cyber functions as defined in Department of Defense (DOD) 8570.01-M, Information Assurance Workforce Improvement Program, Table AP3.T1, shall satisfy both preparatory and sustaining DOD.

2.12.10. Cyber training and certification requirements per DODD 8570.01-M. Personnel performing privileged functions shall be certified at least to Information Assurance Technical (IAT) Level II (DOD 8570.01-M Table Ap3.T1). New contractor hires performing privileged access IA functions shall be required to already be compliant with DODD 8570.01-M, Information Assurance (IA) Training, Certification, and Workforce Management and DOD 8570.01-M for IAT Level II (not acquired at Government expense).

2.12.11. The contractor shall identify, design for, and implement detailed IA requirements, antitamper measures, red-black separation, and supply chain management. The contractor shall address the DODI 8500.01, Cybersecurity Implementation and Cyber controls.

2.12.12. CYBERSECURITY INFORMATION SYSTEM SECURITY MANAGER (ISSM)

2.12.12.1. The contractor shall provide an ISSM to manage and oversee SMIC’s approved lab networks, classified systems, and requirements IAW the PWS.

2.12.13. CYBERSECURITY INFORMATION SYSTEM SECURITY OFFICER (ISSO)

2.12.13.1. The contractor shall provide an ISSO to support and maintain SMIC’s approved lab networks, classified systems, and requirements IAW the PWS.

2.12.14. INFORMATION TECHNOLOGY (IT)

2.12.14.1. The contractor shall staff IT support to maintain SMIC’s approved networks, classified systems, and requirements IAW the PWS. The IT representatives shall integrate, support, and maintain new systems required to be implemented into SMIC’s approved systems and/or newly created and implemented systems.

2.13. PROGRAM PROTECTION PLAN

2.13.1. The contractor shall support the Government’s program protection planning, implementation, and sustainment. Included is program protection for the resources and facilities associated with the design, development, production, integration, assembly, certification artifact developments, test operation, sustainment, and retirement. Establish the appropriate administrative technical and physical safeguards to protect any and all Government data, to ensure its confidentiality, integrity, and availability. Provide for personnel security, information systems security, and physical security as mandated in the DOD 5220.22-M and Supplement 1, National Industrial Security Program Operating Manual (NISPOM) and defined in the applicable Department of Defense (DD) Form 254, Contract Security Classification Specification.

2.13.2. The contractor shall support internal setup and Government approval of classified computer processing, classified document control administration, personnel security clearance administration, processing incoming/outgoing classified and unclassified visits, and transmission security, including subcontractor facilities. The contractor shall provide support for capital improvements related to security (safes, alarms, entry controls, etc.), security education training, temporary duty to support program protection, cost of transporting classified components, and security equipment (secure terminal equipment (STE), computer hardware/software), as well as all security-related installation, operations, and maintenance.

2.13.3. The contractor shall develop and maintain a Program Protection Implementation Plan (PPIP) to ensure that critical technology and critical program information (CPI), including controlled unclassified information (CUI), are protected against deliberate and unintended compromise or disclosure IAW DODM 5200.1, DOD Information Security Program: Overview, Classification, and Declassification, DODI 5200.39, Critical Program Information (CPI) Protection within the Department of Defense, and Air Force Pamphlet (AFPAM) 63-1701, Program Protection Planning, and AFI 63-101, Integrated Life Cycle Management. The PPIP shall ensure program compliance with the MMIII Program Protection Plan and Security Classification Guides.

Should any of the ICBM plans not be available, the PPIP shall comply with all requirements of DODM 5200.1, DOD Information Security Program DODI 5200.39, AFPAM 63-1701, Program Protection Plan (PPP) and AFI 63-101 Integrated Life Cycle Management. When new guidance supersedes guidance listed here, the new guidance shall be followed.

2.13.4. The contractor shall perform all systems security engineering (SSE) tasks IAW MILHDBK-1785, Defense Acquisition Guidebook (DAG), AFPAM 63-1701, PPP, and the PPIP.

2.13.5. The contractor shall protect critical program information (CPI), technologies, systems, and resource assets, and assess protection threats and countermeasures to those CPI assets IAW the PPIP (PCO-approved version).

2.13.6. The contractor shall support Government Foreign Disclosure reviews and processes.

2.13.7. The contractor shall participate in the Minuteman System Safety Group (SSG) in conjunction with technical working groups when an applicable subsystem program is under consideration. Each working group shall be conducted IAW the SSG charter. The PPP shall be revised based on contractor PPIP and joint working sessions.

2.13.8. The contractor shall document and analyze all vulnerability attacks to ensure that the security controls in place provide the required protection and, where necessary, provide recommendations and direction to fortify Cyber controls. The contractor shall also coordinate with all necessary parties to assist in the execution of penetration and any/all other necessary system testing. The contractor shall provide recommendations to the Government based on relevant guidance and policy.

2.13.9. The contractor shall continuously ensure that all inspections, resolution of violations and/or abnormal events, authorizations, certifications, documents, and requirements to keep all systems continuously operational from a Cyber perspective are current, fully valid, and/or settled.

2.13.10. As needed, the contractor shall research and investigate all Cyber-related matters through relevant channels including, but not limited to: all facets of the DoD, Designated Approving Authority (DAA), National Security Agency (NSA), DISA, and all other relevant elements of the US Government at large.

2.13.11. In coordination with appropriate Government Information Technology (IT) specialists, the contractor shall ensure that all USCYBERCOM and other Information Assurance Vulnerability Advisories (IAVAs) are reviewed and complied with in a timely manner.

2.14. CONTINUATION OF ESSENTIAL DOD CONTRACTOR SERVICES DURING CRISIS

2.14.1. IAW DoDI 1100.22, this requirement is not considered mission essential.

2.15. TRANSITION PLAN

2.15.1. The Contractor shall develop a Transition Plan to ensure smooth transition for the

SMIC O&M.

2.16. PHASE OUT/FOLLOW-ON

2.16.1. The Government reserves the right to conduct site visits in all contractor operated facilities in conjunction with the solicitation of offers for any follow-on contracts. In the event a follow-on contract is awarded to other than the current Contractor, the current SMIC Contractor shall cooperate to the extent required to permit an orderly change over to the incoming contractor. With regard to the incoming contractor’s access to incumbent SMIC Contractor employees, a recruitment notice may be placed in each facility.

2.16.2. If there is a change in SMIC Contractor or if the operation reverts to total organic support, the outgoing SMIC Contractor shall provide the incoming contractor reasonable opportunities to observe, but not interact with, maintenance and testing as well as facility familiarization, not to include training, to the Government or the incoming contractor, whichever the case may be. During the phase-out period, the outgoing contractor shall be fully responsible for the continuation of all contracted services.

2.16.3. If there is a change in SMIC contractor, the outgoing SMIC contractor shall provide the incoming contractor reasonable opportunities to observe, the maintenance and testing as well as facility familiarization, to include operations and maintenance on all test equipment to the incoming contractor.

2.16.4. During the phase-out period, the outgoing contractor shall ensure for the continuation and completion of all contracted services.

2.17. DATA RIGHTS

2.17.1. All data developed, delivered, and/or otherwise provided in performance of this contract by the contractor and subcontractors shall be IAW with this section and the contract clauses.

2.17.2. The contractor shall cooperate with the Government during contract drafting for all task orders to ensure the proper data clauses are included in the contract and the Government owns and has unlimited rights and access to all data developed or modified by the contractor during execution of this contract.

2.17.3. The contractor shall ensure its subcontractors flow down the data rights requirements to their subcontractors.

2.17.4. The Contractor shall develop and deliver data IAW CDRLs and requirements contained within this PWS.

2.17.5. Technical data definition shall be as defined in Defense Federal Acquisition Regulation Supplement (DFARS) 252.227-7013(a)(14) and DFARS 252.227-7013(a)(15).

2.17.6. Computer Software shall be as defined in DFARS 252.227-7014(a)(4).

2.17.7. The Contractor shall provide the government appropriate License(s) to technical data or computer software IAW with CDRLs, 10 Untied States Code (USC) 2320, 10 USC 2321, Federal Acquisition Regulation (FAR) Part 7, FAR Subpart 27.400(a), and DFARS Part 227.

2.17.8. The Contractor shall develop and deliver noncommercial technical data using the following Data Rights Categories: Unlimited Rights, Government Purpose Rights, Limited Rights, Specifically Negotiated License Rights. The contractor shall develop and deliver noncommercial computer software using Data Rights Categories: Unlimited, Government Purpose Rights, Restricted Rights, and Specifically Negotiated License Rights.

2.17.9. The Government asserts unlimited/unrestricted rights to:

• Form, fit, and function technical data.

• Technical data necessary for installation, operation, maintenance, or training purposes (other than detailed manufacturing or process data) (including computer software documentation).

• Corrections or changes to technical data (including computer software documentation) furnished to the Contractor by the Government.

• Technical data (including computer software documentation) that is otherwise publicly available or has been released or disclosed by the Contractor or the subcontractor without restriction on further use, release or disclosure resulting from the sale, transfer, or other assignment of interest in the technical data to another or the sale or transfer of some or all of a business entity or its asset to another party.

2.17.10. The contractor shall develop and deliver technical data packages for all test sets and equipment. If any equipment is no longer used, notify CO to add/subtract necessary information.

2.18. SCIENTIFIC TECHNICAL INFORMATION

2.18.1. Refer to Department of Defense (DoD) Instruction 5230.24, Distribution Statements on Technical Documents, Enclosure 4, Table 5, identifies six (6) authorized distribution statements for Scientific and Technical Information (STINFO). The Contractor shall mark all technical data, regardless of media or form, with the appropriate STINFO markings (i.e., distribution statement, export control warning [if applicable], and destruction notice) as specified on the DD Form 1423-1, Contract Data Requirements List (CDRL).

2.18.2. For written or printed material, the STINFO markings shall appear in full text on the front cover/title page and the abbreviated markings shall appear on subsequent pages as specified in the CDRL. Distribution statements shall include all applicable “reasons” based on the contents of the document. The “date of determination” within each distribution statement shall reflect the date the CDRL was signed.

2.18.3. The Controlling DoD Office (CDO) shall review all technical data (e.g., technical reports, test reports, final summaries, and briefings) prior to finalization to ensure the correct STINFO markings (i.e., distribution statement, export control warning [if applicable], and destruction notice) are applied to all documents. A distribution statement designation is distinct from, and in addition to, a security classification marking applied in accordance with (IAW) DoD Manual 5200.01, Volume 2, DoD Information Security Program: Marking of Classified Information.

SECTION 3: SECTION III: GOVERNMENT PROPERTY

3.1. GOVERNMENT PROPERTY AND SERVICE

3.1.1. The Government shall provide items of material and property to the contractor for use in performance of this contract.

3.1.2. The contractor shall be responsible for the management of Government Furnished Property (GFP) and Government Furnished Equipment (GFE). Contractor shall ensure accurate and complete property management of GFP/GFE and shall provide reports. The contractor shall assess and help the AFNWC/NME determine the GFP/GFE (equipment, material, and information) required to perform all functions. Note: Each time a piece of equipment is added or deleted from the inventory; AFNWC/NME will not regularly issue a contract modification to provide an updated GFP list.

3.1.3. The contractor shall provide support for property/equipment management and additional property management support located on-site supporting Government Property and Service requirements IAW this PWS. The equipment/SPRAM manager responsibilities shall comply with DoDI 5000.64, DAFI 23-101 chapter 1, AFI 23- 101, and AFMAN 23-122

3.1.4. The AFNWC/NME will provide items of material, equipment, and property to the contractor for use in performance of this contract. ALL material, equipment and property located at SMIC is considered GFP/GFE unless otherwise documented and agreed upon by the AFNWC/NME. However, any item over $5,000, that is determined by the Contractor to be non-consumable, shall be documented in the GFP inventory, unless otherwise deemed trackable by AFNWC/NME policies. Items less than $5,000 may be added to the inventory if requested by the AFNWC/NME. The contractor shall maintain a list of all SMIC equipment that is in possession of the contractor under this contract and over the $5,000 threshold, unless deemed by the Contractor to be a consumable item.

3.1.5. The Contractor shall keep GFP/GFE inventories current. When an item of material, equipment, or property is added or removed, the list should be updated. The list shall be provided to the CO biannually.

3.1.6. The Government will provide Base support for the contractor in accordance with the provisions of this section. If warranted, and if the contractor has complied with the provisions of this section, an equitable adjustment will be made if the Government fails to provide base support when required.

3.1.7. Base support includes Government-controlled working space, material, equipment, and services. It includes, but is not limited to; fire protection, building maintenance, physical security, security system maintenance, and test equipment calibration. All Government property utilized by the contractor, shall be used in support of this contract and managed in accordance with the government property clauses.

3.1.8. The Government will retain management and possession of the SMIC equipment;

however, the contractor shall have stewardship responsibility and will be permitted to use the government equipment to accomplish tasks on this contract.

3.1.9. Unless otherwise stipulated in the contract, support shall be provided on a no-charge-for use basis and the value will be part of the government’s contract consideration.

3.1.10. The contractor agrees to immediately notify appropriate government officials of inadequacies, defective GFP, or non-availability of support stipulated by the contract schedule, together with a recommended plan for obtaining the required support. The Government agrees to determine (within 10 working days) the validity and extent of the involved requirement and the method by which it will be fulfilled (e.g. purchase, rental, lease, GFP, etc.).

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .