SF-1449__RFQ_Villa_Soamananamby_Roller_Gates_Security.docx
DOCX document 129 KB Posted
- Attached to
- Roller Gates Security Upgrade
- Solicitation number
- SMA10014Q0022
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SMA10014Q00022
| SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, & 30 |
| 1. REQUISITION NUMBER |
PR3630205
PAGE 1 OF
2. CONTRACT NO.
3. AWARD/EFFECTIVE
DATE
4. ORDER NUMBER
5. SOLICITATION NUMBER
SMA10014Q0022
6. SOLICITATION ISSUE DATE
08/28/2014
7. FOR SOLICITATION
INFORMATION CALL:
a. NAME Nirina Herman Edouard
b. TELEPHONE NUMBER(No collect calls) 034-20-352-11
8. OFFER DUE DATE/ LOCAL TIME
September 17, 2014 17:00
9. ISSUED BY CODE
| 10. THIS ACQUISITION IS |
| x UNRESTRICTED OR |
| |_| SET ASIDE:____ % FOR: |
American Embassy Antananarivo GSO/Procurement
| |_| SMALL BUSINESS |
| |_| WOMEN-OWNED SMALL BUSINESS |
Lot 207 A Andranoro Antehiroka Antananarivo, Madagascar
|_| HUBZONE SMALL
BUSINESS
|_| (WOSB) ELLIGIBLE UNDER THE WOMEN-OWNED
SMALL BUSINESS PROGRAM NAICS:
|_| SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
|_| EDWOSB
| |_| 8 (A) |
| SIZE STANDARD: |
11. DELIVERY FOR FOB DESTINAT-
TION UNLESS BLOCK IS
MARKED
|_| SEE SCHEDULE
| 12. DISCOUNT TERMS |
| |_| 13a. THIS CONTRACT IS A |
RATED ORDER UNDER
DPAS (15 CFR 700)
13b. RATING
14. METHOD OF SOLICITATION
|_| RFQ |_| IFB |_| RFP
| 15. DELIVER TO |
| CODE |
| 16. ADMINISTERED BY |
| CODE |
American Embassy Antananarivo Point Liberty Lot 207A Andranoro Antehiroka Antananarivo, Madagascar
Jennifer Empie, Contracting Officer American Embassy Antananarivo
17a. CONTRACTOR/
OFFERER
TELEPHONE NO.
CODE
FACILITY CODE
18a. PAYMENT WILL BE MADE BY
American Embassy Antananarivo Financial Management Office Pt Liberty, Lot 207A Andranoro Antehiroka Antananarivo, Madagascar
CODE
|_|17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN
OFFER
| 18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK | |
| BELOW IS CHECKED | |_| SEE ADDENDUM |
19.
ITEM NO.
20.
SCHEDULE OF SUPPLIES/SERVICES
21.
QUANTITY
22.
UNIT
23.
UNIT PRICE
24.
AMOUNT
Villa Soamananamby Roller Gates Security Upgrade
(Use Reverse and/or Attach Additional Sheets as Necessary)
25. ACCOUNTING AND APPROPRIATION DATA
26. TOTAL AWARD AMOUNT (For Govt. Use Only)
| |_| 27a.SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1, 52.212-4. FAR 52.212-3 AND 52.212-5 ARE ATTACHED. ADDENDA |
| x ARE |_| ARE NOT ATTACHED |
| |_| 27b.CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA |
| |_| ARE |_| ARE NOT ATTACHED |
| |_| 28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN ____ COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED HEREIN. |
| |_| 29. AWARD OF CONTRACT: REF. _________________ OFFER DATED ____________. YOUR OFFER ON SOLICITATION (BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS: |
| 30a. SIGNATURE OF OFFEROR/CONTRACTOR |
| 31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER) |
30b. NAME AND TITLE OF SIGNER (Type or print)
30c. DATE SIGNED
31b. NAME OF CONTRACTING OFFICER (Type or print) Jennifer Empie 31c. DATE SIGNED
| AUTHORIZED FOR LOCAL REPRODUCTION | STANDARD FORM 1449 (REV. 02/2012) | ||
| PREVIOUS EDITION IS NOT USABLE | Computer Generated | Prescribed by GSA - FAR (48 CFR) 53.212 |
19.
ITEM NO.
20.
SCHEDULE OF SUPPLIES/SERVICES
21.
QUANTITY
22.
UNIT
23.
UNIT PRICE
24.
AMOUNT
32a. QUANTITY IN COLUMN 21 HAS BEEN
|_| RECEIVED |_| INSPECTED |_| ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: _______________________________
32b. SIGNATURE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
| 32c. DATE |
| 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT |
REPRESENTATIVE
| 32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE |
| 32f. TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE |
32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE
| 33. SHIP NUMBER |
| 34. VOUCHER NUMBER |
| 35. AMOUNT VERIFIED |
CORRECT FOR
| 36. PAYMENT |
| 37. CHECK NUMBER |
| |_| |
| PARTIAL |
| |_| |
| FINAL |
|_| COMPLETE |_| PARTIAL |_| FINAL
38. S/R ACCOUNT NO.
| 39. S/R VOUCHER NO. |
| 40. PAID BY |
| 41.a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT |
| 42a. RECEIVED BY (Print) |
41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER
41C. DATE
42b. RECEIVED AT (Location)
| 42c. DATE REC’D (YY/MM/DD) |
| 42d. TOTAL CONTAINERS |
STANDARD FORM 1449 (REV. 2/2012) BACK
TABLE OF CONTENTS
Section 1 - The Schedule
· SF 1449 cover sheet
· Continuation To SF-1449, RFQ Number SMA10014Q0022, Prices, Block 23
· Continuation To SF-1449, RFQ Number SMA10014Q0022, Schedule Of Supplies/Services, Block 20 Description/Specifications/Work Statement
· Attachment 1 to Description/Specifications/Statement of Work, Government Furnished Property
Section 2 - Contract Clauses
· Contract Clauses
· Addendum to Contract Clauses - FAR and DOSAR Clauses not Prescribed in Part 12
Section 3 - Solicitation Provisions
· Solicitation Provisions
· Addendum to Solicitation Provisions - FAR and DOSAR Provisions not Prescribed in Part 12
Section 4 - Evaluation Factors
· Evaluation Factors
· Addendum to Evaluation Factors - FAR and DOSAR Provisions not Prescribed in Part 12
Section 5 - Offeror Representations and Certifications
· Offeror Representations and Certifications
· Addendum to Offeror Representations and Certifications - FAR and DOSAR Provisions not Prescribed in Part 12
SECTION 1 - THE SCHEDULE
CONTINUATION TO SF-1449
RFQ NUMBER SMA10014Q0022
PRICES, BLOCK 23
I. PERFORMANCE WORK STATEMENT
The purpose of this firm fixed price contract is to perform the Villa Soamananamby Roller Gates Security Upgrade, in accordance with Attachment 1. The contract type will be a firm fixed price. The price listed below shall include all labor, materials, insurance (see FAR 52.228-4 and 52.228-5), overhead, profit, and transportation. In consideration of satisfactory performance of all scheduled services required under this contract, the contractor shall be paid a firm fixed-price for each delivery.
II. PRICE:
CONTINUATION TO SF-1449
RFQ NUMBER SMA10014Q0022
SCHEDULE OF SUPPLIES/SERVICES, BLOCK 20
DESCRIPTION/SPECIFICATIONS/WORK STATEMENT
SEE ATTACHMENT 1
ATTACHMENT 1
1.0 PROJECT DESCRIPTION
1. Project Synopsis The project is described as “Security roller gates at Villa Soamananamby in Antananarivo, Madagascar``.
The Contractor should furnish all necessary materials, labor, transportation, equipment, investigation and supervision, etc. Work will performed within in fixed-price contract.
2. BACKGROUND
The US Embassy, Antananarivo has a requirement to upgrade the security system at Villa Soamananamby, to bring it to residence standard.
The Contractor shall provide all labor, material tools, equipment, supervision, unforeseen items and other related items required to complete the project as per scope of work, specifications and General contract conditions.
This project requires an experienced contractor to design and execute the job quickly.
Contractors are advised to visit the site, verify the existing site conditions to develop their proposal.
2.0 GENERAL CONDITIONS
1. Fixed-Price Proposal. The Contractor shall provide one fixed-priced Proposal for the complete Project that includes every aspect of the Work.
2. Specifications. The Work shall be governed by the US Embassy, Antananarivo, Madagascar. International Codes, which includes the National Fire Prevention Association (NFPA), International Building Code, International Mechanical Code, International Plumbing Code, and National Electric Code (NEC), also are applicable. Should there be a discrepancy between the US Embassy Specifications and the applicable Building Code, the more stringent of the two shall govern.
The Contractor is responsible for compliance with all Building Codes; Work not in compliance with the Codes shall be deemed to be unacceptable.
3. Execution. The Work shall be executed in a diligent and workmanlike manner in accordance with the negotiated fixed-price, this Scope of Work, the Project Schedule, International Building Codes, and the laws of the City of Antananarivo where applicable.
4. Work Hours. Unless otherwise agreed with COR or the Facility Manager, the Work shall be executed during normal Embassy work hours. Night, weekend or holiday work shall not be permitted except as arranged in advance with Facilities Management and COR. Embassy holiday schedule is available from Facilities Management or COR.
5. Safety. The Contractor shall be responsible for conducting the work in a manner that ensures the safety of employees and visitors to the Embassy, and the Contractor’s employees.
6. Workforce. The contractor shall provide all supervision, skilled and unskilled labor needed to perform the work. The contractor shall comply with Embassy security policy by being escorted while doing work within the residence and entering into it. Contractor escorts shall be in quantity sufficient to comply with RSO escort ratios for number of workers on the project. The contractor shall prepare requests to RSO for vetting of employees to get escort badges.
7. Subcontractors. Contractor shall be responsible for the conduct and workmanship of Subcontractors engaged in the Project, and for Subcontractors compliance with the terms of this Statement of Work. The Contractor is responsible for the behavior and workmanship of Subcontractors while on Consulate property.
8. Modification to Contract. The Contractor shall not incur any costs beyond those described in this SOW unless directed otherwise in writing by the Contracting Officer. Any work performed by the Contractor beyond this SOW without written direction from the Contracting Officer will be at the Contractor’s own risk and at no cost to the Consulate.
9. Stop Work. At any time during the Project, the Contracting Officer reserves the right to Stop Work for protection of employees or visitors, security, or any other reason at his/her discretion.
10. Submittals. The contractor is responsible to submit shop drawings prior to fabrication and release of any materials for the Facility Manager and COR Review and approval. The Facility Manager review, however, does not relieve of the contractor’s responsibility for the engineering work as to provide a complete working system.
11. Excavation and Utilities. The contractor is responsible to locate all existing utility lines prior to any excavation. Prior to disconnecting any existing utility services, the contractor is responsible to provide 48-hour advance notice to the COR.
12. Close-out. Prior to final acceptance, the contractor is to submit to the COR marked up drawings (As-Built) reflecting the work as constructed. The drawings shall be digitally submitted on a CD-ROM in both AutoCAD and PDF format.
13. Housekeeping. The contractor is responsible to clean up daily after working hours. Trash may not be accumulated on site and must be removed from the site daily and disposed of properly and legally in a landfill or government regulated dump or recycling center.
3.0 scope of work:
`` Security roller gates of Villa Soamananamby” the contractor shall be providing all materials, tools and equipment, labors, transportation, and supervision.
1. General Requirements
a. The contractor shall provide to the COR a project schedule showing start to completion of the security upgrades. The schedule is to include significant milestones in the submittal.
b. The Contractor shall provide to the COR a written description outlining details of the proposed installation with sketches or engineered drawings which indicate dimensions.
Shop drawings: After taking all necessary field measurements, submit complete fully dimensioned Shop drawings.
c. Contractor should provide list of materials and products specifications and MSDS to be used on the project.
d. Contractor should provide list of similar projects with all information. The contractor must be knowledgeable about and have had experience in dealing with civil work, electrical installation.
a. The contractor is responsible to dispose of the construction debris outside of the Compound. Include, but not limited to soils, demolition product, packing materials and scrap steel.
b. The contractor is responsible to properly layout and prepare for the security upgrade based on locations provided by RSO and FAC.
c. When pursuing the work, the contractor is to take extra care as not to damage existing structure.
d. All construction work will be in conformance with the following Codes:
f1) International Building Code, 2009 Edition plus the 2011 OBO International Code Supplement.
f2) International Plumbing Code, 2009 Edition plus the 2011 OBO International Code Supplement.
| f3) | International Mechanical Code, 2009 Edition plus the 2011 OBO International Code Supplement. |
| f4) | International Fire Code, 2009 Edition plus the 2011 OBO International Code Supplement. |
| f5) | National Electric Code, 2011 Edition plus the 2011 OBO International Code Supplement. |
F6) International Residential Code 2009 Edition plus the 2011 OBO International Code Supplement.
F7) National Fire Protection Association, NFPA 101 & NFPA 58 F8) ICC/ANSI A117.1-98 Accessible and Usable Buildings and Facilities F9) NECA 90 Recommended Practice for Commissioning Building Electrical Systems (ANSI) F10) NECA 1-2010 Standard Practice of Good Workmanship in Electrical Construction (ANSI) F11) IEEE C2-2012 National Electrical Safety Code (NESC)
A. SECURITY UPGRADE
The contractor is required to perform all work listed below for the security upgrade at Villa Mananamby and is required to investigate the right location for adequate structural support and ensure that their proposed work does not compromise the structural integrity of Villa Mananamby. The contractor should sketch or report the methods towards resolution before the work is done.
Below are the required upgrades;
1. Install security roller gates on the interiors of all accessible (12) exterior doors (5 ground level and 7 second level)
1- Security roller gates on all accessible (12) exterior doors
Contractor is required to install security roller shutters on the interiors of all accessible exterior doors. They are 12 exterior doors; 5 are at the ground level and 7 are at the second level.
All the roller shutters must be made of steel, pre-painted in white.
Contractor is required to do the following work;
· Install properly the steel roller shutter. Each must have a manual and electrical control operation, capable of folding/recoiling into shutter housing.
· Shutter must be properly aligned.
· Contractor is to make all necessary work for hiding motors and curtain rods.
· Make all necessary finishing work to shutter, walls, door jamb, etc. Work is not limited to painting, caulking.
The shutter housing must be properly installed and must be designed so as to prevent from an easy access to the house.
a. Preparation and protection of work area
Performing all the works shall not disturb any of the current structure (to include but not limited to walls, windows, lighting, fixtures).
Trash shall be removed on a daily basis and not allowed to accumulate on site. The work area shall be cleaned at the end of each day. The work area shall be cleaned free of debris prior to acceptable completion of the work.
The Contractor is responsible for covering all furniture or belonging in the area immediately adjacent to any work to prevent destruction or soiling of these items.
Bidding Contractors shall be allowed escorted access to the Villa to take measurements in order to determine price, equipment and time frame required for the completion of the installation.
b. Quality assurance
Upon completion of the works, inspection will be conducted by the US Embassy Quality Control to review the specification above and to test the alarm.
Technical specifications for painting work
1. Exterior Painting Paint surfaces as directed by the task order.
| (a) | Paint: This category includes coating systems materials, primers, emulsions, enamels, stains, sealers and fillers, and other applied materials whether used as prime, intermediate or finish coats. |
| (b) | Product Data: The Contractor shall submit manufacturer's technical information, label analysis, and application instructions to the COR for each paint material proposed for use, prior to starting work. The Contractor shall list each material and cross-reference specific coating and finish system and application as an attachment to the above submittal. The Contractor shall identify each material by the manufacturer's catalog number and general classification. |
| (c) | Single Source Responsibility: The Contractor shall provide primers and undercoat paint produced by the same manufacturer as the finish coats. |
| (d) | Material Quality: The Contractor shall provide the manufacturer's best quality trade sale type paint material. Paint material containers not displaying manufacturer's product identification are not acceptable. |
| (g) | Project Conditions: The Contractor shall not apply paint when the relative humidity exceeds 85 percent, or at temperatures less than 5 degrees F (3 degrees C) above the dew point, or to damp or wet surfaces. The Contractor shall apply paint only in temperatures that comply with the manufacturer's specifications. |
| (h) | Preliminary Examination: The Contractor shall examine substrates and conditions under which painting will be performed for compliance with requirements and shall not begin application until unsatisfactory conditions have been corrected. |
Preparation:
| (i) | The Contractor shall clean and prepare surfaces to be painted following the manufacturer's instructions before applying paint or surface treatments. This preparation includes removal of oil, dust, and direct, loose rust, mildew, peeling paint or other contamination to ensure good adhesion. In some cases, the Contractor may be requested to remove all existing coats of paint and sealers if prior paint application is showing signs of improper adhesion, such as peeling, chipping, etc. All surfaces must be clean and dry. The Contractor shall schedule cleaning and painting so dust and other contaminants will not fall on wet, newly painted surfaces. |
| (ii) | The Contractor shall notify the Contracting Officer or COR of problems anticipated for any minor preparatory work required, such as but not limited to, filling holes, cleaning surfaces to be painted, and priming any requisite areas. Plan preparatory work as some areas will have holes or areas that will need to be primed or sealed. |
| (j) | Materials Preparation: The Contractor shall mix and prepare paint following the manufacturer's directions. |
| (k) | Application: The Contractor shall apply paint following the manufacturer's directions. Use applicators and techniques best suited for substrate and type of material being applied. Do not paint over dirt, rust, scale, grease, moisture, scuffed surfaces, or conditions detrimental to formation of a durable paint film. |
| (i) | Unless otherwise specified, the Contractor shall use a high quality oil based paint (containing no lead or mercury). The Contractor shall provide samples of the color on sample of the type of material to be painted before actual paint date is scheduled. |
| (ii) | The Contractor shall provide finish coats that are compatible with primers used. |
| (iii) | The number of coats and film thickness required is the same regardless of application method. The Contractor shall not apply succeeding coats until previous coat has cured. The Contractor shall sand between applications where required to produce a smooth, even surface. |
| (iv) | The contractor shall apply additional coats when undercoats or other conditions show through final coat, until paint film is of uniform finish, color, and appearance. |
| (l) | Scheduling Painting: The Contractor shall apply the first coat to surfaces that have been cleaned, pretreated or otherwise prepared for painting as soon as practicable, and before subsequent surface deterioration. Allow sufficient time between successive coats to permit proper drying. Do not recoat until paint has dried. |
| (m) | Minimum Coating Thickness: The Contractor shall apply materials at the manufacturer's recommended spreading rate. The Contractor shall provide a total dry film thickness of the system as recommended by the manufacturer. |
| (n) | Prime Coats: Before application of finish coats, the Contractor shall apply a prime coat as recommended by the manufacturer to material required to be painted or finished, and which has not been prime coated. |
(o) Brush Application: The Contractor shall brush-out and work brush coats into surfaces in an even film. The Contractor shall eliminate cloudiness, spotting, laps, brush marks, runs, sags, ropiness, or other surface imperfections. The Contractor shall draw neat glass lines and color breaks.
The Contractor shall apply primers and first coats by brush unless manufacturer's instructions permit use of mechanical applicators.
(p) Mechanical Applications: The Contractor shall use mechanical methods for paint application when permitted by manufacturer's recommendations, governing ordinances, and trade union regulations.
Wherever spray application is used, the Contractor shall apply each coat to provide the equivalent hiding of brush-applied coats. The Contractor shall not double-back with spray equipment building-up film thickness of two coats in one pass, unless recommended by the manufacturer.
| (q) | Upon completion of painting, the Contractor shall clean the glass and paint-spattered surfaces. The Contractor shall remove spattered paint by washing, scraping or other proper methods, using care not to scratch or damage adjacent finished surfaces. |
| (r) | The Contractor shall remove temporary protective wrappings after completion of painting operations. |
Inspection:
Contractor should have their own Quality control. The contractor QC should inspect the work prior US Embassy Quality Control representative inspections.
Inspection will be conducted by the US Embassy Quality Control to review the specification above and to check:
All the specified dimensions All the alignments, plumb parameters The quality of the finishing Test the operation of the alarm system.
4.0 PROJECT SCHEDULE
1. Commencement, Prosecution, and Completion of Work The Contractor shall be required to prosecute the work diligently, and (c) complete the entire work ready as per approved schedule. The time stated for completion shall include final cleanup of the premises.
5.0 RESPONSIBILITIES AND PROJECT MANAGEMENT
1. COR. A Contracting Officers Representative (COR) will be assigned to ensure quality assurance goals are met. The Contractor shall provide the COR access to the site at all times.
2. Point of Contact. The COR shall be the main point of contact for this Project. The Contractor shall report to the COR on (a) status of the Project, (b) changes in Schedule, (c) accidents and safety issues, (d) disruptions to elevator or utility services; and all other important information pertaining to the Project
3. English Speaking Representative. The Contractor shall provide an English-speaking representative on-site during all working hours with the authority to make all decisions on behalf of the Contractor and subcontractors.
4. Management Personnel. The Contractor shall staff the site, full-time, with a competent senior manager who shall perform project management. Remote project management is not an option. This individual shall keep a detailed photographic and written history of the project and shall update the Government weekly.
5. Site Security. The Contractor is responsible for on-site security as necessary to ensure no unauthorized access to their work sites. The Contractor is 100% responsible for securing their working materials and equipment. Any damage to facilities or infrastructure, which happens due to a lack of security, will be the responsibility of the Contractor to correct.
6. Contractor’s Temporary Work Center. The Contractor will be permitted to use a designated area within the contract limits for operation of his construction equipment and office if warranted. If directed by the Contracting Officer, the Contractor shall not receive additional compensation to relocate his operations. The Contractor is responsible for obtaining any required additional mobilization area above that designated. On completion of the contract, all facilities shall be removed from the mobilization area within 5 days of final acceptance by the Contractor and shall be disposed of in accordance with applicable host government laws and regulations. The site shall be cleared of construction debris and other materials and the area restored to its final grade. The Contractor is responsible for maintaining this area in a clear orderly manner.
7. Health and Safety. The Contractor shall be solely responsible for risk assessments, managing health, and safety issues associated with this project. The Contractor must provide cold water to all workers at the job sites. Based on hazard assessments, Contractors shall provide or afford each affected employee personal protective equipment (PPE) that will protect the employee from hazards. At a minimum PPE shall consist of eye protection, hard hats, and closed toe shoes. If the workers arrive on-site with sandals or athletic shoes, the Contractor is expected to provide rubber boots to them or send them home. All construction workers and management personnel must wear hard hats at all times on the construction sites. Contractor provided rubber boots and rubber gloves shall be worn when working around concrete placement. Other PPE such as gloves, dust masks, air respirators (sewage work) are also recommended. These items must be provided at the Contractor’s expense. Workers may use discretion if they feel unsafe in using the equipment in a hostile environment. Any worker at an elevated location above 4 meters, with the exception of a portable ladder, must be provided and utilize a safety harness.
The Contractor is responsible for initiating and maintaining a safety and health program that complies with the safety regulations of the Embassy, as well as those established by ANSI, and OSHA.
Each employee is responsible for complying with applicable safety and occupational health requirements, wearing prescribed safety and health equipment, reporting unsafe conditions/activities, preventing avoidable accidents, and working in a safe manner.
Safety and health programs, documents, signs, and tags shall be communicated to employees in a language that they understand.
The Contractor shall prepare and implement an Activity Hazard Analysis (AHA) prior to the start of work.
The Contactor must have a competent person on-site for inspection of equipment, training workers in the safe use of equipment and the recognition of hazards related to their use, supervision, and identifying and correcting unsafe work practices for high hazard work, such as working at heights that require fall protection.
The job hazards for this project are listed below with the control method requirements:
· Use of scaffolding at elevated heights
| Job steps |
| Potential hazards |
| Safe action or procedure |
| Setting Up Scaffolding |
| Struck by falling scaffolding |
| A scaffold competent person shall supervise the erection, alteration, moving, or dismantling of scaffolding. |
Get help with getting heavy/bulky items to elevated levels.
Keep tools, equipment extension cords, ropes, out of walk ways.
| Improper set-up |
| Scaffolding shall be constructed in conformance with the requirements of manufacturer. |
Before scaffolding is designed or erected, the work area shall be analyzed to identify existing hazards (overhead lines, elevated temperatures, structural stability, soil condition, etc.) that could affect personnel as they erect, alter, move, or dismantle, or work on scaffolding.
Install scaffolding with at least 2 people.
Install scaffolding per manufacturers’ requirements.
| 2. Climbing Up the scaffolding |
| Struck by falling scaffolding |
| Each employee who performs work while on a scaffold (scaffold user) shall be trained by a scaffold competent person qualified to recognize the hazards associated with the type of scaffold being used. |
Inspect scaffolding on a regular basis.
| Fall Injury self |
| Only use scaffolding for its intended purpose. |
Fall injury others Provide a safe means of access.
Properly plank /deck working surfaces.
Do not climb scaffold frame. Do not remove rails or bracing. Do not move scaffolding. Always close the hatch when entering a new level.
Fall protection is required if working above 6 feet.
Maintain three points of contact while on climbing.
Do not allow others to be standing around the scaffolding when not needed.
| 3. Working while on the scaffolding |
| Fall Injury self |
Fall Injury Others
Dropped objects can injure or kill persons below A scaffold competent person shall inspect scaffolding before each work shift, when the scaffold is to be used, and before work resumes after the scaffold has been altered or moved. The inspection shall be documented on a Scaffold Inspection Tag that is attached to the scaffolding.
Fall protection is required if working above 6 feet.
Look before you walk.
Maintain three points of contact while on climbing.
Do not allow others to be standing around the scaffolding when not needed.
Keep 2 feet on the working surface at all times. Keep body center of gravity inside. Do not rely on end rails or diagonals for support.
No more than 2 persons per tower occupancy.
The workers located above shall be careful. Rope off area below as NO ACCESS when working above.
Personal Protective Equipment (PPE) Requirements:
Fall Protection
Scaffolds shall be equipped with a standard guardrail or other fall protection systems.
For workers erecting and dismantling scaffolds, an evaluation shall be conducted by a Competent Person for fall protection to determine the feasibility and safety of providing fall protection. If fall protection is not feasible, an Activity Hazard Analyses detailing rationale for infeasibility of use of fall protection shall be submitted and accepted by the POSHO.
· Use of step ladders
| Job steps |
| Potential hazards |
| Safe action or procedure |
Inspecting and wearing proper PPE
Falling
Particles in eye Ensure slip resistant closed toed, even sole, clean and sturdy shoes are worn.
Ensure that employees are wearing safety glasses.
Ensure that employees are wearing PPE including full length trousers, safety shoes, safety gloves and hearing protection.
Visually/Manually Select a Ladder
| Falling, injury |
| Visually review the ladders for style, size, duty rating and materials. Portable step ladders are usually recommended when you need a reach of two to eight feet. |
Select ladder that is the right size or length. A ladder that is generally long enough when it provides access to work area without necessitating standing on the top two steps of a step ladder.
Ladders selected must be sufficient for the weight of the employee plus the weight of any tools and materials.
Review the duty rating on the side of the ladder.
Fiberglass has become the best choice material for ladders.
Do not use a metal ladder when working on or near electrical equipment.
Wood ladders are not authorized.
| Transporting a ladder by lifting and carrying |
| Muscle strain injuries to self and others from losing control of ladder |
Property damage Use proper lifting technique.
Ask for help if the ladder is too heavy or over 6 feet in length.
Bend at the knees and lift ladder with your leg muscles instead of your back muscles.
Limit turning and twisting motions while carrying the ladder. This may cause a back injury.
Maintain control of ladder by firmly gripping the ladder.
Devote constant attention to the area traveled to avoid striking property or other people.
Always carry step ladders in the closed position.
| Visually / Manually Inspect Ladder before use |
| Lacerations, muscle strain |
| Check the stability of the ladder. |
Check joints between step and side rails in insure they are tight.
Insure that rungs are clean and free of grease and oil.
Check for loose, bent hinge or broken rungs.
Immediately remove damaged ladders from service, label them as “Out-of-Service” and notify the appropriate supervisor.
| Setting up the ladder |
| Injuries to self and others |
| Barricades and warning signs should be posted when ladders are placed near doors or other locations where they could be struck. |
Never place ladders on boxes, barrels, or other unstable bases for additional height.
Ladders must be placed on level surfaces.
Make sure that ladders are not blocking doorways and emergency routes.
Never use a step ladder on slippery surfaces.
Ensure the ladder is opened fully and ladder locks, spreaders or braces are engaged before climbing.
Never use a step ladder over 20 feet in length.
| Potential electrocution |
| Metal ladders are not used near electrical lines. |
| Climbing up ladder |
| Falling, Injury |
| Maintain three points of contact while on the ladder. |
Do not over-reach, jump or slide a ladder while on it.
Always face the ladder and use both hands while ascending and/or descending.
Tools or materials should be raised by means of a rope after the climber has reached the working position. Carrying heavy loads up or down ladders is prohibited.
Ladders should not be used by more than one person at a time.
Do not lean sideways out of the ladder’s width.
Always wear proper footwear; closed-toe, sturdy, and clean.
Perform job task
| Falling |
| Devote your individual attention to the work being performed. |
| Climbing down the ladder |
| Falling, Injury |
| Maintain three points of contact while on the ladder. |
Do not over-reach, jump or slide a ladder while on it.
Always face the ladder and use both hands while ascending and/or descending.
Do not lean sideways out of ladder’s width.
Always wear proper footwear; closed-toe, sturdy, and clean.
| Removing ladder, barricades and other equipment |
| Injuries to self and others from losing control of ladder |
Maintain control of the ladder by firmly gripping the ladder.
Devote constant attention to the area traveled to avoid striking property or other people.
Never leave tools or materials on the top of a step ladder.
| Storing ladder |
| Injuries to self and others by ladder falling |
| Ladders should be stored in a designated storage area |
| Personal Protective Equipment (PPE) Requirements: |
| Slip resistant even sole, closed-toe, sturdy and clean proper footwear |
Recommended – Safety glasses/goggles/hard hat based on job task
· Use of extension ladders
| Job steps |
| Potential hazards |
| Safe action or procedure |
Inspecting and wearing proper PPE
Falling
Particles in eye Ensure slip resistant closed toed, even sole, clean and sturdy shoes are worn.
Ensure that employees are wearing safety glasses.
Ensure that employees are wearing PPE including full length trousers, safety shoes, safety gloves and hearing protection.
Visually/Manually Select a Ladder
| Falling, injury |
| Visually review the ladders for style, size, duty rating and materials. |
Select ladder that is the right size or length. A ladder that is generally long enough when it provides access to work area without necessitating standing on the top two steps of a ladder.
Ladders selected must be sufficient for the weight of the employee plus the weight of any tools and materials.
Review the duty rating on the side of the ladder.
Fiberglass has become the best choice material for ladders.
Do not use a metal ladder when working on or near electrical equipment.
Wood ladders are not authorized.
| Transporting a ladder by lifting and carrying |
| Muscle strain injuries to self and others from losing control of ladder |
Property damage Use proper lifting technique.
Lifting and moving a 20foot extension ladder is a two person job.
Bend at the knees and lift ladder with your leg muscles instead of your back muscles.
Limit turning and twisting motions while carrying the ladder. This may cause a back injury.
Maintain control of ladder by firmly gripping the ladder.
Devote constant attention to the area traveled to avoid striking property or other people.
Always carry step ladders in the closed position.
Carry extension ladders parallel to the ground and hold the side rail in the middle.
| Visually / Manually Inspect Ladder before use |
| Lacerations, muscle strain |
| Check the stability of the ladder. |
Check joints between step and side rails in insure they are tight.
Insure that rungs are clean and free of grease and oil.
Check for loose, bent hinge or broken rungs.
Immediately remove damaged ladders from service, label them as “Out-of-Service” and notify the appropriate supervisor.
| Setting up the ladder |
| Injuries to self and others |
| Barricades and warning signs should be posted when ladders are placed near doors or other locations where they could be struck. |
Never place ladders on boxes, barrels, or other unstable bases for additional height.
Ladders must be placed on level surfaces.
Make sure that ladders are not blocking doorways and emergency routes.
Never use an extension ladder on slippery surfaces.
Ensure the ladder is opened fully and ladder locks, spreaders or braces are engaged before climbing.
Extension ladders should be tied off at the top, blocked, secured or held by a second worker when in use.
Ensure that sections of the ladder overlap enough to retain the strength of the ladder as follows:
−Ladders up to 36’ – 3 feet overlap −Ladders over 36’ to 48’ – 4 feet overlap − Ladders over 48’-60’ – 5 feet overlap Never splice or tie two ladders together.
Always inspect the area to make sure that it is free of electrical lines.
Observe the proper placement angle for your extension ladder.
The base of the ladder should be one-foot (1’) out from the wall for every 4 feet of height.
When using a ladder to access to a landing, it must extend 3 rungs or 3 feet above the landing.
Elevate and extend extension ladders only from the ground.
Metal ladders are not used near electrical lines
| Potential electrocution |
| Metal ladders are not used near electrical lines. |
| Climbing up ladder |
| Falling, Injury |
| Maintain three points of contact while on the ladder. |
Do not over-reach, jump or slide a ladder while on it.
If possible, have someone steady the ladder as you climb it.
Always face the ladder and use both hands while ascending and/or descending.
Tools or materials should be raised by means of a rope after the climber has reached the working position. Carrying heavy loads up or down ladders is prohibited.
Ladders should not be used by more than one person at a time.
Do not lean sideways out of the ladder’s width.
Always wear proper footwear; closed-toe, sturdy, and clean.
Perform job task
| Falling |
| Devote your individual attention to the work being performed. |
| Climbing down the ladder |
| Falling, Injury |
| Maintain three points of contact while on the ladder. |
Do not over-reach, jump or slide a ladder while on it.
Always face the ladder and use both hands while ascending and/or descending.
Do not lean sideways out of ladder’s width.
Always wear proper footwear; closed-toe, sturdy, and clean.
| Removing ladder, barricades and other equipment |
| Injuries to self and others from losing control of ladder |
Maintain control of the ladder by firmly gripping the ladder.
Devote constant attention to the area traveled to avoid striking property or other people.
Never leave tools or materials on the top of a ladder.
| Storing ladder |
| Injuries to self and others by ladder falling |
| Ladders should be stored in a designated storage area |
| Personal Protective Equipment (PPE) Requirements: |
| Slip resistant even sole, closed-toe, sturdy and clean proper footwear |
Recommended – Safety glasses/goggles/hard hat based on job task
· Use of paints
| Job steps |
| Potential hazards |
| Safe action or procedure |
| Open paint can |
| Puncture or cuts from screwdriver or can opener |
| Wear gloves; work with pointed/sharp tool edges pointed away from yourself. |
| Stir/mix/pour paint |
| Paint splashes in eyes/on skin |
Exposure to paint fumes Wear eye protection, gloves; work on level surfaces.
Work in well ventilated areas, consider wearing dust mask.
| Painting |
| Splashes in eyes / on skin |
Exposure to paint fumes
Skin irritation
Skin irritation to hands
Contamination of clothing Eye irritation Muscle strain from repetitive motion, reaching awkward positions Cuts from sharp tools (hand axe, paint scraper) Fire Wear eye protection, gloves; paint slowly to reduce splash.
Work in well ventilated areas, consider wearing dust mask.
Wear a respirator and other PPE as recommended on the MSDS.
Wear long-sleeved, loose fitting clothing that covers all exposed skin.
Wash exposed areas thoroughly with soap and water after handling.
Do not wash skin or hands with paint thinner or lacquer thinner, use hand cleaner.
Wear gloves that are impervious to paint and thinner Wash work clothes separately from other clothing; rinse washer after thoroughly after use.
Wear goggles that seal eyes from paint Take rest breaks as needed; position body minimize awkward movements
Wear gloves, keep blaze preparation toll under control at all times, cut away from yourself Properly store paints that may be combustible Properly dispose of dirty rags into airtight containers No smoking allowed in or around painting area or paint storage area Promptly clean up spills and leaks Keep combustibles away from ignition sources Keep fire extinguisher near painting operations
Personal Protective Equipment (PPE) Requirements:
Respirator Hand protection Eye protection Coveralls long-sleeved
The Contractor must have on hand paints MSDS during application.
· Use of grinding /welding machine
| Principal Steps |
| Potential Safety/Health |
Hazards Recommended Controls
| Check cord integrity. |
| Electrocution, burns |
| Wear leather gloves. |
Inspect before plugging in tool; take Out-of-service if damage is observed.
Check conditions of grinding wheel and appropriate RPM.
| None foreseen |
| Remove damaged wheels from service |
| Check grinding wheel tightness. |
| Hand injury from inadvertent starting |
| Do not plug in the machine until inspection |
is complete.
Verify the guard is tight and appropriate for the job.
| Foot injury from dropping the tool; hand injury |
| Tighten or install appropriate guard. |
| Verify the appropriate handle location. |
| Foot injury from dropping the tool |
| Change handle location based upon user |
Inspect trigger for physical damage and proper operation.
None foreseen
Make sure the materials being ground are adequately secured and positioned correctly Injuries associated with the work propelled by the grinder and/or landing on you Verify the work is adequately secured by trying to dislodge it with a gloved hand (the work weight may secure it enough).
8. Progress Payments. There will be no progress payments. The contractor will request final lump sum payment upon completion of the project. Final completion means that all punch list items have been corrected and that the project is 100% complete.
SECTION 2 - CONTRACT CLAUSES
52.2522 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):
http://acquisition.gov/far/index.html or, http://farsite.hill.af.mil/search.htm
These addresses are subject to change. If the Federal Acquisition Regulation (FAR) is not available at the locations indicated above, use the Dept. of State Acquisition Website at http://www.statebuy.state.gov to see the links to the FAR. You may also use an Internet “search engine” (e.g., Yahoo, Excite, Alta Vista, etc.) to obtain the latest location of the most current FAR.
FEDERAL ACQUISITION REGULATION (48 CFR CH. 1)
Clause Title and Date
| 52.204-9 | PERSONAL IDENTIFICATION VERIFICATION OF CONTRACTOR PERSONNEL (JAN 2006) | |
| 52.209-6 | Protecting the Government's Interest When Subcontracting with | |
| Contractors Debarred, Suspended, or Proposed for Debarment | ||
| (SEP 2006) | ||
| 52.213-4 | Terms and Conditions-Simplified Acquisitions (Other than Commercial | |
| Items) (JUN 2010) |
52.222-1 Notice to the Government of Labor Disputes (FEB 1997) 52.222-19 Child Labor – Cooperation with Authorities and Remedies (AUG 2009)
52.222-50 COMBATING TRAFFICKING IN PERSONS (FEB 2009)
52.225-10 Notice of Buy American Act/Balance of Payments Program—
| Construction Materials (FEB 2000) | |||
| 52.225-13 | Restrictions on Certain Foreign Purchases (JUN 2008) | ||
| 52.225-14 | Inconsistency Between English Version and Translation of | ||
| Contract (AUG 1989) | |||
| 52.228-4 | Workers’ Compensation and War-Hazard Insurance Overseas (APR 1984) | ||
| 52.228-5 | Insurance - Work on a Government Installation (JAN 1997) | ||
| 52.228-11 | Pledges of Assets (SEP 2009) | ||
| 52.228-13 | Alternative Payment Protection (JUL 2000) | ||
| 52.229-6 | Taxes - Foreign Fixed-Price Contracts (JUN 2003) | ||
| 52.232-5 | Payments under Fixed-Price Construction Contracts (SEP 2002) | ||
| 52.232-8 | Discounts for Prompt Payment (FEB 2002) | ||
| 52.232-11 | Extras (APR 1984) | ||
| 52.232-18 | Availability of Funds (APR 1984) | ||
| 52.232-24 | Prohibition of Assignment of Claims (JAN 1986) | ||
| 52.232-27 | Prompt Payment for Construction Contracts (OCT 2008) | ||
| 52.232-34 | Payment by Electronic Funds Transfer – Other than Central Contractor Registration (MAY 1999) | ||
| 52.233-1 | Disputes (JUL 2002) Alternate I (DEC 1991) | ||
| 52.233-3 | Protest after Award (AUG 1996) | ||
| 52.236-2 | Differing Site Conditions (APR 1984) | ||
| 52.236-3 | Site Investigation and Conditions Affecting the Work (APR 1984) | ||
| 52.236-5 | Material and Workmanship (APR 1984) | ||
| 52.236-6 | Superintendence by the Contractor (APR 1984) | ||
| 52.236-7 | Permits and Responsibilities (NOV 1991) | ||
| 52.236-8 | Other Contracts (APR 1984) | ||
| 52.236-9 | Protection of Existing Vegetation, Structures, | ||
| Equipment, Utilities, and Improvements (APR 1984) | |||
| 52.236-10 | Operations and Storage Areas (APR 1984) | ||
| 52.236-11 | Use and Possession Prior to Completion (APR 1984) | ||
| 52.236-12 | Cleaning Up (APR 1984) | ||
| 52.236-14 | Availability and Use of Utility Services (APR 1984) | ||
| 52.236-15 | Schedules for Construction Contracts (APR 1984) | ||
| 52.236-21 | Specifications and Drawings for Construction (FEB 1997) | ||
| 52.236-26 | Preconstruction Conference (FEB 1995) | ||
| 52.242-14 | Suspension Of Work (APR 1984) | ||
| 52.243-4 | Changes (JUNE 2007) | ||
| 52.243-5 | Changes and Changed Conditions (APR 1984) | ||
| 52.244-6 | Subcontracts for Commercial Items (AUG 2009) | ||
| 52.245-9 | Use & Charges (JUNE 2007) | ||
| 52.246-12 | Inspection of Construction (AUG 1996) | ||
| 52.246-21 | Warranty of Construction (APR 1984) |
52.249-2 Termination for Convenience of the Government (Fixed-Price)
| (MAY 2004) Alternate I (APR 1984) | ||
| 52.249-14 | Excusable Delay (APR 1984) |
52.249-10 Default (Fixed-Price Construction) (APR 1984)
The following clauses are set forth in full text:
DEPARTMENT OF STATE ACQUISITION REGULATION (DOSAR) CLAUSES
652.204-70 DEPARTMENT OF STATE PERSONAL IDENTIFICATION CARD ISSUANCE PROCEDURES (AUG 2007)
(a) The Contractor shall comply with the Department of State (DOS) Personal Identification Card Issuance Procedures for all employees performing under this contract who require frequent and continuing access to DOS facilities, or information systems. The Contractor shall insert this clause in all subcontracts when the subcontractor’s employees will require frequent and continuing access to DOS facilities, or information systems.
(b) The DOS Personal Identification Card Issuance Procedures may be accessed at http://www.state.gov/m/ds/rls/rpt/c21664.htm
(End of clause)
CONTRACTOR IDENTIFICATION (JULY 2008)
Contract performance may require contractor personnel to attend meetings with government personnel and the public, work within government offices, and/or utilize government email.
Contractor personnel must take the following actions to identify themselves as non-federal employees:
1. Use an email signature block that shows name, the office being supported and company affiliation (e.g. “John Smith, Office of Human Resources, ACME Corporation Support Contractor”);
1. Clearly identify themselves and their contractor affiliation in meetings;
3) Identify their contractor affiliation in Departmental e-mail and phone listings whenever contractor personnel are included in those listings; and
4) Contractor personnel may not utilize Department of State logos or indicia on business cards.
(End of clause)
DOSAR 652.236-70 ACCIDENT PREVENTION (APR 2004)
(a) General. The contractor shall provide and maintain work environments and procedures which will safeguard the public and Government personnel, property, materials, supplies, and equipment exposed to contractor operations and activities; avoid interruptions of Government operations and delays in project completion dates; and, control costs in the performance of this contract. For these purposes, the contractor shall:
(1) Provide appropriate safety barricades, signs and signal lights;
(2) Comply with the standards issued by any local government authority having jurisdiction over occupational health and safety issues; and,
(3) Ensure that any additional measures the contracting officer determines to be reasonably necessary for this purpose are taken.
(4) For overseas construction projects, the contracting officer shall specify in writing additional requirements regarding safety if the work involves:
(i) Scaffolding;
(ii) Work at heights above two (2) meters;
(iii) Trenching or other excavation greater than one (1) meter in depth;
(iv) Earth moving equipment;
(v) Temporary wiring, use of portable electric tools, or other recognized electrical hazards. Temporary wiring and portable electric tools require the use of a ground fault circuit interrupter (GFCI) in the affected circuits; other electrical hazards may also require the use of a GFCI;
(vi) Work in confined spaces (limited exits, potential for oxygen less that 19.5 percent or combustible atmosphere, potential for solid or liquid engulfment, or other hazards considered to be immediately dangerous to life or health such as water tanks, transformer vaults, sewers, cisterns, etc.);
(vii) Hazardous materials – a material with a physical or health hazard including but not limited to, flammable, explosive, corrosive, toxic, reactive or unstable, or any operations which creates any kind of contamination inside an occupied building such as dust from demolition activities, paints, solvents, etc.; or
(viii) Hazardous noise levels.
(b) Records. The contractor shall maintain an accurate record of exposure data on all accidents incident to work performed under this contract resulting in death, traumatic injury, occupational disease, or damage to or theft of property, materials, supplies, or equipment. The contractor shall report this data in the manner prescribed by the contracting officer.
(c) Subcontracts. The contractor shall be responsible for its subcontractors’ compliance with this clause.
(d) Written program. Before commencing work, the…