SKU 0766.pdf
PDF 203 KB Posted
- Attached to
- MLRS Proof Load Pods
- Solicitation number
- W911RQ26QA017
About this file
This is a technical engineering drawing for a concrete reinforcing weldment component used in the MLRS (Multiple Launch Rocket System) Launch Pod. The drawing is designated SKU OT6G and is classified as Size D per FSC M (Drawing No. I8876).
The weldment specifies a concrete reinforcing structure with a circular cross-section measuring 7.00 inches in diameter maximum, constructed from steel per MIL-W-8611 welding specifications and identified per MIL-STD-130. The component features six equally spaced reinforcing rods (3/8 inch diameter) positioned at 56-degree angles around the structure. Overall dimensions indicate a length of 150.00 inches with three internal support sections spaced at 68.50 inches, 68.50 inches, and shorter sections marked as "S.5" throughout. The design includes mounting provisions with 1.00-inch spacing for attachment points. Manufacturing notes require removal of all burrs and sharp edges. The drawing was prepared by H.R.C., checked by an engineer, and approved by the U.S. Army Missile Command at Redstone Arsenal, Alabama, with a preparation date of 5 AUG 1983. The material specification references Steel PWS-1025 per QQ-S-637 standards.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SKU-0767 PROOF LOAD.PDF | ||
| Combined Synopsis for PODs.pdf | ||
| Proof Load RP DRAFT.pdf | ||
| SKU 0768 TACTICAL LOAD.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .