SJA800-16-Q-0006-A001_-_SF-30_and_Revised_Page_5.pdf
PDF 435 KB Posted
- Attached to
- Swimming Pool Canopy Sheet Replacement Services
- Solicitation number
- SJA800-16-Q-0006
- Issued by
-
Department of State US Embassy Tokyo
About this file
Amendment A001 - Standard Form 30 and Revised Page 5 of the Request for Quotations
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attached to Amendment A001
Request for Quotations (RFQ) No. SJA800-16-Q-0006
1.2 Continuation to SF-1449, Request for Quotations (RFQ) Number
SJA800-16-Q-0006, Block 20, Schedule of Supplies/Services
1.2.1 Scope of Work. The Contractor shall furnish and replace the canopy’s cover sheets with Contractor-furnished new ones for swimming pool located at the U.S. Embassy apartment compound (also known as Mitsui Housing Compound), 2-1-1 Roppongi, Minato-ku, Tokyo
106-0032, as described below.
1.2.2 General
(a) All work required under this contract shall be accomplished in accordance with Japan Architectural Specification Standard (JASS).
All work required under this contract shall be performed in a professional manner of the respective trade. The Contracting
Officer’s Representative (COR) and/or COR’s designee shall perform quality assurance and quality control (QA/QC) inspection on contracted work at-any-time basis. Any found deficiencies and/or discrepancies against contract work requirement and specifications shall be corrected accordingly by the Contractor at no additional cost to the U.S. Government.
(b) All materials and labor shall be furnished by the Contractor unless otherwise stipulated herein. Quality of all materials to be used for all required work shall meet or exceed Japan
Industrial Standard (JIS).
(c) The Contractor shall be responsible for keeping the work areas clean and neat. After completion of work, the Contractor shall clean the work areas in broom-clean conditions. The Contractor shall dispose of all debris left over from the contracted work, unless otherwise stipulated herein, outside the Mitsui Housing
Compound in accordance with applicable local codes for industrial waste disposal.
(d) Prior to work commencement on the job site, the Contractor shall submit shop drawings, material samples, color samples, and work schedule, as requested, to the COR for approval. The work shall be performed on Monday through Friday, unless approved to work on weekend and holidays by the COR.
(e) Reserved.
1.2.3 Description of Work
(a) Drain Pool Water
(1) Draining and filling swimming pool water before and after the construction shall be excluded from this contract. The U.S.
Government staff will drain and fill pool water.
| xSJA800-16-Q-0006-A001 - SF-30 and Revised Page 5 |
| SJA800-16-Q-0006-A001 - Revised Page 5 |
File details come from the government source that posted it. Updated .