SINGLE SOURCE SYNOPSIS.pdf

PDF 117 KB Posted

Attached to
ICS PSFB - CCSFS Eco Struxure System Upgrade
Solicitation number
FA2521
Issued by

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

THIS IS A SINGLE SOURCE SYNOPSIS! The 45th Contracting Squadron has a single source requirement for MC2 Inc. to upgrade Industrial Control Systems (ICS) in facilities on both Patrick Space Force Base (PSFB) and Cape Canaveral Space Force Station (CCSFS). ICS that were identified as out of date and is no longer supported as per AFI 17-101, AFI 17-130, DAFGM 2021-32-01 and UFC 3-410-012 will be replaced. Current Eco Struxure System has reached end of life from both manufacture and DOD cyber security standards. The scope of this project requires proprietary equipment of Schneider Electric equipment and installed by authorized installer MC2. MC2 is an authorized installer of Schneider Electric proprietary equipment in Central Florida. Schneider Electric is required and meets standards as per AFI 17- 101, AFI 17-130, DAFGM 2021-32-01 and UFC 3-410-012.

IAW FAR 5.207(c)(16)(i) all responsible sources may submit a quotation which shall be considered by the agency.

This notice of intent is not a request for competitive quotes; however, the government will consider any responses from capable sources received within 10 days after date of publication of this synopsis. 45 CONS/PKAB has determined that MC2, Inc.is the only source capable of providing this requirement. Phone calls will not be accepted.

Attachment:

Single Source Justification

File details come from the government source that posted it. Updated .