Performance Work Statement_DRAFT ss.pdf
PDF 1 MB Posted
- Attached to
- PACAF Fighter Simulator Instructor Pilot
- Solicitation number
- Not on record
About this file
This is a Performance Work Statement (PWS) for the PACAF Fighter Simulator Instructor Pilot (SIM-IP) Contract, establishing requirements for contractor management and provision of simulator and academic instruction services to develop mission-ready aircrews across Pacific Air Forces locations.
The contract requires the contractor to manage and provide Contractor Instructor Pilots (CIPs) and Contractor Instructor Weapon Systems Officers (CIWs) to conduct aircrew training using government-furnished facilities and equipment at seven operating bases: Joint Base Elmendorf Richardson (Alaska), Kadena AB (Japan), Kunsan AB (Republic of Korea), Misawa AB (Japan), Osan AB (Republic of Korea), Joint Base Pearl Harbor-Hickam (Hawaii), and Eielson AFB (Alaska). Core tasks include Mission Training Center (MTC) instruction for F-22A, F-15EX, F-16CM, and E-3 AWACS aircraft; scenario development including Training Initial Condition (TIC) files; academic support covering syllabus training, Instrument Refresher Courses, and locally-derived topics; security management; and scheduling support. The contractor must support at least 95 percent of all scheduled training events, with decrements applied to monthly payments for availability rates below 95 percent ranging from 2 percent at 94.99-94.00 percent availability to 75 percent at 79.99-79.00 percent availability. Personnel must include a Contract Program Director, Contract Lead Instructors at each site, Site Security Managers at designated locations, and qualified MTCIs/CIPs meeting specific experience and certification requirements. The contractor shall deliver numerous plans (Program Management Plan, System Security Plan, Quality Control Plan, Environmental Health and Safety Plan, Phase-In/Phase-Out Plans, Personnel Replacement Plan) and reports (Monthly Performance Status Reports, End of Day Reports, Trip Reports, Incident Reports) within specified timeframes, with monthly status reports due within five duty days of month-end. Government-furnished property includes facilities, utilities, telecommunications, and simulator equipment, while the contractor is responsible for all personnel, training, materials, transportation, and program management costs.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Performance Work Statement_DRAFT ss.pdf | ||
| RFI.pdf | ||
| PACAF SIM-IP II RFI 1.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PACAF FIGHTER SIM IP
DRAFT_Attachment 1 Performance Work Statement
PACAF FIGHTER SIP
PERFORMANCE WORK STATEMENT Page | 1
PERFORMANCE WORK
STATEMENT
PACAF FIGHTER SIMULATOR INSTRUCTOR
PILOT (SIM-IP) CONTRACT
PERFORMANCE WORK STATEMENT Page | 2
PERFORMANCE WORK STATEMENT Page | 3
Table of Contents
SECTION 1 – INSTRUCTOR PILOT AND ACADEMIC SUPPORT SERVICES
1.0. OBJECTIVE
1.1. SCOPE
1.2. REQUIREMENTS (CIP CORE TASKS)
1.3. PROGRAM MANAGEMENT
1.4. MISSION TRAINING CENTER (MTC) TRAINING DEVICE INSTRUCTION
1.5. SCENARIO DEVELOPMENT
1.6. ACADEMIC SUPPORT
1.7. ANCILLARY SUPPORT – Security
1.8. ANCILLARY SUPPORT - Scheduling
1.9. Electronic Flight Bags (EFBs)
1.10. CONTRACTOR REQUIRED PLANS, REPORTS, AND LETTERS
1.11. CONTRACT TRANSITION
1.12. QUALITY CONTROL
1.13. SPECIAL PROJECTS
SECTION 2 - SERVICES SUMMARY
SECTION 3 – GOVERNMENT-FURNISHED PROPERTY AND SERVICES AND CONTRACTOR
FURNISHED PROPERTY AND SERVICES
3.1. GENERAL
3.2. FACILITIES
3.3. SERVICES
3.4. EQUIPMENT
3.5. GOVERNMENT PROVIDED TRAINING
SECTION 4 – GENERAL INFORMATION
4.1. QUALITY ASSURANCE
4.2. HOURS OF OPERATION
4.3. BASE SECURITY REQUIREMENTS
PERFORMANCE WORK STATEMENT Page | 4
4.4. CONTRACTOR PERSONNEL
4.5. EMPLOYEE QUALIFICATIONS
4.6. GOVERNMENT RIGHTS TO DELIVERABLES
4.7. ENVIRONMENTAL, SAFETY, AND HEALTH (ES&H)
4.8. CONSERVATION OF UTILITIES
4.9. PERFORMANCE OF SERVICES DURING CRISIS DECLARED BY THE NATIONAL
COMMAND AUTHORITY OR OVERSEAS COMBATANT COMMANDER
4.10. EXTERNAL AGENCIES
4.11. CONTRACTOR FULL TIME EQUIVALENT REPORTING
APPENDIX 1 – ACRONYMS
LIST OF ACRONYMS
APPENDIX 2 – DEFINITIONS
DEFINITIONS
APPENDIX 3 – PUBLICATIONS AND FORMS
PUBLICATIONS
FORMS
APPENDIX 4 MDS Specific RTMs
F-22A
E-3 AWACS
F-15C/F-15EX
F-16 Block 40
F-16 Block 50
APPENDIX 5: PLANS, REPORT, and LETTERS (DELIVERABLES)
APPENDIX 6 LOGISTICAL SUPPORT
PACAF FIGHTER SIM IP Attachment 1 Performance Work Statement
PACAF FIGHTER SIP
PERFORMANCE WORK STATEMENT Page | 5
SECTION 1 – INSTRUCTOR PILOT AND ACADEMIC SUPPORT SERVICES
1.0. OBJECTIVE
1.0.1. The objective of the PACAF Fighter Simulator Instructor Pilot (SIP) contract is to manage and provide simulator and academic contract instructors that help develop mission ready aircrews efficiently. A highly skilled cadre of Contractor Instructor Pilots (CIP) and Contractor Instructor Weapon Systems Officers (CIW), working as capable partners with their Air Force counterparts, are required to maximize operational effectiveness and combat capability while preserving PACAF's limited personnel, aircraft and resources. The contract will also provide constructive support to live fly missions. The Government expects Contractor expertise to facilitate and support full-spectrum Distributed Mission Operations and Live - Virtual - Constructive (LVC) capabilities integrated with all fighter assets.
1.1. SCOPE
1.1.1. This Performance Work Statement (PWS) establishes the requirements and responsibilities of the Contractor to manage and provide CIP tasks to conduct aircrew training using Government Furnished Property/Equipment (GFP/GFE), materials, facilities and infrastructures. The Contractor shall comply with all applicable laws, regulations, technical data, and standards.
1.1.2. The primary venue for CIP to conduct their training is the Mission Training Center (MTC).
The MTC may be Contractor Furnished Equipment (CFE) through the Commercial Training Simulation Services Contract (CTSS) or by Contractor Logistic Support (CLS) as GFE. MTC’s provide training to meet SIP tasking at reduced costs over live fly.
1.1.3. Future force structure changes may require a change in scope of CIP requirements--whether expansion or reduction of services or location. Such changes will require negotiation and modification to this contract.
1.2. REQUIREMENTS (CIP/CIW CORE TASKS)
1.2.1. With the exception of properties and services specifically stated as Government-furnished in Section 3 of this PWS, the Contractor shall manage and provide all personnel, supervision, program management/oversight, training, materials, transportation, personnel travel / relocation / moving expenses, and all other items and services required to perform the following CIP core tasks for aircrew training at bases identified in paragraph 1.2.6.
1.2.2. Instruction. Contractor shall manage and provide MTC Instructors (MTCIs) to satisfy operational training requirements for aircrews as specified by Air Force Instructions (AFI). MTCs operated by Contractor shall be, F-22A, F-15EX, F-16CM and E-3 AWACS. MTCI and CIP both designate contract instructor personnel and are used interchangeably.
1.2.3. Scenario Development. Contractor shall develop scenarios to meet wing/local training objectives, to include Training Initial Condition (TIC) files. Contractor shall work with the local flying squadrons to develop these TIC files. Contractor shall also be available to make changes to TIC files.
1.2.4. Academic Support. Contractor shall develop, maintain, and present academic aircrew training. Topics may be specific to current tactics, location/weapons system, or shared between locations.
1542490256C Cross-Out
PACAF FIGHTER SIM IP – Attachment 1
PACAF FIGHTER SIP
PERFORMANCE WORK STATEMENT Page | 6
1.2.5. Ancillary support. Contractor shall provide security and scheduling functions in support of CIP requirements. The contractor will ensure that the Simulator JMPS machine is built IAW local squadron direction. They will work with the squadron to assist with DTM, Mission build loads, and transferring data between the simulator and squadron JMPS computers.
1.2.6. Site Locations: The Contractor shall manage and provide CIPs at the following operating bases:
a. Joint Base Elmendorf Richardson (JBER), Alaska - 3rd Ops Group at JBER is composed of two F-22A Fighter Squadrons (90th & 525th) and one AWACS Squadron (962st AACS). The 477th FG with one F-22A Squadron (302nd) is a reserve component. One 15-console simulator, two Brief/Debrief rooms AWACS MTC is used for E-3 training requirements and a four container, three Brief/Debrief rooms are used for F-22A training. The AWACS MTC is also LVC capable and can connect to the Joint Pacific Alaska Range Complex (JPARC) AK via Distributed Mission Operations (DMO) Network (DMON) Portal. Both MTCs are DMO capable and perform DMO missions with each other on a daily basis. CIPs are required for both AWACS and F-22A MTCs and DMO missions as scheduled.
b. Kadena AB, Japan - 18th Ops Group at Kadena is composed of two F-15EX Fighter Squadrons (44th & 67th) and one AWACS Squadron (961st AACS). Additionally, there is one 14-console simulator, AWACS MTC, used for E-3 training requirements. There are 4 F-15EX LCIDs and three Brief/Debrief rooms utilized for fighter training. MTCs are DMO capable and perform DMO missions with each other on a weekly basis. MTCIs, CIPs, CIWs are required for AWACS DMO missions as scheduled.
c. Kunsan AB, Republic of Korea (ROK) – Kunsan has two F-16 (Block 50) (35th & 80th) fighter squadrons. Kunsan has a four container F-16 MTC located in building 771 with DMO capabilities. The F-16 MTC simulators will be put in a standby status during the contract, and all simulator IP personnel reassigned. This will happen in coordination with the fully operational capable (FOC) status of at least 6 CUTS simulators at Osan AB, Korea.
d. Misawa AB, Japan - Misawa has two F-16 (Block 50) (13th & 14th) Fighter Squadrons.
The 35th Operations Group (35 OG) has a four container Boeing/Lockheed F-16 MTC located in building 650 with two dedicated brief/debriefing rooms and four console positions. The MTCs are DMO/LVC capable and used for this purpose one to two times a month. Two Unit Training Devices are also available in a separate facility.
e. Osan AB, Republic of Korea (ROK) – Osan has one F-16 (Block 40) (36 FS) fighter squadron. Osan has a four container F-16 CUTS with DMO capabilities. Final two CUTS will be delivered by the end of CY 2027 bringing the total CUTS at Osan AB, Korea, to 6. CIPs are required for both F-16 CUTS and DMO missions as scheduled. A new DMO facility will be completed in FY30 with three brief/debrief rooms.
f. Joint Base Pearl Harbor (JBPH-H), Hawaii – 154th Ops Group and 15th Ops Group at JBPH-H is composed of two F-22A Fighter Squadrons (199th & 19th). A four container MTC and three Brief/Debrief rooms are used for F-22A training. CIPs are required for both F-22A MTC and DMO missions as scheduled.
g. Eielson AFB, Alaska – Eielson has one F-16 (Block 40) (18 FS) fighter squadron. Eielson has two four container F-16 CUTS with DMO capabilities. CIPs are required for both F-16 CUTS and DMO missions as scheduled.
PACAF FIGHTER SIP
PERFORMANCE WORK STATEMENT Page | 7
1.2.7. The Contractor shall provide CIP training to anyone identified by the Government as a legitimate user. This could include military, civilian, or other personnel as verified by the Government to have a valid need to receive the training.
PACAF FIGHTER SIP
PERFORMANCE WORK STATEMENT Page | 8
1.2.8. Contracting Officer (CO) Authority. The CO is the only person authorized to approve changes in any of the requirements under this PWS and any provisions contained elsewhere in this contract. The Government will appoint/designate a head Contracting Officer Representative (COR) that will be at HQ PACAF. This head COR will be responsible for overall operations of the contract, has delegated authority from CO to approve the Candidate Qualification Waivers (with the concurrence of receiving local COR), and work closely with the CO for any issues with the contract.
Each operating base will have a local COR that will act as the Government's point of contact for receipt of services and to coordinate daily operations/wing/local issues in accordance with (IAW) this PWS. CORs, or any other Wing personnel, are not authorized to change the PWS, or to task the Contractor other than as described in this PWS. The head COR has final authority as the COR over the local CORs. In the event the Contractor effects any such change at the directions of any person other than the CO, the change shall be considered changed without authority. If required during the life of this contract, the Contractor may prepare and deliver Contract Change Proposals (CCPs) IAW CO guidance.
1.2.9. HQ PACAF/A31 is the Functional Director (FD) for overall CIP program issues but has no contractual authority.
1.2.10. The Contractor shall deliver a list of all MTCI/CIP personnel containing the MTCI’s/CIP’s name, security status, training status, part-time or full-time designation, and name of contractor employing each MTCI/CIP. The list of all MTCI/CIP personal shall be included the Monthly Contractor Performance Status Report.
1.2.11. The Contractor shall deliver an End of Day Report no later than (NLT) 1200L the next duty day, at each location to the local COR. The End of Day Report shall summarize all MTCI/CIP events scheduled, completed, and/or missed at that location. Each completed event shall detail if the event was completed by Contractor personnel or Government personnel. Each missed event shall include a description of why the event was missed.
1.3. PROGRAM MANAGEMENT
1.3.1. Contract Program Director (CPD)
a. The Contractor shall provide an overall CPD to oversee the CIP operations at all MTCs. The CPD is responsible for the performance and quality of work performed in support of the contract at all bases and shall coordinate with the FD to resolve any program issues.
b. Within 30 days after phase-in start, the Contractor shall designate in writing to the CO the name of the CPD and an alternate who shall act for the Contractor when the primary CPD is absent.
1.3.2. Contract Lead Instructor (CLI).
a. The Contractor shall designate a CLI at each MTC site who shall have full authority to actfor the Contractor on all matters relating to daily operation of the contract at that site.
The CLI, or a designated alternate, shall be available by phone within 2 hours to discuss and/or resolve contract issues with COR as necessary.
b. Within 30 days after contract award, the Contractor shall designate in writing to the CO the name of each CLI and alternate who shall act for the Contractor when the CLI is absent for all locations. The CPD, CLI, and/or alternates may be same individual as
PACAF FIGHTER SIP
PERFORMANCE WORK STATEMENT Page | 9 determined by Contractor.
PACAF FIGHTER SIP
PERFORMANCE WORK STATEMENT Page | 10
1.4. MISSION TRAINING CENTER (MTC) TRAINING DEVICE INSTRUCTION
1.4.1. MTC Instruction. The Contractor shall manage CIPs and CIWs that provide: (1) Basic MTC console operation; (2) MTC console operation while providing instruction; and (3) Direct/support instruction (i.e. “over the shoulder” or while flying the MTC). CIPs workload will depend on the MDS RTM (Ready-Aircrew Program Tasking Message). RTMs are updated every year and will change slightly due to mission requirements. Tasks in Appendix 4 are the minimum required per pilot that flies with the squadron to maintain their mission capable qualification. These RTMs show the skills CIPs will be required to provide instruction for. The Contractor shall support at least 95% of all scheduled training events as required by the scheduling agencies at each location.
a. The Contractor shall provide Instructor support for simulator events ranging from single- ship/one-on-one instruction to multi-ship/full-crew DMO events.
b. The CIP shall attend the brief and debrief if they are acting as the IPOR for the simulator. If they are not acting at the IPOR it is desired that they be available for the brief and debrief. If debrief playback software is required CIPs will ensure it is setup and available for the flight to debrief IAW local policies. CIPs are not responsible for maintaining the computer equipment, but must be qualified to operate the playback and simulator equipment to the extent that is required to perform their duties.
c. The Contractor shall provide pre and post mission simulation overview briefings to the students. Post mission briefings shall include instructional feedback of students’ performance and documentation IAW applicable Wing standards.
d. The Contractor shall ensure sufficient number of MTCIs/CIPs to support full mission team / multi-ship flight MTC simulator events. MTCIs/CIPs shall fill-in as flight members as needed to meet scheduled aircrew training requirements, using unit training equipment (i.e. JHMCS, NVG, etc.) if required to support the event.
e. The Contractor shall ensure instructors simulate flying characteristics and capabilities of US and foreign airborne platforms as provided by a Government Subject Matter Expert (SME), to include pilot communications and dialogue.
f. The Contractor shall ensure MTCIs/CIPs portray ground and airborne agencies unique to the simulation events. Instructors shall be capable of simultaneously controlling, as a minimum, three simulation groups composed of multiple tracks/airborne targets on the MTC system. Instructors shall be able to provide verbal dynamic inputs without dependence on scripts. Instructors may be required to operate in a scripted or dynamic simulator event.
g. The Contractor shall ensure MTCIs/CIPs can use current Air Land Sea Application Center (ALSA) communications standards in support of mission requirements.
h. The Contractor shall maintain training and evaluation records for each employee detailing individual training and certification/qualification (AF Form 8 for MTCI/CIP). The records shall be available for Government review. The Contractor shall document instructor proficiency training on Tactics, Techniques, and Procedures (TTPs), equipment, software and systems as they are modified.
i. The Contractor shall provide AF/Joint Exercise event support as required.
PACAF FIGHTER SIP
PERFORMANCE WORK STATEMENT Page | 11
j. The Contractor shall facilitate DMO and the Contractor shall conduct all necessary pre-mission planning for DMO missions. The Contractor shall set up and attend video teleconference (VTC) briefs/ debriefs (if required) in addition to manning the MTCs.
1.4.2. Live-Virtual-Constructive (LVC) training.
a. LVC training bridges the ‘real’ world with computer-based operations training. The domains of LVC are the Live world, real aircraft with real pilots; Virtual world, computer generated aircraft with real pilots; and Constructive world with computer generated models and systems.
b. LVC capabilities will fulfill or augment aircrew training by accessing the DMON & ARCNeT when it becomes available through the use of the DMO Portal—including networked simulators, modeling/constructive systems, and/or live test and training ranges (e.g. JPARC AK). As LVC training is still in its infancy, but expected to grow, the government will address specific LVC training requirements/events as a Special Project (see paragraph 1.13.). Contractor could provide operational support to include planning, mission setup, mission execution and mission debrief as well as specific engineering/technical support required as part of the Special Project.
c. The Contractor shall facilitate support for LVC events that integrate with the Joint Pacific Alaska Range Complex (JPARC) and other assets associated with its mission success.
The contractor is tasked with providing operational support for planning, mission setup, execution, and debrief of LVC events.
1.5. SCENARIO DEVELOPMENT
1.5.1. The Contractor shall develop scenarios (including TIC files) as required and/or requested by Government, within 7 days (30 days for E-3 scenarios) (exceptions can be coordinated through local COR), to support wing/local training objectives. These objectives include all syllabus training, Continuation Training (CT), exercise training, evaluations, and special interest items. If the simulator software allows these scenarios can be pre-programmed and used by pilots without the need of a contractor present. The Government will assist in providing materials to build the scenarios as necessary. Contractor shall verify and validate GFE scenarios/TIC files for use as required, within 7 days (exceptions can be coordinated through local COR). Once completed, all scenarios, including any support materials or digital files, shall become property of the Government. The Contractor shall be available to update the TIC files at the request of the government, within 7 days (exceptions can be coordinated through local COR).
1.6. ACADEMIC SUPPORT
1.6.1. The Contractor shall develop, maintain, and present academic topics/briefings/training (as described in AFM 36-2234 and AFH 36-2235), within 30 days (exceptions can be coordinated through local COR), as requested by the Government and in coordination with CLI to support (1) Syllabus Training, (2) Instrument Refresher Course (IRC), and (3) Locally Derived Topics. The Contractor shall conduct and complete all aircrew instruction IAW AF, Command, Wing, OG, and Squadron guidance, directives, standards and applicable AFMAN 11-2MDS Vol 1 (e.g. AFMAN 11- 2F- 22A).
1.6.2. Syllabus Training: the Contractor shall be responsible for academics in support of any syllabus driven flight training required by the OG. For example: Local Area Orientation Training (LAO), Aerospace Expeditionary Force (AEF) Spin-Up Training, Upgrade Training (UGT),Mission
PACAF FIGHTER SIP
PERFORMANCE WORK STATEMENT Page | 12
Qualification Training (MQT), and CT.
PACAF FIGHTER SIP
PERFORMANCE WORK STATEMENT Page | 13
1.6.3. IRC: The Government will provide initial IRC courseware and exam. The Contractor shall maintain this courseware/exam and teach IRC a minimum of once per month at each CIP base unless a class is not required by the Wing. Contractor shall coordinate the class schedule with the local scheduling office. Additional IRC classes shall be coordinated between CLI and COR if necessary. The MTCI/CIP shall create an IRC exam from the IRC Master Question Bank in coordination with local standardization and evaluation division (OGV). The Government will administer and score the IRC exam.
1.6.4. Locally Derived Topics: The local flying squadrons shall identify academic topics. These topics may be specific to a location/weapons system, or may be shared between locations. The Contractor shall coordinate with the Government designated SME on each topic requested. The Government SME shall provide Contractor with all documentation and guidance available for Contractor use. Contractor shall develop and maintain the academic material requested, and administer briefings associated with the identified topics.
1.6.5. As pertaining to Contractor provided Academic Support:
a. The Contractor shall issue all required material, publications, and approved changes to support courses instructed.
b. The Contractor shall manage all academic related GFE used for Computer Based Training (CBT), including uploading of computer-based instruction and applications.
c. The Contractor shall monitor self-paced CBT and answer training questions during the training activity.
d. The Contractor shall review desired learning objectives with students in preparation for examinations.
e. The Contractor shall administer and score examinations. Examinations shall be corrected to 100 percent.
f. The Contractor shall provide remedial student training for both academic, CBT, and training device instruction IAW appropriate syllabi and Wing directives; schedule remedial training to allow continued normal progression in the syllabus; provide make-up instruction for students who have missed classes.
g. The Contractor shall maintain current reference material to support academics IAW syllabi and AFMAN 11-2MDS Volume 1 through 3.
h. The Contractor shall report all academic material deficiencies to the COR/SME.
i. The Contractor shall provide updates regarding status changes to the students as they occur.
j. The Contractor shall document academic and MTC training accomplishments in the Government-provided AF Form 1522 at the completion of each event.
k. The Contractor shall attend Training Review Board & Stan/Eval Board meetings at the request of the flying squadrons when scheduled by Wing authorities to discuss issues and concerns regarding training and attend Wing/Squadron meetings involving flying operations/discussions.
PACAF FIGHTER SIP
PERFORMANCE WORK STATEMENT Page | 14
1.6.6. Evaluations. After completion of initial training, MTCIs/CIPS shall pass a Mission Evaluation IAW AFMAN 11-2MDS, Vol. 2. MTCIs/CIPs shall also pass an annual MTC Console Certification.
Contractor shall include these evaluations as part of the Quality Control Plan.
a. Mission Evaluation. All MTCIs/CIPs shall hold a current (18 month) AF Form 8 mission / instructor qualification. The OSS/CC, at discretion of each location, will designate one (or more) MTCI/CIP to be evaluated and certified as in-house MTCI/CIP Stan/Eval Flight Evaluator (SEFE). A certified CIP SEFE, or an AF SEFE shall administer subsequent initial/recurring/no-notice evaluations. Mission evaluations shall be documented on standard AF Form 8s which are flown in the MTC in the applicable crew position.
MTCIs/CIPs shall be evaluated on whether they can brief/debrief, provide instruction, and execute the mission effectively. IRC (N/A for E-3), Open/closed book exams, and Emergency Procedures Evaluation (EPE) (N/A for E-3) requisites are required. The contractor shall provide additional training for MTCIs/CIPs who fail to receive an overall satisfactory evaluation, and perform a successful re-evaluation. All evaluation criteria/records shall be maintained by contractor, and made available for Government to review within 24 hours of the request
b. MTC Console Certification. Each MTCI/CIP shall pass an annual, over the shoulder performance evaluation. The contractor shall develop criteria for the evaluation in coordination with the COR. All evaluation criteria/records shall be maintained by contractor and made available for Government to review within 24 hours of the request, discrepancies shall be corrected within ten duty days.
1.7. ANCILLARY SUPPORT – Security
1.7.1. The Contractor shall manage the security of their personnel, courseware, property used, and mission material they develop as well as other requirements that Wing/local requirements and Standard Operating Procedures (SOPs) may direct.
1.7.2. The Contractor shall ensure all training facility members and visitors comply with all on-site security requirements and SOPs as established by the Wing Commander at each operating base and directives from MAJCOM/Higher Command Authority.
1.7.3. The Contractor shall ensure only those training facility members and visitors who have the appropriate security clearance and a valid need-to-know will be given classified information, material, or access to the simulated weapons database and operational results of aircrew training, which will be classified up to and including TOP SECRET/SECRET/NOFORN/SAR.
1.7.4. The Contractor shall ensure training facility members and visitors comply with Operations Security (OPSEC) process IAW Department of Defense (DOD) OPSEC Program and Wing Special Access Program (SAP) SOP.
1.7.5. The Contractor shall ensure training facility members and visitors comply with the provisions of DoD Directive 5230.20, Visits and Assignments of Foreign Representatives. Releases of technical and programmatic information will be governed by this document.
1.7.6. The Contractor shall ensure employees safeguard classified information IAW applicable DoD Directives, AFIs, and DOD 5200 Series Manuals as updated/revised/replaced.
PACAF FIGHTER SIP
PERFORMANCE WORK STATEMENT Page | 15
1.7.7. The Contractor shall ensure training facility members and visitors conform to the provisions of DOD 5220.22-M, National Industrial Security Program Operating Manual and DODD 5220.6, Defense Industrial Personnel Security Clearance Review Program; AFI 16-1404 Air Force Information Security Program; AFI 10-701 Operations Security; DoD/Joint Special Access Program Implementation Guide (JSIG); DoDI 8510.01 Risk Management Framework (RMF) for DoD Information Technology (IT) and ICD 705 Sensitive Compartmented Information Facilities.
1.7.8. The Contractor shall ensure training facility members and visitors strictly adhere to requirements of Wing/Local System Security Plan (SSP) and Security Classification Guides (SCGs) to ensure that all mission-related data is afforded required level of protection. The Site Security Manager (SSM) shall recommend inputs/changes/updates for Wing/Local SSPs/SOPs as necessary to ensure secure operations.
1.7.9. The Contractor shall ensure employees comply with the local Computer Security (COMPUSEC) Communications Security (COMSEC) program SOP for the system and provide day-to-day security administration to protect classified, sensitive and unclassified information processed in Information Systems (IS), which are furnished to, and operated by, the Contractor.
1.7.10. The Contractor shall ensure training facility members and visitors safeguard all Government property provided for Contractor use.
1.7.11. The Contractor shall maintain Personnel Security Folders on contract personnel. To obtain program access, contact local APO (Advanced Program Office) or MAJCOM Government SAP Security Officer (GSSO).
1.7.12. The Contractor shall control access to all Government provided lock combinations to preclude unauthorized entry. The Contractor is not authorized to record lock combinations without written approval IAW local procedures. Records with written combinations to authorized secure storage containers, secure storage rooms, or certified vaults, shall be marked and safeguarded at the highest classification level as the classified material maintained inside the approved containers.
1.7.13. The Contractor shall establish and implement methods of ensuring that all safe combinations are not revealed to unauthorized persons. These procedures shall be included in the Contractor’s QCP as opening and closing procedures.
1.7.14. The Contractor shall ensure that classified data is handled IAW appropriate Air Force and DOD security regulations. Compliance with the current DD Form 254 is required. As required for the completion of duties, the Contractor will be granted access to classified computer networks (e.g., SIPRNET).
1.7.15. The Contractor shall maintain a current listing of Contractor employees. The list shall include the employee's name, last 6 digits of social security number and level of security clearance for the entry authorization list (EAL). The list shall be validated and signed by the company SSM, Facility Security Officer (FSO) and provided to the Sponsoring Agency’s Security Manager Advanced Program Office (APO). A list of the number of personnel, by specialty, will be included in the initial Contractor monthly status report. This list will be updated whenever a new employee is hired or an existing employee's status or information changes.
1.7.16. The Contractor will ensure OPSEC is incorporated into the appropriate areas of this contract IAW DoD Directive 5205.02E, the DoD OPSEC Program and the Wing SAP SOP.
PACAF FIGHTER SIP
PERFORMANCE WORK STATEMENT Page | 16
1.7.17. The Contractor shall immediately report to the building custodian or site COR any occurrences of lost or duplicated keys.
1.7.18. The Contractor shall support annual U.S. Government security inspections and unscheduled spot inspections at each location. A spot inspection is defined as any unscheduled security inspection by the Wing, MAJCOM, or PSO. Unscheduled spot security inspections will be conducted as necessary to evaluate security compliance of Contractor operations. The Contractor shall provide written replies on actions taken within 30 days of the security inspection report, IAW local procedures.
1.7.19. It is not the intention of the Government to have the U.S. Government Security Inspection Program replace internal security surveillance by the Contractor or inspection programs required by other federal agencies.
1.7.20. Site Security Manager (SSM)
a. The Contractor shall designate a SSM to perform as Personnel Security Manager, Information Security Manager, and Physical Security Manager at the following locations.
These security duties may be referred to as an Activity Security Monitor(ASM).
i. Joint Base Elmendorf Richardson (JBER), Alaska.
ii. Joint Base Pearl Harbor-Hickam (JBPH-H), Hawaii.
iii. Kadena AB, Japan.
iv. Misawa AB, Japan.
v. Osan AB, Korea
vi. Eielson AFB, AK
b. The SSM shall provide site security management (Personnel Security Manager, Information Security Manager, Physical Security Manager) over the Government provided aircrew training facility and support equipment, aircrew training devices, aircrew training products and training facility personnel when these services are not provided by Government agencies or CLS contractors at six locations (Osan AB, ROK; JBER, AK; Kadena AB, Japan; Misawa AB, Japan, Eielson AFB, AK; and JBPH-H, HI). The Contractor shall contact the COR immediately if these services are being provided by the Government or CLS contractors.
c. The SSM shall comply with any Security Site Operating Procedures (SOPs) for their location.
d. The SSM shall, if tasked, open training facilities, make service calls for repairs on training facility (such as: alarm systems, electrical, etc.), and/or close facilities at the end of the duty day. The SSM in coordination with the Site Lead can delegate SSM duties to other cleared/trained contractor employees. The Site Lead is responsible to ensure SSM shall not require overtime.
e. The SSM shall ensure training facility members and visitors exit the facility at the end of each work period and all Government facilities, equipment, and materials shall be secured.
f. The SSM shall ensure training facility members and visitors maintain security of the facility, open/close restricted areas, and provide alarm response actions as needed.
g. The SSM shall ensure training facility members and visitors adhere to procedures
PACAF FIGHTER SIP
PERFORMANCE WORK STATEMENT Page | 17 for identification and escort of uncleared visitors within the training facility.
h. The SSM shall monitor training facility activities and ensure compliance with higher-level security regulations and guidance as well as local procedures/SOPs.
i. The SSM shall perform initial evaluations of security problems, conduct/schedule required security training for Contractor personnel, required self-inspections, physical security inspections, and review proposed configuration changes for impact on the Designated Approval Authority (DAA)-approved security posture and SSP/SOPs, IAW applicable DoD Directives, AFIs, and DOD 5200 Series Manuals. Contractor shall document and report security vulnerabilities and incidents through the appropriate channels IAW local procedures.
j. The SSM shall establish procedures to ensure that all Government ciphers and facilities are safeguarded. The Contractor shall prohibit the use of cipher combination by any person other than the SSM authorized employee and appropriate Government personnel. These opening and closing procedures shall be included in the local SOP. It is also the responsibility of the SSM and Contractor to prohibit the opening of locked areas by building occupants to permit entrance of persons other than the SSM approved personnel who are engaged in the performance of assigned work in those areas.
k. The SSM shall follow local base procedures for entry to Air Force controlled/restricted areas. An AF Form 2586, Unescorted Entry Authorization Certificate, must be completed and signed by the sponsoring agencies Security Manager before a Restricted Area Badge will be issued. Contractor employees must have a favorable completed National Agency Check (NAC) investigation before receiving a Restricted Area Badge. Interim access can be granted IAW AFI 31-501, Personnel Security Management.
l. The SSM shall establish and implement methods of making sure all keys issued by the Government are not lost or misplaced and are not used by unauthorized persons. The SSM and Contractor shall not duplicate any keys issued by the government.
1.7.21. Construction Site Security Manager (CSSM)
a. In coordination with United States Army Core of Engineers (USACE) CSSM, will develop Standard Operating Procedures (SOPs) regarding and not limited to: Badging system, Material ground Transportation plan, removal of unauthorized personnel.
Reporting any deviations and violations from the Construction Security Plan (CSP).
b. All non-cleared construction personnel shall provide the CSSM with biographical data (full name, current address, Social Security Number (SSN), date and place of birth (DPOB), proof of citizenship, etc.), and fingerprint cards as allowed by local laws prior to the start of construction/renovation. (1) Two forms of I-9 identification are required to verify U.S. persons. (2) Whenever host nation agreements or Status of Forces Agreements make this information not available, it shall be addressed in the CSP.
c. The CSSM ensure checks are conducted of criminal and subversive files, local, national, and host country agency files, through liaison channels and consistent with host country laws.
d. Prior to initial access to the site, all construction personnel shall receive a security briefing by the CSSM or designee on the security procedures to be followed.
e. CSSM will maintain a list of all workers used on the project; this list shall become
PACAF FIGHTER SIP
PERFORMANCE WORK STATEMENT Page | 18 part of the facility.
f. CSSM will document security violations or deviations from the CSP and notify the AO within 3 business days. Implements procedures to deny unauthorized site access.
g. In exceptional circumstances, CSSMs may deviate from procurement standards with a waiver; such deviation shall be noted in the CSP.
Conduct periodic security inspections to ensure compliance with the CSP.
1.7.22. Security Inspections/Compliance
a. Contractor shall monitor MTC activities and ensure compliance with higher-level security regulations and guidance as well as local procedures/SOPs.
b. Contractor shall perform initial evaluations of security problems, conduct/schedule required security training for Contractor personnel, required self-inspections, physical security inspections, and review proposed configuration changes for impact on the Designated Approval Authority (DAA)-approved security posture and SSP/SOPs, IAW applicable DoD Directives, AFIs, and DOD 5200 Series Manuals. Contractor shall document and report security vulnerabilities and incidents through the appropriate channels IAW local procedures.
c. Contractor shall fully document all preventative measures taken and document actions taken to meet security goals and objectives IAW applicable DoD Directives, AFIs, and DOD 5200 Series Manuals. All preventative measures, inspection reports, replies, and related correspondence shall be routed through appropriate security channels IAW local procedures.
PACAF FIGHTER SIP
PERFORMANCE WORK STATEMENT Page | 19
1.8. ANCILLARY SUPPORT - Scheduling
1.8.1. Squadron schedulers will set the requested simulator block IAW Table 7, PWS 4.2 the week prior. Contractor shall schedule CIPs to support the wing/local squadrons flying, MTC and DMO schedule (Table 7, PWS 4.2). Contractor shall schedule all CAF DMO events via DMONScheduling System (DSS). The Contractor shall schedule MTCI/CIP and academics to meet training objectives in consideration of resource availability and squadron requirements. The Contractor shall coordinate with the local flying unit squadron schedulers (Table 1) to discuss/resolve schedule related issues.
1.8.2. The Contractor shall create and publish a weekly and daily training schedule for MTCI/CIP, simulator cockpits and academic training at each site. The Contractor shall be responsive to changes in schedule during the operations day, to include monitoring of dedicated scheduling number if used, and update/notify/publish schedule revisions. Notification and publishing process is site specific, ranging from scheduling board to email updates.
Table 1
Site Scheduling Agency Kadena 44 FS/DOS (F-15), 67 FS/DOS (F-15), 961 AACS/DOS (AWACS)
Misawa 35 OSS/OSO (F-16), 14 FS/DOS (F-16), 13 FS/DOS (F-16)
Osan 36 FS/DOS (F-16) Kunsan 35 FS/DOS (F-16), 80 FS/DOS (F-16)
JBER 90 FS/DOS (F-22), 525 FS/DOS (F-22),
962 AACS/DOS (AWACS)
JBPH-H 199FS/DOS (F-22), 19FS/DOS (F-22)
Eielson 18 FS/DOS (F-16)
1.8.3. The Contractor is solely responsible for scheduling CIP events and ensuring MTCIs/CIPs are available. The Contractor shall notify the COR if any portion of the MTC/CAF DMO schedule, MTCI/CIP and academic instructor requirements cannot be met, by documenting it in the monthly performance status report (Appendix 5).
1.9. Electronic Flight Bags (EFBs)
1.9.1. The contractor shall update and maintain any EFBs that are located at the training facility IAW local policies and guidance.
1.9.2. The government is responsible for providing EFBs. If no EFBs are provided the Contractor is required to maintain paper Flight Information Publication (FLIP) & Technical Order (T.O.)
applicable to the mission.
1.9.3. Any issues with the EFBs shall be reported to the local COR within 5 duty days. The government is responsible to fix any broken EFBs.
PACAF FIGHTER SIP
PERFORMANCE WORK STATEMENT Page | 20
1.10. CONTRACTOR REQUIRED PLANS, REPORTS, AND LETTERS
1.10.1. The Contractor shall prepare and submit plans, reports, and letters identified in Table 3 (section 2 of this PWS) and Appendix 5.
1.11. CONTRACT TRANSITION
1.11.1 The transition period is that period of time during which the incumbent Contractor and the successor Contractor jointly accomplish a transfer of responsibility for contract performance and GFE as required. The transition period will not exceed 90 days and will coincide with the final 90 days of the incumbent's contract.
a. The Contractor shall develop and deliver a Phase-In Plan and Phase-Out Plan, identified in Table 3 (section 2 of this PWS) and Appendix 5.
b. The incumbent Contractor shall provide supervision, control, and work task responsibility for all functions described in this PWS during the transition period. The incumbent Contractor shall support the Government and the successor Contractor to ensure an orderly transition. As a minimum, the incumbent Contractor shall provide the successor access to facilities, equipment, technical documentation, property accountability, publications, spares etc. on non- interference, no cost basis during the transition period.
c. The Government, incumbent Contractor, and successor shall perform an audit to include a joint inventory and inspection, and all GFP will be transferred no later than 10 duty days prior to the end of the transition period. Incumbent Contractor shall be solely responsible for replacement of missing or damaged-beyond-repair GFP/GFE.
d. GFP/GFE Repair. The incumbent Contractor is liable for the repair or replacement of all items (e.g. facilities, major systems, all other GFP/GFE) in the same or better condition than received, discounted for normal wear and tear. The successor Contractor shall accept items “as is” that have open work orders for maintenance or repairs that are reasonable and expected during the lifecycle of the items.
e. The incumbent Contractor shall transfer all data, information, reports, records, schedules, software products, point of contacts, information on requisitioned items, etc. that pertain to the equipment, systems or services defined by this contract to the successor Contractor.
1.12. QUALITY CONTROL
1.12.1. Contractor shall develop and maintain a quality plan/program, identified in Table 3 (section 2 of this PWS) and Appendix 5. The quality plan/program shall ensure CIP services are performed IAW this contract, Unit Training Program Syllabi, and all federal, state, and local laws and regulations. As a minimum, the Contractor shall develop quality control procedures addressing the areas identified in the Service Summary and Wing/local SOPs. The Contractor shall develop and implement procedures to identify, prevent, correct, and ensure non- recurrence of defective services. Records of all inspections and evaluations/proficiency checks conducted by the Contractor and corrective action taken shall be made available to the Government within 7 duty days of request.
PACAF FIGHTER SIP
PERFORMANCE WORK STATEMENT Page | 21
1.12.2. Customer Feedback: As part of its quality control program, the Contractor shall establish a customer feedback system that is responsive to customer (aircrew) complaints. All customer complaints and follow-up actions must be documented and sent monthly to the COR. All customer feedback documentation shall be made available for review within 7 duty days of request from COR personnel.
1.13. SPECIAL PROJECTS
1.13.1. Special Projects (SPs) are defined as tasks/support identified and determined by the CO to be within scope of work on the contract but not specifically defined/detailed. Special Projects by their nature are unique events, occur infrequently, and are designed to accommodate unforeseen short-term efforts. Special Projects typically will be tasks that if accomplished, could exceed available MTCI/CIP labor hours to detriment of primary mission. Examples of SPs would be operation/integration of LVC systems with MTC; or operation of external constructive source (e.g.
Battlefield Operations Support System (BOSS) as an active element in a training sortie. The Contractor shall accomplish SPs when approved/directed by the CO or COR. The Contractor shall develop a proposal and cost estimate (if required) for the proposed support. Special Projects will be billed against CLIN X012 “Travel/Surge Hours.”
PACAF FIGHTER SIP
PERFORMANCE WORK STATEMENT Page | 22
SECTION 2 - SERVICES SUMMARY
2.1. This Service Summary Table 2 identifies the performance objectives of this contract. The Government reserves the right to monitor all services called for in the contract to determine whether or not the performance objectives and goals were met.
2.2. The absence of any contract requirements from the Service Summary shall not detract from its enforceability nor limit the rights or remedies of the Government under any other provision of the contract.
2.3. Quality Assurance Requirements. The Contractor shall be responsible for the quality of the products and services provided. The Contractor’s Quality Control Plan (Appendix 5) shall be submitted no later than 10 duty days after contract award. Contractor shall not commence performance until the CO/FD have reviewed, and the CO has signed and approved the Quality Control Plan. The CO will provide a copy of signed and approved contractors Quality Control Plan to the site CORs no later than 5 duty days after CO approval.
2.4. Surveillance: Methods may include but are not limited to: trend analysis, periodic inspections, 100% surveillance, contractor metrics, customer complaint, third party audits, or quality index. Methods of surveillance can change after contract award based on, but not limited to:
accepted Contractor Quality Control Plan, adjustment to the metrics used, contractor performance.
2.5. Performance Evaluation: Government shall evaluate performance of a service to determine whether or not it meets the performance threshold. When the level of performance is not met, the Contractor will be advised and required to respond to discrepancy. The contractor’s response shall address why performance threshold was not met, how performance will be returned to acceptable levels, and how recurrence of the cause will be prevented in the future. At the Governments’ request, the contractor shall re-perform the service at no additional cost to the Government, to demonstrate successful meeting of the performance threshold.
TABLE 2
PERFORMANCE
OBJECTIVE
PWS REF. PERFORMANCE THRESHOLD
Contractor maintains a sufficient quantity of qualified MTCIs/CIPs and ancillary support personnel to support the contract
1.2.2, 1.4.1, 1.4.2
Contractor shall provide MTCIs to satisfy operational training requirements for aircrews as specified by AFIs.
MTCs operated by Contractor shall be F-22A, F-15EX, F- 16CM and E-3 AWACS. The Contractor shall support at least 95% of all scheduled events as required by the scheduling agencies to include briefs, simulator events, debriefs and academic classes at each location. See PWS paragraph 2.6 for decrement calculation.
PACAF FIGHTER SIP
PERFORMANCE WORK STATEMENT Page | 23
Contractor performs Scenario Development and Updates
1.2.3, 1.5.1 Contractor shall develop scenarios to meet wing/local training objectives, to include TIC files. Contractor shall work with the local flying squadrons to develop these TIC files. Contractor shall also be available to make changes to TIC files. Scenarios must be developed within 7 days (30 days for E-3 Scenarios) (exceptions can be coordinated through local COR), 100% of the time as determined by the requesting organization.
Contractor performs Academic Support
1.2.4, 1.6.1 Contractor develops, maintains and presents academic topics/briefings/trainings within 30 days (exceptions can be coordinated through local COR), 100% of the time in response to local flying squadron coordinated requests, up to the standards of the USAF Academic Instructor Course or equivalent.
Contractor performs IRC 1.6.3 Contractor schedules and presents IRC classes a minimum of once a month at each CIP base (if requested by the government) and/or as scheduled 100% of the time.
Contractor maintains
CIP/MTCI
training/evaluations records
1.6.6 Contractor ensures MTCI/CIP evaluation and training
files are up to date 100% of the time with discrepancies corrected within ten duty days. Records are available within 24 hours of the request for Governmentreview.
CIPs/MTCIs pass and maintain AF Form 8 qualifications.
1.6.6 CIP/MTCIs after completion of initial training shall pass a Mission Evaluation IAW AFMAN 11-2MDS, Vol. 2.
MTCIs/CIPs shall also pass an annual MTC Console Certification. CIPs/MTCIs shall maintain an AF Form 8 Mission/Instructor Qualification for the simulator IAW AFMAN 11-2MDSv2.
Contractor meets all security requirements.
1.7 (1.7.6-8, 1.7.18-21)
Contractor safeguards classified information; conforms to Wing/Local System Security Plan; complies with all security directives; provides personnel that meet Personnel Security Requirements; performs SSM duties, ensures compliance with higher-level security regulations/guidance and conduct required security inspections 100% of the time.
Contractor maintains SSMs at locations designated in this
PWS
1.7.20 Contractor provides SSMs at the locations listed in
1.7.20 subsection a. SSMs shall provide site security management (Personnel Security Manager, Information Security Manager, Physical Security Manager) over the Government provided aircrew training facility and support equipment, aircrew training devices, aircrew training products and training facility personnel. The SSM will perform all functions 100% of time.
Contractor is required to maintain up to date publications in the simulators
1.9 EFBs or paper publications must be up to date and
current 95% of the time. 100% of issues with the EFBs shall be reported to the government within 5 duty days.
PACAF FIGHTER SIP
PERFORMANCE WORK STATEMENT Page | 24
Contractor submits accurate reports and plans on time and as required.
1.10, Appendix 5
Contractor shall prepare and submit plans, reports, letters, schedules, and summaries that are 100% accurateand 100% on time.
TABLE 3
Deliverable Due Date/ Frequency
Deliver To PWS
REF.
Appendix
REF.
PLANS
Program Management Plan
Due: 30 duty days after contract award
CO and COR 1.3.1, 1.6.6, A5.3.1
(PMP) Frequency: Annual Review, with updates to Government
1.7, 1.10, 1.12.1, 2.3, 4.4.1, 4.5.1-2, 4.7.1
System Security Due: 30 duty days after Local APO 1.7, A5.3.2 Plan contract award
Frequency: Annual Review, and/or
PACAF/A8XZ
1.10 with updates to Government MTCI/CIP Due: 30 duty days after CO and COR 1.10, A5.3.3 Training Plans contract award
Frequency: Annual Review, 4.5.1, 4.5.2 with updates to Government Quality Control Due: 30 duty days after CO and COR 1.6.6,…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .