SIGNED CJA P 8A INC 3 ECP RETROFIT REDACTED_Final.pdf
PDF 362 KB Posted
- Attached to
- P-8A ECP 6 Retrofit NRE
- Solicitation number
- N00019-19-RFPREQ-PMA-290-0727
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEPARTMENT OF THE NAVY
NAVAL AIR SYSTEMS COMMAND
RADM WILLIAM A. MOFFET BUILDING
47123 BUSE ROAD, BLDG 2272
PATUXENT RIVER, MD 20570-1547
IN REPLY REFER TO:
Class J&A Number: 19-0326
CLASS JUSTIFICATION AND APPROVAL
FOR USE OF OTHER THAN FULL AND OPEN COMPETITION
1. Contracting Activity.
Naval Air Systems Command (NA VAIR) Headquarters
2. Description of the Action Being Approved.
This Class Justification and Approval (CJ&A) authorizes and approves the issuance of sole-source contract actions under Basic Ordering Agreement NOOO 19-16-G-OOO I to The Boeing Company (Boeing) in Seattle, WA for the procurement of A-Kits and the initial retrofit aircraft modification of P-8A Increment 3 Engineering Change Proposal (ECP) 6 capabilities into Fleet aircraft. Authority to act under this CJ&A expires on 30 September 2025.
3. Description of Supplies/Services.
P-8A ECP 6 provides a significant modification to the baseline aircraft, installing new airframe racks, radomes, antennas, sensors and wiring, while incorporating a new Combat Systems suite with an improved computer processing and security architecture capability at the Higher than Secret level, a Wide Band SA TCOM system, an ASW Signals Intelligence capability, a Minotaur track management system, and additional communications and acoustics systems to enhance search, detection, and targeting capabilities. The contract actions will cover P-8A ECP 6 retrofit activities to include procurement of A-Kits. Additionally, the contract actions will include initial aircraft (up to
43) modifications and installation of A-Kits and Government Furnished Equipment (GFE) 8-Kits, repair incident to modifications, Non-Recurr.ing Engineering (NRE) for design, fabrication, and correction of deficiencies, and associated logistics support requirements. Initial retrofit activities will occur from FY20 through FY25. The estimated total value of the contract actions and associated funding by FY is as set forth in the table below:
Estimated Dollar Value in Thousands
FY20 FY 21 FY 22 FY23 FY24 FY25 Total
APN-5
O&M
Total
Class 1&.A Number: .j 9-326
CERTD'l�TION8. AND APPROVAL
TECllNl�NTSCQ.TI;ICATIO�
J cemfy "2at the .fads ·an4 :representati.ons under nay, cognizap1;e which are included in this Justificition,atuf.itS'-supporth!g aequisition plannmg.ctocuments, except as noted her&,in· 81\,.cbmplete �d �u� to the� of rrJY lmowtedgc m,� �lief.
c.111, A:nthonvB. Rout pature N�rqe �rinted)
I have-�tetminetftbis i1$titkad9n is legally sufficient
.ThomasJ. FJ'orio.
NIA\e (Printed) yan M. Delaney Na�e (Printed)
PJ;ioneNo.
'PhoneN.o.
Phon,.N9 ..
SENJO'R PJOCIJPMENr.�CUTIVE'.APPR�VAL
Pate
� fr. A-'( �ol '\ D�e
Upoi)� �is. Of� abow'justifici.tion, I hereby approv� is Seniol! Proc�nt'�w of the Navy, the solicitatlon of the· proposed procurernent(s) ��bQC! herein UJing oti. ti.tan full.and ppen ��m��t to the·authori� of 10 U.$.C. 2304 (c)(l).
File details come from the government source that posted it. Updated .