Sidnaw Creek AOP - Schedule of Items - DRAFT.pdf
PDF 197 KB Posted
- Solicitation number
- 1100260
- Issued by
-
Department of Agriculture Forest Service
About this file
This document contains a schedule of items for the Sidnaw Creek Aquatic Organism Passage Replacement project on the Ottawa National Forest. The Forest Service is soliciting bids to replace a culvert and conduct associated excavation, drainage, erosion control, and road work. Key items include removal of existing structures, excavation for the culvert and roadway, placement of a 20' x 10' precast concrete box culvert, installation of riprap, aggregate surfacing, seeding and erosion control mats, and streambed and channel rock placement. Bidders are asked to provide unit pricing for over 25 separate items comprising mobilization, surveying, soil handling, culvert installation, road work, and erosion control measures. The total estimated value will be calculated from the extended unit prices.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PART I - SCHEDULE OF ITEMS
SECTION B – SERVICES AND PRICES
Sidnaw Creek AOP
Kenton Ranger District Ottawa National Forest Houghton County, MI
B- 1 - SCHEDULE OF ITEMS
ITEM
NO.
DESCRIPTION
PAY
UNIT
EST.
QTY.
UNIT
PRICE
TOTAL
PRICE
15101
Mobilization
Lump Sum 1
15201
Construction survey and staking, method I, tolerance A
15713
Soil erosion and pollution control
20301
Removal of structures and obstructions, disposal method A
20403
Roadway excavation and embankment, compaction placement method 2 Cubic Yard 198
20414
Conserved Top Soil
20426
Drainage Excavation
20801
Structure excavation
Cubic Yard 786
20802
Foundation fill including geotextile
Cubic Yard 108
20803
Structural backfill
Cubic Yard 618
20850 Dewatering Lump Sum 1 $________ $________
25101
Placed riprap, class 1
Cubic Yard 100
25151
Placed riprap, class 2
Cubic Yard 20
30101
Aggregate surface course, MDOT 23A, Compaction Method B
Cubic Yard 148
60205
20’ span, 10’ rise precast reinforced concrete box culvert
Foot 64
62451
Placing conserved topsoil Lump Sum 1
62551 Seeding, dry method Lump Sum 1 $________ $________
62951 Erosion control mat, type 3B biodegradable Lump Sum 1
63307
Object marker
Each 4
63501
Temporary traffic control
64801
Placed Streambed simulation rock, bed class 3, method A
Cubic Yard 260
64803
Placed channel rock, class 0, method C
Cubic Yard 10
64853
Placed channel rock, class 2, method A
Cubic Yard 220
Total $_________________
B-2 - NOTE: Payment for bond premiums in accordance with Clause 52.232-5, Payments under Fixed-Price Construction Contracts, shall not be in addition to the contract price. Include bond payments under 151.01 Mobilization.
Payment will be made on actual work performed as described in FP-14 109.01 unless otherwise noted.