Summary of Answers to Proposers' Questions Amendment No. 2

This document is an amendment containing clarifications and answers to proposers' questions for Invitation to Bid No. SHR127-ADMSR-6561, issued by the San Bernardino County Sheriff/Coroner/Public Administrator for a turnkey audio-visual system installation at the Sheriff's Technical Services Division facility located at 1040 E. Cooley Drive, Colton, California. The project scope encompasses the design, supply, installation, programming, and commissioning of two indoor direct-view video wall displays with integrated control and switching systems. The hallway area requires a fine-pitch LED video wall display of approximately 5.5 feet by 9.8 feet, while the office area requires a display of approximately 4.5 feet by 7.8 feet. The system will incorporate an 8x8 switcher with a minimum of eight inputs and outputs, two touchscreen control panels (one per display), two speakers for the lobby walkway, network equipment, and associated cabling and installation services. The equipment price sheet details 24 line items including video displays with spare parts packages, network infrastructure, control systems, installation services, e-waste fees, and shipping, with prevailing wage requirements for installation labor. The project completion date is January 1, 2027, and responses to 50 proposers' questions address technical specifications, scope responsibilities, equipment delivery, storage, working hours, insurance requirements, and warranty terms.

The total project budget allocation is $126,818, with payment terms of Net 60 days after invoice and acceptance of the complete system, though Net 45 terms may be considered. Award will be based on Lowest Price Technically Acceptable (LPTA) evaluation methodology. A bid/performance/payment bond is not required. The County is responsible for electrical work, wall reinforcements, post-demolition finish work, and provision of power for the video walls, while the contractor is responsible for low-voltage cabling installation, AV equipment supply, labor, materials, and system commissioning. Contractors must provide a minimum one-year warranty covering all equipment, installation, and workmanship, with next-business-day support and response time for service requests. Quarterly maintenance during the one-year warranty period is required. No existing AV equipment requires removal or integration, remote access for ongoing support is not permitted, and end-user training is required. Insurance requirements include Workers' Compensation with $250,000 employer's liability limits, Commercial General Liability with $1,000,000 per occurrence coverage and $2,000,000 aggregate limit, and Automobile Liability with $1,000,000 per occurrence coverage. TAA compliance and Buy American requirements are not applicable.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Invitation to Bid No. SHR127-ADMSR-6561

Sheriff’s Technical Services Audio- Visual System

Answers to Proposers’ Questions

San Bernardino County Sheriff/Coroner/Public

Administrator 655 East Third Street

San Bernardino, CA 92415

Administrator

Invitation to Bid Sheriff’s Technical

Services Audio-Visual System

No. SHR127-ADMSR-6561 Amendment No. 2

1) Video System lists (2) monitors, (1) 8x8 switcher, and a set of HDMI cables. Please confirm the following: - What is the intended use of this system? - Where will this system be installed? - Does this system need to be connected to the hallway and office displays as a preview monitor? - Is a blackout/freeze option required? - Is the 8x8 switcher required for (8) inputs and (8) outputs? During the walkthrough on 10/22, (2) inputs were specified. Where will the other sources come from??

ANSWER: The intended use of the system will be for a Security Operation Center. The Video system(s) will be installed on two separate walls located in the office at the Sheriff’s Technical Services Division located at 1040 E. Cooley Drive, Colton, CA 92324. Yes, this system needs to be connected to the hallway and office displays. No, a blackout/freeze option is not required. Yes, an 8x8 switcher is required for a minimum of 8 inputs and 8 outputs. Sources will be provided by the County.

2) Will one touch screen control two displays or will there be one touch screen per display? As per the walkthrough, it was stated that each display needs a local touch screen control panel in addition to one in the IDF room. It is not advisable to use a three-way control on the touch screen panel Video signal requires STP w/ shielded RJ45 termination; line item 16 lists both UTP and STP please confirm which is intended

ANSWER: We are requesting two control panels, with one touchscreen dedicated to each display.

It is not advisable to use a three-way control on the touch screen panel unless the AV system design specifically requires it. The control method should be confirmed with the AV integrator to ensure compatibility and ease of operation.

3) Document does not specify desired scope of work; please clarify scope of work concerning installation, demolition, electrical, network connection, etc. Please specify permits and licenses required for this project

ANSWER: The contractor shall provide all labor, materials, equipment, and services necessary for a complete, operational AV system installation. Wall reinforcement, drywall, patch, paint, required electrical, data path, and other cabling path will all be provided by the County per the contractor design specifications.

4) With respect to the turnkey audiovisual system specified in Invitation to Bid No. SHR127-ADMSR- 6561, would the County consider requesting an optional five-year extended warranty and preventive maintenance service package to help ensure the long-term reliability, performance, and operational continuity of the video wall systems? If so, would the County like bidders to provide a separate line-item price for a five-year warranty and support package that includes the following services?

Extended warranty coverage for the installed video wall displays, control systems, and associated audiovisual equipment, subject to applicable manufacturer warranty terms. Scheduled preventive maintenance visits during the first year. Preventive maintenance inspections, including verification of video wall operation, display performance, source switching, control system functionality, and necessary minor adjustments. Firmware updates to installed audiovisual equipment (if required) to maintain system functionality and operational reliability. Additional basic end-user training covering video wall operation, source selection, and control system functionality. Please clarify whether the County would prefer this five-year warranty and maintenance package to be included in the base bid or submitted as an optional, separately priced item for consideration.

ANSWER: The bid shall include a one-year warranty covering all equipment, installation, and workmanship, and a one-year maintenance period, with maintenance being provided quarterly and next-business-day support and response time for all service requests. Warranty and maintenance should be priced separately for consideration. Additional warranty and maintenance packages may be offered and should also be priced separately.

Administrator

Invitation to Bid Sheriff’s Technical

Services Audio-Visual System

No. SHR127-ADMSR-6561

5) Who is responsible for conduit/raceway for low-voltage cabling - the AV contractor, electrical contractor, or owner?

ANSWER: The contractor is responsible for the low-voltage cabling and may use the existing conduit. The County will provide low voltage path within the monitor walls. The County does not require conduit above drop ceiling from monitor to rack for low voltage. Current County low voltage is installed using J hooks.

6) Who is responsible for electrical work required to support the AV systems?

ANSWER: The County is responsible for the electrical work. The County will provide electrical per the design specifications of contractor.

7) Who is responsible for post-demolition finish work (drywall repair, wall patching, painting, fire-stopping)?

ANSWER: The County is responsible for post-demolition finish work.

8) Will parking be provided for the contractor's crew and vehicles? What is the distance from the jobsite building?

ANSWER: Yes, parking will be provided. The parking lot is 10 feet from jobsite building.

9) Can equipment be delivered to the site prior to the installation period? Is there a designated person to receive deliveries?

ANSWER: Yes, deliveries to the jobsite prior to installation are approved and there is a designated person to receive all deliveries. Contact information will be provided to the selected Proposer after the project has been awarded.

10) Will secure on-site storage be available for AV equipment, tools, and materials during (and before) installation?

ANSWER: Yes, secure on-site storage is available for AV equipment, tools, and materials for installation.

11) If project delays are caused by the client, how will labor and material cost increases be handled?

Can overhead cost increases be passed on to the client? If project delays are caused by the client, how will labor and material cost increases be handled? Can overhead cost increases be passed on to the client?

ANSWER: Cost increases will not be passed along once PO is issued due to schedule.

12) Since installing an LED wall will require a modification in the wall like reenforcing the wall or blocking of the wall, will this project require B-license for the safety?

ANSWER: No, a B-license will not be required. The County is responsible for wall reinforcements.

Administrator

Invitation to Bid Sheriff’s Technical

Services Audio-Visual System

No. SHR127-ADMSR-6561

13) If the contractor is responsible for the electrical work, will this project consider C-7 or C-10 as a requirement?

ANSWER: The County is responsible for electrical work. A C-7 is required.

14) Is removal/demolition of existing AV equipment part of the contractor's scope? If so, please identify the equipment to be removed.

ANSWER: No, there is no existing AV equipment.

15) Is electrical work (beyond low-voltage plug-in connections) included in the AV contractor's scope, or will it be provided by others?

ANSWER: Electrical work will be provided by the County.

16) In the RFP document, it states that the payment term is Net 60 after invoice and acceptance and also states that terms under Net 45 is not accepted. Does that mean either Net60 or Net45 is allowed?

ANSWER: The San Bernardino County standard payment terms are Net 60 days after date of invoice and acceptance of the complete systems. Net 45 terms might be considered by the County.

17) Is there a stated budget ceiling or Independent Government Cost Estimate (IGCE) for this project?

ANSWER: The total amount allocated is $126,818.

18) What is the required project completion date, or duration allowed from Notice to Proceed?

ANSWER: The completion date is January 1, 2027.

19) Are liquidated damages applicable if the completion date is missed? If so, what is the daily or business-day rate?

ANSWER: In the event of any violation of the clause set for in paragraph C.1 of the Federal Contracting Provisions in Attachment C, liquidated damages will apply. Such liquidated damages shall be computed with respect to each individual laborer or mechanic, including watchmen and guards, employed in violation of the clause set forth in paragraph (C)(1) of this section, in the sum of $10 for each individual, for each calendar day on which such individual was required or permitted to work in excess of the standard workweek of forty hours without payment of the overtime wages required by the clause set forth in paragraph (C)(1) of this section.

20) What are the approved working hours (e.g., standard business hours, after-hours, weekends)? Are there restrictions such as holidays or alternate Fridays?

ANSWER: All hours, including after-hours and weekends, are approved, excluding holidays.

21) What insurance is required (Workers' Compensation, Commercial General Liability, Auto Liability, Umbrella), and what are the required coverage limits?

ANSWER: Workers’ Compensation/Employer’s Liability – A program of Workers’ Compensation insurance or a state-approved, self-insurance program in an amount and form to meet all applicable requirements of the Labor Code of the State of California, including Employer’s

Administrator

Invitation to Bid Sheriff’s Technical

Services Audio-Visual System

No. SHR127-ADMSR-6561

Liability with $250,000 limits covering all persons including volunteers providing Services on behalf of the Contractor and all risks to such persons under the Contract.

If Contractor has no employees, it may certify or warrant to the County that it does not currently have any employees or individuals who are defined as “employees” under the Labor Code and the requirement for Workers’ Compensation coverage will be waived by the County’s Director of Risk Management.

With respect to Contractors that are non-profit corporations organized under California or federal law, volunteers for such entities are required to be covered by Workers’ Compensation insurance.

Commercial/General Liability Insurance – Contractor shall carry General Liability Insurance covering all operations performed by or on behalf of the Contractor providing coverage for bodily injury and property damage with a combined single limit of not less than one million dollars ($1,000,000), per occurrence. The policy coverage shall include:

a. Premises operations and mobile equipment.

b. Products and completed operations.

c. Broad form property damage (including completed operations).

d. Explosion, collapse, and underground hazards.

e. Personal injury.

f. Contractual liability.

g. $2,000,000 general aggregate limit.

Automobile Liability Insurance – Primary insurance coverage shall be written on ISO Business Auto coverage form for all owned, hired, and non-owned automobiles or symbol 1 (any auto). The policy shall have a combined single limit of not less than one million dollars ($1,000,000) for bodily injury and property damage per occurrence.

If the Contractor is transporting one or more non-employee passengers in performance of Contract Services, the automobile liability policy shall have a combined single limit of two million dollars ($2,000,000) for bodily injury and property damage per occurrence.

If the Contractor owns no autos, a non-owned auto endorsement to the General Liability policy described above is acceptable.

Umbrella Liability Insurance – An umbrella (over primary) or excess policy may be used to comply with limits or other primary coverage requirements. When used, the umbrella policy shall apply to bodily injury/property damage, personal injury/advertising injury and shall include a “dropdown” provision providing primary coverage for any liability not covered by the primary policy. The coverage shall also apply to automobile liability.

22) Are bid, performance, and/or payment bonds required? If so, what percentage of contract value applies to each?

ANSWER: A bid/performance/payment bond is not required for this project.

23) Is TAA compliance (FAR 52.225-5) or Buy American required for all AV equipment supplied?

ANSWER: No, neither is required.

Administrator

Invitation to Bid Sheriff’s Technical

Services Audio-Visual System

No. SHR127-ADMSR-6561

24) Will award be based on Lowest Price Technically Acceptable (LPTA), or is there a weighted best-value evaluation? If weighted, please provide the evaluation criteria and weighting.

ANSWER: The award is based on Lowest Price Technically Acceptable.

25) What is the required maintenance period after installation, and what frequency is expected (annual, bi-annual, quarterly, monthly)?

ANSWER: Quarterly maintenance is required during the one-year warranty period.

26) What warranty period is required for equipment (manufacturer pass-through warranty)?

ANSWER: The contractor shall provide a minimum one-year warranty covering all equipment, installation, and workmanship.

27) What warranty period and response times are required for contractor service (email/call response time, on-site response time)?

ANSWER: The contractor shall provide a minimum one-year warranty covering all equipment, installation, and workmanship. Next-business-day support and response time are required for all service requests.

28) Will remote access to the AV system be permitted for ongoing support? If so, what are the access requirements and approval process?

ANSWER: Remote access will not be permitted for ongoing support.

29) Is end-user/staff training required as part of the scope of work?

ANSWER: Yes.

30) Where will the inputs/sources would be? Will it be in the same room where the 8x8 AV switcher would be?

ANSWER: The inputs/sources will be in the same rack as the AV switcher.

31) Where will the control panel would be installed? in the AV / Equipment Room? Controlling both videowall?

ANSWER: The control panels shall be installed adjacent to each respective video wall. Each control panel will independently operate its corresponding video wall, providing control of power, input selection, and other applicable AV functions. Final placement shall be coordinated with County Technical Services prior to installation.

32) Will the players and sources all be existing devices? Where are these located, do we need to add signal extenders? Are they all HDMI interfaces?

ANSWER: There are no existing devices.

Administrator

Invitation to Bid Sheriff’s Technical

Services Audio-Visual System

No. SHR127-ADMSR-6561

33) Who will handle power/Electrical works? If AV contractor will handle, will there be spare circuit breakers for the videowall? How far will the Electrical panel to the videowall locations?

ANSWER: The County is responsible for electrical work and yes, there is a spare circuit breaker for the videowall. There shall be 50 feet from the electrical panel to the videowall location.

34) Who will handle the wall support and wall renovation? Are the walls able to support the new videowall?

ANSWER: The County is responsible for all wall reinforcements.

35) Are we to reuse any exiting AV rack / equipment rack?

ANSWER: The contractor can use the existing rack in the intermediate distribution frame room.

36) Are we allowed to use existing conduits?

ANSWER: Yes, if conduit is available, it can be used, however, more cables were ran using J hooks.

37) Are there any IT/ network restrictions in the facility? May we know these restrictions?

ANSWER: There are no restrictions in the facility.

38) There are no audio components in the bid docs, can you confirm that there is no scope for audio system?

ANSWER: A minimum of two speakers is requested in the lobby walkway. Please see Scope of Work and Attachment E – Equipment/Installation Price Sheet attached hereto.

39) Are there any other existing devices that will be integrated in this new system?

ANSWER: There will be no integration of existing devices.

40) How many inputs/sources do you wish to see in the videowall at a time in Picture-in-Picture mode.

ANSWER: A minimum of 8 Inputs/Sources. Computers and Satellite TV will be provided by the County.

41) Please share as-built drawing / floorplans of the facility.

ANSWER: Please see Attachment G – Overall Plan attached hereto.

42) How many inputs and sources are you expecting on the LED wall?

ANSWER: A minimum of 8 Inputs/Sources.

43) Can the County confirm whether they will be providing the power for the video walls or if it is the responsibility of the vendor?

ANSWER: The County will provide the power for the video walls.

Administrator

Invitation to Bid Sheriff’s Technical

Services Audio-Visual System

No. SHR127-ADMSR-6561

44) At the job-walk, speakers were requested in the lobby. This is not mentioned in the equipment list provided in the RFP. Please confirm the amount of speakers.

ANSWER: A minimum of two speakers is requested in the lobby walkway. Please see Scope of Work and Attachment E – Equipment/Installation Price Sheet attached hereto.

45) Please confirm if there are existing electrical power outlets located directly at or near the designated installation locations to plug in and power the displays

ANSWER: There are no existing electrical lines at or near the installation location. The outlet will be installed by the County per design specifications of the awarded contractor.

46) Please confirm whether local video/audio input connections/sources are needed.

ANSWER: Local video/audio input connections/sources are not needed. Sources (Computers and Satellite TV) will be provided by the County.

47) Can the County confirm whether they will be providing the power for the video walls or if it is the responsibility of the vendor?

ANSWER: The County will provide the power for the video walls.

48) At the job-walk, speakers were requested in the lobby. This is not mentioned in the equipment list provided in the RFP. Please confirm the amount of speakers.

ANSWER: A minimum of two speakers is requested in the lobby walkway.

49) What will be the exact source list?

ANSWER: The source list has not been determined at this time. Sources will include various computers and satellite TV.

50) What is the source desired for the preview monitor?

ANSWER: The source list has not been determined at this time. Sources will include various computers and satellite TV.

Administrator

Invitation to Bid Sheriff’s Technical

Services Audio-Visual System

No. SHR127-ADMSR-6561

SCOPE OF WORK

The San Bernardino County Sheriff’s Department is procuring a turnkey audio-visual system to deploy two indoor direct-view video wall displays at its Tech Services Division (TSD) facility, located at 1040 E. Cooley Drive, Colton, CA. The project involves design, supply, installation, programming, and commissioning of a complete video wall system in two areas of the facility: a Hallway Area and an Office Area. Each area will receive a wall-mounted, fine-pitch LED video wall display (or equivalent high-resolution large-format display technology) of approximately 5.5 ft (height) by 9.8 ft (width) in the hallway, and approximately 4.5 ft by 7.8 ft in the office. A minimum of two (2) speakers is requested for the lobby walkway area, and the speakers must be compatible with the existing audio-visual system. The Contractor may propose the speaker type, size, and configuration that best meets the operational and installation requirements of the project. The video walls, along with an integrated control and switching system, will enable flexible display of multiple video and computer sources for improved situational awareness and operational capabilities within TSD. The Contractor shall furnish all labor, equipment, materials, and services required to deliver a complete, functional, and professionally installed video wall system meeting the requirements described in this Scope of Work.

DEFINITIONS FOR ATTACHMENT E – EQUIPMENT / INSTALLATION PRICE SHEET

• Composite Video Baseband Signal (CVBS)

• Communication Multipurpose Plenum (CMP)

• Digital Twisted Pair (DTP)

• Digital Signal Processing (DSP)

• High-Definition Multimedia Interface (HDMI)

• High Dynamic Range (HDR)

• Light Emitting Diode (LED)

• National Electrical Manufacturers Association (NEMA)

• Power over Ethernet Plus (PoE+)

• Serial-Wireless Local Area Network (LAN)

• Standard Definition-Serial Digital Interface (SD-SDI)

Administrator

Invitation to Bid Sheriff’s Technical

Services Audio-Visual System

No. SHR127-ADMSR-6561

ATTACHMENT E – EQUIPMENT / INSTALLATION PRICE SHEET

ITEM QTY DESCRIPTION Unit Price Extended Price

VIDEO WALL - HALLWAY

1. 1 1 Indoor Video Display(s) - 1350x2400, 1.2mm - 5 ft-6.44 in H x 9 ft-10.11 in W x 0 ft-

0.95 in D (approx. dimensions) - with comprehensive spare parts package including 18 modules

EA $ $

2. 5 Network Cable Pull Kits; Keystone, Wall Plate, Mud Ring, etc.

EA $ $

3. 1 Display Installation kits EA $ $

4. 2 Speaker EA $ $

VIDEO WALL – OFFICE AREA

5. 1 1 Indoor Video Display(s) - 1080x1920, 1.2mm - 4 ft-5.15 in H x 7 ft-10.49 in W x 0 ft-

0.95 in D (approx. dimensions) - with comprehensive spare parts package including 12 modules

EA $ $

6. 4 Network Cable Pull Kits; Keystone, Wall Plate, Mud Ring, etc.

EA $ $

7. 1 Display Installation kits EA $ $

VIDEO SYSTEM

8. 1 8x8 4K60 4:4:4 HDR AV Switcher EA $ $

9. 2 17.3 in MONITOR 3G/HD/SD-

SDI/HDMI/CVBS IN AND LOOP OUT

EA $ $

10. 3 HDMI 2.1 Cable, 48 Gbps, 3 ft (0.9 m) - 3 ft HDMI A/V Cable for Audio/Video Device - First End: 1 x 19-Pin HDMI 2.1 Type A Digital Audio/Video - Male - Second End: 1 x 19-Pin HDMI 2.1 Type A Digital Audio/Video - Male - 48 Gbit/s

Administrator

Invitation to Bid Sheriff’s Technical

Services Audio-Visual System

No. SHR127-ADMSR-6561

11. 4 HDMI 2.1 Cable, 48 Gbps, 6 ft

(1.8 m) - 6 ft HDMI A/V Cable for Audio/Video Device - First End: 1 x 19-Pin HDMI 2.1 Type A Digital Audio/Video - Male - Second End:

1 x 19-Pin HDMI 2.1 Type A Digital Audio/Video - Male

- 48 Gbit/s

CONTROL SYSTEM

12. 1 Control System (single controller unless video equipment requires two)

EA $ $

13. 1 10.1 in. Wall Mount Touch Screen, Black Smooth

EA $ $

14. 1 Rack Mount Kit for – ForTouch Panel, Rack

- 4U Rack Height – Rack mountable

- Meta

NETWORK

15. 1 8-port Gigabit Ethernet PoE+ Unmanaged Switch (GS108PP) - 8 Ports - 2 Layer Supported - Twisted Pair - Desktop, Wall Mountable, Rack mountable- Lifetime Limited Warranty

EA $ $

16. 1 PD Rack Mounted Power Distribution Unit - 15 Amp, 9 Outlet PDU - Basic Surge Protection - NEMA 5-15P - 9 x NEMA 5-15R - 9 ft Cord - 15 A Current - 120 V AC Voltage – Rack mountable- Black Anodized

EA $ $

17. 1 10GX63F Multi-Conductor - Enhanced Category 6A F/UTP Bonded-Pair Cable - 1000 ft Category 6a Network Cable for Network Device - First End: Bare Wire - Second End:

Bare Wire - 10 Gbit/s - Shielding - FT6, CMP Plenum - 23 AWG - Black, White/Blue

Administrator

Invitation to Bid Sheriff’s Technical

Services Audio-Visual System

No. SHR127-ADMSR-6561

18. 1 LBP Horizontal 4in Offset L-Shaped

Rack Cable Management Lace Bar - 10 Pack

- TAA Compliant - Horizontal Lacing Bar - Black – 19 in Panel Width - Aluminum - 10 Pac

EA $ $

19. 2 2U Blank Panel - Black - 3.5 in H - 19 in W -

0.5 in D

EA $ $

20. 1 1U Blank Panel - Black - 3.5 in H – 19 in W -

0.5 in D

INSTALLATION

21. 1 Firm Fixed Priced Installation Services (Prevailing Wages) Must include California Department of Industrial Relations (DIR) number

22. 1 Firm Fixed Priced Materials and Expenses EA $ $

E – WASTE

23.

E-Waste fees EA $ $

SHIPPING

24. 1 SHIPPING CHARGE EA $ $

ATTACHMENT G – OVERALL PLAN