SEFO Kent Warehouse Questions and Answers .pdf
PDF 91 KB Posted
- Attached to
- FBI Seattle Division Window and Skylight Security Protection for the Kent Warehouse Project
- Solicitation number
- SHOP-PR-24-001429
About this file
The provided document is a set of Questions and Answers related to a federal contract opportunity for the FBI Seattle Division's Window and Skylight Security Protection for the Kent Warehouse Project. The key details include:
The RFQ is seeking a company to furnish and install window blast film, Kane security screens, and manbars at a warehouse located in Kent, Washington per the Statement of Work (SOW) requirements. This requirement is set aside for total small business and will be awarded based on Lowest Price Technically Acceptable (LPTA). The document confirms the dimensions of the window/door glass pieces are 69.5" high by 30" wide, and that a clean, climate-controlled space will be provided for the film installation. There is no cost estimate, budget, or actual start date listed, but the delivery dates are stated in the SOW.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| FBI SEFO - RFQ-_Kent_Warehouse.pdf | ||
| Key_Management_Personnel_List.xlsx | XLSX spreadsheet | |
| FBI SEFO - SOW.DOCX-_Kent_Warehouse_21MayRevision.pdf | ||
| FBI SEFO - SOW.DOCX-_Kent_Warehouse.pdf | ||
| FBI SEFO - RFQ-_Kent_Warehouse.pdf | ||
| SEFO- Kent Warehouse - Self Certifying Document .xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Questions and Answers
• I have a question regarding the dimensions of the windows and doors at the front of the space.
Are both sides of the glass windows/doors the same dimensions? Specifically, are you referring to the door with a large glass area that measures 69.5" high by 30" wide? Yes, both door window glass pieces are the same measurements of 69.5” high by 30”. Also, both doors have a handlebar going through the middle.
• Is there a cost estimate, budget or ballpark figure for the project listed? No
• Is there an actual start date for the project? Delivery dates are stated under deliverable in the
SOW.
• Can a clean, warm area be provided in the building where the contractor can install the film? Yes, the film will be installed in a reasonably clean, climate-controlled space.