Shiloh ES_Int Renv_Ad for Bid_20241004.pdf
PDF 113 KB Posted
- Attached to
- Shiloh ES - Interior Renovations
- Solicitation number
- PE-77021-NONST-2025-000000116
- Issued by
- Crisp County, Georgia
About this file
This document is an advertisement for bid for the interior renovations project at Shiloh Elementary School in Gwinnett County, Georgia. The project is being solicited by the Gwinnett County Board of Education. Sealed bids will be received until 3:00 PM local time on Tuesday, November 12, 2024, at which time they will be publicly opened and read aloud. Bidders must submit an AIA Document A305 Contractor's Qualifications Statement prior to receiving the bidding documents. A mandatory pre-bid conference will be held on site on Tuesday, October 21, 2024, at 3:00 PM local time, and failure to attend will result in disqualification. The contract, if awarded, will be on a lump sum basis, and the bids may not be withdrawn for 60 days after the bid opening. Bid bonds and performance and labor/material payment bonds will be required.
The bid documents, including drawings and project manual, will be available for review at the architect's office and the owner's office. Contractors are not to solicit pricing from the Energy Management and Control System (EMCS) subcontractor, as Frazier Controls will contract directly with the Gwinnett County Public Schools to furnish and install the EMCS system. Coordination between the contractor and Frazier Controls will be required.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Shiloh ES_Addendum No_1.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Shiloh Elementary School Interior Renovations 00 11 13 - Page 1 Project Number FSF Architecture - 2413 Advertisement for Bid
ADVERTISEMENT FOR BID
SHILOH ELEMENTARY SCHOOL
INTERIOR RENOVATIONS
SHILOH ELEMENTARY SCHOOL
2400 Ross Road
Snellville, Georgia 30039 for the
GWINNETT COUNTY BOARD OF EDUCATION
GWINNETT COUNTY, GEORGIA
Sealed Bids will be received from Bidders by the Gwinnett County Board of Education, 53 Gwinnett Drive, Lawrenceville, Georgia 30046, Bldg. “C” Conference Room, for: The furnishing of all labor, materials, and services necessary for the construction of the Interior Renovations project at Shiloh Elementary School, until 3:00 PM local time on Tuesday, November 12, 2024. Bids will be opened publicly and will be read aloud at the time and place stated above. Bids received after the above time is called will not be accepted.
No phones will be available.
All Bidders must submit AIA Document A305 Contractor’s Qualifications Statement to be evaluated by the Owner and Designer prior to being issued bidding documents. Bidders who do not submit the A305 Statement will be subject to disqualification. The A305 must show the Contractor’s ability to complete the Contract in a satisfactory manner on projects of similar scope and complexity. References from past clients and projects must be included and will be verified.
Statement of Qualifications must be received by the Architect and Owner for evaluation prior to issuance of the documents to Contractors. Send your Statement of Qualifications and requests for Bid documents to the office of Foreman Seeley Fountain Architecture via email – braxton@fsfarchitecture.com. If you have questions you may contact: Jerry A. Fountain, Principal - 3091 Governors Lake Drive, Suite 150, Peachtree Corners, Georgia 30071, Phone: 770-729-8433. Applications for Bid documents, together with a non-refundable payment of $250.00 per hard set and a Statement of Qualifications, must be received by Foreman Seeley Fountain Architecture prior to issuance of the documents to Contractors. Or, the proposer may request access to the firms FTP website for the documents at no charge. These Bid documents, including all drawings and project manual, will be forwarded as soon as possible if the Contractor is approved for bidding the project.
A copy of the Bidding Documents, including Drawings and Project Manuals, shall be available for review at the Architect’s office, the Owner’s office.
As part of the pre-qualification process, a mandatory Pre-Bid Conference will be held on site at Shiloh Elementary School on Tuesday, October 21, 2024, at 3:00 PM local time. Failure to attend the Pre-Bid Conference shall result in disqualification of the Bidders. Representative shall be Project manager or Estimator directly responsible for the Bid of this project. Any Bidders may be required, at the discretion of the Owner, to furnish evidence satisfactory to the Owner that his proposed subcontractors have sufficient means and experience in the types of work called for to assure completion of the contract in a satisfactory manner. Any Bidders that are disqualified may respond to the Owner in writing within 20 days of the Notice of Disqualification as to why the Bidders feel that the disqualification is unfounded. The written appeal from the disqualified Bidders will not change the decision already made on this project. However, a favorable appeal may open the way for the Bidders in question to Bid on future Gwinnett County Public School projects.
Contract, if awarded, will be on a lump sum basis. The bids may not be withdrawn for a period of sixty (60) days after date of opening. Bids must be accompanied by an AIA Document A310 Bid Bond made payable mailto:braxton@fsfarchitecture.com
00 11 13 - Page 2 Shiloh Elementary School Interior Renovations Advertisement for Bid Project Number FSF Architecture - 2413 to Gwinnett County Public Schools, in an amount equal to 5 percent of the Base Bid price. The successful Bidders will be required to furnish a Performance Bond and a Labor and Material Payment Bond, each equal to 100% of the Contract Sum. These bonds are to be executed by a Surety Company licensed to do business in the State of Georgia, listed on “Department of the Treasury Circular 570”, latest edition, and have an A.M. Best Company rating of at least Class “A”, with a Financial Size of VI or better. Bonds must be accompanied by letter stating company’s current Owner/Contractor agreement.
Time is of the essence to the Contract performance. Notice to Proceed will be issued after the Pre- Construction meeting as soon as all required paperwork such as Contracts, Bonds, Insurance, Submittals, etc. are in order. Contractor shall mobilize within ten (10) days of the Notice to Proceed; however, construction must be performed by a completion date of July 25, 2025.
Performance Bond and Labor and Material Payment Bond, each equal to 100% of the Contract Sum will be required of the successful bidder and from successful Mechanical/HVAC, Plumbing, Electrical, Fire Protection, Subcontractors. These bonds are to be executed by a Surety Company licensed to do business in the State of Georgia, be listed on “Department of the Treasury Circular 570” and have an A.M. Best Company rating of at least Class “A”, with a Financial Size of VI or better. Bonds must be accompanied by letter stating company’s current rating for verification prior to acceptance by the Owner and execution of the formal Owner/Contractor agreement.
The above description is an advertisement for the submission of Bids which are to be considered as offers of performance of work by the submitting party. The Owner reserves the right to accept or reject any or all Bids and to waive technicalities.
Contractors are not to solicit Energy Management and Control System (EMCS) cost numbers from Frazier Controls, nor include pricing for installing EMCS installation in the bid. Frazier Controls shall contract directly with Gwinnett County Public Schools. Frazier Controls will furnish and install the EMCS. Contractors and Frazier Controls shall coordinate together to facilitate the EMCS installation.
| SHILOH ELEMENTARY SCHOOL |
| INTERIOR RENOVATIONS |
| SHILOH ELEMENTARY SCHOOL |
| for the |
| GWINNETT COUNTY BOARD OF EDUCATION |
| GWINNETT COUNTY, GEORGIA |
File details come from the government source that posted it. Updated .