Shell_Point_Tennis_Pickleball_Court_Resurfacing_(Addendum_#1_Revision).pdf
PDF 642 KB Posted
- Attached to
- Shell Point Tennis/Pickleball Court Resurfacing
- Solicitation number
- 102026
- Issued by
- Beaufort County, South Carolina
About this file
This Addendum #1 Revision document pertains to the Shell Point Tennis/Pickleball Court Resurfacing project in South Carolina and clarifies modifications to the original solicitation. The project scope involves repairing and resurfacing hybrid tennis/pickleball courts at Shell Point Park that have been closed due to pavement upheaval caused by root intrusion. The work includes severing and treating roots, repairing and re-paving the court surfaces, and removing and replacing the surrounding fence. The addendum addresses changes to project specifications, bid requirements, or contract terms established in the original request for proposals, ensuring all bidders have consistent and current information for submission.
The addendum revision establishes clarifications or corrections necessary for contractors to prepare accurate and compliant bids for this county maintenance and improvement project. By revising the addendum documentation, the county ensures transparency in the bidding process and provides all qualified contractors with equal access to updated requirements, reducing the risk of bid protests or construction disputes. This document is essential for contractors to reference when developing proposals and cost estimates for the court resurfacing work.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| IMG_1497.JPG | JPG image | |
| IMG_1527.JPG | JPG image | |
| IMG_1515.JPG | JPG image | |
| IMG_1520.JPG | JPG image | |
| IMG_1516.JPG | JPG image | |
| IMG_1519.JPG | JPG image | |
| IMG_1522.JPG | JPG image | |
| IMG_1506.JPG | JPG image | |
| IMG_1511.JPG | JPG image | |
| IMG_1508.JPG | JPG image | |
| IMG_1507.JPG | JPG image | |
| AERIAL_VIEW_1.png | PNG image | |
| IMG_1501.JPG | JPG image | |
| IMG_1500.JPG | JPG image | |
| IMG_1513.JPG | JPG image | |
| AERIAL_VIEW_2.png | PNG image | |
| Exhibit_4_-_Monthly_Compliance_Status_Report.pdf |
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BID DOCUMENTS
SHELL POINT TENNIS/PICKLEBALL COURT
RESURFACING
IFB # 102026
Prepared By: Beaufort County Procurement Services
Dated: Friday, September 11, 2026
Proposal Due Date: Tuesday, October 20, 2026, 2:00 pm (EST)
IFB #102026 DOCUMENTS Page 2
IMPORTANT ELECTRONIC SUBMITTAL REQUIREMENTS
Response submittals for this Invitation For Bid will ONLY be received electronically and must be submitted ONLINE, through the Procurement Portal, no later than 2:00 pm on Tuesday, October
20, 2026.
All responses must adhere to the following guidelines:
• Suppliers are encouraged to submit responses as soon as possible. Responses are received through our secure Procurement Portal and cannot be opened prior to the due date and time. The time and date of receipt as recorded by the server will serve as the official time of receipt. The County is not responsible for late submissions, regardless of the reason.
• All requested information and forms MUST be uploaded as indicated in the
PROPOSAL SUBMITTAL Section. If you have a problem with your submittal, you may contact Support through the Procurement Portal.
TITLE VI STATEMENT
COUNTY COUNCIL OF BEAUFORT COUNTY
Title VI Statement to Prime Contractors, Subcontractors, Architects, Engineers, and
Consultants
It is the policy of the County Council of Beaufort County, South Carolina, hereafter referred to as
“Beaufort County” or “the County”, to comply with Title VI of the 1964 Civil Rights Act (Title
VI) and its related statutes. To this end, Beaufort County assures that no person shall be excluded from participation in, denied the benefit of, or subjected to discrimination under any of its programs or activities on the basis of race, color, national origin, age, sex, disability, religion, or language regardless of whether those programs and activities are Federally funded or not. The
County is also committed to assuring every effort will be made to prevent the discrimination of low-income and minority populations as a result of any impact of its programs or activities. Beaufort County also assures that every effort will be made to prevent discrimination through the impacts of its programs, policies, and activities on minority and low-income populations. Additionally, the County will take reasonable steps to provide meaningful access to services for persons with limited English proficiency. In addition, Beaufort County will not retaliate against any person who complains of discrimination or who participates in an investigation of discrimination. Beaufort County will, where necessary and appropriate, revise, update, and incorporate nondiscrimination requirements into appropriate documents, directives, and regulations.
https://procurement.opengov.com/portal/bcgov/projects/302356/document?section=undefined
IFB #102026 DOCUMENTS Page 3
Pursuant to Title VI requirements, any entity that enters into a contract with Beaufort County including, but not limited to Prime Contractors, Subcontractors, Architects, Engineers, and
Consultants, may not discriminate on the basis of race, color, national origin, age, sex, disability, religion, or language in their selection and retention of first-tier subcontractors, and first-tier subcontractors may not discriminate in their election and retention of second-tier subcontractors, including those who supply materials and/or lease equipment. Further, Contractors may not discriminate in their employment practices in connection with highway construction projects or other projects assisted by the U.S. Department of Transportation (USDOT) and/or the Federal
Highway Administration (FHWA).
In all solicitations either by competitive bidding or negotiation made by the Contractor for work to Beaufort County to be performed under a subcontract, including procurements of materials or leases of equipment, each potential subcontractor or supplier shall be notified by the Contractor of the Contractor's obligations under the contract and the Title VI regulations relative to nondiscrimination on the basis of race, color, national origin, age, sex, disability, religion, or language by providing such a statement in its bidding and contract documents.
Upon request, the Contractor shall provide all information and reports required by Title VI requirements issued pursuant thereto, and shall permit access to its books, records, accounts and other sources of information, and its facilities as may be determined by Beaufort County, USDOT, and/or FHWA to be pertinent to ascertain compliance with such regulations, orders, and instructions. Where any information required of a Contractor is in the exclusive possession of another who fails or refuses to furnish this information, the Contractor shall so certify to USDOT or FHWA, as appropriate and via Beaufort County, and shall set forth what efforts it has made to obtain the information. In the event of the Contractor's non-compliance with nondiscrimination provisions of this contract, USDOT may impose such contract sanctions as it or FHWA may determine to be appropriate, including, but not limited to:
• Withholding of payments to the Contractor under the contract until the Contractor complies, and/or
• Cancellation, termination, or suspension of the contract, in whole or in part.
In the event a Contractor becomes involved in, or is threatened with, litigation with a subcontractor or supplier as a result of this direction to comply with Title VI, the Contractor may request USDOT to enter into such litigation to protect the interests of USDOT and FHWA. Additionally, the
Contractor may request the United States to enter into such litigation to protect the interests of the
United States. Any person or Subcontractor who believes that they have been subjected to an unlawful discriminatory practice under Title VI has a right to file a formal complaint within one hundred eighty (180) days following the alleged discriminatory action. Any such complaint must be filed in writing or in person:
Beaufort County Government Post Office Drawer 1228 | Beaufort, SC 29901-1228
843-255-2304 Telephone | E-mail: dthomas@bcgov.net mailto:dthomas@bcgov.net
IFB #102026 DOCUMENTS Page 4
IFB #102026 DOCUMENTS Page 5
INVITATION FOR BID
Dates Advertised: September 16, 2026
This is a Formal Sealed Bid
We require Bids to be Electronically submitted through the Procurement Portal. Please go to https://procurement.opengov.com/portal/bcgov and sign up to submit your bid.
BIDS WILL BE RECEIVED UNTIL 2:00 pm LOCAL TIME ON Tuesday, October 20, 2026.
Bid Title: Shell Point Tennis/Pickleball Court Resurfacing Bid No: 102026
PREBID CONFERENCE: A Pre-Bid conference will be held on Wednesday, September 30, 2026 at 2:00 pm p.m. virtually through Teams. This is a Non-Mandatory meeting; all interested bidders and subcontractors are encouraged to attend. Teams: Please email gmurray@bcgov.net for your
TEAMS invitation.
All questions must be submitted through the Procurement Portal no later than 5:00 pm on
Wednesday, October 7, 2026.
A Bid Tabulation Will Be Posted On The Procurement Portal After Bid Opening.
BID ACCEPTANCE AND DELIVERY (Prices bid must be firm for a minimum of 90 Days). In compliance with the Invitation, and subject to all conditions thereof, the Offeror agrees, if this bid is accepted within (90) days from date of opening, to furnish any or all items quoted on at prices as set forth after the item and to make delivery within 180 after receipt of order with transportation cost included and prepaid. Unless otherwise stated and accepted herein, the Offeror agrees to complete this proposed contract in less than thirty (30) calendar days after issue date of purchase order.
I M P O R T A N T
IF YOU CONSIDER THESE SPECIFICATIONS AS RESTRICTIVE, SEE GENERAL
PROVISIONS, PARAGRAPH #20, DISCREPANCIES.
Bids received after the time specified for opening cannot be considered.
https://procurement.opengov.com/portal/bcgov
IFB #102026 DOCUMENTS Page 6
BID INVITATION
Shell Point Tennis/Pickleball Court Resurfacing 102026
Sealed bids submitted through the Procurement Portal will be received electronically until 2:00 pm on Tuesday, October 20, 2026 at which time responses to this request will be recorded in the presence of one or more witnesses in the Procurement Services Department. A Bid Tab will be posted on the Procurement Portal for:
Shell Point Tennis/Pickleball Court Resurfacing
A PRE-BID conference will be held on Wednesday, September 30, 2026 at 2:00 pm p.m.
virtually through Teams. This is a Non-Mandatory meeting; all interested bidders are encouraged to attend. TEAMS: Please email gmurray@bcgov.net for your TEAMS invitation.
Bid documents are available through the Procurement Portal at https://procurement.opengov.com/portal/bcgov.
Beaufort County reserves the right to reject all proposals and to waive minor informalities and irregularities.
All Bids shall be accompanied by a Bid Bond drawn in favor of the Beaufort County Treasurer of Beaufort County, Beaufort, South Carolina, in the amount of at least five percent (5%) of the bid for the complete work: such Bid Bond representing that the Bidder, if awarded a contract, will promptly enter into a contract and furnish Performance Bond and Payment Bond as provided by law and approved by the attorney for Beaufort County, South Carolina. Each bond shall be equal one hundred percent (100%) of the contract amount. A copy of the Bid Bond or Certified
Check must be electronically sent with your bid documents through the Procurement Portal, as indicated in the Vendor Questionnaire Section. The original Bid Bond or Certified Check must be received by the Procurement Services Department within 10 days after the bid due date.
Failure on the bidder’s part to provide a copy of the Bid Bond or Certified Check by the Bid closing date and time will be considered as a nonresponsive bid and rejected by the County. The
Bid Bond shall be forfeited to the County Council of Beaufort County, South Carolina as liquidated damages if the Bidder fails to execute the contract and provide Performance and
Payment Bonds within fourteen (14) days after being notified that he has been awarded the
Contract.
The successful bidder shall secure and pay for necessary approvals, permits, assessments, and changes required for the construction and installation of this project as required by local, state, and federal regulations. County permits shall be required as applicable, but the fee shall be waived.
This waiver shall apply to the Beaufort County permit fee only and not to any "City or Town" permit fee and/or licenses, when applicable.
https://procurement.opengov.com/portal/bcgov
IFB #102026 DOCUMENTS Page 7
Bidders must comply with Title VI of the Civil Rights Act of 1964, the Anti-Kickback Act, the
Contract Work Hour Standard Act, and the National Occupational Safety and Health Act of
1970.
Bidders must certify that they do not and will not maintain or provide for their employees any facilities, which are segregated on the basis of race, color, creed, or national origin.
The Beaufort County Council reserves the right to reject all Bids and waive any formalities. Any claims for cost incurred by any bidders in preparation of any part of, or total package for this project will not be handled for reimbursement by Beaufort County or their representatives.
The Bidding Documents consist of the following, including all addenda issued there with and forms referenced therein, in addition to the drawings:
1. Bid Documents
2. Contract
3. General Conditions
4. Supplemental Conditions
5. General Provisions
6. Special Provisions
7. Specifications
Bid opening will be held at the Procurement Services Department. There will be no Public Bid
Opening. A Bid Tabulation will be posted on the Procurement Portal.
SCOPE OF WORK
Scope of Work
This project includes inspecting the existing Shell Point courts, cleaning and preparing the surface, repairing structural damage such as cracks, depressions, and unstable asphalt, removal of root intrusion, pruning roots, and repaving the courts with properly graded and compacted asphalt to ensure correct drainage; applying a multi-layer sports surfacing system with base, texture, and color coats; installing regulation line striping and necessary court accessories;
restoring any disturbed surrounding areas; maintaining safety throughout the project; and completing a final inspection and punch list to confirm quality and deliver warranty and maintenance recommendations.
Site Preparation
• Mill top 2” of asphalt and existing court surface.
• Saw cut areas of root intrusion.
IFB #102026 DOCUMENTS Page 8
• Excavate root intrusion area, root prune, backfill area compacting in 6” lifts.
• Patch asphalt in root intrusion areas.
• Flood court with water to check for low areas and identify all cracks and irregularities in the court surface.
• Any area that holds water at a depth of one-eighth inch (1/8”) or more after one (1) hour dry time shall be properly filled.
• Utilize acrylic fortified trowel grade crack filler in accordance with the manufacturer directions to achieve a smooth, even, and structurally sound playing surface suitable for resurfacing.
• Machine sand surface as needed for superior adhesion.
• Prepare the surface for the resurfacing material in accordance with manufacturer directions.
• Excavate trench along the south side of the courts, approximately one hundred and ten feet (110’) long, one foot (1’) wide and three feet (3’) deep. Prune all roots that extend under the courts. Treat trench with a root inhibiting herbicide such as copper sulfate or equivalent, back fill with flowable fill.
• Repave entire court area
CONTRACT TERM
Contractor shall complete all work not later than 180 calendar days following the date of the
Notice to Proceed.
Liquidated Damages
Liquidated Damages are set at $400 per calendar day.
Surface repair and renovation
• All coatings and equipment utilized must meet the minimum standard specifications of
USAPA.
• Apply a minimum of two coats of court surfacing material to provide a uniform base.
• Install an acrylic color coating system specifically designed for pickleball courts.
• The color scheme shall consist of a blue in bounds playing area, light blue non-volley area, with green out of bounds areas. Refer to Attachment B - Pickleball Court Color
Scheme.
IFB #102026 DOCUMENTS Page 9
• Ensure the finished surface complies with USAPA standards for texture, slip resistance, playability, and durability.
• Apply a barrier seal line primer after masking tape has been laid to avoid “bleed under” when line paint is applied.
• Apply a minimum of two coats of textured white paint that provides clear contrast with the court surface colors.
• Lay out and stripe all lines straight, uniform, and accurately located to meet current tennis court regulation dimensional requirements.
• Lay out and stripe all lines straight, uniform, and accurately located to meet current pickleball court regulation dimensional requirements.
Net systems and equipment
• Remove existing pickleball and tennis net posts, nets, and related hardware.
• Nets that are in good condition shall remain property of the County, all others shall be properly disposed of by the Contractor.
• Provide and install new pickleball net posts, center anchors, and nets for two (2) pickleball courts with a height of thirty-six (36) inches at the sidelines and thirty-four
(34) inches at the center.
• Provide and install new tennis net post, center anchors, and net for one (1) tennis court with a height of thirty-six (36) inches at the sidelines and thirty-four
(34) inches at the center.
• Ensure all net systems are securely anchored, structurally stable, and capable of straightforward height adjustment and tensioning.
Fence and Gate Installation
• Remove existing twelve-foot (12) fence and gate/gates
• Provide and install twelve-foot (12) chain-link fence
• Coordinate the final fence layout, locations of gates, and tie ins with the County prior setting posts.
• Fence shall be black vinyl coated chain link, minimum 9 gauge (or equivalent), suitable for outdoor recreational use.
• All framework, including posts, rails, braces, and fittings, shall be galvanized steel with black vinyl coating, designed for exterior exposure.
IFB #102026 DOCUMENTS Page 10
• Fence and components shall conform to applicable ASTM standards for strength, coating, and durability.
• Ties, fasteners, and accessories shall be corrosion resistant and color matched to the fence system.
• Line posts, terminal posts, and gate posts shall be sized, spaced, and embedded in accordance with the manufacturer’s recommendations and applicable codes, wind load, and usage requirements.
• Install all fence components plumb, level, and properly tensioned, with secure anchorage.
• Set posts in concrete footings of adequate size for site soil conditions and design loads.
• Finish concrete footings flush with adjacent grade and slop surfaces to prevent water ponding or erosion.
• Provide and install three (3) gates as required for safe and convenient court access, with a clear opening of not less than five (5) feet unless otherwise directed by the County.
• Gates shall be six foot (6') black vinyl coated chain link construction and have the ability to open 180 degrees with lockable latches. No self-closing hinges will be allowed.
• Coordinate number, placement, and swing direction of gates with the County prior to installation to ensure safe access and egress.
Safety
• Develop and implement a comprehensive project specific safety plan addressing worker safety, public safety, and protection of County property and facilities.
• Ensure that all workers receive appropriate safety training and use suitable personal protective equipment (PPE) in accordance with OSHA and applicable regulations.
• Maintain a clean, orderly, and secure work area, minimizing hazards and disruptions to the daily park operations.
Site Access and Storage
• Coordinate with the County’s Project Manager to establish approved access routes, staging areas, and material storage locations.
• Provide equipment washout area, area of containment for the washout of equipment to keep rinseate from leaving the site.
IFB #102026 DOCUMENTS Page 11
• Store all equipment and materials in a secure manner that does not obstruct park pathways, parking areas, or other facilities, and does not create safety hazards for park users.
• County will not be held responsible for any stored materials or equipment.
Final Delivery and Closeout
• At substantial completion, conduct a final inspection and walkthrough with the County to verify that all work is complete and functional.
• Provide a final project report summarizing work performed, materials data, and recommended maintenance procedures.
• Deliver all applicable warranties, manufacturer guarantees, and maintenance manuals to the County in written form (and digital format if requested).
• Conduct a final walkthrough with County to identify any punch list items and corrective work to be completed within ten (10) calendar days of notification, unless otherwise approved by the County.
SMALL AND MINORITY BUSINESS PARTICIPATION
PLEASE REVIEW THIS SECTION CAREFULLY, PAYING PARTICULAR
ATTENTION TO “PRE-AWARD DOCUMENTS” DUE WITH THE BID/PROPOSAL,
THE “GOOD FAITH EFFORTS CHECKLIST”, AND EXHIBITS 1-3.
FAILURE TO FOLLOW THE PROGRAM REQUIREMENTS AND/OR FURNISH THE
REQUESTED DOCUMENTS MAY RESULT IN THE REJECTION OF YOUR
BID/PROPOSAL.
PRE-AWARD DOCUMENTS
Item/Form SubmissionRequirements
1 Program Overview n/a
2 Self-Performance Affidavit Indicates intention to perform work and/or provide services with own current workforce.
Due with bid/proposal only if self-performing
100%.
IFB #102026 DOCUMENTS Page 12
3 Good Faith Efforts Checklist
Indicates the actions undertook to recruit and solicit small and minority businesses for this project.
Due with bid/proposal.
4 Good Faith Agencies Distribution List
Indicates agencies that should receive notice of solicitation to small and minority businesses for this project.
Copy of notice sent to good faith agencies due with bid/proposal.
5 Outreach Written Notice Example
Sample of notice to be sent to small and minority businesses soliciting their participation for this project.
Copy of notice sent to small and minority businesses due with bid/proposal.
6 Non-Discrimination Statement – Exhibit 1
Certification that this project is open to all businesses and persons and that no business or person shall be excluded from participating in the Beaufort County procurement process.
Due with bid/proposal.
7 Outreach Documentation Log – Exhibit 2
Documents solicitation efforts to obtain small and minority business participation for this project.
Due with bid/proposal.
8 Proposed Utilization Plan – Exhibit 3
Listing of the small and minority businesses that will participate on this project and their proposed contract dollar amounts.
Due with bid/proposal.
POST-AWARD DOCUMENTS
Item/Form SubmissionRequirements
9 Compliance Efforts
If the successful bidder/proposer, indicates the actions required to earnestly carry out the small and minority business utilization plan and document payments thereof.
n/a
10 Monthly Compliance Status Report – Exhibit 4
Certifies monthly usage and payments to small and minority businesses.
Due monthly after work commences throughout the life of the contract.
IFB #102026 DOCUMENTS Page 13
* NOTE: Projects involving Federal funds may have Disadvantaged Business Enterprise
(DBE) participation goals and requirements of 49 CFR Part 26, Regulations of the U.S.
Department of Transportation (USDOT), or other Federal requirements prescribed by the
U.S. Department of Agriculture (USDA) or U.S. Department of Housing and Urban
Development (HUD). Contractors submitting bids on such projects will also have to meet any outlined DBE Program requirements listed in the bid documents and submit items, including but not limited to, the following: (1) Certification of Contractor to Comply with
DBE Requirements; (2) DBE Letter of Intent and Affirmation; (3) DBE Contract Totals and
Percentage; and (4) Bidder’s List Questionnaire. For a current list of South Carolina DBE firms, please visit www.scdot.org and go to “Doing Business with SCDOT”, then see “Office of Business Development and Special Programs” and click on “DBE Directory”. Likewise, any USDA and/or HUD requirements must be met in addition to Beaufort County’s requirements.
PROGRAM OVERVIEW
Introduction
Beaufort County recognizes that the South Carolina General Assembly, in South Carolina Code of
Laws Section 11-35-5210*, has declared that businesses owned and operated by minority persons have been historically restricted from full participation in our free enterprise system to a degree disproportionate to other businesses; and that it is in the state’s best interest to assist minority-owned businesses to develop fully as a part of the state’s policies and programs which are designed to promote balanced economic and community growth throughout the state. Therefore, Beaufort
County wishes to ensure that those businesses owned and operated by minorities are afforded the opportunity to fully participate in its overall procurement process for goods and services. Further, Beaufort County seeks to ensure that small businesses are likewise afforded the same participation opportunity as minority businesses. Consequently, attention of all bidders and proposers is called to contract conditions contained herein pertaining to Beaufort County’s “Small and Minority
Business Participation Program”, as prescribed in the Beaufort County Code of Ordinances
Section 2-537.2.
Definitions
Small Business means a for-profit concern, including its affiliates, that is independently owned and operated, not dominant in the field of operation in which it is bidding on government contracts, and qualified as a small business under the criteria and size standards in the Code of Federal
Regulations, Title 13, Part 121, as amended. Beaufort County refers to these businesses as Small
Business Enterprises or “SBE”.
Minority Business means a concern at least fifty-one percent (51%) owned by a person determined to be socially and economically disadvantaged. Socially disadvantaged means those persons who have been subject to racial or ethnic prejudice or cultural bias because of their identification as members of a certain group without regard to their individual qualities. Such groups include, but http://www.scdot.org/
IFB #102026 DOCUMENTS Page 14 are not limited to, Black Americans, Hispanic Americans, Native Americans (including American
Indians, Eskimos, Aleuts and Native Hawaiians), Asian Pacific Americans, women and other minorities to be designated by the Beaufort County Council. Economically disadvantaged means those socially disadvantaged persons whose ability to compete in the free enterprise system has been impaired due to diminished capital and credit opportunities as compared to others in the same business area that are not socially disadvantaged. Beaufort County refers to minority businesses as Minority Business Enterprises or “MBE”.
Small and Minority Business Enterprises will be abbreviated as “S/MBE”.
Provisions
The successful bidder or proposer, hereafter referred to as “Contractor”, is required to (1) make specific Pre-Award “Good Faith Efforts” to recruit S/MBE and (2) Post-Award “Compliance
Efforts” of its labors to utilize S/MBE, unless self-performing one hundred percent (100%) of the contract work. Falsification of any pre-award or post-award documents will be considered a serious breach of public trust and funds.
* SOUTH CAROLINA CODE OF LAWS, CHAPTER 35 “SOUTH CAROLINA
CONSOLIDATED PROCUREMENT CODE, SUBARTICLE 1 “ASSISTANCE TO
MINORITY BUSINESSES”
COMPLIANCE EFFORTS (POST-AWARD)
The successful Contractor is required to fulfill any Small and Minority Business Enterprise
(S/MBE) commitments made in conjunction with the “Pre-Award Good Faith Efforts”, unless good cause is demonstrated for any failure to fulfill such commitment.
If the Contractor intends to make any substitutions for any reasons, the Beaufort County
Compliance Office must be notified in writing within ten (10) business days for discussion and approval. No Contractor shall enter into an agreement with any S/MBE that would in any manner limit the S/MBE from selling or acting as a subcontractor to any other party.
Beaufort County shall have the right to inspect the Contractor’s records related to activity and expenditures to S/MBE utilized on its projects, to include related contracts/purchase orders and payment records, such as cancelled check copies. Further, designated Beaufort County personnel are permitted access to all work sites. Contractors and their staff should take measures to cooperate fully with all Beaufort County staff, including, but not limited to the Procurement Services
Director and Compliance Officer.
“Post-Award Compliance Efforts” require the Contractor to not only provide monthly reports regarding activity and expenditures to S/MBE, but also to maintain related records throughout the life of the project regarding its efforts to comply with the Small and Minority Business
Participation Program. The “Monthly Compliance Status Report” must be submitted to the
Compliance Office until the project ends, by the fifth (5th) day, reflecting the activity of the previous month.
IFB #102026 DOCUMENTS Page 15
After the County receives a monthly status report marked as “final”, the Contractor will be issued an affidavit to certify totals regarding S/MBE usage throughout the life of the project.
All questions regarding “Post-Award Compliance Efforts” should be directed to the Compliance
Office vie e-mail at dthomas@bcgov.net or (843) 255-2304.
VENDOR QUESTIONNAIRE
Certification*
I certify that this bid is made without prior understanding, agreement, or connection with any corporation, firm or any corporation, firm, or person submitting a bid for the same materials, supplies, or equipment, and is in all respects fair and without collusion or fraud. I agree to abide by all conditions of this bid and certify that I am authorized by the firm to submit this bid.
☐ Please confirm
*Response required
Contact information of authorized representative?*
Please enter name, title, phone and email of the authorized representative:
*Response required
Please Provide Licenses and Certificate of Insurance*
*Response required
100% Labor and Material Payment Bond*
If awarded, you will be required to submit a 100% Labor and Material Payment Bond when requested.
Please note, this is NOT due at the time of bid submission.
☐ Please confirm
*Response required
Bidder Confirmation*
1. BIDDER has examined all Contract Documents including Addenda.
2. BIDDER understands and accepts the terms and conditions of the Invitation to Bid, Instructions to Bidders, and all other Contract Documents.
3. BIDDER having examined the plans and specifications with related documents and the site of the proposed work, and being familiar with all of the conditions surrounding the construction of the proposed project including the availability of materials and supplies to construct the project in accordance with the contract documents, within the time set forth herein, and at the process stated below, proposed to enter into a contract with the County to provide the necessary machinery, tools, apparatus, all materials and labor, and other
IFB #102026 DOCUMENTS Page 16 means of construction necessary to complete the Work. The undersigned proposes to furnish and construct the items listed in the attached Schedule of Items for the unit prices stated.
4. BIDDER agrees that the cost of any work performed, materials furnished, services provided or expenses incurred, which are not specifically delineated in the Contract
Documents, but which are incidental to the scope, intent, and completion of the Contract, shall be deemed to have been included in the prices bid for the various items scheduled.
☐ Please confirm
*Response required
Communications*
Communications concerning this Bid should be addressed to the BIDDER’s company, to the attention of:
Name:
Address:
Email:
Telephone:
*Response required
Are you submitting this bid as a local vendor?*
☐ Yes
☐ No
*Response required
When equals "Yes"
Local Vendor Preference - Participation Affidavit*
Please download the below documents, complete, and upload.
• Local_Vendor_Preference_-_P...
*Response required
Non-Collusion Affidavit of Prime Bidder*
Please download the below documents, complete, and upload.
• Non-Collusion_Affidavit_of_...
*Response required
Will you be using subcontractors?*
☐ Yes
☐ No https://government-project.s3.us-west-2.amazonaws.com/96409/f84b38b5-bce5-4d5d-a82e-e1fd2b3faba8_Local_Vendor_Preference_-_Participation_Affidavit.pdf?X-Amz-Algorithm=AWS4-HMAC-SHA256&X-Amz-Content-Sha256=UNSIGNED-PAYLOAD&X-Amz-Credential=ASIA47RIURE4DNTRBGST%2F20260914%2Fus-west-2%2Fs3%2Faws4_request&X-Amz-Date=20260914T134449Z&X-Amz-Expires=72000&X-Amz-Security-Token=IQoJb3JpZ2luX2VjEB0aCXVzLXdlc3QtMiJIMEYCIQC9oJpC%2F%2B4WcV3r4DSkleQwk4g6Uh%2Fa6fcZPUYn70DpywIhAIh5lhK96UJBI9Tyy7bKgc89k7GfoIST9oa8dXfBa3zHKpUFCOX%2F%2F%2F%2F%2F%2F%2F%2F%2F%2FwEQAhoMODkyMzY0Njg3NjcyIgyZJ9JJZc1eEZcHmekq6QQ8rC3UhZmDCAzZxNnOriLD0kS%2FljzMKw8V84GzTwLRbi%2F0j8SODDOCwUQibLmY3wFGm08lygAChFBqN4jLlzssRnMjC8PTGEeQSqjW6SuzWvpTJGjkbeCQwzfKmbmyxWSPX6DqYwAtg8q51Yk%2BuY6zKhMrWBmjdPQdLv6ssgw9Y8MPccjUHWot7JrtBCz%2FsPnZGksgfC2nv6v3s9h61imN4kaVBEDWLi3JRu%2BLlp0fapWjDouWlKn4KvfUaCBvpLIK6bk2AvhoXxuqzesl6JncYOklX%2BC%2BBY6lA9%2BWU4m%2FuRfdfUOm3J5LihS8EgNm80IsHU2kLyRl5v7k3uIJgle4aBgAKxjsWhyxTQyjF0D6yhxvYUWq3tcM0zYI1gL7YSAtKeunbJc7CxU56zZjXKaT4CMXKxSajm9SBv8lMFpD%2BHvzrid%2FF17dcBUqIvjOuHSWvd0ZkWGMigeIHS8ED7DS7TFcuWIzS4EHbkve8J%2FUYN69rLUUIjlImbntyFrDURwH7%2Bjawm3Ghdpx5rkq4mmSfrCw985wep3mZ80GefoZA38a8%2BPU5O%2BlN%2FjDeih%2F0QOGOdKXP%2FxFJ%2BpK7JFkjAbs77yMUrd3QisG5p5uDwXloF6AVdkHN0uwXRDceWSkFNfML0Ala9Fa4xk%2F27N5C3q95HuSrNvF2z%2FNnANZevtVWiJV0SGeRkI1v6NeilZhjD7MdMITtsqopSpFvBrK8ThPHqM852ldMA7Iuc60Na%2Fe1NnD%2FVs1KXvcXKiZt4iN8Tt3%2BH7S20i5daAN%2BqDTVBIB2wHzDcX7EDi9216Ab5t8it3IM9deJriVzDDb3Z%2FVBjqYAW383LuVeiEC07qXKr268qJhQpkvAXvRUGMnMap7jOn7ifgEFvhJazcKBoyCEglp7NHlhmWgd2c7ei4ZZKlu7SG3Kl7tFt8bZf84R1fICfWtHFN3kX6%2BLPEeOO7tH8doxA5gt7tFolt2wcS0u6w46LqFN%2FcZcw5Tchq69z69JB5LF1z3WIUs%2BmtDRQQ6laOUIFnGqrhNCzz4&X-Amz-Signature=a0fb8d98a4acc4e16a2babb681a614a33c6d659d94b9e08c2d6949f968534db3&X-Amz-SignedHeaders=host&response-content-disposition=attachment%3B%20filename%3D%22Local_Vendor_Preference_-_Participation_Affidavit.pdf%22&x-id=GetObject https://government-project.s3.us-west-2.amazonaws.com/96409/2ac6bb9f-a974-4a14-a297-7d965488dba7_Non-Collusion_Affidavit_of_Prime_Bidder.pdf?X-Amz-Algorithm=AWS4-HMAC-SHA256&X-Amz-Content-Sha256=UNSIGNED-PAYLOAD&X-Amz-Credential=ASIA47RIURE4DNTRBGST%2F20260914%2Fus-west-2%2Fs3%2Faws4_request&X-Amz-Date=20260914T134449Z&X-Amz-Expires=72000&X-Amz-Security-Token=IQoJb3JpZ2luX2VjEB0aCXVzLXdlc3QtMiJIMEYCIQC9oJpC%2F%2B4WcV3r4DSkleQwk4g6Uh%2Fa6fcZPUYn70DpywIhAIh5lhK96UJBI9Tyy7bKgc89k7GfoIST9oa8dXfBa3zHKpUFCOX%2F%2F%2F%2F%2F%2F%2F%2F%2F%2FwEQAhoMODkyMzY0Njg3NjcyIgyZJ9JJZc1eEZcHmekq6QQ8rC3UhZmDCAzZxNnOriLD0kS%2FljzMKw8V84GzTwLRbi%2F0j8SODDOCwUQibLmY3wFGm08lygAChFBqN4jLlzssRnMjC8PTGEeQSqjW6SuzWvpTJGjkbeCQwzfKmbmyxWSPX6DqYwAtg8q51Yk%2BuY6zKhMrWBmjdPQdLv6ssgw9Y8MPccjUHWot7JrtBCz%2FsPnZGksgfC2nv6v3s9h61imN4kaVBEDWLi3JRu%2BLlp0fapWjDouWlKn4KvfUaCBvpLIK6bk2AvhoXxuqzesl6JncYOklX%2BC%2BBY6lA9%2BWU4m%2FuRfdfUOm3J5LihS8EgNm80IsHU2kLyRl5v7k3uIJgle4aBgAKxjsWhyxTQyjF0D6yhxvYUWq3tcM0zYI1gL7YSAtKeunbJc7CxU56zZjXKaT4CMXKxSajm9SBv8lMFpD%2BHvzrid%2FF17dcBUqIvjOuHSWvd0ZkWGMigeIHS8ED7DS7TFcuWIzS4EHbkve8J%2FUYN69rLUUIjlImbntyFrDURwH7%2Bjawm3Ghdpx5rkq4mmSfrCw985wep3mZ80GefoZA38a8%2BPU5O%2BlN%2FjDeih%2F0QOGOdKXP%2FxFJ%2BpK7JFkjAbs77yMUrd3QisG5p5uDwXloF6AVdkHN0uwXRDceWSkFNfML0Ala9Fa4xk%2F27N5C3q95HuSrNvF2z%2FNnANZevtVWiJV0SGeRkI1v6NeilZhjD7MdMITtsqopSpFvBrK8ThPHqM852ldMA7Iuc60Na%2Fe1NnD%2FVs1KXvcXKiZt4iN8Tt3%2BH7S20i5daAN%2BqDTVBIB2wHzDcX7EDi9216Ab5t8it3IM9deJriVzDDb3Z%2FVBjqYAW383LuVeiEC07qXKr268qJhQpkvAXvRUGMnMap7jOn7ifgEFvhJazcKBoyCEglp7NHlhmWgd2c7ei4ZZKlu7SG3Kl7tFt8bZf84R1fICfWtHFN3kX6%2BLPEeOO7tH8doxA5gt7tFolt2wcS0u6w46LqFN%2FcZcw5Tchq69z69JB5LF1z3WIUs%2BmtDRQQ6laOUIFnGqrhNCzz4&X-Amz-Signature=332d2a681d9725ba2823d6898e0fc6c746b3fd26baaa012dbcf4af1b6c8095b0&X-Amz-SignedHeaders=host&response-content-disposition=attachment%3B%20filename%3D%22Non-Collusion_Affidavit_of_Prime_Bidder.pdf%22&x-id=GetObject
IFB #102026 DOCUMENTS Page 17
*Response required
When equals "Yes"
Non-Collusion Affidavit of Subcontractor*
Please download the below documents, complete, and upload.
• Non-Collusion_Affidavit_of_...
*Response required
Certification By Contractor Regarding Non-Segregated Facilities*
Please download the below documents, complete, and upload.
• Certification_By_Contractor...
*Response required
Business Organization
Type of Business Organization:*
☐ Corporation
☐ Individual
☐ Partnership
☐ Joint Venture
☐ Other
*Response required
If you selected "Other" for your type of business, please explain:*
*Response required
If applicable, please provide name of partners and additional information below:*
Names of Partners:
Date of Organization:
Type of Partnership:
List of General Partners:
Name, Address, & Phone No:
Years of GP:
If not applicable, please state N/A.
*Response required
If your agency is a Corporation:*
If your agency is a Corporation, please provide the State of Incorporation.
If NOT incorporated in South Carolina, please provide the following:
• State Corporation Commission Registration Number https://government-project.s3.us-west-2.amazonaws.com/96409/2570088f-aa3f-49d2-973c-93c896637c3d_Non-Collusion_Affidavit_of_Subcontractor.pdf?X-Amz-Algorithm=AWS4-HMAC-SHA256&X-Amz-Content-Sha256=UNSIGNED-PAYLOAD&X-Amz-Credential=ASIA47RIURE4DNTRBGST%2F20260914%2Fus-west-2%2Fs3%2Faws4_request&X-Amz-Date=20260914T134449Z&X-Amz-Expires=72000&X-Amz-Security-Token=IQoJb3JpZ2luX2VjEB0aCXVzLXdlc3QtMiJIMEYCIQC9oJpC%2F%2B4WcV3r4DSkleQwk4g6Uh%2Fa6fcZPUYn70DpywIhAIh5lhK96UJBI9Tyy7bKgc89k7GfoIST9oa8dXfBa3zHKpUFCOX%2F%2F%2F%2F%2F%2F%2F%2F%2F%2FwEQAhoMODkyMzY0Njg3NjcyIgyZJ9JJZc1eEZcHmekq6QQ8rC3UhZmDCAzZxNnOriLD0kS%2FljzMKw8V84GzTwLRbi%2F0j8SODDOCwUQibLmY3wFGm08lygAChFBqN4jLlzssRnMjC8PTGEeQSqjW6SuzWvpTJGjkbeCQwzfKmbmyxWSPX6DqYwAtg8q51Yk%2BuY6zKhMrWBmjdPQdLv6ssgw9Y8MPccjUHWot7JrtBCz%2FsPnZGksgfC2nv6v3s9h61imN4kaVBEDWLi3JRu%2BLlp0fapWjDouWlKn4KvfUaCBvpLIK6bk2AvhoXxuqzesl6JncYOklX%2BC%2BBY6lA9%2BWU4m%2FuRfdfUOm3J5LihS8EgNm80IsHU2kLyRl5v7k3uIJgle4aBgAKxjsWhyxTQyjF0D6yhxvYUWq3tcM0zYI1gL7YSAtKeunbJc7CxU56zZjXKaT4CMXKxSajm9SBv8lMFpD%2BHvzrid%2FF17dcBUqIvjOuHSWvd0ZkWGMigeIHS8ED7DS7TFcuWIzS4EHbkve8J%2FUYN69rLUUIjlImbntyFrDURwH7%2Bjawm3Ghdpx5rkq4mmSfrCw985wep3mZ80GefoZA38a8%2BPU5O%2BlN%2FjDeih%2F0QOGOdKXP%2FxFJ%2BpK7JFkjAbs77yMUrd3QisG5p5uDwXloF6AVdkHN0uwXRDceWSkFNfML0Ala9Fa4xk%2F27N5C3q95HuSrNvF2z%2FNnANZevtVWiJV0SGeRkI1v6NeilZhjD7MdMITtsqopSpFvBrK8ThPHqM852ldMA7Iuc60Na%2Fe1NnD%2FVs1KXvcXKiZt4iN8Tt3%2BH7S20i5daAN%2BqDTVBIB2wHzDcX7EDi9216Ab5t8it3IM9deJriVzDDb3Z%2FVBjqYAW383LuVeiEC07qXKr268qJhQpkvAXvRUGMnMap7jOn7ifgEFvhJazcKBoyCEglp7NHlhmWgd2c7ei4ZZKlu7SG3Kl7tFt8bZf84R1fICfWtHFN3kX6%2BLPEeOO7tH8doxA5gt7tFolt2wcS0u6w46LqFN%2FcZcw5Tchq69z69JB5LF1z3WIUs%2BmtDRQQ6laOUIFnGqrhNCzz4&X-Amz-Signature=fa2cb69b5d5dfb8ba9b05b7f180cda8779bc148ac73dbd32729359ca3aa7952c&X-Amz-SignedHeaders=host&response-content-disposition=attachment%3B%20filename%3D%22Non-Collusion_Affidavit_of_Subcontractor.pdf%22&x-id=GetObject https://government-project.s3.us-west-2.amazonaws.com/96409/1488ef02-a573-42d0-b94f-02e833eb1d99_Certification_By_Contractor_Regarding_Non-Segregated_Facilities.pdf?X-Amz-Algorithm=AWS4-HMAC-SHA256&X-Amz-Content-Sha256=UNSIGNED-PAYLOAD&X-Amz-Credential=ASIA47RIURE4DNTRBGST%2F20260914%2Fus-west-2%2Fs3%2Faws4_request&X-Amz-Date=20260914T134449Z&X-Amz-Expires=72000&X-Amz-Security-Token=IQoJb3JpZ2luX2VjEB0aCXVzLXdlc3QtMiJIMEYCIQC9oJpC%2F%2B4WcV3r4DSkleQwk4g6Uh%2Fa6fcZPUYn70DpywIhAIh5lhK96UJBI9Tyy7bKgc89k7GfoIST9oa8dXfBa3zHKpUFCOX%2F%2F%2F%2F%2F%2F%2F%2F%2F%2FwEQAhoMODkyMzY0Njg3NjcyIgyZJ9JJZc1eEZcHmekq6QQ8rC3UhZmDCAzZxNnOriLD0kS%2FljzMKw8V84GzTwLRbi%2F0j8SODDOCwUQibLmY3wFGm08lygAChFBqN4jLlzssRnMjC8PTGEeQSqjW6SuzWvpTJGjkbeCQwzfKmbmyxWSPX6DqYwAtg8q51Yk%2BuY6zKhMrWBmjdPQdLv6ssgw9Y8MPccjUHWot7JrtBCz%2FsPnZGksgfC2nv6v3s9h61imN4kaVBEDWLi3JRu%2BLlp0fapWjDouWlKn4KvfUaCBvpLIK6bk2AvhoXxuqzesl6JncYOklX%2BC%2BBY6lA9%2BWU4m%2FuRfdfUOm3J5LihS8EgNm80IsHU2kLyRl5v7k3uIJgle4aBgAKxjsWhyxTQyjF0D6yhxvYUWq3tcM0zYI1gL7YSAtKeunbJc7CxU56zZjXKaT4CMXKxSajm9SBv8lMFpD%2BHvzrid%2FF17dcBUqIvjOuHSWvd0ZkWGMigeIHS8ED7DS7TFcuWIzS4EHbkve8J%2FUYN69rLUUIjlImbntyFrDURwH7%2Bjawm3Ghdpx5rkq4mmSfrCw985wep3mZ80GefoZA38a8%2BPU5O%2BlN%2FjDeih%2F0QOGOdKXP%2FxFJ%2BpK7JFkjAbs77yMUrd3QisG5p5uDwXloF6AVdkHN0uwXRDceWSkFNfML0Ala9Fa4xk%2F27N5C3q95HuSrNvF2z%2FNnANZevtVWiJV0SGeRkI1v6NeilZhjD7MdMITtsqopSpFvBrK8ThPHqM852ldMA7Iuc60Na%2Fe1NnD%2FVs1KXvcXKiZt4iN8Tt3%2BH7S20i5daAN%2BqDTVBIB2wHzDcX7EDi9216Ab5t8it3IM9deJriVzDDb3Z%2FVBjqYAW383LuVeiEC07qXKr268qJhQpkvAXvRUGMnMap7jOn7ifgEFvhJazcKBoyCEglp7NHlhmWgd2c7ei4ZZKlu7SG3Kl7tFt8bZf84R1fICfWtHFN3kX6%2BLPEeOO7tH8doxA5gt7tFolt2wcS0u6w46LqFN%2FcZcw5Tchq69z69JB5LF1z3WIUs%2BmtDRQQ6laOUIFnGqrhNCzz4&X-Amz-Signature=a800f9442907816eccb28ba4d28fa608a393261009b34260bae5ed29e72313b2&X-Amz-SignedHeaders=host&response-content-disposition=attachment%3B%20filename%3D%22Certification_By_Contractor_Regarding_Non-Segregated_Facilities.pdf%22&x-id=GetObject
IFB #102026 DOCUMENTS Page 18
• Date of Incorporation:
• Federal ID Number
• Officers o Name o Address o Phone No.
o Position o Years In
If your agency is NOT a corporation, please state N/A.
*Response required
Are you a Subchapter S Corporation?*
☐ Yes
☐ No
*Response required
When equals "Yes"
Please provide Subchapter S Shareholders:*
Name:
Address:
Phone No:
*Response required
If individually owned:*
• Sole-proprietor's o Name:
o Address:
o Phone No:
o Years in business:
*Response required
Have you ever operated under another name?*
☐ Yes
☐ No
IFB #102026 DOCUMENTS Page 19
When equals "Yes"
Please provide all other business names and addresses of principal place of business for each business:*
Also provide:
• Number of years in business under each name
• Contractor’s license number in each state in which a business was operated
*Response required
Bonding
Bid Bond*
Upload your Bid Bond here. Bid Bond must be 5% of your Bid Price
*Response required
Please provide the Bonding information:*
• Bonding Agent o Name o Address o Telephone Number (including area code) o Contact Person
• Bonding Company o Name o Address o Telephone Number (including area code) o Contact Person o Best’s Key Rating of bonding company
• Number of years this bonding company has acted as surety for you
• Bonding Capacity: Maximum single job size o Total bonding limit
IFB #102026 DOCUMENTS Page 20
Do you intend to use any alternative form of security*
☐ Yes
☐ No
*Response required
When equals "Yes"
Indicate the form of security you intend to use and the name, address, point of contact, and telephone number of the banks, savings and loan, or surety you intend to use. (NOTE:
Prequalification will not assure acceptance of any form of security.)*
Also provide:
• Form of Secuirty
• Bank or Savings & Loan
• Contact
• Address & Phone No.
*Response required
Have any Performance or Payment Bond claims ever been paid by any surety on behalf of your organization?*
☐ Yes
☐ No
*Response required
When equals "Yes"
State the name of the project(s); the date; the name, address, telephone number, and contact person for the claimant; the surety satisfying the claim; the size of the claim; and the circumstances giving rise to the claim. *
*Response required
Have you ever arbitrated or litigated a claim with an Owner, Architect, or Engineer in the last five years?*
☐ Yes
☐ No
When equals "Yes"
IFB #102026 DOCUMENTS Page 21
State the name of the project(s); the date; the name, address, telephone number, and contact person for the claimant; the surety satisfying the claim; the size of the claim; and the circumstances giving rise to the claim. (Provide attachments if necessary.)*
*Response required
Have you or any officer, partner, or owner of your organization, in any state or territory of the United States, or with respect to any agency of the Federal government:
In the last in the last five years, received any fines or citations for building code violations which were unrelated to design?*
☐ Yes
☐ No
*Response required
When equals "Yes"
Provide the name, address, telephone number, contact person, and circumstances relating to the question.*
*Response required
Ever been found to be guilty of charges relating to conflicts of interest:*
☐ Yes
☐ No
*Response required
When equals "Yes"
Provide the name, address, telephone number, contact person, and circumstances relating to the question.*
*Response required
Ever been convicted on charges related to any criminal activity relating to construction means, methods, or techniques; bidding or bid rigging; or bribery?*
☐ Yes
☐ No
*Response required
When equals "Yes"
Provide the name, address, telephone number, contact person, and circumstances relating to the question.*
*Response required
In the last five years, been found guilty of any minority contracting law violations?*
IFB #102026 DOCUMENTS Page 22
When equals "Yes"
Provide the name, address, telephone number, contact person, and circumstances relating to the question.*
*Response required
In the last five years, pleaded no contest in any criminal proceeding related to contracting?*
☐ Yes
☐ No
*Response required
When equals "Yes"
Provide the name, address, telephone number, contact person, and circumstances relating to the question.*
*Response required
Ever been disbarred from doing Federal, state, or local government work for any reason?*
☐ Yes
☐ No
*Response required
When equals "Yes"
Provide the name, address, telephone number, contact person, and circumstances relating to the question.*
*Response required
Ever been terminated on a contract due to your default?*
☐ Yes
☐ No
*Response required
When equals "Yes"
Provide the name, address, telephone number, contact person, and circumstances relating to the question.*
*Response required
In the last five years, paid liquidated damages for being late on a project?*
☐ Yes
IFB #102026 DOCUMENTS Page 23
When equals "Yes"
Provide the name, address, telephone number, contact person, and circumstances relating to the question.*
*Response required
In the last five years, been subject to tax collection proceedings?*
☐ Yes
☐ No
*Response required
When equals "Yes"
Provide the name, address, telephone number, contact person, and circumstances relating to the question.*
*Response required
In the last seven years, filed for bankruptcy?*
☐ Yes
☐ No
*Response required
When equals "Yes"
Provide the name, address, telephone number, contact person, and circumstances relating to the question.*
☐ Yes
☐ No
*Response required
When equals "Yes"
Under what chapter of bankruptcy did you file?*
*Response required
When equals "Yes"
If you filed under Chapter 11 Reorganization, how long did you operate under this status?*
If this does not apply, please state N/A.
*Response required
When equals "Yes"
Are you operating under Chapter 11 status now?*
IFB #102026 DOCUMENTS Page 24
Safety
Have you, in the last three years, been cited for willful violations for failure to abate, or for repeated violations, by the United States Occupational Safety and Health Administration or by the South Carolina Occupational Safety and Health Administration or by any other governmental body?*
☐ Yes
☐ No
*Response required
When equals "Yes"
State date, name, address, telephone number, and contact person for agency issuing citation and the nature of the violation. Also, advise the amount of fines paid, if any. Provide attachments if necessary.*
*Response required
When equals "Yes"
List your worker’s compensation experience modifier for the last three years.*
*Response required
References
Provide at least two references from each industry group listed. Provide other references as requested. Provide current names, addresses, telephone numbers, and contacts.*
• Architects/Engineers:
• Major Subcontractors:
• Financial Institutions:
*Response required
Certification regarding Debarment, Suspension, Ineligibility, and Voluntary Exclusion:
The contractor certifies:*
The contractor certifies, by submission of this bid or acceptance of a contract, that neither it nor its principals is presently debarred, suspended, proposed for debarment, declared ineligible, or voluntarily excluded from participation in this transaction by any State, Federal department, or agency. It further agrees by submitting this qualification statement that it will include this clause without modification in all lower tier transactions, solicitations, proposals, contracts, and subcontracts. Where the bidder/contractor or any lower tier participant is unable to certify to this statement, it shall attach an explanation to this solicitation/bid. State whether or not your company has been involved in any litigation within the past five (5) years arising out of your performance.
IFB #102026 DOCUMENTS Page 25
☐ No
*Response required
When equals "Yes"
Explain fully if it has been involved in any litigation involving performance. *
*Response required
Small and Minority Business Participation Program
DO WE WANT TO ENTER ALL THE INFO ON THIS FORM?
Are you a Small or Minority Business ?*
☐ Yes
☐ No
*Response required
When equals "Yes"
Upload your Small/Minority Documentation*
Please note that the proposed utilization plan document is still required. You may put your company in that list.
*Response required
Are you self-performing 100%?*
☐ Yes
☐ No
*Response required
When equals "Yes"
Self-Performing 100% Affidavit*
Please download the below document, complete, and upload.
• Self_Performance_Affidavit.pdf
*Response required
When equals "No"
Good Faith Agencies Distribution List*
Please download the below documents, complete, and upload.
Pre-award efforts include the following “good faith efforts” for Contractors intending to use subcontractors, or the bid/proposal may be rejected.
https://government-project.s3.us-west-2.amazonaws.com/96409/ebb4cf5e-d250-4e5f-8dc1-fb6d7e1e4505_Self_Performance_Affidavit.pdf?X-Amz-Algorithm=AWS4-HMAC-SHA256&X-Amz-Content-Sha256=UNSIGNED-PAYLOAD&X-Amz-Credential=ASIA47RIURE4DNTRBGST%2F20260914%2Fus-west-2%2Fs3%2Faws4_request&X-Amz-Date=20260914T134449Z&X-Amz-Expires=72000&X-Amz-Security-Token=IQoJb3JpZ2luX2VjEB0aCXVzLXdlc3QtMiJIMEYCIQC9oJpC%2F%2B4WcV3r4DSkleQwk4g6Uh%2Fa6fcZPUYn70DpywIhAIh5lhK96UJBI9Tyy7bKgc89k7GfoIST9oa8dXfBa3zHKpUFCOX%2F%2F%2F%2F%2F%2F%2F%2F%2F%2FwEQAhoMODkyMzY0Njg3NjcyIgyZJ9JJZc1eEZcHmekq6QQ8rC3UhZmDCAzZxNnOriLD0kS%2FljzMKw8V84GzTwLRbi%2F0j8SODDOCwUQibLmY3wFGm08lygAChFBqN4jLlzssRnMjC8PTGEeQSqjW6SuzWvpTJGjkbeCQwzfKmbmyxWSPX6DqYwAtg8q51Yk%2BuY6zKhMrWBmjdPQdLv6ssgw9Y8MPccjUHWot7JrtBCz%2FsPnZGksgfC2nv6v3s9h61imN4kaVBEDWLi3JRu%2BLlp0fapWjDouWlKn4KvfUaCBvpLIK6bk2AvhoXxuqzesl6JncYOklX%2BC%2BBY6lA9%2BWU4m%2FuRfdfUOm3J5LihS8EgNm80IsHU2kLyRl5v7k3uIJgle4aBgAKxjsWhyxTQyjF0D6yhxvYUWq3tcM0zYI1gL7YSAtKeunbJc7CxU56zZjXKaT4CMXKxSajm9SBv8lMFpD%2BHvzrid%2FF17dcBUqIvjOuHSWvd0ZkWGMigeIHS8ED7DS7TFcuWIzS4EHbkve8J%2FUYN69rLUUIjlImbntyFrDURwH7%2Bjawm3Ghdpx5rkq4mmSfrCw985wep3mZ80GefoZA38a8%2BPU5O%2BlN%2FjDeih%2F0QOGOdKXP%2FxFJ%2BpK7JFkjAbs77yMUrd3QisG5p5uDwXloF6AVdkHN0uwXRDceWSkFNfML0Ala9Fa4xk%2F27N5C3q95HuSrNvF2z%2FNnANZevtVWiJV0SGeRkI1v6NeilZhjD7MdMITtsqopSpFvBrK8ThPHqM852ldMA7Iuc60Na%2Fe1NnD%2FVs1KXvcXKiZt4iN8Tt3%2BH7S20i5daAN%2BqDTVBIB2wHzDcX7EDi9216Ab5t8it3IM9deJriVzDDb3Z%2FVBjqYAW383LuVeiEC07qXKr268qJhQpkvAXvRUGMnMap7jOn7ifgEFvhJazcKBoyCEglp7NHlhmWgd2c7ei4ZZKlu7SG3Kl7tFt8bZf84R1fICfWtHFN3kX6%2BLPEeOO7tH8doxA5gt7tFolt2wcS0u6w46LqFN%2FcZcw5Tchq69z69JB5LF1z3WIUs%2BmtDRQQ6laOUIFnGqrhNCzz4&X-Amz-Signature=2272096f17db7a212d3927e07b53eae41075a7d94ad40fa14cfe39b9ac5cb86d&X-Amz-SignedHeaders=host&response-content-disposition=attachment%3B%20filename%3D%22Self_Performance_Affidavit.pdf%22&x-id=GetObject
IFB #102026 DOCUMENTS Page 26
If using subcontractors, return this page (and required supporting documents) with your bid/proposal.
• Divide and/or combine scope of work packages into economically feasible units, if possible.
• Send a written notice at least ten (10) business days prior to the bid/response due date of your intent to submit a bid/response, and express interest in receiving quotes…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .