This document contains an invitation to bid on the Sheldon Woods Elementary Gym Addition & Improvements project in West Olive, Michigan. The project is being overseen by West Ottawa Public Schools and involves interior renovations during the summer of 2024, followed by a gym addition to be constructed from August 2024 to June 2025. Bids are due on April 18, 2024 at 10:00 A.M. A pre-bid walkthrough is scheduled for April 10, 2024 at 4:00 P.M., and any questions must be submitted by April 15, 2024 at 12:00 P.M. The project includes various construction trades such as sitework, asphalt paving, concrete, masonry, metals, general trades, roofing, glazing, HVAC, plumbing, and electrical work.

The bid documents include detailed specifications, drawings, and a project schedule. Bidders must provide a 5% bid bond, a sworn familial disclosure, and an Iran Disclosure Act affidavit. The project is not subject to prevailing wage requirements. Allowances and alternates are included, and the owner reserves the right to accept or reject any voluntary alternates. Warranties and insurance requirements are also specified in the bid documents.

View the file

Other files

File Type Posted
Sheldon Woods Gym Addition Bid.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BID INVITE

INVITE DETAILS

PROJECT: Sheldon Woods Gym Addition & Improvements

OWNER: West Ottawa Public Schools

A&E FIRM: GMB Architect & Engineering

BIDS DUE: April 18, 2024 @ 10:00 A.M.

PRE-BID WALK THRU: April 10, 2024 @ 4:00 P.M.

CONTACT: Fritz Wahlfield III, Ph: (616) 784.5833, Email: f3@wahlfieldconstruction.com

PROJECT DETAILS

PROJECT LOCATION: Sheldon Woods Elementary School (15050 Blair St, West Olive, MI 49460)

PROJECT DESCRIPTION: Interior renovations during the summer of 2024, and a gym addition to begin in August

2024.

Project Schedule: June 2024-June 2025

BID TRADES: Sitework, Asphalt Paving, Concrete, Masonry, Metals, General Trades, Roofing Systems, Metal

Roofing/Metal Panel Systems, Aluminum Storefronts/Glazing, LPDA, Flooring. Painting. Mechanical, Electrical

INVITE RESPONSE

(PLEASE FILL OUT INVITE AND RETURN) Email: amanda@wahlfieldconstruction.com

Company

Contact Name Phone

Email

Please check one. ( ) We will be submitting a bid for this project.

( ) We will not be submitting a bid for this project.

Start End Pre-Construction Permitting SOM 28-Mar-2024 28-May-2024 Bidding 01-Apr-2024 18-Apr-2024 Post Bid Interviews 19-Apr-2024 19-Apr-2024 BOE Recommendations 23-Apr-2024 23-Apr-2024 Contract Procurement 25-Apr-2024 02-May-2024 Submittals 03-May-2024 31-May-2024 Milestones Last Day of School (23-24) 07-Jun-2024 07-Jun-2024 50% Inspections (Interior Renovations) 09-Jul-2024 13-Jul-2024 Final Inspections (Interior Renovations) 06-Aug-2024 10-Aug-2024 Substantial Completion (Interior Renovations) 13-Aug-2024 13-Aug-2024 Construction Interior Renovations 01-Jun-2024 13-Aug-2024 Casework 04-Jun-2024 22-Jun-2024 Selective Demolition 08-Jun-2024 15-Jun-2024 MEP Demolition 08-Jun-2024 22-Jun-2024 Masonry Demo/Cut Ins 10-Jun-2024 18-Jun-2024 Plumbing/Mechanical Equipment Installation 11-Jun-2024 03-Aug-2024 Asbestos Abatement 18-Jun-2024 22-Jun-2024 Painting 18-Jun-2024 18-Jul-2024 Exterior Window Demo/Install 18-Jun-2024 30-Jul-2024 Mechanical/Plumbing Rough Ins 25-Jun-2024 06-Jul-2024 Electrical Rough Ins 25-Jun-2024 06-Jul-2024 Ceiling Grid Installation 09-Jul-2024 20-Jul-2024 Flooring 09-Jul-2024 03-Aug-2024 Light Fixture Installation 21-Jul-2024 01-Aug-2024 Ceiling Pad Installation 31-Jul-2024 09-Aug-2024 Gym Addition 01-Aug-2024 01-Jun-2025 Footings & Foundations 01-Aug-2024 15-Aug-2024 Blocking 15-Aug-2024 22-Aug-2024 Roofing 22-Aug-2024 29-Aug-2024

WOPS - Sheldon Woods Gym Addition & Improvements

00 11 13 ADVERTISEMENT FOR BIDS

BID PROPOSAL

Sealed bids, in triplicate, for West Ottawa Public Schools, Sheldon Woods Elementary Gym Additions &

Improvements, will be received at West Ottawa Public Schools Administration Office, 1138 136 th Ave., Holland, MI

49424 on April 18, 2024 at 10:00 A.M. Any bids received after this date and time will not be accepted or considered.

All bids will be opened and read publicly. FAXED OR EMAILED BIDS WILL NOT BE ACCEPTED.

This project is not a prevailing wage project.

All bids must be accompanied by the following;

1. 5% Bid Bond/ Security

2. Sworn and Notarized Familial Disclosure

3. Iran Disclosure Act

SITE INSPECTION

A Pre-bid meeting will be Wednesday, April 10, 2024 @ 4:00 P.M. This meeting will take place at Sheldon Woods

Elementary School located at 15050 Blair St, West Olive, MI 49460. This pre-bid walk thru is highly recommended.

There will be no other time available to view the site.

BID DOCUMENTS

Bidding documents may be viewed and/or requested via the following:

GMBs Website www.gmb.com under “Bid Sets”.

Bidders may download drawings and specifications from the Plan Command Site.

Please note that contractors are responsible to review information on all drawings and specifications.

GMB Architecture + Engineering

85 East Eighth St., Suite 200

Holland, MI 49423

Ph: (616) 796-0200

West Michigan Builders Exchange

678 Front St. NW, Grand Rapids, MI 49504

(616) 949-8650

Please note that contractors are responsible to review information on all drawings and specifications.

http://www.gmb.com/

BIDDER QUALIFICATIONS

Bidders submitting a proposal for this project shall have the following qualifications:

1. At least (10) years’ experience under the current company’s name.

2. Licensed and insured to perform work in the State of Michigan.

3. Shall have financial resources to complete work under this scope

BID SECURITY

All bids are required to have a bid security or bid bond in the amount of 5% of the bid being submitted. This shall secure the Owner from loss or damage by reason in the occurrence a bid is withdrawn or failure of the successful bidder not entering into Contract with the Owner if the Bid is accepted by the Owner.

The Successful bidder will be asked to secure a Performance, Labor, and Material bond for all work under contract.

Please keep this cost separate on the bid form provided. All bonds shall be from a surety company with an ‘A’ rating.

00 41 00 BID FORM

SUBMIT IN TRIPLICATE

BID TO: West Ottawa Public Schools

1138 136 th Ave.

Holland, MI 49424

ATTENTION: Mr. Jeff Malloch, Assistant Superintendent of Business Services

BID FROM: _______________________________________________________

PROJECT: Sheldon Woods Elementary Gym Additions & Improvements

The undersigned has familiarized themselves with the local conditions with the cost of the work by having examined the site conditions, and Bidding Documents prepared by GMB Architecture & Engineering (85 East Eighth St. (Suite

200), Holland, MI 49423), and hereby proposes to furnish all labor, materials, taxes, equipment, and services needed for the completion of the work category submitted. All Addendums that have been issued for this project have been recognized and included. The cost for performing work is:

Bid Category Number: _________________

Bid Category Description: ____________________________________________________________

Base Bid Amount: ____________________________________________________________ Dollars

ALLOWANCES: Base Bid includes all allowance cost(s) set forth in Section 01020 of the General Requirements and

Identified in the Instruction to Bidders.

TAXES: Base Bid includes all applicable taxes, including Michigan Sales Tax.

COST OF BONDS: Bond Cost for Performance, Labor, and Material Bond Cost. This cost must be included in the

Base Bid. Please list the cost of the bond below.

PLM Bond Amount ____________________________________________________________ Dollars

ACKNOWLEDGEMENT OF ADDENDA

The following addenda have been received and acknowledged with their execution is included in the base bid cost:

Addendum No. _____ Dated __________ Addendum No. _____ Dated __________

Addendum No. _____ Dated __________ Addendum No. _____ Dated __________

ALTERNATES (MANDATORY TO PROVIDE PRICING AS NEEDED WITH BASE BID)

The following alternates are an add to the Base Bid Cost.

Alternate No. A-1: Provide all costs associated with removal of slab below ceramic tile in corridor A102 and

B102 as shown on drawings. Provide new slab and polish PC1.

Cost: Add/ Delete $___________________________________

Alternate No. M1: Provide all costs associated with the removal of existing Kitchen make-up air unit and exhaust systems and the provision and installation of new make-up air and exhaust systems as shown in the construction documents.

Cost: Add/ Delete $___________________________________

VOLUNTARY ALTERNATES

The following is a list of Voluntary Alternates. The owner reserves the right to accept or reject and voluntary alternates.

1. ______________________________________________________________________________

Cost: Add/ Delete $___________________________________

2. ______________________________________________________________________________

Cost: Add/ Delete $___________________________________

UNIT PRICE

1. Unit Price No. 1: None

BID BOND

Accompanying this bid as required by the instructions to Bidders, is a bid security if the form of (Certified Check, Cashier’s Check, or Bid Bond) in the amount of:

Bid Bond Amount ____________________________________________________________ Dollars

CONSTRUCTION SCHEDULE

The undersigned acknowledges the construction schedule set in the bid documents and that they must be met.

ADDITIONAL WORK

1. There will be a fee of 10% applied to the total cost of materials purchased and work completed by a contractor's own forces. This includes both overhead and profit.

2. There will be a fee of 5% applied to the total cost of work completed by a subcontractor. This includes both overhead and profit.

CREDIT FOR WORK DELETED FROM CONTRACT

All work deleted from this contract by the Owner should be credited 100% back to the Owner.

AGREEMENT

In submitting this bid, it is understood that the Owner reserves the right to accept or reject any/all bids for any reason.

This bid is valid 60 days from the date of the opening.

Firm: _______________________________________________________________

Date: __________________

By: _____________________________________________________

Signature: ________________________________________________________

Title: ______________________________

Phone: (_______) _____________________

Email: ______________________________________________________

FAMILIAL DISCLOSURE STATEMENT

In accordance with Section 1267 of the Revised School Code this bid must be accompanied by a sworn and notarized statement disclosing the familial relationship between the Owner or any employee of the Bidder and any member of West Ottawa Public Schools Board of Education or Superintendent of West Ottawa Public Schools.

(_____) No, there is no relationship between the Owner or any employee of the Bidder and any member of West Ottawa Public Schools Board of Education or Superintendent of West

Ottawa Public Schools.

(_____) Yes, there is a relationship between the Owner or any employee of the Bidder and any member of West Ottawa Public Schools Board of Education or Superintendent of West

Ottawa Public Schools. Please list the relationship below.

BIDDER BOARD OF EDUCATION MEMBER OR SUPERINTENDENT

Subscribed and sworn this _______________________ day of ___________________________________, 2024.

In the County of ______________________________ In the State of ___________________________________.

By ___________________________________________________________________________

Notary Public Signature

My Commission Expires on: ________________________________ Seal or Stamp:

AFFIDAVIT OF COMPLIANCE IRAN ECONOMICS SANCTIONS ACT

Michigan Public Act No. 517 of 2012

The undersigned, the owner, or authorized officer of the below-named company (the “Contractor”), pursuant to the compliance certification requirement provided in West Ottawa Public Schools Request for Proposal (the “RFP”), hereby certifies, represents, and warrants that the Contractor (which includes its officers, directors and employees) is not an “Iran Linked Business” within the meaning of the Iran Economic Sanctions Act, Michigan Public Act No. 517 of

2012 (the “Act”), and that in the event the Contractor is awarded a contract by the West Ottawa Public Schools as a result of the aforementioned RFP, the Contractor is not and will not become an “Iran Linked Business” at any time during the course of performing any services under the Contract.

The Contractor further acknowledges that any person who is found to have submitted a false certification is responsible for a civil penalty of not more than $250,000.00 or two (2) times the amount of the contract or proposed contract for which the false certification was made, whichever is greater, the cost of the School Districts investigation, and reasonable attorney fees, in addition to the fine. Moreover, any person who submitted a false certification shall be ineligible to bid on a request for proposal for three (3) years from the date that it is determined that the person has submitted the false certification.

Contractor: _____________________________________________________

By: _______________________________________________ Title: ____________________________________

Date: __________________________________________________________

This instrument was acknowledged before me on the __________________ day of _____________________, 2024

In the County of ______________________________ In the State of ___________________________________.

By ___________________________________________________________________________

Notary Public Signature

My Commission Expires on: ________________________________ Seal or Stamp:

REQUEST FOR INFORMATION (RFI) DURING BIDDING PHASE

Please fill out the RFI form provided on page 9 in the front ends of this project.

All Pre-Bid RFI’s due: April 15, 2024 by 12:00 P.M.

Please email the completed RFI form to both:

amanda@wahlfieldconstruction.com f3@wahlfieldconstruction.com

The CM will review the RFI before submitting to the AE firm.

Any questions not submitted following this process prior to the deadline will not be answered.

REQUEST FOR INFORMATION (RFI) FORM

Project: Sheldon Woods Elementary Gym Additions & Improvements RFI No: _______ Date: ___________

Project Location: 15050 Blair St, West Olive, MI 49460

Action Requested:

Attn: Fritz Wahlfield III, Fritz Wahlfield Construction (CM) ______ Clarification

______ Direction

From: _________________________________________________ ______ Approval

Contact: _______________________________________________ ______ Alternate Proposal

Phone No: _____________________________________________ ______ Other

Reference Drawing No: __________________________ Detail No: ___________ Spec. Section: ___________

Information Needed / Clarification: _______________________________________________________________

CM Recommendation: _________________________________________________________________________

By: _______________________________ Date: ________________

AE Recommendation: __________________________________________________________________________

By: _______________________________ Date: ________________

BID CATEGORIES INDEX

1. Sitework

2. Asphalt Paving

3. Concrete

4. Masonry

5. Metals

6. General Trades

7. Roofing Systems

8. Metal Roofing/Metal Panel Systems

9. Aluminum Storefronts/Glazing

10. LPDA

11. Flooring

12. Painting

13. Mechanical

14. Electrical

BID CATEGORY NO. 01 - SITEWORK

INCLUDE:

1. Complete Sitework and related work as shown on the drawings and as specified in the following sections:

SPECIFICATION MANUAL AND FRONT ENDS

00.0115 LIST OF DRAWING SHEETS

00.1113 ADVERTISEMENT FOR BIDS

00.3132 GEOTECHNICAL INFORMATION

00.4100 BID FORM

01.0000 GENERAL REQUIREMENTS

01.0001 ELECTRONIC MODEL/DRAWING FILE EXCHANGE AGREEMENT

01.1000.0 SUMMARY

01.1000.1 ABBREVIATIONS

01.1010.1 WORK COVERED BY CONTRACT DOCUMENTS

01.1010.2 SCHEDULING

01.1010.3 CONTRACTOR USE OF PREMISES

01.1010.4 SUBSTANTIAL COMPLETION

01.2100 ALLOWANCES

01.2200 UNIT PRICES

01.2300 ALTERNATES

01.3000 ADMINISTRATIVE REQUIREMENTS

01.3000.1 SUBMITTALS

01.3113 INSURANCE REQUIREMENTS

01.4000 QUALITY REQUIREMENTS

01.4533 CODE REQUIRED SPECIAL INSPECTIONS

01.4100 REGULATORY REQUIREMENTS

01.5000 TEMPORARY FACILITIES AND CONTROLS

01.5100 TEMPORARY UTILITIES

01.5713 TEMPORARY EROSION AND SEDIMENT CONTROL

01.7329 CUTTING AND PATCHING

01.7700 CLOSE OUT PROCEDURES

01.7823 OPERATION AND MAINTENANCE DATA

01.7839 PROJECT RECORD DOCUMENTS

01.9113 GENERAL COMMISSIONING REQUIREMENTS

02.2200 EXISTING CONDITIONS ASSESSMENT

02.3200 SUBSURFACE CONDITIONS

02.4119 SELECTIVE DEMOLITION

31.1000 SITE CLEARING

31.2000 GRADING, EXCAVATION AND FILL

31.2500 SOIL EROSION AND SEDIMENTATION CONTROLS

31.3116 TERMITE CONTROL

31.3700 RIP RAP

32.9219 SEEDING

32.9300 PLANTS

33.0513 MANHOLES AND STRUCTURES

33.4600 SUBDRAINAGE

2. CONSTRUCTION DRAWINGS: CONTRACTOR IS RESPONSIBLE FOR REVIEWING ALL

CONSTRUCTION DRAWING PAGES AND BECOMING FAMILIAR WITH THE COMPLETE SET TO

SATISFY THE SCOPE OF WORK RELATED TO THE BID CATEGORY.

a. DRAWING INDEX CAN BE FOUND ON TITLE PAGE.

3. All Excavating as shown on plans and specifications for the building and monument sign only.

a. This includes the digging and backfill for foundation walls and slab on grade.

i. Including the removal of all excess soils and spoils to balance the site as shown.

4. Compacting any imported soils as required to meet compaction requirements of soils for future footings, foundations, slab on grade, and/or backfill material.

5. Responsibility of the contractor to contact Miss Dig at least 36 hours prior to start of work.

6. The CM will provide a one time staking of grades, building footprint, and misc. locations.

a. Additional staking will be at the cost of the contractor.

7. Furnish and Install as shown:

a. Site demolition and site clearing as shown on C1.01

b. Storm Utility Drainage Piping

c. Sanitary Work

d. Gas Utility relocation

e. Digging for Footings and Foundations

i. Backfill

f. Site Grading

g. Landscaping and Seeding

8. Concrete or asphalt cutting to complete work in this scope.

9. Any dewatering necessary to complete this scope of work.

10. Include All SESC as shown on page C7.01.

11. All Sanitary and/or Storm to be completed within 5’ of new building foundation.

a. This work is to be inspected by State officials. Include Permit through the State of Michigan.

b. This includes road cuts, inspections and permit/tap fees in the general right of way work.

12. Dust control measures for all work in this Bid Category.

13. Daily clean-up at work areas.

14. Contractor to meet Project Schedule, this includes weekend work or daily overtime.

a. Project Manager/Project Foreman required to attend the following meetings:

i. Pre-Construction Kick Off

ii. Bi-Weekly Progress Meeting

iii. Any meetings required by the Local Ordinance, Architect, and/ or Civil Engineer

15. All work must be done in accordance with MIOSHA Regulations.

16. Warranties as specified.

17. Submit shop drawings to scale so they can be accurately commented on/coordinated with other trades.

18. When shop drawings are returned from the Architect to Contractor marked “Rejected” or “Revise and

Resubmit”, contractor shall reissue the second time with the revisions clouded.

BID CATEGORY NO. 02 - ASPHALT PAVING

1. Complete Sitework and related work as shown on the drawings and as specified in the following sections:

SPECIFICATION MANUAL AND FRONT ENDS

00.0115 LIST OF DRAWING SHEETS

00.1113 ADVERTISEMENT FOR BIDS

00.3132 GEOTECHNICAL INFORMATION

00.4100 BID FORM

01.0000 GENERAL REQUIREMENTS

01.0001 ELECTRONIC MODEL/DRAWING FILE EXCHANGE AGREEMENT

01.1000.0 SUMMARY

01.1000.1 ABBREVIATIONS

01.1010.1 WORK COVERED BY CONTRACT DOCUMENTS

01.1010.2 SCHEDULING

01.1010.3 CONTRACTOR USE OF PREMISES

01.1010.4 SUBSTANTIAL COMPLETION

01.2100 ALLOWANCES

01.2200 UNIT PRICES

01.2300 ALTERNATES

01.3000 ADMINISTRATIVE REQUIREMENTS

01.3000.1 SUBMITTALS

01.3113 INSURANCE REQUIREMENTS

01.4000 QUALITY REQUIREMENTS

01.4533 CODE REQUIRED SPECIAL INSPECTIONS

01.4100 REGULATORY REQUIREMENTS

01.5000 TEMPORARY FACILITIES AND CONTROLS

01.5100 TEMPORARY UTILITIES

01.5713 TEMPORARY EROSION AND SEDIMENT CONTROL

01.7329 CUTTING AND PATCHING

01.7700 CLOSE OUT PROCEDURES

01.7823 OPERATION AND MAINTENANCE DATA

01.7839 PROJECT RECORD DOCUMENTS

01.9113 GENERAL COMMISSIONING REQUIREMENTS

02.2200 EXISTING CONDITIONS ASSESSMENT

02.3200 SUBSURFACE CONDITIONS

02.4119 SELECTIVE DEMOLITION

32.1123 AGGREGATE BASE COURSES

32.1216 ASPHALT PAVING

32.1723 PAINTED PAVEMENT MARKINGS

2. CONSTRUCTION DRAWINGS: CONTRACTOR IS RESPONSIBLE FOR REVIEWING ALL

CONSTRUCTION DRAWING PAGES AND BECOMING FAMILIAR WITH THE COMPLETE SET TO

SATISFY THE SCOPE OF WORK RELATED TO THE BID CATEGORY.

a. DRAWING INDEX CAN BE FOUND ON TITLE PAGE.

3. Furnish and Install Asphalt Paving as specified and shown.

4. All Parking Lot striping and markings to be included.

5. Dust control measures for all work in this Bid Category.

6. Daily clean-up at work areas.

7. Contractor to meet Project Schedule, this includes weekend work or daily overtime.

a. Project Manager/Project Foreman required to attend the following meetings:

i. Pre-Construction Kick Off

ii. Bi-Weekly Progress Meeting

iii. Any meetings required by the Local Ordinance, Architect, and/ or Civil Engineer

8. All work must be done in accordance with MIOSHA Regulations.

9. Warranties as specified.

10. Submit shop drawings to scale so they can be accurately commented on/coordinated with other trades.

11. When shop drawings are returned from the Architect to Contractor marked “Rejected” or “Revise and

BID CATEGORY NO. 03 - CONCRETE

1. Complete Concrete and related work as shown on the drawings and as specified in the following sections:

SPECIFICATION MANUAL AND FRONT ENDS

00.0115 LIST OF DRAWING SHEETS

00.1113 ADVERTISEMENT FOR BIDS

00.3132 GEOTECHNICAL INFORMATION

00.4100 BID FORM

01.0000 GENERAL REQUIREMENTS

01.0001 ELECTRONIC MODEL/DRAWING FILE EXCHANGE AGREEMENT

01.1000.0 SUMMARY

01.1000.1 ABBREVIATIONS

01.1010.1 WORK COVERED BY CONTRACT DOCUMENTS

01.1010.2 SCHEDULING

01.1010.3 CONTRACTOR USE OF PREMISES

01.1010.4 SUBSTANTIAL COMPLETION

01.2100 ALLOWANCES

01.2200 UNIT PRICES

01.2300 ALTERNATES

01.3000 ADMINISTRATIVE REQUIREMENTS

01.3000.1 SUBMITTALS

01.3113 INSURANCE REQUIREMENTS

01.4000 QUALITY REQUIREMENTS

01.4533 CODE REQUIRED SPECIAL INSPECTIONS

01.4100 REGULATORY REQUIREMENTS

01.5000 TEMPORARY FACILITIES AND CONTROLS

01.5100 TEMPORARY UTILITIES

01.5713 TEMPORARY EROSION AND SEDIMENT CONTROL

01.7329 CUTTING AND PATCHING

01.7700 CLOSE OUT PROCEDURES

01.7823 OPERATION AND MAINTENANCE DATA

01.7839 PROJECT RECORD DOCUMENTS

01.9113 GENERAL COMMISSIONING REQUIREMENTS

02.2200 EXISTING CONDITIONS ASSESSMENT

02.3200 SUBSURFACE CONDITIONS

02.4119 SELECTIVE DEMOLITION

03.3000 CAST-IN-PLACE CONCRETE

03.3543 POLISHED CONCRETE FINISHING

07.2100 THERMAL INSULATION

07.9200 JOINT SEALANTS

SATISFY THE SCOPE OF WORK RELATED TO THE BID CATEGORY.

a. DRAWING INDEX CAN BE FOUND ON TITLE PAGE.

3. Furnish and Install Concrete Site Paving as shown.

a. Joint Sealants at all CJS

4. Furnish and Install Concrete Footings, Foundation Walls, and Column pads as shown on S2.1A, S2.1C, S7.01

5. Furnish and Install all reinforcement as shown.

6. Furnish and Install Concrete Floor Polishing as specified and shown.

7. Provide Sealer and Vapor Barrier as specified.

8. Provide and Install Rigid Insulation as shown.

a. Furnish and Install the radiant floor insulation board underneath the concrete as shown.

9. Furnish and install all interior & exterior concrete MEP pads as shown.

10. Furnish and install joint sealants at all new exterior concrete paving as shown and specified.

11. Alternate No. A-1: Provide all costs associated with removal of slab below ceramic tile in corridor

A102 and B102 as shown on drawings. Provide new slab and polish PC1.

12. Dust control measures for all work in this Bid Category.

13. Daily clean-up at work areas.

14. Contractor to meet Project Schedule, this includes weekend work or daily overtime.

a. Project Manager/Project Foreman required to attend the following meetings:

i. Pre-Construction Kick Off

ii. Bi-Weekly Progress Meeting

iii. Any meetings required by the Local Ordinance, Architect, and/ or Civil Engineer

15. All work must be done in accordance with MIOSHA Regulations.

16. Warranties as specified.

17. Submit shop drawings to scale so they can be accurately commented on/coordinated with other trades.

18. When shop drawings are returned from the Architect to Contractor marked “Rejected” or “Revise and

BID CATEGORY NO. 04 - MASONRY

1. Complete Masonry and related work as shown on the drawings and as specified in the following sections:

SPECIFICATION MANUAL AND FRONT ENDS

00.0115 LIST OF DRAWING SHEETS

00.1113 ADVERTISEMENT FOR BIDS

00.3132 GEOTECHNICAL INFORMATION

00.4100 BID FORM

01.0000 GENERAL REQUIREMENTS

01.0001 ELECTRONIC MODEL/DRAWING FILE EXCHANGE AGREEMENT

01.1000.0 SUMMARY

01.1000.1 ABBREVIATIONS

01.1010.1 WORK COVERED BY CONTRACT DOCUMENTS

01.1010.2 SCHEDULING

01.1010.3 CONTRACTOR USE OF PREMISES

01.1010.4 SUBSTANTIAL COMPLETION

01.2100 ALLOWANCES

01.2200 UNIT PRICES

01.2300 ALTERNATES

01.3000 ADMINISTRATIVE REQUIREMENTS

01.3000.1 SUBMITTALS

01.3113 INSURANCE REQUIREMENTS

01.4000 QUALITY REQUIREMENTS

01.4533 CODE REQUIRED SPECIAL INSPECTIONS

01.4100 REGULATORY REQUIREMENTS

01.5000 TEMPORARY FACILITIES AND CONTROLS

01.5100 TEMPORARY UTILITIES

01.5713 TEMPORARY EROSION AND SEDIMENT CONTROL

01.7329 CUTTING AND PATCHING

01.7700 CLOSE OUT PROCEDURES

01.7823 OPERATION AND MAINTENANCE DATA

01.7839 PROJECT RECORD DOCUMENTS

01.9113 GENERAL COMMISSIONING REQUIREMENTS

02.2200 EXISTING CONDITIONS ASSESSMENT

02.3200 SUBSURFACE CONDITIONS

02.4119 SELECTIVE DEMOLITION

04.2000 UNIT MASONRY

07.2100 THERMAL INSULATION

07.9200 JOINT SEALANTS

SATISFY THE SCOPE OF WORK RELATED TO THE BID CATEGORY.

a. DRAWING INDEX CAN BE FOUND ON TITLE PAGE.

3. All masonry reinforcement, grout fill, loose fill or cavity wall insulation, etc., as shown and/or specified.

4. Grouting solid of hollow metal frames in masonry.

5. Clean all new masonry.

6. Furnish and Install complete Masonry as shown and specified.

a. Provide a mock-up masonry wall for approval.

7. Furnish and Install Portal Frame as shown.

8. Furnish and Install all reinforcement as shown.

9. Demo masonry openings at new louvers as called out in note 7 on pages A1.1A & A1.1B.

10. All new masonry units need to be rubbed of debris and/or mortar and ready for paint.

11. Furnish and Install all necessary flashing as shown.

a. Masonry membrane flashing as shown.

12. Flashing and weep holes concealed in masonry work. Includes pre-finished flashings.

13. Cavity wall insulation, this includes all spray insulation at all new exterior walls.

14. Joint Sealants at all CMU wall CJs.

15. Fire safe-ing, fire resistant caulking, sound attenuation blankets and acoustical sealants being an integral part of the all system, where shown. Include fire safe-ing at existing masonry walls where shown. See code compliance plans for locations.

16. Install lintels as provided for new openings.

17. Provided rebar caps for all exposed rebar ends installed by this contractor.

18. This contractor is responsible for the disposal of excess masonry and masonry related items. I.e., rubble, cut blocks, mortar, etc., into concrete dumpster. Coordinate this with Construction Manager. It is the responsibility of this contractor to provide its own dumpsters as necessary.

19. All work must be done in accordance to the new Silica Regulations.

20. Furnish and install masonry toothing as required for all new openings as shown. Openings may include, but not limited to: doors, windows, louvers, chases and masonry openings for new MEP work.

21. Installation of anchor bolts at top of wall for wood blocking.

22. Dust control measures for all work in this Bid Category.

23. Daily clean-up at work areas.

24. Contractor to meet Project Schedule, this includes weekend work or daily overtime.

a. Project Manager/Project Foreman required to attend the following meetings:

i. Pre-Construction Kick Off

ii. Bi-Weekly Progress Meeting

iii. Any meetings required by the Local Ordinance, Architect, and/ or Civil Engineer

25. All work must be done in accordance with MIOSHA Regulations.

26. Warranties as specified.

27. Submit shop drawings to scale so they can be accurately commented on/coordinated with other trades.

28. When shop drawings are returned from the Architect to Contractor marked “Rejected” or “Revise and

BID CATEGORY NO. 05 - METALS

1. Complete Metals and related work as shown on the drawings and as specified in the following sections:

SPECIFICATION MANUAL AND FRONT ENDS

00.0115 LIST OF DRAWING SHEETS

00.1113 ADVERTISEMENT FOR BIDS

00.3132 GEOTECHNICAL INFORMATION

00.4100 BID FORM

01.0000 GENERAL REQUIREMENTS

01.0001 ELECTRONIC MODEL/DRAWING FILE EXCHANGE AGREEMENT

01.1000.0 SUMMARY

01.1000.1 ABBREVIATIONS

01.1010.1 WORK COVERED BY CONTRACT DOCUMENTS

01.1010.2 SCHEDULING

01.1010.3 CONTRACTOR USE OF PREMISES

01.1010.4 SUBSTANTIAL COMPLETION

01.2100 ALLOWANCES

01.2200 UNIT PRICES

01.2300 ALTERNATES

01.3000 ADMINISTRATIVE REQUIREMENTS

01.3000.1 SUBMITTALS

01.3113 INSURANCE REQUIREMENTS

01.4000 QUALITY REQUIREMENTS

01.4533 CODE REQUIRED SPECIAL INSPECTIONS

01.4100 REGULATORY REQUIREMENTS

01.5000 TEMPORARY FACILITIES AND CONTROLS

01.5100 TEMPORARY UTILITIES

01.5713 TEMPORARY EROSION AND SEDIMENT CONTROL

01.7329 CUTTING AND PATCHING

01.7700 CLOSE OUT PROCEDURES

01.7823 OPERATION AND MAINTENANCE DATA

01.7839 PROJECT RECORD DOCUMENTS

01.9113 GENERAL COMMISSIONING REQUIREMENTS

02.2200 EXISTING CONDITIONS ASSESSMENT

02.3200 SUBSURFACE CONDITIONS

02.4119 SELECTIVE DEMOLITION

05.1200 STRUCTURAL STEEL FRAMING

05.2100 STEEL JOIST FRAMING

05.3100 STEEL DECKING

05.5000 METAL FABRICATIONS

SATISFY THE SCOPE OF WORK RELATED TO THE BID CATEGORY.

a. DRAWING INDEX CAN BE FOUND ON TITLE PAGE.

3. Furnish all steel lintels as shown.

4. Furnish and Install Structural Steel Framing as shown.

5. Furnish and Install Steel Joist Framing as shown.

6. Furnish and Install Steel Decking as shown.

7. Furnish and Install all Galvanized Steel for Screen Walls at Clerestory Roof areas.

8. Furnish and Install steel for Dumpster Enclosure.

9. Furnish steel Bollards as shown.

10. All onsite welding must be done by certified welders.

11. Provide Fire Watch for work completed above.

12. Dust control measures for all work in this Bid Category.

13. Daily clean-up at work areas.

14. Contractor to meet Project Schedule, this includes weekend work or daily overtime.

a. Project Manager/Project Foreman required to attend the following meetings:

i. Pre-Construction Kick Off

ii. Bi-Weekly Progress Meeting

iii. Any meetings required by the Local Ordinance, Architect, and/ or Civil Engineer

15. All work must be done in accordance with MIOSHA Regulations.

a. Provide lifting plan for any crane work.

16. Warranties as specified.

17. Submit shop drawings to scale so they can be accurately commented on/coordinated with other trades.

18. When shop drawings are returned from the Architect to Contractor marked “Rejected” or “Revise and

BID CATEGORY NO. 06 - GENERAL TRADES

1. Complete General Trades work as shown on the drawings and as specified in the following sections:

SPECIFICATION MANUAL AND FRONT ENDS

00.0115 LIST OF DRAWING SHEETS

00.1113 ADVERTISEMENT FOR BIDS

00.3132 GEOTECHNICAL INFORMATION

00.4100 BID FORM

01.0000 GENERAL REQUIREMENTS

01.0001 ELECTRONIC MODEL/DRAWING FILE EXCHANGE AGREEMENT

01.1000.0 SUMMARY

01.1000.1 ABBREVIATIONS

01.1010.1 WORK COVERED BY CONTRACT DOCUMENTS

01.1010.2 SCHEDULING

01.1010.3 CONTRACTOR USE OF PREMISES

01.1010.4 SUBSTANTIAL COMPLETION

01.2100 ALLOWANCES

01.2200 UNIT PRICES

01.2300 ALTERNATES

01.3000 ADMINISTRATIVE REQUIREMENTS

01.3000.1 SUBMITTALS

01.3113 INSURANCE REQUIREMENTS

01.4000 QUALITY REQUIREMENTS

01.4533 CODE REQUIRED SPECIAL INSPECTIONS

01.4100 REGULATORY REQUIREMENTS

01.5000 TEMPORARY FACILITIES AND CONTROLS

01.5100 TEMPORARY UTILITIES

01.5713 TEMPORARY EROSION AND SEDIMENT CONTROL

01.7329 CUTTING AND PATCHING

01.7700 CLOSE OUT PROCEDURES

01.7823 OPERATION AND MAINTENANCE DATA

01.7839 PROJECT RECORD DOCUMENTS

01.9113 GENERAL COMMISSIONING REQUIREMENTS

02.2200 EXISTING CONDITIONS ASSESSMENT

02.3200 SUBSURFACE CONDITIONS

02.4119 SELECTIVE DEMOLITION

06.1000 ROUGH CARPENTRY

06.1600 SHEATHING

06.6116 SOLID SURFACING MATERIALS

07.9200 JOINT SEALANTS

08.1113 HOLLOW METAL DOORS AND FRAMES

08.1416 FLUSH WOOD DOORS

08.3113 ACCESS DOORS AND PANELS

08.7100 DOOR HARDWARE

10.1100 VISUAL DISPLAY UNITS

10.1416 PLAQUES

10.2113.17 PHENOLIC-CORE TOILET COMPARTMENTS

10.2800 TOILET ROOM ACCESSORIES

10.4413 FIRE PROTECTION CABINETS

10.4416 FIRE EXTINGUISHERS

10.5113 METAL LOCKERS

11.6623 GYMNASIUM EQUIPMENT

12.2413 ROLLER WINDOW SHADES

12.3216 MANUFACTURED PLASTIC-LAMINATE-FACED CASEWORK

12.3623 COUNTERTOPS

12.6613 TELESCOPING BLEACHERS

2. CONSTRUCTION DRAWINGS: CONTRACTOR IS RESPONSIBLE FOR REVIEWING ALL

CONSTRUCTION DRAWING PAGES AND BECOMING FAMILIAR WITH THE COMPLETE SET TO

SATISFY THE SCOPE OF WORK RELATED TO THE BID CATEGORY.

a. DRAWING INDEX CAN BE FOUND ON TITLE PAGE.

3. Schedule, take delivery, inventory, and store and install all items noted as “Install Only” above. Provide a list of material received each day to the Construction Manager’s Superintendent. All items not noted are to be furnished and installed.

4. Demo as shown on pages A1.1A, A1.1B, notes 1-5, 7-9 and 11-16.

5. Furnish and erect all blocking shown on drawings or as specified in Miscellaneous Carpentry. Include all blocking not shown but incidental to your scope of work.

a. Top of wall blocking.

b. Casework and furnishings blocking as required.

c. Any doors or window bucks as needed/shown.

6. All wood blocking for door hatch, roof curbs & ACM/roofing membrane transition areas as shown.

7. Furnish and Install Peel & Stick Air-Barrier on plywood.

8. All lumber to be treated as specified.

9. Joint Sealants at all new door frames, casework, and countertops and any application where drywall meets

CMU walls.

10. Alternate No. A-1: Provide all costs associated with removal of slab below ceramic tile in corridor

A102 and B102 as shown on drawings. Provide new slab and polish PC1.

11. Furnish and Install all Hollow Metal Door Frames and Window Frames as shown.

12. Furnish and Install all Hollow Metal and Wood Doors as shown.

13. Furnish and Install all new Door Hardware as shown for items 8 & 9.

14. Furnish and Install all new Casework and Countertops as shown.

15. Furnish and Install all new Bath Accessories as specified and shown.

16. Furnish and Install all new Toilet Partitions as specified and shown.

17. Furnish and Install all of the new Window Treatments as specified and shown.

18. Furnish and Install all interior signage as specified and shown.

19. Furnish and Install all Fire Extinguisher Cabinets and Fire Extinguishers as shown.

20. Furnish and Install all Gym Equipment as shown.

21. Furnish and Install bleachers in the Gym as shown.

22. Dust control measures for all work in this Bid Category.

23. Daily clean-up at work areas.

24. Contractor to meet Project Schedule, this includes weekend work or daily overtime.

a. Project Manager/Project Foreman required to attend the following meetings:

i. Pre-Construction Kick Off

ii. Bi-Weekly Progress Meeting

iii. Any meetings required by the Local Ordinance, Architect, and/ or Civil Engineer

25. All work must be done in accordance with MIOSHA Regulations.

a. Provide lifting plan for any crane work.

26. Warranties as specified.

27. Submit shop drawings to scale so they can be accurately commented on/coordinated with other trades.

28. When shop drawings are returned from the Architect to Contractor marked “Rejected” or “Revise and

BID CATEGORY NO. 07 - ROOFING SYSTEMS

1. Complete Roofing Systems as shown on the drawings and as specified in the following sections:

SPECIFICATION MANUAL AND FRONT ENDS

00.0115 LIST OF DRAWING SHEETS

00.1113 ADVERTISEMENT FOR BIDS

00.3132 GEOTECHNICAL INFORMATION

00.4100 BID FORM

01.0000 GENERAL REQUIREMENTS

01.0001 ELECTRONIC MODEL/DRAWING FILE EXCHANGE AGREEMENT

01.1000.0 SUMMARY

01.1000.1 ABBREVIATIONS

01.1010.1 WORK COVERED BY CONTRACT DOCUMENTS

01.1010.2 SCHEDULING

01.1010.3 CONTRACTOR USE OF PREMISES

01.1010.4 SUBSTANTIAL COMPLETION

01.2100 ALLOWANCES

01.2200 UNIT PRICES

01.2300 ALTERNATES

01.3000 ADMINISTRATIVE REQUIREMENTS

01.3000.1 SUBMITTALS

01.3113 INSURANCE REQUIREMENTS

01.4000 QUALITY REQUIREMENTS

01.4533 CODE REQUIRED SPECIAL INSPECTIONS

01.4100 REGULATORY REQUIREMENTS

01.5000 TEMPORARY FACILITIES AND CONTROLS

01.5100 TEMPORARY UTILITIES

01.5713 TEMPORARY EROSION AND SEDIMENT CONTROL

01.7329 CUTTING AND PATCHING

01.7700 CLOSE OUT PROCEDURES

01.7823 OPERATION AND MAINTENANCE DATA

01.7839 PROJECT RECORD DOCUMENTS

01.9113 GENERAL COMMISSIONING REQUIREMENTS

02.2200 EXISTING CONDITIONS ASSESSMENT

02.3200 SUBSURFACE CONDITIONS

02.4119 SELECTIVE DEMOLITION

07.5323 ETHYLENE-PROPYLENE-DIENE-MONOMER (EPDM) ROOFING

07.6200 SHEET METAL FLASHING AND TRIM

07.7200 ROOF ACCESSORIES

SATISFY THE SCOPE OF WORK RELATED TO THE BID CATEGORY.

a. DRAWING INDEX CAN BE FOUND ON TITLE PAGE.

3. Demo existing roof as shown on pages A2.3A & A 2.3B.

4. Furnish and Install new roof as shown on pages A2.3A, A2.3B, & A2.3C.

5. Furnish and Install all joint sealants for related work in this scope.

6. All Traffic pads for Roof protection as shown.

7. Furnish and Install Roof Hatches as shown.

8. Furnish and Install complete roofing system as shown.

a. This includes all Flashing and Membranes.

b. Furnish and Install all edge metal/fascia around the perimeter of the flat roofs and the counter flashing with reglet at all roof to wall locations.

9. Daily clean-up at work areas.

10. Contractor to meet Project Schedule, this includes weekend work or daily overtime.

a. Project Manager/Project Foreman required to attend the following meetings:

i. Pre-Construction Kick Off

ii. Bi-Weekly Progress Meeting

iii. Any meetings required by the Local Ordinance, Architect, and/ or Civil Engineer

11. All work must be done in accordance with MIOSHA Regulations.

a. Provide lifting plan for any crane work.

12. Warranties as specified.

13. Submit shop drawings to scale so they can be accurately commented on/coordinated with other trades.

14. When shop drawings are returned from the Architect to Contractor marked “Rejected” or “Revise and

BID CATEGORY NO. 08 - METAL ROOFING/METAL PANEL SYSTEMS

1. Complete Metal Roofing/Metal Panel Systems as shown on the drawings and as specified in the following sections:

SPECIFICATION MANUAL AND FRONT ENDS

00.0115 LIST OF DRAWING SHEETS

00.1113 ADVERTISEMENT FOR BIDS

00.3132 GEOTECHNICAL INFORMATION

00.4100 BID FORM

01.0000 GENERAL REQUIREMENTS

01.0001 ELECTRONIC MODEL/DRAWING FILE EXCHANGE AGREEMENT

01.1000.0 SUMMARY

01.1000.1 ABBREVIATIONS

01.1010.1 WORK COVERED BY CONTRACT DOCUMENTS

01.1010.2 SCHEDULING

01.1010.3 CONTRACTOR USE OF PREMISES

01.1010.4 SUBSTANTIAL COMPLETION

01.2100 ALLOWANCES

01.2200 UNIT PRICES

01.2300 ALTERNATES

01.3000 ADMINISTRATIVE REQUIREMENTS

01.3000.1 SUBMITTALS

01.3113 INSURANCE REQUIREMENTS

01.4000 QUALITY REQUIREMENTS

01.4533 CODE REQUIRED SPECIAL INSPECTIONS

01.4100 REGULATORY REQUIREMENTS

01.5000 TEMPORARY FACILITIES AND CONTROLS

01.5100 TEMPORARY UTILITIES

01.5713 TEMPORARY EROSION AND SEDIMENT CONTROL

01.7329 CUTTING AND PATCHING

01.7700 CLOSE OUT PROCEDURES

01.7823 OPERATION AND MAINTENANCE DATA

01.7839 PROJECT RECORD DOCUMENTS

01.9113 GENERAL COMMISSIONING REQUIREMENTS

02.2200 EXISTING CONDITIONS ASSESSMENT

02.3200 SUBSURFACE CONDITIONS

02.4119 SELECTIVE DEMOLITION

07.4243 PREFINISHED NON-INSULATED COMPOSITE ALUMINUM PANEL

07.4245 HIGH PRESSURE LAMINATE PHENOLIC WALL SIDING AND SOFFIT

07.6200 SHEET METAL FLASHING AND TRIM

SATISFY THE SCOPE OF WORK RELATED TO THE BID CATEGORY.

a. DRAWING INDEX CAN BE FOUND ON TITLE PAGE.

3. Furnish and Install all joint sealants for related work in this scope.

4. Furnish and Install complete roofing system as shown.

a. Standing Seam Metal Roofing System.

5. Furnish and Install wood composite soffit system.

6. Furnish and Install Insulation underneath the Metal Roof System.

7. Daily clean-up at work areas.

8. Contractor to meet Project Schedule, this includes weekend work or daily overtime.

a. Project Manager/Project Foreman required to attend the following meetings:

i. Pre-Construction Kick Off

ii. Bi-Weekly Progress Meeting

iii. Any meetings required by the Local Ordinance, Architect, and/ or Civil Engineer

9. All work must be done in accordance with MIOSHA Regulations.

a. Provide lifting plan for any crane work.

10. Warranties as specified.

11. Submit shop drawings to scale so they can be accurately commented on/coordinated with other trades.

12. When shop drawings are returned from the Architect to Contractor marked “Rejected” or “Revise and

BID CATEGORY NO. 09 - ALUMINUM STOREFRONTS & GLAZING

1. Complete Aluminum Storefronts & Glazing as shown on the drawings and as specified in the following sections:

SPECIFICATION MANUAL AND FRONT ENDS

00.0115 LIST OF DRAWING SHEETS

00.1113 ADVERTISEMENT FOR BIDS

00.3132 GEOTECHNICAL INFORMATION

00.4100 BID FORM

01.0000 GENERAL REQUIREMENTS

01.0001 ELECTRONIC MODEL/DRAWING FILE EXCHANGE AGREEMENT

01.1000.0 SUMMARY

01.1000.1 ABBREVIATIONS

01.1010.1 WORK COVERED BY CONTRACT DOCUMENTS

01.1010.2 SCHEDULING

01.1010.3 CONTRACTOR USE OF PREMISES

01.1010.4 SUBSTANTIAL COMPLETION

01.2100 ALLOWANCES

01.2200 UNIT PRICES

01.2300 ALTERNATES

01.3000 ADMINISTRATIVE REQUIREMENTS

01.3000.1 SUBMITTALS

01.3113 INSURANCE REQUIREMENTS

01.4000 QUALITY REQUIREMENTS

01.4533 CODE REQUIRED SPECIAL INSPECTIONS

01.4100 REGULATORY REQUIREMENTS

01.5000 TEMPORARY FACILITIES AND CONTROLS

01.5100 TEMPORARY UTILITIES

01.5713 TEMPORARY EROSION AND SEDIMENT CONTROL

01.7329 CUTTING AND PATCHING

01.7700 CLOSE OUT PROCEDURES

01.7823 OPERATION AND MAINTENANCE DATA

01.7839 PROJECT RECORD DOCUMENTS

01.9113 GENERAL COMMISSIONING REQUIREMENTS

02.2200 EXISTING CONDITIONS ASSESSMENT

02.3200 SUBSURFACE CONDITIONS

02.4119 SELECTIVE DEMOLITION

08.4113 ALUMINUM-FRAMED ENTRANCES AND STOREFRONTS

08.5113 ALUMINUM WINDOWS

08.7100 DOOR HARDWARE

08.8000 GLAZING

08.8717 SAFETY AND SECURITY GLAZING FILMS

SATISFY THE SCOPE OF WORK RELATED TO THE BID CATEGORY.

a. DRAWING INDEX CAN BE FOUND ON TITLE PAGE.

3. Furnish and Install all Aluminum Frames and Doors as shown.

a. Including all Door Hardware related to this scope of work.

4. Furnish and Install all Glass and Glazing as shown.

5. Furnish and Install Mirrors as shown.

6. Furnish and Install all joint sealants for related work in this scope.

7. Glass cleaning at substantial completion of the entire project.

8. Furnish and install all storefront systems as shown and specified.

9. Contractor responsible for all field measurements for this scope of work.

10. Provide specified cylinders and cores specified under this scope.

11. Furnish and install any break metal necessary to complete this scope.

12. Furnish and install egress stickers at all new egress openings.

13. Furnish and install all glazing films as shown.

14. Daily clean-up at work areas.

15. Contractor to meet Project Schedule, this includes weekend work or daily overtime.

a. Project Manager/Project Foreman required to attend the following meetings:

i. Pre-Construction Kick Off

ii. Bi-Weekly Progress Meeting

iii. Any meetings required by the Local Ordinance, Architect, and/or Civil Engineer

16. All work must be done in accordance with MIOSHA Regulations.

a. Provide lifting plan for any crane work.

17. Warranties as specified.

18. Submit shop drawings to scale so they can be accurately commented on/coordinated with other trades.

19. When shop drawings are returned from the Architect to Contractor marked “Rejected” or “Revise and

BID CATEGORY NO. 10 - LPDA

1. Complete LPDA work as shown on the drawings and as specified in the following sections:

SPECIFICATION MANUAL AND FRONT ENDS

00.0115 LIST OF DRAWING SHEETS

00.1113 ADVERTISEMENT FOR BIDS

00.3132 GEOTECHNICAL INFORMATION

00.4100 BID FORM

01.0000 GENERAL REQUIREMENTS

01.0001 ELECTRONIC MODEL/DRAWING FILE EXCHANGE AGREEMENT

01.1000.0 SUMMARY

01.1000.1 ABBREVIATIONS

01.1010.1 WORK COVERED BY CONTRACT DOCUMENTS

01.1010.2 SCHEDULING

01.1010.3 CONTRACTOR USE OF PREMISES

01.1010.4 SUBSTANTIAL COMPLETION

01.2100 ALLOWANCES

01.2200 UNIT PRICES

01.2300 ALTERNATES

01.3000 ADMINISTRATIVE REQUIREMENTS

01.3000.1 SUBMITTALS

01.3113 INSURANCE REQUIREMENTS

01.4000 QUALITY REQUIREMENTS

01.4533 CODE REQUIRED SPECIAL INSPECTIONS

01.4100 REGULATORY REQUIREMENTS

01.5000 TEMPORARY FACILITIES AND CONTROLS

01.5100 TEMPORARY UTILITIES

01.5713 TEMPORARY EROSION AND SEDIMENT CONTROL

01.7329 CUTTING AND PATCHING

01.7700 CLOSE OUT PROCEDURES

01.7823 OPERATION AND MAINTENANCE DATA

01.7839 PROJECT RECORD DOCUMENTS

01.9113 GENERAL COMMISSIONING REQUIREMENTS

02.2200 EXISTING CONDITIONS ASSESSMENT

02.3200 SUBSURFACE CONDITIONS

02.4119 SELECTIVE DEMOLITION

07.2129 SPRAY-APPLIED ACOUSTIC TREATMENT

09.2216 NON-STRUCTURAL METAL FRAMING

09.2900 GYPSUM BOARD

09.5100 ACOUSTICAL CEILINGS

09.8414 ACOUSTIC STRETCHED-FABRIC WALL PANELS

SATISFY THE SCOPE OF WORK RELATED TO THE BID CATEGORY.

a. DRAWING INDEX CAN BE FOUND ON TITLE PAGE.

3. Furnish and Install all new metal studs as shown.

a. This includes cold form metal framing and non structural metal framing.

4. Engineered drawings required to be provided for cold form metal framing.

5. Furnish and Install all Gypsum boards as shown.

a. All Gypsum board must be finished as specified for painting.

6. Furnish and Install new Ceilings and Grid as shown on the drawings.

7. Furnish and Install new drywall bulkheads as shown.

8. Furnish and Install all batt insulation as shown on interior partitions as well as any exterior metal stud walls as shown.

9. Furnish and Install sound absorbing wall and ceiling units.

10. Furnish and install Spray-applied acoustic treatment as shown.

11. Furnish and Install firestopping at all rated assemblies as shown on the drawing.

12. Coordinate layout and elevations with the Construction Manager prior to install.

13. Dust control measures for all work in this Bid Category.

14. Daily clean-up at work areas.

15. Contractor to meet Project Schedule, this includes weekend work or daily overtime.

a. Project Manager/Project Foreman required to attend the following meetings:

i. Pre-Construction Kick Off

ii. Bi-Weekly Progress Meeting

iii. Any meetings required by the Local Ordinance, Architect, and/or Civil Engineer

16. All work must be done in accordance with MIOSHA Regulations.

17. Warranties as specified.

18. Submit shop drawings to scale so they can be accurately commented on/coordinated with other trades.

19. When shop drawings are returned from the Architect to Contractor marked “Rejected” or “Revise and

BID CATEGORY NO. 11 - FLOORING

1. Complete Flooring work as shown on the drawings and as specified in the following sections:

SPECIFICATION MANUAL AND FRONT ENDS

00.0115 LIST OF DRAWING SHEETS

00.1113 ADVERTISEMENT FOR BIDS

00.3132 GEOTECHNICAL INFORMATION

00.4100 BID FORM

01.0000 GENERAL REQUIREMENTS

01.0001 ELECTRONIC MODEL/DRAWING FILE EXCHANGE AGREEMENT

01.1000.0 SUMMARY

01.1000.1 ABBREVIATIONS

01.1010.1 WORK COVERED BY CONTRACT DOCUMENTS

01.1010.2 SCHEDULING

01.1010.3 CONTRACTOR USE OF PREMISES

01.1010.4 SUBSTANTIAL COMPLETION

01.2100 ALLOWANCES

01.2200 UNIT PRICES

01.2300 ALTERNATES

01.3000 ADMINISTRATIVE REQUIREMENTS

01.3000.1 SUBMITTALS

01.3113 INSURANCE REQUIREMENTS

01.4000 QUALITY REQUIREMENTS

01.4533 CODE REQUIRED SPECIAL INSPECTIONS

01.4100 REGULATORY REQUIREMENTS

01.5000 TEMPORARY FACILITIES AND CONTROLS

01.5100 TEMPORARY UTILITIES

01.5713 TEMPORARY EROSION AND SEDIMENT CONTROL

01.7329 CUTTING AND PATCHING

01.7700 CLOSE OUT PROCEDURES

01.7823 OPERATION AND MAINTENANCE DATA

01.7839 PROJECT RECORD DOCUMENTS

01.9113 GENERAL COMMISSIONING REQUIREMENTS

02.2200 EXISTING CONDITIONS ASSESSMENT

02.3200 SUBSURFACE CONDITIONS

02.4119 SELECTIVE DEMOLITION

09.3013 CERAMIC TILING

09.6400 WOOD FLOORING

09.6513 RESILIENT BASE AND ACCESSORIES

09.6519 RESILIENT TILE FLOORING

09.6813 TILE CARPETING

SATISFY THE SCOPE OF WORK RELATED TO THE BID CATEGORY.

a. DRAWING INDEX CAN BE FOUND ON TITLE PAGE.

3. Demo of Existing flooring as shown in note 10 on pages A1.1A, & A1.1B.

4. Furnish and Install new flooring as shown on the drawings.

a. This includes carpet, tile, wall tile, LVT, and vinyl base.

5. Minor floor prep as needed.

6. Furnish and Install Entrance Floor Mats and Frames as shown.

7. Coordinate layout and elevations with the Construction Manager prior to install.

8. Dust control measures for all work in this Bid Category.

9. Daily clean-up at work areas.

10. Contractor to meet Project Schedule, this includes weekend work or daily overtime.

a. Project Manager/Project Foreman required to attend the following meetings:

i. Pre-Construction Kick Off

ii. Bi-Weekly Progress Meeting

iii. Any meetings required by the Local Ordinance, Architect, and/or Civil Engineer

11. All work must be done in accordance with MIOSHA Regulations.

12. Warranties as specified.

13. Submit shop drawings to scale so they can be accurately commented on/coordinated with other trades.

14. When shop drawings are returned from the Architect to Contractor marked “Rejected” or “Revise and

BID CATEGORY NO. 12 - PAINTING

1. Complete Painting work as shown on the drawings and as specified in the following sections:

SPECIFICATION MANUAL AND FRONT ENDS

00.0115 LIST OF DRAWING SHEETS

00.1113 ADVERTISEMENT FOR BIDS

00.3132 GEOTECHNICAL INFORMATION

00.4100 BID FORM

01.0000 GENERAL REQUIREMENTS

01.0001 ELECTRONIC MODEL/DRAWING FILE EXCHANGE AGREEMENT

01.1000.0 SUMMARY

01.1000.1 ABBREVIATIONS

01.1010.1 WORK COVERED BY CONTRACT DOCUMENTS

01.1010.2 SCHEDULING

01.1010.3 CONTRACTOR USE OF PREMISES

01.1010.4 SUBSTANTIAL COMPLETION

01.2100 ALLOWANCES

01.2200 UNIT PRICES

01.2300 ALTERNATES

01.3000 ADMINISTRATIVE REQUIREMENTS

01.3000.1 SUBMITTALS

01.3113 INSURANCE REQUIREMENTS

01.4000 QUALITY REQUIREMENTS

01.4533 CODE REQUIRED SPECIAL INSPECTIONS

01.4100 REGULATORY REQUIREMENTS

01.5000 TEMPORARY FACILITIES AND CONTROLS

01.5100 TEMPORARY UTILITIES

01.5713 TEMPORARY EROSION AND SEDIMENT CONTROL

01.7329 CUTTING AND PATCHING

01.7700 CLOSE OUT PROCEDURES

01.7823 OPERATION AND MAINTENANCE DATA

01.7839 PROJECT RECORD DOCUMENTS

01.9113 GENERAL COMMISSIONING REQUIREMENTS

02.2200 EXISTING CONDITIONS ASSESSMENT

02.3200 SUBSURFACE CONDITIONS

02.4119 SELECTIVE DEMOLITION

09.9000 PAINTING AND COATINGS

09.9001 MECHANICAL ELECTRICAL PAINTING

SATISFY THE SCOPE OF WORK RELATED TO THE BID CATEGORY.

a. DRAWING INDEX CAN BE FOUND ON TITLE PAGE.

3. Furnish and Install all painting as shown and specified in the Construction Documents for this project.

4. Furnish and Install all staining finishes as shown.

5. Painting of Steel Lintels at New Louver Locations.

6. Contractor responsible for final touch-up.

7. Fire barrier signage/ stenciling on fire walls within concealed space above ceiling per Barrier Free

Dimensions.

8. Dust control measures for all work in this Bid Category.

9. Daily clean-up at work areas.

10. Contractor to meet Project Schedule, this includes weekend work or daily overtime.

a. Project Manager/Project Foreman required to attend the following meetings:

i. Pre-Construction Kick Off

ii. Bi-Weekly Progress Meeting

iii. Any meetings required by the Local Ordinance, Architect, and/or Civil Engineer

11. All work must be done in accordance with MIOSHA Regulations.

12. Warranties as specified.

13. Submit shop drawings to scale so they can be accurately commented on/coordinated with other trades.

14. When shop drawings are returned from the Architect to Contractor marked “Rejected” or “Revise and

BID CATEGORY NO. 13 - MECHANICAL

1. Complete Mechanical work as shown on the drawings and as specified in the following categories:

SPECIFICATION MANUAL AND FRONT ENDS

00.0115 LIST OF DRAWING SHEETS

00.1113 ADVERTISEMENT FOR BIDS

00.3132 GEOTECHNICAL INFORMATION

00.4100 BID FORM

01.0000 GENERAL REQUIREMENTS

01.0001 ELECTRONIC MODEL/DRAWING FILE EXCHANGE AGREEMENT

01.1000.0 SUMMARY

01.1000.1 ABBREVIATIONS

01.1010.1 WORK COVERED BY CONTRACT DOCUMENTS

01.1010.2 SCHEDULING

01.1…