SGL 234 Storage Building_Specifications.pdf
PDF 404 KB Posted
- Attached to
- WH ELECTRICAL INSTALLATION BLDG SGL#234
- Solicitation number
- 6100049790
- Issued by
- Montgomery County, Aaronsburg CDP, Pennsylvania
About this file
This document contains the project specifications for the construction of a new 40' x 100' storage building on State Game Lands #234 in Montgomery County, Pennsylvania. The project consists of two construction contracts - a general contract for the building structure, walls, roof, and appurtenances, and an electrical contract for electrical service, power distribution, lighting, and fixtures. Key details include:
The project location is on State Game Lands #234 approximately 2.25 miles west of Schwenksville, PA. The work must be completed by June 26, 2020. The Pennsylvania Game Commission will secure the necessary building permit, and the contractor shall coordinate inspections with the Pennsylvania Department of Labor and Industry. The contractor is responsible for obtaining all other required permits and approvals. The specified materials and installation requirements are detailed across 13 technical specification sections covering items such as concrete, framing, roof trusses, siding, doors, and electrical systems.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Drawings - Contract No. 1 and 2.pdf | ||
| Bid Notice_Contract No. 1 and No. 2.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PGC-234-19-02
PROJECT SPECIFICATIONS
The Contractor shall comply with the Contract Terms and Conditions provided with the Bid Documents including but not limited to the following:
INSURANCE REQUIREMENTS – The Contractor is required to have in place during the term of the Contract and any renewals or extensions thereof, Worker’s Compensation Insurance and Public Liability and Property Damage Insurance issued by companies acceptable to the Commonwealth and authorized to conduct such business under the laws of the Commonwealth of Pennsylvania. Insurance and coverage requirements shall be provided in accordance with the Contract Terms and Conditions.
Insurance coverage shall also include:
Fire Insurance. The Contractor shall furnish and pay for insurance on all work included in the contract, in the total amount of the contract price, against loss or damage by fire and lightning and the extended coverage, in the names of the Pennsylvania Game Commission and the Contractor as their respective interests may appear, before starting work. Duplicate certificates of insurance for the Installation Floater covering this project will be acceptable.
Special Hazard. Special hazards, if there is a possibility of such hazard existing in the work contemplated, this shall be covered by separate insurance or by rider(s) to other required policy(s). Possible hazards, such as blasting, explosion, and fire on insurable items shall be so covered.
Policy or Policies in duplicate to accomplish insurance as above described, shall be written on either a Builder’s Risk Form or Alterations and Additions Form or Installation Floater Form, whichever, is applicable, and shall be filed, upon request, with the Pennsylvania Game Commission before starting the work. Duplicate certificates of insurance for the Installation Floater covering this project will be acceptable.
The Commonwealth of Pennsylvania AND the Pennsylvania Game Commission shall be listed as an “Additional Insured” on all policies.
COMPLIANCE WITH LAW – The Contractor shall comply with all applicable federal and state laws and regulations and local ordinances in the performance of the Contract.
WORKMANSHIP - All work shall be performed in a Workmanlike manner and all materials and labor shall be in strict and entire conformity with the Drawings and Specifications.
INSPECTION AND CHANGES - All work is subject to inspection and acceptance by the Pennsylvania Game Commission. Any work rejected as defective or unsuitable shall be removed and replaced with suitable work and materials at the sole cost of the Contractor to the satisfaction of the Game Commission.
Changes shall be in accordance with the Contract Terms and Conditions.
TEMPORARY SERVICES AND JOB CONDITIONS - The Contractor shall be responsible for providing temporary facilities necessary to execute and protect his work. The Contractor shall accept all conditions as found by him upon examination of the site. The Contractor shall cooperate in the arrangements of his work as necessary to least affect the administration or operations of present buildings and shall keep the site clean at all times. If such modifications materially increase the unit cost of work, the increased expense will be paid by the Commission following execution of a Change Order in a dollar amount determined by the Commission, in its sole discretion, to be fair and reasonable. If such modifications diminish the unit cost of the work, the amount of said diminution may be retained or withheld by the Commission. No consequent loss of anticipated profit on work not executed will be paid to the Contractor.
PREVAILING WAGE – Prevailing minimum wages apply to this project. See Contract Terms and Conditions and attached Prevailing Wage Determination.
The Contractor and each Subcontractor shall file a statement each week and a final statement at the conclusion of the work on the contract with the contracting agency, under oath, and in form satisfactory to the Secretary, certifying that workmen have been paid wages in strict conformity with the provisions of the contract as prescribed by this section or if wages remain unpaid to set forth the amount of wages due and owing to each workman respectively. The PA Labor and Industry “Weekly Payroll Certification for Public Works Projects” form shall be used. The initial and final Payroll Certifications shall be notarized.
PAYMENT TERMS - A schedule of values is provided with the bid. Payment will be made on a monthly basis upon satisfactory completion of items listed on the Schedule of Values and in accordance with the Contract Terms and Conditions.
All payments due to the Contractor shall be processed after all work has been inspected and approved by an agent of the Pennsylvania Game Commission. Payment will not be made for work that is not progressing satisfactorily or for unsuitable or defective work.
Payments may be withheld for failure to provide required documentation for the project including but not limited to required submittals / shop drawings and weekly submission of Certified Payrolls.
CONTRACT TERM - The Contract shall commence upon delivery of purchase order to Contractor and shall terminate on June 26, 2020. All work must be completed and accepted by that date.
EXCISE TAXES, PENNSYLVANIA SALES TAX - The Commonwealth is exempt from all Excise Taxes. See Contract Terms and Conditions.
OFFSET PROVISION - The Contractor agrees that the Commonwealth may set off the amount of any state liability or other debt of the Contractor or its subsidiaries that is owed to the Commonwealth and not being contested on appeal against any payments due the Contractor under this or any other contract with the Commonwealth.
PERFORMANCE SECURITY / CONTRACT BONDS – Within 10 days after award of the purchase order, the Bidder to whom the Contract is awarded, shall provide Contract Performance Security in a form acceptable to the Commonwealth and, if required, a Payment Bond based on the amount of the Contract in accordance with the Contract Terms and Conditions.
GUARANTY / WARRANTY – See Contract Terms and Conditions – all items are warranted for a period of one year following delivery by the Contractor and acceptance by the Commonwealth.
Contractor shall comply with the conditions listed below in accordance with the Contract Terms and Conditions:
1. Steel Products Procurement Act
2. Prohibition Against the Use of Certain Steel and Aluminum Products (Trade
Practices Act)
3. Reciprocal Limitations Act - The form GSPUR89 (Reciprocal Limitations Act
Requirements) is attached. The Contractor shall complete the applicable portions of pages 3 and 4 of the form and submit the completed pages within two days after the bid opening.
Project Name: SGL #234 Equipment Storage Building
Awarding Agency: Bobbi Mercer
Contract Award Date: 3/17/2020
Serial Number: 20-00204
Project Classification: Building/Highway
Determination Date: 1/8/2020
Assigned Field Office: Philadelphia
Field Office Phone Number: (215)560-1858
Toll Free Phone Number:
Project County: Montgomery County
BUREAU OF LABOR LAW COMPLIANCE
PREVAILING WAGES PROJECT RATES
Commonwealth of Pennsylvania Department of Labor & Industry Report Date: 1/8/2020 Page 1 of 10
Project: 20-00204 - Building Effective Date
Expiration Date
Hourly Rate Fringe Benefits
Total
Asbestos & Insulation Workers 5/29/2017 $47.30 $34.85 $82.15
Asbestos & Insulation Workers 5/1/2018 $49.30 $35.85 $85.15
Asbestos & Insulation Workers 5/1/2019 $51.20 $36.95 $88.15
Boilermaker (Commercial, Institutional, and Minor Repair Work)
3/1/2017 $28.52 $18.22 $46.74
Boilermaker (Commercial, Institutional, and Minor Repair Work)
3/1/2018 $29.52 $18.22 $47.74
Boilermaker (Commercial, Institutional, and Minor Repair Work)
1/1/2019 $29.26 $18.48 $47.74
Boilermakers 1/1/2018 $46.26 $33.36 $79.62
Boilermakers 3/1/2018 $45.89 $33.73 $79.62
Boilermakers 1/1/2019 $45.51 $34.11 $79.62
Boilermakers 8/1/2019 $47.21 $34.11 $81.32
Bricklayer 5/1/2017 $40.98 $26.78 $67.76
Bricklayer 5/1/2018 $43.73 $26.78 $70.51
Bricklayer 5/1/2019 $46.48 $26.78 $73.26
Carpenter - Chief of Party (Surveying & Layout) 5/1/2017 $45.25 $27.59 $72.84
Carpenter - Chief of Party (Surveying & Layout) 5/1/2018 4/30/2019 $45.83 $27.59 $73.42
Carpenter - Chief of Party (Surveying & Layout) 5/1/2019 4/30/2020 $46.54 $27.59 $74.13
Carpenter - Chief of Party (Surveying & Layout) 5/1/2020 $47.73 $27.59 $75.32
Carpenter - Instrument Person (Surveying & Layout) 5/1/2017 $39.35 $27.59 $66.94
Carpenter - Instrument Person (Surveying & Layout) 5/1/2018 4/30/2019 $39.85 $27.59 $67.44
Carpenter - Instrument Person (Surveying & Layout) 5/1/2019 4/30/2020 $40.47 $27.59 $68.06
Carpenter - Instrument Person (Surveying & Layout) 5/1/2020 $41.50 $27.59 $69.09
Carpenter - Rodman (Surveying & Layout) 5/1/2017 $19.68 $19.64 $39.32
Carpenter - Rodman (Surveying & Layout) 5/1/2018 4/30/2019 $19.93 $19.49 $39.42
Carpenter - Rodman (Surveying & Layout) 5/1/2019 4/30/2020 $20.24 $19.69 $39.93
Carpenter - Rodman (Surveying & Layout) 5/1/2020 $20.75 $19.49 $40.24
Carpenters 5/1/2017 $39.35 $27.59 $66.94
Carpenters 5/1/2018 4/30/2019 $39.85 $27.59 $67.44
Carpenters 5/1/2019 4/30/2020 $40.87 $27.59 $68.46
Carpenters 5/1/2020 $41.90 $27.59 $69.49
Cement Masons 5/1/2017 $36.45 $31.76 $68.21
Cement Masons 5/1/2018 $37.50 $32.26 $69.76
Cement Masons 5/1/2019 $38.50 $32.81 $71.31
DockBuilder/Pile Drivers (Building, Heavy & Highway) 5/1/2018 $43.45 $34.47 $77.92
Dockbuilder/Piledriver (Building, Heavy, Highway) 11/1/2017 $43.45 $33.22 $76.67
Dockbuilder/Piledriver (Building, Heavy, Highway) 5/1/2018 $44.70 $33.22 $77.92
Drywall Finisher 5/1/2017 $37.11 $26.75 $63.86
Drywall Finisher 5/1/2018 4/30/2019 $39.27 $27.49 $66.76
Drywall Finisher 5/1/2019 $37.75 $28.11 $65.86
Electricians 4/30/2017 $45.16 $35.25 $80.41
Electricians 4/29/2018 $46.89 $36.52 $83.41
Electricians 5/1/2019 $48.26 $38.15 $86.41
Elevator Constructor 1/1/2018 $55.76 $33.05 $88.81
BUREAU OF LABOR LAW COMPLIANCE
PREVAILING WAGES PROJECT RATES
Report Date: 1/8/2020 Page 2 of 10
Expiration Date
Hourly Rate Fringe Benefits
Total
Floor Coverer 5/1/2019 $44.37 $28.44 $72.81
Floor Coverer 5/1/2020 $46.01 $28.44 $74.45
Floor Layer 5/1/2017 $42.51 $27.91 $70.42
Floor Layer 5/1/2018 $43.11 $28.09 $71.20
Glazier 5/1/2017 $41.30 $31.80 $73.10
Glazier 5/1/2018 4/30/2019 $43.32 $32.33 $75.65
Glazier 5/1/2019 $43.87 $33.38 $77.25
Iron Workers - Reinforcing Steel Mesh - Rebar 7/1/2017 $42.56 $29.30 $71.86
Iron Workers - Reinforcing Steel Mesh - Rebar 7/1/2018 $51.46 $30.60 $82.06
Iron Workers - Reinforcing Steel Mesh - Rebar 7/1/2019 $52.66 $30.85 $83.51
Iron Workers (Riggers) 7/1/2017 $39.83 $27.92 $67.75
Iron Workers 7/1/2017 $47.30 $32.91 $80.21
Iron Workers 7/1/2018 $42.88 $30.60 $73.48
Iron Workers 7/1/2019 $49.30 $34.41 $83.71
Iron Workers 1/1/2020 $49.80 $34.41 $84.21
Laborers (Class 01 - See notes) 5/1/2017 $28.65 $24.95 $53.60
Laborers (Class 02 - See notes) 5/1/2017 $30.85 $25.65 $56.50
Laborers (Class 03 - See notes) 5/1/2017 $28.92 $25.18 $54.10
Laborers (Class 04 - See notes) 5/1/2017 $28.95 $24.95 $53.90
Laborers (Class 05 - See notes) 5/1/2017 $28.65 $24.95 $53.60
Landscape Laborer 5/1/2017 $22.71 $23.08 $45.79
Marble Finisher 5/1/2017 $35.55 $24.17 $59.72
Marble Finisher 5/1/2018 $37.55 $24.17 $61.72
Marble Finisher 5/1/2019 $39.75 $24.17 $63.92
Marble Mason 5/1/2017 $40.36 $26.99 $67.35
Marble Mason 5/1/2018 $43.11 $26.99 $70.10
Marble Mason 5/1/2019 $45.86 $26.99 $72.85
Millwright 7/1/2017 $41.35 $32.24 $73.59
Millwright 5/1/2018 $43.33 $32.96 $76.29
Millwright 5/1/2019 $45.50 $33.29 $78.79
Operators (Building, Class 01 - See Notes) 5/1/2017 $44.87 $28.14 $73.01
Operators (Building, Class 01 - See Notes) 5/1/2018 $46.41 $28.60 $75.01
Operators (Building, Class 01 - See Notes) 5/1/2019 $46.41 $30.60 $77.01
Operators (Building, Class 01 - See Notes) 5/1/2020 $47.96 $31.05 $79.01
Operators (Building, Class 01 - See Notes) 5/1/2021 $49.50 $31.51 $81.01
Operators (Building, Class 01A - See Notes) 5/1/2017 $47.86 $29.03 $76.89
Operators (Building, Class 01A - See Notes) 5/1/2018 $49.41 $29.49 $78.90
Operators (Building, Class 01A - See Notes) 5/1/2019 $49.41 $31.49 $80.90
Operators (Building, Class 01A - See Notes) 5/1/2020 $50.96 $31.94 $82.90
Operators (Building, Class 01A - See Notes) 5/1/2021 $52.51 $32.39 $84.90
Operators (Building, Class 02 - See Notes) 5/1/2017 $44.62 $28.07 $72.69
Operators (Building, Class 02 - See Notes) 5/1/2018 $46.16 $28.53 $74.69
Operators (Building, Class 02 - See Notes) 5/1/2019 $46.16 $30.53 $76.69
Operators (Building, Class 02 - See Notes) 5/1/2020 $47.71 $30.98 $78.69
BUREAU OF LABOR LAW COMPLIANCE
PREVAILING WAGES PROJECT RATES
Report Date: 1/8/2020 Page 3 of 10
Expiration Date
Hourly Rate Fringe Benefits
Total
Operators (Building, Class 02 - See Notes) 5/1/2021 $49.25 $31.44 $80.69
Operators (Building, Class 02A - See Notes) 5/1/2017 $47.61 $28.97 $76.58
Operators (Building, Class 02A - See Notes) 5/1/2018 $49.16 $29.42 $78.58
Operators (Building, Class 02A - See Notes) 5/1/2019 $49.17 $31.41 $80.58
Operators (Building, Class 02A - See Notes) 5/1/2020 $50.71 $31.87 $82.58
Operators (Building, Class 02A - See Notes) 5/1/2021 $52.26 $32.32 $84.58
Operators (Building, Class 03 - See Notes) 5/1/2017 $40.53 $26.87 $67.40
Operators (Building, Class 03 - See Notes) 5/1/2018 $42.07 $27.33 $69.40
Operators (Building, Class 03 - See Notes) 5/1/2019 $42.08 $29.32 $71.40
Operators (Building, Class 03 - See Notes) 5/1/2020 $43.62 $29.78 $73.40
Operators (Building, Class 03 - See Notes) 5/1/2021 $45.16 $30.24 $75.40
Operators (Building, Class 04 - See Notes) 5/1/2017 $40.24 $26.78 $67.02
Operators (Building, Class 04 - See Notes) 5/1/2018 $41.78 $27.22 $69.00
Operators (Building, Class 04 - See Notes) 5/1/2019 $41.78 $29.23 $71.01
Operators (Building, Class 04 - See Notes) 5/1/2020 $43.32 $29.69 $73.01
Operators (Building, Class 04 - See Notes) 5/1/2021 $44.87 $30.14 $75.01
Operators (Building, Class 05 - See Notes) 5/1/2017 $38.51 $26.27 $64.78
Operators (Building, Class 05 - See Notes) 5/1/2018 $40.05 $26.73 $66.78
Operators (Building, Class 05 - See Notes) 5/1/2019 $40.06 $28.72 $68.78
Operators (Building, Class 05 - See Notes) 5/1/2020 $41.60 $29.18 $70.78
Operators (Building, Class 05 - See Notes) 5/1/2021 $43.14 $29.64 $72.78
Operators (Building, Class 06 - See Notes) 5/1/2017 $37.52 $25.98 $63.50
Operators (Building, Class 06 - See Notes) 5/1/2018 $39.07 $26.43 $65.50
Operators (Building, Class 06 - See Notes) 5/1/2019 $39.07 $28.43 $67.50
Operators (Building, Class 06 - See Notes) 5/1/2020 $40.61 $28.89 $69.50
Operators (Building, Class 06 - See Notes) 5/1/2021 $42.16 $29.34 $71.50
Operators (Building, Class 07A- See Notes) 5/1/2017 $54.14 $32.47 $86.61
Operators (Building, Class 07A- See Notes) 5/1/2018 $55.99 $33.02 $89.01
Operators (Building, Class 07A- See Notes) 5/1/2019 $56.30 $35.11 $91.41
Operators (Building, Class 07A- See Notes) 5/1/2020 $58.16 $35.65 $93.81
Operators (Building, Class 07A- See Notes) 5/1/2021 $60.00 $36.21 $96.21
Operators (Building, Class 07B- See Notes) 5/1/2017 $53.84 $32.40 $86.24
Operators (Building, Class 07B- See Notes) 5/1/2018 $55.70 $32.92 $88.62
Operators (Building, Class 07B- See Notes) 5/1/2019 $56.00 $35.03 $91.03
Operators (Building, Class 07B- See Notes) 5/1/2020 $57.86 $35.57 $93.43
Operators (Building, Class 07B- See Notes) 5/1/2021 $59.72 $36.11 $95.83
Painters Class 1 (see notes) 5/1/2017 $37.82 $26.46 $64.28
Painters Class 1 (see notes) 5/1/2018 4/30/2019 $38.64 $27.64 $66.28
Painters Class 1 (see notes) 5/1/2019 $39.04 $28.99 $68.03
Painters Class 2 (see notes) 2/1/2017 $53.67 $26.09 $79.76
Painters Class 2 (see notes) 2/1/2018 $54.14 $27.27 $81.41
Painters Class 2 (see notes) 2/1/2019 $55.52 $28.39 $83.91
Painters Class 3 (see notes) 5/1/2017 $38.20 $26.46 $64.66
Painters Class 3 (see notes) 5/1/2019 $39.42 $28.99 $68.41
BUREAU OF LABOR LAW COMPLIANCE
PREVAILING WAGES PROJECT RATES
Report Date: 1/8/2020 Page 4 of 10
Expiration Date
Hourly Rate Fringe Benefits
Total
Plasterers 5/1/2017 $37.42 $28.83 $66.25
Plasterers 5/1/2018 $37.42 $30.04 $67.46
Plasterers 5/1/2019 $37.72 $30.74 $68.46 plumber 5/1/2018 4/30/2019 $53.45 $33.54 $86.99 plumber 5/1/2019 $55.45 $34.54 $89.99
Plumbers 5/1/2017 $51.42 $32.57 $83.99
Pointers, Caulkers, Cleaners 5/1/2017 $42.26 $25.69 $67.95
Pointers, Caulkers, Cleaners 5/1/2018 $45.01 $25.69 $70.70
Pointers, Caulkers, Cleaners 5/1/2019 $47.76 $25.69 $73.45
Roofers (Composition) 5/1/2017 $36.15 $30.22 $66.37
Roofers (Composition) 5/1/2018 $37.15 $31.27 $68.42
Roofers (Composition) 5/1/2019 $38.35 $31.80 $70.15
Roofers (Shingle) 5/1/2016 $25.70 $19.17 $44.87
Roofers (Shingle) 5/1/2019 $28.50 $20.87 $49.37
Roofers (Slate & Tile) 5/1/2016 $28.70 $19.17 $47.87
Roofers (Slate & Tile) 5/1/2018 $30.50 $20.37 $50.87
Roofers (Slate & Tile) 5/1/2019 $31.50 $20.87 $52.37
Sheet Metal Workers 5/1/2017 $46.42 $39.51 $85.93
Sheet Metal Workers 5/1/2018 $47.58 $41.60 $89.18
Sheet Metal Workers 5/1/2019 $49.79 $42.89 $92.68
Sprinklerfitters 4/1/2017 $37.40 $21.74 $59.14
Sprinklerfitters 4/1/2018 $38.80 $22.74 $61.54
Sprinklerfitters 5/1/2019 $57.20 $28.32 $85.52
Steamfitters 5/1/2017 $54.64 $32.53 $87.17
Steamfitters 5/1/2018 $56.37 $34.39 $90.76
Steamfitters 5/1/2019 $58.17 $35.99 $94.16
Stone Masons 5/1/2017 $40.36 $26.99 $67.35
Stone Masons 5/1/2018 $43.11 $26.99 $70.10
Stone Masons 5/1/2019 $45.86 $26.99 $72.85
Terrazzo Finisher 5/1/2017 $39.06 $22.73 $61.79
Terrazzo Finisher 5/1/2018 $41.31 $22.73 $64.04
Terrazzo Finisher 5/1/2019 $43.61 $22.73 $66.34
Terrazzo Grinder 5/1/2017 $39.33 $22.73 $62.06
Terrazzo Grinder 5/1/2018 $41.58 $22.73 $64.31
Terrazzo Grinder 5/1/2019 $43.88 $22.73 $66.61
Terrazzo Mechanics 5/1/2017 $43.71 $24.81 $68.52
Terrazzo Mechanics 5/1/2018 $46.46 $24.81 $71.27
Terrazzo Mechanics 5/1/2019 $49.21 $24.81 $74.02
Tile Finisher 5/1/2017 $35.55 $24.17 $59.72
Tile Finisher 5/1/2018 $37.55 $24.17 $61.72
Tile Finisher 5/1/2019 $39.75 $24.17 $63.92
Tile Setter 5/1/2017 $43.71 $24.81 $68.52
Tile Setter 5/1/2018 $46.46 $24.81 $71.27
Tile Setter 5/1/2019 $49.21 $24.81 $74.02
BUREAU OF LABOR LAW COMPLIANCE
PREVAILING WAGES PROJECT RATES
Report Date: 1/8/2020 Page 5 of 10
Expiration Date
Hourly Rate Fringe Benefits
Total
Truckdriver class 1(see notes) 5/1/2017 $30.46 $17.96 $48.42
Truckdriver class 1(see notes) 5/1/2018 $31.93 $17.96 $49.89
Truckdriver class 1(see notes) 5/1/2019 $32.21 $19.19 $51.40
Truckdriver class 1(see notes) 5/1/2020 $34.93 $17.96 $52.89
Truckdriver class 1(see notes) 5/1/2021 $36.48 $17.96 $54.44
Truckdriver class 2 (see notes) 5/1/2017 $30.56 $17.96 $48.52
Truckdriver class 2 (see notes) 5/1/2018 $32.03 $17.96 $49.99
Truckdriver class 2 (see notes) 5/1/2019 $32.31 $19.19 $51.50
Truckdriver class 2 (see notes) 5/1/2020 $35.03 $17.96 $52.99
Truckdriver class 2 (see notes) 5/1/2021 $36.58 $17.96 $54.54
Truckdriver class 3 (see notes) 5/1/2017 $30.56 $17.96 $48.52
Truckdriver class 3 (see notes) 5/1/2018 $32.28 $17.96 $50.24
Truckdriver class 3 (see notes) 5/1/2019 $32.56 $19.19 $51.75
Truckdriver class 3 (see notes) 5/1/2020 $35.28 $17.96 $53.24
Truckdriver class 3 (see notes) 5/1/2021 $36.83 $17.96 $54.79
Window Film / Tint Installer 6/1/2019 $24.52 $12.08 $36.60
BUREAU OF LABOR LAW COMPLIANCE
PREVAILING WAGES PROJECT RATES
Report Date: 1/8/2020 Page 6 of 10
Project: 20-00204 - Heavy/Highway Effective
Expiration Date
Hourly Rate Fringe Benefits
Total
Carpenter - Chief of Party (Surveying & Layout) 5/1/2017 $51.42 $27.39 $78.81
Carpenter - Chief of Party (Surveying & Layout) 5/1/2018 4/30/2019 $53.20 $27.69 $80.89
Carpenter - Chief of Party (Surveying & Layout) 5/1/2019 4/30/2020 $54.98 $28.04 $83.02
Carpenter - Chief of Party (Surveying & Layout) 5/1/2020 4/30/2021 $57.22 $28.04 $85.26
Carpenter - Chief of Party (Surveying & Layout) 5/1/2021 $59.93 $27.69 $87.62
Carpenter - Instrument Person (Surveying & Layout) 5/1/2017 $44.71 $27.39 $72.10
Carpenter - Instrument Person (Surveying & Layout) 5/1/2018 4/30/2019 $46.26 $27.69 $73.95
Carpenter - Instrument Person (Surveying & Layout) 5/1/2019 4/30/2020 $47.81 $28.04 $75.85
Carpenter - Instrument Person (Surveying & Layout) 5/1/2020 4/30/2021 $49.76 $28.04 $77.80
Carpenter - Instrument Person (Surveying & Layout) 5/1/2021 $52.11 $27.69 $79.80
Carpenter - Rodman (Surveying & Layout) 5/1/2017 $35.77 $21.19 $56.96
Carpenter - Rodman (Surveying & Layout) 5/1/2018 4/30/2019 $37.01 $21.34 $58.35
Carpenter - Rodman (Surveying & Layout) 5/1/2019 4/30/2020 $38.25 $21.34 $59.59
Carpenter - Rodman (Surveying & Layout) 5/1/2020 4/30/2021 $39.81 $21.34 $61.15
Carpenter - Rodman (Surveying & Layout) 5/1/2021 $41.69 $21.34 $63.03
Carpenter 5/1/2018 4/30/2019 $46.26 $27.69 $73.95
Carpenter 5/1/2019 4/30/2020 $47.81 $28.04 $75.85
Carpenter 5/1/2020 4/30/2021 $49.76 $28.04 $77.80
Carpenter 5/1/2021 $51.76 $28.04 $79.80
Carpenters 5/1/2017 $44.71 $27.39 $72.10
Carpenters 5/1/2018 $46.56 $27.39 $73.95
Carpenters 5/1/2019 $48.46 $27.39 $75.85
Carpenters 5/1/2020 $50.41 $27.39 $77.80
Carpenters 5/1/2021 $52.41 $27.39 $79.80
Cement Masons 5/1/2017 $34.45 $31.51 $65.96
Cement Masons 5/1/2018 $35.65 $32.01 $67.66
Cement Masons 5/1/2019 $37.90 $31.51 $69.41
Cement Masons 5/1/2020 $39.70 $31.51 $71.21
Cement Masons 5/1/2021 $41.55 $31.51 $73.06
Electric Lineman 5/29/2017 $52.60 $26.37 $78.97
Electric Lineman 5/28/2018 $53.64 $27.45 $81.09
Electric Lineman 5/27/2019 $54.66 $28.56 $83.22
Iron Workers (Bridge, Structural Steel, Ornamental, Precast, Reinforcing)
1/1/2017 $44.20 $31.26 $75.46
Iron Workers 7/1/2017 $47.30 $32.91 $80.21
Iron Workers 7/1/2019 $49.30 $34.41 $83.71
Iron Workers 1/1/2020 $49.80 $34.41 $84.21
Laborers (Class 01 - See notes) 5/1/2017 $29.75 $25.65 $55.40
Laborers (Class 01 - See notes) 5/1/2018 $31.25 $25.65 $56.90
Laborers (Class 01 - See notes) 5/1/2019 $32.80 $25.65 $58.45
Laborers (Class 01 - See notes) 5/1/2020 $34.45 $25.65 $60.10
Laborers (Class 01 - See notes) 5/1/2021 $36.20 $25.65 $61.85
Laborers (Class 02 - See notes) 5/1/2017 $29.95 $25.65 $55.60
Laborers (Class 02 - See notes) 5/1/2018 $31.45 $25.65 $57.10
Laborers (Class 02 - See notes) 5/1/2019 $33.00 $25.65 $58.65
BUREAU OF LABOR LAW COMPLIANCE
PREVAILING WAGES PROJECT RATES
Report Date: 1/8/2020 Page 7 of 10
Expiration Date
Hourly Rate Fringe Benefits
Total
Laborers (Class 02 - See notes) 5/1/2020 $34.65 $25.65 $60.30
Laborers (Class 02 - See notes) 5/1/2021 $36.40 $25.65 $62.05
Laborers (Class 03 - See notes) 5/1/2017 $29.95 $25.65 $55.60
Laborers (Class 03 - See notes) 5/1/2018 $31.45 $25.65 $57.10
Laborers (Class 03 - See notes) 5/1/2019 $33.00 $25.65 $58.65
Laborers (Class 03 - See notes) 5/1/2020 $34.65 $25.65 $60.30
Laborers (Class 03 - See notes) 5/1/2021 $36.40 $25.65 $62.05
Laborers (Class 04 - See notes) 5/1/2017 $24.55 $25.65 $50.20
Laborers (Class 04 - See notes) 5/1/2018 $26.05 $25.65 $51.70
Laborers (Class 04 - See notes) 5/1/2019 $27.60 $25.65 $53.25
Laborers (Class 04 - See notes) 5/1/2020 $29.25 $25.65 $54.90
Laborers (Class 04 - See notes) 5/1/2021 $31.00 $25.65 $56.65
Laborers (Class 05 - See notes) 5/1/2017 $30.60 $25.65 $56.25
Laborers (Class 05 - See notes) 5/1/2018 $32.10 $25.65 $57.75
Laborers (Class 05 - See notes) 5/1/2019 $33.65 $25.65 $59.30
Laborers (Class 05 - See notes) 5/1/2020 $35.30 $25.65 $60.95
Laborers (Class 05 - See notes) 5/1/2021 $37.05 $25.65 $62.70
Laborers (Class 06 - See notes) 5/1/2017 $30.65 $25.65 $56.30
Laborers (Class 06 - See notes) 5/1/2018 $32.15 $25.65 $57.80
Laborers (Class 06 - See notes) 5/1/2019 $33.70 $25.65 $59.35
Laborers (Class 06 - See notes) 5/1/2020 $35.35 $25.65 $61.00
Laborers (Class 06 - See notes) 5/1/2021 $37.10 $25.65 $62.75
Laborers (Class 07 - See notes) 5/1/2017 $30.50 $25.65 $56.15
Laborers (Class 07 - See notes) 5/1/2018 $32.00 $25.65 $57.65
Laborers (Class 07 - See notes) 5/1/2019 $33.55 $25.65 $59.20
Laborers (Class 07 - See notes) 5/1/2020 $35.20 $25.65 $60.85
Laborers (Class 07 - See notes) 5/1/2021 $36.95 $25.65 $62.60
Laborers (Class 08 - See notes) 5/1/2017 $30.25 $25.65 $55.90
Laborers (Class 08 - See notes) 5/1/2018 $31.75 $25.65 $57.40
Laborers (Class 08 - See notes) 5/1/2019 $33.30 $25.65 $58.95
Laborers (Class 08 - See notes) 5/1/2020 $34.95 $25.65 $60.60
Laborers (Class 08 - See notes) 5/1/2021 $36.70 $25.65 $62.35
Laborers (Class 09 - See notes) 5/1/2017 $30.10 $25.65 $55.75
Laborers (Class 09 - See notes) 5/1/2018 $31.60 $25.65 $57.25
Laborers (Class 09 - See notes) 5/1/2019 $33.15 $25.65 $58.80
Laborers (Class 09 - See notes) 5/1/2020 $34.80 $25.65 $60.45
Laborers (Class 09 - See notes) 5/1/2021 $36.55 $25.65 $62.20
Laborers (Class 10- See notes) 5/1/2017 $30.25 $25.65 $55.90
Laborers (Class 10- See notes) 5/1/2018 $33.30 $25.65 $58.95
Laborers (Class 10- See notes) 5/1/2018 $31.75 $25.65 $57.40
Laborers (Class 10- See notes) 5/1/2020 $34.95 $25.65 $60.60
Laborers (Class 10- See notes) 5/1/2021 $36.70 $25.65 $62.35
Laborers (Class 11 -See Notes) 5/1/2017 $30.15 $25.65 $55.80
Laborers (Class 11 -See Notes) 5/1/2018 $31.55 $25.65 $57.20
BUREAU OF LABOR LAW COMPLIANCE
PREVAILING WAGES PROJECT RATES
Report Date: 1/8/2020 Page 8 of 10
Expiration Date
Hourly Rate Fringe Benefits
Total
Laborers (Class 11 -See Notes) 5/1/2019 $33.10 $25.65 $58.75
Laborers (Class 11 -See Notes) 5/1/2020 $34.75 $25.65 $60.40
Laborers (Class 11 -See Notes) 5/1/2021 $36.50 $25.65 $62.15
Laborers (Class 12 -See Notes) 5/1/2017 $31.85 $25.65 $57.50
Laborers (Class 12 -See Notes) 5/1/2018 $32.45 $25.65 $58.10
Laborers (Class 12 -See Notes) 5/1/2019 $34.00 $25.65 $59.65
Laborers (Class 12 -See Notes) 5/1/2020 $35.65 $25.65 $61.30
Laborers (Class 12 -See Notes) 5/1/2021 $37.40 $25.65 $63.05
Laborers (Class 13 -See Notes) 5/1/2017 $33.88 $25.65 $59.53
Laborers (Class 13 -See Notes) 5/1/2018 $35.38 $25.65 $61.03
Laborers (Class 13 -See Notes) 5/1/2019 $36.93 $25.65 $62.58
Laborers (Class 13 -See Notes) 5/1/2020 $38.58 $25.65 $64.23
Laborers (Class 13 -See Notes) 5/1/2021 $40.33 $25.65 $65.98
Laborers (Class 14 -See Notes) 5/1/2017 $30.00 $25.65 $55.65
Laborers (Class 14 -See Notes) 5/1/2018 $31.50 $25.65 $57.15
Laborers (Class 14 -See Notes) 5/1/2019 $33.05 $25.65 $58.70
Laborers (Class 14 -See Notes) 5/1/2020 $34.70 $25.65 $60.35
Laborers (Class 14 -See Notes) 5/1/2021 $36.45 $25.65 $62.10
Laborers Utility (PGW ONLY) (Flagperson) 5/1/2017 $23.52 $17.58 $41.10
Laborers Utility (PGW ONLY) 5/1/2017 $30.55 $17.58 $48.13
Landscape Laborer 4/1/2016 $21.19 $22.65 $43.84
Operators Class 01 - See Notes (Building, Heavy, Highway)
5/1/2017 $44.87 $28.14 $73.01
Operators Class 01 - See Notes (Building, Heavy, Highway)
5/1/2018 $46.41 $28.60 $75.01
Operators Class 01a - See Notes (Building, Heavy, Highway)
5/1/2017 $47.86 $29.03 $76.89
Operators Class 01a - See Notes (Building, Heavy, Highway)
5/1/2018 $49.41 $29.49 $78.90
Operators Class 02 - See Notes (Building, Heavy, Highway)
5/1/2017 $44.62 $28.07 $72.69
Operators Class 02 - See Notes (Building, Heavy, Highway)
5/1/2018 $46.16 $28.53 $74.69
Operators Class 02a - See Notes (Building, Heavy, Highway)
5/1/2017 $47.61 $28.97 $76.58
Operators Class 02a - See Notes (Building, Heavy, Highway)
5/1/2018 $49.16 $29.42 $78.58
Operators Class 03 - See Notes (Building, Heavy, Highway)
5/1/2017 $40.53 $26.87 $67.40
Operators Class 03 - See Notes (Building, Heavy, Highway)
5/1/2018 $42.07 $27.33 $69.40
Operators Class 04 - See Notes (Building, Heavy, Highway)
5/1/2017 $40.24 $26.78 $67.02
Operators Class 04 - See Notes (Building, Heavy, Highway)
5/1/2018 $41.78 $27.22 $69.00
Operators Class 05 - See Notes (Building, Heavy, Highway)
5/1/2017 $38.51 $26.27 $64.78
Operators Class 05 - See Notes (Building, Heavy, Highway)
5/1/2018 $40.05 $26.73 $66.78
BUREAU OF LABOR LAW COMPLIANCE
PREVAILING WAGES PROJECT RATES
Report Date: 1/8/2020 Page 9 of 10
Expiration Date
Hourly Rate Fringe Benefits
Total
Operators Class 06 - See Notes (Building, Heavy, Highway)
5/1/2017 $37.52 $25.98 $63.50
Operators Class 06 - See Notes (Building, Heavy, Highway)
5/1/2018 $39.07 $26.43 $65.50
Operators Class 07 (A) - See Notes (Building, Heavy, Highway)
5/1/2017 $54.14 $32.47 $86.61
Operators Class 07 (A) - See Notes (Building, Heavy, Highway)
5/1/2018 $55.99 $33.02 $89.01
Operators Class 07 (B) - See Notes (Building, Heavy, Highway)
5/1/2017 $53.84 $32.40 $86.24
Operators Class 07 (B) - See Notes (Building, Heavy, Highway)
5/1/2018 $55.70 $32.92 $88.62
Painters (Bridges, Stacks, Towers) 2/1/2017 $53.67 $26.09 $79.76
Painters (Bridges, Stacks, Towers) 2/1/2018 $54.14 $27.27 $81.41
Painters (Bridges, Stacks, Towers) 2/1/2019 $55.52 $28.39 $83.91
Steamfitters (Heavy and Highway - Gas Distribution) 5/1/2017 $51.91 $32.53 $84.44
Steamfitters 5/1/2018 $56.37 $34.39 $90.76
Truckdriver class 1(see notes) 5/1/2017 $30.31 $17.96 $48.27
Truckdriver class 1(see notes) 5/1/2018 $31.78 $17.96 $49.74
Truckdriver class 1(see notes) 5/1/2019 $32.06 $19.19 $51.25
Truckdriver class 1(see notes) 5/1/2020 $34.78 $17.96 $52.74
Truckdriver class 1(see notes) 5/1/2021 $36.33 $17.96 $54.29
Truckdriver class 2 (see notes) 5/1/2017 $30.41 $17.96 $48.37
Truckdriver class 2 (see notes) 5/1/2018 $31.88 $17.96 $49.84
Truckdriver class 2 (see notes) 5/1/2019 $32.16 $19.19 $51.35
Truckdriver class 2 (see notes) 5/1/2020 $34.88 $17.96 $52.84
Truckdriver class 2 (see notes) 5/1/2021 $36.43 $17.96 $54.39
Truckdriver class 3 (see notes) 5/1/2017 $30.66 $17.96 $48.62
Truckdriver class 3 (see notes) 5/1/2018 $32.13 $17.96 $50.09
Truckdriver class 3 (see notes) 5/1/2019 $32.41 $19.19 $51.60
Truckdriver class 3 (see notes) 5/1/2020 $35.13 $17.96 $53.09
Truckdriver class 3 (see notes) 5/1/2021 $36.68 $17.96 $54.64
BUREAU OF LABOR LAW COMPLIANCE
PREVAILING WAGES PROJECT RATES
Report Date: 1/8/2020 Page 10 of 10
Department of General Services GSPUR-89 Rev. 11/06/12
RECIPROCAL LIMITATIONS ACT
REQUIREMENTS
Please Complete Applicable Portion of Pages 3 & 4 and Return with Bid.
NOTE: These Requirements Do Not Apply To Bids Under $10,000.00
I. REQUIREMENTS
A. The Reciprocal Limitations Act requires the Commonwealth to give preference to those bidders offering supplies produced, manufactured, mined or grown in Pennsylvania as against those bidders offering supplies produced, manufactured, mined or grown in any state that gives or requires a preference to supplies produced, manufactured, mined or grown in that state. The amount of the preference shall be equal to the amount of the preference applied by the other state for that particular supply.
The following is a list of states which have been found by the Department of General Services to have applied a preference for in-state supplies and the amount of the preference:
STATE PREFERENCE
1. Alaska 7% (applies only to timber, lumber, and manufactured lumber products originating in the state)
2. Arizona 5% (construction materials produced or manufactured in the state only)
3. Hawaii 10%
4. Illinois 10% for coal only
5. Iowa 5% for coal only
6. Louisiana 4% meat and meat products 4% catfish 10% milk & dairy products 10% steel rolled in Louisiana 7% all other products
7. Montana 5% for residents * 3% for non-residents* *offering in-state goods, supplies, equipment and materials
8. New Mexico 5%
9. New York 3% for purchase of food only
10. Oklahoma 5%
11. Virginia 4% for coal only
12. Washington 5% (fuels mined or produced in the state only)
13. Wyoming 5%
B. The Reciprocal Limitations Act requires the Commonwealth to give preference to those bidders offering printing performed in Pennsylvania as against those bidders offering printing performed in any state that gives or requires a preference to printing performed in that state. The amount of the preference shall be equal to the amount of the preference applied by the other state for that particular category of printing.
The following is a list of states which have been found by the Department of General Services to have applied a preference for in-state printing and the amount of the preference:
STATE PREFERENCE
1. Hawaii 15%
2. Idaho 10%
3. Louisiana 3%
4. Montana 8%
5. New Mexico 5%
6. Wyoming 10%
C. The Reciprocal Limitations Act, also requires the Commonwealth to give resident bidders a preference against a nonresident bidder from any state that gives or requires a preference to bidders from that state or exclude bidders from states that exclude nonresident bidders. The amount of the preference shall be equal to the amount of the preference applied by the state of the nonresident bidder. The following is a list of the states which have been found by the Department of General Services to have applied a preference for in-state bidders and the amount of the preference:
STATE PREFERENCE
1. Alaska 5% (supplies only)
2. Arizona 5% (construction materials from Arizona resident dealers only)
3. California 5% (for supply contracts only in excess of $100,000.00)
4. Connecticut 10% (for supplies only)
5. Montana 3%
6. New Mexico 5% (for supplies only)
7. South Carolina 2% (under $2,500,000.00) 1% (over $2,500,000.00)
This preference does not apply to construction contracts nor where the price of a single unit exceeds $10,000.
8. West Virginia 2.5% (for the construction, repair or improvement of any buildings
9. Wyoming 5%
STATE PROHIBITION
1. New Jersey For supply procurements or construction projects restricted to Department of General
Services Certified Small Businesses, New Jersey bidders shall be excluded from award even if they themselves are Department of General Services Certified Small Businesses.
D. The Reciprocal Limitations Act also requires the Commonwealth not to specify, use or purchase supplies which are produced, manufactured, mined or grown in any state that prohibits the specification for, use, or purchase of such items in or on its public buildings or other works, when such items are not produced, manufactured, mined or grown in such state. The following is a list of the states which have been found by the Department of General Services to have prohibited the use of out-of-state supplies:
STATE PROHIBITION
1. Alabama Only for printing and binding involving ”messages of the Governor to the Legislature“, all bills, documents and reports ordered by and for the use of the Legislature or either house thereof while in session; all blanks, circulars, notices and forms used in the office of or ordered by the Governor, or by any state official, board, commission, bureau or department, or by the clerks of the supreme court . . ./and other appellate courts/; and all blanks and forms ordered by and for the use of the Senate and Clerk or the House of Representatives, and binding the original records and opinions of the Supreme Court . . .
/and other appellate courts/
2. Georgia Forest products only
3. Indiana Coal
4. Michigan Printing
5. New Mexico Construction
6. Ohio Only for House and Senate bills, general and local laws, and joint resolutions; the journals and bulletins of the Senate and house of Representatives and reports, communications, and other documents which form part of the journals; reports, communications, and other documents ordered by the General Assembly, or either House, or by the executive department or elective state officers; blanks, circulars, and other work for the use of the executive departments, and elective state officers; and opinions of the Attorney General.
7. Rhode Island Only for food for state institutions.
*If the bid discloses that the bidder is offering to supply one of the above-listed products that is manufactured, mined, or grown in the listed state, it shall be rejected. Contractors are prohibited from supplying these items from these states.
II. CALCULATION OF PREFERENCE
In calculating the preference, the amount of a bid submitted by a Pennsylvania bidder shall be reduced by the percentage preference which would be given to a nonresident bidder by its state of residency (as found by the Department of General Services in Paragraph C above). Similarly, the amount of a bid offering Pennsylvania goods, supplies, equipment or materials shall be reduced by the percentage preference which would be given to another bidder by the state where the goods, supplies, equipment or materials are produced, manufactured, mined or grown (as found by the Department of General Services in Paragraphs A and B above).
THIS FORM MUST BE COMPLETED AND RETURNED WITH THE BID
III. STATE OF MANUFACTURE
All bidders must complete the following chart by listing the name of the manufacturer and the state (or foreign country) of manufacture for each item. If the item is domestically produced, the bidder must indicate the state in the United States where the item will be manufactured. This chart must be completed and submitted with the bid or no later than two (2) business days after notification from the Issuing Office to furnish the information. Failure to complete this chart and provide the required information prior to the expiration of the second business day after notification shall result in the rejection of the bid.
ITEM NUMBER NAME OF MANUFACTURER
STATE
(OR FOREIGNCOUNTRY)
OF MANUFACTURE
IV. BIDDER’S RESIDENCY
A. In determining whether the bidder is a nonresident bidder from a state that gives or requires a preference to bidders from that state, the address given on the first page of this invitation to bid shall be used by the Commonwealth. If that address is incorrect, or if no address is given, the correct address should be provided in the space below:
Correct Address:
B. In order to claim the preference provided under Section I.B., Pennsylvania resident bidders must complete the following or have such information on file with the Issuing Office:
1. Address of bidder’s bona fide establishment in Pennsylvania at which it was transacting business on the date when bids for this contract/requisition were first solicited:
2. a. If the bidder is a corporation:
(1) The corporation is or is not incorporated under the laws of the Commonwealth of
Pennsylvania.
(a) If the bidder is incorporated under the laws of the Commonwealth of Pennsylvania, provide date of incorporation:
(b) If the bidder is not incorporated under the laws of the Commonwealth of Pennsylvania, it must have a certificate of authority to do business in the Commonwealth of Pennsylvania from the Pennsylvania Department of State as required by the Pennsylvania Business Corporation Law (15 P.S. §2001). Provide date of issuance of certificate of authority:
(2) The corporation is or is not conducting business in Pennsylvania under an assumed or fictitious name. If the bidder is conducting business under an assumed or fictitious name, it must register the fictitious name with the Secretary of the Commonwealth and the office of the prothonotary of the county wherein the registered office of such corporation is located as required by the Fictitious Corporate Name Act, as amended 15 P.S. §51 et seq. Corporate bidders conducting business under an assumed or fictitious name must provide date of registry of the assumed or fictitious name:
b. If the bidder is a partnership:
(1) The partnership is or is not conducting business in Pennsylvania under an assumed or fictitious name. If the bidder is conducting business under an assumed or fictitious name, it must file with the Secretary of the Commonwealth and the office of the prothonotary the county wherein the principal place of business is located as required by the Fictitious Name Act of May 24, 1945, P.L. 967, as amended 54 P.S. §28.1. Partnerships conducting business under an assumed or fictitious name must provide the date of filing of the assumed or fictitious name with the Secretary of the Commonwealth:
(2) The partnership is or is not a limited partnership formed under the laws of any jurisdiction other than the Commonwealth of Pennsylvania. If the bidder is an Out-of-state limited partnership, it must register with the Pennsylvania Department of State as required by the Act of July 10, 1981, P.L. 237, as amended, 59 Pa. C.S.A. §503. Out-of-state limited partnerships must provide the date of registry with the Pennsylvania Department of State:
c. If the bidder is an individual:
He or she is or is not conducting business under an assumed or fictitious name. If the bidder is conducting business under an assumed or fictitious name, he or she must file with the Secretary of the Commonwealth and the office of the prothonotary in the county wherein the principal place of business is located as required by the Fictitious Name Act of May 24, 1945, P.L. 967, as amended, 54 P.S. §28.1. Individuals conducting business under an assumed or fictitious name must provide the date of filing of the assumed or fictitious name with the Secretary of the Commonwealth:
Contract No. PGC-234-19-02
TS-1-1
TECHNICAL SPECIFICATION SECTION 1 - SUMMARY OF WORK
1.1 – SCOPE OF PROJECT
The intent of this project is to construct a new 40’ x 100’ storage building on an existing concrete slab. The new building is located on State Game Lands (SGL) No. 234 in Limerick Township, Montgomery County.
The project consists of two (2) Construction Contracts:
Contract No. 1 – General: Furnish and install building structure, walls, roof, metal roofing and siding, door installation, and other building appurtenances / related work.
Contract No. 2 – Electrical: Furnish and install electrical service, power distribution, lighting, and fixtures.
1.2 – WORK AREA
The work area for this project is on SGL #234 approximately 2.25 miles west of Schwenksville. The site address is 291 Game Farm Road, Schwenksville, PA 19473. The work site is located on a relatively level area accessible by paved public road (S.R. 4018 Game Farm Road). The property is owned by the PGC. A location map is shown on the drawing.
1.3 – WORK HOURS
The work hours at the project site are during regular PGC business hours which are Monday through Friday, 7:45AM to 4:00PM. Work during different hours must have prior written approval by the PGC. Requests for different working hours must be submitted in writing two days in advance.
1.4 – ACCESS TO WORK AREA
Access to the work area(s) will be directly from a stabilized driveway which connects to a paved public road. The Contractor must keep the PGC access road clear; parking of vehicles and equipment on the driveway is prohibited. The PGC staff will be continuing regular operations at the site during the demolition project. The Contractor shall coordinate vehicle and equipment parking and building demolition activities with the PGC staff at the site to avoid disrupting PGC operations.
1.5 – SITE LAYOUT AND PREPARATION
The PGC demolished a structure at the site. The Contractor shall verify the dimensions of the concrete slab before ordering any materials. The Contractor may adjust the building width dimensions to match the existing concrete slab and foundation.
TS-1-2
1.6 – PERMITS, LAWS AND REGULATIONS
The PGC will secure a building permit from the PA Department of Labor and Industry (L&I) for construction of this building. A copy of the Building Permit will be provided to the contractor along with an inspection log checklist. The contractor shall notify the L&I inspector and coordinate with the PGC so that required inspections take place and the project is not delayed. Local building code officials have no jurisdiction over this project. The Contractor shall procure and pay for all other permits, licenses, inspections, conveniences, or other approvals necessary for the execution of the contract.
The Contractor shall coordinate, acquire, pay for, and maintain for the duration of the project any and all permits or bonds required by local municipalities and/or PennDOT to utilize public roads for heavy hauling and related construction activities. Responsibilities shall include any pre or post construction inspections and related reports if required. Any and all costs related to permitting and bonding public roadways shall be included with and incidental to the Bid submitted by the Contractor and will not be paid for separately.
The Contractor shall comply with all laws, ordinances, rules, orders and regulations relating to the performance of the work, the protection of adjacent property, the maintaining of surface passageways, safety measures, and/or other protective facilities.
All applicable Federal and State laws and regulations and regulations of all utilities, having jurisdiction over construction of the project shall apply to the contract throughout, and they shall be deemed to be included in the contract as a part, thereof, the same as though herein written out in full.
All regulations of the Occupational Safety and Health Act are in effect on this contract. It will be the Contractor’s responsibility to make himself aware of all appropriate County, State and Federal regulations that apply to this contract.
Costs and expenses resulting from any violations and/or delays incurred from improper execution of the above provisions shall be the Contractor’s responsibility.
TS-2-1
TECHNICAL SPECIFICATION SECTION NO. 2 – CONCRETE
2.1 - SCOPE
This work is furnishing all materials, plant, and equipment, and performing all labor for the manufacture, transporting, placing, finishing, patching, curing, and testing of concrete to be placed under the Contract. Concrete is to be used for the curb wall for the new building. The Contractor shall protect all concrete against injury until final inspection and acceptance by the Game Commission.
Except as herein qualified, matters pertaining to measuring, placing and testing of concrete;
materials used; construction of formwork; concrete finishing; curing of concrete; detailing, fabricating and placing of reinforcing and accessories shall be governed by the following codes and regulations:
A. Building Code Requirements for Reinforced Concrete (ACI 318)
B. Current "Manual of Standard Practice for Detailing Reinforced Concrete
Structures" (ACI 315)
C. Current "Recommended Practice for Measuring, Mixing, and Placing Concrete"
(ACI 304)
D. All matters in connection with concrete work, not otherwise specified, shall conform to the applicable sections of the Pennsylvania Department of Transportation Specification Publication 408.
2.2 - TESTING AND CERTIFICATIONS
Obtain all concrete from a PennDOT approved source. Submit a concrete mix design for each supplier to the Game Commission for approval 3 days prior to placing concrete.
Provide product information, and/or original certifications for the following items: cement, admixtures, aggregates, preformed expansion joint filler, epoxy bonding compound, joint seal material, and curing compound.
2.3 - COMPOSITION
Concrete shall be composed of Portland cement, water, fine and coarse aggregates and approved admixtures, all well mixed and brought to the proper consistency.
A. Concrete shall be Class A and shall develop a minimum compressive strength of
3,300 psi in twenty-eight (28) days.
TS-2-2
B. Concrete shall be obtained from a batch plant currently approved by the Pennsylvania Department of Transportation (PennDOT) or the Department.
C. Ready-mixed concrete shall be mixed and delivered in accordance with ASTM
Designation C94.
2.4 - MATERIALS
All materials shall be obtained from sources listed in PennDOT Bulletin 14 or PennDOT Bulletin 15 as applicable.
A. Cement - Cement shall be one of the following types:
(1) Normal Strength Air-Entraining Portland Cement, Type IA or Type IIA, conforming to ASTM Designation C150.
(2) Normal Strength Air-Entraining Portland Blast Furnace Slag Cement, Type IS-A, conforming to ASTM Designation C595.
B. Admixtures - Approved types of admixtures meeting ASTM Designation C260, increasing the plasticity and workability of the concrete may be used.
C. Water - Water for concrete shall be clean and free from injurious amounts of oil, acid, alkali, organic matter, or other deleterious substances.
D. Aggregates - Aggregates for concrete of normal weight shall conform to "Specifications for Concrete Aggregates" (ASTM C33).
E. Preformed Expansion Joint Filler - Preformed expansion joint filler shall be of the size shown on the Drawings, shall be gray in color, and shall conform with the requirements of AASHTO M153, Type 1, sponge rubber. Joint filler shall be solid sponge rubber, and no reprocessed material will be accepted. Joint filler made of numerous pieces of sponge rubber which adhere to each other will not be acceptable. The material shall be stored as recommended by the manufacturer.
F. Joint Seal Material - The joint seal material shall conform with the requirements of ASTM C290 such as Sikaflex-2c or Sikadur 51 as manufactured by the Sika Corporation, Lyndhurst, New Jersey or an approved equal. The material shall be stored as recommended by the manufacturer.
G. Curing Compound - The curing compound shall be clear or translucent containing a red fugitive dye conforming to the requirements of AASHTO M148, Type 1-D, and must not affect water in any respect to injure fish life or impair or be detrimental to water for human consumption. The curing compound shall be stored as recommended by the manufacturer.
2.5 – PREPARATION OF AREAS TO RECEIVE CONCRETE
TS-2-3
Clean existing surfaces and remove all loose and any organic material from the areas to receive concrete.
2.6 - JOINTS AND EMBEDDED ITEMS
Place anchors and reinforcement as shown on the Drawings. All embedded items shall be clean and free of dust, grit, mud, oil or grease, and shall be held firmly in place to avoid displacement during concreting.
2.7 - FORMWORK
Forms shall conform to the shapes, lines, grades, and dimensions of the concrete as called for on the Drawings. They shall be sufficiently tight to prevent leakage of mortar and shall be properly braced or tied together so as to maintain the desired position and shape during and after placing concrete. Forms shall be removed in such a manner as to assure the complete safety of the structure.
2.8 - CONCRETE PLACEMENT
A. Depositing - Concrete shall be deposited in the presence of a representative of the Game Commission.
In all cases, concrete shall be deposited as nearly as practicable in its final position and not allowed to flow in a manner to permit or cause segregation and loss of slump. Once concreting is started, the operation shall be carried on continuously until the placing of the panel or section is completed. Concrete shall be placed in continuous, approximately horizontal layers, the depths of which generally shall not exceed twenty (20) inches.
All conveying equipment shall be of such size and design as to insure a practically continuous flow of concrete at the forms. Free falls of more than four (4) feet are not permitted.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .