1. THIS REQUIREMENT MUST BE ENGINEERED AND PROVISIONED TOTALLY

DIVERSE END TO END TO THE GOVERNMENT'S SERVICE DELIVERY POINTS

(SDP'S) FROM CJON: SF16JUL209143; MEANING THAT THE PHYSICAL PATHS ARE

TOTALLY SEPARATE INCLUDING MAN HOLES, CONDUIT, CENTRAL OFFICE

LOCATIONS), AND FIBER BUILDS. ADDITIONALLY AS A MINIMUM MUST HAVE 50

METERS PHYSICALSEPARATION FROM CJON: SF16JUL209143.

2. ALL FIBER SUPPORTING THIS REQUIREMENT MUST BE BURIED, AERIAL FIBER

IS NOT AUTHORIZED.

3. THE TELECOM PROVIDER MUST PROVIDE DITCO COLOR POWERPOINT

DRAWINGS FOR TECHNICAL REVIEW SHOWING THE ROUTE FROM THE

COMMERCIAL DEMARCS TO THE SUPPORTING CENTRAL OFFICES AND/OR

WIRING CENTERS. DRAWINGS MUST INCLUDE TOTAL FIBER MILES AND ROUND

TRIP DELAY (RTD). ADDITIONALLY, THE VENDOR IS TO PROVIDE DITCO WITH

DETAILED CIRCUIT/PATH CONNECTIVITY DIAGRAMS, IN KMZ OR KML FORMAT,

IDENTIFYING ALL POINTS OF PRESENCE (POP) FOR PROPOSAL EVALUATION AND

AS A FINAL RECORD OF THE INSTALLED PATH. THESE DIAGRAMS MUST BE

PROVIDED TO DISA HQ IE16 (DISA.MEADE.IE.MBX.IE16-PROVISIONING-

TEAM@MAIL.MI L) FOR HISTORICAL PURPOSES.

4. SITE SURVEYS ARE AUTHORIZED AT BOTH GOVERNMENT SITES.

5. SINGLE MODE FIBER MUST BE ENGINEERED/PROVISIONED IN SUCH A WAY

THAT THE GOVERNMENT CAN CHANGE/REVISE CHANNELIZATION WITHOUT

TELECOM PROVIDER INTERVENTION.

A. NOTE 1 (JITTER): IN A STEADY-STATE CONDITION, THE PATTERN OF

SYNCHRONOUS TRANSPORT SIGNAL (STS) POINTER ADJUSTMENTS, SDN TO SDN

(END-TO-END THROUGH THE SERVICE PROVIDED NETWORK OUTPUTS), SHALL

BE NO MORE STRESSFUL (I.E., CREATE MORE JITTER THROUGH THE

DESYNCHRONIZER AS DESCRIBED IN TABLE 6 OF ANSI T1.105.03-1994) THAN THE

POINTER ADJUSTMENT SEQUENCE IN FIGURE 5 OF ANSI T1.105.03-1994. DURING

TRANSIENT EVENTS (WHICH SHALL OCCUR NO MORE THAN 2 TIMES PER DAY),

THE PATTERN OF STS POINTER ADJUSTMENTS, SDN TO SDN (END-TO-END

THROUGH THE SERVICE PROVIDED NETWORK OUTPUTS), SHALL BE FOUR OR

LESS PER HOUR. ADDITIONALLY, THE MAXIMUM TIME INTERVAL ERROR (MTIE)

OVER A PERIOD OF S SECONDS, OR WANDER, SHALL NOT EXCEED (.01S + 10000)

NANOSECONDS FOR VALUES OF S GREATER THAN 10,000.

B. WAVELENGTH TRANSMISSION SERVICES: WAVELENGTH TRANSMISSION

SERVICES FOR RATES OF 10GBPS SHALL BE IN ACCORDANCE WITH ITU-T

RECOMMENDATIONS G.709(03/2003), G.707(12/03), G.957(03/06), G.692(10/98) &

TELCORDIA GR253-IE4. THE PROVIDED WAVELENGTH TRANSMISSION SERVICE

SHALL NOT INHIBIT GOVERNMENT OPERATION OF UNDERLYING PROTOCOLS

AND TRANSPORT SYSTEMS SUCH AS, BUT NOT LIMITED TO, SONET/SDH, IP, O.

REMARKS CONTINUED: ATM, GIGABIT ETHERNET, AND ENCRYPTION. THE

WAVELENGTH TRANSMISSION SERVICE PROVIDED SHALL PASS ALL PAYLOAD,

PATH AND LINE OVERHEAD BYTES TRANSPARENTLY UNTOUCHED/UNALTERED)

AND WITHOUT MONITORING SDP TO SDP. THERE SHALL NOT BE ANY LINE

TERMINATING EQUIPMENT (LTE) BETWEEN SDP AND SDP.

C. SINGLE MODE FIBER MUST BE TERMINATED TO THE LINE SIDE OF THE FIBER

TERMINATING PATCH PANEL INSTALLED IN THE DISA IE1 PROVIDED MSPP SUITE

AT HOMSTEAD ARB, FL, AND THE FIBER TERMINATING PATCH PANEL INSTALLED

IN THE DISA IE1 PROVIDED ODXC SUITE INSTALLED AT MIAMI NAP.

D. THE TELECOM PROVIDER MUST CONTACT DISA GOC TIER-II ENGINEERING

UPON RECEIPT OF A VALID TSO TO ESTABLISH THE COORDINATION AND

ACTIVATION PROCESS. PRI POC: DISA GLOBAL CASA INFRASTRUCTURE

INTEGRATION LEASE BB TEAM PHONE: (C) 618-418-9813, (D) 418-9813 EMAIL:

DISA.SCOTT.GLOBAL.MBX.CASA-INFRASTRUCTURE-INTEGRATION-L EASE-BB-

T@MAIL.MIL ALT POC: ORGANIZATIONAL NUMBER (CASA RF CIRCUIT

ACTIVATIONS) PHONE: (C) 618-418-8691, (D) 418-8691 EMAIL:

DISA.SCOTT.GLOBAL.MBX.RF-CIRCUIT-ACTIVATIONS@MAIL.MIL P. REMARKS

CONTINUED:

6. ONCE TELECOM PROVIDER HAS COMPLETED INSIDE WIRING FROM THEIR

FIBER DISTRIBUTION PANEL INSTALLED IN THEIR DWDM EQUIPMENT SUITE TO

THE GOVERNMENT SERVICE DELIVERY POINT (SDP) AT EACH LOCATION, THEY

MUST ENSURE THE LIGHT LEVEL READINGS (DB LOSS) ARE ADJUSTED TO READ -

3 TO -9 LOSS. ADDITIONALLY, THESE LEVELS MUST BE DOCUMENTED ON THE

NOTICE OF COMPLETION (NOC) SENT TO DITCO.

***THE VENDOR MUST TERMINATE SINGLE MODE FIBER AT BOTH LOCATIONS

IAW UNIQUE INSTALLATION FACTORS.***

7. THE SINGLE MODE FIBER MUST PASS A DOCUMENTED SATISFACTORY 72 HOUR

END TO END TEST IAW ITU STANDARD M.2101 PRIOR TO TURN-UP TO THE

GOVERNMENT. ==================================================

1. VENDOR MUST MEET SVC DATE.

2. CIRCUIT REQUIRES THE FOLLOWING PARAMETERS:

(A) FIBER TERMINATION: SINGLE-MODE INTERFACE REQUIREMENT/INTERFACE

DATA RATE: LINE CODING, FRAME FORMAT, Q. REMARKS CONTINUED:

PHYSICAL CONNECTOR, 10 GBPS, NRZ, SCRAMBLED PER ANSI T1.104-1991 (R2003).

ALL OPTIONS DEFINED SC CONNECTOR, SINGLE-MODE FIBER PER ANSI T1.105.06-

2002 (SR-0, SR-1, IR-1, IR-2, LR-1, LR-2, LR-3).

(B) LINE MUST REMAIN FULLY OPERATIONAL AND AVAILABLE TO USERS 24

HOURS A DAY, SEVEN DAYS PER WEEK, AT LEAST 99.5% OR BETTER.

(C) ONE-HOUR RESPONSE TIME TURN-AROUND MUST OCCUR TO REPAIR ONCE

TROUBLE-CALL HAS BEEN REPORTED.

(D) GFE CLOCKING: VENDOR ESFU (OR EQUIVALENT) NOT TO BE ENGINEERED

INTO CIRCUIT.

(E) SINGLE MODE FIBER TERMINATIONS "SC" CONNECTORS.

(F) NO NETWORK INTERFACE UNIT.

(G) DEDICATED PATH.

(H) CARRIER REQUIRED TO HAVE CIRCUIT VISIBILITY TO ASSIST IN ANY CIRCUIT

OUTAGES.

(I) THE VENDOR MUST CONDUCT A 72 HOUR SATISFACTORY END TO END TEST

ON THE 10 WAVE SERVICE IAW ITU STANDARD M.2101. ADDITIONALLY, THE

VENDOR TEST SET/SETS MUST HAVE THE ABILITY TO PRINT THE TEST RESULTS

AND THOSE RESULTS MUST BE EMAILED TO THE ACCEPTING AUTHORITY FOR

REVIEW.

(J) VENDOR MUST HAVE A 24X7 NETWORK OPERATIONAL CENTER.

(K) THE COMMERCIAL CIRCUIT WILL BE ACCEPTED ON BEHALF OF THE

GOVERNMENT BY THE DGOC: PRI POC: DISA GLOBAL CASA INFRASTRUCTURE

INTEGRATION LEASE BB TEAM PHONE: (C) 618-418-9813, (D) 418-9813 EMAIL:

DISA.SCOTT.GLOBAL.MBX.CASA-INFRASTRUCTURE-INTEGRATION-L EASE-BB-

T@MAIL.MIL ALT POC: ORGANIZATIONAL NUMBER (CASA RF CIRCUIT

ACTIVATIONS) PHONE: (C) 618-418-8691, (D) 418-8691 EMAIL:

DISA.SCOTT.GLOBAL.MBX.RF-CIRCUIT-ACTIVATIONS@MAIL.MIL

(L) THE VENDOR MUST PROVIDE THE LONG HAUL CIRCUIT NUMBER AND THE 1-

800 TROUBLE REPORT NUMBER TO THE ACCEPTING AUTHORITY PRIOR TO THE

GOVERNMENT ACCEPTING SERVICE. INSIDE WIRING MUST BE COMPLETED AND

TESTED PROPERLY IAW THE ORDER PRIOR TO TURN-UP TO THE GOVERNMENT.

3. VENDOR IS RESPONSIBLE FOR INSTALLATION AND MAINTENANCE OF SINGLE

MODE FIBER IAW UNIQUE INSTALLATION FACTORS.

4. INSIDE WIRING IS AUTHORIZED IAW WITH THE UNIQUE INSTALLATION

FACTORS. R. REMARKS CONTINUED:

5. VENDOR MUST COORDINATE SITE VISIT WITH POC'S 72 HOURS IN ADVANCE

PRIOR TO REQUIRING ACCESS TO FACILITIES AT BOTH USER LOCATIONS. 6. FOR

UNSATISFACTORY SERVICE OR TO REPORT EQUIPMENT AND/OR CIRCUIT

PROBLEMS INVOLVING DISA PROVIDED TRANSPORT AND/OR EQUIPMENT,

PLEASE CONTACT THE DISN CUSTOMER CONTACT CENTER (DCCC) SCOTT AFB,

IL. TOLL FREE: 1-855-868-9500, COML: 618-418-9500, DSN: 312-418-9500. 7. DD FORM

1368 WILL BE SUBMITTED ON THIS TRUNK IAW DISAC-DITCO 350-135-1 BY RNSOC,

mailto:DISA.SCOTT.GLOBAL.MBX.RF-CIRCUIT-ACTIVATIONS@MAIL.MIL

SCOTT AFB, IL. GUIDANCE ON SUBMISSION IS AVAILABLE AT

<HTTP://WWW.DITCO.DISA.MIL/ASP/PUBLICATIONS.ASP>. CLICK ON "DISA-DITCO

CIRCULAR, 350-135-1, DEFENSE COMMERCIAL COMMUNICATIONS ACQUISITION

PROCEDURES."

MINIMUM TECHNICAL SPECIFICATIONS:

SPECIFIC FORMAT TO BE USED IS: LINE RATE: 10GB. LINE CODE: NRZ. FRAME

FORMAT: SCRAMBLED IAW ANSI T1.104-1991 (R2003).

1. TEST AND ACCEPTANCE: FIBER OPTIC 10GB WAVE CIRCUITS SHALL PASS A

FULLY DOCUMENTED SATISFACTORY SOAK TEST BY THE GOC AT SCOTT AFB, IL.

PRIMARY: (C) 618-418-8691, (D) 418-8691.

2. THE WAVELENGTH TRANSMISSION SERVICE PROVIDED SHALL MEET THE

FOLLOWING PERFORMANCE REQUIREMENTS ON A MONTHLY BASIS.

PERFORMANCE REQUIREMENT/PERFORMANCE SPECIFICATION: NON-

DIVERSE/NON-PROTECTED AVAILABILITY: GREATER THAN OR EQUAL TO 99.5%

OR BETTER. MONTHLY SHORT INTERRUPTION EVENT COUNT (SEIC): LESS THAN

OR EQUAL TO 9%. ERRORED SECONDS (ES): LESS THAN OR EQUAL TO 0.005%.

SEVERELY ERRORED SECONDS (SES): LESS THAN OR EQUAL TO 0.00035.

BACKGROUND BLOCK ERROR RATIO (BBER): LESS THAN OR EQUAL TO 5 X 10-6.

BIT COUNT INTEGRITY (BCI)/PATTERN SLIP (PAT SLIP): LESS THAN OR EQUAL TO

1 PER 72 HOURS. JITTER: SEE NOTE 1 (JITTER). BER: LESS THAN OR EQUAL TO

1X10-12. DELAY (ONE WAY): * LESSER OF 10 MSEC OR (0.01 X D MSEC) * WHERE

"D" IS THE SDP TO SDP TRANSMISSION DISTANCE, MEASURED SHORTEST GREAT

CIRCLE, IN KILOMETERS.

3. ROUND TRIP DELAY (RTD) FOR THIS DISA TRANSPORT TRUNK WILL BE

MEASURED IN MILLISECONDS FROM THE CUSTOMER'S SERVICE DELIVERY POINT

(SDP) SITE-A TO THE CUSTOMER'S SERVICE DELIVERY POINT (SDP) SITE-Z. THE

RTD SHALL BE LESS THAN OR EQUAL TO 10 MILLISECONDS TO EFFECTIVELY

SUPPORT THE GOVERNMENT'S MISSION. THE GOVERNMENT ACCEPTING

AUTHORITY WILL CONFIRM THE RTD DURING THE TURN-UP AND TEST PHASE

AND IF IT DOES NOT ALIGN WITH THE CONTRACTORS PROPOSAL, DISA IE161

WILL NOTIFY DITCO IMMEDIATELY IN WRITING. (**UNIQ INSTALL FACTORS**)

(SP A) COMPLETE. E. VENDOR MUST SCHEDULE/COORDINATE WITH THE POCS

LISTED ON THIS ORDER 72 HOURS IN ADVANCE PRIOR TO SITE SURVEYS OR

INSTALLATIONS.

4. THE VENDOR MUST CONTACT DISA GOC TIER-II ENGINEERING 48 HOURS PRIOR

TO BEGINNING THEIR END-TO-END TESTING. PHONE: (C) 618-418-8627, (D) 418-

8627.