1. 10GB WAVE SERVICE MUST BE ENGINEERED/PROVISIONED IN SUCH A WAY THAT THE

GOVERNMENT CAN CHANGE/REVISE CHANNELIZATION WITHOUT TELECOM PROVIDER

INTERVENTION. A. NOTE 1 (JITTER): IN A STEADY-STATE CONDITION, THE PATTERN OF

SYNCHRONOUS TRANSPORT SIGNAL (STS) POINTER ADJUSTMENTS, SDN TO SDN (END-TO-END

THROUGH THE SERVICE PROVIDED NETWORK OUTPUTS), SHALL BE NO MORE STRESSFUL (I.E.,

CREATE MORE JITTER THROUGH THE DESYNCHRONIZER AS DESCRIBED IN TABLE 6 OF ANSI

T1.105.03-1994) THAN THE POINTER ADJUSTMENT SEQUENCE IN FIGURE 5 OF ANSI T1.105.03-

1994. DURING TRANSIENT EVENTS (WHICH SHALL OCCUR NO MORE THAN 2 TIMES PER DAY),

THE PATTERN OF STS POINTER ADJUSTMENTS, SDN TO SDN (END-TO-END THROUGH THE

SERVICE PROVIDED NETWORK OUTPUTS), SHALL BE FOUR OR LESS PER HOUR. ADDITIONALLY,

THE MAXIMUM TIME INTERVAL ERROR (MTIE) OVER A PERIOD OF S SECONDS, OR WANDER,

SHALL NOT EXCEED (.01S + 10000) NANOSECONDS FOR VALUES OF S GREATER THAN 10,000.

2. REMARKS CONTINUED: B. WAVELENGTH TRANSMISSION SERVICES: WAVELENGTH

TRANSMISSION SERVICES FOR RATES OF 10GBPS SHALL BE IN ACCORDANCE WITH ITU-T

RECOMMENDATIONS G.709(03/2003), G.707(12/03), G.957(03/06), G.692(10/98) & TELCORDIA

GR253-IE1. THE PROVIDED WAVELENGTH TRANSMISSION SERVICE SHALL NOT INHIBIT

GOVERNMENT OPERATION OF UNDERLYING PROTOCOLS AND TRANSPORT SYSTEMS SUCH AS,

BUT NOT LIMITED TO, SONET/SDH, IP, ATM, GIGABIT ETHERNET, AND ENCRYPTION. THE

WAVELENGTH TRANSMISSION SERVICE PROVIDED SHALL PASS ALL PAYLOAD, PATH AND LINE

OVERHEAD BYTES TRANSPARENTLY (UNTOUCHED/UNALTERED) AND WITHOUT MONITORING

SDP TO SDP. THERE SHALL NOT BE ANY LINE TERMINATING EQUIPMENT (LTE) BETWEEN SDP

AND SDP.

3. 10GB WAVE SERVICE MUST BE TERMINATED TO THE LINE SIDE OF THE FIBER TERMINATING PATCH PANEL INSTALLED IN THE DISA IE1 PROVIDED MSPP SUITE AT CHARLESTON AFB AND THE

FIBER TERMINATING PATCH PANEL INSTALLED IN THE DISA IE1 PROVIDED MSPP SUITE

INSTALLED AT SHAW AFB.

4. THE TELECOM PROVIDER MUST CONTACT DISA GOC TIER-II ENGINEERING UPON RECEIPT OF A

VALID TSO TO ESTABLISH THE COORDINATION AND ACTIVATION PROCESS.

5. ONCE TELECOM PROVIDER HAS COMPLETED INSIDE WIRING FROM THE DWDM EQUIPMENT

SUITE TO THE GOVERNMENT SERVICE DELIVERY POINT (SDP) AT EACH LOCATION, THEY MUST

ENSURE THE LIGHT LEVEL READINGS (DB LOSS) ARE ADJUSTED TO READ -3 TO -9 LOSS.

ADDITIONALLY, THESE LEVELS MUST BE DOCUMENTED ON THE NOTICE OF COMPLETION (NOC)

SENT TO DITCO. THE VENDOR MUST TERMINATE 10GB WAVE SERVICE AT BOTH LOCATIONS IAW

UNIQUE INSTALLATION FACTORS.

6. THE 10GB WAVE SERVICE MUST PASS A DOCUMENTED SATISFACTORY 72 HOUR END TO END

TEST IAW ITU STANDARD M.2101 PRIOR TO TURN UP TO THE GOVERNMENT.

7. CROSS REFERENCE CCSD IS "DIYU6XK2".