SFS605SL19002461_Jun_23_25_solicitation_doc.pdf
PDF 24 KB Posted
- Attached to
- Specific DOT Rapid Set Cement
- Solicitation number
- SFS605SL19002461
- Issued by
- St. Louis City, Missouri
About this file
This document is a solicitation (SFS605SL19002461) from the Missouri Department of Transportation (MoDOT), St. Louis District, for a Single Feasible Source (SFSR) procurement of Specific DOT Rapid Set Cement. The solicitation was issued from April 25-29, 2019, seeking a specialized bulk cement product exclusively from CTS Cement Manufacturing Corp located in Mexico, Missouri. The cement is specifically required for deck and dense overlay patching applications, with critical performance specifications including the ability to reach 3,000 psi compressive strength within one hour and provide smooth surface finishes. The contract period is set for April 30, 2019 to April 30, 2020, with the procurement justified by the cement's proven compatibility and performance across extreme temperature conditions.
The solicitation is structured as an open procurement technically available to all vendors, though CTS Cement Manufacturing is identified as the sole feasible source due to the proprietary nature of their product. Delivery terms are specified as Free On Board Destination with payment terms to be vendor-specified. The procurement follows Missouri's regulatory guidelines for single feasible source purchases, which require public notice for acquisitions over $5,000 and additional advertising for purchases exceeding $25,000. The document emphasizes the cement's unique technical capabilities, including successful performance in both summer heat and winter conditions, as the primary rationale for the single source determination. Vendors can submit responses electronically through the MissouriBUYS eProcurement system or via hard copy, with the solicitation making no explicit mention of budget ranges or total contract value.
View the file
Other files
Show all 32
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Solicitation Number: SFS605SL19002461
Specific DOT Rapid Set Cement
MODOT Single Feasible Source (SFSR)
MoDOT - SL
April 25, 2019 - April 29, 2019
Page:2
General Header Information
SFS605SL19002461
No. SFS605SL19002461 Title: Specific DOT Rapid Set Cement Start Date: April 25, 2019 at 4:00:00 PM CDT End Date: April 29, 2019 at 5:00:00 PM CDT Vendor Q&A Start Date:
Vendor Q&A End Date:
Estimated Total Value:
Who can respond to this bid? : All Vendors Description: The Missouri Department of Transportation, St. Louis District has determined that only CTS Cement Manufacturing Corp of Mexico, MO can provide the Department with specific use, Rapid-Set DOT Cement in bulk form as blended to perform a specific use patching material for deck and dense overlays with the ability to reach 3000 psi in one hour, and the reasonable workability in patching operations that allows for a smooth finished surface. This specific product has been tested as fully and absolutely compatible for use with the desired result. This material has a proven history to successfully meet the patching needs of the district in the summer heat as well as conditions below freezing in the winter. This notice shall meet the single feasible source posting requirements for one calendar year and in association with the needs described. Contract Period: April 30, 2019 - April 30, 2020.
Delivery Terms: Free On Board Destination Payment Terms: Vendor Specified Contact Information: MoDOT - SL
Cheryl Sprogoe 2309 Barrett Station Rd Ballwin MO, 63021 United States Tel: 314-205-7308 Cheryl.Sprogoe@modot.mo.gov
Contact Details: If you have any questions, please contact:
Cheryl Sprogoe 2309 Barrett Station Rd Ballwin MO, 63021 United States Tel: 314-205-7308 Cheryl.Sprogoe@modot.mo.gov
Selected Categories:
Page:3
Header Custom Fields:
SFS605SL19002461
NOTICE
Vendor Responsibility
The vendor is solely responsible for ensuring timely submission of their solicitation response, whether submitting an online response or a hard copy response. Failure to allow adequate time prior to the solicitation end date to complete and submit a response to a solicitation, particularly in the event technical support assistance is required, places the vendor and their response at risk of not being accepted on time.
The State of Missouri's Privacy Policy can be accessed here.
MODOT Section Numbering
Section Numbering All section numbering contained in this solicitation is for the convenience of reference only and is not intended to define or limit the scope of any provision of this solicitation and may not be sequential.
http://www.mo.gov/privacy-policy/
Page:4
Solicitation Requirements:
SFS605SL19002461
MoDOT Instructions for Submitting a Response
Instructions for Submitting a Response
Page:5
The Missouri Department of Transportation is now posting all of its bid solicitation documents on the new
MissouriBUYS Bid Board (https://www.missouribuys.mo.gov). MissouriBUYS is the State of Missouri’s web-based statewide eProcurement system which is powered by WebProcure, through our partner, Perfect
Commerce.
For all bid solicitations, vendors now have the option of submitting their solicitation response either as an electronic response or as a hard copy response. As a means to save vendors the expense of submitting a hard copy response and to provide vendors both the ease and the timeliness of responding from a computer, vendors are encouraged to submit an electronic response. Both methods of submission are explained briefly below and in more detail in the step-by-step instructions provided at https://missouribuys.mo.gov/sites/missouribuys/files/How_To_Respond_To_A_Solicitation.pdf
Notice: The vendor is solely responsible for ensuring timely submission of their solicitation response, whether submitting an online response or a hard copy response. Failure to allow adequate time prior to the solicitation end date to complete and submit a response to a solicitation, particularly in the event technical support assistance is required, places the vendor and their response at risk of not being accepted on time.
• ELECTRONIC RESPONSES: To respond electronically to a solicitation, the vendor must first register with MissouriBUYS by going to the MissouriBUYS Home Page (https://missouribuys.mo.gov), clicking the
“Register” button at the top of the page, and completing the Vendor Registration. Once registered the vendor should log back into MissouriBUYS and edit their profile by selecting the organizational contact(s) that should receive an automated confirmation of the vendor’s electronic bid responses successfully submitted to the state.
To respond electronically to a solicitation, the vendor must login to MissouriBUYS, locate the desired solicitation on the Bid Board, and, at a minimum, the vendor must read and accept the Original Solicitation
Documents and complete pricing and any other identified requirements. In addition, the vendor should download and save all of the Original Solicitation Documents on their computer so that they can prepare their response to these documents. Vendors should upload their completed response to these downloaded documents (including exhibits, forms, and other information concerning the solicitation) as an attachment to the electronic solicitation response. Step-by-step instructions for how a registered vendor responds to a solicitation electronically are available on the MissouriBUYS system at:
https://missouribuys.mo.gov/sites/missouribuys/files/How_To_Respond_To_A_Solicitation.pdf
Vendors are encouraged to submit their entire proposal electronically; however in lieu of attaching exhibits, forms, pricing, etc. to the electronic solicitation response, a vendor may submit the exhibits, forms, pricing, etc. through mail or courier service. However, any such submission must be received prior to the solicitation’s specified end date and time. Be sure to include the solicitation/opportunity (OPP) number, company name, and a contact name on any hard copy solicitation response documents submitted through mail or courier service.
In the event a registered vendor electronically submits a solicitation response and also mails hard copy documents that are not identical, the vendor should explain which response is valid for the state's consideration. In the absence of such explanation, the state reserves the right to evaluate and award the response which serves its best interest.
https://www.missouribuys.mo.gov https://missouribuys.mo.gov/sites/missouribuys/files/How_To_Respond_To_A_Solicitation.pdf https://missouribuys.mo.gov https://missouribuys.mo.gov/sites/missouribuys/files/How_To_Respond_To_A_Solicitation.pdf
Page:6
Addendum Document: If an addendum document is subsequently issued, please follow these steps to accept the addendum document(s).
1. If you have not accepted the original solicitation document go to the Overview page, find the section titled, Original Solicitation Documents, review the solicitation document(s) then click on the box under
Select, and then click on the Accept button.
2. To accept the addendum document, on the Overview page find the section titled Addendum Document, review the addendum document(s) then click on the box under Select, and then click on the Accept button.
Note: If you submitted an electronic response prior to the addendum date and time, you should review your solicitation response to ensure that it is still valid by taking into consideration the revisions addressed in the addendum document. If a revision is needed to your solicitation response and/or to indicate your acceptance of the addendum document, you will need to retract your response and re-submit your response by following these steps:
1. Log into MissouriBUYS.
2. Select the Solicitations tab.
3. Select View Current Solicitations.
4. Select My List.
5. Select the correct Opportunity Number (Opportunity No); the Overview page will display.
6. Click on Review Response from the navigation bar.
7. Click on Retract if your response needs to be revised.
8. A message will come up asking, “Are you sure you want to retract the Bid”. Click on Continue to confirm.
9. Click on Respond and revise as applicable.
10. Click on Review Response from the navigation bar and then click on Submit to submit your response.
• HARD COPY RESPONSES: Be sure to include the solicitation/opportunity (OPP) number, company name, and a contact name on any hard copy solicitation response documents.
MODOT Single Feasible Source
1.1. SFS Notification
The Missouri Department of Transportation has determined that only one source, CTS Cement
Manufacturing Corporation can provide the department with Specific Use Rapid-Set DOT Cement in bulk.
This determination is in accordance with the following section of 7 CSR 10-11.020(4)(A) 1 and 7CSR10-
11.020(4)(B) 1 E.
1.2. SFS Determination
Page:7
This Single Feasible Source Determination is made in accordance with the following Code of State
Regulation: 7 CSR 10-11.020 Procedures for Solicitation, Receipt of Bids, and Award and
Administration of Contracts
(4) The division may waive the requirement of competitive bids or proposals for supplies when the division has determined in writing that there is only a single feasible source for the supplies. Immediately upon discovering that other feasible sources exist, the division shall rescind the waiver and proceed to procure the supplies through the competitive processes as described in this rule.
(A) A single feasible source exists when:
1. Supplies are proprietary and only available from the manufacturer or a single distributor; or
2. Based on past procurement experience, it is determined that only one (1) distributor services the region in which the supplies are needed; or
3. Supplies are available at a discount from a single distributor for a limited period of time.
(B) When the Single Feasible Source procurement method is utilized, the division shall use the following guidelines to support the Single Feasible Source determination:
1. The following guidelines may be utilized to determine if supplies can be purchased as a single feasible source due to being proprietary:
A. The parts are required to maintain validity of a warranty;
B. Additions to a system must be compatible with original equipment;
C. Only one (1) type of computer software exists for a specific application;
D. Factory authorized maintenance must be utilized to maintain validity of a warranty;
E. The materials are copyrighted and are only available from the publisher or a single distributor; or
F. The services of a particular provider are unique, e.g., entertainers, authors, etc.
2. The following guidelines may be utilized if past procurement activity indicates that only one (1) bid has been submitted in a particular region. In these situations the division shall monitor the market for developing competition; and
3. The following guidelines may be utilized to determine if supplies may be purchased as a single feasible source due to being available at a discount for a limited period of time:
A. The discounted price must be compared to a price established through a reasonable market analysis; and
B. The discounted price should normally be at least ten percent (10%) less than the current contract or other comparable price. A discount of less than ten percent (10%) may be acceptable under appropriate market conditions. The discount should be compared to a price which, where feasible, should be no more than twelve (12) months old.
Page:8
This quote has no questions defined.
This quote does not have any documents.
(C) On any single feasible source purchase where the estimated expenditure shall be five thousand dollars
($5,000) or over, the division shall post notice of the proposed purchase. Where the estimated expenditure is twenty-five thousand dollars ($25,000) or over, the division shall also advertise its intent to make such purchase in such places as are most likely to reach prospective bidders or offerors and may provide such information through an electronic medium available to the general public at least five (5) days before the contract is to be let. Other methods of advertisement, however, may be adopted by the division when such other methods are deemed more advantageous for the supplies to be purchased. The requirement for advertising may be waived, if not feasible, due to the supplies being available at a discount for only a limited period of time.
Page:9
Item Specifications Solicitation has been designated as having no line items.
Page:10
File details come from the government source that posted it. Updated .